k. Description of Request: The
exemptee requests to amend its
exemption by replacing the two
authorized, non-operational units (total
capacity of 300 kilowatt) with a single
unit of the same capacity. The exemptee
also proposes to replace and upgrade
powerhouse equipment and
infrastructure, repair the existing dam
and fish ladder, and add a new intake
structure with movable fish screens and
bypass channel for downstream fish
passage. The proposal will not change
the nameplate capacity or discharge at
the project. The exemptee has consulted
with the resource agencies on the
proposed amendment. The work would
require a drawdown of the reservoir and
would begin in July 2021.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must: (1) Bear in all capital
letters the title COMMENTS, PROTEST,
or MOTION TO INTERVENE as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
VerDate Sep<11>2014
16:16 Dec 08, 2020
Jkt 253001
number of the person commenting,
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, motions to intervene, or
protests must set forth their evidentiary
basis. Any filing made by an intervenor
must be accompanied by proof of
service on all persons listed in the
service list prepared by the Commission
in this proceeding, in accordance with
18 CFR 385.2010.
Dated: December 3, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–27035 Filed 12–8–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP20–1111–002.
Applicants: Transcontinental Gas
Pipe Line Company.
Description: Compliance filing GT&C
Section 49—Bid Evaluation—
Compliance Filing to be effective 1/2/
2021.
Filed Date: 12/2/20.
Accession Number: 20201202–5097.
Comments Due: 5 p.m. ET 12/14/20.
Docket Numbers: RP21–241–001.
Applicants: Southern Star Central Gas
Pipeline, Inc.
Description: Compliance filing
Annual Cash-Out Activity Report
2020—Correction to be effective N/A.
Filed Date: 12/2/20.
Accession Number: 20201202–5129.
Comments Due: 5 p.m. ET 12/14/20.
Docket Numbers: RP21–287–000.
Applicants: Southern Natural Gas
Company, L.L.C.
Description: Compliance filing
Abandon Tenneco X-Rate Schedules
Compliance Filing to be effective 2/1/
2021.
Filed Date: 12/2/20.
Accession Number: 20201202–5013.
Comments Due: 5 p.m. ET 12/14/20.
Docket Numbers: RP21–288–000.
Applicants: Rover Pipeline LLC.
Description: § 4(d) Rate Filing:
Summary of Negotiated Rate Capacity
Release Agreements on 12–2–20 to be
effective 12/1/2020.
Filed Date: 12/2/20.
Accession Number: 20201202–5044.
Comments Due: 5 p.m. ET 12/14/20.
Docket Numbers: RP21–289–000.
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
79177
Applicants: Northwest Pipeline LLC.
Description: § 4(d) Rate Filing: Non
Conforming Service Agreements—XTO,
Citadel, Cascade to be effective 1/2/
2021.
Filed Date: 12/2/20.
Accession Number: 20201202–5073.
Comments Due: 5 p.m. ET 12/14/20.
Docket Numbers: RP21–290–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate—Yankee Gas 510802 eff
12–3–2020 to be effective 12/3/2020.
Filed Date: 12/2/20.
Accession Number: 20201202–5100.
Comments Due: 5 p.m. ET 12/14/20.
Docket Numbers: RP21–291–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 120220
Negotiated Rates—Castleton
Commodities Merchant Trading R–
4010–28 to be effective 12/3/2020.
Filed Date: 12/2/20.
Accession Number: 20201202–5111.
Comments Due: 5 p.m. ET 12/14/20.
Docket Numbers: RP21–292–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 120220
Negotiated Rates—Castleton
Commodities Merchant Trading R–
4010–27 to be effective 12/3/2020.
Filed Date: 12/2/20.
Accession Number: 20201202–5113.
Comments Due: 5 p.m. ET 12/14/20.
Docket Numbers: RP21–293–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) Rate Filing: REX
2020–12–02 Negotiated Rate
Agreements to be effective 12/2/2020.
Filed Date: 12/2/20.
Accession Number: 20201202–5176.
Comments Due: 5 p.m. ET 12/14/20.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
E:\FR\FM\09DEN1.SGM
09DEN1
79178
Federal Register / Vol. 85, No. 237 / Wednesday, December 9, 2020 / Notices
Dated: December 3, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–27033 Filed 12–8–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[P–619–171]
jbell on DSKJLSW7X2PROD with NOTICES
Pacific Gas and Electric Company, City
of Santa Clara, California; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Non-capacity
amendment of license..
b. Project No.: 619–171.
c. Date Filed: November 24, 2020.
d. Applicants: Pacific Gas and Electric
Company, and City of Santa Clara,
California.
e. Name of Project: Bucks Creek
Hydroelectric Project.
f. Location: The project is located on
the North Fork Feather River and Bucks
and Grizzly creeks in Plumas County,
California.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contacts: Ms. Elisabeth
Rossi, Pacific Gas & Electric Company,
245 Market Street, San Francisco, CA
94105, (415) 531–5186, Mr. Chris
Karwick, Silicon Valley Power/City of
Santa Clara, 1705 Martin Avenue, Santa
Clara, CA 95054, (408) 615–6554.
i. FERC Contact: Mr. Korede Olagbegi,
(202) 502–6268, Korede.Olagbegi@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 30
days from the issuance of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/doc-sfiling/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may send a paper copy. Submissions
VerDate Sep<11>2014
16:16 Dec 08, 2020
Jkt 253001
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–619–171. Comments emailed
to Commission staff are not considered
part of the Commission record.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: The
applicants propose to reconnect the
Grizzly Powerhouse to the grid. The
Grizzly Powerhouse connects to the grid
at Pacific Gas and Electric Company’s
(PG&E) Caribou-Palermo transmission
line, via the project’s 115-kV
transmission line referred to as the
Grizzly Tap. In November 2018, the
Caribou-Palermo transmission line was
de-energized as a result of damage from
the Camp Fire, forcing the Grizzly
Powerhouse out of service. Following
the Camp Fire, PG&E committed to
permanently de-energizing the CaribouPalermo line. The applicants propose to
reconnect the Grizzly Powerhouse to the
grid by removing the connection from
the Caribou-Palermo line and
interconnecting the Grizzly Tap at the
230-kV Bucks Creek-Cresta transmission
line instead, which begins in the Bucks
Creek substation yard (substation yard),
and is part of the project.
The applicants propose a 3-phase
process in order to facilitate the
reconnection to the grid. In the first
phase, which it has already completed,
the applicants removed a 900-foot-long
section of the Grizzly Tap, spanning
from the substation yard to the CaribouPalermo line. The applicants report that
they did not engage in any grounddisturbing activity to remove the
section. The applicants state that they
are currently finalizing the design of the
reconnection, but propose in the second
and third phase to reinforce an existing
access bridge with steel plates to
support the weight of vehicles
transporting new electrical equipment,
remove a lattice tower in the substation
yard, and to reconfigure the substation
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
yard, largely to incorporate a new
transformer, so that the 115-kV Grizzly
Tap may be stepped up to 230-kV and
connected to the existing Bucks CreekCresta 230-kV line. The applicants state
that all activities associated with its
non-capacity amendment application
would occur within the existing
footprint of the previously disturbed
areas of the substation yard, the adjacent
parking areas and roads, and the Grizzly
Tap transmission right of way, and
included an Exhibit E (environmental
assessment) along with the application.
l. Locations of the Applications: The
Commission provides all interested
persons an opportunity to view and/or
print the contents of this document via
the internet through the Commission’s
website at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
Agencies may obtain copies of the
application directly from the applicants.
At this time, the Commission has
suspended access to the Commission’s
Public Reference Room due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll free, (866) 208–3676 or TTY, (202)
502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Motions to Intervene, or
Protests: Anyone may submit
comments, a motion to intervene, or a
protest in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
motions to intervene, or protests must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title COMMENTS,
MOTION TO INTERVENE, or PROTEST
as applicable; (2) set forth in the
heading the name of the applicant and
the project number of the application to
E:\FR\FM\09DEN1.SGM
09DEN1
Agencies
[Federal Register Volume 85, Number 237 (Wednesday, December 9, 2020)]
[Notices]
[Pages 79177-79178]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-27033]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Docket Numbers: RP20-1111-002.
Applicants: Transcontinental Gas Pipe Line Company.
Description: Compliance filing GT&C Section 49--Bid Evaluation--
Compliance Filing to be effective 1/2/2021.
Filed Date: 12/2/20.
Accession Number: 20201202-5097.
Comments Due: 5 p.m. ET 12/14/20.
Docket Numbers: RP21-241-001.
Applicants: Southern Star Central Gas Pipeline, Inc.
Description: Compliance filing Annual Cash-Out Activity Report
2020--Correction to be effective N/A.
Filed Date: 12/2/20.
Accession Number: 20201202-5129.
Comments Due: 5 p.m. ET 12/14/20.
Docket Numbers: RP21-287-000.
Applicants: Southern Natural Gas Company, L.L.C.
Description: Compliance filing Abandon Tenneco X-Rate Schedules
Compliance Filing to be effective 2/1/2021.
Filed Date: 12/2/20.
Accession Number: 20201202-5013.
Comments Due: 5 p.m. ET 12/14/20.
Docket Numbers: RP21-288-000.
Applicants: Rover Pipeline LLC.
Description: Sec. 4(d) Rate Filing: Summary of Negotiated Rate
Capacity Release Agreements on 12-2-20 to be effective 12/1/2020.
Filed Date: 12/2/20.
Accession Number: 20201202-5044.
Comments Due: 5 p.m. ET 12/14/20.
Docket Numbers: RP21-289-000.
Applicants: Northwest Pipeline LLC.
Description: Sec. 4(d) Rate Filing: Non Conforming Service
Agreements--XTO, Citadel, Cascade to be effective 1/2/2021.
Filed Date: 12/2/20.
Accession Number: 20201202-5073.
Comments Due: 5 p.m. ET 12/14/20.
Docket Numbers: RP21-290-000.
Applicants: Algonquin Gas Transmission, LLC.
Description: Sec. 4(d) Rate Filing: Negotiated Rate--Yankee Gas
510802 eff 12-3-2020 to be effective 12/3/2020.
Filed Date: 12/2/20.
Accession Number: 20201202-5100.
Comments Due: 5 p.m. ET 12/14/20.
Docket Numbers: RP21-291-000.
Applicants: Iroquois Gas Transmission System, L.P.
Description: Sec. 4(d) Rate Filing: 120220 Negotiated Rates--
Castleton Commodities Merchant Trading R-4010-28 to be effective 12/3/
2020.
Filed Date: 12/2/20.
Accession Number: 20201202-5111.
Comments Due: 5 p.m. ET 12/14/20.
Docket Numbers: RP21-292-000.
Applicants: Iroquois Gas Transmission System, L.P.
Description: Sec. 4(d) Rate Filing: 120220 Negotiated Rates--
Castleton Commodities Merchant Trading R-4010-27 to be effective 12/3/
2020.
Filed Date: 12/2/20.
Accession Number: 20201202-5113.
Comments Due: 5 p.m. ET 12/14/20.
Docket Numbers: RP21-293-000.
Applicants: Rockies Express Pipeline LLC.
Description: Sec. 4(d) Rate Filing: REX 2020-12-02 Negotiated Rate
Agreements to be effective 12/2/2020.
Filed Date: 12/2/20.
Accession Number: 20201202-5176.
Comments Due: 5 p.m. ET 12/14/20.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
[[Page 79178]]
Dated: December 3, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-27033 Filed 12-8-20; 8:45 am]
BILLING CODE 6717-01-P