Cornell University; Notice of Availability of Environmental Assessment, 78316-78317 [2020-26713]
Download as PDF
78316
Federal Register / Vol. 85, No. 234 / Friday, December 4, 2020 / Notices
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov, or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Comment Date: 5:00 p.m. Eastern
Time on December 15, 2020.
Dated: November 30, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–26711 Filed 12–3–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2530–057]
Brookfield White Pine Hydro LLC;
Notice of Application Tendered for
Filing With the Commission and
Establishing Procedural Schedule for
Licensing and Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2530–057.
c. Date Filed: November 20, 2020.
d. Applicant: Brookfield White Pine
Hydro LLC (White Pine Hydro).
e. Name of Project: Hiram
Hydroelectric Project.
f. Location: The existing project is
located on the Saco River in the towns
of Hiram, Baldwin, Brownfield, and
Denmark within Oxford and
Cumberland Counties, Maine. The
project does not affect federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Luke Anderson,
Licensing Manager, Brookfield White
Pine Hydro LLC, 150 Main Street,
Lewiston, ME 04240; Telephone (207)
755–5600.
i. FERC Contact: Dianne Rodman,
(202) 502–6077 or dianne.rodman@
ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. Project Description: The existing
Hiram Project consists of a 255-acre, 7.5mile-long impoundment at normal full
pond elevation 349.0 feet; a 448-footlong dam located at the top of Great
Falls fitted with an inflatable dam
across the spillway crest; an intake that
is integral to the dam; a 320-foot-long,
15.5-foot-diameter penstock that
bifurcates to one 170-foot-long by 10foot-wide penstock (to Unit 1), and one
VerDate Sep<11>2014
18:18 Dec 03, 2020
Jkt 253001
80-foot-long by 15.5-foot-diameter
penstock (to Unit 2); a powerhouse
containing two turbine-generator units,
Unit 1 rated at 2.4 megawatts (MW) and
Unit 2 at 8.1 MW, for a total installed
capacity of 10.5 MW; and appurtenant
facilities. The project’s transmission
facilities include: (1) Generator leads;
(2) a substation located adjacent to, and
north of, the powerhouse; and (3) a
transmission circuit connecting the
substation to a non-project switching
station. The project generates an annual
average of 45,142 megawatt-hours.
White Pine Hydro proposes to
continue to: operate the project in a runof-river mode from October 1 through
November 15, with head pond
drawdowns limited to 1 foot or less
from the full pond elevation, or from the
spillway crest when the inflatable dam
is down. From November 16 through
September 30, White Pine Hydro
proposes to continue to cycle daily
operations whereby it would turn on
and off its generating units when inflow
is sufficient to meet load demands,
resulting in drawdown of the head pond
by up to 2 feet from the full pond
elevation during normal project
operation, or from the spillway crest
when the inflatable dam is down.
During this period, White Pine Hydro
would continue to provide a minimum
flow of 300 cubic feet per second (cfs),
of inflow, whichever is less below the
powerhouse.
White Pine Hydro proposes to remove
from the current project boundary 152
acres of land and 25 acres of water.
l. In addition to publishing the full
text of this notice in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
notice, as well as other documents in
the proceeding (e.g., license application)
via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document (P–2530).
At this time, the Commission has
suspended access to the Commission’s
Public Reference Room due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19) issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or (202) 502–
8659 (TTY).
m. You may also register online at
https://ferconline.ferc.gov/
FERCOnline.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
For assistance, contact FERC Online
Support.
n. Procedural Schedule:
The application will be processed
according to the following preliminary
Hydro Licensing Schedule. Revisions to
the schedule may be made as
appropriate.
Milestone
Notice of Acceptance/
Notice of Ready for
Environmental Analysis.
Filing of recommendations, preliminary
terms and conditions,
and fishway prescriptions.
Reply Comments due ..
Target Date
January 2021.
March 2021.
May 2021.
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: November 30, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–26712 Filed 12–3–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3251–010]
Cornell University; Notice of
Availability of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380, the Office
of Energy Projects has reviewed the
application for a new license for the
Cornell University Hydroelectric
Project, located on Fall Creek in the City
of Ithaca, Tompkins County, New York,
and has prepared an Environmental
Assessment (EA) for the project. The
project does not occupy federal land.
The EA contains staff’s analysis of the
potential environmental impacts of the
project and concludes that licensing the
project, with appropriate environmental
protective measures, would not
constitute a major federal action that
would significantly affect the quality of
the human environment.
The Commission provides all
interested persons with an opportunity
to view and/or print the EA via the
internet through the Commission’s
Home Page (https://www.ferc.gov/) using
E:\FR\FM\04DEN1.SGM
04DEN1
Federal Register / Vol. 85, No. 234 / Friday, December 4, 2020 / Notices
the eLibrary link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room,
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued by the President on March 13,
2020. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202)
502–8659.
You may also register online at
https://ferconline.ferc.gov/
eSubscription.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
45 days from the date of this notice.
The Commission strongly encourages
electronic filings. Please file comments
using the Commission’s eFiling system
at https://ferconline.ferc.gov/
eFiling.aspx. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
ferconline.ferc.gov/Quick
Comment.aspx. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support. In
lieu of electronic filing, you may submit
a paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. The first page of any filing
should include docket number P–3251–
010.
For further information, contact Chris
Millard at (202) 502–8256 or by email at
christopher.millard@ferc.gov.
Dated: November 30, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–26713 Filed 12–3–20; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
18:18 Dec 03, 2020
Jkt 253001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC21–29–000.
Applicants: Basin Electric Power
Cooperative, Inc.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Basin
Electric Power Cooperative.
Filed Date: 11/25/20.
Accession Number: 20201125–5167.
Comments Due: 5 p.m. ET 12/16/20.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1818–024;
ER10–1819–027; ER10–1820–030.
Applicants: Public Service Company
of Colorado, Northern States Power
Company, a Minnesota corporation,
Northern States Power Company, a
Wisconsin corporation.
Description: Notice of Change in
Status of Public Service Company of
Colorado, et al.
Filed Date: 11/25/20.
Accession Number: 20201125–5195.
Comments Due: 5 p.m. ET 12/16/20.
Docket Numbers: ER10–2531–011.
Applicants: Cedar Creek Wind
Energy, LLC.
Description: Notice of Non-Material
Change in Status of Cedar Creek Wind
Energy, LLC.
Filed Date: 11/25/20.
Accession Number: 20201125–5194.
Comments Due: 5 p.m. ET 12/16/20.
Docket Numbers: ER20–1736–002.
Applicants: Versant Power.
Description: Compliance filing: Order
No. 864 Compliance Filing—Response
to Staff Letter (ER20–1736–ll) to be
effective N/A.
Filed Date: 11/25/20.
Accession Number: 20201125–5001.
Comments Due: 5 p.m. ET 12/16/20.
Docket Numbers: ER20–1739–001.
Applicants: American Transmission
Systems, Incorporated, PJM
Interconnection, L.L.C.
Description: Compliance filing: ATSI
Response to Deficiency Letter for Order
No. 864 Compliance to be effective N/
A.
Filed Date: 11/25/20.
Accession Number: 20201125–5013.
Comments Due: 5 p.m. ET 12/16/20.
Docket Numbers: ER21–116–001.
Applicants: XO Energy CAL, LP.
Description: Tariff Amendment:
Amendment to 1 to be effective 10/16/
2020.
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
78317
Filed Date: 11/25/20.
Accession Number: 20201125–5152.
Comments Due: 5 p.m. ET 12/16/20.
Docket Numbers: ER21–496–000.
Applicants: ISO New England Inc.,
New England Power Pool.
Description: ISO New England Inc.
submits Installed Capacity Requirement,
Hydro Quebec Interconnection
Capability Credits and Related Values
for the 2021–2022, 2022–2023 and
2023–2024 Annual Reconfiguration
Auctions.
Filed Date: 11/25/20.
Accession Number: 20201125–5179.
Comments Due: 5 p.m. ET 12/16/20.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 27, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–26708 Filed 12–3–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP21–12–000]
Mountain Valley Pipeline, LLC; Notice
of Application and Establishing
Intervention Deadline
Take notice that on November 18,
2020, Mountain Valley Pipeline, LLC
(Mountain Valley), 2200 Energy Drive
Canonsburg, Pennsylvania 15317, filed
an application under section 7(c) of the
Natural Gas Act (NGA), and Part 157 of
the Commission’s regulations requesting
authorization to amend Mountain
Valley’s existing certificate of public
convenience and necessity (Certificate)
for the Mountain Valley Pipeline Project
E:\FR\FM\04DEN1.SGM
04DEN1
Agencies
[Federal Register Volume 85, Number 234 (Friday, December 4, 2020)]
[Notices]
[Pages 78316-78317]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-26713]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 3251-010]
Cornell University; Notice of Availability of Environmental
Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380, the Office of Energy Projects has
reviewed the application for a new license for the Cornell University
Hydroelectric Project, located on Fall Creek in the City of Ithaca,
Tompkins County, New York, and has prepared an Environmental Assessment
(EA) for the project. The project does not occupy federal land.
The EA contains staff's analysis of the potential environmental
impacts of the project and concludes that licensing the project, with
appropriate environmental protective measures, would not constitute a
major federal action that would significantly affect the quality of the
human environment.
The Commission provides all interested persons with an opportunity
to view and/or print the EA via the internet through the Commission's
Home Page (https://www.ferc.gov/) using
[[Page 78317]]
the eLibrary link. Enter the docket number, excluding the last three
digits in the docket number field, to access the document. At this
time, the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact FERC Online
Support at [email protected] or toll-free at (866) 208-3676,
or for TTY, (202) 502-8659.
You may also register online at https://ferconline.ferc.gov/eSubscription.aspx to be notified via email of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
Any comments should be filed within 45 days from the date of this
notice.
The Commission strongly encourages electronic filings. Please file
comments using the Commission's eFiling system at https://ferconline.ferc.gov/eFiling.aspx. Commenters can submit brief comments
up to 6,000 characters, without prior registration, using the eComment
system at https://ferconline.ferc.gov/QuickComment.aspx. You must
include your name and contact information at the end of your comments.
For assistance, please contact FERC Online Support. In lieu of
electronic filing, you may submit a paper copy. Submissions sent via
the U.S. Postal Service must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Room 1A, Washington, DC 20426. Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852.
The first page of any filing should include docket number P-3251-010.
For further information, contact Chris Millard at (202) 502-8256 or
by email at [email protected].
Dated: November 30, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-26713 Filed 12-3-20; 8:45 am]
BILLING CODE 6717-01-P