Heart Mountain Irrigation District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 70136-70137 [2020-24456]

Download as PDF 70136 Federal Register / Vol. 85, No. 214 / Wednesday, November 4, 2020 / Notices n. You may also register online at https://ferconline.ferc.gov/ FERCOnline.aspx to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. o. Scoping Process Commission staff will prepare either an environmental assessment (EA) or an Environmental Impact Statement (EIS) that describes and evaluates the probable effects, if any, of the licensee’s proposed action and alternatives. The EA or EIS will consider environmental impacts and reasonable alternatives to the proposed action. The Commission’s scoping process will help determine the required level of analysis and satisfy the NEPA scoping requirements, irrespective of whether the Commission prepares an EA or an EIS. Due to restrictions on mass gatherings related to COVID–19, we do not intend to conduct a public scoping meeting and site visit in this case. Instead, we are soliciting written comments and suggestions on the preliminary list of issues and alternatives to be addressed in the NEPA document, as described in scoping document 1 (SD1), issued October 29, 2020. Copies of the SD1 outlining the subject areas to be addressed in the NEPA document were distributed to the parties on the Commission’s mailing list and the applicant’s distribution list. Copies of SD1 may be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call 1–866– 208–3676 or for TTY, (202) 502–8659. Dated: October 29, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–24460 Filed 11–3–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CD21–2–2000] Heart Mountain Irrigation District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act (FPA). The proposed Ralston Lateral Hydrokinetic Project would have an installed capacity of 10 kilowatts (kW), and would be located in an existing irrigation lateral in Powell, Park County, Wyoming. Applicant Contact: Tyler Weckler, District Manager, 1206 Rd 18, Powell, Wyoming 82435, Phone No. (307) 754– 4685, Email: hmid00@tritel.net. FERC Contact: Christopher Chaney, Phone No. (202) 502–6778, Email: christopher.chaney@ferc.gov. Qualifying Conduit Hydropower Facility Description: The proposed project would consist of: (1) One 10-kW hydrokinetic module; and (2) appurtenant facilities. The proposed project would have an estimated annual generation of approximately 44 megawatt-hours. A qualifying conduit hydropower facility is one that is determined or deemed to meet all the criteria shown in the table below. On October 23, 2020, Heart Mountain Irrigation District filed a notice of intent TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY Statutory provision Description Satisfies (Y/N) FPA 30(a)(3)(A) .................................................... The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.. The facility is constructed, operated, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit. The facility has an installed capacity that does not exceed 40 megawatts ..................................... On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA. Y FPA 30(a)(3)(C)(i) ................................................. khammond on DSKJM1Z7X2PROD with NOTICES FPA 30(a)(3)(C)(ii) ................................................ FPA 30(a)(3)(C)(iii) ............................................... Preliminary Determination: The proposed Ralston Lateral Hydrokinetic Project will not alter the primary purpose of the conduit, which is used to distribute water for agricultural irrigation. Therefore, based upon the above criteria, Commission staff preliminarily determines that the proposal satisfies the requirements for a qualifying conduit hydropower facility, which is not required to be licensed or exempted from licensing. Comments and Motions To Intervene: Deadline for filing comments contesting whether the facility meets the qualifying criteria is 30 days from the issuance date of this notice. Deadline for filing motions to intervene is 30 days from the issuance date of this notice. Anyone may submit comments or a motion to intervene in accordance with the requirements of Rules of Practice and VerDate Sep<11>2014 18:16 Nov 03, 2020 Jkt 253001 Procedure, 18 CFR 385.210 and 385.214. Any motions to intervene must be received on or before the specified deadline date for the particular proceeding. Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the ‘‘COMMENTS CONTESTING QUALIFICATION FOR A CONDUIT HYDROPOWER FACILITY’’ or ‘‘MOTION TO INTERVENE,’’ as applicable; (2) state in the heading the name of the applicant and the project number of the application to which the filing responds; (3) state the name, address, and telephone number of the person filing; and (4) otherwise comply with the requirements of sections 385.2001 through 385.2005 of the Commission’s regulations.1 All 1 18 PO 00000 CFR 385.2001–2005 (2020). Frm 00010 Fmt 4703 Sfmt 4703 Y Y Y comments contesting Commission staff’s preliminary determination that the facility meets the qualifying criteria must set forth their evidentiary basis. The Commission strongly encourages electronic filing. Please file motions to intervene and comments using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may send a paper copy. Submissions sent via the U.S. Postal Service must be E:\FR\FM\04NON1.SGM 04NON1 Federal Register / Vol. 85, No. 214 / Wednesday, November 4, 2020 / Notices addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Locations of Notice of Intent: The Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s website at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number (i.e., CD21–2) in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. Copies of the notice of intent can be obtained directly from the applicant. At this time, the Commission has suspended access to the Commission’s Public Reference Room due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, call toll-free 1–866–208– 3676 or email FERCOnlineSupport@ ferc.gov. For TTY, call (202) 502–8659. Dated: October 29, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–24456 Filed 11–3–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AC19–122–000] khammond on DSKJM1Z7X2PROD with NOTICES Pacific Gas and Electric Company; Notice of Filing Take notice that on October 15, 2020, Pacific Gas and Electric Company (PG&E) filed an Offer of Settlement and Stipulation in its Formula Rate Proceedings (Docket Nos. ER19–13–000, ER19–1816–000, and ER20–2265–000) which included adjustments to PG&E’s regulatory capital structure used in its Formula Rate. As such, PG&E states that the parties filing interventions and/or comments/protests in Docket Nos. VerDate Sep<11>2014 18:16 Nov 03, 2020 Jkt 253001 AC19–122–000 and AC20–150–000 are also parties to the Settlement in the Formula Rate Proceedings. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 or 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Comment Date: 5 p.m. Eastern Time on November 12, 2020. Dated: October 28, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–24450 Filed 11–3–20; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00011 Fmt 4703 Sfmt 4703 70137 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP21–7–000] Gulf South Pipeline Company, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline Take notice that on October 21, 2020, Gulf South Pipeline Company, LLC (Gulf South), 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, filed a prior notice application pursuant to sections 157.205(b), 157.208(c) and 157.210 of the Federal Energy Regulatory Commission’s (Commission) regulations under the Natural Gas Act, and Gulf South’s blanket certificate issued in Docket No. CP82–430–000. Gulf South proposes to replace four reciprocating compressor units totaling 13,200 horsepower with one, 13,058 horsepower Solar Mars 100 compressor unit located at Gulf South’s Marksville Compressor Station in Avoyelles Parish, Louisiana, all as more fully set forth in the application, which is open to the public for inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding this application should be directed to Juan Eligio, Jr., Supervisor of Regulatory Affairs, Gulf South Pipeline Company, LLC, 9 Greenway Plaza, Houston, Texas 77046, at (713) 479–3480 or by email to juan.eligio@bwpipelines.com. Questions may also be directed to Payton Barrientos, Sr., Regulatory Analyst, Gulf South Pipeline Company, LLC, 9 Greenway Plaza, Houston, Texas 77046, at (713) 479–8157 or by email to payton.barrientos@bwpipelines.com. E:\FR\FM\04NON1.SGM 04NON1

Agencies

[Federal Register Volume 85, Number 214 (Wednesday, November 4, 2020)]
[Notices]
[Pages 70136-70137]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-24456]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD21-2-2000]


Heart Mountain Irrigation District; Notice of Preliminary 
Determination of a Qualifying Conduit Hydropower Facility and 
Soliciting Comments and Motions To Intervene

    On October 23, 2020, Heart Mountain Irrigation District filed a 
notice of intent to construct a qualifying conduit hydropower facility, 
pursuant to section 30 of the Federal Power Act (FPA). The proposed 
Ralston Lateral Hydrokinetic Project would have an installed capacity 
of 10 kilowatts (kW), and would be located in an existing irrigation 
lateral in Powell, Park County, Wyoming.
    Applicant Contact: Tyler Weckler, District Manager, 1206 Rd 18, 
Powell, Wyoming 82435, Phone No. (307) 754-4685, Email: 
[email protected].
    FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, Email: 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) One 10-kW hydrokinetic module; and (2) 
appurtenant facilities. The proposed project would have an estimated 
annual generation of approximately 44 megawatt-hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all the criteria shown in the table below.

      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
      Statutory provision              Description       Satisfies (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A)................  The conduit the                      Y
                                  facility uses is a
                                  tunnel, canal,
                                  pipeline, aqueduct,
                                  flume, ditch, or
                                  similar manmade water
                                  conveyance that is
                                  operated for the
                                  distribution of water
                                  for agricultural,
                                  municipal, or
                                  industrial
                                  consumption and not
                                  primarily for the
                                  generation of
                                  electricity..
FPA 30(a)(3)(C)(i).............  The facility is                      Y
                                  constructed,
                                  operated, or
                                  maintained for the
                                  generation of
                                  electric power and
                                  uses for such
                                  generation only the
                                  hydroelectric
                                  potential of a non-
                                  federally owned
                                  conduit.
FPA 30(a)(3)(C)(ii)............  The facility has an                  Y
                                  installed capacity
                                  that does not exceed
                                  40 megawatts.
FPA 30(a)(3)(C)(iii)...........  On or before August 9,               Y
                                  2013, the facility is
                                  not licensed, or
                                  exempted from the
                                  licensing
                                  requirements of Part
                                  I of the FPA.
------------------------------------------------------------------------

    Preliminary Determination: The proposed Ralston Lateral 
Hydrokinetic Project will not alter the primary purpose of the conduit, 
which is used to distribute water for agricultural irrigation. 
Therefore, based upon the above criteria, Commission staff 
preliminarily determines that the proposal satisfies the requirements 
for a qualifying conduit hydropower facility, which is not required to 
be licensed or exempted from licensing.
    Comments and Motions To Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 30 
days from the issuance date of this notice. Deadline for filing motions 
to intervene is 30 days from the issuance date of this notice. Anyone 
may submit comments or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210 and 
385.214. Any motions to intervene must be received on or before the 
specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2020).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, you may send a 
paper copy. Submissions sent via the U.S. Postal Service must be

[[Page 70137]]

addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE, Room 1A, Washington, DC 20426. 
Submissions sent via any other carrier must be addressed to: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, MD 20852. A copy of all other filings in reference 
to this application must be accompanied by proof of service on all 
persons listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 385.2010.
    Locations of Notice of Intent: The Commission provides all 
interested persons an opportunity to view and/or print the contents of 
this document via the internet through the Commission's website at 
https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number 
(i.e., CD21-2) in the docket number field to access the document. You 
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. Copies of the notice of 
intent can be obtained directly from the applicant. At this time, the 
Commission has suspended access to the Commission's Public Reference 
Room due to the proclamation declaring a National Emergency concerning 
the Novel Coronavirus Disease (COVID-19), issued by the President on 
March 13, 2020. For assistance, call toll-free 1-866-208-3676 or email 
[email protected]. For TTY, call (202) 502-8659.

    Dated: October 29, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-24456 Filed 11-3-20; 8:45 am]