Georgia Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Protests, 75312-75313 [2020-26080]
Download as PDF
jbell on DSKJLSW7X2PROD with NOTICES
75312
Federal Register / Vol. 85, No. 228 / Wednesday, November 25, 2020 / Notices
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Crossing
Trails Wind Power Project LLC, et al.
Filed Date: 11/18/20.
Accession Number: 20201118–5199.
Comments Due: 5 p.m. ET 12/9/20.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG21–37–000.
Applicants: Luna Storage, LLC.
Description: Self-Certification of
Exempt Wholesale Generator of Luna
Storage, LLC.
Filed Date: 11/18/20.
Accession Number: 20201118–5185.
Comments Due: 5 p.m. ET 12/9/20.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–2508–025;
ER11–2863–012; ER19–1411–001;
ER19–1412–001; ER19–1414–001;
ER19–1417–002; ER19–1865–001;
ER19–1866–001; ER19–1867–001;
ER19–1868–001; ER19–1869–001;
ER19–1870–001; ER19–1871–001;
ER19–1872–001; ER19–2140–002;
ER19–2141–002; ER19–2142–002;
ER19–2143–002; ER19–2144–002;
ER19–2145–002; ER19–2146–002;
ER19–2147–002; ER19–2148–002;
ER20–1887–001.
Applicants: GenOn Energy
Management, LLC, Blossburg Power,
LLC, Brunot Island Power, LLC, Chalk
Point Steam, LLC, GenOn Bowline, LLC,
GenOn Canal, LLC, GenOn MidAtlantic, LLC, GenOn Power Midwest,
LP, GenOn REMA, LLC, Gilbert Power,
LLC, Hamilton Power, LLC, Heritage
Power Marketing, LLC, Hunterstown
Power, LLC, Niles Power, LLC, Orrtanna
Power, LLC, New Castle Power, LLC,
Mountain Power, LLC, Portland Power,
LLC, Sayreville Power, LLC, Shawnee
Power, LLC, Shawville Power, LLC,
Titus Power, LLC, Tolna Power, LLC,
Warren Generation, LLC.
Description: Supplement to June 26,
2020 Updated Market Power Analysis
for the Northeast Region of the GenOn
Holdings, Inc. subsidiaries.
Filed Date: 11/18/20.
Accession Number: 20201118–5186.
Comments Due: 5 p.m. ET 12/9/20.
Docket Numbers: ER20–1800–002;
ER20–1799–002; ER20–1801–003.
Applicants: Techren Solar III LLC,
Techren Solar IV LLC, Techren Solar V
LLC.
Description: Notice of Non-Material
Change in Status of Techren Solar III
LLC, et al.
Filed Date: 11/18/20.
Accession Number: 20201118–5195.
Comments Due: 5 p.m. ET 12/9/20.
VerDate Sep<11>2014
16:27 Nov 24, 2020
Jkt 253001
Docket Numbers: ER21–121–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment: Errata
to WMPA SA No. 5825, Queue No.
AF2–401 in Docket No. ER21–121 to be
effective 9/16/2020.
Filed Date: 11/18/20.
Accession Number: 20201118–5080.
Comments Due: 5 p.m. ET 12/9/20.
Docket Numbers: ER21–434–000.
Applicants: Nevada Power Company.
Description: Compliance filing:
Market-Based Rate Tariff, Volume No.
11; WECC Price Cap to be effective 12/
31/9998.
Filed Date: 11/18/20.
Accession Number: 20201118–5052.
Comments Due: 5 p.m. ET 12/9/20.
Docket Numbers: ER21–435–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
2020–11–18_PSC–SWF-Info-2020–09Intercon Study-614–0.0.0 to be effective
11/19/2020.
Filed Date: 11/18/20.
Accession Number: 20201118–5064.
Comments Due: 5 p.m. ET 12/9/20.
Docket Numbers: ER21–436–000.
Applicants: San Diego Gas & Electric.
Description: Annual Filing of Revised
Costs and Accruals for PostEmployment Benefits Other than
Pensions of San Diego Gas & Electric
Company.
Filed Date: 11/18/20.
Accession Number: 20201118–5174.
Comments Due: 5 p.m. ET 12/9/20.
Docket Numbers: ER21–437–000.
Applicants: AEP Texas Inc.
Description: § 205(d) Rate Filing:
AEPTX–LCRA TSC Asphalt Mines
Facilities Development Agreement to be
effective 11/11/2020.
Filed Date: 11/19/20.
Accession Number: 20201119–5011.
Comments Due: 5 p.m. ET 12/10/20.
Docket Numbers: ER21–438–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Third Revised ISA No. 4415; Queue No.
AF2–044 to be effective 10/20/2020.
Filed Date: 11/19/20.
Accession Number: 20201119–5045.
Comments Due: 5 p.m. ET 12/10/20.
Docket Numbers: ER21–439–000.
Applicants: Moss Landing Energy
Storage 1, LLC.
Description: Baseline eTariff Filing:
SFA new baseline to be effective 11/20/
2020.
Filed Date: 11/19/20.
Accession Number: 20201119–5057.
Comments Due: 5 p.m. ET 12/10/20.
Docket Numbers: ER21–440–000.
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
Applicants: Moss Landing Energy
Storage 2, LLC.
Description: Baseline eTariff Filing:
SFA COC new baseline to be effective
11/20/2020.
Filed Date: 11/19/20.
Accession Number: 20201119–5058.
Comments Due: 5 p.m. ET 12/10/20.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 19, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–26083 Filed 11–24–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2413–132]
Georgia Power Company; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions to
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Recreation and
Land Use Plan.
b. Project No: 2413–132.
c. Date Filed: October 16, 2020.
d. Applicant: Georgia Power
Company.
e. Name of Project: Wallace Dam
Pumped Storage Project.
f. Location: Oconee River in Hancock,
Putnam, Green, and Morgan counties,
Georgia.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Joseph Charles,
Hydro Compliance Coordinator, Georgia
E:\FR\FM\25NON1.SGM
25NON1
jbell on DSKJLSW7X2PROD with NOTICES
Federal Register / Vol. 85, No. 228 / Wednesday, November 25, 2020 / Notices
Power, 241 Ralph McGill Blvd., NE, BIN
10151, Atlanta, Georgia 30308, (404)
506–2337, jcharles@southernco.com.
i. FERC Contact: Mark Carter, (678)
245–3083, mark.carter@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
December 21, 2020.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–2413–132. Comments
emailed to Commission staff are not
considered part of the Commission
record.
k. Description of Request: As required
by Article 410 of the June 28, 2020,
license, Georgia Power Company filed a
revised Recreation and Land Use Plan
for the project. In addition to the
provisions of the plan filed during
relicensing, the revised Recreation and
Land Use Plan includes the provisions
required by Article 410 (i.e., a ten-year
plan review process, incorporating U.S.
Forest Service 4(e) Condition 24,
consulting the Georgia Department of
Natural Resources on boating access,
documenting the number of parking
spaces at each boat ramp, and specifying
public access available on future
recreation lands).
l. Locations of the Application: In
addition to publishing the full text of
this document in the Federal Register,
the Commission provides all interested
persons an opportunity to view and/or
print the contents of this document via
the internet through the Commission’s
Home Page (https://www.ferc.gov) using
the elibrary link. Enter the docket
number excluding the last three digits in
the document field to access the
VerDate Sep<11>2014
16:27 Nov 24, 2020
Jkt 253001
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room,
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued by the President on March 13,
2020. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3673 or TYY, (202)
502–8659. Agencies may obtain copies
of the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title COMMENTS, PROTEST,
or MOTION TO INTERVENE as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person commenting,
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, motions to intervene, or
protests must set forth their evidentiary
basis. Any filing made by an intervenor
must be accompanied by proof of
service on all persons listed in the
service list prepared by the Commission
in this proceeding, in accordance with
18 CFR 385.2010.
Dated: November 19, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–26080 Filed 11–24–20; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
75313
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP21–1–000]
Golden Pass Pipeline LLC; Notice of
Scoping Period Requesting Comments
on Environmental Issues for the
Proposed Compression Relocation
and Modification Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental document, that will
discuss the environmental impacts of
the Compression Relocation and
Modification Project involving
construction and operation of facilities
by Golden Pass Pipeline LLC (Golden
Pass) in Calcasieu Parish, Louisiana.
The Commission will use this
environmental document in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies regarding the
project. As part of the National
Environmental Policy Act (NEPA)
review process, the Commission takes
into account concerns the public may
have about proposals and the
environmental impacts that could result
from its action whenever it considers
amending a Certificate of Public
Convenience and Necessity. This
gathering of public input is referred to
as ‘‘scoping.’’ The main goal of the
scoping process is to focus the analysis
in the environmental document on the
important environmental issues.
Additional information about the
Commission’s NEPA process is
described below in the NEPA Process
and Environmental Document section of
this notice.
By this notice, the Commission
requests public comments on the scope
of issues to address in the
environmental document. To ensure
that your comments are timely and
properly recorded, please submit your
comments so that the Commission
receives them in Washington, DC on or
before 5:00 p.m. Eastern Time on
December 19, 2020. Comments may be
submitted in written form. Further
details on how to submit comments are
provided in the Public Participation
section of this notice.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
Your input will help the Commission
E:\FR\FM\25NON1.SGM
25NON1
Agencies
[Federal Register Volume 85, Number 228 (Wednesday, November 25, 2020)]
[Notices]
[Pages 75312-75313]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-26080]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2413-132]
Georgia Power Company; Notice of Application Accepted for Filing
and Soliciting Comments, Motions to Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Recreation and Land Use Plan.
b. Project No: 2413-132.
c. Date Filed: October 16, 2020.
d. Applicant: Georgia Power Company.
e. Name of Project: Wallace Dam Pumped Storage Project.
f. Location: Oconee River in Hancock, Putnam, Green, and Morgan
counties, Georgia.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Joseph Charles, Hydro Compliance Coordinator,
Georgia
[[Page 75313]]
Power, 241 Ralph McGill Blvd., NE, BIN 10151, Atlanta, Georgia 30308,
(404) 506-2337, [email protected].
i. FERC Contact: Mark Carter, (678) 245-3083, [email protected].
j. Deadline for filing comments, motions to intervene, and
protests: December 21, 2020.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may
submit a paper copy. Submissions sent via the U.S. Postal Service must
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852. The first page of any filing should
include docket number P-2413-132. Comments emailed to Commission staff
are not considered part of the Commission record.
k. Description of Request: As required by Article 410 of the June
28, 2020, license, Georgia Power Company filed a revised Recreation and
Land Use Plan for the project. In addition to the provisions of the
plan filed during relicensing, the revised Recreation and Land Use Plan
includes the provisions required by Article 410 (i.e., a ten-year plan
review process, incorporating U.S. Forest Service 4(e) Condition 24,
consulting the Georgia Department of Natural Resources on boating
access, documenting the number of parking spaces at each boat ramp, and
specifying public access available on future recreation lands).
l. Locations of the Application: In addition to publishing the full
text of this document in the Federal Register, the Commission provides
all interested persons an opportunity to view and/or print the contents
of this document via the internet through the Commission's Home Page
(https://www.ferc.gov) using the elibrary link. Enter the docket number
excluding the last three digits in the document field to access the
document. At this time, the Commission has suspended access to the
Commission's Public Reference Room, due to the proclamation declaring a
National Emergency concerning the Novel Coronavirus Disease (COVID-19),
issued by the President on March 13, 2020. For assistance, contact FERC
at [email protected] or call toll-free, (886) 208-3673 or TYY,
(202) 502-8659. Agencies may obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title COMMENTS, PROTEST, or MOTION TO INTERVENE as
applicable; (2) set forth in the heading the name of the applicant and
the project number of the application to which the filing responds; (3)
furnish the name, address, and telephone number of the person
commenting, protesting or intervening; and (4) otherwise comply with
the requirements of 18 CFR 385.2001 through 385.2005. All comments,
motions to intervene, or protests must set forth their evidentiary
basis. Any filing made by an intervenor must be accompanied by proof of
service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 385.2010.
Dated: November 19, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-26080 Filed 11-24-20; 8:45 am]
BILLING CODE 6717-01-P