Spire Storage West, LLC; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Clear Creek Expansion Project, 73032-73034 [2020-25209]
Download as PDF
jbell on DSKJLSW7X2PROD with NOTICES
73032
Federal Register / Vol. 85, No. 221 / Monday, November 16, 2020 / Notices
ER10–1852–044; ER10–1905–019;
ER10–1907–018; ER10–1918–019;
ER10–1925–019; ER10–1927–019;
ER10–1950–019; ER10–1951–026;
ER10–1970–018; ER10–1972–018;
ER10–2005–019; ER10–2006–019;
ER10–2078–019; ER11–26–019; ER11–
4462–047; ER12–1660–018; ER13–2458–
013; ER13–2461–013; ER16–1872–009;
ER16–2506–010; ER17–2270–010;
ER17–838–022; ER18–1771–008; ER18–
2224–008; ER18–2246–007; ER19–1003–
006; ER19–1393–006; ER19–1394–006;
ER19–2382–002; ER19–2398–003;
ER19–2437–002; ER19–2461–002;
ER19–987–006; ER20–122–002; ER20–
975–001.
Applicants: Ashtabula Wind I, LLC,
Ashtabula Wind II, LLC, Ashtabula
Wind III, LLC, Butler Ridge Wind
Energy Center, LLC, Crowned Ridge
Interconnection, LLC, Crowned Ridge
Wind, LLC, Crowned Ridge Wind II,
LLC, Crystal Lake Wind Energy I, LLC,
Crystal Lake Wind Energy II, LLC,
Crystal Lake Wind III, LLC, EmmonsLogan Wind, LLC, Endeavor Wind I,
LLC, Endeavor Wind II, LLC, Florida
Power & Light Company, FPL Energy
Mower County, LLC, FPL Energy North
Dakota Wind, LLC, FPL Energy North
Dakota Wind II, LLC, FPL Energy Oliver
Wind I, LLC, FPL Energy Oliver Wind
II, LLC, Garden Wind, LLC, Hancock
County Wind, LLC, Hawkeye Power
Partners, LLC, Heartland Divide Wind
Project, LLC, Langdon Renewables, LLC,
Marshall Solar, LLC, NextEra Energy
Duane Arnold, LLC, NextEra Energy
Point Beach, LLC, Oliver Wind III, LLC,
Pegasus Wind, LLC, Pheasant Run
Wind, LLC, Story County Wind, LLC,
Stuttgart Solar, LLC, Tuscola Bay Wind,
LLC, Tuscola Wind II, LLC, White Oak
Energy LLC, NEPM II, LLC, NextEra
Energy Services Massachusetts, LLC,
NextEra Energy Marketing, LLC.
Description: Notification of Change in
Status of NextEra Resources Entities.
Filed Date: 11/5/20.
Accession Number: 20201105–5187.
Comments Due: 5 p.m. ET 11/27/20.
Docket Numbers: ER21–321–000.
Applicants: RRE Power LLC, Bridge
Solar LLC.
Description: Petition of for Limited
Waiver of RRE Power LLC, et al.
Filed Date: 10/30/20.
Accession Number: 20201030–5463.
Comments Due: 5 p.m. ET 11/20/20.
Docket Numbers: ER21–351–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2020–11–06_Surplus Interconnection
Product Study Clarification Filing to be
effective 1/6/2021.
Filed Date: 11/6/20.
VerDate Sep<11>2014
20:13 Nov 13, 2020
Jkt 253001
Accession Number: 20201106–5162.
Comments Due: 5 p.m. ET 11/27/20.
Docket Numbers: ER21–352–000.
Applicants: Flat Ridge
Interconnection LLC.
Description: Baseline eTariff Filing:
Filing of Common Facilities Agreement
to be effective 12/1/2020.
Filed Date: 11/6/20.
Accession Number: 20201106–5163.
Comments Due: 5 p.m. ET 11/27/20.
Docket Numbers: ER21–353–000.
Applicants: Oakland Power Company
LLC.
Description: § 205(d) Rate Filing:
Notices of Succession and Revisions to
Tariffs and Agreements (I) to be effective
10/30/2020.
Filed Date: 11/6/20.
Accession Number: 20201106–5166.
Comments Due: 5 p.m. ET 11/27/20.
Docket Numbers: ER21–354–000.
Applicants: Moss Landing Power
Company LLC.
Description: § 205(d) Rate Filing:
Notices of Succession and Revisions to
Tariffs and Agreements (II) to be
effective 10/30/2020.
Filed Date: 11/6/20.
Accession Number: 20201106–5170.
Comments Due: 5 p.m. ET 11/27/20.
Docket Numbers: ER21–355–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing: 1st
Amendment to CDWR Hyatt-Thermalito
LGIA (SA 273) to be effective 1/6/2021.
Filed Date: 11/6/20.
Accession Number: 20201106–5172.
Comments Due: 5 p.m. ET 11/27/20.
Docket Numbers: ER21–356–000.
Applicants: Flat Ridge 2 Wind Energy
LLC.
Description: § 205(d) Rate Filing:
Certificate of Concurrence to Common
Facilities Agreement to be effective 12/
1/2020.
Filed Date: 11/6/20.
Accession Number: 20201106–5182.
Comments Due: 5 p.m. ET 11/27/20.
Docket Numbers: ER21–357–000.
Applicants: Public Service Company
of New Mexico.
Description: § 205(d) Rate Filing:
Executed Engineering and Procurement
Agreement between PNM and 201LC
8me LLC to be effective 10/20/2020.
Filed Date: 11/6/20.
Accession Number: 20201106–5183.
Comments Due: 5 p.m. ET 11/27/20.
Docket Numbers: ER21–358–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, Service Agreement No.
5823; Queue No. AC2–103 to be
effective 10/12/2020.
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
Filed Date: 11/9/20.
Accession Number: 20201109–5068.
Comments Due: 5 p.m. ET 11/30/20.
Docket Numbers: ER21–359–000.
Applicants: Flat Ridge 3 Wind Energy,
LLC.
Description: § 205(d) Rate Filing: CFA,
Common Facilities Agreement to be
effective 12/1/2020.
Filed Date: 11/9/20.
Accession Number: 20201109–5067.
Comments Due: 5 p.m. ET 11/30/20.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 9, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–25204 Filed 11–13–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP21–6–000]
Spire Storage West, LLC; Notice of
Scoping Period Requesting Comments
on Environmental Issues for the
Proposed Clear Creek Expansion
Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental document, that will
discuss the environmental impacts of
the Clear Creek Expansion Project
involving construction and operation of
facilities by Spire Storage West, LLC
(Spire Storage) in Uinta County,
Wyoming. The Commission will use
this environmental document in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
E:\FR\FM\16NON1.SGM
16NON1
jbell on DSKJLSW7X2PROD with NOTICES
Federal Register / Vol. 85, No. 221 / Monday, November 16, 2020 / Notices
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies regarding the
project. As part of the National
Environmental Policy Act (NEPA)
review process, the Commission takes
into account concerns the public may
have about proposals and the
environmental impacts that could result
from its action whenever it considers
the issuance of a Certificate of Public
Convenience and Necessity. This
gathering of public input is referred to
as ‘‘scoping.’’ The main goal of the
scoping process is to focus the analysis
in the environmental document on the
important environmental issues.
Additional information about the
Commission’s NEPA process is
described below in the NEPA Process
and Environmental Document section of
this notice.
By this notice, the Commission
requests public comments on the scope
of issues to address in the
environmental document. To ensure
that your comments are timely and
properly recorded, please submit your
comments so that the Commission
receives them in Washington, DC on or
before 5:00 p.m. Eastern Time on
December 9, 2020. Comments may be
submitted in written form. Further
details on how to submit comments are
provided in the Public Participation
section of this notice.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
Your input will help the Commission
staff determine what issues they need to
evaluate in the environmental
document. Commission staff will
consider all written comments during
the preparation of the environmental
document.
If you submitted comments on this
project to the Commission before the
opening of this docket on October 9,
2020, you will need to file those
comments in Docket No. CP21–6–000 to
ensure they are considered as part of
this proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
VerDate Sep<11>2014
20:13 Nov 13, 2020
Jkt 253001
seek to negotiate a mutually acceptable
easement agreement. You are not
required to enter into an agreement.
However, if the Commission approves
the project, the Natural Gas Act conveys
the right of eminent domain to the
company. Therefore, if you and the
company do not reach an easement
agreement, the pipeline company could
initiate condemnation proceedings in
court. In such instances, compensation
would be determined by a judge in
accordance with state law. The
Commission does not subsequently
grant, exercise, or oversee the exercise
of that eminent domain authority. The
courts have exclusive authority to
handle eminent domain cases; the
Commission has no jurisdiction over
these matters.
Spire Storage provided landowners
with a fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ which addresses typically
asked questions, including the use of
eminent domain and how to participate
in the Commission’s proceedings. This
fact sheet along with other landowner
topics of interest are available for
viewing on the FERC website
(www.ferc.gov) under the Natural Gas
Questions or Landowner Topics link.
Public Participation
There are three methods you can use
to submit your comments to the
Commission. Please carefully follow
these instructions so that your
comments are properly recorded. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to FERC Online. Using
eComment is an easy method for
submitting brief, text-only comments on
a project;
(2) You can file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to FERC Online. With
eFiling, you can provide comments in a
variety of formats by attaching them as
a file with your submission. New
eFiling users must first create an
account by clicking on ‘‘eRegister.’’ You
will be asked to select the type of filing
you are making; a comment on a
particular project is considered a
‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
73033
Commission. Be sure to reference the
project docket number (CP21–6–000) on
your letter. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
Additionally, the Commission offers a
free service called eSubscription which
makes it easy to stay informed of all
issuances and submittals regarding the
dockets/projects to which you
subscribe. These instant email
notifications are the fastest way to
receive notification and provide a link
to the document files which can reduce
the amount of time you spend
researching proceedings. Go to https://
www.ferc.gov/ferc-online/overview to
register for eSubscription.
Summary of the Proposed Project
Spire Storage proposes to expand its
natural gas storage facilities at its
existing Clear Creek Storage Field in
Uinta County, Wyoming in order to
increase the certificated gas capacities
from 4.0 billion cubic feet (Bcf) to 20
Bcf, and increase the maximum daily
injection and withdrawal capacities
from 35 million cubic feet (MMcf) and
50 MMcf per day, to 350 MMcf and 500
MMcf per day, respectively. Spire
Storage further proposes to construct
pipeline connections north to the
Canyon Creek Plant, south to the Kern
River Gas Transmission mainline, and
reconnect with the Questar Pipeline at
the Clear Creek Plant. According to
Spire Storage, the purpose of this
project is to increase storage capacity
and enhance operational capabilities to
satisfy market demand for natural gas
services in the Western United States.
The Clear Creek Expansion Project
would consist of the following facilities:
• Four compressor units at the Clear
Creek Plant;
• a tank storage and natural gas
liquids fueling equipment facility on an
existing pad;
• 11 new injection/withdrawal wells,
one new water disposal well, and
associated lines;
• approximately 10.6 miles of 20inch-diameter pipeline;
• approximately 3.5 miles of 4,160volt powerline; and
• other related appurtenances.
E:\FR\FM\16NON1.SGM
16NON1
73034
Federal Register / Vol. 85, No. 221 / Monday, November 16, 2020 / Notices
The general location of the project
facilities is shown in appendix 1.1
Land Requirements for Construction
Construction of the proposed facilities
would disturb about 249.0 acres of land
for the aboveground facilities and the
pipeline. Following construction, Spire
Storage would maintain about 128.1
acres for permanent operation of the
project’s facilities; the remaining
acreage would be restored and revert to
former uses.
jbell on DSKJLSW7X2PROD with NOTICES
NEPA Process and the Environmental
Document
Any environmental document issued
by the Commission will discuss impacts
that could occur as a result of the
construction and operation of the
proposed project under the relevant
general resource areas:
• Geology and soils;
• water resources and wetlands;
• vegetation and wildlife;
• threatened and endangered species;
• cultural resources;
• land use;
• air quality and noise; and
• reliability and safety.
Commission staff will also evaluate
reasonable alternatives to the proposed
project or portions of the project and
make recommendations on how to
lessen or avoid impacts on the various
resource areas. Your comments will
help Commission staff identify and
focus on the issues that might have an
effect on the human environment and
potentially eliminate others from further
study and discussion in the
environmental document.
Following this scoping period,
Commission staff will determine
whether to prepare an Environmental
Assessment (EA) or an Environmental
Impact Statement (EIS). The EA or the
EIS will present Commission staff’s
independent analysis of the issues. If
Commission staff prepares an EA, a
Notice of Schedule for the Preparation
of an Environmental Assessment will be
issued. The EA may be issued for an
allotted public comment period. The
Commission would consider timely
comments on the EA before making its
decision regarding the proposed project.
1 The appendices referenced in this notice will
not appear in the Federal Register. Copies of the
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’. For instructions on
connecting to eLibrary, refer to the last page of this
notice. At this time, the Commission has suspended
access to the Commission’s Public Reference Room
due to the proclamation declaring a National
Emergency concerning the Novel Coronavirus
Disease (COVID–19), issued by the President on
March 13, 2020. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll free, (886)
208–3676 or TTY (202) 502–8659.
VerDate Sep<11>2014
20:13 Nov 13, 2020
Jkt 253001
If Commission staff prepares an EIS, a
Notice of Intent to Prepare an EIS/
Notice of Schedule will be issued,
which will open up an additional
comment period. Staff will then prepare
a draft EIS which will be issued for
public comment. Commission staff will
consider all timely comments received
during the comment period on the draft
EIS and revise the document, as
necessary, before issuing a final EIS.
Any EA or draft and final EIS will be
available in electronic format in the
public record through eLibrary 2 and the
Commission’s natural gas
environmental documents web page
(https://www.ferc.gov/industries-data/
natural-gas/environment/
environmental-documents). If
eSubscribed, you will receive instant
email notification when the
environmental document is issued.
With this notice, the Commission is
asking agencies with jurisdiction by law
and/or special expertise with respect to
the environmental issues of this project
to formally cooperate in the preparation
of the environmental document.3
Agencies that would like to request
cooperating agency status should follow
the instructions for filing comments
provided under the Public Participation
section of this notice. Currently, the
Bureau of Land Management has
expressed its intention to participate as
a cooperating agency in the preparation
of the environmental document to
satisfy its NEPA responsibilities related
to this project.
Consultation Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, the Commission is
using this notice to initiate consultation
with the applicable State Historic
Preservation Office(s), and to solicit
their views and those of other
government agencies, interested Indian
tribes, and the public on the project’s
potential effects on historic properties.4
The environmental document for this
project will document findings on the
impacts on historic properties and
2 For instructions on connecting to eLibrary, refer
to the last page of this notice.
3 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Section 1501.6.
4 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
PO 00000
Frm 00018
Fmt 4703
Sfmt 9990
summarize the status of consultations
under section 106.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project and includes a
mailing address with their comments.
Commission staff will update the
environmental mailing list as the
analysis proceeds to ensure that
Commission notices related to this
environmental review are sent to all
individuals, organizations, and
government entities interested in and/or
potentially affected by the proposed
project.
If you need to make changes to your
name/address, or if you would like to
remove your name from the mailing list,
please return the attached ‘‘Mailing List
Update Form’’ (appendix 2).
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number in the ‘‘Docket Number’’
field. Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or (866)
208–3676, or for TTY, contact (202)
502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Public sessions or site visits will be
posted on the Commission’s calendar
located at https://w.ferc.gov/newsevents/events along with other related
information.
Dated: November 9, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–25209 Filed 11–13–20; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\16NON1.SGM
16NON1
Agencies
[Federal Register Volume 85, Number 221 (Monday, November 16, 2020)]
[Notices]
[Pages 73032-73034]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-25209]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP21-6-000]
Spire Storage West, LLC; Notice of Scoping Period Requesting
Comments on Environmental Issues for the Proposed Clear Creek Expansion
Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental document, that will discuss
the environmental impacts of the Clear Creek Expansion Project
involving construction and operation of facilities by Spire Storage
West, LLC (Spire Storage) in Uinta County, Wyoming. The Commission will
use this environmental document in its decision-making process to
determine whether the project is in the public convenience and
necessity.
[[Page 73033]]
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies regarding the project. As part of the National Environmental
Policy Act (NEPA) review process, the Commission takes into account
concerns the public may have about proposals and the environmental
impacts that could result from its action whenever it considers the
issuance of a Certificate of Public Convenience and Necessity. This
gathering of public input is referred to as ``scoping.'' The main goal
of the scoping process is to focus the analysis in the environmental
document on the important environmental issues. Additional information
about the Commission's NEPA process is described below in the NEPA
Process and Environmental Document section of this notice.
By this notice, the Commission requests public comments on the
scope of issues to address in the environmental document. To ensure
that your comments are timely and properly recorded, please submit your
comments so that the Commission receives them in Washington, DC on or
before 5:00 p.m. Eastern Time on December 9, 2020. Comments may be
submitted in written form. Further details on how to submit comments
are provided in the Public Participation section of this notice.
Your comments should focus on the potential environmental effects,
reasonable alternatives, and measures to avoid or lessen environmental
impacts. Your input will help the Commission staff determine what
issues they need to evaluate in the environmental document. Commission
staff will consider all written comments during the preparation of the
environmental document.
If you submitted comments on this project to the Commission before
the opening of this docket on October 9, 2020, you will need to file
those comments in Docket No. CP21-6-000 to ensure they are considered
as part of this proceeding.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this proposed
project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the proposed facilities. The company
would seek to negotiate a mutually acceptable easement agreement. You
are not required to enter into an agreement. However, if the Commission
approves the project, the Natural Gas Act conveys the right of eminent
domain to the company. Therefore, if you and the company do not reach
an easement agreement, the pipeline company could initiate condemnation
proceedings in court. In such instances, compensation would be
determined by a judge in accordance with state law. The Commission does
not subsequently grant, exercise, or oversee the exercise of that
eminent domain authority. The courts have exclusive authority to handle
eminent domain cases; the Commission has no jurisdiction over these
matters.
Spire Storage provided landowners with a fact sheet prepared by the
FERC entitled ``An Interstate Natural Gas Facility On My Land? What Do
I Need To Know?'' which addresses typically asked questions, including
the use of eminent domain and how to participate in the Commission's
proceedings. This fact sheet along with other landowner topics of
interest are available for viewing on the FERC website (www.ferc.gov)
under the Natural Gas Questions or Landowner Topics link.
Public Participation
There are three methods you can use to submit your comments to the
Commission. Please carefully follow these instructions so that your
comments are properly recorded. The Commission encourages electronic
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected].
(1) You can file your comments electronically using the eComment
feature, which is located on the Commission's website (www.ferc.gov)
under the link to FERC Online. Using eComment is an easy method for
submitting brief, text-only comments on a project;
(2) You can file your comments electronically by using the eFiling
feature, which is located on the Commission's website (www.ferc.gov)
under the link to FERC Online. With eFiling, you can provide comments
in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You will be asked to select the type of filing you
are making; a comment on a particular project is considered a ``Comment
on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the Commission. Be sure to reference the project docket number (CP21-6-
000) on your letter. Submissions sent via the U.S. Postal Service must
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
Additionally, the Commission offers a free service called eSubscription
which makes it easy to stay informed of all issuances and submittals
regarding the dockets/projects to which you subscribe. These instant
email notifications are the fastest way to receive notification and
provide a link to the document files which can reduce the amount of
time you spend researching proceedings. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
Summary of the Proposed Project
Spire Storage proposes to expand its natural gas storage facilities
at its existing Clear Creek Storage Field in Uinta County, Wyoming in
order to increase the certificated gas capacities from 4.0 billion
cubic feet (Bcf) to 20 Bcf, and increase the maximum daily injection
and withdrawal capacities from 35 million cubic feet (MMcf) and 50 MMcf
per day, to 350 MMcf and 500 MMcf per day, respectively. Spire Storage
further proposes to construct pipeline connections north to the Canyon
Creek Plant, south to the Kern River Gas Transmission mainline, and
reconnect with the Questar Pipeline at the Clear Creek Plant. According
to Spire Storage, the purpose of this project is to increase storage
capacity and enhance operational capabilities to satisfy market demand
for natural gas services in the Western United States.
The Clear Creek Expansion Project would consist of the following
facilities:
Four compressor units at the Clear Creek Plant;
a tank storage and natural gas liquids fueling equipment
facility on an existing pad;
11 new injection/withdrawal wells, one new water disposal
well, and associated lines;
approximately 10.6 miles of 20-inch-diameter pipeline;
approximately 3.5 miles of 4,160-volt powerline; and
other related appurtenances.
[[Page 73034]]
The general location of the project facilities is shown in appendix
1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of the appendices were sent to all
those receiving this notice in the mail and are available at
www.ferc.gov using the link called ``eLibrary''. For instructions on
connecting to eLibrary, refer to the last page of this notice. At
this time, the Commission has suspended access to the Commission's
Public Reference Room due to the proclamation declaring a National
Emergency concerning the Novel Coronavirus Disease (COVID-19),
issued by the President on March 13, 2020. For assistance, contact
FERC at [email protected] or call toll free, (886) 208-3676
or TTY (202) 502-8659.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facilities would disturb about 249.0
acres of land for the aboveground facilities and the pipeline.
Following construction, Spire Storage would maintain about 128.1 acres
for permanent operation of the project's facilities; the remaining
acreage would be restored and revert to former uses.
NEPA Process and the Environmental Document
Any environmental document issued by the Commission will discuss
impacts that could occur as a result of the construction and operation
of the proposed project under the relevant general resource areas:
Geology and soils;
water resources and wetlands;
vegetation and wildlife;
threatened and endangered species;
cultural resources;
land use;
air quality and noise; and
reliability and safety.
Commission staff will also evaluate reasonable alternatives to the
proposed project or portions of the project and make recommendations on
how to lessen or avoid impacts on the various resource areas. Your
comments will help Commission staff identify and focus on the issues
that might have an effect on the human environment and potentially
eliminate others from further study and discussion in the environmental
document.
Following this scoping period, Commission staff will determine
whether to prepare an Environmental Assessment (EA) or an Environmental
Impact Statement (EIS). The EA or the EIS will present Commission
staff's independent analysis of the issues. If Commission staff
prepares an EA, a Notice of Schedule for the Preparation of an
Environmental Assessment will be issued. The EA may be issued for an
allotted public comment period. The Commission would consider timely
comments on the EA before making its decision regarding the proposed
project. If Commission staff prepares an EIS, a Notice of Intent to
Prepare an EIS/Notice of Schedule will be issued, which will open up an
additional comment period. Staff will then prepare a draft EIS which
will be issued for public comment. Commission staff will consider all
timely comments received during the comment period on the draft EIS and
revise the document, as necessary, before issuing a final EIS. Any EA
or draft and final EIS will be available in electronic format in the
public record through eLibrary \2\ and the Commission's natural gas
environmental documents web page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). If eSubscribed, you
will receive instant email notification when the environmental document
is issued.
---------------------------------------------------------------------------
\2\ For instructions on connecting to eLibrary, refer to the
last page of this notice.
---------------------------------------------------------------------------
With this notice, the Commission is asking agencies with
jurisdiction by law and/or special expertise with respect to the
environmental issues of this project to formally cooperate in the
preparation of the environmental document.\3\ Agencies that would like
to request cooperating agency status should follow the instructions for
filing comments provided under the Public Participation section of this
notice. Currently, the Bureau of Land Management has expressed its
intention to participate as a cooperating agency in the preparation of
the environmental document to satisfy its NEPA responsibilities related
to this project.
---------------------------------------------------------------------------
\3\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Section 1501.6.
---------------------------------------------------------------------------
Consultation Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, the Commission is using this notice to initiate
consultation with the applicable State Historic Preservation Office(s),
and to solicit their views and those of other government agencies,
interested Indian tribes, and the public on the project's potential
effects on historic properties.\4\ The environmental document for this
project will document findings on the impacts on historic properties
and summarize the status of consultations under section 106.
---------------------------------------------------------------------------
\4\ The Advisory Council on Historic Preservation's regulations
are at Title 36, Code of Federal Regulations, Part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project and includes a mailing address with their
comments. Commission staff will update the environmental mailing list
as the analysis proceeds to ensure that Commission notices related to
this environmental review are sent to all individuals, organizations,
and government entities interested in and/or potentially affected by
the proposed project.
If you need to make changes to your name/address, or if you would
like to remove your name from the mailing list, please return the
attached ``Mailing List Update Form'' (appendix 2).
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website at www.ferc.gov using the eLibrary link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number
in the ``Docket Number'' field. Be sure you have selected an
appropriate date range. For assistance, please contact FERC Online
Support at [email protected] or (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of all formal documents issued by the Commission, such as orders,
notices, and rulemakings.
Public sessions or site visits will be posted on the Commission's
calendar located at https://w.ferc.gov/news-events/events along with
other related information.
Dated: November 9, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-25209 Filed 11-13-20; 8:45 am]
BILLING CODE 6717-01-P