STS Hydropower, LLC; Notice of Application Accepted For Filing and Soliciting Comments, Motions To Intervene, and Protests, 71647-71648 [2020-24929]
Download as PDF
Federal Register / Vol. 85, No. 218 / Tuesday, November 10, 2020 / Notices
Applicants: GridLiance West LLC.
Description: § 205(d) Rate Filing: GLW
TRBAA 2021 Annual Update Filing to
be effective 1/1/2021.
Filed Date: 11/3/20.
Accession Number: 20201103–5112.
Comments Due: 5 p.m. ET 11/24/20.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES21–9–000.
Applicants: Altavista Solar, LLC.
Description: Application Under
Section 204 of the Federal Power Act for
Authorization to Issue Securities for
Altavista Solar, LLC.
Filed Date: 10/29/20.
Accession Number: 20201029–5278.
Comments Due: 5 p.m. ET 11/19/20.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 3, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–24864 Filed 11–9–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jbell on DSKJLSW7X2PROD with NOTICES
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Number: PR20–73–002.
Applicants: DTE Gas Company.
Description: Tariff filing per
284.123(b), (e)/: DTE Gas GSA Errata
Filing to be effective 10/1/2020.
Filed Date: 11/3/2020.
Accession Number: 202011035068.
Comments/Protests Due: 5 p.m. ET
11/13/2020.
VerDate Sep<11>2014
17:21 Nov 09, 2020
Jkt 253001
Docket Numbers: RP21–190–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) Rate Filing: REX
2020–11–03 GT&C Section 13 Revisions
to be effective 12/3/2020.
Filed Date: 11/3/20.
Accession Number: 20201103–5057.
Comments Due: 5 p.m. ET 11/16/20.
Docket Numbers: RP21–191–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate—Yankee Gas 510802
Release eff 11–4–2020 to be effective 11/
4/2020.
Filed Date: 11/3/20.
Accession Number: 20201103–5064.
Comments Due: 5 p.m. ET 11/16/20.
Docket Numbers: RP21–192–000
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreement Update
(EOG Nov. 20) to be effective 11/4/2020.
Filed Date: 11/3/20.
Accession Number: 20201103–5099.
Comments Due: 5 p.m. ET 11/16/20.
Docket Numbers: RP21–193–000.
Applicants: Alliance Pipeline L.P.
Description: § 4(d) Rate Filing:
Negotiated Rates—Contract Adjustments
eff 11–01–2020 to be effective 11/1/
2020.
Filed Date: 11/3/20.
Accession Number: 20201103–5117.
Comments Due: 5 p.m. ET 11/16/20.
Docket Numbers: RP21–194–000.
Applicants: Northern Natural Gas
Company.
Description: § 4(d) Rate Filing:
20201103 Negotiated Rate to be effective
11/3/2020.
Filed Date: 11/3/20.
Accession Number: 20201103–5122.
Comments Due: 5 p.m. ET 11/16/20.
Docket Numbers: RP21–195–000.
Applicants: Enable Mississippi River
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate Filing—SES 6129 to be
effective 11/1/2020.
Filed Date: 11/3/20.
Accession Number: 20201103–5135.
Comments Due: 5 p.m. ET 11/16/20.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
71647
may be considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 4, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–24924 Filed 11–9–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 9000–006]
STS Hydropower, LLC; Notice of
Application Accepted For Filing and
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Temporary
variance of lake level elevation.
b. Project No.: 9000–006.
c. Date Filed: September 21, 2020 and
supplemented October 20, 2020.
d. Applicant: STS Hydropower, LLC.
e. Name of Project: Morrow Dam
Hydroelectric Project.
f. Location: The project is located on
the Kalamazoo River in Kalamazoo
County, Michigan.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Ms. Jody J.
Smet, STS Hydropower, LLC, 116 N.
State Street, P.O. Box 167, Neshkoro,
WI, 85260, (804) 739–0654.
i. FERC Contact: Jennifer Polardino,
(202) 502–6437, Jennifer.Polardino@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 20
days from the issuance of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/doc-sfiling/
ecomment.asp. You must include your
name and contact information at the end
E:\FR\FM\10NON1.SGM
10NON1
jbell on DSKJLSW7X2PROD with NOTICES
71648
Federal Register / Vol. 85, No. 218 / Tuesday, November 10, 2020 / Notices
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may send a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–9000–006. Comments
emailed to Commission staff are not
considered part of the Commission
record.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: The
exemptee requests a temporary variance
from Article 2 of the project’s exemption
(exemption issued July 26, 1985) to
lower the project’s reservoir elevation to
repair damages to the trunnion arms on
two Tainter gates at the Morrow
Hydroelectric Project No. 9000. The
exemptee initiated a controlled
drawdown of the reservoir by 9 feet for
this repair and public safety in October
2019. The exemptee proposes to
complete the work on the Tainter gates
by December 31, 2020 and says it would
refill the reservoir 6 inches per day. The
exemptee proposes to completely refill
the project’s reservoir by no later than
April 1, 2020. During this time, the
exemptee proposes to mitigate impacts
to water quality, sedimentation,
turbidity, cultural resources, and
recreation as a result of the reservoir
drawdown in consultation with the
resource agencies and stakeholders.
l. Locations of the Applications: In
addition to publishing the full text of
this document in the Federal Register,
the Commission provides all interested
persons an opportunity to view and/or
print the contents of this document via
the internet through the Commission’s
website at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
VerDate Sep<11>2014
17:21 Nov 09, 2020
Jkt 253001
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
Agencies may obtain copies of the
application directly from the applicant.
At this time, the Commission has
suspended access to the Commission’s
Public Reference Room due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll free, (866) 208–3676 or TTY, (202)
502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Motions to Intervene, or
Protests: Anyone may submit
comments, a motion to intervene, or a
protest in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
motions to intervene, or protests must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title COMMENTS,
MOTION TO INTERVENE, or PROTEST
as applicable; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis. A copy of all other filings in
reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: November 4, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–24929 Filed 11–9–20; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER20–2647–001.
Applicants: Morgantown Steam, LLC.
Description: Tariff Amendment:
Response to Commission Staff Request
for Information to be effective 8/4/2020.
Filed Date: 11/4/20.
Accession Number: 20201104–5065.
Comments Due: 5 p.m. ET 11/25/20.
Docket Numbers: ER21–314–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: Cost
Responsibility Agreement, SA No. 5840;
Non-Queue No. NQ166 to be effective
10/21/2020.
Filed Date: 11/4/20.
Accession Number: 20201104–5045.
Comments Due: 5 p.m. ET 11/25/20.
Docket Numbers: ER21–315–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
2020–11–04–NSPM–OTP–CAPX–BSSBRev TCEA–596–0.1.0-Filing to be
effective 1/4/2021.
Filed Date: 11/4/20.
Accession Number: 20201104–5067
Comments Due: 5 p.m. ET 11/25/20.
Docket Numbers: ER21–316–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA SA No. 5844; Queue
No. AF1–299 to be effective 10/5/2020.
Filed Date: 11/4/20.
Accession Number: 20201104–5073.
Comments Due: 5 p.m. ET 11/25/20.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
E:\FR\FM\10NON1.SGM
10NON1
Agencies
[Federal Register Volume 85, Number 218 (Tuesday, November 10, 2020)]
[Notices]
[Pages 71647-71648]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-24929]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 9000-006]
STS Hydropower, LLC; Notice of Application Accepted For Filing
and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Temporary variance of lake level elevation.
b. Project No.: 9000-006.
c. Date Filed: September 21, 2020 and supplemented October 20,
2020.
d. Applicant: STS Hydropower, LLC.
e. Name of Project: Morrow Dam Hydroelectric Project.
f. Location: The project is located on the Kalamazoo River in
Kalamazoo County, Michigan.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Ms. Jody J. Smet, STS Hydropower, LLC, 116 N.
State Street, P.O. Box 167, Neshkoro, WI, 85260, (804) 739-0654.
i. FERC Contact: Jennifer Polardino, (202) 502-6437,
[email protected].
j. Deadline for filing comments, motions to intervene, and protests
is 20 days from the issuance of this notice. The Commission strongly
encourages electronic filing. Please file comments, motions to
intervene, and protests using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/doc-sfiling/ecomment.asp. You
must include your name and contact information at the end
[[Page 71648]]
of your comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may send a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852. The first page of any filing should include docket
number P-9000-006. Comments emailed to Commission staff are not
considered part of the Commission record.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. Description of Request: The exemptee requests a temporary
variance from Article 2 of the project's exemption (exemption issued
July 26, 1985) to lower the project's reservoir elevation to repair
damages to the trunnion arms on two Tainter gates at the Morrow
Hydroelectric Project No. 9000. The exemptee initiated a controlled
drawdown of the reservoir by 9 feet for this repair and public safety
in October 2019. The exemptee proposes to complete the work on the
Tainter gates by December 31, 2020 and says it would refill the
reservoir 6 inches per day. The exemptee proposes to completely refill
the project's reservoir by no later than April 1, 2020. During this
time, the exemptee proposes to mitigate impacts to water quality,
sedimentation, turbidity, cultural resources, and recreation as a
result of the reservoir drawdown in consultation with the resource
agencies and stakeholders.
l. Locations of the Applications: In addition to publishing the
full text of this document in the Federal Register, the Commission
provides all interested persons an opportunity to view and/or print the
contents of this document via the internet through the Commission's
website at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the
docket number excluding the last three digits in the docket number
field to access the document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of
new filings and issuances related to this or other pending projects.
Agencies may obtain copies of the application directly from the
applicant. At this time, the Commission has suspended access to the
Commission's Public Reference Room due to the proclamation declaring a
National Emergency concerning the Novel Coronavirus Disease (COVID-19),
issued by the President on March 13, 2020. For assistance, contact FERC
at [email protected] or call toll free, (866) 208-3676 or TTY,
(202) 502-8659.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Motions to Intervene, or Protests: Anyone may submit
comments, a motion to intervene, or a protest in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, motions to
intervene, or protests must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title COMMENTS, MOTION TO INTERVENE, or
PROTEST as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person protesting or intervening; and (4) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions
to intervene, or protests must set forth their evidentiary basis. A
copy of all other filings in reference to this application must be
accompanied by proof of service on all persons listed in the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 385.2010.
Dated: November 4, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-24929 Filed 11-9-20; 8:45 am]