Notice of Change in Meeting, 75319 [2020-26019]

Download as PDF 75319 Federal Register / Vol. 85, No. 228 / Wednesday, November 25, 2020 / Notices foot-wide center pier, each containing a 14-foot-wide trash rack; (4) a 20-foot by 36-foot powerhouse integral to the dam and containing two vertical axial flow propeller type turbines rated at 100 kilowatts each and two 100-kilovoltampere Westinghouse generators with a power factor of 0.8; (5) two generator leads from the turbine-generator units to a switchgear at the powerhouse interconnecting with the local grid; and (6) appurtenant facilities. The Village of Gouverneur proposes to continue operating the project in a run-of-river mode and release a minimum flow of 110 cubic feet per second over the project’s spillways. In addition, the applicant proposes to enhance the existing boat launch located on River Street. The project generated an annual average of 1,195 megawatt-hours between 2014 and 2017. m. A copy of the application can be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. All filings must (1) bear in all capital letters the title COMMENTS, REPLY COMMENTS, RECOMMENDATIONS, TERMS AND CONDITIONS, or PRESCRIPTIONS; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person submitting the filing; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Each filing must be accompanied by proof of service on all persons listed on the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. The license applicant must file no later than 60 days following the date of issuance of this notice: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. Please note that the certification request must be sent to the Milestone Deadline for Filing Comments, Recommendations, and Agency Terms and Conditions/Prescriptions. Deadline for Filing Reply Comments. Target date January 2021. February 2021. Dated: November 19, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–26082 Filed 11–24–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Change in Meeting Upon the affirmative votes of Chairman Danly and Commissioners Chatterjee, and Glick, the following Company name Entergy Mississippi, Inc., is hereby added to Item No. E–15 on the Commission’s open meeting scheduled for November 19, 2020.1 Item No. Docket No. Company E–15 ....... EL10–65–007 .............................................. Louisiana Public Service Commission v. Entergy Corporation, Entergy Services, Inc., Entergy Louisiana, LLC, Entergy Arkansas, Inc., Entergy Mississippi, Inc., Entergy New Orleans, Inc., Entergy Gulf States, Louisiana, L.L.C., Entergy Texas, Inc. Entergy Services, Inc. ER14–2085–003, ER11–3658–003, ER12– 1920–003, ER13–1595–003, (consolidated). Dated: November 17, 2020. Kimberly D. Bose, Secretary. This notice announces that pesticide related information submitted to EPA’s Office of Pesticide Programs (OPP) pursuant to the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) and the Federal Food, Drug, and Cosmetic Act (FFDCA), including information that may have been claimed as Confidential Business Information (CBI) by the submitter, will be transferred to Research Triangle Institute in accordance with the CBI regulations. Research Triangle Institute has been awarded a contract to perform work for OPP, and access to this information will enable Research Triangle Institute to fulfill the obligations of the contract. SUMMARY: [FR Doc. 2020–26019 Filed 11–24–20; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPP–2019–0188; FRL–10016–47] Research Triangle Institute; Transfer of Data (October 2020) jbell on DSKJLSW7X2PROD with NOTICES certifying authority and to the Commission concurrently. o. Procedural schedule: The application will be processed according to the following schedule. Revisions to the schedule will be made as appropriate. Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: Research Triangle Institute will be given access to this information on or before November 30, 2020. DATES: FOR FURTHER INFORMATION CONTACT: William Northern, Information Technology and Resources Management Division (7502P), Office of Pesticide Programs, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, Washington, DC 20460–0001; telephone number: (703) 305–6478 email address: northern.william@epa.gov. SUPPLEMENTARY INFORMATION: 1 This Notice of Change in Meeting is published pursuant to the government in the Sunshine Act (Pub. L. 94–409), 5 U.S.C. 552b. VerDate Sep<11>2014 16:27 Nov 24, 2020 Jkt 253001 PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 E:\FR\FM\25NON1.SGM 25NON1

Agencies

[Federal Register Volume 85, Number 228 (Wednesday, November 25, 2020)]
[Notices]
[Page 75319]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-26019]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Change in Meeting

    Upon the affirmative votes of Chairman Danly and Commissioners 
Chatterjee, and Glick, the following Company name Entergy Mississippi, 
Inc., is hereby added to Item No. E-15 on the Commission's open meeting 
scheduled for November 19, 2020.\1\
---------------------------------------------------------------------------

    \1\ This Notice of Change in Meeting is published pursuant to 
the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 552b.

------------------------------------------------------------------------
      Item No.             Docket No.                  Company
------------------------------------------------------------------------
E-15...............  EL10-65-007...........  Louisiana Public Service
                                              Commission v. Entergy
                                              Corporation, Entergy
                                              Services, Inc., Entergy
                                              Louisiana, LLC, Entergy
                                              Arkansas, Inc., Entergy
                                              Mississippi, Inc., Entergy
                                              New Orleans, Inc., Entergy
                                              Gulf States, Louisiana,
                                              L.L.C., Entergy Texas,
                                              Inc.
                     ER14-2085-003, ER11-    Entergy Services, Inc.
                      3658-003, ER12-1920-
                      003, ER13-1595-003,
                      (consolidated).
------------------------------------------------------------------------


    Dated: November 17, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-26019 Filed 11-24-20; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.