Premium Energy Holdings, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 73035 [2020-25208]
Download as PDF
Federal Register / Vol. 85, No. 221 / Monday, November 16, 2020 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15035–000]
jbell on DSKJLSW7X2PROD with NOTICES
Premium Energy Holdings, LLC; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On June 9, 2020, Premium Energy
Holdings LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Isabella Pumped Storage Project
(Isabella Project or project), a closedloop pumped storage project to be
located in Kern County, California. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) An upper reservoir
created by a new dam at one of three
alternative locations in the Southern
Sierra Nevada Mountains with a
capacity between 19,073 and 34,459
acre-feet, at an elevation between 4,500
and 5,960 feet above mean sea level; (2)
a tunnel system of steel penstocks and
concrete pressurized tunnels to connect
the upper and lower reservoirs to the
powerhouse; (3) pump-turbine units in
an underground powerhouse with
generation capacity of 2,000 megawatts
located at one of the three alternative
locations; (4) a cavern of the
transformers chamber adjacent to the
powerhouse; (5) the existing Isabella
Reservoir, to be used as the lower
reservoir, with a storage capacity of
568,000 acre-feet, at an elevation of
2,580 feet above mean sea level; (6)
electrical switchyards and
interconnecting transmission lines from
the powerhouse to the nearest major
transmission interconnection at one of
the six alternative locations; and (7)
appurtenant facilities. The estimated
average annual generation of the Isabella
Project would be 6,900 gigawatt-hours.
Applicant Contact: Victor M. Rojas,
Premium Energy Holdings, 355 South
Lemon Avenue, Suite A, Walnut,
California 91789; phone: (909) 595–
5314.
FERC Contact: Khatoon Melick, (202)
502–8433, khatoon.melick@ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
VerDate Sep<11>2014
20:13 Nov 13, 2020
Jkt 253001
(without notices of intent), or notices of
intent to file competing applications: 60
Days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. The first page of any filing
should include docket number P–
15035–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–15035) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: November 9, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–25208 Filed 11–13–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Number: CP21–10–000.
Applicants: Tennessee Gas Pipeline
Company, L.L.C.
Description: Abbreviated Joint
Application for Authorization to
Abandon Emergency Exchange Service
PO 00000
Frm 00019
Fmt 4703
Sfmt 9990
73035
of Tennessee Gas Pipeline Company,
L.L.C., et al. under CP21–10.
Filed Date: 11/2/2020.
Accession Number: 202011025124.
Comments/Protests Due: 5 p.m. ET
11/23/2020.
Docket Number: PR21–4–000.
Applicants: Columbia Gas of Ohio,
Inc.
Description: Submits tariff filing per
284.123(b),(e)/: COH Rates effective 10–
27–2020 to be effective 10/27/2020.
Filed Date: 11/4/2020.
Accession Number: 202011045030.
Comments/Protests Due: 5 p.m. ET
11/25/2020.
Docket Number: PR21–5–000.
Applicants: Moss Bluff Hub, LLC.
Description: Submits tariff filing per
284.123(b),(e)/: Moss Bluff LINK URL
Conversion Filing to be effective 12/1/
2020.
Filed Date: 11/5/2020.
Accession Number: 202011055026.
Comments/Protests Due: 5 p.m. ET
11/27/2020.
Docket Numbers: RP21–200–000.
Applicants: Rover Pipeline LLC.
Description: § 4(d) Rate Filing: Fuel
Filing on 11–5–20 to be effective 11/1/
2020.
Filed Date: 11/5/20.
Accession Number: 20201105–5061.
Comments Due: 5 p.m. ET 11/10/20.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 9, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–25206 Filed 11–13–20; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\16NON1.SGM
16NON1
Agencies
[Federal Register Volume 85, Number 221 (Monday, November 16, 2020)]
[Notices]
[Page 73035]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-25208]
[[Page 73035]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 15035-000]
Premium Energy Holdings, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On June 9, 2020, Premium Energy Holdings LLC, filed an application
for a preliminary permit, pursuant to section 4(f) of the Federal Power
Act (FPA), proposing to study the feasibility of the Isabella Pumped
Storage Project (Isabella Project or project), a closed-loop pumped
storage project to be located in Kern County, California. The sole
purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed project would consist of the following: (1) An upper
reservoir created by a new dam at one of three alternative locations in
the Southern Sierra Nevada Mountains with a capacity between 19,073 and
34,459 acre-feet, at an elevation between 4,500 and 5,960 feet above
mean sea level; (2) a tunnel system of steel penstocks and concrete
pressurized tunnels to connect the upper and lower reservoirs to the
powerhouse; (3) pump-turbine units in an underground powerhouse with
generation capacity of 2,000 megawatts located at one of the three
alternative locations; (4) a cavern of the transformers chamber
adjacent to the powerhouse; (5) the existing Isabella Reservoir, to be
used as the lower reservoir, with a storage capacity of 568,000 acre-
feet, at an elevation of 2,580 feet above mean sea level; (6)
electrical switchyards and interconnecting transmission lines from the
powerhouse to the nearest major transmission interconnection at one of
the six alternative locations; and (7) appurtenant facilities. The
estimated average annual generation of the Isabella Project would be
6,900 gigawatt-hours.
Applicant Contact: Victor M. Rojas, Premium Energy Holdings, 355
South Lemon Avenue, Suite A, Walnut, California 91789; phone: (909)
595-5314.
FERC Contact: Khatoon Melick, (202) 502-8433,
[email protected].
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 Days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://ferconline.ferc.gov/QuickComment.aspx. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852. The first page of any filing should include docket
number P-15035-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-15035) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: November 9, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-25208 Filed 11-13-20; 8:45 am]
BILLING CODE 6717-01-P