Hazardous and Solid Waste Management System: Disposal of CCR; A Holistic Approach to Closure Part B: Alternate Demonstration for Unlined Surface Impoundments; Correction, 80626 [2020-27031]

Download as PDF 80626 * Federal Register / Vol. 85, No. 240 / Monday, December 14, 2020 / Rules and Regulations * * (e) * * * * * (1) * * * Applicable geographic area Name of non-regulatory SIP revision * * Reasonably Available Control Technology (RACT) for the 2008 ozone national ambient air quality standard (NAAQS). * * * * * Statewide .... * [FR Doc. 2020–23857 Filed 12–11–20; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 257 [EPA–HQ–OLEM–2019–0173; FRL–10017– 88–OLEM] RIN 2050–AH11 Hazardous and Solid Waste Management System: Disposal of CCR; A Holistic Approach to Closure Part B: Alternate Demonstration for Unlined Surface Impoundments; Correction Environmental Protection Agency (EPA). ACTION: Final rule; correction. The Environmental Protection Agency (EPA or the Agency) is correcting a typographical error in a final rule published in the Federal Register on November 12, 2020. The EPA finalized regulations under the Resource Conservation and Recovery Act (RCRA) with procedures to allow certain facilities to request approval to operate an existing coal combustion residuals (CCR) surface impoundment with an alternate liner, among other things. DATES: This final rule correction is effective on December 14, 2020. FOR FURTHER INFORMATION CONTACT: Michelle Long, Office of Resource Conservation and Recovery, Materials Recovery and Waste Management Division, Environmental Protection Agency, 1200 Pennsylvania Avenue NW, MC: 5304P, Washington, DC 20460; telephone number: (703) 347–8953; email address: Long.Michelle@epa.gov. For more information on this rulemaking, please visit https:// www.epa.gov/coalash. SUPPLEMENTARY INFORMATION: The EPA finalized procedures to allow certain facilities to request approval to use an jbell on DSKJLSW7X2PROD with RULES VerDate Sep<11>2014 16:47 Dec 11, 2020 Jkt 253001 * 8/13/18 EPA approval date * 12/14/20, [insert Federal Register citation]. alternate liner for CCR surface impoundments (85 FR 72506, November 12, 2020), but after publication the Agency identified a typographical error in one of the amendatory instructions. Specifically, instruction 6 directed that paragraphs (f)(14) through (23) be added to § 257.105. However, an additional paragraph (f)(24) was also set out under § 257.105 that the Agency failed to include in instruction 6. See 85 FR 72543. That is, EPA intended instruction 6 to read ‘‘Amend § 257.105 by adding paragraphs (f)(14) through (24) to read as follows:’’ This document corrects instruction 6 by directing that paragraphs (f)(14) through (24) be added to § 257.105 as intended. Recordkeeping requirements. * * * * * (f) * * * (14) The application and any supplemental materials submitted in support of the application as required by § 257.71(d)(1)(i)(E). (15) The alternative liner demonstration as required by § 257.71(d)(1)(ii)(D). (16) The alternative liner demonstration extension request as required by § 257.71(d)(2)(ii)(D). (17) The documentation prepared for the preliminary demonstration as required by § 257.71(d)(2)(ii)(E). (18) The notification of an incomplete application as required by § 257.71(d)(2)(iii)(B). (19) The decision on the application as required by § 257.71(d)(2)(iii)(F). (20) The final decision on the alternative liner demonstration as required by § 257.71(d)(2)(vii). PO 00000 Frm 00046 * * This action pertains to control technique guideline (CTG) source categories. (21) The alternative source demonstration as required under § 257.71(d)(2)(ix)(A)(4). (22) The final decision on the alternative source demonstration as required under § 257.71(d)(2)(ix)(A)(5). (23) The final decision on the trend analysis as required under § 257.71(d)(2)(ix)(B)(3). (24) The decision that the alternative source demonstration has been withdrawn as required under § 257.71(d)(2)(ix)(C). * * * * * Peter Wright, Assistant Administrator, Office of Land and Emergency Management. BILLING CODE 6560–50–P In FR Doc. 2020–23327, appearing on page 72506 in the Federal Register of Thursday, November 12, 2020, on page 72543, in the first column, correct instruction 6 to read as follows: ■ 6. Amend § 257.105 by adding paragraphs (f)(14) through (24) to read as follows: § 257.105 Additional explanation [FR Doc. 2020–27031 Filed 12–11–20; 8:45 am] Correction AGENCY: SUMMARY: State submittal date Fmt 4700 Sfmt 4700 DEPARTMENT OF HEALTH AND HUMAN SERVICES Office of the Secretary 42 CFR Part 2 [SAMHSA–4162–20] RIN 0930–AA30 Confidentiality of Substance Use Disorder Patient Records Substance Abuse and Mental Health Services Administration (SAMHSA), U.S. Department of Health and Human Services (HHS). ACTION: Final rule. AGENCY: This final rule amends the Substance Abuse and Mental Health Services Administration’s (SAMHSA) regulation governing the Confidentiality of Substance Use Disorder Patient Records, to clarify one of the conditions under which a court may authorize disclosure of confidential communications made by a patient to a part 2 program as defined in this regulation. This change to the regulation is intended to clarify that a court has the authority to permit disclosure of confidential communications when the SUMMARY: E:\FR\FM\14DER1.SGM 14DER1

Agencies

[Federal Register Volume 85, Number 240 (Monday, December 14, 2020)]
[Rules and Regulations]
[Page 80626]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-27031]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 257

[EPA-HQ-OLEM-2019-0173; FRL-10017-88-OLEM]
RIN 2050-AH11


Hazardous and Solid Waste Management System: Disposal of CCR; A 
Holistic Approach to Closure Part B: Alternate Demonstration for 
Unlined Surface Impoundments; Correction

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule; correction.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA or the Agency) is 
correcting a typographical error in a final rule published in the 
Federal Register on November 12, 2020. The EPA finalized regulations 
under the Resource Conservation and Recovery Act (RCRA) with procedures 
to allow certain facilities to request approval to operate an existing 
coal combustion residuals (CCR) surface impoundment with an alternate 
liner, among other things.

DATES: This final rule correction is effective on December 14, 2020.

FOR FURTHER INFORMATION CONTACT: Michelle Long, Office of Resource 
Conservation and Recovery, Materials Recovery and Waste Management 
Division, Environmental Protection Agency, 1200 Pennsylvania Avenue NW, 
MC: 5304P, Washington, DC 20460; telephone number: (703) 347-8953; 
email address: [email protected]. For more information on this 
rulemaking, please visit https://www.epa.gov/coalash.

SUPPLEMENTARY INFORMATION: The EPA finalized procedures to allow 
certain facilities to request approval to use an alternate liner for 
CCR surface impoundments (85 FR 72506, November 12, 2020), but after 
publication the Agency identified a typographical error in one of the 
amendatory instructions. Specifically, instruction 6 directed that 
paragraphs (f)(14) through (23) be added to Sec.  257.105. However, an 
additional paragraph (f)(24) was also set out under Sec.  257.105 that 
the Agency failed to include in instruction 6. See 85 FR 72543. That 
is, EPA intended instruction 6 to read ``Amend Sec.  257.105 by adding 
paragraphs (f)(14) through (24) to read as follows:'' This document 
corrects instruction 6 by directing that paragraphs (f)(14) through 
(24) be added to Sec.  257.105 as intended.

Correction

    In FR Doc. 2020-23327, appearing on page 72506 in the Federal 
Register of Thursday, November 12, 2020, on page 72543, in the first 
column, correct instruction 6 to read as follows:

0
6. Amend Sec.  257.105 by adding paragraphs (f)(14) through (24) to 
read as follows:


Sec.  257.105  Recordkeeping requirements.

* * * * *
    (f) * * *
    (14) The application and any supplemental materials submitted in 
support of the application as required by Sec.  257.71(d)(1)(i)(E).
    (15) The alternative liner demonstration as required by Sec.  
257.71(d)(1)(ii)(D).
    (16) The alternative liner demonstration extension request as 
required by Sec.  257.71(d)(2)(ii)(D).
    (17) The documentation prepared for the preliminary demonstration 
as required by Sec.  257.71(d)(2)(ii)(E).
    (18) The notification of an incomplete application as required by 
Sec.  257.71(d)(2)(iii)(B).
    (19) The decision on the application as required by Sec.  
257.71(d)(2)(iii)(F).
    (20) The final decision on the alternative liner demonstration as 
required by Sec.  257.71(d)(2)(vii).
    (21) The alternative source demonstration as required under Sec.  
257.71(d)(2)(ix)(A)(4).
    (22) The final decision on the alternative source demonstration as 
required under Sec.  257.71(d)(2)(ix)(A)(5).
    (23) The final decision on the trend analysis as required under 
Sec.  257.71(d)(2)(ix)(B)(3).
    (24) The decision that the alternative source demonstration has 
been withdrawn as required under Sec.  257.71(d)(2)(ix)(C).
* * * * *

Peter Wright,
Assistant Administrator, Office of Land and Emergency Management.
[FR Doc. 2020-27031 Filed 12-11-20; 8:45 am]
BILLING CODE 6560-50-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.