Sunshine Act Meeting Notice, 81193-81195 [2020-27656]
Download as PDF
Federal Register / Vol. 85, No. 241 / Tuesday, December 15, 2020 / Notices
Comments are invited on whether or
not: (a) The proposed collection of
information is necessary for the proper
performance of agency functions,
including whether the information will
have a practical utility; (b) EIA’s
estimate of the burden of the proposed
collection of information, including the
validity of the methodology and
assumptions used, is accurate; (c) EIA
can improve the quality, utility, and
clarity of the information it will collect;
and (d) EIA can minimize the burden of
the collection of information on
respondents, such as automated
collection techniques or other forms of
information technology.
Statutory Authority: 15 U.S.C. 772(b) and
42 U.S.C. 7101 et seq.
Signed in Washington, DC, on December 9,
2020.
Samson A. Adeshiyan,
Director, Office of Statistical Methods &
Research, U.S. Energy Information
Administration.
[FR Doc. 2020–27519 Filed 12–14–20; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP21–6–000]
Spire Storage West, LLC; Notice of
Schedule for the Preparation of an
Environmental Assessment for the
Clear Creek Expansion Project
17:35 Dec 14, 2020
Jkt 253001
Schedule for Environmental Review
Issuance of EA May 13, 2021
90-day Federal Authorization Decision
Deadline August 11, 2021
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
The Clear Creek Expansion Project
would consist of the following facilities
in Uinta County, Wyoming:
• Four compressor units at the Clear
Creek Plant;
• a tank storage and natural gas
liquids fueling equipment facility on an
existing pad;
• 11 new injection/withdrawal wells,
one new water disposal well, and
associated lines;
• approximately 10.6 miles of 20inch-diameter pipeline;
• approximately 3.5 miles of 4,160volt powerline; and
• other related appurtenances.
Background
On October 9, 2020, Spire Storage
West, LLC (Spire Storage) filed an
application in Docket No. CP21–6–000
requesting a Certificate of Public
Convenience and Necessity pursuant to
Section 7(c) of the Natural Gas Act to
construct and operate certain natural gas
pipeline facilities. The proposed project
is known as the Clear Creek Expansion
Project (Project), and would expand
Spire Storage’s natural gas storage
facilities in Uinta County, Wyoming in
order to increase the certificated gas
capacities from 4.0 billion cubic feet
(Bcf) to 20 Bcf, and increase the
maximum daily injection and
withdrawal capacities from 35 million
cubic feet (MMcf) and 50 MMcf per day,
to 350 MMcf and 500 MMcf per day,
respectively.
On October 22, 2020, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
VerDate Sep<11>2014
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s environmental
document for the Project.
This notice identifies Commission
staff’s intention to prepare an
environmental assessment (EA) for the
Project and the planned schedule for the
completion of the environmental
review.1
81193
formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
service provides automatic notification
of filings made to subscribed dockets,
document summaries, and direct links
to the documents. Go to https://
www.ferc.gov/ferc-online/overview to
register for eSubscription.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP21–6), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: December 9, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–27531 Filed 12–14–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
On November 9, 2020, the
Sunshine Act Meeting Notice
Commission issued a Notice of Scoping
Period Requesting Comments on
The following notice of meeting is
Environmental Issues for the Proposed
published pursuant to section 3(a) of the
Clear Creek Expansion Project (Notice of government in the Sunshine Act (Pub.
Scoping). The Notice of Scoping was
L. 94–409), 5 U.S.C. 552b:
sent to affected landowners; federal,
AGENCY HOLDING MEETING: Federal
state, and local government agencies;
Energy Regulatory Commission.
elected officials; environmental and
TIME AND DATE: December 17, 2020,
public interest groups; Native American
10:00 a.m.
tribes; other interested parties; and local
the public via audio
libraries and newspapers. In response to PLACE: Open to
1
Webcast
only.
the Notice of Scoping, the Commission
STATUS: OPEN.
received comments from the Wyoming
MATTERS TO BE CONSIDERED: Agenda,
Department of Environmental Quality.
* NOTE—Items listed on the agenda
The primary issues raised by the
may be deleted without further notice.
commenter are permitting, stream
crossings, wetland impacts, and spill
CONTACT PERSON FOR MORE INFORMATION:
reporting. All substantive comments
Kimberly D. Bose, Secretary, Telephone
will be addressed in the EA.
(202) 502–8400.
The U.S. Bureau of Land Management
For a recorded message listing items
is a cooperating agency in the
struck from or added to the meeting, call
preparation of the EA.
(202) 502–8627.
This is a list of matters to be
Additional Information
considered by the Commission. It does
In order to receive notification of the
not include a listing of all documents
issuance of the EA and to keep track of
1 40
PO 00000
1 Join FERC online to listen live at https://
ferc.capitolconnection.org/.
CFR 1501.10 (2020).
Frm 00018
Fmt 4703
Sfmt 4703
E:\FR\FM\15DEN1.SGM
15DEN1
81194
Federal Register / Vol. 85, No. 241 / Tuesday, December 15, 2020 / Notices
relevant to the items on the agenda. All
public documents, however, may be
viewed on line at the Commission’s
website at https://
ferc.capitolconnection.org/ using the
eLibrary link.
1073rd MEETING—OPEN MEETING
[December 17, 2020 10:00 a.m.]
Item No.
Docket No.
Company
Administrative
A–1 .........
A–2 .........
A–3 .........
AD21–1–000 ..........................................
AD21–2–000 ..........................................
AD21–3–000 ..........................................
Agency Administrative Matters.
Customer Matters, Reliability, Security and Market Operations.
Inquiry into California Heat Storm, August 2020.
Electric
E–1 .........
E–2 .........
E–3 .........
E–4 .........
E–5 .........
E–6 .........
E–7 .........
E–8 .........
E–9 .........
E–10 .......
E–11 .......
E–12 .......
E–13 .......
E–14 .......
E–15 .......
E–16 .......
E–17 .......
E–18 .......
E–19 .......
E–20 .......
OMITTED.
RM21–3–000 ..........................................
EL21–19–000 .........................................
ER20–2046–001 ....................................
ER20–2308–000 ....................................
RM20–8–000 ..........................................
OMITTED.
RM21–2–000, RM20–20–000 ................
ER21–155–000 ......................................
ER21–161–000 ......................................
ER20–2590–000 ....................................
EF20–7–000 ...........................................
ER20–687–001 ......................................
OMITTED.
ER19–2722–000,
ER19–2722–001,
ER19–2722–002.
EC20–94–000 ........................................
OMITTED.
EL20–18–000, QF20–184–001, QF20–
185–001, QF20–186–001, QF20–
187–001, QF20–188–001, QF20–
189–001, QF20–190–001, QF20–
191–001, QF20–192–001, QF20–
193–001, QF20–194–001, QF20–
195–001, QF20–196–001, QF20–
197–001, QF20–198–001, QF20–
199–001, QF20–200–001.
EL20–64–000 .........................................
EL20–15–001 .........................................
Cybersecurity Incentives.
California Independent System Operator Corporation.
PJM Interconnection, L.L.C.; American Transmission Systems Inc.
PJM Interconnection, L.L.C.
Virtualization and Cloud Computing Services.
Fuel Cell Thermal Energy Output; Bloom Energy Corporation.
Southern California Edison Company.
Midcontinent Independent System Operator, Inc. and MidAmerican Energy Company.
Basin Electric Power Cooperative.
Western Area Power Administration.
Tri–State Generation and Transmission Association, Inc.
PJM Interconnection, L.L.C.
IIF US Holding LP and IIF US Holding 2 LP.
Curry Solar Farm, LLC.
IIF US Holding 2 GP, LLC.
North Carolina Eastern Municipal Power Agency.
Gas
G–1 .........
G–2 .........
RM20–14–000 ........................................
PL20–3–000 ...........................................
G–3
G–4
G–5
G–6
RM20–7–000 ..........................................
RP17–811–002, RP18–271–000 ...........
OMITTED.
RP19–1634–002,
RP20–788–000,
RP13–1116–000, RP19–54–000.
FA15–16–000 .........................................
IS20–171–001, IS20–169–001, IS20–
166–001.
IN13–15–000, IN13–15–001, IN13–15–
002.
PL21–1–000 ...........................................
.........
.........
.........
.........
G–7 .........
G–8 .........
G–9 .........
G–10 .......
Five–Year Review of the Oil Pipeline Index.
Actions Regarding the Commission’s Policy on Price Index, Formation and Transparency,
and Indices Referenced in Natural Gas and Electric Tariffs.
Safe Harbor Policy for Data Providers to Price Index Developers.
Peregrine Oil & Gas II, LLC v. Texas Eastern Transmission, LP.
Kinetica Deepwater Express, LLC; Kinetica Energy Express, LLC.
Dominion Energy Transmission, Inc.
BP Pipelines (Alaska) Inc.; ConocoPhillips Transportation Alaska, Inc.; ExxonMobil Pipeline Company.
BP America Inc.; BP Corporation North America Inc.; BP America Production Company,
BP Energy Company.
Oil Pipeline Affiliate Contracts.
Hydro
H–1 .........
P–2197–135 ...........................................
Cube Yadkin Generation LLC.
Certificates
C–1
C–2
C–3
C–4
C–5
C–6
C–7
.........
.........
.........
.........
.........
.........
.........
VerDate Sep<11>2014
CP20–471–000 ......................................
CP16–10–000 ........................................
CP19–118–000 ......................................
OMITTED.
OMITTED.
OMITTED.
CP16–9–011 ..........................................
17:35 Dec 14, 2020
Jkt 253001
PO 00000
Texas Eastern Transmission, LP.
Mountain Valley Pipeline LLC.
Trans–Foreland Pipeline Company LLC.
Algonquin Gas Transmission, LLC and Maritimes & Northeast Pipeline, LLC.
Frm 00019
Fmt 4703
Sfmt 4703
E:\FR\FM\15DEN1.SGM
15DEN1
Federal Register / Vol. 85, No. 241 / Tuesday, December 15, 2020 / Notices
81195
1073rd MEETING—OPEN MEETING—Continued
[December 17, 2020 10:00 a.m.]
Item No.
Docket No.
Company
C–8 .........
C–9 .........
C–10 .......
C–11 .......
C–12 .......
C–13 .......
CP17–458–006, CP19–17–002 .............
OMITTED.
OMITTED.
OMITTED.
OMITTED.
CP15–17–005 ........................................
Issued: December 10, 2020.
Kimberly D. Bose,
Secretary.
The public is invited to listen to the
meeting live at https://
ferc.capitolconnection.org/. Anyone
with internet access who desires to hear
this event can do so by navigating to
www.ferc.gov’s Calendar of Events and
locating this event in the Calendar. The
event will contain a link to its audio
webcast. The Capitol Connection
provides technical support for this free
audio webcast. It will also offer access
to this event via phone bridge for a fee.
If you have any questions, visit https://
ferc.capitolconnection.org/ or contact
Shirley Al-Jarani at 703–993–3104.
[FR Doc. 2020–27656 Filed 12–11–20; 11:15 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 5944–024]
Ampersand Moretown Hydro, LLC;
Notice of Application Tendered for
Filing With the Commission and
Soliciting Additional Study Requests
and Establishing Procedural Schedule
for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Minor
License.
b. Project No.: 5944–024.
c. Date Filed: November 30, 2020.
d. Applicant: Ampersand Moretown
Hydro, LLC (AMH).
e. Name of Project: Moretown #8
Hydroelectric Project.
f. Location: The existing project is
located on the Mad River in the the
town of Moretown, Washington County,
Vermont. The project does not affect
federal lands.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
VerDate Sep<11>2014
17:35 Dec 14, 2020
Jkt 253001
Midship Pipeline Company, LLC.
Sabal Trail Transmission, LLC.
h. Applicant Contact: Sayad
Moudachirou, Licensing Manager,
Ampersand Moretown Hydro LLC, 717
Atlantic Avenue, Suite 1A, Boston, MA
02111; Telephone (617) 933–7206.
i. FERC Contact: Maryam Zavareh,
(202) 502–8474 or maryam.zavareh@
ferc.gov.
j. Cooperating Agencies: Federal,
state, local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: January 29, 2021. The
Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY).
m. The application is not ready for
environmental analysis at this time.
n. Project Description: The existing
Moretown Project consists of a 36-acre
impoundment at normal maximum
elevation of 524.7 feet above mean sea
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
level (msl); a 159-foot-long overflow
spillway dam with a crest elevation of
524.7 msl; a concrete intake structure
with a 12.5-foot-wide, 15.1-foot-high
trashrack; a 169-foot-long wingwall
adjacent to spillway; a 39.4-foot-long,
8.5-foot-diameter steel penstock; a 39.4foot-long, 19.7-foot-wide concrete
powerhouse containing a single 1.25megawatt turbine-generator unit; a
tailrace; a 106-foot-long, 12.5-kilovolt
transmission line; and appurtenant
facilities. The project generates an
annual average of 2,094 megawatthours.
AMH proposes to continue to operate
the project in an automated run-of-river
mode. The project operates within a
flow range of 100 cubic feet per second
(cfs) (minimum hydraulic capacity of
the turbine) and 459 cfs (maximum
hydraulic capacity of the turbine).
o. In addition to publishing the full
text of this notice in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
notice, as well as other documents in
the proceeding (e.g., license application)
via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document (P–5944).
A copy of the application is typically
available to be viewed at the
Commission in the Public Reference
Room. At this time, the Commission has
suspended access to the Commission’s
Public Reference Room due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19) issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or (202) 502–
8659 (TTY).
You may also register online at
https://ferconline.ferc.gov/
FERCOnline.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
E:\FR\FM\15DEN1.SGM
15DEN1
Agencies
[Federal Register Volume 85, Number 241 (Tuesday, December 15, 2020)]
[Notices]
[Pages 81193-81195]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-27656]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Sunshine Act Meeting Notice
The following notice of meeting is published pursuant to section
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C.
552b:
Agency Holding Meeting: Federal Energy Regulatory Commission.
TIME AND DATE: December 17, 2020, 10:00 a.m.
PLACE: Open to the public via audio Webcast only.\1\
---------------------------------------------------------------------------
\1\ Join FERC online to listen live at https://ferc.capitolconnection.org/.
---------------------------------------------------------------------------
STATUS: OPEN.
MATTERS TO BE CONSIDERED: Agenda, * NOTE--Items listed on the agenda
may be deleted without further notice.
CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary,
Telephone (202) 502-8400.
For a recorded message listing items struck from or added to the
meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It
does not include a listing of all documents
[[Page 81194]]
relevant to the items on the agenda. All public documents, however, may
be viewed on line at the Commission's website at https://ferc.capitolconnection.org/ using the eLibrary link.
1073rd Meeting--Open Meeting
[December 17, 2020 10:00 a.m.]
----------------------------------------------------------------------------------------------------------------
Item No. Docket No. Company
----------------------------------------------------------------------------------------------------------------
Administrative
----------------------------------------------------------------------------------------------------------------
A-1................... AD21-1-000............................................... Agency Administrative
Matters.
A-2................... AD21-2-000............................................... Customer Matters,
Reliability, Security and
Market Operations.
A-3................... AD21-3-000............................................... Inquiry into California Heat
Storm, August 2020.
----------------------------------------------------------------------------------------------------------------
Electric
----------------------------------------------------------------------------------------------------------------
E-1................... OMITTED..................................................
E-2................... RM21-3-000............................................... Cybersecurity Incentives.
E-3................... EL21-19-000.............................................. California Independent System
Operator Corporation.
E-4................... ER20-2046-001............................................ PJM Interconnection, L.L.C.;
American Transmission
Systems Inc.
E-5................... ER20-2308-000............................................ PJM Interconnection, L.L.C.
E-6................... RM20-8-000............................................... Virtualization and Cloud
Computing Services.
E-7................... OMITTED..................................................
E-8................... RM21-2-000, RM20-20-000.................................. Fuel Cell Thermal Energy
Output; Bloom Energy
Corporation.
E-9................... ER21-155-000............................................. Southern California Edison
Company.
E-10.................. ER21-161-000............................................. Midcontinent Independent
System Operator, Inc. and
MidAmerican Energy Company.
E-11.................. ER20-2590-000............................................ Basin Electric Power
Cooperative.
E-12.................. EF20-7-000............................................... Western Area Power
Administration.
E-13.................. ER20-687-001............................................. Tri-State Generation and
Transmission Association,
Inc.
E-14.................. OMITTED..................................................
E-15.................. ER19-2722-000, ER19-2722-001, ER19-2722-002.............. PJM Interconnection, L.L.C.
E-16.................. EC20-94-000.............................................. IIF US Holding LP and IIF US
Holding 2 LP.
E-17.................. OMITTED..................................................
E-18.................. EL20-18-000, QF20-184-001, QF20-185-001, QF20-186-001, Curry Solar Farm, LLC.
QF20-187-001, QF20-188-001, QF20-189-001, QF20-190-001,
QF20-191-001, QF20-192-001, QF20-193-001, QF20-194-001,
QF20-195-001, QF20-196-001, QF20-197-001, QF20-198-001,
QF20-199-001, QF20-200-001.
E-19.................. EL20-64-000.............................................. IIF US Holding 2 GP, LLC.
E-20.................. EL20-15-001.............................................. North Carolina Eastern
Municipal Power Agency.
----------------------------------------------------------------------------------------------------------------
Gas
----------------------------------------------------------------------------------------------------------------
G-1................... RM20-14-000.............................................. Five-Year Review of the Oil
Pipeline Index.
G-2................... PL20-3-000............................................... Actions Regarding the
Commission's Policy on Price
Index, Formation and
Transparency, and Indices
Referenced in Natural Gas
and Electric Tariffs.
G-3................... RM20-7-000............................................... Safe Harbor Policy for Data
Providers to Price Index
Developers.
G-4................... RP17-811-002, RP18-271-000............................... Peregrine Oil & Gas II, LLC
v. Texas Eastern
Transmission, LP.
G-5................... OMITTED..................................................
G-6................... RP19-1634-002, RP20-788-000, RP13-1116-000, RP19-54-000.. Kinetica Deepwater Express,
LLC; Kinetica Energy
Express, LLC.
G-7................... FA15-16-000.............................................. Dominion Energy Transmission,
Inc.
G-8................... IS20-171-001, IS20-169-001, IS20-166-001................. BP Pipelines (Alaska) Inc.;
ConocoPhillips
Transportation Alaska, Inc.;
ExxonMobil Pipeline Company.
G-9................... IN13-15-000, IN13-15-001, IN13-15-002.................... BP America Inc.; BP
Corporation North America
Inc.; BP America Production
Company, BP Energy Company.
G-10.................. PL21-1-000............................................... Oil Pipeline Affiliate
Contracts.
----------------------------------------------------------------------------------------------------------------
Hydro
----------------------------------------------------------------------------------------------------------------
H-1................... P-2197-135............................................... Cube Yadkin Generation LLC.
----------------------------------------------------------------------------------------------------------------
Certificates
----------------------------------------------------------------------------------------------------------------
C-1................... CP20-471-000............................................. Texas Eastern Transmission,
LP.
C-2................... CP16-10-000.............................................. Mountain Valley Pipeline LLC.
C-3................... CP19-118-000............................................. Trans-Foreland Pipeline
Company LLC.
C-4................... OMITTED..................................................
C-5................... OMITTED..................................................
C-6................... OMITTED..................................................
C-7................... CP16-9-011............................................... Algonquin Gas Transmission,
LLC and Maritimes &
Northeast Pipeline, LLC.
[[Page 81195]]
C-8................... CP17-458-006, CP19-17-002................................ Midship Pipeline Company,
LLC.
C-9................... OMITTED..................................................
C-10.................. OMITTED..................................................
C-11.................. OMITTED..................................................
C-12.................. OMITTED..................................................
C-13.................. CP15-17-005.............................................. Sabal Trail Transmission,
LLC.
----------------------------------------------------------------------------------------------------------------
Issued: December 10, 2020.
Kimberly D. Bose,
Secretary.
The public is invited to listen to the meeting live at https://ferc.capitolconnection.org/. Anyone with internet access who desires to
hear this event can do so by navigating to www.ferc.gov's Calendar of
Events and locating this event in the Calendar. The event will contain
a link to its audio webcast. The Capitol Connection provides technical
support for this free audio webcast. It will also offer access to this
event via phone bridge for a fee. If you have any questions, visit
https://ferc.capitolconnection.org/ or contact Shirley Al-Jarani at 703-
993-3104.
[FR Doc. 2020-27656 Filed 12-11-20; 11:15 am]
BILLING CODE 6717-01-P