Grandfathering (GF) Registration Notice, 71985-71986 [2020-24957]
Download as PDF
Federal Register / Vol. 85, No. 219 / Thursday, November 12, 2020 / Notices
Bright obtained authority to control BCR
as a rail carrier.3 (Pet. 3–4.)
TERRI states that in December 1995,
‘‘[d]ue to an inadvertent oversight and
lack of knowledge that additional
agency approval was necessary,’’ BCR
was merged with and into TERRI, the
surviving corporation, without prior
agency authorization as required under
49 U.S.C. 11323–25. (Pet. 4–5.) TERRI
explains that, had it ‘‘been aware of its
obligation to obtain additional agency
authorization, it would have timely filed
a verified notice of exemption under 49
CFR 1180.2(d)(3) prior to consummating
the merger.’’ (Id. at 5.) In its petition,
TERRI disclaims any intention ‘‘to flout
the law,’’ as it ‘‘only became aware of
the need for such authorization as part
of current Counsel’s due diligence
relating to the imminent and expected
sale’’ of BC&G to the State of West
Virginia. (Id.) To address this oversight,
TERRI seeks expedited consideration of
its petition under 49 U.S.C. 10502 for an
exemption from the prior approval
requirements of 49 U.S.C. 11323–25 to
authorize its 1995 merger with BCR and
seeks retroactive effect.
jbell on DSKJLSW7X2PROD with NOTICES
Discussion and Conclusions
Under 49 U.S.C. 11323(a)(1), the
merger of two rail carriers into one
corporation for the ownership,
management, or operation of the
previously separately owned properties
requires prior approval of the Board.
When a transaction does not involve the
merger or control of at least two Class
I railroads, it is governed by 49 U.S.C.
11324(d). However, under 49 U.S.C.
10502(a), the Board must exempt a
transaction or service from regulation
upon finding that: (1) Regulation is not
necessary to carry out the rail
transportation policy (RTP) of 49 U.S.C.
10101; and (2) either (a) the transaction
or service is of limited scope, or (b)
regulation is not needed to protect
shippers from the abuse of market
power.
Here, an exemption from the prior
approval requirements of sections
11323–25 is consistent with section
10502(a). Detailed scrutiny of this
transaction is not necessary to carry out
the RTP here. An exemption from the
application process would promote a
fair and expeditious regulatory decisionthe TERRI line; milepost 0 on the BC&G line) to
Widen (milepost 18.6 on the BC&G line) in Clay
County, W. Va.).
3 See Bright—Control Exemption—Buffalo Creek
R.R., FD 31969, slip op. at 3 (ICC served Mar. 9,
1992) (granting an exemption for Bright to control
BCR). Bright placed the stock of BCR in an
independent voting trust before BCR acquired the
BC&G line in order to avoid controlling BCR as a
rail carrier before obtaining his ICC authority to do
so. See id. at 1; (Pet. 3–4).
VerDate Sep<11>2014
17:07 Nov 10, 2020
Jkt 253001
making process, minimize the need for
Federal regulatory control, encourage
honest and efficient management of
railroads, and result in the expeditious
handling of this proceeding. See 49
U.S.C. 10101(2), (9), (15). Other aspects
of the RTP would not be adversely
affected.
Regulation of this transaction is not
needed to protect shippers from the
abuse of market power.4 At the time of
the 1995 merger, TERRI and BCR
already were commonly controlled by
Bright, and indeed, as TERRI points out,
the transaction likely would have
qualified for the class exemption for
transactions within a corporate family
under 49 CFR 1180.2(d)(3) had it been
timely sought. Moreover, the record
indicates there has been no loss of rail
competition, no adverse change in the
competitive balance in the
transportation market, and no change in
the level of service to any shippers
because, as TERRI explains in its
petition, the BC&G rail line does not
connect with another rail line other than
TERRI’s at Dundon, W. Va., and has not
carried any traffic in over twenty years.
(Pet. 6.)
Under 49 U.S.C. 10502(g), the Board
may not use its exemption authority to
relieve a rail carrier of its statutory
obligation to protect the interests of its
employees. Section 11326(c), however,
precludes the Board from imposing
labor protection for Class III rail carriers
receiving authority under sections
11324–25. Accordingly, the Board may
not impose labor protective conditions
here because TERRI and BCR were both
Class III carriers at the time of the
merger.
This transaction is categorically
excluded from environmental review
under 49 CFR 1105.6(c)(1) and from the
historic reporting requirements under
49 CFR 1105.8(b).
As stated above, TERRI seeks an
exemption with retroactive effect,
arguing that its failure to obtain prior
approval or an exemption for its merger
with BCR was ‘‘an inadvertent
oversight’’ and ‘‘was in no way intended
to flout the law[.]’’ (Pet. 5.) Although the
Board on occasion has granted authority
retroactively,5 it generally disfavors
4 Because the Board concludes that regulation is
not needed to protect shippers from the abuse of
market power, it is unnecessary to determine
whether the proposed transaction is limited in
scope. See 49 U.S.C. 10502(a).
5 See, e.g., Grand Elk R.R.—Acquis. of Incidental
Trackage Rights Exemption—Norfolk S. Ry., FD
35187 (Sub-No. 1) et al., slip op. at 4 (STB served
Nov. 20, 2017) (after having previously denied a
request for retroactive authority, reopening the
proceeding to make exemption retroactive in light
of changed circumstances).
PO 00000
Frm 00111
Fmt 4703
Sfmt 4703
71985
retroactive grants of authority.6 As
TERRI provides no explanation as to
why retroactive authority is needed, the
Board declines to grant retroactive
authority here.
It is ordered:
1. Under 49 U.S.C. 10502, the Board
exempts from the prior approval
requirements of 49 U.S.C. 11323–25
BCR’s merger with and into TERRI.
2. Notice of the exemption will be
published in the Federal Register.
3. The exemption will be effective on
the service date of this decision.
Decided: November 5, 2020.
By the Board, Board Members Begeman,
Fuchs, and Oberman.
Tammy Lowery,
Clearance Clerk.
[FR Doc. 2020–25016 Filed 11–10–20; 8:45 am]
BILLING CODE 4915–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Grandfathering (GF) Registration
Notice
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
This notice lists
Grandfathering Registration for projects
by the Susquehanna River Basin
Commission during the period set forth
in DATES.
DATES: October 1–31, 2020.
ADDRESSES: Susquehanna River Basin
Commission, 4423 North Front Street,
Harrisburg, PA 17110–1788.
FOR FURTHER INFORMATION CONTACT:
Jason E. Oyler, General Counsel and
Secretary to the Commission, telephone:
(717) 238–0423, ext. 1312; fax: (717)
238–2436; email: joyler@srbc.net.
Regular mail inquiries may be sent to
the above address.
SUPPLEMENTARY INFORMATION: This
notice lists GF Registration for projects,
described below, pursuant to 18 CFR
806, subpart E for the time period
specified above:
SUMMARY:
Grandfathering Registration Under 18
CFR Part 806, Subpart E
1. Danville Borough Municipal
Authority—Public Water Supply
System, GF Certificate No. GF–
202010119, Danville Borough, Montour
County, Pa.; Susquehanna River; Issue
Date: October 13, 2020.
6 See, e.g., Ark.-Okla. R.R.—Acquis. & Operation
Exemption—Okla., FD 36323, slip op. at 3 (STB
served Sept. 19, 2019) (declining a request for
retroactive authority and stating that the Board
‘‘generally disfavors retroactive grants of
authority’’).
E:\FR\FM\12NON1.SGM
12NON1
71986
Federal Register / Vol. 85, No. 219 / Thursday, November 12, 2020 / Notices
2. Pennsylvania Department of
Corrections—State Correctional Institute
at Camp Hill, GF Certificate No. GF–
202010120, Lower Allen Township,
Cumberland County, Pa.; Cedar Run and
consumptive use; Issue Date: October
13, 2020.
3. Pennsylvania Department of
Corrections—State Correctional Institute
at Dallas, GF Certificate No. GF–
202010121, Jackson Township, Luzerne
County, Pa.; Well 1 and consumptive
use; Issue Date: October 13, 2020.
4. Joseph and Susan Tallman—Joseph
and Susan Tallman Farm, GF Certificate
No. GF–202010122, Porter Township,
Schuylkill County, Pa.; Wiconisco
Creek; Issue Date: October 13, 2020.
5. Port Royal Municipal Authority—
Public Water Supply System, GF
Certificate No. GF–202010123, Turbett
Township, Juniata County, Pa.; Wells 1,
3, 4, and 5; Issue Date: October 15, 2020.
6. Pennsylvania Fish & Boat
Commission—Huntsdale State Fish
Hatchery, GF Certificate No. GF–
202010124, Penn Township,
Cumberland County, Pa.; Northline/
Knaubs, McManus, and Springs 3, 4, 5,
6, 7, and 9; Issue Date: October 15, 2020.
7. Centre Hall Borough—Centre Hall
Borough Waterworks, GF Certificate No.
GF–202010125, Centre Hall Borough
and Potter Township, Centre County,
Pa.; Wells 8 and 9; Issue Date: October
15, 2020.
8. Henry Reiner—Reiner Farms, GF
Certificate No. GF–202010126, Upper
Mahantongo Township, Schuylkill
County, Pa.; Mahantongo Creek—Pivot
and Mahantongo Creek—Reel; Issue
Date: October 15, 2020.
Authority: Public Law 91–575, 84 Stat.
1509 et seq., 18 CFR parts 806 and 808.
Dated: November 5, 2020.
Jason E. Oyler,
General Counsel and Secretary to the
Commission.
[FR Doc. 2020–24957 Filed 11–10–20; 8:45 am]
BILLING CODE 7040–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Commission Meeting
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
The Susquehanna River Basin
Commission will conduct its regular
business meeting on December 11, 2020,
from Harrisburg, Pennsylvania. Details
concerning the matters to be addressed
at the business meeting are contained in
the Supplementary Information section
of this notice. Also the Commission
jbell on DSKJLSW7X2PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
17:07 Nov 10, 2020
Jkt 253001
published a document in the Federal
Register on October 7, 2020, concerning
its public hearing on November 5, 2020,
in Harrisburg, Pennsylvania.
The meeting will be held on
Friday, December 11, 2020, at 9 a.m.
DATES:
The meeting will be
conducted telephonically from the
Susquehanna River Basin Commission,
4423 N. Front Street, Harrisburg, PA
17110.
Dated: November 5, 2020.
Jason E. Oyler,
General Counsel and Secretary to the
Commission.
[FR Doc. 2020–24958 Filed 11–10–20; 8:45 am]
BILLING CODE 7040–01–P
ADDRESSES:
TENNESSEE VALLEY AUTHORITY
Sunshine Act Meetings
TIME AND DATE:
FOR FURTHER INFORMATION CONTACT:
2020.
Jason E. Oyler, General Counsel and
Secretary to the Commission, telephone:
717–238–0423; fax: 717–238–2436.
PLACE:
The
business meeting will include actions or
presentations on the following items: (1)
Adoption of a policy to incentivize the
use of impaired waters; (2) adoption of
an updated regulatory program fee
schedule; (3) adoption of a general
permit for groundwater remediation
projects; (4) ratification/approval of
contracts/grants; (5) a report on
delegated settlements; and (6)
Regulatory Program projects.
This agenda is complete at the time of
issuance, but other items may be added,
and some stricken without further
notice. The listing of an item on the
agenda does not necessarily mean that
the Commission will take final action on
it at this meeting. When the
Commission does take final action,
notice of these actions will be published
in the Federal Register after the
meeting. Any actions specific to projects
will also be provided in writing directly
to project sponsors.
Due to the COVID–19 orders, the
meeting will be conducted
telephonically and there will be no
physical public attendance. The public
is invited to attend the Commission’s
business meeting by telephone
conference and may do so by dialing
Conference Call # 1–888–387–8686, the
Conference Room Code # 9179686050.
Written comments pertaining to items
on the agenda at the business meeting
may be mailed to the Susquehanna
River Basin Commission, 4423 North
Front Street, Harrisburg, Pennsylvania
17110–1788, or submitted electronically
through www.srbc.net/about/meetingsevents/business-meeting.html. Such
comments are due to the Commission
on or before December 9, 2020.
Comments will not be accepted at the
business meeting noticed herein.
SUPPLEMENTARY INFORMATION:
Authority: Public Law 91–575, 84 Stat.
1509 et seq., 18 CFR parts 806, 807, and 808.
PO 00000
Frm 00112
Fmt 4703
Sfmt 4703
10 a.m. on November 13,
Please use the following link for
the live stream of meeting: https://
bcove.video/2ThhkTb.
STATUS: Open, via live streaming only.
MATTERS TO BE CONSIDERED:
Meeting No. 20–04
The TVA Board of Directors will hold
a public meeting on November 13, 2020.
Due to the ongoing risks associated with
the COVID–19 outbreak, the meeting
will be conducted via teleconference.
The meeting will be called to order at
10 a.m. ET to consider the agenda items
listed below. TVA Board Chair John
Ryder and TVA management will
answer questions from the news media
following the Board meeting.
Public health concerns also require a
change to the Board’s public listening
session. Although in-person comments
from the public are not feasible, the
Board is encouraging those wishing to
express their opinions to submit written
comments that will be provided to the
Board members before the November 13
meeting. Written comments can be
submitted through the same online
system used to register to speak at
previous listening sessions.
Agenda
1. Approval of minutes of the August
27, 2020, Board Meeting
2. Report from President and CEO
3. Report of the Finance, Rates, and
Portfolio Committee
A. FY 2021 Financial Plan and Budget
B. Electric Vehicle Charging—Policy
and Pricing
4. Report of the People and Performance
Committee
A. Fiscal Year 2020 Performance and
Compensation
B. Fiscal Year 2021 Corporate Goals
5. Report of the Audit, Risk, and
Regulation Committee
A. Extension of Pandemic Relief
Delegation
6. Report of the Nuclear Oversight
Committee
7. Report of the External Relations
Committee
8. Information Items
E:\FR\FM\12NON1.SGM
12NON1
Agencies
[Federal Register Volume 85, Number 219 (Thursday, November 12, 2020)]
[Notices]
[Pages 71985-71986]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-24957]
=======================================================================
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Grandfathering (GF) Registration Notice
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: This notice lists Grandfathering Registration for projects by
the Susquehanna River Basin Commission during the period set forth in
DATES.
DATES: October 1-31, 2020.
ADDRESSES: Susquehanna River Basin Commission, 4423 North Front Street,
Harrisburg, PA 17110-1788.
FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel and
Secretary to the Commission, telephone: (717) 238-0423, ext. 1312; fax:
(717) 238-2436; email: [email protected]. Regular mail inquiries may be
sent to the above address.
SUPPLEMENTARY INFORMATION: This notice lists GF Registration for
projects, described below, pursuant to 18 CFR 806, subpart E for the
time period specified above:
Grandfathering Registration Under 18 CFR Part 806, Subpart E
1. Danville Borough Municipal Authority--Public Water Supply
System, GF Certificate No. GF-202010119, Danville Borough, Montour
County, Pa.; Susquehanna River; Issue Date: October 13, 2020.
[[Page 71986]]
2. Pennsylvania Department of Corrections--State Correctional
Institute at Camp Hill, GF Certificate No. GF-202010120, Lower Allen
Township, Cumberland County, Pa.; Cedar Run and consumptive use; Issue
Date: October 13, 2020.
3. Pennsylvania Department of Corrections--State Correctional
Institute at Dallas, GF Certificate No. GF-202010121, Jackson Township,
Luzerne County, Pa.; Well 1 and consumptive use; Issue Date: October
13, 2020.
4. Joseph and Susan Tallman--Joseph and Susan Tallman Farm, GF
Certificate No. GF-202010122, Porter Township, Schuylkill County, Pa.;
Wiconisco Creek; Issue Date: October 13, 2020.
5. Port Royal Municipal Authority--Public Water Supply System, GF
Certificate No. GF-202010123, Turbett Township, Juniata County, Pa.;
Wells 1, 3, 4, and 5; Issue Date: October 15, 2020.
6. Pennsylvania Fish & Boat Commission--Huntsdale State Fish
Hatchery, GF Certificate No. GF-202010124, Penn Township, Cumberland
County, Pa.; Northline/Knaubs, McManus, and Springs 3, 4, 5, 6, 7, and
9; Issue Date: October 15, 2020.
7. Centre Hall Borough--Centre Hall Borough Waterworks, GF
Certificate No. GF-202010125, Centre Hall Borough and Potter Township,
Centre County, Pa.; Wells 8 and 9; Issue Date: October 15, 2020.
8. Henry Reiner--Reiner Farms, GF Certificate No. GF-202010126,
Upper Mahantongo Township, Schuylkill County, Pa.; Mahantongo Creek--
Pivot and Mahantongo Creek--Reel; Issue Date: October 15, 2020.
Authority: Public Law 91-575, 84 Stat. 1509 et seq., 18 CFR
parts 806 and 808.
Dated: November 5, 2020.
Jason E. Oyler,
General Counsel and Secretary to the Commission.
[FR Doc. 2020-24957 Filed 11-10-20; 8:45 am]
BILLING CODE 7040-01-P