Wapello Solar LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 82471-82472 [2020-27937]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 85, No. 244 / Friday, December 18, 2020 / Notices
l. Deadline for filing additional study
requests and requests for cooperating
agency status: January 30, 2021.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–3309–021.
m. The application is not ready for
environmental analysis at this time.
n. Marlow Hydro electronically filed
the final license application cover letter
and exhibit G drawings with the
Commission on November 30, 2020 at
6:39 p.m. and the license application on
December 1, 2020 at 10:03 a.m. Pursuant
to 18 CFR 385.2001(a)(2), any document
received after 5:00 p.m. eastern time is
considered filed on the next regular
business day. By this notice, the
requirement under 18 CFR 16.20(c) to
file the subsequent license application
at least 24 months before the expiration
of the current license (i.e., no later than
November 30, 2020 at 5:00 p.m.) is
waived.
o. Project Description: The existing
Nash Mill Dam Project utilizes water
from the 2-acre impoundment and
consists of: (1) A 249-foot-long dam
consisting of: (i) A 57-foot-long, 9 foothigh concrete gravity spillway topped
with 3-foot-high wooden flashboards,
(ii) a 12-foot-long concrete intake
section, and (iii) two, 12-foot-high
earthen dam sections totaling 180 feet in
length; (2) an intake structure with a 10foot-high, 10-foot-wide trash rack; (3) a
1,500 foot-long, 48-inch diameter steel
penstock; (4) a 31-foot-long, 18-footwide powerhouse located on the north
side of the Ashuelot River that contains
two vertical-shaft, fixed propeller
turbine-generator units and one
horizontal-shaft turbine-generator unit
for a total installed capacity of 225
kilowatts; (5) a 600-foot-long tailrace; (6)
a 1,800-foot-long bypassed reach; (7) a
1,400 foot-long transmission line and a
12.5-kilovolt transformer; and (8)
VerDate Sep<11>2014
22:22 Dec 17, 2020
Jkt 253001
appurtenant facilities. The average
annual generation was 558,923 kilowatthours for the period from 2009 to 2018.
Marlow Hydro currently operates the
project in run-of-river mode and
releases a minimum flow of 5 cubic feet
per second (cfs) into the bypassed reach.
Marlow Hydro proposes to continue
to operate in run-of-river mode and to
increase the minimum flow released
into the bypassed reach to 12 cfs.
p. In addition to publishing the full
text of this notice in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
notice, as well as other documents in
the proceeding (e.g., license application)
via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document (P–3309).
At this time, the Commission has
suspended access to the Commission’s
Public Reference Room due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19) issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or (202) 502–
8659 (TTY).
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
q. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary schedule. Revisions to the
schedule will be made as appropriate.
Issue Deficiency Letter (if necessary)
February 2021
Request Additional Information
February 2021
Issue Notice of Acceptance May 2021
Issue Scoping Document 1 for
comments June 2021
Request Additional Information (if
necessary) September 2021
Issue Scoping Document 2 September
2021
Issue Notice of Ready for Environmental
Analysis September 2021
r. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
82471
Dated: December 14, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–27930 Filed 12–17–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER21–639–000]
Wapello Solar LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced Wapello Solar LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is January 4,
2021.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
E:\FR\FM\18DEN1.SGM
18DEN1
82472
Federal Register / Vol. 85, No. 244 / Friday, December 18, 2020 / Notices
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the eLibrary link. Enter
the docket number excluding the last
three digits in the docket number field
to access the document. At this time, the
Commission has suspended access to
the Commission’s Public Reference
Room, due to the proclamation
declaring a National Emergency
concerning the Novel Coronavirus
Disease (COVID–19), issued by the
President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: December 14, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–27937 Filed 12–17–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER21–627–000]
khammond on DSKJM1Z7X2PROD with NOTICES
Dry Lake Solar Holdings LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Dry
Lake Solar Holdings LLC’s application
for market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is January 4,
2021.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
VerDate Sep<11>2014
22:22 Dec 17, 2020
Jkt 253001
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the eLibrary link. Enter
the docket number excluding the last
three digits in the docket number field
to access the document. At this time, the
Commission has suspended access to
the Commission’s Public Reference
Room, due to the proclamation
declaring a National Emergency
concerning the Novel Coronavirus
Disease (COVID–19), issued by the
President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: December 14, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–27938 Filed 12–17–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. NJ21–6–000]
City of Riverside, California; Notice of
Petition for Declaratory Order
Take notice that on December 10,
2020, pursuant to Rules 205 and 207 of
the Commission’s Rules of Practice and
Procedure, 18 CFR 385.205, 385.207,
and consistent with the provisions of
the Transmission Owner (TO) Tariff, the
City of Riverside, California (Riverside),
submitted a petition for a declaratory
order by the Commission (1) accepting
Riverside’s annual revision to its
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
Transmission Revenue Balancing
Account Adjustment (TRBAA); (2)
approving Riverside’s annual update to
the costs of its Existing Transmission
Contracts (ETCs) with Southern
California Edison Company (SCE) for
purposes of recovery of such costs
through the ETC Passthrough Clause
contained in Riverside’s TO Tariff; (3)
accepting revisions to Appendix I to
Riverside’s TO Tariff to reflect
Riverside’s revised TRBAA, ETC costs,
and updated Base and High Voltage
Transmission Revenue Requirements
(TRRs); (4) to the extent necessary,
waiving the sixty-day notice
requirement provided for in the
Commission’s regulations at 18
CFR35.3(a); (5) waiving the filing fee
associated with this Petition that is
provided for by Rule 207 of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.207; and (6)
granting any other relief or waivers
necessary or appropriate for approval
and implementation of the revisions to
Riverside’s Base TRR (including the
updated ETC cost components),
TRBAA, High Voltage TRR, and
modifications to Riverside’s TO Tariff
effective as of January 1, 2021, as more
fully explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically may
mail similar pleadings to the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
E:\FR\FM\18DEN1.SGM
18DEN1
Agencies
[Federal Register Volume 85, Number 244 (Friday, December 18, 2020)]
[Notices]
[Pages 82471-82472]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-27937]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER21-639-000]
Wapello Solar LLC; Supplemental Notice That Initial Market-Based
Rate Filing Includes Request for Blanket Section 204 Authorization
This is a supplemental notice in the above-referenced Wapello Solar
LLC's application for market-based rate authority, with an accompanying
rate tariff, noting that such application includes a request for
blanket authorization, under 18 CFR part 34, of future issuances of
securities and assumptions of liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is January 4, 2021.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically may mail similar pleadings to
the Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. Hand delivered submissions in docketed
proceedings should be delivered to Health and Human Services, 12225
Wilkins Avenue, Rockville, Maryland 20852.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all
[[Page 82472]]
interested persons an opportunity to view and/or print the contents of
this document via the internet through the Commission's Home Page
(https://ferc.gov) using the eLibrary link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. At this time, the Commission has suspended access to the
Commission's Public Reference Room, due to the proclamation declaring a
National Emergency concerning the Novel Coronavirus Disease (COVID-19),
issued by the President on March 13, 2020. For assistance, contact the
Federal Energy Regulatory Commission at [email protected] or
call toll-free, (886) 208-3676 or TYY, (202) 502-8659.
Dated: December 14, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-27937 Filed 12-17-20; 8:45 am]
BILLING CODE 6717-01-P