Equitrans, L.P.; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 70611-70612 [2020-24548]

Download as PDF khammond on DSKJM1Z7X2PROD with NOTICES Federal Register / Vol. 85, No. 215 / Thursday, November 5, 2020 / Notices Applicants: MidAmerican Energy Company. Description: § 205(d) Rate Filing: Services Tariff v. 2—Revised to be effective 1/1/2021. Filed Date: 10/30/20. Accession Number: 20201030–5261. Comments Due: 5 p.m. ET 11/20/20. Docket Numbers: ER21–282–000. Applicants: DATC Path 15, LLC. Description: § 205(d) Rate Filing: Appendix I 2021 to be effective 1/1/ 2021. Filed Date: 10/30/20. Accession Number: 20201030–5240. Comments Due: 5 p.m. ET 11/20/20. Docket Numbers: ER21–283–000. Applicants: Hillcrest Solar I, LLC. Description: Baseline eTariff Filing: Baseline new to be effective 2/27/2021. Filed Date: 10/30/20. Accession Number: 20201030–5266. Comments Due: 5 p.m. ET 11/20/20. Docket Numbers: ER21–284–000. Applicants: Groton Station Fuel Cell, LLC. Description: Baseline eTariff Filing: Baseline new to be effective 12/1/2020. Filed Date: 10/30/20. Accession Number: 20201030–5283. Comments Due: 5 p.m. ET 11/20/20. Docket Numbers: ER21–285–000. Applicants: Sigurd Solar LLC. Description: Baseline eTariff Filing: Application for Market-Based Rate Authorization to be effective 12/30/ 2020. Filed Date: 10/30/20. Accession Number: 20201030–5292. Comments Due: 5 p.m. ET 11/20/20. Docket Numbers: ER21–286–000. Applicants: Duke Energy Carolinas, LLC. Description: § 205(d) Rate Filing: DECDynamic Transfer Agmt DEP, Carolina Power Partners, Camden RS No. 558 to be effective 1/1/2021. Filed Date: 10/30/20. Accession Number: 20201030–5295. Comments Due: 5 p.m. ET 11/20/20. Docket Numbers: ER21–287–000. Applicants: Pacific Gas and Electric Company. Description: § 205(d) Rate Filing: Amendment to Extend Port of Oakland (TO SA 4) to be effective 1/1/2021. Filed Date: 10/30/20. Accession Number: 20201030–5299. Comments Due: 5 p.m. ET 11/20/20. Docket Numbers: ER21–288–000. Applicants: AMP Transmission, LLC, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: AMPT submits Revisions to PJM Tariff, Att. H–32A to be effective 1/1/2021. Filed Date: 10/30/20. Accession Number: 20201030–5304. VerDate Sep<11>2014 20:36 Nov 04, 2020 Jkt 253001 Comments Due: 5 p.m. ET 11/20/20. DEPARTMENT OF ENERGY Docket Numbers: ER21–289–000. Applicants: Duke Energy Florida, LLC. Description: § 205(d) Rate Filing: DEFCity of Alachua NITSA SA No. 305 to be effective 10/1/2020. Filed Date: 10/30/20. Accession Number: 20201030–5323. Comments Due: 5 p.m. ET 11/20/20. Federal Energy Regulatory Commission Take notice that the Commission received the following electric reliability filings: Docket Numbers: RD21–1–000. Applicants: North American Electric Reliability Corporation, Western Electric Coordinating Council. Description: Joint Petition of the North American Electric Reliability Corporation and Western Electricity Coordinating Council for approval of Proposed Reliability Standard PRC– 006–5. Filed Date: 10/27/20. Accession Number: 20201027–5233. Comments Due: 5 p.m. ET 11/27/20. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 30, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–24546 Filed 11–4–20; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 70611 [Docket No. CP21–8–000] Equitrans, L.P.; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline Take notice that on October 22, 2020, Equitrans, L.P. (Equitrans) filed a prior notice application pursuant to sections 157.205 and 157.216(b) of the Commission’s regulations under the Natural Gas Act (NGA), and Equitrans’ blanket certificate issued in Docket No. CP96–352. Equitrans requests authorization to plug and abandon an injection and withdrawal well in the Hunters Cave Storage Field due to safety concerns. Equitrans estimates the cost of the project to be approximately $407,000, all as more fully set forth in the request which is on file with the Commission and open to public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding this application should be directed to Matthew Eggerding, Assistant General Counsel, Midstream, at Equitrans, L.P., 2200 Energy Drive, Canonsburg, PA 15317; by phone at (412) 553–5786; or by email to MEggerding@ equitransmidstream.com. Public Participation There are three ways to become involved in the Commission’s review of this project: You can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The E:\FR\FM\05NON1.SGM 05NON1 70612 Federal Register / Vol. 85, No. 215 / Thursday, November 5, 2020 / Notices deadline for filing protests, motions to intervene, and comments is 5:00 p.m. Eastern Time on December 29, 2020. How to file protests, motions to intervene, and comments is explained below. khammond on DSKJM1Z7X2PROD with NOTICES Protests Pursuant to section 157.205 of the Commission’s regulations under the NGA,1 any person 2 or the Commission’s staff may file a protest to the request. If no protest is filed within the time allowed or if a protest is filed and then withdrawn within 30 days after the allowed time for filing a protest, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for authorization will be considered by the Commission. Protests must comply with the requirements specified in section 157.205(e) of the Commission’s regulations,3 and must be submitted by the protest deadline, which is December 29, 2020. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. Interventions Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 4 and the regulations under the NGA 5 by the intervention deadline for the project, which is December 29, 2020. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, 1 18 CFR 157.205. include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 3 18 CFR 157.205(e). 4 18 CFR 385.214. 5 18 CFR 157.10. 2 Persons VerDate Sep<11>2014 20:36 Nov 04, 2020 Jkt 253001 refer to the FERC website at https:// www.ferc.gov/resources/guides/how-to/ intervene.asp. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely, and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The Commission encourages electronic filing of submissions (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Protests and motions to intervene must be served on the applicant either by mail or email (with a link to the document) at: 9 Greenway Plaza, Houston, Texas, 77046 or at MEggerding@equitransmidstream.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken. To ensure that your comments are timely and properly recorded, please submit your comments on or before December 29, 2020. The filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the eLibrary link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. How To File Protests, Interventions, and Comments There are two ways to submit protests, motions to intervene, and comments. In both instances, please reference the Project docket number CP21–8–000 in your submission. (1) You may file your protest, motion to intervene, and comments by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on eRegister. You will be asked to select the type of filing you are making; first select General and then select Protest, Intervention, or Comment on a Filing; or 6 (2) You can file a paper copy of your submission by mailing it to the address below.7 Your submission must reference the Project docket number CP21–8–000. 6 Additionally, you may file your comments electronically by using the eComment feature, which is located on the Commission’s website at www.ferc.gov under the link to Documents and Filings. Using eComment is an easy method for interested persons to submit brief, text-only comments on a project. 7 Hand-delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 Dated: October 30, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–24548 Filed 11–4–20; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OLEM–2020–0354; FRL10016– 05–OLEM] Proposed Information Collection Request; Comment Request; Gathering Data on Results of Newly Required Annual and Triennial Testing To Evaluate the Impacts of U.S. E.P.A.’s 2015 Federal Underground Storage Tank Regulation Environmental Protection Agency (EPA). AGENCY: E:\FR\FM\05NON1.SGM 05NON1

Agencies

[Federal Register Volume 85, Number 215 (Thursday, November 5, 2020)]
[Notices]
[Pages 70611-70612]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-24548]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP21-8-000]


Equitrans, L.P.; Notice of Request Under Blanket Authorization 
and Establishing Intervention and Protest Deadline

    Take notice that on October 22, 2020, Equitrans, L.P. (Equitrans) 
filed a prior notice application pursuant to sections 157.205 and 
157.216(b) of the Commission's regulations under the Natural Gas Act 
(NGA), and Equitrans' blanket certificate issued in Docket No. CP96-
352. Equitrans requests authorization to plug and abandon an injection 
and withdrawal well in the Hunters Cave Storage Field due to safety 
concerns. Equitrans estimates the cost of the project to be 
approximately $407,000, all as more fully set forth in the request 
which is on file with the Commission and open to public inspection.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact the Federal Energy 
Regulatory Commission at [email protected] or call toll-free, 
(886) 208-3676 or TYY, (202) 502-8659.
    Any questions regarding this application should be directed to 
Matthew Eggerding, Assistant General Counsel, Midstream, at Equitrans, 
L.P., 2200 Energy Drive, Canonsburg, PA 15317; by phone at (412) 553-
5786; or by email to [email protected].

Public Participation

    There are three ways to become involved in the Commission's review 
of this project: You can file a protest to the project, you can file a 
motion to intervene in the proceeding, and you can file comments on the 
project. There is no fee or cost for filing protests, motions to 
intervene, or comments. The

[[Page 70612]]

deadline for filing protests, motions to intervene, and comments is 
5:00 p.m. Eastern Time on December 29, 2020. How to file protests, 
motions to intervene, and comments is explained below.

Protests

    Pursuant to section 157.205 of the Commission's regulations under 
the NGA,\1\ any person \2\ or the Commission's staff may file a protest 
to the request. If no protest is filed within the time allowed or if a 
protest is filed and then withdrawn within 30 days after the allowed 
time for filing a protest, the proposed activity shall be deemed to be 
authorized effective the day after the time allowed for protest. If a 
protest is filed and not withdrawn within 30 days after the time 
allowed for filing a protest, the instant request for authorization 
will be considered by the Commission.
---------------------------------------------------------------------------

    \1\ 18 CFR 157.205.
    \2\ Persons include individuals, organizations, businesses, 
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------

    Protests must comply with the requirements specified in section 
157.205(e) of the Commission's regulations,\3\ and must be submitted by 
the protest deadline, which is December 29, 2020. A protest may also 
serve as a motion to intervene so long as the protestor states it also 
seeks to be an intervenor.
---------------------------------------------------------------------------

    \3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------

Interventions

    Any person has the option to file a motion to intervene in this 
proceeding. Only intervenors have the right to request rehearing of 
Commission orders issued in this proceeding and to subsequently 
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \4\ and the regulations under the NGA \5\ by the 
intervention deadline for the project, which is December 29, 2020. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position regarding the proceeding, as well as 
your interest in the proceeding. For an individual, this could include 
your status as a landowner, ratepayer, resident of an impacted 
community, or recreationist. You do not need to have property directly 
impacted by the project in order to intervene. For more information 
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------

    \4\ 18 CFR 385.214.
    \5\ 18 CFR 157.10.
---------------------------------------------------------------------------

    All timely, unopposed motions to intervene are automatically 
granted by operation of Rule 214(c)(1). Motions to intervene that are 
filed after the intervention deadline are untimely, and may be denied. 
Any late-filed motion to intervene must show good cause for being late 
and must explain why the time limitation should be waived and provide 
justification by reference to factors set forth in Rule 214(d) of the 
Commission's Rules and Regulations. A person obtaining party status 
will be placed on the service list maintained by the Secretary of the 
Commission and will receive copies (paper or electronic) of all 
documents filed by the applicant and by all other parties.

Comments

    Any person wishing to comment on the project may do so. The 
Commission considers all comments received about the project in 
determining the appropriate action to be taken. To ensure that your 
comments are timely and properly recorded, please submit your comments 
on or before December 29, 2020. The filing of a comment alone will not 
serve to make the filer a party to the proceeding. To become a party, 
you must intervene in the proceeding.

How To File Protests, Interventions, and Comments

    There are two ways to submit protests, motions to intervene, and 
comments. In both instances, please reference the Project docket number 
CP21-8-000 in your submission.
    (1) You may file your protest, motion to intervene, and comments by 
using the Commission's eFiling feature, which is located on the 
Commission's website (www.ferc.gov) under the link to Documents and 
Filings. New eFiling users must first create an account by clicking on 
eRegister. You will be asked to select the type of filing you are 
making; first select General and then select Protest, Intervention, or 
Comment on a Filing; or \6\
---------------------------------------------------------------------------

    \6\ Additionally, you may file your comments electronically by 
using the eComment feature, which is located on the Commission's 
website at www.ferc.gov under the link to Documents and Filings. 
Using eComment is an easy method for interested persons to submit 
brief, text-only comments on a project.
---------------------------------------------------------------------------

    (2) You can file a paper copy of your submission by mailing it to 
the address below.\7\ Your submission must reference the Project docket 
number CP21-8-000. Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
---------------------------------------------------------------------------

    \7\ Hand-delivered submissions in docketed proceedings should be 
delivered to Health and Human Services, 12225 Wilkins Avenue, 
Rockville, Maryland 20852.
---------------------------------------------------------------------------

    The Commission encourages electronic filing of submissions (option 
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected]
    Protests and motions to intervene must be served on the applicant 
either by mail or email (with a link to the document) at: 9 Greenway 
Plaza, Houston, Texas, 77046 or at [email protected]. 
Any subsequent submissions by an intervenor must be served on the 
applicant and all other parties to the proceeding. Contact information 
for parties can be downloaded from the service list at the eService 
link on FERC Online.

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at www.ferc.gov using the 
eLibrary link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to 
www.ferc.gov/docs-filing/esubscription.asp.

    Dated: October 30, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-24548 Filed 11-4-20; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.