STS Hydropower, LLC; Notice of Application Accepted For Filing and Soliciting Comments, Motions To Intervene, and Protests, 71647-71648 [2020-24929]

Download as PDF Federal Register / Vol. 85, No. 218 / Tuesday, November 10, 2020 / Notices Applicants: GridLiance West LLC. Description: § 205(d) Rate Filing: GLW TRBAA 2021 Annual Update Filing to be effective 1/1/2021. Filed Date: 11/3/20. Accession Number: 20201103–5112. Comments Due: 5 p.m. ET 11/24/20. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES21–9–000. Applicants: Altavista Solar, LLC. Description: Application Under Section 204 of the Federal Power Act for Authorization to Issue Securities for Altavista Solar, LLC. Filed Date: 10/29/20. Accession Number: 20201029–5278. Comments Due: 5 p.m. ET 11/19/20. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: November 3, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–24864 Filed 11–9–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission jbell on DSKJLSW7X2PROD with NOTICES Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Number: PR20–73–002. Applicants: DTE Gas Company. Description: Tariff filing per 284.123(b), (e)/: DTE Gas GSA Errata Filing to be effective 10/1/2020. Filed Date: 11/3/2020. Accession Number: 202011035068. Comments/Protests Due: 5 p.m. ET 11/13/2020. VerDate Sep<11>2014 17:21 Nov 09, 2020 Jkt 253001 Docket Numbers: RP21–190–000. Applicants: Rockies Express Pipeline LLC. Description: § 4(d) Rate Filing: REX 2020–11–03 GT&C Section 13 Revisions to be effective 12/3/2020. Filed Date: 11/3/20. Accession Number: 20201103–5057. Comments Due: 5 p.m. ET 11/16/20. Docket Numbers: RP21–191–000. Applicants: Algonquin Gas Transmission, LLC. Description: § 4(d) Rate Filing: Negotiated Rate—Yankee Gas 510802 Release eff 11–4–2020 to be effective 11/ 4/2020. Filed Date: 11/3/20. Accession Number: 20201103–5064. Comments Due: 5 p.m. ET 11/16/20. Docket Numbers: RP21–192–000 Applicants: El Paso Natural Gas Company, L.L.C. Description: § 4(d) Rate Filing: Negotiated Rate Agreement Update (EOG Nov. 20) to be effective 11/4/2020. Filed Date: 11/3/20. Accession Number: 20201103–5099. Comments Due: 5 p.m. ET 11/16/20. Docket Numbers: RP21–193–000. Applicants: Alliance Pipeline L.P. Description: § 4(d) Rate Filing: Negotiated Rates—Contract Adjustments eff 11–01–2020 to be effective 11/1/ 2020. Filed Date: 11/3/20. Accession Number: 20201103–5117. Comments Due: 5 p.m. ET 11/16/20. Docket Numbers: RP21–194–000. Applicants: Northern Natural Gas Company. Description: § 4(d) Rate Filing: 20201103 Negotiated Rate to be effective 11/3/2020. Filed Date: 11/3/20. Accession Number: 20201103–5122. Comments Due: 5 p.m. ET 11/16/20. Docket Numbers: RP21–195–000. Applicants: Enable Mississippi River Transmission, LLC. Description: § 4(d) Rate Filing: Negotiated Rate Filing—SES 6129 to be effective 11/1/2020. Filed Date: 11/3/20. Accession Number: 20201103–5135. Comments Due: 5 p.m. ET 11/16/20. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified date(s). Protests PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 71647 may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: November 4, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–24924 Filed 11–9–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 9000–006] STS Hydropower, LLC; Notice of Application Accepted For Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Temporary variance of lake level elevation. b. Project No.: 9000–006. c. Date Filed: September 21, 2020 and supplemented October 20, 2020. d. Applicant: STS Hydropower, LLC. e. Name of Project: Morrow Dam Hydroelectric Project. f. Location: The project is located on the Kalamazoo River in Kalamazoo County, Michigan. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Ms. Jody J. Smet, STS Hydropower, LLC, 116 N. State Street, P.O. Box 167, Neshkoro, WI, 85260, (804) 739–0654. i. FERC Contact: Jennifer Polardino, (202) 502–6437, Jennifer.Polardino@ ferc.gov. j. Deadline for filing comments, motions to intervene, and protests is 20 days from the issuance of this notice. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/doc-sfiling/ ecomment.asp. You must include your name and contact information at the end E:\FR\FM\10NON1.SGM 10NON1 jbell on DSKJLSW7X2PROD with NOTICES 71648 Federal Register / Vol. 85, No. 218 / Tuesday, November 10, 2020 / Notices of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may send a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P–9000–006. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: The exemptee requests a temporary variance from Article 2 of the project’s exemption (exemption issued July 26, 1985) to lower the project’s reservoir elevation to repair damages to the trunnion arms on two Tainter gates at the Morrow Hydroelectric Project No. 9000. The exemptee initiated a controlled drawdown of the reservoir by 9 feet for this repair and public safety in October 2019. The exemptee proposes to complete the work on the Tainter gates by December 31, 2020 and says it would refill the reservoir 6 inches per day. The exemptee proposes to completely refill the project’s reservoir by no later than April 1, 2020. During this time, the exemptee proposes to mitigate impacts to water quality, sedimentation, turbidity, cultural resources, and recreation as a result of the reservoir drawdown in consultation with the resource agencies and stakeholders. l. Locations of the Applications: In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s website at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online VerDate Sep<11>2014 17:21 Nov 09, 2020 Jkt 253001 at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. Agencies may obtain copies of the application directly from the applicant. At this time, the Commission has suspended access to the Commission’s Public Reference Room due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll free, (866) 208–3676 or TTY, (202) 502–8659. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Motions to Intervene, or Protests: Anyone may submit comments, a motion to intervene, or a protest in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, motions to intervene, or protests must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title COMMENTS, MOTION TO INTERVENE, or PROTEST as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: November 4, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–24929 Filed 11–9–20; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER20–2647–001. Applicants: Morgantown Steam, LLC. Description: Tariff Amendment: Response to Commission Staff Request for Information to be effective 8/4/2020. Filed Date: 11/4/20. Accession Number: 20201104–5065. Comments Due: 5 p.m. ET 11/25/20. Docket Numbers: ER21–314–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Cost Responsibility Agreement, SA No. 5840; Non-Queue No. NQ166 to be effective 10/21/2020. Filed Date: 11/4/20. Accession Number: 20201104–5045. Comments Due: 5 p.m. ET 11/25/20. Docket Numbers: ER21–315–000. Applicants: Public Service Company of Colorado. Description: § 205(d) Rate Filing: 2020–11–04–NSPM–OTP–CAPX–BSSBRev TCEA–596–0.1.0-Filing to be effective 1/4/2021. Filed Date: 11/4/20. Accession Number: 20201104–5067 Comments Due: 5 p.m. ET 11/25/20. Docket Numbers: ER21–316–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original WMPA SA No. 5844; Queue No. AF1–299 to be effective 10/5/2020. Filed Date: 11/4/20. Accession Number: 20201104–5073. Comments Due: 5 p.m. ET 11/25/20. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. E:\FR\FM\10NON1.SGM 10NON1

Agencies

[Federal Register Volume 85, Number 218 (Tuesday, November 10, 2020)]
[Notices]
[Pages 71647-71648]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-24929]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 9000-006]


STS Hydropower, LLC; Notice of Application Accepted For Filing 
and Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Temporary variance of lake level elevation.
    b. Project No.: 9000-006.
    c. Date Filed: September 21, 2020 and supplemented October 20, 
2020.
    d. Applicant: STS Hydropower, LLC.
    e. Name of Project: Morrow Dam Hydroelectric Project.
    f. Location: The project is located on the Kalamazoo River in 
Kalamazoo County, Michigan.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Ms. Jody J. Smet, STS Hydropower, LLC, 116 N. 
State Street, P.O. Box 167, Neshkoro, WI, 85260, (804) 739-0654.
    i. FERC Contact: Jennifer Polardino, (202) 502-6437, 
[email protected].
    j. Deadline for filing comments, motions to intervene, and protests 
is 20 days from the issuance of this notice. The Commission strongly 
encourages electronic filing. Please file comments, motions to 
intervene, and protests using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://www.ferc.gov/doc-sfiling/ecomment.asp. You 
must include your name and contact information at the end

[[Page 71648]]

of your comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may send a paper copy. 
Submissions sent via the U.S. Postal Service must be addressed to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via 
any other carrier must be addressed to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, 
Maryland 20852. The first page of any filing should include docket 
number P-9000-006. Comments emailed to Commission staff are not 
considered part of the Commission record.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. Description of Request: The exemptee requests a temporary 
variance from Article 2 of the project's exemption (exemption issued 
July 26, 1985) to lower the project's reservoir elevation to repair 
damages to the trunnion arms on two Tainter gates at the Morrow 
Hydroelectric Project No. 9000. The exemptee initiated a controlled 
drawdown of the reservoir by 9 feet for this repair and public safety 
in October 2019. The exemptee proposes to complete the work on the 
Tainter gates by December 31, 2020 and says it would refill the 
reservoir 6 inches per day. The exemptee proposes to completely refill 
the project's reservoir by no later than April 1, 2020. During this 
time, the exemptee proposes to mitigate impacts to water quality, 
sedimentation, turbidity, cultural resources, and recreation as a 
result of the reservoir drawdown in consultation with the resource 
agencies and stakeholders.
    l. Locations of the Applications: In addition to publishing the 
full text of this document in the Federal Register, the Commission 
provides all interested persons an opportunity to view and/or print the 
contents of this document via the internet through the Commission's 
website at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of 
new filings and issuances related to this or other pending projects. 
Agencies may obtain copies of the application directly from the 
applicant. At this time, the Commission has suspended access to the 
Commission's Public Reference Room due to the proclamation declaring a 
National Emergency concerning the Novel Coronavirus Disease (COVID-19), 
issued by the President on March 13, 2020. For assistance, contact FERC 
at [email protected] or call toll free, (866) 208-3676 or TTY, 
(202) 502-8659.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Motions to Intervene, or Protests: Anyone may submit 
comments, a motion to intervene, or a protest in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, motions to 
intervene, or protests must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title COMMENTS, MOTION TO INTERVENE, or 
PROTEST as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions 
to intervene, or protests must set forth their evidentiary basis. A 
copy of all other filings in reference to this application must be 
accompanied by proof of service on all persons listed in the service 
list prepared by the Commission in this proceeding, in accordance with 
18 CFR 385.2010.

    Dated: November 4, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-24929 Filed 11-9-20; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.