City of Woonsocket (City); Notice of Authorization for Continued Project Operation, 75003-75004 [2020-25983]
Download as PDF
Federal Register / Vol. 85, No. 227 / Tuesday, November 24, 2020 / Notices
You may also register online at
https://ferconline.ferc.gov/
FERCOnline.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
q. Procedural schedule: The
application will be processed according
to the following preliminary schedule.
Revisions to the schedule will be made
as appropriate.
Issue Deficiency Letter (if necessary)
January 2021
Request Additional Information
January 2021
Issue Acceptance Letter April 2021
Issue Scoping Document 1 for
comments May 2021
Request Additional Information (if
necessary) August 2021
Issue Scoping Document 2 August
2021
Issue Notice of Ready for Environmental
Analysis August 2021
r. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: November 17, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–25984 Filed 11–23–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER21–425–000]
jbell on DSKJLSW7X2PROD with NOTICES
Copper Mountain Solar 5, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Copper
Mountain Solar 5, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
VerDate Sep<11>2014
17:48 Nov 23, 2020
Jkt 253001
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is December 8,
2020.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: November 18, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–25927 Filed 11–23–20; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
75003
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2972–000]
City of Woonsocket (City); Notice of
Authorization for Continued Project
Operation
On November 1, 2018, City of
Woonsocket, licensee for the
Woonsocket Falls Hydroelectric Project,
filed an Application for a New License
pursuant to the Federal Power Act
(FPA) and the Commission’s regulations
thereunder. The Woonsocket Falls
Hydroelectric Project is on the
Blackstone river in Woonsocket city and
Providence county, Rhode Island.
The license for Project No.2972 was
issued for a period ending October 31,
2020. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No.2972 is
issued to the City of Woonsocket for a
period effective Nov 1, 2020 through
October 31, 2021, or until the issuance
of a new license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before October 31, 2021,
notice is hereby given that, pursuant to
18 CFR 16.18(c), an annual license
under section 15(a)(1) of the FPA is
renewed automatically without further
order or notice by the Commission,
E:\FR\FM\24NON1.SGM
24NON1
75004
Federal Register / Vol. 85, No. 227 / Tuesday, November 24, 2020 / Notices
unless the Commission orders
otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that the City of Woonsocket, is
authorized to continue operation of the
Woonsocket Falls Hydroelectric Project,
until such time as the Commission acts
on its application for a subsequent
license.
Dated: November 17, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–25983 Filed 11–23–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jbell on DSKJLSW7X2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC21–22–000.
Applicants: Basin Electric Power
Cooperative, Inc.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Basin
Electric Power Cooperative.
Filed Date: 11/17/20.
Accession Number: 20201117–5179.
Comments Due: 5 p.m. ET 12/8/20.
Docket Numbers: EC21–23–000.
Applicants: NV Energy, Inc.,
DesertLink, LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of NV Energy,
Inc., et al.
Filed Date: 11/17/20.
Accession Number: 20201117–5205.
Comments Due: 5 p.m. ET 12/8/20.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2895–021;
ER10–2460–017; ER10–2461–018;
ER10–2463–017; ER10–2466–018;
ER10–2917–021; ER10–2918–022;
ER10–2920–021; ER10–2921–021;
ER10–2922–021; ER10–2966–021;
ER10–3167–013; ER11–2201–021;
ER11–2383–016; ER11–3941–019;
ER11–3942–023; ER11–4029–017;
ER12–1311–017; ER12–161–021; ER12–
2068–017; ER12–682–018; ER13–1613–
014; ER13–17–015; ER13–203–013;
ER13–2143–014; ER14–1964–012;
ER16–287–007; ER17–482–006; ER19–
1074–005; ER19–1075–005; ER19–529–
005; ER20–1447–002.
Applicants: Bear Swamp Power
Company LLC, BIF II Safe Harbor
VerDate Sep<11>2014
17:48 Nov 23, 2020
Jkt 253001
Holdings, LLC, BIF III Holtwood LLC,
Black Bear SO, LLC, Black Bear
Development Holdings, LLC, Black Bear
Hydro Partners, LLC, BREG Aggregator
LLC, Brookfield Energy Marketing Inc.,
Brookfield Energy Marketing LP,
Brookfield Energy Marketing US LLC,
Brookfield Power Piney & Deep Creek
LLC, Brookfield Renewable Energy
Marketing US LLC, Brookfield
Renewable Trading and Marketing LP,
Brookfield White Pine Hydro LLC, Carr
Street Generating Station, L.P., Erie
Boulevard Hydropower, L.P., Granite
Reliable Power, LLC, Great Lakes Hydro
America, LLC, Hawks Nest Hydro LLC,
Rumford Falls Hydro LLC, Safe Harbor
Water Power Corporation, Bishop Hill
Energy, LLC, Blue Sky East, LLC,
Canandaigua Power Partners, LLC,
Canandaigua Power Partners II, LLC,
Erie Wind, LLC, Evergreen Wind Power,
LLC, Evergreen Wind Power III, LLC,
Niagara Wind Power, LLC, Stetson
Holdings, LLC, Stetson Wind II, LLC,
Vermont Wind, LLC.
Description: Supplement to June 30,
2020 Updated Market Power Analysis
for the Northeast Region of the
Brookfield Companies and Terra Form
Companies.
Filed Date: 11/17/20.
Accession Number: 20201117–5187.
Comments Due: 5 p.m. ET 12/8/20.
Docket Numbers: ER14–2080–002;
ER15–1136–003; ER15–502–003.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Midcontinent
Independent System Operator, Inc.
submits tariff filing per 35.19a(b):
Refund Report_Louisiana Generating,
Bayou Cove and Big Cajun I to be
effective N/A.
Filed Date: 11/17/20.
Accession Number: 20201117–5180.
Comments Due: 5 p.m. ET 12/8/20.
Docket Numbers: ER19–1507–007.
Applicants: Duke Energy Florida,
LLC, Duke Energy Progress, LLC, Duke
Energy Carolinas, LLC.
Description: Compliance filing: Joint
OATT Compliance Filing—Order 845
(Technological) to be effective 5/22/
2019.
Filed Date: 11/17/20.
Accession Number: 20201117–5060.
Comments Due: 5 p.m. ET 12/8/20.
Docket Numbers: ER20–2750–000.
Applicants: PacifiCorp.
Description: Report Filing: UAMPS
TSOA Rev 5 Refund Report to be
effective N/A.
Filed Date: 11/18/20.
Accession Number: 20201118–5043.
Comments Due: 5 p.m. ET 12/9/20.
Docket Numbers: ER20–2802–000.
Applicants: PacifiCorp.
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Description: Report Filing: Deseret
TSOA Rev 7 Refund Report to be
effective N/A.
Filed Date: 11/18/20.
Accession Number: 20201118–5041.
Comments Due: 5 p.m. ET 12/9/20.
Docket Numbers: ER21–427–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Cancel ISA SA #4792; Q# AB2–038/
AB2–041; ICSA SA #4793; Q# U3–073/
Z2–013/AB2–041 to be effective 12/21/
2020.
Filed Date: 11/17/20.
Accession Number: 20201117–5052.
Comments Due: 5 p.m. ET 12/8/20.
Docket Numbers: ER21–428–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to the OA, section 18.17 re
DIMA to be effective 2/1/2021.
Filed Date: 11/17/20.
Accession Number: 20201117–5069.
Comments Due: 5 p.m. ET 12/8/20.
Docket Numbers: ER21–429–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Third Revised ISA, Service Agreement
No. 4109; Queue No. AD1–067 to be
effective 10/19/2020.
Filed Date: 11/18/20.
Accession Number: 20201118–5006.
Comments Due: 5 p.m. ET 12/9/20.
Docket Numbers: ER21–430–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, SA No. 5833; Queue No.
AC1–110/AD1–131 to be effective 10/
20/2020.
Filed Date: 11/18/20.
Accession Number: 20201118–5026.
Comments Due: 5 p.m. ET 12/9/20.
Docket Numbers: ER21–431–000.
Applicants: American Electric Power
Service Corporation, Ohio Power
Company, AEP Ohio Transmission
Company, Inc., PJM Interconnection,
L.L.C.
Description: Compliance filing: AEP
submits Compliance filing in ER20–
2794 to be effective 11/2/2020.
Filed Date: 11/18/20.
Accession Number: 20201118–5032.
Comments Due: 5 p.m. ET 12/9/20.
Docket Numbers: ER21–432–000.
Applicants: ITC Midwest LLC.
Description: § 205(d) Rate Filing:
Filing of a Distribution-Transmission
Interconnection Agreement to be
effective 1/18/2021.
Filed Date: 11/18/20.
Accession Number: 20201118–5044.
Comments Due: 5 p.m. ET 12/9/20.
Docket Numbers: ER21–433–000.
E:\FR\FM\24NON1.SGM
24NON1
Agencies
[Federal Register Volume 85, Number 227 (Tuesday, November 24, 2020)]
[Notices]
[Pages 75003-75004]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-25983]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2972-000]
City of Woonsocket (City); Notice of Authorization for Continued
Project Operation
On November 1, 2018, City of Woonsocket, licensee for the
Woonsocket Falls Hydroelectric Project, filed an Application for a New
License pursuant to the Federal Power Act (FPA) and the Commission's
regulations thereunder. The Woonsocket Falls Hydroelectric Project is
on the Blackstone river in Woonsocket city and Providence county, Rhode
Island.
The license for Project No.2972 was issued for a period ending
October 31, 2020. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1),
requires the Commission, at the expiration of a license term, to issue
from year-to-year an annual license to the then licensee under the
terms and conditions of the prior license until a new license is
issued, or the project is otherwise disposed of as provided in section
15 or any other applicable section of the FPA. If the project's prior
license waived the applicability of section 15 of the FPA, then, based
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c),
and as set forth at 18 CFR 16.21(a), if the licensee of such project
has filed an application for a subsequent license, the licensee may
continue to operate the project in accordance with the terms and
conditions of the license after the minor or minor part license
expires, until the Commission acts on its application. If the licensee
of such a project has not filed an application for a subsequent
license, then it may be required, pursuant to 18 CFR 16.21(b), to
continue project operations until the Commission issues someone else a
license for the project or otherwise orders disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No.2972 is issued to
the City of Woonsocket for a period effective Nov 1, 2020 through
October 31, 2021, or until the issuance of a new license for the
project or other disposition under the FPA, whichever comes first. If
issuance of a new license (or other disposition) does not take place on
or before October 31, 2021, notice is hereby given that, pursuant to 18
CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is
renewed automatically without further order or notice by the
Commission,
[[Page 75004]]
unless the Commission orders otherwise.
If the project is not subject to section 15 of the FPA, notice is
hereby given that the City of Woonsocket, is authorized to continue
operation of the Woonsocket Falls Hydroelectric Project, until such
time as the Commission acts on its application for a subsequent
license.
Dated: November 17, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-25983 Filed 11-23-20; 8:45 am]