Download as PDF Federal Register / Vol. 85, No. 231 / Tuesday, December 1, 2020 / Notices Docket No. File date 3. P–10853–022 ............................................................................................. 4. CP16–9–000 ............................................................................................... 5. CP15–558–000, CP19–78–000, CP20–47–000 ........................................ 11–19–2020 11–19–2020 11–19–2020 77205 Presenter or requester FERC Staff. 3 U.S. Senate. 4 New Jersey Department of Environmental Protection. 1 Memo dated 11/10/20 forwarding U.S. Fish and Wildlife Service’s updated list of threatened, endangered, candidate, and proposed species. dated 11/10/2020 forwarding the National Marine Fisheries Service’s comments. dated 11/18/20 regarding the conference call with representatives from Otter Tail Power Company and the Kleinschmidt Group. 4 U.S. Senators Edward J. Markey and Elizabeth Warren. 2 Memo 3 Memo Dated: November 24, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. Schedule for Environmental Review Issuance of EA: December 28, 2020 90-day Federal Authorization Decision Deadline: March 28, 2021 If a schedule change becomes necessary, additional notice will be provided so that the relevant agencies are kept informed of the Project’s progress. [FR Doc. 2020–26447 Filed 11–30–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP21–2–000] khammond on DSKJM1Z7X2PROD with NOTICES4 Southern Star Central Gas Pipeline, Inc.; Notice of Schedule for the Preparation of an Environmental Assessment for the Lines DT and DS Replacement Project Amendment On October 2, 2020, Southern Star Central Gas Pipeline, Inc. (Southern Star) filed an application in Docket No. CP21–2–000 requesting an amendment to the Federal Energy Regulatory Commission’s (Commission or FERC) authorization pursuant to Section 7(b) of the Natural Gas Act issued on December 19, 2019, in Docket No. CP19–31–000. The proposed project is known as the Lines DT and DS Replacement Project Amendment (Project). The purpose of this Project is to modify the previous authorization (CP19–31–000) to grant Southern Star’s proposed abandonment of certain natural gas pipeline facilities in-place rather than by removal, as previously proposed. On October 7, 2020, the Commission issued its Notice of Application for the Project. Among other things, that notice alerted agencies issuing federal authorizations of the requirement to complete all necessary reviews and to reach a final decision on a request for a federal authorization within 90 days of the date of issuance of the Commission staff’s environmental document for the Project. This notice identifies Commission staff’s intention to prepare an environmental assessment (EA) for the Project and the planned schedule for the completion of the environmental review.1 1 40 CFR 1501.10 (2020). VerDate Sep<11>2014 18:11 Nov 30, 2020 Jkt 253001 Project Description The Project would involve the abandonment in-place of the 31.8-milelong, 26-inch-diameter Line DT and the 31.4-mile-long, 20-inch-diameter Line DS, rather than abandonment by removal, which was authorized in Docket No. CP19–31–000. The Project is located in Anderson and Franklin Counties, Kansas. Background On October 27, 2020, the Commission issued a Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Lines DT and DS Replacement Project Amendment and Notice of Public Scoping Session. The Notice of Scoping was sent to affected landowners; federal, state, and local government agencies; elected officials; environmental and public interest groups; Native American tribes; other interested parties; and local libraries and newspapers. In response to the Notice of Scoping, the Commission received a comment from a landowner who requested that Southern Star abandon the pipeline by removal on his land, as originally proposed. All substantive comments will be addressed in the EA. Additional Information In order to receive notification of the issuance of the EA and to keep track of formal issuances and submittals in specific dockets, the Commission offers a free service called eSubscription. This service provides automatic notification of filings made to subscribed dockets, document summaries, and direct links to the documents. Go to https:// www.ferc.gov/ferc-online/overview to register for eSubscription. Additional information about the Project is available from the PO 00000 Frm 00067 Fmt 4703 Sfmt 4703 Commission’s Office of External Affairs at (866) 208–FERC or on the FERC website (www.ferc.gov). Using the ‘‘eLibrary’’ link, select ‘‘General Search’’ from the eLibrary menu, enter the selected date range and ‘‘Docket Number’’ excluding the last three digits (i.e., CP21–2–000), and follow the instructions. For assistance with access to eLibrary, the helpline can be reached at (866) 208–3676, TTY (202) 502–8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC website also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings. Dated: November 24, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–26454 Filed 11–30–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC21–25–000. Applicants: Iberdrola, S.A., Avangrid, Inc., Avangrid Networks, Inc., PNM Resources, Inc., Public Service Company of New Mexico, NMRD Data Center II, LLC, NMRD Data Center III, LLC, New Mexico PPA Corporation. Description: Application for Authorization Under Section 203 of the Federal Power Act, et al. of Iberdrola, S.A., et al. Filed Date: 11/23/20. Accession Number: 20201123–5188. Comments Due: 5 p.m. ET 1/22/21. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG21–39–000. Applicants: Haystack Wind Project, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Haystack Wind Project, LLC. E:\FR\FM\01DEN1.SGM 01DEN1 khammond on DSKJM1Z7X2PROD with NOTICES4 77206 Federal Register / Vol. 85, No. 231 / Tuesday, December 1, 2020 / Notices Filed Date: 11/23/20. Accession Number: 20201123–5139. Comments Due: 5 p.m. ET 12/14/20. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–3028–006. Applicants: Elk Hills Power, LLC. Description: Notice of Non-Material Change in Status of Elk Hills Power, LLC. Filed Date: 11/23/20. Accession Number: 20201123–5192. Comments Due: 5 p.m. ET 12/14/20. Docket Numbers: ER17–996–005. Applicants: New York Independent System Operator, Inc. Description: Compliance filing: Compliance re: Remove state program text from Offer Floor calculations of SCRs to be effective 10/7/2020. Filed Date: 11/23/20. Accession Number: 20201123–5080. Comments Due: 5 p.m. ET 12/14/20. Docket Numbers: ER19–1492–002. Applicants: Wisconsin Electric Power Company. Description: Compliance filing: Settlement Compliance Filing—PIPP Retirement to be effective 5/29/2019. Filed Date: 11/23/20. Accession Number: 20201123–5107. Comments Due: 5 p.m. ET 12/14/20. Docket Numbers: ER20–1719–002. Applicants: PPL Electric Utilities Corporation, PJM Interconnection, L.L.C. Description: Compliance filing: PPL Electric submits Deficiency Response to Compliance in ER20–1719 re Order 864 to be effective N/A. Filed Date: 11/24/20. Accession Number: 20201124–5038. Comments Due: 5 p.m. ET 12/15/20. Docket Numbers: ER20–1877–002. Applicants: PJM Interconnection, L.L.C. Description: Tariff Amendment: Suppl. & Amendment: Rev. ISA, SA#3601 & ICSA, SA#5630; Queue No. V3–028/AB2–170 to be effective 4/22/ 2020. Filed Date: 11/24/20. Accession Number: 20201124–5036. Comments Due: 5 p.m. ET 12/15/20. Docket Numbers: ER21–460–000. Applicants: PJM Interconnection, L.L.C. Description: Compliance filing: Compliance in Docket No. EL20–56 to be effective 11/23/2020. Filed Date: 11/23/20. Accession Number: 20201123–5102. Comments Due: 5 p.m. ET 12/14/20. Docket Numbers: ER21–461–000. Applicants: El Paso Electric Company. Description: § 205(d) Rate Filing: Service Agreement No. 346, EPE-La VerDate Sep<11>2014 18:11 Nov 30, 2020 Jkt 253001 Mesa PV I LLC SGIA to be effective 11/23/2020. Filed Date: 11/23/20. Accession Number: 20201123–5112. Comments Due: 5 p.m. ET 12/14/20. Docket Numbers: ER21–462–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, Service Agreement No. 5846; Queue No. AB2–133 to be effective 10/22/2020. Filed Date: 11/23/20. Accession Number: 20201123–5117. Comments Due: 5 p.m. ET 12/14/20. Docket Numbers: ER21–463–000. Applicants: Old Dominion Electric Cooperative, Inc. Description: Request for Limited Waiver of Old Dominion Electric Cooperative. Filed Date: 11/23/20. Accession Number: 20201123–5190. Comments Due: 5 p.m. ET 12/14/20. Docket Numbers: ER21–464–000. Applicants: New York Independent System Operator, Inc., Niagara Mohawk Power Corporation. Description: § 205(d) Rate Filing: SGIA (SA 2571) among NYISO, National Grid and Martin Rd Solar to be effective 11/16/2020. Filed Date: 11/24/20. Accession Number: 20201124–5023. Comments Due: 5 p.m. ET 12/15/20. Docket Numbers: ER21–465–000. Applicants: New York Independent System Operator, Inc., Niagara Mohawk Power Corporation. Description: § 205(d) Rate Filing: SGIA (SA 2572) among NYISO, National Grid, and Bakerstand Solar, LLC to be effective 11/16/2020. Filed Date: 11/24/20. Accession Number: 20201124–5026. Comments Due: 5 p.m. ET 12/15/20. Docket Numbers: ER21–466–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 2415R13 Kansas Municipal Energy Agency NITSA and NOA to be effective 9/1/2020. Filed Date: 11/24/20. Accession Number: 20201124–5030. Comments Due: 5 p.m. ET 12/15/20. Docket Numbers: ER21–467–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 2562R8 Kansas Municipal Energy Agency NITSA and NOA to be effective 9/1/2020. Filed Date: 11/24/20. Accession Number: 20201124–5034. Comments Due: 5 p.m. ET 12/15/20. Docket Numbers: ER21–468–000. PO 00000 Frm 00068 Fmt 4703 Sfmt 4703 Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2020–11–24_SA 3375 Entergy ArkansasSearcy Solar 1st Rev GIA (J893 S1000) to be effective 11/12/2020. Filed Date: 11/24/20. Accession Number: 20201124–5035. Comments Due: 5 p.m. ET 12/15/20. Docket Numbers: ER21–469–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 2900R14 KMEA NITSA NOA to be effective 9/1/2020. Filed Date: 11/24/20. Accession Number: 20201124–5039. Comments Due: 5 p.m. ET 12/15/20. Docket Numbers: ER21–470–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3675R1 Doniphan Electric Cooperative Assn, Inc. NITSA NOA to be effective 9/1/2020. Filed Date: 11/24/20. Accession Number: 20201124–5041. Comments Due: 5 p.m. ET 12/15/20. Docket Numbers: ER21–471–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2020–11–24_SA 3576 MDU-Emmons Logan Wind FSA (J302 J503) to be effective 1/24/2021. Filed Date: 11/24/20. Accession Number: 20201124–5047. Comments Due: 5 p.m. ET 12/15/20. Docket Numbers: ER21–472–000. Applicants: PacifiCorp. Description: § 205(d) Rate Filing: TriState, Empire Const Agmt at Pinto to be effective 1/24/2021. Filed Date: 11/24/20. Accession Number: 20201124–5089. Comments Due: 5 p.m. ET 12/15/20. Docket Numbers: ER21–473–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA No. 5849; Queue No. AE2– 131 to be effective 10/28/2020. Filed Date: 11/24/20. Accession Number: 20201124–5091. Comments Due: 5 p.m. ET 12/15/20. Docket Numbers: ER21–474–000. Applicants: New York Independent System Operator, Inc., Niagara Mohawk Power Corporation. Description: § 205(d) Rate Filing: SGIA Among the NYISO, National Grid, and Sky High Solar to be effective 11/ 16/2020. Filed Date: 11/24/20. Accession Number: 20201124–5097. Comments Due: 5 p.m. ET 12/15/20. Docket Numbers: ER21–475–000. E:\FR\FM\01DEN1.SGM 01DEN1 khammond on DSKJM1Z7X2PROD with NOTICES4 Federal Register / Vol. 85, No. 231 / Tuesday, December 1, 2020 / Notices Applicants: PacifiCorp. Description: § 205(d) Rate Filing: TriState, Empire Interconnect Agmt at Pinto to be effective 1/24/2021. Filed Date: 11/24/20. Accession Number: 20201124–5099. Comments Due: 5 p.m. ET 12/15/20. Docket Numbers: ER21–476–000. Applicants: Georgia Power Company. Description: § 205(d) Rate Filing: GPCo 2020 PBOP Filing to be effective 1/1/2020. Filed Date: 11/24/20. Accession Number: 20201124–5104. Comments Due: 5 p.m. ET 12/15/20. Docket Numbers: ER21–477–000. Applicants: Mississippi Power Company. Description: § 205(d) Rate Filing: PBOP 2020 Filing to be effective 1/1/ 2020. Filed Date: 11/24/20. Accession Number: 20201124–5105. Comments Due: 5 p.m. ET 12/15/20. Docket Numbers: ER21–478–000. Applicants: Southern Electric Generating Company. Description: § 205(d) Rate Filing: SEGCo 2020 PBOP Filing to be effective 1/1/2020. Filed Date: 11/24/20. Accession Number: 20201124–5107. Comments Due: 5 p.m. ET 12/15/20. Docket Numbers: ER21–479–000. Applicants: Alabama Power Company. Description: Initial rate filing: Nassau Solar Affected System Upgrade Agreement Filing to be effective 10/27/ 2020. Filed Date: 11/24/20. Accession Number: 20201124–5126. Comments Due: 5 p.m. ET 12/15/20. Docket Numbers: ER21–480–000. Applicants: Georgia Power Company. Description: Initial rate filing: Nassau Solar Affected System Upgrade Agreement Filing to be effective 10/27/ 2020. Filed Date: 11/24/20. Accession Number: 20201124–5127. Comments Due: 5 p.m. ET 12/15/20. Docket Numbers: ER21–481–000. Applicants: Mississippi Power Company. Description: Initial rate filing: Nassau Solar Affected System Upgrade Agreement Filing to be effective 10/27/ 2020. Filed Date: 11/24/20. Accession Number: 20201124–5130. Comments Due: 5 p.m. ET 12/15/20. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. VerDate Sep<11>2014 18:11 Nov 30, 2020 Jkt 253001 Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: November 24, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–26445 Filed 11–30–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3409–032] Boyne USA, Inc.; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Subsequent Minor License. b. Project No.: 3409–032. c. Date filed: January 31, 2020. d. Applicant: Boyne USA, Inc. (Boyne USA). e. Name of Project: Boyne River Hydroelectric Project. f. Location: On the Boyne River in Boyne Valley Township, Charlevoix County, Michigan. The project does not occupy federal land. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Tyler Prange, Area Manager, 1 Boyne Mountain Rd., Boyne Falls, MI 49713; (231) 549–6076; tyler.prange@boynemountain.com. i. FERC Contact: Patrick Ely at patrick.ely@ferc.gov or (202) 502–8570. j. Deadline for filing comments, recommendations, terms and conditions, and prescriptions: 60 days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice. PO 00000 Frm 00069 Fmt 4703 Sfmt 4703 77207 The Commission strongly encourages electronic filing. Please file comments, recommendations, terms and conditions, and prescriptions using the Commission’s eFiling system at https:// ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://ferconline.ferc.gov/ QuickComment.aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper request. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P–3409– 032. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted for filing and is now ready for environmental analysis. The Council on Environmental Quality (CEQ) issued a final rule on July 15, 2020, revising the regulations under 40 CFR parts 1500–1518 that federal agencies use to implement NEPA (see Update to the Regulations Implementing the Procedural Provisions of the National Environmental Policy Act, 85 FR 43304). The Final Rule became effective on and applies to any NEPA process begun after September 14, 2020. An agency may also apply the regulations to ongoing activities and environmental documents begun before September 14, 2020, which includes the proposed Boyne River Project. Commission staff intends to conduct its NEPA review in accordance with CEQ’s new regulations. l. The Boyne River Project consists of the following facilities: (1) An existing 610-foot-long by 30-foot-high (left) earth-fill dam embankment and a 180- E:\FR\FM\01DEN1.SGM 01DEN1

Agencies

[Federal Register Volume 85, Number 231 (Tuesday, December 1, 2020)]
[Notices]
[Pages 77205-77207]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-26445]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:
    Docket Numbers: EC21-25-000.
    Applicants: Iberdrola, S.A., Avangrid, Inc., Avangrid Networks, 
Inc., PNM Resources, Inc., Public Service Company of New Mexico, NMRD 
Data Center II, LLC, NMRD Data Center III, LLC, New Mexico PPA 
Corporation.
    Description: Application for Authorization Under Section 203 of the 
Federal Power Act, et al. of Iberdrola, S.A., et al.
    Filed Date: 11/23/20.
    Accession Number: 20201123-5188.
    Comments Due: 5 p.m. ET 1/22/21.

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG21-39-000.
    Applicants: Haystack Wind Project, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status of Haystack Wind Project, LLC.

[[Page 77206]]

    Filed Date: 11/23/20.
    Accession Number: 20201123-5139.
    Comments Due: 5 p.m. ET 12/14/20.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-3028-006.
    Applicants: Elk Hills Power, LLC.
    Description: Notice of Non-Material Change in Status of Elk Hills 
Power, LLC.
    Filed Date: 11/23/20.
    Accession Number: 20201123-5192.
    Comments Due: 5 p.m. ET 12/14/20.

    Docket Numbers: ER17-996-005.
    Applicants: New York Independent System Operator, Inc.
    Description: Compliance filing: Compliance re: Remove state program 
text from Offer Floor calculations of SCRs to be effective 10/7/2020.
    Filed Date: 11/23/20.
    Accession Number: 20201123-5080.
    Comments Due: 5 p.m. ET 12/14/20.

    Docket Numbers: ER19-1492-002.
    Applicants: Wisconsin Electric Power Company.
    Description: Compliance filing: Settlement Compliance Filing--PIPP 
Retirement to be effective 5/29/2019.
    Filed Date: 11/23/20.
    Accession Number: 20201123-5107.
    Comments Due: 5 p.m. ET 12/14/20.

    Docket Numbers: ER20-1719-002.
    Applicants: PPL Electric Utilities Corporation, PJM 
Interconnection, L.L.C.
    Description: Compliance filing: PPL Electric submits Deficiency 
Response to Compliance in ER20-1719 re Order 864 to be effective N/A.
    Filed Date: 11/24/20.
    Accession Number: 20201124-5038.
    Comments Due: 5 p.m. ET 12/15/20.

    Docket Numbers: ER20-1877-002.
    Applicants: PJM Interconnection, L.L.C.
    Description: Tariff Amendment: Suppl. & Amendment: Rev. ISA, 
SA#3601 & ICSA, SA#5630; Queue No. V3-028/AB2-170 to be effective 4/22/
2020.
    Filed Date: 11/24/20.
    Accession Number: 20201124-5036.
    Comments Due: 5 p.m. ET 12/15/20.

    Docket Numbers: ER21-460-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Compliance filing: Compliance in Docket No. EL20-56 to 
be effective 11/23/2020.
    Filed Date: 11/23/20.
    Accession Number: 20201123-5102.
    Comments Due: 5 p.m. ET 12/14/20.

    Docket Numbers: ER21-461-000.
    Applicants: El Paso Electric Company.
    Description: Sec.  205(d) Rate Filing: Service Agreement No. 346, 
EPE-La Mesa PV I LLC SGIA to be effective 11/23/2020.
    Filed Date: 11/23/20.
    Accession Number: 20201123-5112.
    Comments Due: 5 p.m. ET 12/14/20.

    Docket Numbers: ER21-462-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA, Service 
Agreement No. 5846; Queue No. AB2-133 to be effective 10/22/2020.
    Filed Date: 11/23/20.
    Accession Number: 20201123-5117.
    Comments Due: 5 p.m. ET 12/14/20.

    Docket Numbers: ER21-463-000.
    Applicants: Old Dominion Electric Cooperative, Inc.
    Description: Request for Limited Waiver of Old Dominion Electric 
Cooperative.
    Filed Date: 11/23/20.
    Accession Number: 20201123-5190.
    Comments Due: 5 p.m. ET 12/14/20.

    Docket Numbers: ER21-464-000.
    Applicants: New York Independent System Operator, Inc., Niagara 
Mohawk Power Corporation.
    Description: Sec.  205(d) Rate Filing: SGIA (SA 2571) among NYISO, 
National Grid and Martin Rd Solar to be effective 11/16/2020.
    Filed Date: 11/24/20.
    Accession Number: 20201124-5023.
    Comments Due: 5 p.m. ET 12/15/20.

    Docket Numbers: ER21-465-000.
    Applicants: New York Independent System Operator, Inc., Niagara 
Mohawk Power Corporation.
    Description: Sec.  205(d) Rate Filing: SGIA (SA 2572) among NYISO, 
National Grid, and Bakerstand Solar, LLC to be effective 11/16/2020.
    Filed Date: 11/24/20.
    Accession Number: 20201124-5026.
    Comments Due: 5 p.m. ET 12/15/20.

    Docket Numbers: ER21-466-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 2415R13 Kansas Municipal 
Energy Agency NITSA and NOA to be effective 9/1/2020.
    Filed Date: 11/24/20.
    Accession Number: 20201124-5030.
    Comments Due: 5 p.m. ET 12/15/20.

    Docket Numbers: ER21-467-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 2562R8 Kansas Municipal 
Energy Agency NITSA and NOA to be effective 9/1/2020.
    Filed Date: 11/24/20.
    Accession Number: 20201124-5034.
    Comments Due: 5 p.m. ET 12/15/20.

    Docket Numbers: ER21-468-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2020-11-24_SA 3375 Entergy 
Arkansas-Searcy Solar 1st Rev GIA (J893 S1000) to be effective 11/12/
2020.
    Filed Date: 11/24/20.
    Accession Number: 20201124-5035.
    Comments Due: 5 p.m. ET 12/15/20.

    Docket Numbers: ER21-469-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 2900R14 KMEA NITSA NOA to be 
effective 9/1/2020.
    Filed Date: 11/24/20.
    Accession Number: 20201124-5039.
    Comments Due: 5 p.m. ET 12/15/20.

    Docket Numbers: ER21-470-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 3675R1 Doniphan Electric 
Cooperative Assn, Inc. NITSA NOA to be effective 9/1/2020.
    Filed Date: 11/24/20.
    Accession Number: 20201124-5041.
    Comments Due: 5 p.m. ET 12/15/20.

    Docket Numbers: ER21-471-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2020-11-24_SA 3576 MDU-
Emmons Logan Wind FSA (J302 J503) to be effective 1/24/2021.
    Filed Date: 11/24/20.
    Accession Number: 20201124-5047.
    Comments Due: 5 p.m. ET 12/15/20.

    Docket Numbers: ER21-472-000.
    Applicants: PacifiCorp.
    Description: Sec.  205(d) Rate Filing: Tri-State, Empire Const Agmt 
at Pinto to be effective 1/24/2021.
    Filed Date: 11/24/20.
    Accession Number: 20201124-5089.
    Comments Due: 5 p.m. ET 12/15/20.

    Docket Numbers: ER21-473-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA No. 5849; Queue 
No. AE2-131 to be effective 10/28/2020.
    Filed Date: 11/24/20.
    Accession Number: 20201124-5091.
    Comments Due: 5 p.m. ET 12/15/20.

    Docket Numbers: ER21-474-000.
    Applicants: New York Independent System Operator, Inc., Niagara 
Mohawk Power Corporation.
    Description: Sec.  205(d) Rate Filing: SGIA Among the NYISO, 
National Grid, and Sky High Solar to be effective 11/16/2020.
    Filed Date: 11/24/20.
    Accession Number: 20201124-5097.
    Comments Due: 5 p.m. ET 12/15/20.

    Docket Numbers: ER21-475-000.

[[Page 77207]]

    Applicants: PacifiCorp.
    Description: Sec.  205(d) Rate Filing: Tri-State, Empire 
Interconnect Agmt at Pinto to be effective 1/24/2021.
    Filed Date: 11/24/20.
    Accession Number: 20201124-5099.
    Comments Due: 5 p.m. ET 12/15/20.

    Docket Numbers: ER21-476-000.
    Applicants: Georgia Power Company.
    Description: Sec.  205(d) Rate Filing: GPCo 2020 PBOP Filing to be 
effective 1/1/2020.
    Filed Date: 11/24/20.
    Accession Number: 20201124-5104.
    Comments Due: 5 p.m. ET 12/15/20.

    Docket Numbers: ER21-477-000.
    Applicants: Mississippi Power Company.
    Description: Sec.  205(d) Rate Filing: PBOP 2020 Filing to be 
effective 1/1/2020.
    Filed Date: 11/24/20.
    Accession Number: 20201124-5105.
    Comments Due: 5 p.m. ET 12/15/20.

    Docket Numbers: ER21-478-000.
    Applicants: Southern Electric Generating Company.
    Description: Sec.  205(d) Rate Filing: SEGCo 2020 PBOP Filing to be 
effective 1/1/2020.
    Filed Date: 11/24/20.
    Accession Number: 20201124-5107.
    Comments Due: 5 p.m. ET 12/15/20.

    Docket Numbers: ER21-479-000.
    Applicants: Alabama Power Company.
    Description: Initial rate filing: Nassau Solar Affected System 
Upgrade Agreement Filing to be effective 10/27/2020.
    Filed Date: 11/24/20.
    Accession Number: 20201124-5126.
    Comments Due: 5 p.m. ET 12/15/20.

    Docket Numbers: ER21-480-000.
    Applicants: Georgia Power Company.
    Description: Initial rate filing: Nassau Solar Affected System 
Upgrade Agreement Filing to be effective 10/27/2020.
    Filed Date: 11/24/20.
    Accession Number: 20201124-5127.
    Comments Due: 5 p.m. ET 12/15/20.

    Docket Numbers: ER21-481-000.
    Applicants: Mississippi Power Company.
    Description: Initial rate filing: Nassau Solar Affected System 
Upgrade Agreement Filing to be effective 10/27/2020.
    Filed Date: 11/24/20.
    Accession Number: 20201124-5130.
    Comments Due: 5 p.m. ET 12/15/20.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: November 24, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-26445 Filed 11-30-20; 8:45 am]