Walden Hydro, LLC; Notice Soliciting Scoping Comments, 81921-81922 [2020-27799]
Download as PDF
Federal Register / Vol. 85, No. 243 / Thursday, December 17, 2020 / Notices
limitation should be waived. Motions to
intervene are more fully described at
https://www.ferc.gov/ferc-online/ferconline/how-guides.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
Dated: December 11, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–27798 Filed 12–16–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP21–302–000.
Applicants: Northern Border Pipeline
Company.
Description: § 4(d) Rate Filing: NBPL
Sequent NRA to be effective 11/1/2020.
Filed Date: 12/7/20.
Accession Number: 20201207–5111.
Comments Due: 5 p.m. ET 12/21/20.
Docket Numbers: RP21–304–000.
Applicants: Transwestern Pipeline
Company, LLC.
Description: § 4(d) Rate Filing: Revise
Contracting Procedures to be effective
1/9/2021.
Filed Date: 12/9/20.
Accession Number: 20201209–5026.
Comments Due: 5 p.m. ET 12/21/20.
Docket Numbers: RP21–305–000.
Applicants: Bear Creek Storage
Company, L.L.C.
Description: Compliance filing
Annual Fuel Summary 2020 to be
effective N/A.
Filed Date: 12/10/20.
Accession Number: 20201210–5015.
VerDate Sep<11>2014
18:52 Dec 16, 2020
Jkt 253001
Comments Due: 5 p.m. ET 12/22/20.
Docket Numbers: RP21–306–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 121020
Negotiated Rates—Mercuria Energy
America, LLC R–7540–02 to be effective
1/1/2021.
Filed Date: 12/10/20.
Accession Number: 20201210–5040.
Comments Due: 5 p.m. ET 12/22/20.
Docket Numbers: RP21–307–000.
Applicants: Equitrans, L.P.
Description: § 4(d) Rate Filing:
Standards of Conduct Update to be
effective 1/10/2021.
Filed Date: 12/10/20.
Accession Number: 20201210–5114.
Comments Due: 5 p.m. ET 12/22/20.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 11, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–27795 Filed 12–16–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 4428–011]
Walden Hydro, LLC; Notice Soliciting
Scoping Comments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: P–4428–011.
c. Date filed: May 29, 2020.
d. Applicant: Walden Hydro, LLC.
e. Name of Project: Walden
Hydroelectric Project.
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
81921
f. Location: On the Wallkill River, in
the Village of Walden, Orange County,
New York. The project does not occupy
any federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Ms. Elise
Anderson, Senior Environmental
Permitting Specialist, Walden Hydro,
LLC, Enel Green Power North America,
Inc., 100 Brickstone Square, Suite 300,
Andover, MA 01810; Phone at (978)
447–4408 or email at Elise.Anderson@
enel.com.
i. FERC Contact: Samantha Pollak at
(202) 502–6419, or samantha.pollak@
ferc.gov.
j. Deadline for filing scoping
comments: January 11, 2021.
The Commission strongly encourages
electronic filing. Please file scoping
comments using the Commission’s
eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–4428–011.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application is not ready for
environmental analysis at this time.
l. The Walden Project consists of: (1)
A 417-foot-long (consisting of 165-footlong east-west and 252-foot-long northsouth portions), V-shaped concrete dam
topped with 2-foot-high flashboards; (2)
an impoundment with a surface area of
69 acres at the normal pool elevation of
E:\FR\FM\17DEN1.SGM
17DEN1
81922
Federal Register / Vol. 85, No. 243 / Thursday, December 17, 2020 / Notices
321.3 feet National Geodetic Vertical
Datum of 1929 (NGVD29); (3) an intake
structure consisting of a 252-foot-long,
56-foot-wide, 18-foot-deep canal
forebay; (4) a 6-foot-wide sluice gate for
a minimum flow of 31 cfs; (5) four 40foot-long steel penstocks; (6) a 60-footlong, 45-foot-wide, 29-foot-high
powerhouse containing three horizontal
double-runner Francis turbine units
with actual ratings of 740 kilowatts
(kW), 540 kW, and 360 kW,
respectively, for a total capacity of 1,640
kW; 1 (7) a 30-foot-long, 37-foot-wide
tailrace; (8) a 230-foot-long bypassed
reach; (9) a 115-foot-long transmission
line from the project generators to a
New York State Electric and Gas
Corporation’s 4.16-kilovolt (kV)
distribution line; (10) a substation with
a single-phase 13.2-kV transformer; and
(11) appurtenant facilities.
m. In addition to publishing the full
text of this notice in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
notice, as well as other documents in
the proceeding (e.g., scoping document)
via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document (P–4428).
At this time, the Commission has
suspended access to the Commission’s
Public Reference Room due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19) issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3673 or (202) 502–
8659 (TTY).
n. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. Scoping Process.
The Commission staff intends to
prepare an Environmental Assessment
(EA) or Environmental Impact
Statement (EIS) for the Walden
Hydroelectric Project in accordance
with the National Environmental Policy
Act (NEPA). The NEPA document will
consider impacts and reasonable
alternatives to the proposed action.
1 In an October 14, 2020 filing, Walden Hydro
stated that although the total rated capacity of the
project as stated in the license application is 2,110
kW (980 kW, 630 kW, and 500 kW), the maximum
achievable output from each turbine/generator unit
is lower than the stated capacities.
VerDate Sep<11>2014
18:52 Dec 16, 2020
Jkt 253001
Commission staff does not propose to
conduct any on-site scoping meetings at
this time. Instead, we are soliciting
comments, recommendations, and
information, on the Scoping Document
(SD) issued on December 11, 2020.
Copies of the SD outlining the subject
areas to be addressed in the NEPA
document were distributed to the
parties on the Commission’s mailing list
and the applicant’s distribution list.
Copies of the SD may be viewed on the
web at https://www.ferc.gov using the
eLibrary link. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. For assistance, call 1–866–
208–3676 or for TTY, (202) 502–8659.
Dated: December 11, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–27799 Filed 12–16–20; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2017–0440; FRL–10016–61–
OMS]
Agency Information Collection
Activities; Renewal Request Submitted
to OMB for Review and Approval;
Comment Request; Plant Incorporated
Protectants; CBI Substantiation and
Adverse Effects Reporting (Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA) has submitted an
information collection request (ICR),
Plant Incorporated Protectants; CBI
Substantiation and Adverse Effects
Reporting (EPA ICR Number 1693.10,
OMB Control Number 2070–0142) to the
Office of Management and Budget
(OMB) for review and approval in
accordance with the Paperwork
Reduction Act. This is a proposed
extension of the ICR, which is currently
approved through February 28, 2021.
Public comments were previously
requested via the Federal Register on
August 17, 2020 during a 60-day
comment period. This notice allows for
an additional 30 days for public
comments. A fuller description of the
ICR is given below, including its
estimated burden and cost to the public.
An agency may not conduct or sponsor
and a person is not required to respond
to a collection of information unless it
displays a currently valid OMB control
number.
SUMMARY:
PO 00000
Frm 00054
Fmt 4703
Sfmt 4703
Additional comments may be
submitted on or before January 19, 2021.
ADDRESSES: Submit your comments to
EPA, referencing Docket ID No. EPA–
HQ–OPP–2017–0440, online using
www.regulations.gov. EPA’s policy is
that all comments received will be
included in the public docket without
change including any personal
information provided, unless the
comment includes profanity, threats,
information claimed to be Confidential
Business Information (CBI), or other
information whose disclosure is
restricted by statute.
Submit written comments and
recommendations to OMB for the
proposed information collection within
30 days of publication of this notice to
www.reginfo.gov/public/do/PRAMain.
Find this particular information
collection by selecting ‘‘Currently under
30-day Review—Open for Public
Comments’’ or by using the search
function.
FOR FURTHER INFORMATION CONTACT:
Carolyn Siu, Mission Support Division
(7101M), Office of Program Support,
Environmental Protection Agency, 1200
Pennsylvania Ave. NW, Washington, DC
20460–0001; telephone number: (703)
347–0159; email address: siu.carolyn@
epa.gov.
SUPPLEMENTARY INFORMATION:
Supporting documents, which explain
in detail the information that the EPA
will be collecting, are available in the
public docket for this ICR. The docket
can be viewed online at
www.regulations.gov or in person at the
EPA Docket Center, WJC West, Room
3334, 1301 Constitution Ave. NW,
Washington, DC. The telephone number
for the Docket Center is 202–566–1744.
For additional information about EPA’s
public docket, visit https://www.epa.gov/
dockets.
Abstract: EPA is responsible for the
regulation of pesticides as authorized by
Federal Insecticide, Fungicide, and
Rodenticide Act (FIFRA). Prior to EPA
granting a registration, the manufacturer
of the pesticide must demonstrate to the
Agency that the use of the pesticide
product will not result in any
unreasonable adverse effects to humans
or the environment. EPA is also
responsible under the Federal Food,
Drug, and Cosmetic Act (FFDCA) for
establishing a tolerance or exemption
from the requirement of a tolerance for
pesticide residues on food or feed.
Form Numbers: None.
Respondents/Affected entities:
Pesticides and other agricultural
chemical manufacturing, research and
development in the physical,
engineering, and life sciences, biological
DATES:
E:\FR\FM\17DEN1.SGM
17DEN1
Agencies
[Federal Register Volume 85, Number 243 (Thursday, December 17, 2020)]
[Notices]
[Pages 81921-81922]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-27799]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 4428-011]
Walden Hydro, LLC; Notice Soliciting Scoping Comments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: P-4428-011.
c. Date filed: May 29, 2020.
d. Applicant: Walden Hydro, LLC.
e. Name of Project: Walden Hydroelectric Project.
f. Location: On the Wallkill River, in the Village of Walden,
Orange County, New York. The project does not occupy any federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Ms. Elise Anderson, Senior Environmental
Permitting Specialist, Walden Hydro, LLC, Enel Green Power North
America, Inc., 100 Brickstone Square, Suite 300, Andover, MA 01810;
Phone at (978) 447-4408 or email at [email protected].
i. FERC Contact: Samantha Pollak at (202) 502-6419, or
[email protected].
j. Deadline for filing scoping comments: January 11, 2021.
The Commission strongly encourages electronic filing. Please file
scoping comments using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://ferconline.ferc.gov/QuickComment.aspx. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426. Submissions sent via any other
carrier must be addressed to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland
20852. The first page of any filing should include docket number P-
4428-011.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application is not ready for environmental analysis at this
time.
l. The Walden Project consists of: (1) A 417-foot-long (consisting
of 165-foot-long east-west and 252-foot-long north-south portions), V-
shaped concrete dam topped with 2-foot-high flashboards; (2) an
impoundment with a surface area of 69 acres at the normal pool
elevation of
[[Page 81922]]
321.3 feet National Geodetic Vertical Datum of 1929 (NGVD29); (3) an
intake structure consisting of a 252-foot-long, 56-foot-wide, 18-foot-
deep canal forebay; (4) a 6-foot-wide sluice gate for a minimum flow of
31 cfs; (5) four 40-foot-long steel penstocks; (6) a 60-foot-long, 45-
foot-wide, 29-foot-high powerhouse containing three horizontal double-
runner Francis turbine units with actual ratings of 740 kilowatts (kW),
540 kW, and 360 kW, respectively, for a total capacity of 1,640 kW; \1\
(7) a 30-foot-long, 37-foot-wide tailrace; (8) a 230-foot-long bypassed
reach; (9) a 115-foot-long transmission line from the project
generators to a New York State Electric and Gas Corporation's 4.16-
kilovolt (kV) distribution line; (10) a substation with a single-phase
13.2-kV transformer; and (11) appurtenant facilities.
---------------------------------------------------------------------------
\1\ In an October 14, 2020 filing, Walden Hydro stated that
although the total rated capacity of the project as stated in the
license application is 2,110 kW (980 kW, 630 kW, and 500 kW), the
maximum achievable output from each turbine/generator unit is lower
than the stated capacities.
---------------------------------------------------------------------------
m. In addition to publishing the full text of this notice in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this notice, as well
as other documents in the proceeding (e.g., scoping document) via the
internet through the Commission's Home Page (https://www.ferc.gov) using
the eLibrary link. Enter the docket number excluding the last three
digits in the docket number field to access the document (P-4428). At
this time, the Commission has suspended access to the Commission's
Public Reference Room due to the proclamation declaring a National
Emergency concerning the Novel Coronavirus Disease (COVID-19) issued by
the President on March 13, 2020. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3673 or (202)
502-8659 (TTY).
n. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
o. Scoping Process.
The Commission staff intends to prepare an Environmental Assessment
(EA) or Environmental Impact Statement (EIS) for the Walden
Hydroelectric Project in accordance with the National Environmental
Policy Act (NEPA). The NEPA document will consider impacts and
reasonable alternatives to the proposed action.
Commission staff does not propose to conduct any on-site scoping
meetings at this time. Instead, we are soliciting comments,
recommendations, and information, on the Scoping Document (SD) issued
on December 11, 2020.
Copies of the SD outlining the subject areas to be addressed in the
NEPA document were distributed to the parties on the Commission's
mailing list and the applicant's distribution list. Copies of the SD
may be viewed on the web at https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, call 1-866-
208-3676 or for TTY, (202) 502-8659.
Dated: December 11, 2020.
Kimberly D. Bose,
Secretary.