Texas Central Railroad High-Speed Rail Safety Standards, 69700-69776 [2020-20388]
Download as PDF
69700
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
Federal Railroad Administration
or Kathryn Johnson, Attorney Adviser,
at (202) 493–0407.
SUPPLEMENTARY INFORMATION:
49 CFR Part 299
Table of Contents
DEPARTMENT OF TRANSPORTATION
[Docket No. FRA–2019–0068, Notice 5]
RIN 2130–AC84
Texas Central Railroad High-Speed
Rail Safety Standards
Federal Railroad
Administration (FRA), Department of
Transportation (DOT).
ACTION: Final rule; rule of particular
applicability and record of decision.
AGENCY:
This final rule of particular
applicability (RPA) establishes safety
standards for the Texas Central Railroad
(TCRR or the railroad) high-speed rail
(HSR) system. These standards are not
intended for general application in the
railroad industry, but apply only to the
TCRR system planned for development
in the State of Texas. This rule takes a
systems approach to safety, and so
includes standards that address the
aspects of the TCRR HSR system
consistent with the regulatory
framework for the general system, but in
a manner appropriate to TCRR’s
technology and application, including
signal and trainset control, track, rolling
stock, operating practices, system
qualifications, and maintenance. The
TCRR HSR system is planned to operate
from Houston to Dallas, on dedicated
track, with no grade crossings, at speeds
not to exceed 330 km/h (205 mph). The
TCRR rolling stock, track, and core
systems will replicate the Tokaido
Shinkansen HSR system operated by the
Central Japan Railway Company (JRC),
and will be used exclusively for revenue
passenger service.
DATES: Effective date. This final rule is
effective December 3, 2020.
Incorporation by reference. The
incorporation by reference of the
standards listed in the rule is approved
by the Director of the Federal Register
as of December 3, 2020.
ADDRESSES: Docket: For access to the
docket to read background documents
or comments received, go to https://
www.regulations.gov at any time.
FOR FURTHER INFORMATION CONTACT: For
issues related to the technical safety
requirements: Frederick Mottley,
Systems Engineer, at (617) 494–3160;
Devin Rouse, Mechanical Engineer, at
(202) 493–6185; or Michael Hunter,
Attorney Adviser, at (202) 493–0368.
For issues related to the Record of
Decision: Kevin Wright, Environmental
Protection Specialist at (202) 493–0845;
khammond on DSKJM1Z7X2PROD with RULES2
SUMMARY:
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
I. Executive Summary
II. Statutory Authority
III. Proceedings to Date
IV. Discussion of Comments Received on the
NPRM
A. Context and Overview
B. Regulatory Approach
C. General Safety Oversight
D. Interference With the Union Pacific
Railroad
E. Track Safety
F. Crashworthiness and Occupant
Protection
G. Reissuance of NPRM
H. Electrical Arcing From the Overhead
Catenary System
I. Right-of-Way Barrier Protection
J. Emergency Response
K. Noise Emission and Vibration
L. Eminent Domain
M. Regulatory Evaluation
N. Enforcement
V. Discussion of Final Rule and Regulatory
Changes
A. Non-Substantive Corrections
B. Evaluation of Substantive Changes
1. § 299.5 Definitions
2. Subpart B—Signal and Trainset Control
System
3. § 299.345 Visual Inspections; Right-ofWay
4. § 299.347 Special Inspections
5. § 299.713 Program Approval
Procedures
C. Trainset Image Recording System
D. Decision Under 49 U.S.C. 20306,
Exemption for Technological
Improvements
E. Incorporation by Reference
VI. FRA’s Record of Decision
A. Summary of Alternatives Considered
1. No Build Alternative
2. Build Alternatives
B. Environmentally Preferable Alternative
1. Environmentally Preferable Build
Alternative
2. Environmentally Preferable Houston
Station Option
C. Mitigation Commitments
VII. Regulatory Impact and Notices
A. Executive Orders 12866 and 13771, and
DOT Regulatory Policies and Procedures
B. Regulatory Flexibility Act and Executive
Order 13272; Regulatory Flexibility
Assessment
C. Paperwork Reduction Act
D. Federalism Implications
E. International Trade Impact Assessment
F. National Environmental Policy Act
G. Executive Order 12898 (Environmental
Justice)
H. Clean Air Act/Air Quality General
Conformity
I. Section 106 of the National Historic
Preservation Act
J. Department of Transportation Act
Section 4(f) Determination
K. Endangered Species Act/Section 7 U.S.
Fish and Wildlife Service Biological
Opinion
PO 00000
Frm 00002
Fmt 4701
Sfmt 4700
L. Executive Order 11990 Preservation of
the Nation’s Wetlands (Executive Order
11990 & DOT Order 5660.1a)
M. Floodplain Management (Executive
Order 11988 & DOT Order 5650.2)
N. Executive Order 13175 (Tribal
Consultation)
O. Unfunded Mandates Reform Act of 1995
P. Energy Impact
I. Executive Summary
On August 30, 2019, FRA granted
TCRR’s rulemaking petition (petition),
which was submitted April 16, 2016.1
The petition proposed comprehensive
safety requirements for the application
of JRC’s Tokaido Shinkansen
technology, and its associated design
and engineering principals. TCRR’s
petition represented that the regulatory
requirements offered by TCRR translate
the technological and operational
aspects of the JRC Tokaido Shinkansen
system in a manner that can be
regulated under a framework similar to
other US passenger rail operations while
maintaining the integrity of the safety
case developed by JRC over 50 years of
experience operating high-speed trains.
The Tokaido Shinkansen system first
went into service on October 1, 1964,
under the operation of the Japanese
National Railways (JNR). On April 1,
1987, JNR was privatized and split into
six passenger railroads and a freight
railroad. JRC took over operations of the
Tokaido Shinkansen system in Central
Japan, and is still operating the system
today. In over 50 years of Tokaido
Shinkansen system operations, JNR, and
now JRC, have optimized operations to
a very high level of safety and
performance. The Tokaido Shinkansen
system has moved over 6 billion
passengers without a passenger fatality
or injury due to trainset accidents such
as a derailment or collision.
TCRR intends to implement a highspeed passenger rail system by using the
Tokaido Shinkansen system’s serviceproven technology and by replicating
JRC’s operational and maintenance
practices and procedures. TCRR plans to
implement the latest, service-proven
derivative of the N700 trainset and other
core systems currently in use on the
Tokaido Shinkansen line,2 which have
been refined for high-speed operations
over the last 50+ years. TCRR plans to
adapt the N700 series trainset and
supporting systems in a manner suitable
for the Texas environment and operate
under a regulatory framework that
1 TCRR supplemented its petition in August 2016,
and submitted an updated petition in September
2017.
2 Subsequent references to ‘‘N700’’ or ‘‘N700
series trainset’’ are meant to refer to the N700 series
trainset currently in, or future variants approved
for, use.
E:\FR\FM\03NOR2.SGM
03NOR2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
khammond on DSKJM1Z7X2PROD with RULES2
enables FRA to provide effective safety
oversight.
FRA has evaluated the economic
burden that the final rule would have on
TCRR. Discussion of this can be found
under section VII. A. Executive Orders
12866 and 13771, and DOT Regulatory
Policies and Procedures. FRA
concluded that because this final rule
generally includes only voluntary
actions, or alternative action that would
be voluntary, the final rule does not
impart additional burdens on TCRR.
Further, this document also contains
FRA’s Record of Decision with respect
to the environmental review conducted
pursuant to the National Environmental
Policy Act (NEPA), as discussed in
section VI. FRA’s Record of Decision.
Except for the changes discussed
under sections V. A. Non-substantive
Corrections and V. B. Evaluation of
Substantive Changes, FRA is adopting
the rule text of the NPRM otherwise
unchanged in this final rule.
II. Statutory Authority
Under the Federal railroad safety
laws, FRA has jurisdiction over all
railroads, as defined in 49 U.S.C. 20102,
except urban rapid transit operations
that are not connected to the general
railroad system of transportation
(general system). Moreover, FRA
considers a standalone intercity railroad
line to be part of the general system,
even if it is not physically connected to
other railroads (as FRA has previously
stated with respect to the Alaska
Railroad; 49 CFR part 209, appendix A).
FRA considers the contemplated TCRR
system as intercity passenger rail, not
urban rapid transit. Accordingly, the
TCRR system will be subject to FRA
jurisdiction, whether it connects to the
general system or not. Please see FRA’s
policy statement, contained at 49 CFR
part 209, appendix A, discussing in
greater detail FRA’s jurisdiction over
passenger railroads, which includes
discussion on how FRA characterizes
passenger operations.
FRA has a regulatory program in
place, pursuant to its statutory
authority, to address equipment, track,
operating practices, and human factors
in the existing, conventional railroad
environment. However, significant
operational and equipment differences
exist between TCRR’s system and
existing passenger operations in the
United States. In many of the railroad
safety disciplines, FRA’s existing
regulations do not address the safety
concerns and operational peculiarities
of the TCRR system. Therefore, to allow
TCRR to operate as envisioned, an
alternative regulatory approach is
required to provide safety oversight.
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
III. Proceedings to Date
On March 10, 2020, FRA published a
notice of proposed rulemaking
(NPRM).3 The NPRM proposed safety
standards to enable safe operations and
an alternate method for Federal safety
oversight. The NPRM also opened the
public comment period, which was
initially scheduled to close on May 11,
2020.
On March 12, 2020, FRA announced
that it was holding three public hearings
on the NPRM, and was conducting
proceedings under 49 U.S.C. 20306.4
Those hearings were to be held in
Dallas, Navasota, and Houston, Texas,
between March 31 and April 2, 2020.
However, in light of the President’s
March 13, 2020, national emergency
declaration, Proclamation on Declaring
a National Emergency Concerning the
Novel Coronavirus Disease (COVID–19)
public health emergency, and the
Centers for Disease Control and
Prevention (CDC) guidance to cancel
mass gatherings of people,5 FRA
postponed the three public hearings on
March 30, 2020.6
On April 16, 2020, FRA announced,
consistent with CDC guidance advising
against in-person gatherings, that it
decided to convene the three public
hearings, and to conduct proceedings
under 49 U.S.C. 20306, telephonically
between May 4th through 6th, 2020.7
The choice to conduct these hearings
telephonically represented merely a
change in the manner of public
engagement. Also, in the same
announcement, FRA extended the
comment period to May 26, 2020, so
that members of the public would have
adequate time to review and provide
written comments on the transcripts of
the three public hearings conducted.
Further, FRA addressed the numerous
requests it received to not hold ‘‘virtual
hearings,’’ due to concerns over the lack
of reliable high-speed internet access,
and/or to postpone hearings until they
can be safely held in-person.
In response to public comments, FRA
explained that it decided to hold
telephonic hearings, capable of
accommodating the same number of
participants as previously scheduled inperson hearings, as it was consistent
with ensuring public health and that no
technology beyond a telephone was
necessary for participation. Moreover,
FRA explained that there was no need
FR 14036.
FR 14449.
5 See https://www.cdc.gov/coronavirus/2019ncov/community/large-events/massgatheringsready-for-covid-19.html.
6 85 FR 17527.
7 85 FR 21159.
69701
to further postpone the public hearings
or further extend the comment period
given the extensive public outreach
already conducted related to this
proposed rule, and the supplementary
nature of the public hearings as related
to the opportunity to provide detailed
written comments on the proposed rule.
FRA conducted the three telephonic
public hearings, and proceedings under
49 U.S.C. 20306, as scheduled and the
comment period closed on May 26,
2020. FRA is aware of concerns that the
publication of the final environmental
impact statement (EIS) effectively cut off
the comment period for the NPRM on
May 15, 2020. Those concerns are
unfounded. The Final EIS stated that—
As of the execution of this Final EIS on
May 15, 2020, oral comments made during
the public hearings and written comments
submitted to the Docket have raised no new
substantive issues relevant to environmental
concerns from those received during the
public comment period of the Draft EIS
(discussed in Section 9.6.2, Public and
Agency Involvement, Draft EIS Comment
Period, and Appendix H, Response to Draft
EIS Comments) or on topics not already
covered within this Final EIS. FRA will
continue to evaluate comments received
during the comment period for the Proposed
Rulemaking. FRA will address comments on
technical safety requirements proposed in the
NPRM in the Final Rule, which will be
published in the Federal Register.8
It is clear from the text of the Final
EIS that FRA did not close the
rulemaking comment period on May 15,
2020. Rather, FRA informed the public
that FRA was not able to consider in the
Final EIS comments submitted on the
NPRM that were received by FRA after
May 15, 2020. This was necessary to
allow for printing and distribution of
the Final EIS. However, the text of the
Final EIS clarified that FRA continued
to consider comments submitted during
the rulemaking comment period.
IV. Discussion of Comments Received
on the NPRM 9
During the 77-day comment period,
FRA received 287 written submissions
providing comments on the NPRM and
had fifty-two individuals provide
testimony during the three days of
public hearings. As discussed below,
not all comments necessitated a
response in this final rule, but all
comments were carefully and
thoroughly considered.
Although FRA’s responses to
comments, discussed below, generally
3 85
4 85
PO 00000
Frm 00003
Fmt 4701
Sfmt 4700
8 See Docket FRA–2019–0068, Final
Environmental Impact Statement at ES–5.
9 Comments submitted regarding the Final EIS are
addressed below, under section VII. F. National
Environmental Policy Act.
E:\FR\FM\03NOR2.SGM
03NOR2
69702
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
address issues raised in comments
critical of the rulemaking or TCRR, or
both, FRA also received comments
supportive of the rulemaking or TCRR,
or both. Commenters providing support
ranged from members of the public, to
various railroad or railroad-related
associations, to State and Federal
elected officials. As these supportive
commenters did not raise any
substantive issues regarding the
technical safety requirements proposed
in the NPRM, FRA has not provided a
response to those comments in this final
rule.
FRA also received comments
requesting that FRA either extend the
comment period or otherwise postpone
the issuance of this final rule, or
objecting to the telephonic hearing
format or the notice provided for the
public hearings. These comments are
addressed above, in section III.
Proceedings to Date.
FRA did not provide responses in this
final rule to comments that were
considered either outside the scope of
the rulemaking, or that raised issues that
were previously raised to FRA as part of
the environmental review process,
which FRA addressed and responded to
in the Final EIS released on May 29,
2020, available for review on FRA’s
website for the environmental review of
the proposed Dallas to Houston HighSpeed Rail.10
FRA’s responses below address the
remaining comments received. These
comments were either critical of the
rulemaking or raised issues
necessitating further explanation or
clarification. As multiple commenters
raised similar issues, FRA organized its
responses so that like-issues are grouped
together.
khammond on DSKJM1Z7X2PROD with RULES2
A. Context and Overview
FRA received comments regarding the
timing of the rulemaking in relation to
the timing of the EIS. Commenters
expressed confusion over how the
rulemaking and NEPA processes, and
the final rule and the EIS relate to each
other. Commenters were concerned
about FRA granting a ‘‘safety permit’’
without conducting surveys of the entire
right-of-way (ROW), or other types of
analyses (such as a hazard analysis). In
addition, commenters raised concerns
about the timing of coordination with
other Federal agencies that may need to
occur before or during construction.
10 FRA. Dallas to Houston High-Speed Rail—
Passenger Service from Houston to Dallas https://
railroads.dot.gov/environmental-reviews/dallashouston-high-speed-rail/dallas-houston-high-speedrail-passenger, Final Environmental Impact
Statement.
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
As discussed in the NPRM, TCRR
approached FRA in March of 2014,
seeking assistance in understanding
how FRA would or could apply its
regulations to a high-speed passenger
railroad system that replicated the
Tokaido Shinkansen HSR system, as
operated by JRC.11 On June 25, 2014,
FRA published a Notice of Intent to
prepare an Environmental Impact
Statement in the Federal Register.12 On
December 22, 2017, FRA published its
Draft EIS and opened its comment
period.13 FRA stated in the Draft EIS
that FRA’s regulations at the time did
not address safety requirements
comprehensively for passenger train
operations above 150 mph, such as
TCRR’s contemplated operation. As
such, FRA would need to take some
form of regulatory action to ensure the
contemplated system would be operated
safely, such as issuing an RPA,
imposing requirements or conditions by
order(s) or waiver(s), or taking some
other form of regulatory action.14 This
regulatory action constitutes a Major
Federal Action requiring review under
NEPA.15
The purpose of the NEPA process is
to inform the decisionmaker and the
public of the potential environmental
impacts that may result from the
proposed action. As such, the EIS must
be finalized before the agency takes the
action that is the subject of the
environmental review. The Final EIS
itself, while a meaningful milestone in
the NEPA process, does not permit
construction or operations. Rather, the
EIS enables FRA to reach a decision that
is informed by an understanding of the
11 85
FR 14036, 14038.
FR 36123.
13 82 FR 60723 and FRA. Dallas to Houston HighSpeed Rail—Passenger Service from Houston to
Dallas https://railroads.dot.gov/environmentalreviews/dallas-houston-high-speed-rail/dallashouston-high-speed-rail-passenger, Draft
Environmental Impact Statement.
14 While this statement was accurate at the time
of publication of the Draft EIS in December 2017,
it was incomplete. The Final EIS clarified that it
was not just the proposed speed of the TCRR’s
passenger operations that require FRA regulatory
action. As described in the Final EIS, FRA’s existing
regulations do not adequately address the safety
concerns and operational characteristics of TCRR’s
proposed HSR system. FRA. Dallas to Houston
High-Speed Rail—Passenger Service from Houston
to Dallas https://railroads.dot.gov/environmentalreviews/dallas-houston-high-speed-rail/dallashouston-high-speed-rail-passenger, Final
Environmental Impact Statement, Chapter 1.0,
Introduction. Subsequent to the publication of the
Draft EIS, in November 2018, FRA published a final
rule establishing safety standards for passenger
operations up to 220 miles per hour.
15 FRA. Dallas to Houston High-Speed Rail—
Passenger Service from Houston to Dallas https://
railroads.dot.gov/environmental-reviews/dallashouston-high-speed-rail/dallas-houston-high-speedrail-passenger, Final Environmental Impact
Statement, Abstract.
12 79
PO 00000
Frm 00004
Fmt 4701
Sfmt 4700
potential environmental impacts of this
rulemaking.
The analysis of potential
environmental impacts in the EIS is
based on TCRR’s conceptual
engineering design, which is contained
in conceptual engineering reports
prepared by TCRR and appended to the
Draft and Final EIS. While the
conceptual engineering design has been
appropriately used to inform the NEPA
process, TCRR must complete more
thorough engineering and design work
to facilitate construction. TCRR will
need to consider the agreed upon
mitigation and compliance measures 16
and the requirements of this rule as it
advances the engineering design. In
addition, TCRR must follow all
applicable Federal, State, and local
requirements, which are separate from
FRA’s jurisdiction. This includes the
Surface Transportation Board (STB),
which issued a decision on July 16,
2020, finding that the operation
proposed by TCRR is subject to STB
jurisdiction.17
FRA does not grant any kind of
construction approval or permit. Neither
does this final rule, by itself, grant any
permission or authority for TCRR to
operate. Furthermore, this rulemaking
does not relieve TCRR of its
responsibilities to design, construct and
operate a safe railroad. It merely
provides alternatives to certain
requirements and safety standards,
which are more appropriate for the
technology and system proposed by
TCRR. TCRR must design, operate and
maintain its system in compliance with
this regulation.
What this final rule does is establish
the minimum Federal safety
requirements with which TCRR must
comply. The publication of this final
rule is the beginning for TCRR, not the
end, of its continuous obligation to
demonstrate compliance with the
regulation. FRA will continue to
provide safety oversight throughout
TCRR’s development and testing phases,
in addition to during revenue
operations. In this manner, the
expectations for compliance are no
16 FRA. Dallas to Houston High-Speed Rail—
Passenger Service from Houston to Dallas https://
railroads.dot.gov/environmental-reviews/dallashouston-high-speed-rail/dallas-houston-high-speedrail-passenger, Record of Decision Attachments,
Mitigation Commitments.
17 Surface Transportation Board Decision, Texas
Central Railroad and Infrastructure, Inc. & Texas
Central Railroad, LLC-Petition for ExemptionPassenger Rail Line Between Dallas and Houston,
Tex., July 16, 2020, Docket No. FD 36025. STB also
found that TCRR must file an application under 49
U.S.C. 10901 and 49 CFR part 1150 to seek STB
authority to construct and operate its proposed
system.
E:\FR\FM\03NOR2.SGM
03NOR2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
khammond on DSKJM1Z7X2PROD with RULES2
different for TCRR than any other
railroad under FRA jurisdiction.
Prior to commencing actual revenue
operations, TCRR will need to
demonstrate that all the safety critical
components system work together as a
single, integrated system, pursuant to
subpart F of this rule.18 This involves a
number of points of compliance that
TCRR will work through over the
coming years.
To underscore this point, there are
several significant requirements that
TCRR must meet. For example, TCRR
must demonstrate that the trainset meets
the requisite crashworthiness and
occupant protection requirements as
established under subpart D.19 Also,
TCRR must have its positive train
control (PTC) system certified in
accordance with 49 U.S.C. 20157 and
subpart B of this final rule.20 Further,
TCRR must train and qualify its
employees performing safety sensitive
functions before those employees
engage in their respective work (i.e.,
drivers will need to be certified under
49 CFR part 240, maintenance
employees will need to be qualified in
accordance with TCRR’s training
program established under 49 CFR part
243, etc.).21 Moreover, not only initially,
but continuously thereafter, TCRR must
demonstrate that its track meets the
track safety standards outlined in
subpart C. In addition, not only must
TCRR comply with the technical safety
requirements established in this final
rule, it also must comply with the other
regulations identified under § 299.3(c),
such as part 214, Railroad Workplace
Safety; part 219, Control of Alcohol and
Drug Use; part 228, Hours of Service of
Railroad Employees; and part 270,
System Safety Program.
FRA notes that there were questions
and concerns raised with respect to the
lack of interoperability of the system.
However, lack of interoperability is not,
per se, a bar to operation in the U.S. It
is true that FRA stated in 2016 that it
did not envision a network of
standalone, non-interoperable HSR
systems comprising the nationwide
network, but this perspective was built
largely on historical precedence and
18 See the discussion of System Qualification in
the NPRM at 85 FR 14036, 14044.
19 See the discussion of crashworthiness and
occupant protection under Trainset Structure of the
NPRM at 85 FR 14036, 14039, and under section
IV. F. Crashworthiness and Occupant Protection of
this final rule.
20 Please also see the discussion of Automatic
Train Control System in the NPRM. 85 FR 14036,
14041.
21 Please also see section IV. C. 8. Personnel
Qualification in the NPRM at 85 FR 14036, 14045,
and section IV. G. Reissuance of NPRM of this final
rule.
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
should not be interpreted as a
prohibition in any way. And in 2018,
FRA stated that standalone systems
should continue to be regulated
comprehensively (such as through a rule
of particular applicability or other
specific regulatory action(s)), and on a
case-by-case basis, as it is prudent due
to the small number of potential
operations and the potential for
significant differences in their design.22
Since then, FRA has not seen a
proliferation of non-interoperable
systems in the U.S. In fact, FRA has
seen more potential conventional (steelwheel-on-steel-rail) operations avail
themselves of the Tier III requirements
rather than pursuing the more arduous
and costly route of being a standalone
system. For example, Amtrak’s nextgeneration Acela is in the process of
demonstrating that its new trainsets
comply with the Tier III requirements.
XpressWest, is attempting to conduct
Tier III operations between Victorville,
CA and Las Vegas, NV (the XpressWest
bullet train). And while FRA generally
considers matters in the context of the
established interoperable general
railroad system, FRA’s mission is to
enable safe, reliable, and efficient
movement of people and goods by rail,
regardless of the technology used.
B. Regulatory Approach
Several commenters asked why FRA
elected to pursue a rule of particular
applicability for TCRR. Initially, FRA
notes that taking action to provide a
regulatory framework to govern the
operation of the system proposed by
TCRR is consistent with FRA’s mission
is to enable safe, reliable, and efficient
movement of people and goods by rail.
Further, as FRA stated when granting
the petition to undertake the
rulemaking, TCRR’s petition
demonstrated that TCRR’s system would
replicate the system and operations of
the Tokaido Shinkansen, as operated by
JRC, allowing TCRR to take advantage of
that system’s exemplary 50-year safety
record. (Docket FRA–2019–0068, FRA
Letter Granting Petition).
As discussed under section III.
Regulatory Approach of the NPRM, FRA
explained that it was taking this
approach as it was consistent with its
statement in the Passenger Equipment
Safety Standards final rule, published
November 21, 2018.23 FRA considers
TCRR a standalone system, as its tracks
are not physically connected to the rest
of the general system, and would be
prohibited from doing so by this
regulation. FRA stated in 2018 that a
22 83
23 85
PO 00000
FR 59182, 59186.
FR 14036, 14037; 83 FR 59182.
Frm 00005
Fmt 4701
Sfmt 4700
69703
standalone system’s regulation would
have to bring together all aspects of
railroad safety (such as operating
practices, signal and trainset control,
and track) that must be applied to the
individual system.24 Such an approach
covers more than passenger equipment,
and would likely necessitate particular
ROW intrusion protection and other
safety requirements not typically
addressed in FRA’s more general
regulations. With this regulation, FRA
continues to believe that addressing
proposals for standalone HSR systems
in this manner is prudent. Entities
considering standalone operations
voluntarily assume the higher costs of
building new and dedicated
infrastructure, knowing they cannot take
advantage of the cost savings from
sharing existing infrastructure.
Alternatively, FRA could have issued
a comprehensive set of waivers from
FRA’s existing regulations, to the extent
permitted by law, under 49 U.S.C.
20103(b), in order to provide regulatory
approval to the operation. However, in
this case, electing to develop and
publish a comprehensive regulation is
more efficient. Such a regulation, in
addition to providing regulatory
approval, institutes a comprehensive
regulatory framework, that provides
TCRR clarity on the minimum Federal
safety standards that it must comply
with through technology-specific,25
performance-based requirements. In
addition, it provides the railroad a
higher degree of regulatory certainty
than waivers, as waivers are revocable,
subject to changing conditions, and
necessitate renewal, generally every five
years. Further, by issuing an RPA, FRA
is able to protect the integrity of the
system, by establishing regulatory
requirements codifying the serviceproven technological, operational, and
maintenance aspects of the Tokaido
Shinkansen HSR system operated by
JRC.
C. General Safety Oversight
FRA received a number of comments,
both written oral, concerning a lack of
adequate safety oversight for TCRR. The
commenters expressed general concerns
regarding the safe construction of the
system, and more specific concerns with
construction of the system where it
intersects various pipelines. In addition,
commenters expressed concerns that no
24 83
FR 59182, 59186.
FRA typically tries to craft regulations so
that they are technology-neutral and performancebased. Because TCRR’s safety case is derived from
the use of JRC’s technology, and operational and
maintenance practices, this regulation was written
specifically for that technology to maintain the
integrity of the baseline safety case.
25 Note,
E:\FR\FM\03NOR2.SGM
03NOR2
khammond on DSKJM1Z7X2PROD with RULES2
69704
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
one agency would be responsible for the
overall safety of the system and for the
perceived lack of coordination between
three specific Federal agencies: FRA, the
Pipeline and Hazardous Materials Safety
Administration (PHMSA), and the
Federal Energy Regulatory Commission
(FERC). As these comments are closely
related, FRA will address them together.
DOT does not have plenary authority
to regulate every aspect of
transportation and is limited to the
authority granted to it by Congress.
Accordingly, the same is true for each
of DOT’s operating administrations—the
regulatory authority for each one is
limited at the Federal level by the scope
of authority granted by Congress.
As discussed above in section II.
Statutory Authority, FRA’s authority to
regulate the railroad industry is
established in 49 U.S.C. ch. 201. FRA
has jurisdiction over all railroads, as
defined in 49 U.S.C. 20102, except
urban rapid transit operations that are
not connected to the general railroad
system of transportation. Notably, FRA
has broad authority to regulate every
area of railroad safety. 49 U.S.C. 20103.
But, there must be a nexus to railroad
safety for FRA to regulate. However,
FRA does not exercise jurisdiction
under all of its regulations to the full
extent permitted by statute. Based on its
knowledge of where the safety problems
were occurring at the time of its
regulatory action, and its assessment of
the practical limitations on its role, FRA
decided to regulate something less than
the total universe of railroads.26
While FRA’s jurisdiction is broad, it
is not unlimited, and there are some
areas where FRA defers to another
entity. In practice, FRA exercises its
authority through regulations on matters
where safety is most effectively
addressed at the Federal level, and is
necessary to ensure unimpeded
interstate commerce, or explicitly
required by statute. Some elements of
safety are more effectively addressed by
other levels of government (i.e., State or
local), or by industry itself through the
development and maintenance of
industry standards and recommended
practices. For example, the civil
construction of a railroad and its
structures are more effectively
addressed by State and local
requirements that take into account the
geotechnical, seismic, and hydrological
conditions associated with a local
environment. While FRA could assert
its safety authority over the design and
construction of a railroad bridge, for
example, these specific requirements are
more effectively addressed and
26 49
CFR part 209, Appendix A.
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
monitored at the State and local level.
Similarly, in railroad repair shop
environments, where railroads perform
maintenance on their equipment, the
Occupational Safety and Health
Administration provides Federal safety
oversight of the work conditions within
the shop environment, even though it is
a railroad facility and railroad
employees are involved.
With that said, FRA clarifies that
there is no one agency that is
responsible for every aspect of safety as
it relates to TCRR. To ensure proper
safety of the system, each Federal, State,
and local authority must perform its
part. FRA will certainly oversee railroad
safety where conditions might impact
the safe operation of the system, but
other agencies will also play a role.
Where there are intersections among
agencies, appropriate coordination must
occur to ensure that the proper agency
or entity is enforcing the correct
requirements (whether Federal, State, or
local), at the appropriate time. In the
same spirit, where non-governmental
organizations have a potential nexus of
safety considerations (e.g., TCRR
operations adjacent to Union Pacific
Railroad (UPRR) operations), it is
expected that those organizations
coordinate appropriately with each
other in good faith.
In turning to the specific issues raised
about safety oversight of the
construction of the system, and the
safety of the TCRR system in relation to
pipelines in the vicinity, FRA clarifies
that where a condition impacts the safe
operation of the railroad, FRA could
intervene to ensure the condition is
properly remediated. Although FRA has
not exercised its jurisdiction in this area
(civil construction), FRA would not be
precluded from doing so, should the
need arise, to ensure railroad safety. The
particular facts of a situation would
dictate the appropriate authority to
handle the issue.
Generally, TCRR is obligated to
comply with PHMSA’s safety
requirements, including those related to
pipeline damage, electrical emissions,
and cathodic protection, where there are
pipeline crossings. FERC has no
jurisdiction or decision-making
authority over the construction or
operation of TCRR’s system. FERCregulated pipelines occur in the vicinity
of the alignment, and relocation and/or
maintenance activities of these utilities
during the construction of the system
may require FERC involvement by the
applicable utility providers. PHMSA
and FERC requirements are discussed in
more detail in Section 3.9.2, Utilities
PO 00000
Frm 00006
Fmt 4701
Sfmt 4700
and Energy, Regulatory Context of the
Final EIS.27
All natural gas utility providers,
including Atmos Energy, are required to
operate in accordance with operational
safety regulations, including regulations
promulgated by PHMSA, and would
have to consider how external factors
might impact their operational safety as
the parties communicate and coordinate
during planning and development. Id.
It is not necessary for FRA to
coordinate with PHMSA or FERC in
order to develop the minimum Federal
railroad safety requirements contained
in this final rule. As discussed above,
FERC has no involvement during the
development of minimum Federal safety
standards for the operation of the TCRR
system. As TCRR advances from the
conceptual engineering that was the
basis for the environmental analysis in
the Final EIS to design engineering,
more detailed information will become
available about pipelines that may need
to be relocated, which would be subject
to FERC jurisdiction. In addition, TCRR
is already required to comply with
PHMSA requirements regarding
pipeline safety applicable to utility
crossings, relocations, and/or
maintenance activities involving natural
gas or hazardous liquid transportation
pipelines impacted by TCRR’s system.
FRA is unaware of any need to amend
PHMSA’s requirements in light of the
contemplated TCRR system.
Although no coordination was
necessary, FRA has nonetheless
coordinated with both FERC and
PHMSA after receiving the public
comments regarding pipeline safety and
in response to the expressed lack of
coordination. Both the EIS and the
development of the safety standards in
this final rule represent only the
beginning of coordination on these
issues common to any linear
construction project, and FRA would
expect TCRR to continue and, as
necessary expand, this coordination and
engagement as TCRR moves forward.
D. Interference With the Union Pacific
Railroad
A number of comments received were
focused on the potential impacts to
conventional track circuits and
signaling technology caused by TCRR’s
electrified railroad. UPRR submitted
27 FRA. Dallas to Houston High-Speed Rail—
Passenger Service from Houston to Dallas https://
railroads.dot.gov/environmental-reviews/dallashouston-high-speed-rail/dallas-houston-high-speedrail-passenger, Final Environmental Impact
Statement.
E:\FR\FM\03NOR2.SGM
03NOR2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
khammond on DSKJM1Z7X2PROD with RULES2
comments expressing these concerns to
both the Draft EIS and the NPRM.28
FRA notes that the matter of potential
interference to conventional track
circuits and signaling technology,
whether from traction power systems,29
or other known sources, is a matter that
is not unique to the contemplated TCRR
operation. The effects and potential
interference that can be caused by rail
vehicle traction power systems are wellestablished, and require design-specific
and local environmental information to
assess. To date, FRA has not
promulgated specific regulations
addressing the use of traction power
systems on railroads holistically, as the
matter has been effectively handled by
industry standards, local or utility
requirements (if applicable), and
contractual responsibilities. In this final
rule FRA does not deviate from this
practice and therefore is not regulating
TCRR’s traction power system.
Electrified railroads and transit
systems operate over and adjacent to rail
lines using conventional track circuitry
and signaling technology throughout the
U.S., including FRA-regulated
operations on the Northeast Corridor,
and in Pennsylvania, Chicago, northern
Indiana, Denver, and San Francisco
(specifically the electrification of
Caltrain’s commuter rail service,
currently in progress). Furthermore,
numerous light-rail and transit
operations utilize traction power
systems that operate adjacent to, or in
some cases directly on, FRA-regulated
properties utilizing conventional
signaling technology (e.g., Utah Transit
Authority’s mid-Jordan extension). FRA
points to numerous examples that UPRR
itself, operates over or adjacent to
25kVA electrified track, including most
notably Denver’s A-line, which operates
on electrified track directly adjacent to
UPRR utilizing the same PTC
technology.
Several commenters, including UPRR,
provided broad language concerning the
need to address potential
electromagnetic interference (EMI), but
provided no specific justification as to
why current industry practice, or the
requirements proposed within the
NPRM were insufficient. FRA believes
28 See Section 3.15, Electromagnetic Fields of the
Final EIS for a discussion of the potential impacts
associated with the generation of electromagnetic
fields.
29 A tractive power system is a system that
provides a means to produce tractive effort to a
trainset or motive power unit, i.e., the propulsion
system. Most traction power systems utilize the
transmission of direct current (DC) or alternating
current (AC) electricity by means of an overhead
wire or powered third rail to convert electrical
energy to tractive effort (the force that accelerates
a vehicle along a track).
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
the high-level language used by the
commenters to describe the hazard,
unaccompanied by any supporting
technical data, underscores a lack of
understanding of the subject matter.
Although commenters did not specify
the mechanism by which traction power
systems may introduce risk, they may be
concerned with the potential for
voltages to be induced into parallel
conductors (i.e., UPRR’s track) which, in
turn, could interfere with rudimentary
circuit designs and technology being
employed by UPRR for track circuit
occupancy and grade crossing activation
circuits. Commenter references to
interference with UPRR’s PTC system
may likewise relate to the potential for
induced voltage that could lead to a
track circuit appearing to be unoccupied
even though a train may actually be
shunting the circuit. This typically
occurs with more primitive DC and AC
technologies, if not designed to account
for such conditions, as those types of
primitive technologies cannot decipher
the induced voltage from the circuit’s
own power source. FRA notes that
while this is certainly a hazard that
must be addressed, such site-specific
issues can only be addressed as TCRR
proceeds from conceptual to detailed
design phases. It is FRA’s expectation
that TCRR and any affected stakeholders
will collaboratively address any
potential impacts in the same manner as
all other projects have, to date.
Although FRA believes the matter is
sufficiently addressed under its current
regulatory framework, this final rule
addresses traction power system EMI
and electromagnetic compatibility
(EMC) as it relates to safety critical
equipment and systems employed by
TCRR. See § 299.435(e). This
requirement is an adaptation of the
electrical systems requirements for Tier
II trainsets in 49 CFR 238.425. TCRR
proposed applying these requirements
to be consistent with deliberations by
the Railroad Safety Advisory Committee
on a recommended expansion of FRA’s
Tier III requirements in a future
rulemaking. UPRR commented on this
requirement contained in the NPRM,
but did not understand the requirement,
its context, or origins. The requirement
under § 299.435(e) is not intended to
provide a means for UPRR to negate its
responsibilities to ensure that its own
systems are designed to protect against
undesired inputs and potential
interference, as UPRR’s suggested
modifications and commentary
recommend, but rather to illustrate the
due diligence performed through the
development of the rulemaking. Both
FRA and TCRR recognized the
importance of EMI/EMC for electrified
PO 00000
Frm 00007
Fmt 4701
Sfmt 4700
69705
high-speed railroads, and the inclusion
of this requirement will ensure TCRR is
responsive to the issue.
UPRR also raised concern over
sightlines being reduced at a particular
highway-rail grade crossing on UPRR’s
system due to the possible future
placement of a TCRR viaduct support
column. UPRR’s concern is based on the
conceptual engineering provided as part
of the environmental review process.
Similar to the above discussion on
possible EMI with UPRR’s signal
system, FRA would expect that the two
railroads work together, and with the
owner of the roadway, to identify and
mitigate any hazards associated with
reduced sightlines at any impacted
highway-rail grade crossing, once final
designs are developed. In addition, FRA
expects that any localized risk presented
regarding these issues would be
identified in TCRR’s risk-based hazard
analysis program under part 270 and
mitigated appropriately.
E. Track Safety
Several commenters raised concerns
with the potential for buckling of the
track structure due to high ambient
temperatures in Texas during the
summer. These general concerns were
supplemented by comments that soil
conditions and curvature in the
alignment could exacerbate this
potential. Many cited challenges UPRR
has faced in this regard to support their
concerns. A certain set of commenters
further argued that an expert report had
identified ‘‘sharp curves’’ in the
alignment as a potential risk when
compared to tangent track; while it is
factually correct that the probability of
rail buckling is higher for a curve
compared to tangent track, the
commenters seem to have
mischaracterized this relationship in
this particular instance to support their
point. In either case, this regulation
addresses this risk in a manner that is
consistent with how this risk is
managed for all railroads under FRA’s
jurisdiction, and when combined with
JRC’s adopted practice, provides a level
of engineering and internal rail stress
management that is superior to most, if
not all, North American practice.
The continuous welded rail (CWR)
program, as proposed in the NPRM, is
a translation and an adaptation of JRC’s
designs, standards, and procedures. Like
the track and CWR requirements
applicable to railroads on the general
system under 49 CFR part 213, the track
and CWR requirements in this rule are
independent of the specific
environmental conditions over which
they are applied. The governing sitespecific geotechnical, drainage, and
E:\FR\FM\03NOR2.SGM
03NOR2
khammond on DSKJM1Z7X2PROD with RULES2
69706
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
weather conditions will drive the
detailed design of the track and its
support structure in order to achieve
and maintain compliance with the
regulatory requirements. (Please see the
discussion under section IV. A. Context
and Overview of this final rule.) These
safety requirements set the standards
that must be maintained by the track
and track structure design. In addition,
these safety requirements set the
operational limitations associated with
various track conditions. In effect, these
represent variables that the railroad
must consider when determining its
final designs. If it is not possible to
attain the required alignment geometry
or maintain a specific track class due to
site specific conditions, then the design
operating speed must reflect what is
safely achievable. Concurrently, safe
operational limits will also be validated
by comprehensive dynamic tests of the
actual revenue trainsets over the entire
line, as required under Subpart F. While
the variables at play in this rule are
specific to TCRR (based on JRC’s
designs), the fundamental railroad
engineering principles and design
process is not. To be clear, the
conceptual engineering report included
as part of the Final EIS does not
represent the final design of TCRR’s
alignment and track structure. This
regulation will help TCRR establish a
safe, detailed design.
The track safety standards under
Subpart C of the final rule translate the
track safety standards as implemented
on JRC’s Tokaido Shinkansen HSR
system for TCRR’s HSR system. As
discussed in the NPRM, the Tokaido
Shinkansen’s technical safety
requirements were developed over
many years, and have been highly
optimized in conjunction with the rest
of the system (i.e., signal and train
control, and rolling stock), since service
began over 50 years ago. The primary
reason for adopting the Tokaido
Shinkansen’s technical safety
requirements for TCRR is to ensure the
safety of the TCRR operation by
protecting the integrity of the system as
established by JRC. These requirements
are, in many cases, more stringent than
requirements under 49 CFR part 213
that were developed for operation of a
broad range of equipment (freight and
passenger) over the general network.
Furthermore, the approach JRC takes
to manage internal rail stress in the
Tokaido Shinkansen system is very
different than standard North American
practice. The final rule requires TCRR to
comply with the JRC approach, to
ensure that the integrity of the safety
case behind the Tokaido Shinkansen
can be maintained. In addition to the
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
comprehensive use of well-designed
expansion joints and other engineering
means intended to manage internal rail
stress caused by thermal (and other)
loads, the regulation requires
procedures, operational restrictions, or
both, for high temperature scenarios that
are more advanced and conservative
than those employed by North
American railroads. For example, these
procedures require TCRR to monitor rail
temperature continuously, which is far
more stringent than the ‘‘average’’
temperature approach often used by
most railroads. Likewise, a system of
reference markers is required to be used
on the field side of all track to help
proactively identify any track shift that
might occur. The ties and fastener
system, and the ballast, are specifically
engineered for the tonnage and speed of
the equipment operating over it to
provide maximum resistance to track
buckling. This is superior to the practice
of most U.S. railroads, which have to
design to a general standard since a
variety of equipment traverses their
track. The comprehensive monitoring of
track conditions through temperature,
geometry and ride quality readings, in
addition to traditional visual
inspections, enables the railroad to
analyze the conditions of the rail in a
manner that is far superior to using only
visual observation as suggested by
commenters.
A number of comments also focused
on the effects that heat can have on
CWR, and the fact that alignment
curvature can increase horizontal rail
forces which could, in-turn, lead to
buckling if the track is not sufficiently
restrained and internal rail stress is not
managed effectively. Many comments
focus on concerns associated with a
specific curve referred to as the
‘‘Hockley curve.’’ These comments
primarily stem from Delta Troy
Interests, LTD. (Delta Troy), and its
commissioned study conducted by the
Virginia consulting firm R.L. Banks &
Associates, Inc.30 (RLBA). These
comments and the RLBA study attempt
to connect an increased probability for
buckling to occur in non-tangent
(curved) track, and particularly with the
Hockley curve, with the fact that nontangent rail can experience higher
lateral rail forces due to thermal
expansion. This specific portion of the
proposed alignment does not represent
a geometrically challenging portion, but
Delta Troy indicated that its concern for
this portion of proposed alignment is
underscored by the fact that it traverses
30 See
PO 00000
https://www.rlbadc.com.
Frm 00008
Fmt 4701
Sfmt 4700
a site of a planned real estate
development by the company.
The commissioned RLBA study
loosely connects the concern of track
buckling with the fact that this
particular curve includes a radius that
could be near the allowable limit for
maximum speed operation. Delta Troy,
RLBA, and other commenters, insinuate
that a different alignment would enable
TCRR to avoid ‘‘numerous sharp
curves.’’ Whether intentional or not, the
comments and RLBA analysis ignore the
fact that the Hockley curve (and other
similar curves designed to allow for
maximum design speed of a high-speed
train), by nature, utilize a curve radius
that is not fairly compared to the highdegree curvature that can pose a risk for
track buckling, particularly when
compared to freight railroads that utilize
a more economical focused approach to
CWR management. To insinuate that the
curves are ‘‘sharp,’’ and thus
intrinsically unsafe as proposed, is
simply not true.
The RLBA study attempts to describe
the effects of curvature on the potential
for track buckling. However, this is an
issue that is not unique to TCRR, and
there are various means by which track
can be designed to address and mitigate
these concerns safely. Further, while the
RLBA study recognized that the NPRM
contained a requirement for the railroad
to develop a CWR plan to address
internal rail stress related to CWR, the
study incorrectly asserts that FRA
should dictate specific alignment
geometry as a matter of safety. This is
not appropriate or necessary, as the
safety concern is addressed by the track
safety standards and CWR requirements,
as described above. Moreover, this final
rule addresses these issues in the same
manner as all other U.S. railroad
operations subject to FRA’s jurisdiction.
F. Crashworthiness and Occupant
Protection
Some commenters raised concerns
regarding the crashworthiness
requirements proposed in the NPRM.
An examination of these comments,
however, suggests that they stem from
an incomplete reading of the NRPM.
FRA proposed to retain the
crashworthiness and occupant
requirements established by JRC
intended to address potential residual
risks to the operation and to ensure the
trainset can handle the expected
operational loads experienced in the
intended service environment.31 While
these requirements are not directly
comparable to standard U.S. practice, as
the NPRM explains, the service
31 85
E:\FR\FM\03NOR2.SGM
FR 14036, 14039.
03NOR2
khammond on DSKJM1Z7X2PROD with RULES2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
environment of TCRR’s contemplated
system is vastly different and presents
significantly less risk than conventional
North American railroad rights-of-way.
Id. To adhere to requirements based on
hazards that have otherwise been
heavily mitigated or eliminated would
require significant modification to the
existing service-proven trainset design
by changing the weight and dynamic
characteristics, making it effectively a
new trainset design, which would
negate the service-proven nature of the
system.
Some commenters asserted that FRA
is exempting TCRR from any
crashworthiness requirements so that
the N700 series trainset technology
could be imported. This assertion,
however, is not supported by the
requirements proposed in the NPRM, as
FRA makes clear that its approach is to
ensure that the trainset is safe for the
environment in which it will operate.
To this end, FRA is including additional
requirements that are not inherent in the
JRC approach to trainset structure
design. These requirements include a
dynamic collision scenario analysis that
is designed to address the residual risks
that could potentially exist within the
TCRR operating environment.32 Of
particular note, in this instance, is the
inclusion of the steel coil collision
scenario outlined in § 299.403(c).
Despite the safety record of JRC’s
Tokaido Shinkansen system, FRA
believes that the North American
environment poses unique risks with
respect to potential objects that might
somehow enter the protected ROW,
either by accident or on purpose. In this
case, FRA believes that requiring
dynamic collision scenario analysis
using the 14,000-lbs steel coil scenario
derived from existing requirements to
protect against risks presented by grade
crossings can serve as a conservative
surrogate for potential hazards that
might be present on the TCRR ROW
(e.g., feral hogs, stray livestock,
unauthorized disposal of refuse). With
the inclusion of this dynamic collision
scenario, and adaptations of existing
U.S. requirements on emergency
systems and fire safety, FRA believes it
has reasonably addressed risks unique
to the TCRR operating environment in a
manner that appropriately considers
crashworthiness and occupant
protection standards for the operating
environment intended, while at the
32 This reference to ‘‘operating environment’’ or
‘‘environment in which the equipment will
operate’’ or other similar references, means, in this
discussion, the fully dedicated, fully gradeseparated ROW that is not comingled with any
other type of equipment (freight or passenger).
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
same time keeping intact the serviceproven nature of the equipment.
G. Reissuance of NPRM
UPRR commented 33 that FRA needs
to re-notice the proposed rule so that it:
(1) Adequately considers the safety
impact on already existing railroads that
will intersect and/or run adjacent to the
proposed system; (2) specifically
evaluates whether modification of each
safety-critical aspect of the Japanese
Shinkansen system is needed in order to
transplant and implement them in the
United States; and (3) provides
sufficient detail to enable the public to
understand the safety standards,
operational requirements, or regulatory
framework applicable to TCRR fully.
UPRR’s comments express concern that
the NPRM ‘‘lacks any analysis of the
potential disruption to other railroad
operations and infrastructure and the
consequential safety and economic
impacts to communities and the
region,’’ and the NPRM ‘‘focuses solely
on the safety of [TCRR’s] operations and
neglects to consider the potential impact
on safety of current rail operations;
operations that are fully compliant with
existing FRA regulations.’’ 34
FRA received a similar comment from
Delta Troy.35 Delta Troy identified six
‘‘deficiencies’’ that ‘‘plague the safety
analysis’’ in the NPRM, and elaborated
that any attempt to fix the deficiencies
in a final rule would be so extensive
that the final would look nothing like
the NPRM and therefore would not be
a ‘‘logical outgrowth’’ of the NPRM, thus
necessitating FRA to re-notice the
proposed rule. The six areas identified
by Delta Troy are that the NPRM: (1)
Failed to adequately evaluate possible
EMI from TCRR to the adjacent UPRR
rail line; 36 (2) unreasonably assumed
exigent circumstances will not require
coupling or uncoupling; 37 (3) failed to
examine the safety impact of TCRR’s
grade separation proposal on the
adjacent UPRR rail line; 38 (4) failed to
acknowledge or examine the possible
increase in truck traffic and grade
crossing usage due to TCRR’s proposed
viaduct; 39 (5) did not recognize that a
different alignment could alleviate the
33 Docket No. FRA–2019–0068, Document ID:
FRA–2019–0068–0316.
34 Id.
35 Docket No. FRA–2019–0068, Document ID:
FRA–2019–0068–0315.
36 See section IV. D. Interference with the Union
Pacific Railroad of this final rule.
37 See sections IV. J. Emergency Response and V.
D. Decision under 49 U.S.C. 20306, Exemption for
technological improvements of this final rule.
38 See section IV. D. Interference with the Union
Pacific Railroad of this final rule.
39 See section IV. D. Interference with the Union
Pacific Railroad of this final rule.
PO 00000
Frm 00009
Fmt 4701
Sfmt 4700
69707
risks of heat-induced track buckling and
slow orders; 40 and (6) ignored the
context and local circumstances in
which proposed operations will occur.41
FRA responds to Delta Troy’s six
identified ‘‘deficiencies’’ in other areas
of this final rule, and so FRA will
address UPRR’s concerns here.
Primarily, UPRR expressed concern
with possible EMI resulting from
TCRR’s contemplated system, along
with potential increased risk at certain
grade crossings, which is addressed in
section IV. D. Interference with the
Union Pacific Railroad. What remains
are essentially concerns regarding
whether the requirements of the rule, as
they were proposed, properly account
for the effect on safety of adjacent
railroads, that FRA has somehow
deprived the public of a meaningful
opportunity to comment, and that the
requirements are consistent with the
requirements of JRC.
UPRR stated in its comment that the
NPRM was conclusory in its approach
in ‘‘importing’’ the Shinkansen’s
regulatory framework without properly
accounting for the effect on the safety of
other existing rail operations or of the
costs imposed on those other rail
operations.42 However, FRA expects
that the final rule framework would
have no direct bearing on the safety of
UPRR’s operation, assuming it is in
compliance with its own requirements
to protect its systems from electrical
interference. FRA makes clear that it is
imposing its own regulatory regime on
TCRR. As discussed above, this
rulemaking is translating the safetycritical technical requirements as
implemented on JRC’s Tokaido
Shinkansen system to allow FRA to
provide effect safety oversight, as
discussed in the NPRM.43
UPRR also stated that FRA has
deprived the public of a meaningful
opportunity to comment. FRA disagrees
and has clearly met the minimum
requirements of the Administrative
Procedure Act (APA). Under 5 U.S.C.
553(b)(3), when engaged in rulemaking,
an agency is required to provide notice
of a proposed rulemaking to the public
through publication in the Federal
Register, and shall, among other things,
include either the terms or substance of
the proposed rule, or a description of
the subjects and issues involved. The
NPRM, as it explained, was based on the
petition and associated supporting
40 See
section IV. E. Track Safety of this final rule.
section IV. J. Emergency Response of this
final rule.
42 See also section IV. M. Regulatory Evaluation
of this final rule.
43 84 FR 14036.
41 See
E:\FR\FM\03NOR2.SGM
03NOR2
69708
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
technical information, all of which was
made available for public review and
scrutiny.44 In addition, the NPRM
exceeded the statutory requirement to
provide merely the substance of the
proposed rule, by providing the entirety
of the proposed rule text for critical
examination by interested members of
the public.
In a related concern, UPRR stated that
it was unclear what FRA meant when it
used the terms ‘‘shall be based on’’ in
the regulatory text, when referring to
requirements for TCRR. For example,
under § 299.707, FRA is requiring that
TCRR’s initial maintenance schedules,
included as part of its inspection,
testing, and maintenance program, be
based on those maintenance schedules
in effect on JRC’s Tokaido Shinkansen
system. UPRR asserted that the use of
this reference created ambiguity to the
degree that it denied the public a
meaningful opportunity to comment.
Again, FRA disagrees. FRA is unclear as
to what ambiguity exists in light of the
information in the rulemaking docket,
in both meeting presentations and
associated section analyses, provided by
TCRR.45 FRA placed this information in
the docket, to allow interested members
of the public to scrutinize and provide
comment. As part of those documents,
the maintenance intervals in effect on
JRC at the time of submittal of the
documents was included. As part of the
inspection, testing, and maintenance
program review and approval process
under this final rule, TCRR must
demonstrate how its initial maintenance
intervals replicate those of JRC. FRA
would expect TCRR to include the most
current maintenance intervals in use by
JRC for the Tokaido Shinkansen.
Along with the claims discussed
above, UPRR raised several comments
regarding some of the regulatory text
associated with §§ 299.13(c)(3), 299.207,
299.209, 299.215, 299.341, and 299.351–
299.357. The concerns were focused on
ensuring that the language of those
sections, as proposed in the NPRM,
would be consistent with similar
requirements for JRC’s Tokaido
Shinkansen system so that TCRR would
be able to replicate the Tokaido
Shinkansen properly. UPRR was
concerned that FRA did not ensure this
consistency and asked FRA to explain
khammond on DSKJM1Z7X2PROD with RULES2
44 85
FR 14036, 14038.
example, the following provides
information on maintenance intervals associated
with rolling stock: Docket No. FRA–2019–0068,
Document IDs. FRA–2019–0068–0016 ‘‘2017—
Exhibit C–8 Subpart J Section Analysis (Inspection
Testing and Maintenance),’’ FRA–2019–0068–0022
‘‘2017—Presentation M10P04—N700 Bogie ITM (CI
redacted),’’ and FRA–2019–0068–0024 ‘‘JRCs
Practice on Movement of Defective Equipment (CI
redacted).’’
45 For
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
in detail whatever differences might
exist in a reissued NPRM so that the
public could meaningfully participate in
the rulemaking process.
FRA believes that UPRR does not
understand fully what FRA stated in the
NPRM, nor what the rule text is
accomplishing for the above-cited
sections of this final rule. As discussed
in the NPRM, TCRR’s petition
represented that the regulatory
requirements offered by TCRR were
translated from the technological and
operational aspects of the JRC Tokaido
Shinkansen.46 Each of the above-cited
sections referenced by UPRR are either
technological or operational in nature.
First, as it relates to the personnel
training requirements under
§ 299.13(c)(3), it is unclear to FRA what
precise misunderstanding UPRR has
about this proposed requirement.
Section 299.13(c)(3) requires TCRR to
comply with part 243, which is a
performance-based regulation that is
designed to accommodate myriad
different railroad job functions and
personnel qualifications. This part
provides a railroad with broad
autonomy in determining how its safetycritical employees are categorized and
does not dictate in any way the required
level of training or qualification of
employees as UPRR seems to suggest.
Part 243 is designed to help ensure that
safety critical roles and qualifications
are identified, and that proper
adherence to an adequate training
program is maintained and documented.
JRC’s training and qualification program
is very thorough and comprehensive
and far exceeds the level of employee
training, development, and hands-on
experience practiced by most, if not all,
North American rail operators. As such,
TCRR should have no difficulty
complying with the requirements of part
243, and TCRR should be able to
leverage fully JRC’s proven approach to
personnel training and qualification.
In a similar vein, UPRR’s comment
regarding the PTC Safety Plan Content
Requirements in § 299.207 is equally
perplexing. The PTC requirements
proposed are derived from 49 CFR part
236, subpart I, but modified to reflect
only those requirements common to all
systems, and specific to standalone
systems, such as TCRR’s. PTC is not a
technology itself, but rather a set of
performance requirements that establish
the minimum functionality a train
control system must have, the most
fundamental of which are required by
statute. PTC terminology used in this
context is unique to the U.S. statutory
and regulatory requirements. The PTC
46 85
PO 00000
FR 14036.
Frm 00010
Fmt 4701
Safety Plan (PTCSP) is the primary
means by which the railroad
demonstrates compliance with the
requirements in subpart B of this final
rule. And, as long as TCRR’s train
control system, as implemented in
Texas, meets the minimum performance
and functionality requirements of
subpart B, what requirements exist in
Japan are irrelevant in relation to PTC,
especially as Japan has no equivalent
PTC requirement. To put it another way,
subpart B requires that TCRR
demonstrate that its PTC system, as
implemented and installed in Texas,
fulfill the minimum safety
requirements—it is not intended to
prove JRC’s technology or its
implementation. Likewise, paragraph
(a)(6) dictates that TCRR demonstrate
the adequacy of its program, but it does
not prescribe how TCRR must do so. In
this respect, any pertinent training or
qualifications required for the
successful implementation of JRC’s
Automatic Train Control (ATC)
technology would be expected to be
articulated within TCRR’s plan and
consistent with JRC’s training.
With respect to §§ 299.209 and
299.215, these sections were not
specifically included in TCRR’s
petition. However, in TCRR’s petition,
TCRR stated that it would comply with
subpart I of 49 CFR part 236, in toto. As
further explained in the NRPM, FRA
stated that it was tailoring the
requirements of part 236, subpart I, to
TCRR’s standalone PTC system.47
Sections 299.209 and 299.215 contain
virtually equivalent requirements as
§§ 236.1029 and 236.1039. And with
respect to the cited track sections,
§§ 299.341, and 299.351–299.357, TCRR
provided FRA the language for these
sections, again representing in its
petition that they translate the
technological and operational aspects of
JRC’s Tokaido Shinkansen.
In addition, part 299, subpart B of this
final rule is a performance standard.
This provides TCRR appropriate
flexibility in how it complies with the
requirements, allowing TCRR to
replicate the service-proven, safetycritical aspects of JRC’s Tokaido
Shinkansen. In its regulatory language,
FRA is not requiring TCRR to deviate
from JRC practice, but expects TCRR to
remain consistent with JRC practice.
In addition to the six ‘‘deficiencies’’
noted above, Delta Troy also
commented that FRA’s NPRM was
deficient and contrary to the APA in
that it did not provide adequate notice
in the docket of an ‘‘economic analysis,’’
47 85
Sfmt 4700
E:\FR\FM\03NOR2.SGM
FR 14036, 14041.
03NOR2
khammond on DSKJM1Z7X2PROD with RULES2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
and that the NPRM was based on a
‘‘world that no longer exists.’’
In support of its assertion that FRA
failed to provide adequate notice of an
‘‘economic analysis’’ in accord with the
APA, Delta Troy argues that it could not
find any type of economic analysis
despite FRA’s repeated mentioning of
such an analysis during the telephonic
hearings held on May 4–6, 2020. Delta
Troy cited to the transcript of the May
6th hearing, noting that on page 3 of the
transcript the Hearing Officer stated that
the ‘‘purpose of tonight’s hearing is for
FRA to listen to any interested party’s
comments on the technical safety
requirements proposed in the NPRM
along with the associated economic
analysis published in the rule’s online
docket.’’ 48 Further, Delta Troy
explained that it examined the NPRM
and could not find an economic analysis
contained in the NPRM, nor in the
rulemaking docket.
FRA disagrees. FRA provided its
evaluation of the regulatory burden on
the regulated entity in the NPRM as it
is required to under Executive Order
(E.O.) 12866.49
In support of its claim that the
‘‘NPRM must be replaced as it is based
on a world that no longer exists,’’ Delta
Troy invokes the coronavirus disease
2019 (COVID–19) public health
emergency. Delta Troy asserted that the
future of intercity travel will be
dramatically different from the recent
past. It further asserted that the decision
to move forward with the rulemaking
was based on projected ridership and
train designs that were developed prior
to the COVID–19 public health
emergency, and thus now must be reevaluated in light of the current global
situation, and no final rule should be
issued until the re-evaluation is
complete.
While FRA agrees that these are
unprecedented times, it disagrees that
the rulemaking is obsolete. As explained
in section IV. B. Regulatory Approach of
this final rule, FRA advanced the
rulemaking because TCRR’s proposal:
(1) Is consistent with FRA’s mission is
to enable safe, reliable, and efficient
movement of people and goods by rail;
and (2) demonstrated that the proposed
system would replicate the system and
operations of the Tokaido Shinkansen
system and its 50-year safety record.
This rulemaking removes the
government barrier to private industry
48 05.06.2020—TCRR Telephonic Hearing
Transcript at page 3, available at
www.regulations.gov, Docket No. FRA–2019–0068,
Docket ID: FRA–2019–0068–0300.
49 Section V. A. Executive Orders 12866, 13771,
and DOT Regulatory Policies and Procedures of the
NPRM. 85 FR 14036, 14047.
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
seeking to bring transportation
innovations to the United States; FRA’s
analysis in an E.O. 12866 context
properly relates to the effects of
government regulatory burdens, and not
whether TCRR’s proposed operation is
financially viable. In addition, the
analysis performed under E.O. 12866 as
part of the NPRM and this final rule do
not rely on ridership estimates or other
projections of demand.
To the commenter’s assertion that
train design must be reevaluated due to
the pandemic, the technical safety
requirements identified in the NPRM
remain valid. FRA is not amending any
of its other passenger equipment safety
regulations to mandate train designs
account for any form of social
distancing. FRA expects the railroads
and the public to abide by protocols and
guidance issued by other Federal
agencies, and State and local
governments, and does not believe that
rulemaking is appropriate.
H. Electrical Arcing From the Overhead
Catenary System
A number of commenters raised
concern about the ‘‘sparking’’ effect
often associated with electrified trains.
This concern was tied to the fact Atmos
Energy maintains a natural gas
compression station near the
contemplated TCRR alignment, and that
a ‘‘spark’’ from a passing high-speed
train could in-turn ignite some volume
of gas present at either the compression
station, or pipelines along the route.
However, no specific context or
evidence was provided to elaborate why
the design or operation of either the
railroad, the compression station, or a
pipeline, provides for a specific risk to
adjacent property.
The ‘‘spark’’ often associated with
electrified train systems is caused when
there is a separation between the power
source (the catenary system) and its
collector (the pantograph on the roof of
the train). When this separation occurs,
it is possible for current to continue to
flow between the power source and
collector. In these situations, the high
voltage ionizes the air and causes what
is known as an electrical arc or ‘‘spark’’
between the two components. This
occurrence is part of the normal
operation of an electrical traction power
system like the one proposed by TCRR,
and by itself does not pose any
particular safety risk. Existing FRA
regulations do not cover electrical
arcing because of the lack of a particular
safety risk. Further, the JRC technology
and maintenance practice that is being
adopted by TCRR has refined this
interface to minimize this arcing effect
significantly, and to a degree that is not
PO 00000
Frm 00011
Fmt 4701
Sfmt 4700
69709
comparable to what might be witnessed
on light-rail or other conventional U.S.
electrified operations.
FRA does not believe that this issue
requires regulatory action within this
rule. However, as this issue has been
raised, FRA expects TCRR to work with
Atmos Energy, and any other entity to
examine the risk, and take whatever
precautionary measures that are
necessary. To this extent, FRA would
expect TCRR appropriately addresses
this risk within the context of its System
Safety Program, and is willing to
provide assistance in coordinating with
external entities or regulators, as
appropriate.
I. Right-of-Way Barrier Protection
A certain number of comments were
raised concerning ROW protection and
the potential use of barriers in certain
situations. These comments primarily
involved the ability of feral hogs to
access the track, but also raised
questions regarding the protection of
TCRR structures and track from UPRR
derailments.
With respect to general ROW
protection, and specifically the risk
posed by local feral hogs, FRA notes
that safety is generally established
through multiple fronts. In this case, in
addition to requirements for ROW
protection within this rule under
§ 299.13(b)(3), FRA also points to its
crashworthiness discussion in section
IV. F. Crashworthiness and Occupant
Protection, above. Most notably, in
developing the requirements of this
final rule, both FRA and TCRR
considered the potential for differences
between the Japanese and U.S. operating
environments. The existence of animals
and other potential obstructions
supports the adoption of the final rule
requirement to verify the
crashworthiness of the trainset structure
to protect against the residual risk that
might exist beyond even the best ROW
protection measures.
As it relates to protection of TCRR
structures or ROW from potential
incursions due to UPRR derailments,
such mitigations are not covered under
FRA’s current regulations, and
protection of bridge piers is typically
driven by industry or local standard.
Factors that would drive such decisions
are highly variable based on specific site
conditions (e.g., track centers, curvature,
difference in height between top-of-rail,
etc.) and cannot be adequately
addressed globally. FRA expects that
once structural designs exist, any
localized risk presented would be
identified in TCRR’s risk-based hazard
analysis program under part 270 and
mitigated appropriately.
E:\FR\FM\03NOR2.SGM
03NOR2
69710
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
khammond on DSKJM1Z7X2PROD with RULES2
J. Emergency Response
As part of the public hearing process,
several comments were received with
respect to emergency response and
access for first responders. These
comments largely articulated concerns
regarding the effect that the absence of
certain safety requirements might have
on first responders’ ability to get inside
a trainset, the impact construction might
generally have on emergency response
times, the ability of first responders to
access the ROW, and coordination with
local first responders to ensure adequate
capability to respond to an emergency
on the high-speed railroad. Comments
related to the first topic, the ability first
responders gaining access to a trainset,
are addressed in the discussion
regarding safety appliances under
section V. D. Decision under 49 U.S.C.
20306, Exemption for technological
improvements of this final rule. Those
comments related to potential
disruptions to normal emergency
response routes caused by construction
are outside the scope of this
rulemaking.50 FRA defers to local and
State officials in the coordination of
potential road closures or other impacts
to potential emergency response times
caused by construction.
As it relates to comments regarding
ROW access and TCRR coordination
with local first responders, FRA notes
that the NPRM proposed to apply all
Passenger Train Emergency
Preparedness requirements contained
within 49 CFR part 239, and is doing so
in this final rule. Right-of-way access,
coordination, and establishment of the
emergency equipment needs and
training requirements for local first
responders are a part of the planning
process required by part 239. Many of
these specific planning activities cannot
begin in earnest until final ROW designs
are developed. This rule only
establishes the planning requirements,
with the execution of those
requirements naturally occurring at a
later time, and is identical to the
requirements with which all other
passenger railroads in the U.S. must
comply.
A number of commenters objected to
TCRR’s limited early engagement with
local first responders. Specifically,
commenters raised concern with TCRR
having asked the local first responders
50 While outside the scope of rulemaking FRA
considered potential disruptions to emergency
response routes in Section 3.16.5.2.2, Safety and
Security, Build Alternatives of the Final EIS. TCRR
has agreed to implement mitigation to address
potential delays. See Section 3.16.6.2, Safety and
Security, Mitigation Measures of the Final EIS, SS–
MM#1, Model Construction Impacts on Emergency
Response Times of the Final EIS.
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
what equipment the first responders
thought would be necessary in
responding to an emergency on the
railroad. Commenters expressed
disappointment that TCRR was not
advising the local first responders as to
the type of equipment TCRR would
expect the first responders to have. In
addition, commenters noted that TCRR
has not provided a list of necessary or
required equipment to the local first
responders. This appears to be a
byproduct of misunderstanding the
level of maturity of the system, and the
fact that only conceptual design exists at
this stage. The actions taken by TCRR at
this early stage demonstrate a proactive
approach to the matter, and will help
inform the railroad on the capability of
the local first responders along the
alignment. This knowledge will benefit
TCRR as it continues to develop the
engineering design, and situations such
as ladder height, emergency egress and
equipment needs, and ROW access
capability.
K. Noise Emission and Vibration
Several commenters raised concerns
about the noise emission and vibration
that will be caused by the passing of the
trainset once in service. With respect to
noise emission, when looking at
§ 299.3(c)(3) as proposed in the NPRM
and in this final rule, TCRR must
comply with 49 CFR part 210, Railroad
Noise Emission Compliance
Regulations, which prescribes minimum
compliance regulations for enforcement
of the Railroad Noise Emission
Standards established by the
Environmental Protection Agency in 40
CFR part 201.
There are no required vibration
standards for railroads. However, FRA
evaluated the potential impacts
resulting from vibration during
construction and operation of the HSR
system in the Final EIS, and found that
while there may be some annoyance
impacts due to vibration during
construction, no vibration impacts due
to operations are anticipated.
Nevertheless, the Final EIS identified
mitigation measures for potential noise
and vibration impacts, which includes
compliance with local regulations on
noise and vibration as well as
conducting additional noise and
vibration assessments and monitoring
noise and vibration during operations
testing.51 In addition, where
construction activities such as pile
51 FRA. Dallas to Houston High-Speed Rail—
Passenger Service from Houston to Dallas https://
railroads.dot.gov/environmental-reviews/dallashouston-high-speed-rail/dallas-houston-high-speedrail-passenger, Final Environmental Impact
Statement, Section 3.4., Noise and Vibration.
PO 00000
Frm 00012
Fmt 4701
Sfmt 4700
driving for structures and vibratory
compaction for ground improvements
would occur within 50 feet of
underground utilities, TCRR would
coordinate with the utilities to identify
where relocation and/or encasement
would be needed to avoid vibration
damage from nearby construction, and
compensate the utilities for such
work.52 TCRR has agreed to implement
the identified mitigation. See section VI.
C. Mitigation Commitments, of this final
rule.
L. Eminent Domain
One commenter raised the issue of
eminent domain and asked FRA what
influence its Federal actions would have
on any eminent domain issue. To the
best of FRA’s knowledge, eminent
domain powers under the Fifth
Amendment of the U.S. Constitution are
not involved. FRA understands the
eminent domain issues to be centered
on the interpretation of various Texas
State statutes. FRA defers to the State of
Texas to interpret its own statutes.
M. Regulatory Evaluation
Several commenters discussed the
financial feasibility of TCRR and stated
that FRA did not take this into account
when it issued the NPRM. However, it
is outside FRA’s regulatory scope to
consider the economic viability of a
specific railroad project, so it was not
addressed as part of the NPRM.53 FRA’s
economic analysis in the NPRM
evaluates the impact of the Federal
regulatory burden on TCRR
operations.54 FRA’s responsibility is to
ensure that the railroad industry is
operating in a safe manner, not to
examine the economic viability of a
specific project.
In addition, several commenters
asserted that FRA did not adequately
account for the costs in its economic
analysis. As discussed in the NPRM,
FRA concluded that since TCRR’s
compliance with the requirements in
this rulemaking are voluntary, the
rulemaking does not impose any
additional Federal regulatory burdens.55
Costs such as equipment design,
52 Id.
at 3.4–33.
FR 14036, 14048, FN 10.
54 In addition, as required by NEPA, FRA
considered as part of the EIS the overall direct and
indirect impacts to the socioeconomic environment
that may occur as a result of TCRR’s construction
and operation of its proposed project, including
employment and earnings, property impacts,
property tax and net change in tax revenue. FRA.
Dallas to Houston High-Speed Rail—Passenger
Service from Houston to Dallas https://
railroads.dot.gov/environmental-reviews/dallashouston-high-speed-rail/dallas-houston-high-speedrail-passenger, Final Environmental Impact
Statement, Section 3.14.5.2.3, Economic Impacts.
55 85 FR 14036, 14047.
53 85
E:\FR\FM\03NOR2.SGM
03NOR2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
khammond on DSKJM1Z7X2PROD with RULES2
equipment changes, associated studies,
and other costs are costs voluntarily
assumed by TCRR to create the specific
system contemplated by this rule. TCRR
petitioned FRA for a rulemaking so it
could create a unique HSR system,
which does not meet Tier III passenger
equipment requirements.
UPRR commented that the rulemaking
did not address the effect of the
implementation of TCRR’s system and
on the safety of other entities. UPRR
further stated that although TCRR’s
actions may be considered voluntary,
TCRR’s system would introduce outside
interference on adjacent railroads,
which require action and incur cost to
address. FRA understands that there
could be costs to existing railroads
when an adjacent railroad begins
operations, these costs will not
necessarily occur and FRA is unable to
estimate them. These costs are
speculative and are difficult to
determine because the final designs for
the TCRR project are not yet developed.
Therefore, these costs are not included
in FRA’s economic analysis. Further, as
explained above in response to UPRR
concerns regarding potential
interference, FRA expects that the final
rule framework would have no direct
bearing on the safety of UPRR’s
operation.
Several commenters also stated that
the requirements, as proposed in the
NPRM, would have an impact on small
entities and FRA did not account for
this within its regulatory flexibility
analysis. FRA, in conjunction with the
Small Business Administration (SBA),
has developed a definition of small
entities that is used when evaluating the
economic impact of regulations.
Commuter railroads serving populations
of 50,000 or less are considered to be
small entities, therefore TCRR is not a
small entity and the regulation will not
impact any small entities. For further
information, please see FRA’s
discussion of its regulatory flexibility
analysis, as required by the Regulatory
Flexibility Act 56 and E.O. 13272,57
under section V. B. Regulatory
Flexibility Act and Executive Order
13272; Regulatory Flexibility
Assessment of the NPRM 58 and section
VII. B. Regulatory Flexibility Act and
Executive Order 13272; Regulatory
Flexibility Assessment of this final rule.
N. Enforcement
As stated in the NPRM under section
IV. F. Enforcement, FRA will publish a
U.S.C. 601 et seq.
FR 53461 (Aug. 16, 2002).
58 85 FR 14036, 14048.
civil penalty schedule on its website.59
Because such penalty schedules are
statements of agency policy, notice and
comment are not required prior to their
issuance, nor are they required to be
published in the CFR.60 Although not
required, FRA solicited comment on
this subject, but did not receive any
comments on the types of actions or
omissions under each regulatory section
that would subject a person to the
assessment of a civil penalty.
FRA also clarifies that other
enforcement tools, such as emergency
orders, individual liability actions, or
compliance orders, are available for
FRA to use, as necessary, in providing
safety oversight of TCRR.
V. Discussion of Final Rule and
Regulatory Changes
A. Non-Substantive Corrections
TCRR, in its comments, pointed out a
few instances where FRA had
inadvertently included (or failed to
include) certain regulatory text that was
not submitted in the proposed rule text
included with TCRR’s petition. In
response, FRA is modifying the final
rule, but these changes are not
substantive.
Under proposed § 299.301(b), FRA
included maintenance-of-way (MOW)
yards (locations where MOW equipment
is stored) when discussing restoration or
renewal of track class H2. As track
within MOW yards will be classified
only as track class H0, it was not correct
for FRA to include a reference to yards
in this provision. Accordingly, in this
final rule, FRA has removed ‘‘yards
and’’ from paragraph (b).
Under proposed § 299.345, FRA
converted a table appearing in TCRR’s
petition to rule text. The table depicted
the frequency of certain types of
required track inspections. In converting
the table to text, FRA clarified the
requirements contained in the table.
However, in doing so, there were also
some inadvertent errors in the NPRM
rule text. Under § 299.345(b)(1), which
contains the requirements for safe
walkway inspections, FRA failed to
include the text from footnote 1 to
§ 2xx.343(c) from the TCRR petition’s
rule text. The footnote permitted a
visual inspection during overnight
hours and, in the event of extreme
weather, from the trainset cab in lieu of
a safe walkway inspection. To correct
this oversight, FRA is adding new
paragraph (b)(1)(vii), which permits a
visual inspection from the trainset cab
or an on-track visual inspection in lieu
56 5
57 67
VerDate Sep<11>2014
18:02 Nov 02, 2020
59 85
60 5
Jkt 253001
PO 00000
FR 14036, 14046.
U.S.C. 553(b)(3)(A).
Frm 00013
Fmt 4701
Sfmt 4700
69711
of a safe walkway inspection in the
event of extreme weather. FRA slightly
modified the language to make clear that
an inspection during the overnight
hours is considered an on-track visual
inspection.
In addition, under § 299.345(b)(2),
FRA proposed requirements for on-track
inspections for track other than track
located within Train Maintenance
Facilities (TMFs) and MOW yards.
Proposed paragraph (b)(2)(iii) specified
that turn-outs and track crossings were
to be inspected at least once a week,
with a minimum of three calendar days
between inspections. However, FRA
inadvertently failed to distinguish
between turn-outs and track crossing on
ballasted track versus on non-ballasted
track. In this final rule, FRA is making
that distinction by clarifying that the
requirements of § 299.345(b)(2)(iii)
apply only to turn-outs and rail
crossings on ballasted track. FRA has
added new paragraph (b)(2)(iv) for nonballasted track, which specifies that
turn-outs and rail crossings on nonballasted track shall have an on-track
inspection conducted at least once every
two weeks, with a minimum of six
calendar days between inspections. This
is consistent with the rule text in
TCRR’s petition.
Under § 299.345(b)(3), FRA
inadvertently restricted the conduct of
on-track inspections to ‘‘during
maintenance hours.’’ Under
§ 299.301(b), track maintenance in
MOW yards and TMFs is not restricted
to maintenance hours, as it is for
mainline track under § 299.301(a). As
such, track inspections can be
conducted under traffic conditions, so
long as proper on-track safety is
provided as required under 49 CFR part
214. Under § 299.3(c), TCRR must
comply with 49 CFR part 214 for ontrack safety, with the exception of
§ 214.339. Accordingly, in this final
rule, FRA removed ‘‘during
maintenance hours’’ from
§ 299.345(b)(3) and added new
paragraph (b)(3)(iii) to make explicit the
requirement that 49 CFR part 214 (with
the exception of § 214.339) be followed
for on-track safety within the TMFs and
MOW yards when on-track inspections
are performed under traffic conditions.
Nothing in this discussion should be
construed as affecting the general
prohibition under § 299.301(a) of
performing on-track maintenance or
inspections of track, other than track in
MOW yards and TMFs, under traffic
conditions. In those locations, MOW
work and revenue service must still be
E:\FR\FM\03NOR2.SGM
03NOR2
69712
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
temporally separated, as discussed in
the NRPM.61
Under proposed § 299.609(a), FRA
inadvertently left out the word ‘‘types’’
after vehicle. In this final rule, FRA has
added the word ‘‘types’’ to clarify the
requirement, which is consistent with
FRA practice regarding vehicle/track
interaction qualification.
In addition to the above changes, FRA
also made several minor technical
changes. Under § 299.315(g), FRA
removed an incorrect cross-reference to
§ 299.337 as the term ‘‘vehicle type’’ is
not used in § 299.337. Under
§ 299.407(d), FRA changed ‘‘emergency
window exit’’ to ‘‘emergency egress
window’’ for consistency of term use.
FRA made the same change for the same
reason to § 299.427. Finally, under
§ 299.439(b), FRA fixed an incorrect
reference to ‘‘this paragraph’’ and
correctly changed the reference to
‘‘paragraph (c) of this section.’’
B. Evaluation of Substantive Changes
khammond on DSKJM1Z7X2PROD with RULES2
1. § 299.5
Definitions
In its comments, TCRR requested that
FRA make some changes to the rule text
to help remove ambiguity. Under
§ 299.5, TCRR requested that FRA
amend the proposed definition of
‘‘passenger equipment.’’ In support of
its request, TCRR stated that the
proposed definition implied that
TCRR’s trainsets would be approved for
use on JRC’s Tokaido Shinkansen HSR
system, which TCRR commented is not
correct. While TCRR’s trainset will be
based on current or future variants of
the N700 series trainset approved for
use on the Tokaido Shinkansen HSR
system, TCRR’s trainset itself will not be
approved for use on the Tokaido
Shinkansen HSR system, as it has fewer
passenger cars than what JRC runs.
Accordingly, TCRR requested that FRA
change the definition of ‘‘passenger
equipment’’ to mean the N700 series
trainset that is based on trainsets
currently in service, or future variants
operated on, JRC’s Tokaido Shinkansen
system, or any unit thereof. FRA agrees
and has made the change in this final
rule. To be clear, the term ‘‘passenger
equipment’’ is referring to the N700
series passenger trainset that TCRR will
operate on its system, which is based on
the trainset in use presently, or future
variants thereof, by JRC on the Tokaido
Shinkansen HSR system. What is
important is not whether the TCRR
trainset has been approved for use on
the Tokaido Shinkansen HSR system,
but that it is based on that technology
61 85
FR 14036, 14038 and 14043.
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
and complies with the requirements of
this rule.
In addition, under § 299.5, TCRR
requested that FRA amend the proposed
definition of ‘‘in passenger service/in
revenue service.’’ In support of its
request, TCRR pointed to proposed
§ 299.13(a)(3), which discussed and
defined the requirement for temporally
separating scheduled ROW maintenance
from revenue passenger operations.
TCRR raised a concern in its comment
that leaving a passenger trainset
properly secured in a station overnight
during MOW operations could run afoul
of the temporal separation requirement.
TCRR further explained that its
understanding of the temporal
separation requirement under
§ 299.13(a)(3), as proposed in the
NPRM, is that the ROW must be cleared
of all revenue service trainsets
(including any trainset repositioning
moves) in order to ensure trainsets
cannot be moved into established
maintenance zones. Moreover, TCRR
stated that it would not consider a
parked, properly secured trainset in a
station location to be a revenue service
trainset because it would not be actively
carrying or available to carry passengers.
TCRR further stated that a trainset could
be considered available to carry
passengers, and thus considered ‘‘in
passenger service/in revenue service’’
only after receiving power from the
overhead catenary system and receiving
a pre-departure inspection by the driver.
And, as overhead catenary power will
be restored to the ROW only after it has
been cleared of MOW equipment, with
the general control center returning the
signal and trainset control system to the
state required to protect revenue
operations, a trainset could not be
considered ‘‘in passenger service/in
revenue service’’ during MOW
operations, thus accomplishing the
temporal separation required by the
rule. Accordingly, to codify this
understanding, TCRR requested that
FRA add to the definition of ‘‘in
passenger service/in revenue service’’ a
carve-out that a trainset that is parked
and properly secured within a station
overnight is not considered to be in
revenue service, and thereby it does not
need to be cleared from the ROW prior
to MOW operations commencing.
The purpose of the temporal
separation requirement is two-fold: (1)
Protection of passengers in the highspeed trainsets from a collision with
heavy MOW equipment; and (2)
protection of the MOW employees
performing work within the ROW from
the risk of being struck by a high-speed
trainset. In both situations, the risk
involves a moving high-speed trainset.
PO 00000
Frm 00014
Fmt 4701
Sfmt 4700
As discussed in the NPRM, removal of
overhead catenary power to those
sections of the ROW where MOW
operations are occurring or planned to
occur is a requirement,62 and without
overhead catenary power, a high-speed
trainset is incapable of generating
tractive power, so those two risks, a
collision between a high-speed trainset
carrying passengers and MOW
equipment, and MOW employees being
struck by a high-speed trainset, are
heavily mitigated.
However, when looking at the
requirements for temporal separation
under § 299.13(a)(3), there is a
requirement that the railroad must
complete its trainset repositioning
moves prior to the commencement of
MOW operations. Trainset repositioning
moves are not considered ‘‘in passenger
service/in revenue service,’’ but rather
considered ‘‘in service,’’ as that term
was defined in the NPRM, as trainsets
being repositioned would not
necessarily be available to carry
passengers. In addition, as scheduled
MOW operations 63 occur outside of
revenue service hours, FRA would
expect trainsets to be loaded with
passengers or available to carry
passengers, and thus would not
consider trainsets outside of revenue
service hours to be ‘‘in passenger
service/in revenue service.’’ But, they
may be considered ‘‘in service.’’
Accordingly, FRA is adopting the
proposed definition of ‘‘in passenger
service/in revenue service’’ in this final
rule unchanged. But, FRA is amending
the definition of ‘‘in service’’ to include
a fourth exception to address the
situation where TCRR has a trainset
parked in a station location that is
properly secured and has been deemed
not in service by the railroad (meaning
TCRR is not intending on repositioning
or otherwise moving the trainset until
the cessation of MOW operations).
2. Subpart B—Signal and Trainset
Control System
In its response to the NPRM, TCRR
provided several comments and
suggested edits with respect to FRA’s
proposed requirements for a PTC
system, the certification process, and
TCRR’s interpretation of how those
requirements should apply to its
proposed use of the Tokaido
62 85
FR 14036, 14043.
or emergency MOW operations
during revenue service hours to repair a broken rail,
for example, requires TCRR to halt revenue service
over the affected portion of the right-of-way until
the repair work is completed and has been
inspected. See § 299.301(a) (prohibiting the
restoration or renewal of track under traffic
conditions that is located other than in TMFs and
MOW yards).
63 Unscheduled
E:\FR\FM\03NOR2.SGM
03NOR2
khammond on DSKJM1Z7X2PROD with RULES2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
Shinkansen ATC technology. FRA finds
that many of these comments appear to
originate from a misunderstanding of
how the term ‘‘system’’ is used and
what, exactly, FRA must certify under
49 U.S.C. 20157, Implementation of
positive train control systems.
TCRR commented on § 299.201(c) and
asserted that it does not anticipate the
need for any regression testing 64 before
FRA certifies TCRR’s PTC system. In
support of its assertion, TCRR stated
that TCRR’s system will be based on the
service-proven Tokaido Shinkansen
ATC system, and TCRR does not
anticipate that any changes will be
made to safety-critical software prior to
obtaining PTC System Certification from
FRA. Further, while TCRR does not
believe regression testing would be
necessary prior to its initial installation
of ATC and FRA certification, TCRR
does believe regression testing is
appropriate for potential changes to its
ATC technology that could possibly
occur in the future.
As proposed in the NPRM,
§ 299.201(c) generally authorizes TCRR
to conduct field testing of its uncertified
PTC system and field regression testing
of its FRA-certified PTC system, which
could encompass, for example, future
modifications to ATC functionality. As
proposed, paragraph (c) was not
intended to specify what type of tests
are required in either instance. The
exact tests to be performed are to be
defined by the railroad in the
development of its PTCSP, particularly
with respect to the content requirements
in § 299.207(a)(7), (a)(9), and (a)(10).
TCRR must demonstrate that its PTC
system, as built, fulfills the
requirements contained in subpart B.
The distinction that TCRR’s proposed
PTC system is based on a service-proven
technology has no bearing in this
instance. Under the statutory mandate,
FRA must certify that a railroad’s PTC
system complies with the applicable
PTC regulations (in this instance, 49
CFR part 299, subpart B), not the
theoretical capability of the
technology.65 What constitutes safetycritical software has yet to be defined in
detail by TCRR, as required under
§ 299.441, and the changes required to
be made to the existing ATC software
(whether on the executive or application
side) have yet to be described.
As such, although the term
‘‘regression testing’’ in paragraph (c) is
used in the context of post-certification
field testing, this is not intended to
64 Regression testing is used to ensure that
previously tested software still performs as
intended after a change to that software.
65 49 U.S.C. 20157(h).
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
suggest that this is the only
circumstance that would call for
regression testing, as several railroads
have performed regression testing on an
ongoing basis before and after obtaining
PTC System Certification from FRA.
FRA does not agree with TCRR’s reading
of § 299.201(c) as requiring regression
testing; that paragraph merely
authorizes TCRR to conduct various
levels of field testing, including
regression testing. FRA believes the
necessary level of testing and validation
should be determined as TCRR’s system
is developed and implemented, as
required under § 299.207.
In its comments, TCRR also asserts
that because it plans to use an existing
signaling system, the requirement to
include a ‘‘description of the safety
assurance concepts that are to be used
for system development, including an
explanation of the design principles and
assumptions’’ within TCRR’s PTCSP
(see § 299.207(a)(2)) should only apply
only to modifications to its system.
TCRR contends that because the system
was developed long ago, these
principles would not apply in the same
manner as they would to a system that
is under development. TCRR
recommends that paragraph (a)(2) be
modified to refer only to safety-critical
changes to the ATC system, not the
initial version of TCRR’s ATC system.
FRA disagrees with this perspective.
TCRR is correct that the core safety
assurance concepts, design principles,
and design assumptions are
fundamental to the development of any
new system, but they are also equally
important in the implementation of
existing technology. These core
concepts, principles, and assumptions
provide a baseline for safety assurance
that govern the safe implementation of
a system, whether proven or novel. In
the case of TCRR, although the ATC
system used on JRC’s Tokaido
Shinkansen HSR system was developed
years ago, FRA would expect that the
fundamental concepts (e.g., fail safe),
essential design principles, and any
assumptions critical to the safety case of
the system are understood by TCRR in
a manner that can be articulated as part
of its PTCSP. If TCRR cannot articulate
these fundamental concepts, FRA would
question how TCRR intends to ensure
that the application and installation of
the system in Texas is performed
correctly. FRA acknowledges that JRC’s
Tokaido Shinkansen ATC technology
has an extraordinary safety record, but
TCRR must provide sufficient
information in its PTCSP for FRA to
certify that the ATC system in Texas
fulfills the requirements under 49 CFR
part 299, subpart B.
PO 00000
Frm 00015
Fmt 4701
Sfmt 4700
69713
With respect to the requirement to
include a complete description of
TCRR’s verification and validation
process in its PTCSP, under
§ 299.207(a)(5), TCRR proposed that
operational data from JRC’s Tokaido
Shinkansen HSR system would serve to
adequately demonstrate that the
technology and its functions, as
conceived by JRC, have been
successfully validated. FRA suspects
that TCRR’s interpretation comes from
its perception that this requirement, and
the corresponding requirement in 49
CFR 236.1015(d)(5), are intended for the
validation and verification of a new
system under development. FRA would
like to make clear that a verification and
validation process is essential to the
implementation of any system, whether
new or previously certified. The actual
application of a technology is just as
important as its theoretical performance.
In this respect, even railroads that are
implementing previously certified and
type-approved PTC systems have
substantial verification and validation
processes and tests to ensure that the
system, once installed, functions as
designed and intended. Operational
data from the existing JRC operation
would not suffice in this case. As an
example, a technology may be proven to
effectively enforce civil speeds (i.e.,
speed limits), but if the installation or
application design is not correct, the cab
signal code or track chart could allow
for a maximum authorized speed that is
not consistent with the safe civil speed
required for a particular curve. Errors
such as this are not uncommon when
considering the volume of work that
must be performed to install a system on
hundreds (or thousands) of miles of
track, and thus the verification and
validation process is critical for the safe
implementation of any train control
system.
In its comments, TCRR further
recommended changes to
§ 299.207(a)(18) to specifically reference
the Tokaido Shinkansen system as being
the baseline for comparison with
TCRR’s system. However, the
modification is unnecessary for TCRR to
reference the Tokaido Shinkansen as the
baseline for comparison. As TCRR
correctly identified, this requirement is
derived from 49 CFR 236.1007(c)(1).
FRA believes that, when possible, the
RPA and the existing PTC requirements
for high-speed service should be
consistent. TCRR will be able to comply
with § 299.207(a)(18), as the provision
permits TCRR to use foreign service data
in its PTCSP.
FRA is updating the language under
§ 299.209(e) to directly reference
§ 236.1029(h). The language of
E:\FR\FM\03NOR2.SGM
03NOR2
69714
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
§ 299.209(e) as proposed in the NPRM
was based on the language of
§ 236.1029(h), so the requirement to
report has not changed. This is
consistent with other sections under
subpart B.
In addition, in its comments, TCRR
acknowledges that proposed § 299.211
would establish certain security
requirements for a PTC system utilizing
wireless communications. Although
TCRR does not currently intend for its
ATC system to utilize wireless
communications, TCRR comments that
it does not object to retaining this
provision in case it utilizes wireless
communications in the future.
Accordingly, FRA will retain the
language under proposed § 299.211, as it
mirrors the existing PTC requirements
under § 236.1033.
khammond on DSKJM1Z7X2PROD with RULES2
3. § 299.345 Visual Inspections; Rightof-Way
Under § 299.345(b)(3)(i) and (ii),
TCRR asked for the inspection
frequency to be reduced from twice to
once during the relevant period. As
proposed, § 299.345(b)(3)(i) and (ii)
require TCRR to inspect track within
TMFs and MOW yards twice during a
60-day period for ballasted track and
twice during a 120-day period for nonballasted track. TCRR commented that
although the rule language as proposed
was consistent with the rule text
provided with TCRR’s petition, it is not
wholly consistent with JRC practice.
According to TCRR, JRC’s practice is to
inspect this type of track only once
during the relevant periods (a 60-day
period for ballasted track and a 120-day
period for non-ballasted track). FRA
recognizes that the language as
proposed under § 299.345(b)(3)(i) and
(ii) appears to contain requirements
more stringent than what JRC requires
on the Tokaido Shinkansen HSR system.
Therefore, consistent with FRA and
TCRR’s goal to replicate JRC’s
requirements as closely as possible, FRA
has made the requested change.
4. § 299.347 Special Inspections
TCRR requested in its comments that
FRA amend the language of proposed
§ 299.347. As proposed, § 299.347
contains requirements for TCRR to
conduct a special inspection of its track
and ROW prior to the operation of a
trainset in the event of fire, flood, severe
storm, or temperature extremes that
could damage the track structure. TCRR
pointed out, though, that the language of
proposed § 299.347 prohibits movement
of a trainset, regardless of location in the
ROW (e.g., between stations), until an
inspection has been performed. TCRR
also stated that JRC has certain
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
operating rules that would permit
movement of a trainset to the next
forward station location prior to an
inspection so long as specific criteria
were met. TCRR offered as an example
if operations were suspended due to a
heavy rainfall, defined by an amount of
rain measured by that segment’s rainfall
gauge over a specific time interval
preceding the trainset movement, a
trainset would be allowed to move to
the next station at a speed not to exceed
30 km/h (18.6 mph). Accordingly, TCRR
requested that FRA amend the language
of this section to require inspections of
the track and ROW to be performed as
soon as possible after the occurrence of
a fire, flood, severe storm, temperature
extremes, or other types of events that
may cause damage to the track structure,
in accordance with the railroad’s
inspection, testing, and maintenance
program, and operating rules.
FRA agrees that an event may occur
while a trainset is en route between
stations that would halt the operation of
the trainset prior to reaching the next
station and trigger a special inspection,
as proposed in the NPRM under
§ 299.347. Because of this, FRA has
updated this section in the final rule.
FRA has designated the previously
undesignated text as paragraph (a) and
added a new paragraph (b) to allow a
trainset that is between stations to
proceed to the next forward station at
restricted speed, not to exceed 30 km/
h (18.6 mph) after an event
contemplated by this section occurs.
This allows for the movement of
passengers to a station so they are not
stranded in the ROW until an inspection
of the track and ROW can be performed.
However, FRA makes clear that no
trainset may depart a station location
until a special inspection of the effected
track and ROW can be performed. This
new paragraph (b) is only to permit the
movement of passengers to the next
station that would otherwise be
stranded between station locations.
Should the track and/or ROW be
discovered to be damaged so as to put
the safety of the passengers in jeopardy,
then the movement is expected to stop
until the track is inspected by a
qualified person, and the qualified
person makes a determination that
movement can safely proceed.
5. § 299.713 Program Approval
Procedures
TCRR further requested that FRA
amend the language of § 299.713(c)(2) as
proposed in the NPRM. As proposed,
§ 299.713(c)(2) provided the procedures
for approval of amendments to the
inspection, testing, and maintenance
program. Any amendment that relaxes
PO 00000
Frm 00016
Fmt 4701
Sfmt 4700
an FRA-approved requirement will be
reviewed by FRA within 45 days of
receipt of the amendment, by which
time FRA will notify TCRR whether the
amendment is approved, or if not
approved, stating the specific points in
which the amendment is deficient.
Crucial to this part of the paragraph was
that the railroad could not implement
the amendment until FRA had approved
it. The proposed paragraph further
stated that if the railroad wanted to
amend the program by making an FRAapproved requirement more stringent,
the railroad could implement the
amendment prior to receiving FRA
approval on the amendment.
Although TCRR generally accepted
that the language would address many
possible amendments, TCRR
commented that there may be situations
where it is unclear as to whether the
proposed inspection, testing, and
maintenance program amendment is
making an FRA-approved requirement
more stringent or relaxed. Thus, TCRR
requested FRA change the language of
proposed paragraph (c)(2), such that if
the railroad proposes to amend an FRAapproved program requirement that
TCRR deems to be more stringent, the
railroad is permitted to act immediately
to implement the amendment prior to
obtaining FRA approval.
FRA is not adopting TCRR’s
recommendation because FRA finds the
language to be sufficiently clear and
expects that most situations, as TCRR
has acknowledged, will be
straightforward in their resolution. For
example, if TCRR wishes to perform
inspections more frequently than
required in its inspection, testing, and
maintenance program, FRA would
consider TCRR’s proposed action as
more stringent than what is required.
Conversely, if TCRR wishes to perform
inspections less frequently than
required in its inspection program,
testing, and maintenance program, FRA
would consider TCRR’s proposed action
as less stringent than what is required,
and TCRR must have FRA approval
before implementing the change. When
there is a question as to whether TCRR’s
proposed action is making a
requirement more stringent or relaxed,
FRA would expect TCRR to either treat
the action as relaxing, triggering FRA
review, or to contact FRA to inquire.
C. Trainset Image Recording System
In the NPRM, FRA proposed to make
applicable to TCRR the requirement to
have an image recording system
installed on its trainsets, consistent with
FRA’s Locomotive Image and Audio
Recording Devices for Passenger Trains
E:\FR\FM\03NOR2.SGM
03NOR2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
NPRM.66 As discussed in the TCRR
NPRM, FRA stated that once the image
recording device rulemaking was
finalized, that FRA would make
conforming changes to this final rule’s
regulatory text. However, as FRA has
not yet published the image recording
devices final rule, FRA will make any
necessary changes to this regulation as
part of that rulemaking.
khammond on DSKJM1Z7X2PROD with RULES2
D. Decision Under 49 U.S.C. 20306,
Exemption for Technological
Improvements
As discussed in the NPRM, FRA’s
safety appliance regulation is based on
longstanding statutory requirements for
individual railroad cars used in general
service. These requirements are
primarily intended to keep railroad
employees safe while performing their
essential job functions. Historically,
these duties have revolved around the
practice of building trains by switching
individual cars or groups of cars, and
are not directly applicable to how
modern high-speed passenger
equipment is designed and operated.
The application of such appliances
would require a significant redesign of
HSR equipment, and would create
aerodynamic problems, particularly
with respect to associated noise
emissions. In the NPRM, FRA proposed
to exempt TCRR from statutory
requirements that are not applicable or
practical for inclusion on its high-speed
trainset technology, pursuant to the
authority granted under 49 U.S.C.
20306.67
Rather than apply legacy
requirements that are inappropriate for
the proposed equipment’s design and
service environment, this final rule
focuses on how to provide a safe
environment for crews as it pertains to
the N700 series trainset, and modern
high-speed operations throughout the
world. In this respect, this final rule
defines specific safety appliance
performance requirements applicable to
this semi-permanently coupled trainset.
By focusing on the job functions this
approach is expected to: Improve safety
for crews and railroad employees;
provide flexibility for superior designs
based on modern ergonomics; and allow
for elimination of appliances when their
functionality is moot (e.g., riding on
side sill steps despite an inability to
couple/decouple cars). FRA believes it
is appropriate to grant relief under the
discretionary process established under
49 U.S.C. 20306 and adopts these
66 85 FR 14036, 14041; (84 FR 35712, Jul. 24,
2019).
67 85 FR 14036, 14040.
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
requirements under its statutory
authority as part of this rulemaking.
As part of the hearing held on May 4,
2020, FRA conducted proceedings
under 49 U.S.C. 20306 to determine
whether to invoke its discretionary
authority to provide relief to TCRR from
certain requirements of 49 U.S.C. ch.
203 for its planned operation of highspeed trainsets built to the requirements
contained in this final rule. Under 49
U.S.C. 20306, FRA may exempt TCRR
from the above-identified statutory
requirements based on evidence
received and findings developed at a
hearing demonstrating that the statutory
requirements ‘‘preclude the
development or implementation of more
efficient railroad transportation
equipment or other transportation
innovations under existing law.’’
In its rulemaking petition, TCRR
requested FRA exercise its discretionary
authority under 49 U.S.C. 20306 to
exempt its high-speed passenger rail
trainsets from the requirements of 49
U.S.C. 20302, which mandates that
railroad vehicles be equipped with: (1)
Secure sill steps and efficient hand
brakes; (2) secure grab irons or
handholds on vehicle ends and sides for
greater security to individuals coupling
and uncoupling vehicles; and (3) the
standard height of drawbars. See 49
U.S.C. 20302(a)(1)(B), (a)(2), and (a)(3).
On May 14, 2020, FRA granted similar
relief under 49 U.S.C. 20306 to exempt
Amtrak’s new high-speed passenger rail
trainsets,68 based on evidence presented
at a public hearing held on December
11, 2019. TCRR also testified at this
hearing in support of Amtrak’s petition
and noted its pending need for similar
technological exemption. FRA notes no
substantive differences in the
justification for exemption between
TCRR and Amtrak, as both requests
pertain to the implementation of
modern high-speed passenger rail
trainsets. FRA believes its exemption for
such technology under Amtrak’s
petition could be extended to any
similar high-speed passenger rail
trainset technology, but given the
unique nature of this rulemaking, and
the overlap in timing between TCRR’s
petition and FRA’s decision to grant
Amtrak’s petition, FRA felt it was
appropriate to conduct proceedings
under 49 U.S.C. 20306 as part of the
hearing held on May 4, 2020. By taking
this approach, FRA could ensure
transparency and provide ample
opportunity for comment from those
most affected by the TCRR proposal.
In support of its request for an
exemption, TCRR noted in its petition
68 See
PO 00000
docket FRA–2019–0066.
Frm 00017
Fmt 4701
Sfmt 4700
69715
that safety appliances such as sill steps,
or end or side handholds, are typically
used in conventional North American
practice by maintenance personnel who
ride the side of trainsets in yards or
maintenance facilities for marshalling
operations. The N700 series trainset, as
described in this final rule, is a fixedconsist trainset where trainset make-up
only occurs in defined locations where
maintenance personnel can safely climb
on, under, or between the equipment,
consistent with the protections afforded
under 49 CFR part 218.
In addition, the leading and trailing
ends of the N700 series trainset are
equipped with an automatic coupler
located behind a removable shroud.
These couplers, as proposed by TCRR,
will only be used for rescue operations
in accordance with TCRR’s operating
rules, and provide for the safe coupling
of one trainset to another (i.e., each end
will have automatic self-centering
couplers that couple to other trainsets
on impact, and uncouple by
mechanisms that do not require a
person to go between trainsets or
activate a traditional uncoupling lever).
Further, as proposed, level boarding
will be provided at all locations in
trainset maintenance facilities where
crew and maintenance personnel are
normally required to access or
disembark trainsets. Moreover, because
the equipment is a fixed-consist trainset
in which individual vehicles are semipermanently coupled and, as noted
above, individual vehicles can only be
disconnected in repair facilities where
personnel can work on, under, or
between units under protections
consistent with 49 CFR part 218, having
drawbars at the statutorily prescribed
height is unnecessary.
As such, there is not a functional need
to equip the ends of the trainsets with
sill steps, end or side handholds, or
uncoupling levers. As this technology is
intended to operate at high-speeds, the
inclusion of these appurtenances would
have a significant and detrimental
impact on the aerodynamics of the
trainset. This increase in the
aerodynamic footprint would negatively
impact both efficiency and aerodynamic
noise emissions.
TCRR also noted that trainset
securement will be provided by the use
of wheel chocks in addition to stringent
operating rules and procedures, which
will be consistent with the serviceproven procedures utilized on the
Tokaido Shinkansen system. In
addition, as proposed in the NPRM,
TCRR will be required to demonstrate,
as part of its vehicle qualification
procedures, that the procedures
E:\FR\FM\03NOR2.SGM
03NOR2
khammond on DSKJM1Z7X2PROD with RULES2
69716
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
effectively secure the trainset (see
§ 299.607).
In sum, TCRR asserted that requiring
compliance with the identified statutory
requirements would serve to preclude
the development or implementation of
more efficient railroad transportation
equipment or other transportation
innovations under existing law.
During the hearing conducted on May
4, 2020, TCRR provided testimony in
support of its exemption request, which
reiterated its position stated in its
rulemaking petition, which is
summarized below.69
TCRR testified that, with respect to
couplers being able to couple
automatically on impact and capable of
being uncoupled without the necessity
of an individual going between ends of
vehicles, that the inter-car connections
and coupling mechanisms on TCRR’s
trainsets are different than those
envisioned by 49 U.S.C. 20302(a)(1)(A).
TCRR explained that its trainsets can
only be separated at a maintenance
facility, as the separation of the trainset
requires special tools and procedures to
safety disconnect the inter-car
mechanical and electrical connections.
Separation at a maintenance facility also
provides railroad employees needing to
go between individual cars proper safety
protection. Further, TCRR testified that
its trainsets will be equipped with
rescue couplers at each end of the
trainset in the event a trainset needs to
be rescued from the ROW. These rescue
couplers are located within a removable
shroud at each end of the train set, and
are automatic couplers, in that they
couple upon impact.
With respect to 49 U.S.C. 20302(a)(2),
which requires secure grab irons or
handholds on the ends and sides of
vehicles for greater security for
individuals involved with coupling and
uncoupling vehicles, TCRR testified that
these are not necessary due to the
coupling arrangement of its trainset,
described above. TCRR further testified
that inclusion of these safety appliances
would have a significant and
detrimental impact on the aerodynamic
performance of the trainset and
significantly increase the aerodynamic
noise generated from the trainset. TCRR
stated that providing an exemption from
these requirements is consistent with
the treatment of similar equipment.
TCRR further testified with respect to
49 U.S.C. 20302(a)(3), which requires
drawbars to be of a standard height as
specified by FRA regulation, that TCRR
69 See 05.04.2020—TCRR Telephonic Hearing
Transcript at page 17–30, available at
www.regulations.gov, Docket No. FRA–2019–0068,
Document ID: 2019–0068–0291.
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
will not conduct any type of joint
operation with conventional freight or
passenger equipment. Accordingly, as
TCRR testified, there is no need to have
couplers at a standard height, as TCRR’s
trainsets will have no need to couple to
dissimilar equipment.
TCRR next testified with respect to 49
U.S.C. 20302(a)(1)(B), which requires
vehicles to be equipped with secure sill
steps and efficient handbrakes, that
TCRR’s trainset will not be equipped
with a handbrake. TCRR further testified
that its unattended trainsets will be
secured through a combination of an
urgent brake application, which is
equivalent to an emergency brake
application in the U.S., and the use of
wheel chocks. According to TCRR’s
testimony, this is reflective of JRC’s
practice on the Tokaido Shinkansen
system, which has a demonstrated
safety record. TCRR also testified that its
operating rules will also define
securement procedures, which will be
based on the service-proven procedures
employed by JRC.
TCRR also testified that sill steps and
vertical handholds are not necessary for
railroad employees to access or
disembark from its trainsets. TCRR
offered that it will have provisions for
high-level boarding at all locations
(passenger stations and maintenance
facilities) an employee could be
expected to access or disembark a
trainset.
As noted above, FRA received several
comments regarding TCRR’s request for
exemption. Some comments concerned
the effect that the lack of identified
safety appliances would have on the
ability for TCRR to separate a train in
the event of an emergency, while other
comments concerned the impact that
the absence of said appliance would
have to emergency egress and first
responder access to the trainset. In both
instances, while FRA deeply appreciates
the commenters’ concerns with respect
to the efficacy of emergency response,
assisting in emergency rescue access is
not the purpose of the safety appliances
in question, and in many ways, what
TCRR has proposed exceeds common
practice for emergency passenger egress
and first responder rescue access within
the U.S.
In addition, FRA would like to
address the comments related to the
separation of trains in an emergency.
While semi-permanently coupled
passenger equipment is virtually
universal for high-speed operations, it is
also very common throughout
conventional passenger and freight
operations throughout the U.S., most
often seen in Multiple Unit (MU)
trainset operations and articulated
PO 00000
Frm 00018
Fmt 4701
Sfmt 4700
freight cars (e.g., double-stack well car
sets). It is not common practice to break
a train apart as part of an emergency
procedure. Rescue of an entire disabled
trainset is the most common scenario,
and TCRR will be equipping its lead
units with rescue couplers and other
appliances to allow for a disabled
trainset to be towed, if necessary. If a
train is disabled such that intermediate
uncoupling would be required to move
it, it would typically be more
appropriate to evacuate the impaired
train either to a safe location, or by
cross-transfer to another trainset,
pursuant to the railroad’s emergency
plans. FRA notes that it is not the intent
of the safety appliance requirements to
prevent the use of semi-permanently
coupled or articulated rail vehicles,
whether by statute or regulation. Rather,
the purpose of these appliances is to
ensure that railroad personnel are
provided the means to perform their
duties safely, particularly where
coupling or switching are common
place. Notably, while the absence of
such practice reduces the operational
flexibility afforded to the railroad, it
also serves to reduce the hazards that
railroad personnel are exposed to,
which, in itself, is a worthwhile
application of safe practice being
proposed for TCRR.
Notwithstanding FRA’s prior
statements on this topic, FRA received
several comments expressing concern
over first responder access to a trainset
that is not equipped with traditional
safety appliances. As discussed
previously, safety appliances are
primarily for railroad employee
protection. Other rescue access and
emergency egress systems are relied on
to facilitate the entry of first responders
into a trainset, and evacuation of
passengers off a trainset, such as rescue
access/emergency egress windows and
doors, and roof spots, to name a few.
See, generally, subpart D—Rolling
Stock. Although safety appliances, if
present, may be used for rescue access
and emergency egress, it is not the
primary function of these appliances. In
addition, the safety appliances that
would typically be utilized to access a
trainset are not required under statute,
and in virtually all cases, are
insufficient for emergency egress and
access needs.
Safety appliances as not required to
be part of the required emergency
systems for passenger equipment.
Generally, it is FRA’s position that the
safest location for a passenger during an
emergency is within the trainset or
passenger car. There are limited
circumstances where an evacuation to
an adjacent car would be necessary, and
E:\FR\FM\03NOR2.SGM
03NOR2
khammond on DSKJM1Z7X2PROD with RULES2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
only in a life-threatening scenario is
passenger self-evacuation off a train
necessary. In addition, FRA also
generally assumes that first responders
will have certain equipment with them
when responding to an emergency
involving a train, to include ladders,
axes, portable jaws-of-life, and other
access-gaining tools. Furthermore,
TCRR’s proposal includes the use of
deployable ladders with handrails to
facilitate egress and access from the
trainset to ground level in the event of
an emergency or other appropriate
situation. The use of such on-board
ladders, while not required by this
regulation, provide a superior means to
get on or off the trainset in such
scenarios than any traditional safety
appliance, particularly for first
responders. Further, not all emergencies
require an immediate stopping of the
trainset, as it may be more efficient to
meet first responders at a dedicated
location (such as a station location, or
a location where access has been
specifically planned for) to permit easier
access to the trainset. Understandably,
FRA is also aware that there may be
emergency situations that will not
permit continued travel along the ROW,
such as a derailment of the equipment.
FRA also received a comment from
Delta Troy challenging the legality of
virtual hearings to satisfy the hearing
requirement of 49 U.S.C. 20306.70 In its
comment, Delta Troy argued that virtual
hearings are not an adequate or
sufficient replacement for the value of a
public hearing during notice-andcomment rulemaking, in addition to the
statutory requirement that findings
under 49 U.S.C. 20306 be based on
evidence developed ‘‘at a hearing.’’ In
support of its position, Delta Troy stated
that conducting a virtual hearing would
necessarily limit and truncate public
engagement and discourse. And that
‘‘untold members of the public’’ would
be precluded from participation because
they lack adequate internet access,
whether due to financial, technological,
or other reasons. In conclusion, Delta
Troy stated that a virtual hearing would
not meet the requirements of 49 U.S.C.
20306, nor would it comport with ‘‘the
spirit of public comment’’ as described
in the APA. FRA disagrees and notes
that 49 U.S.C. 20306 is silent as to the
manner in which hearings may be
conducted. As discussed under section
III. Proceedings to Date, the telephonic
hearings that FRA conducted
represented only a change in the way
information was exchanged. Further, the
change to a telephonic hearing was
70 See FRA Docket No. FRA–2019–0068,
Document ID: FRA–2019–0068–0039.
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
made specifically to address the internet
reliability concerns raised by Delta Troy
and other commenters.
Based on the evidence developed at
the hearing, including supporting
information provided in TCRR’s
rulemaking petition, FRA is providing
TCRR with its requested relief, as not
doing so would preclude the
development or implementation of more
efficient railroad transportation
equipment. FRA makes clear, though,
that this relief will be in effect for highspeed trainsets, used only on TCRR’s
system, for the life of each variation put
into service. If the equipment is sold or
transferred to any other entity in the
U.S., that entity would have to request
its own relief under 49 U.S.C. 20306.
E. Incorporation by Reference
FRA is incorporating by reference six
Japanese Industrial Standards (JIS) and
three ASTM International (ASTM)
standards. As required by 1 CFR 51.5,
FRA has summarized the standards it is
incorporating by reference and has
shown the reasonable availability of
those standards here. The Japanese
Industrial Standards are reasonably
available to all interested parties online
at www.jsa.or.jp (Japanese site), or
www.jsa.or.jp/en (English site). In
addition, the ASTM standards are
reasonably available to all interested
parties online at www.astm.org.
In § 299.13(d)(4) and (5), FRA
incorporates by reference three versions
of JIS E 1101, ‘‘Flat bottom railway rails
and special rails for switches and
crossings of non-treated steel.’’ JIS E
1101:2001 addresses the manufacturing
of the steel rail. It specifies the quality
and tests for flat bottom railway rails of
non-treated steel, with a calculated mass
of 30 kg/m or more, and special rails for
those railway switches and crossings.
JIS E 1101:2006 and JIS E 1101:2012
amend JIS E 1101:2001 by updating
references to other cited standards (e.g.,
updating the title to the cited reference),
updating references to specific clauses
within a cited standard, or by deleting
a reference to a cited standard. By
incorporating these standards by
reference, TCRR will be required to use
rail that is manufactured to the same
specifications as the rail used on the
Tokaido Shinkansen system, which will
help ensure that the rail side of the
wheel-rail interface remains identical to
that used on the service-proven highspeed lines of JRC.
Under § 299.403(b), FRA incorporates
by reference two versions of JIS E 7105
‘‘Rolling Stock—Test methods of static
load for body structures.’’ JIS E
7105:2006 addresses test methods for
trainset carbodies. It specifies the test
PO 00000
Frm 00019
Fmt 4701
Sfmt 4700
69717
methods of static load for confirming
strength, rigidity, and the like of body
structures for passenger stock, such as
electric railcars, internal combustion
railcars, and passenger cars, principally.
JIS E 7105:2011 amends JIS E 7105:2006
by updating references to other cited
standards (e.g., updating the title to the
cited reference), updating references to
specific clauses within a cited standard,
or by updating specifications from the
2006 version. By incorporating these
standards by reference, FRA will
maintain the same strength and rigidity
of TCRR’s trainset carbody structure.
This will help preserve the occupied
volume from premature degradation due
to typical in-service loads and vibration.
Under § 299.409(g), FRA incorporates
by reference JIS B 8265:2010
‘‘Construction of pressure vessels
general principles.’’ JIS B 8265:2010
addresses manufacturing of pressure
vessels and specifies certain
requirements for the construction and
fixtures of pressure vessels with the
design pressure of less than 30 MPa. By
incorporating this standard by reference,
FRA will ensure that the pressurized air
reservoirs used in TCRR’s trainset are
designed and constructed to the same
service-proven standard as used in the
N700 trainsets currently operated on the
Tokaido Shinkansen system.
Under § 299.423(e)(1) and (f)(3), FRA
incorporates by reference ASTM D
4956–07ε1 ‘‘Standard Specification for
Retroreflective Sheeting for Traffic
Control,’’ approved March 15, 2007.
ASTM D 4956–07ε1 covers flexible,
nonexposed glass bead lens and
microprismatic, retroreflective sheeting
designed for use on traffic control signs,
delineators, barricades, and other
devices.
Under § 299.423(e)(1), FRA
incorporates by reference ASTM E 810–
03 ‘‘Standard Test Method for
Coefficient of Retroreflection of
Retroreflective Sheeting Utilizing the
Coplanar Geometry,’’ approved
February 10, 2003. Test method ASTM
E 810–03 describes an instrument
measurement of the retroreflective
performance of retroreflective sheeting.
Under § 299.423(e)(2), FRA incorporates
by reference ASTM E 2073–07
‘‘Standard Test Method for Photopic
Luminance of Photoluminescent
(Phosphorescent) Markings,’’ approved
July 1, 2007. FRA also incorporates by
reference Section 5.2 of ASTM E 2073–
07 under § 299.423(e)(2) and
§ 299.423(e)(2)(ii). Test method ASTM E
2073–07 covers a procedure for
determining the photopic luminance of
photoluminescent (phosphorescent)
markings. It does not cover scotopic or
mesopic measurements. Incorporation
E:\FR\FM\03NOR2.SGM
03NOR2
69718
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
of the three ASTM standards by
reference is to ensure that the materials
used for interior and exterior emergency
markings can provide adequate
photoluminescence or retroreflectivity.
As the markings utilizing these
materials will be relied on during
emergencies (either for passenger egress
or first responder access), it is important
that the marking can be easily identified
and followed should the emergency
occur during hours of limited visibility,
with possible degradation or complete
loss of interior lighting. The standards
either provide performance
specifications for design and
manufacture, or provide the testing
methods.
khammond on DSKJM1Z7X2PROD with RULES2
VI. FRA’s Record of Decision
This final rule constitutes the Record
of Decision (ROD) for FRA’s publication
of an RPA, pursuant to NEPA and the
NEPA implementing regulations from
the Council on Environmental Quality
(CEQ).71 In making its decision to
proceed with the RPA, FRA considered
the information and analysis included
in the Draft and Final EIS, public and
agency comments submitted on the
Draft and Final EIS for Dallas to
Houston High-Speed Rail, technical
supporting information, and public and
agency comments submitted on the
NPRM.
As required by CEQ regulations,72 in
addition to the Agency’s decision, this
final rule and ROD sets forth a summary
of the alternatives considered by FRA in
reaching its decision, including the
environmentally preferable alternative,
and identifies the mitigation measures
to be implemented.
A. Summary of Alternatives Considered
TCRR identified its intent to construct
and operate a high-speed rail system
between Dallas and Houston in its
rulemaking petition. Therefore, while
FRA’s decision is whether to publish an
RPA (or take other regulatory action
necessary for the implementation of the
Tokaido Shinkansen technology within
the U.S.), FRA also identified and
evaluated six end-to-end Build
Alternatives in the Draft and Final EIS
to understand the potential impacts that
could result if FRA publishes the RPA
and TCRR advances the proposed Dallas
to Houston project.
To identify the six end-to-end Build
Alternatives evaluated in the Draft and
Final EIS, FRA completed a two-step
alternatives development process.
Section 2.4, Alternatives Considered,
Development and Evaluation of
71 40
72 40
CFR 1500–1508.
CFR 1505.2.
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
Proposed Corridors of the Final EIS,
summarizes the process FRA undertook
to identify four corridor alternatives.
The Dallas to Houston High-Speed Rail
Project, Corridor Alternatives Analysis
Technical Report, which describes the
corridor analysis in detail, is available
on FRA’s website.73
Section 2.5, Alternatives Considered,
Development and Evaluation of Initial
Alignment, Station and TMF
Alternatives of the Final EIS, details the
process that FRA undertook to identify
the six build alternatives that were
evaluated in the Draft and Final EIS.
The complete analysis of alignment
alternatives is described in the Dallas to
Houston High Speed Rail Project,
Alignment Alternatives Analysis Report,
also available on FRA’s website.
1. No Build Alternative
As required by NEPA, the Final EIS
included the No Build Alternative, also
known as the alternative of no action, in
its analysis as the baseline for
comparison with Build Alternatives A
through F and the three Houston
Terminal Station Options. Under the No
Build Alternative, FRA would not
publish an RPA or take other regulatory
action necessary for the implementation
of the Tokaido Shinkansen technology
within the U.S.; therefore, TCRR would
not construct nor be able to operate the
HSR system and associated facilities.
Travel between Dallas and Houston
would continue via existing highway
(IH–45) and airport (Dallas Fort Worth
International Airport [DFW], Dallas
Love Field Airport [DAL], George Bush
Intercontinental Airport [IAH] and
William P. Hobby Airport [HOU])
infrastructure. See Section 2.61,
Alternatives Considered, No Build
Alternative of the Final EIS for a full
description of the No Build Alternative.
2. Build Alternatives
The two-step alternatives
development process resulted in the six
end-to-end Build Alternatives, A
through F, considered in the Draft and
Final EIS. For analytical purposes, each
alternative was divided into segments,
as depicted on Figure 2–28 of the Final
EIS.74 Table 1 identifies the segments
that create each Build Alternative. In
addition to the track alignments, the
73 FRA. Dallas to Houston High-Speed Rail—
Passenger Service from Houston to Dallashttps://
railroads.dot.gov/environmental-reviews/dallashouston-high-speed-rail/dallas-houston-high-speedrail-passenger.
74 FRA. Dallas to Houston High-Speed Rail—
Passenger Service from Houston to Dallas https://
railroads.dot.gov/environmental-reviews/dallashouston-high-speed-rail/dallas-houston-high-speedrail-passenger, Final Environmental Impact
Statement.
PO 00000
Frm 00020
Fmt 4701
Sfmt 4700
limits of disturbance evaluated for each
Build Alternative contains the
infrastructure necessary to support HSR
operations including stations, TMFs,
MOW Facilities, signaling and
communications infrastructure, Traction
Power Substations (TPSS), sectioning
posts, and sub-sectioning posts. See
Section 2.6.2, Alternatives Considered,
Build Alternatives of the Final EIS for
complete descriptions of the alternatives
and associated infrastructure.
The Final EIS analyzed the three
stations proposed by TCRR, the Dallas
Terminal Station, Brazos Valley
Intermediate Station in Grimes County,
and the Houston Terminal Station
(which included three station location
options in Houston). Stations and
platforms would be designed to
accommodate planned future
operations. Two TMFs would be located
near the terminal stations to serve as
cleaning and maintenance facilities for
the HSR trainsets. Each would occupy
approximately 100 acres and include
sidings for trainset storage, trainset car
washes and other facilities. Seven MOW
facilities would be located every 15 to
46 miles along the HSR ROW. Each
MOW facility would be approximately
35 acres and have sidings for MOW
equipment and sweeper vehicles.
Signaling and communications
infrastructure would typically be
between 0.1 and 0.3 acre and spaced no
more than 25 miles apart along the
alignment. Radio towers approximately
50 feet tall would be spaced at
approximately 6-mile intervals.
Approximately 14 TPSSs, including 2 at
the TMFs, would be spaced between 10
and 25 miles apart, generally adjacent to
or within 1 mile of existing 138 kV
transmission line. The TPSSs would
have a footprint of approximately 6
acres with a substation building of
approximately 2,200 square feet. An
anticipated 11 sectioning posts and nine
sub-sectioning posts would be placed
between the TPSSs. Each would have a
footprint of approximately one half to
one acre each, with a small electrical
building (approximately 1,600 square
feet).
TABLE 1—BUILD ALTERNATIVES A
THROUGH F
Build alternative
Alternative
Alternative
Alternative
Alternative
Alternative
Alternative
E:\FR\FM\03NOR2.SGM
A
B
C
D
E
F
.......................
.......................
.......................
.......................
.......................
.......................
03NOR2
Segment
1,
1,
1,
1,
1,
1,
2A,
2A,
2A,
2B,
2B,
2B,
3A, 4, 5.
3B, 4, 5.
3C, 5.
3A, 4, 5.
3B, 4, 5.
3C, 5.
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
Segment 1 is located in Dallas County
and is common to all Build Alternatives.
The segment is approximately 18-miles
and includes the Dallas Terminal
Station, Dallas TMF and a TPSS.
Segment 2A, located in Ellis County
beginning about 1.5 miles south of the
Ellis County Line, is approximately 23
miles in length. Segment 2A includes
one MOW facility and one TPSS.
Segment 2B is also located in Ellis
County and is approximately 23 miles
in length. Segment 2B includes one
MOW facility and one TPSS. Segment
3A is located in Ellis and Navarro
counties. It is approximately 30 miles in
length and includes one siding-off track
and two TPSSs. Segment 3B is also
located in Ellis and Navarro counties
and is approximately 31 miles in length.
Segment 3B includes one siding off
track and one TPSS. Segment 3C,
approximately 113 miles long, is located
in Navarro, Freestone, Leon, Madison
and Grimes counties. Segment 3C
includes two MOW facilities, one siding
off track and six TPSSs. Segment 4 is
located in Freestone, Limestone, Leon,
Madison and Grimes counties. It is
approximately 80 miles in length and
includes two MOW facilities, two siding
off tracks and four TPSSs. Segment 5, at
approximately 84 miles, is common to
all Build Alternatives. It is located in
Grimes, Waller and Harris counties.
Segment 5 includes the Brazos Valley
Intermediate Station, one TMF, two
MOW facilities, one siding off track and
four TPSSs.
In addition, as detailed in Section
2.5.2.3, Alternatives Considered,
Houston Terminal Station Options of
the Final EIS, three terminal station
options, including the Industrial Site,
Northwest Mall and Northwest Transit
Center were considered for the Houston
Terminal Station located in northwest
Houston within the vicinity of US 290,
IH–10 and IH–610 north of Post Oak
Road, west of IH–610 and just north of
Hempstead Road.
B. Environmentally Preferable
Alternative
The environmentally preferable
alternative is the alternative that is least
damaging to the environment or that
best protects, preserves, and enhances
historic, cultural, and natural
resources.75 After considering the
comparative analysis of the potential
impacts of the No Build Alternative,
Build Alternatives A–F, and the three
Houston Terminal Station options
presented in the Final EIS, FRA finds
that Build Alternative A (comprised of
Segments 1, 2A, 3A, 4, and 5) and the
Houston Northwest Mall Terminal
Station Option, which were identified
as the Preferred Alternative in the Final
69719
EIS, are the environmentally preferable
alternatives that provide the best
balance to transportation goals while
minimizing physical impacts to the
built and natural environment.76
1. Environmentally Preferable Build
Alternative
For many resource areas, there are no
distinguishable differences in impacts
among Build Alternatives A–F.77 When
the environmental impacts of Build
Alternatives A–F are compared, Build
Alternative A would have the overall
fewest permanent impacts to the
socioeconomic, natural, physical, and
cultural resources environment,
including generally fewer permanent
acquisitions and displacements, and
impacts to transportation, floodplains,
and waters of the U.S.
In addition, Segment 2B, a component
of Build Alternatives D, E, and F, would
cross U.S. Army Corps of Engineers
(USACE) fee land. Coordination with
USACE identified that the USACE
National Non-Recreation Outgrant
Policy would prevent USACE from
carrying forward Segment 2B in the
USACE evaluation criteria, as there is a
viable alternative not on federal
property. Environmental resources that
differentiate Build Alternatives A, B,
and C are presented in Table 2.
TABLE 2—COMPARISON OF BUILD ALTERNATIVES A, B AND C 78
Evaluation criteria
Measure
Alt A
Alt B
Alt C
Water Quality (Section 3.3)
Impaired Waterbodies—303(d) List ............................................................
Impaired Waterbodies Total .......................................................................
Groundwater Wells .....................................................................................
Feet .....................
Feet .....................
Count ..................
344.7
830.0
9
517.4
1,002.7
13
496
981.3
7
Count ..................
10
12
10
Count ..................
280
290
275
297
298
326
Noise and Vibration (Section 3.4)
Severe Noise Impact:
Residential ...........................................................................................
Moderate Noise Impact:
Residential ...........................................................................................
Hazardous Materials and Solid Waste (Section 3.5)
khammond on DSKJM1Z7X2PROD with RULES2
Low-Risk Hazardous Material Sites ...........................................................
75 CEQ’s Forty Most Asked Questions Concerning
CEQ’s National Environmental Policy Act
Regulations, 46 FR 18026 (Mar. 23, 1981, as
amended 1986).
76 See Section 2.7, Alternatives Considered,
Preferred Alternative of the Final EIS for a more
detailed comparison of the potential environmental
impacts that differentiate the Build Alternatives and
Houston Terminal Station Options.
77 Including air quality, elderly and handicapped,
socioeconomic, electromagnetic field,
environmental justice, vibration, aesthetics and
visual, and greenhouse gas emissions.
78 Specific impacts are not included in this
comparison table if they are equal across Build
Alternatives A, B and C. Section references within
this table are to sections of the Final EIS.
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
Count ..................
79 Threatened and Endangered Species acreages
include habitat for species with mapped habitat that
may be impacted, including the Houston toad,
large-fruited sand verbena, and Navasota ladies’tresses. Threatened and endangered species in the
Study Area that may be impacted, but that do not
have mapped habitat, include the interior least tern
and the whooping crane.
80 Road modifications reflect the number of
reroutes, road adjustments, or road over rail
constructions that would occur. Some roads are
affected by multiple modifications (such as IH–45).
Modifications do not reflect total number of roads,
but total number of road construction sites.
81 Shared access roads are included in roadway
modification lengths. Shared access roads will be
PO 00000
Frm 00021
Fmt 4701
Sfmt 4700
developed to provide for maintenance, emergency
response access, and private property access with
a corresponding reduction in the number of new
public roads to decrease burden on roadway
authorities. Shared access roads would be
constructed and maintained by TCRR.
82 Anxiety Aerodrome would be directly
impacted by Segment 3B, which is part of
Alternatives B and E. Indirect impacts to special
status farmland in Section 3.13, Land Use of the
Final EIS are defined as a 25-foot setback added to
the LOD to account for indirect loss of productive
farmland to accommodate the use of farm and ranch
equipment or impacts such as induced wind and
changes in irrigation.
E:\FR\FM\03NOR2.SGM
03NOR2
69720
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
TABLE 2—COMPARISON OF BUILD ALTERNATIVES A, B AND C 78—Continued
Evaluation criteria
Measure
Moderate-Risk Hazardous Material Sites ...................................................
Count ..................
Alt A
155
Alt C
155
165
328
1,058
328
1,058
325
1,452
83,459
38,898
59.5
50.0
33.5
27.6
83,791
45,631
59.0
47.4
36.3
27.2
90,942
35,096
44.3
63.4
30.4
21.1
616
132
529
219
748
63
126
557
132
479
210
689
63
142
642
133
579
196
775
71
137
13
85
98
37
12
85
97
37
13
74
87
22
11
11
10
138
59
16.8
5.1
0
150
66
21.4
5.0
1
102
79
46.9
27.2
0
2,553.4
6,619.8
1,710.8
3,534.5
847.5
42
235
2
1,731
272
196
12
2
12
49
0
2,532.9
6,814.0
1,690.4
3,764.3
888.2
42
255
2
1,814
277
223
12
2
12
50
0
2,393.2
7,295.6
1,459.8
3,573.4
697.3
65
239
3
1,789
259
196
18
1
17
51
1
Count ..................
12
13
9
Count ..................
Count ..................
Count ..................
56
3
8
57
4
7
51
5
6
Natural Ecological Systems and Protected Species (Section
Protected Species Modeled Habitat—Temporary ......................................
Protected Species Modeled Habitat—Permanent ......................................
Alt B
3.6) 79
Acres ...................
Acres ...................
Waters of the U.S. (Section 3.7)
Stream Crossings—Temporary ..................................................................
Stream Crossings—Permanent ..................................................................
Wetlands—Temporary ................................................................................
Wetlands—Permanent ................................................................................
Waterbodies—Temporary ...........................................................................
Waterbodies—Permanent ..........................................................................
Feet .....................
Feet .....................
Acres ...................
Acres ...................
Acres ...................
Acres ...................
Floodplains (Section 3.8)
Impacts to 100-Year Floodplain .................................................................
Impacts to 500-Year Floodplain .................................................................
Permanent Impacts to 100-Year and 500-Year Floodplains .....................
Temporary Impacts to 100-Year and 500-Year Floodplains ......................
Total Acres of Impacted Floodplain ...........................................................
Total Number of Bridge/Viaduct Crossings of FEMA Zone AE .................
Total Number of Bridge/Viaduct Crossings of FEMA Zone A ...................
Acres ...................
Acres ...................
Acres ...................
Acres ...................
Acres ...................
Count ..................
Count ..................
Utilities and Energy (Section 3.9)
New Electric TPSS Connections ................................................................
Electric Utility Pole Adjustments .................................................................
Total Electric Connections and Adjustment ...............................................
Abandoned Oil and Gas Wells ...................................................................
Count
Count
Count
Count
..................
..................
..................
..................
Aesthetics and Scenic Resources (Section 3.10)
Total Number of Adverse Visual Resource Impacts ..................................
Count ..................
Transportation (Section 3.11)
Modifications 80
Road
(Public and Private) ................................................
Road Modifications 81 (Public only) ............................................................
Length added to Public Roads (miles) .......................................................
Length removed from Public Roads (miles) ...............................................
Impacts to airports 82 ..................................................................................
Count ..................
Count ..................
Miles ...................
Miles ...................
Count ..................
Land Use (Section 3.13)
khammond on DSKJM1Z7X2PROD with RULES2
LU Conversion—Temporary .......................................................................
LU Conversion—Permanent .......................................................................
Special Status Farmland—Temporary .......................................................
Special Status Farmland—Permanent .......................................................
Special Status Farmland—Indirect 5 ...........................................................
Displacement—Commercial (primary) ........................................................
Displacement—Residence (primary) ..........................................................
Displacement—Community Facilities (primary) .........................................
Estimated Permanent Parcel Acquisitions .................................................
Estimated Temporary Parcel Acquisitions .................................................
Estimated Structure Acquisitions—Agriculture ...........................................
Estimated Structure Acquisitions—Commercial .........................................
Estimated Structure Acquisitions—Cultural/Civic Resources ....................
Estimated Structure Acquisitions—Oil and Gas .........................................
Estimated Structure Acquisitions—Residence ...........................................
Estimated Structure Acquisitions—Transportation and Utilities .................
Acres ...................
Acres ...................
Acres ...................
Acres ...................
Acres ...................
Count ..................
Count ..................
Count ..................
Count ..................
Count ..................
Count ..................
Count ..................
Count ..................
Count ..................
Count ..................
Count ..................
Safety and Security (Section 3.16)
Permanent Road Modifications resulting in 1 minute or more in additional through travel time.
Total fire and EMS service areas bisected by construction ......................
Fire and EMS providers with high potential for construction effects .........
Fire and EMS providers with localized potential for construction effects ..
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
PO 00000
Frm 00022
Fmt 4701
Sfmt 4700
E:\FR\FM\03NOR2.SGM
03NOR2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
69721
TABLE 2—COMPARISON OF BUILD ALTERNATIVES A, B AND C 78—Continued
Evaluation criteria
Measure
Alt A
Alt B
Alt C
Recreational Facilities (Section 3.17)
Parks ...........................................................................................................
Count ..................
0
0
1
Count ..................
80
80
81
Count ..................
118
118
119
14
14
13
9,173.4
2,593.6
1,458.4
2,284.0
2,727.9
1,611.6
4,511.2
2,963.5
55.3
2,204.8
6,824.5
5,245.3
9,347.1
2,585.8
1,465.1
2,477.1
2,697.5
1,591.3
4,619.9
3,036.8
71.8
2,182.0
6,992.5
5,454.7
9,689.0
2,848.3
1,485.0
2,471.2
2,781.8
1,914.1
4,786.6
2,907.9
81.4
2,761.1
6,764.5
5,033.2
Environmental Justice (Section 3.18)
Number of Minority and/or Low-Income block groups intersected by the
Study Area.
Number of all block groups intersected by the Study Area .......................
Cultural Resources (Section 3.19)
Adverse Impacts to Historic Properties ......................................................
Count ..................
Soils and Geology (Section 3.20)
LOD Area ....................................................................................................
Shrink-Swell Potential—Low ......................................................................
Shrink-Swell Potential—Moderate ..............................................................
Shrink-Swell Potential—High ......................................................................
Shrink-Swell Potential—Very High .............................................................
Erosion Potential—Low ..............................................................................
Erosion Potential—Moderate ......................................................................
Erosion Potential—High .............................................................................
Corrosion Potential—Low ...........................................................................
Corrosion Potential—Moderate ..................................................................
Corrosion Potential—High ..........................................................................
Prime Farmland Soils .................................................................................
Acres
Acres
Acres
Acres
Acres
Acres
Acres
Acres
Acres
Acres
Acres
Acres
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
Source: AECOM, 2019.
2. Environmentally Preferable Houston
Station Option
Like the Build Alternatives, for most
resource areas, there are no
distinguishable differences among the
Houston Terminal Station Options.
When the environmental impacts of
each station option are compared, the
Houston Industrial Site Terminal
Station Option would have fewer
permanent impacts to the
socioeconomic, natural, physical, and
cultural resources environment.
However, the Houston Industrial Site
Terminal Station Option would require
the use of a resource protected by
Section 4(f) of the Department
Transportation Act,83 which the other
Houston Terminal Station Options
would not.84 Because of the special
consideration given to resources
protected under Section 4(f), FRA finds
that the Houston Industrial Site
Terminal Station Option is not
environmentally preferable.
When the environmental impacts of
Houston Northwest Mall Terminal
Station Option and Northwest Transit
Center Terminal Station Option are
compared, the Houston Northwest Mall
Terminal Station Option would have
fewer permanent impacts to the
socioeconomic, natural, physical, and
cultural resources environment, as
shown in Table 3.
TABLE 3—COMPARISON OF HOUSTON NORTHWEST TRANSIT CENTER TERMINAL STATION OPTIONS AND HOUSTON
NORTHWEST MALL TERMINAL STATION OPTION 85
Evaluation criteria
Northwest
Transit
Center
Measure
Northwest
Mall
Hazardous Materials and Solid Waste (Section 3.5)
Low-Risk Hazardous Material Sites ..................................................................................
Moderate-Risk Hazardous Material Sites .........................................................................
High-Risk Hazardous Material Sites .................................................................................
Count ........................
Count ........................
Count ........................
6
8
0
0
3
0
Acres ........................
Acres ........................
1.6
0.10
0.0
0.0
Count ........................
22
24
khammond on DSKJM1Z7X2PROD with RULES2
Waters of the U.S. (Section 3.7)
Wetlands—Temporary ......................................................................................................
Waterbodies—Temporary .................................................................................................
Transportation (Section 3.11)
Intersections at LOS E or F ..............................................................................................
83 49
U.S.C. 303.
VerDate Sep<11>2014
18:02 Nov 02, 2020
84 See Chapter 7.0, Section 4(f) and Section 6(f)
Evaluation, of the Final EIS.
Jkt 253001
PO 00000
Frm 00023
Fmt 4701
Sfmt 4700
85 Section references within this table are to
sections of the Final EIS.
E:\FR\FM\03NOR2.SGM
03NOR2
69722
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
TABLE 3—COMPARISON OF HOUSTON NORTHWEST TRANSIT CENTER TERMINAL STATION OPTIONS AND HOUSTON
NORTHWEST MALL TERMINAL STATION OPTION 85—Continued
Evaluation criteria
Northwest
Transit
Center
Measure
Northwest
Mall
Land Use (Section 3.13)
LU Conversion—Temporary .............................................................................................
LU Conversion—Permanent .............................................................................................
Displacement—Commercial (primary) ..............................................................................
Displacement—Community Facility (primary) ...................................................................
Estimated Permanent Parcel Acquisitions ........................................................................
Estimated Temporary Parcel Acquisitions ........................................................................
Estimated Structure Acquisitions—Commercial ...............................................................
Acres
Acres
Count
Count
Count
Count
Count
........................
........................
........................
........................
........................
........................
........................
11.8
88.7
15
1
43
0
0
27.4
75.8
22
0
40
1
1
1
0
1
0
Socioeconomics and Community Facilities (Section 3.14)
Community Facility ............................................................................................................
Count ........................
Cultural Resources (Section 3.19)
Adverse Impacts to Historic Properties ............................................................................
Count ........................
Source: AECOM 2019.
khammond on DSKJM1Z7X2PROD with RULES2
C. Mitigation Commitments
FRA identified compliance and
mitigation measures based upon
identification of best practices and
technical consideration of the likely
success in implementation, Agency
consultations, comments on the Draft
and Final EIS, regulatory requirements,
and input from TCRR. These mitigation
commitments would avoid, minimize,
mitigate, or compensate for the potential
adverse impacts related to the
construction and/or operation of TCRR’s
proposed Dallas to Houston project.
TCRR has agreed to implement the
compliance and mitigation measures
identified in the Dallas to Houston
High-Speed Rail Mitigation
Commitments, which is located on
FRA’s website.86 The compliance and
mitigation measures were also included
in the Final EIS. In addition, TCRR is
responsible for adhering to applicable
Federal, State, and local laws,
ordinances and requirements. TCRR has
agreed to maintain an environmental
compliance system to serve as a
database of compliance and mitigation
commitments and provide
accountability and transparency to
environmental regulatory agencies.
TCRR will also prepare a quarterly
report that summarizes the status of
implementing compliance and
mitigation measures by geographic area,
mitigation activities completed,
significant upcoming activities, and any
86 FRA. Dallas to Houston High-Speed Rail—
Passenger Service from Houston to Dallas https://
railroads.dot.gov/environmental-reviews/dallashouston-high-speed-rail/dallas-houston-high-speedrail-passenger, Record of Decision Attachments,
Mitigation Commitments.
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
corrective actions taken for any
instances of non-compliance. TCRR will
make the quarterly report available to
the public by posting it on the TCRR
website.
VII. Regulatory Impact and Notices
A. Executive Orders 12866 and 13771,
and DOT Regulatory Policies and
Procedures
The TCRR high-speed system is
modeled on JRC’s Tokaido Shinkansen
HSR system, which does not meet many
of the requirements under the Passenger
Equipment Safety Standards (Tier III)
final rule.87 TCRR desires to maintain
the safety record of the Tokaido
Shinkansen HSR system, so it is
imperative that the systems approach to
safety and the philosophy of the JRC
system be implemented in the United
States. As such, TCRR is requesting,
through this rulemaking, that it comply
with regulations that are different, and
in some instances, more stringent than
the Tier III requirements.
FRA has a regulatory program that
addresses equipment, track, operating
practices, and human factors in the
existing, conventional railroad
environment. However, significant
operational and equipment differences
exist between the system contemplated
by TCRR and other passenger operations
in the United States. In many of the
railroad safety disciplines, FRA’s
existing regulations do not address the
operational characteristics of TCRR’s
system. Therefore, to ensure that this
new system will operate safely,
minimum Federal safety standards must
87 83
PO 00000
FR 59182 (Nov. 21, 2018).
Frm 00024
Fmt 4701
Sfmt 4700
be in place when TCRR commences
operations.
Through this final rule, FRA will
regulate the TCRR system as a
standalone system. FRA stated in the
Tier III final rule that a standalone
system would have to combine all
aspects of railroad safety (such as
operating practices, signal and train
control, and track) that must be applied
to the individual system. Such an
approach covers more than passenger
equipment and would likely necessitate
particular ROW intrusion protection
and other safety requirements not
adequately addressed in FRA’s
regulations. Without this final rule,
TCRR would not be allowed to
implement its system as it does not meet
many of the requirements of FRA’s
existing regulations of general
applicability. Accordingly, by enabling
private activity that would otherwise be
prohibited, this final rule is an E.O.
13771 deregulatory action.
E.O. 12866 requires agencies to
account for additional regulatory
burdens that a particular regulatory
action would have on a regulated entity.
In the rulemaking context, under E.O.
12866, two similar forms of regulatory
action (e.g., a rulemaking versus a
waiver process) could have substantially
different burdens on a regulated entity.
For this reason, the methodology used
to evaluate burdens of a particular
regulatory action on a regulated entity
under E.O. 12866 will differ from the
methodology used under NEPA to
assess the potential environmental
impacts that may result from the
regulatory action. For more information
regarding the NEPA process, please see
section VII. F. National Environmental
E:\FR\FM\03NOR2.SGM
03NOR2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
khammond on DSKJM1Z7X2PROD with RULES2
Policy Act, or the Final EIS which has
been included in the rulemaking docket
(Docket No. FRA–2019–0068, Final
Environmental Impact Statement).
This final rule though, as an RPA, was
not subject to review under E.O. 12866,
as that applies only to rules of general
applicability. Accordingly, FRA
concluded that because this final rule
generally includes only voluntary
actions or alternative actions that would
be voluntary, the final rule does not
impart additional burdens on regulated
entities, specifically TCRR. Even though
not subject to E.O. 12866 review, FRA
has provided a qualitative discussion on
the costs, benefits, and alternatives
considered, which can be found under
section V. A. Executive Orders 12866
and 13771, and DOT Regulatory Policies
and Procedures of the NPRM.88
Responses to comments on FRA’s
regulatory evaluation are under section
IV. M. Regulatory Evaluation of this
final rule.
B. Regulatory Flexibility Act and
Executive Order 13272; Regulatory
Flexibility Assessment
The Regulatory Flexibility Act of
1980 89 and E.O. 13272 90 require agency
review of proposed and final rules to
assess their impacts on small entities.
An agency must prepare a Final
Regulatory Flexibility Analysis unless it
determines and certifies that a rule, if
promulgated, would not have a
significant economic impact on a
substantial number of small entities.
‘‘Small entity’’ is defined in 5 U.S.C.
601 as a small business concern that is
independently owned and operated, and
is not dominant in its field of operation.
The SBA has authority to regulate issues
related to small businesses, and
stipulates in its size standards that a
‘‘small entity’’ in the railroad industry is
a for profit ‘‘line-haul railroad’’ that has
fewer than 1,500 employees, a ‘‘short
line railroad’’ with fewer than 500
employees, or a ‘‘commuter rail system’’
with annual receipts of less than seven
million dollars.91 In addition, section
601(5) of the Small Business Act defines
‘‘small entities’’ as governments of
cities, counties, towns, townships,
villages, school districts, or special
districts with populations less than
50,000 that operate railroads. Federal
agencies may adopt their own size
standards for small entities in
consultation with SBA and in
conjunction with public comment.
88 85
FR 14036, 14047.
U.S.C. 601 et seq.
90 67 FR 53461, Aug. 16, 2002.
91 ‘‘Size Eligibility Provisions and Standards,’’ 13
CFR part 121, subpart A.
Thus, in consultation with SBA, FRA
has published a final statement of
agency policy that formally establishes
‘‘small entities’’ or ‘‘small businesses’’
as railroads, contractors, and shippers
that meet the revenue requirements of a
Class III railroad—$20 million or less in
inflation-adjusted annual revenue—and
commuter railroads or small
government jurisdictions that serve
populations of 50,000 or less.
As this final rule applies only to one
railroad, TCRR, which provides
intercity rail passenger service between
Dallas and Houston, Texas, which have
populations larger than 50,000 people,
TCRR is not considered a small entity.
FRA invited all interested parties to
submit comments, data, and information
demonstrating the potential economic
impact on any small entity that would
result from the adoption of the final
rule. During the comment period, FRA
did not receive any comments from the
public or stakeholders regarding the
impact that the final rule would have on
small entities.
Accordingly, the Administrator of
FRA hereby certifies that this final rule
will not have a significant economic
impact on a substantial number of small
entities.
C. Paperwork Reduction Act
In accordance with the Paperwork
Reduction Act of 1995,92 and its
implementing regulations,93 when
information collection requirements
pertain to nine or fewer entities, Office
of Management and Budget (OMB)
approval of the collection requirements
is not required. This regulation pertains
to one railroad, and therefore, OMB
approval of the paperwork collection
requirements in this final rule is not
required.
D. Federalism Implications
E.O. 13132, ‘‘Federalism,’’ 94 requires
FRA to develop an accountable process
to ensure ‘‘meaningful and timely input
by State and local officials in the
development of regulatory policies that
have federalism implications.’’ ‘‘Policies
that have federalism implications’’ are
defined in the E.O. to include
regulations that have ‘‘substantial direct
effects on the States, on the relationship
between the national government and
the States, or on the distribution of
power and responsibilities among the
various levels of government.’’ Under
E.O. 13132, an agency may not issue a
regulation with federalism implications
that imposes substantial direct
89 5
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
compliance costs and that is not
required by statute, unless the Federal
Government provides the funds
necessary to pay the direct compliance
costs incurred by State and local
governments, or the agency consults
with State and local government
officials early in the process of
developing the regulation. Where a
regulation has federalism implications
and preempts State law, the agency
seeks to consult with State and local
officials in the process of developing the
regulation.
This final rule has been analyzed
under the principles and criteria
contained in E.O. 13132. This final rule
will not have a substantial effect on the
States or their political subdivisions,
and it will not affect the relationships
between the Federal Government and
the States or their political subdivisions,
or the distribution of power and
responsibilities among the various
levels of government. In addition, FRA
has determined that this regulatory
action will not impose substantial direct
compliance costs on the States or their
political subdivisions. Therefore, the
consultation and funding requirements
of E.O. 13132 do not apply.
However, the final rule arising from
this rulemaking could have preemptive
effect by operation of law under certain
provisions of the Federal railroad safety
statutes, specifically the former Federal
Railroad Safety Act of 1970,95 and the
former Locomotive Boiler Inspection
Act (LIA).96 Section 20106 provides that
States may not adopt or continue in
effect any law, regulation, or order
related to railroad safety or security that
covers the subject matter of a regulation
prescribed or order issued by the
Secretary of Transportation (with
respect to railroad safety matters) or the
Secretary of Homeland Security (with
respect to railroad security matters),
except when the State law, regulation,
or order qualifies under the ‘‘essentially
local safety or security hazard’’
exception to section 20106. Moreover,
the former LIA has been interpreted by
the Supreme Court as preempting the
field concerning locomotive safety.97
E. International Trade Impact
Assessment
The Trade Agreements Act of 1979
prohibits Federal agencies from
engaging in any standards or related
activities that create unnecessary
obstacles to the foreign commerce of the
95 Repealed
and recodified at 49 U.S.C. 20106.
U.S.C. 22–34, repealed and recodified at 49
U.S.C. 20701–20703.
97 See Napier v. Atlantic Coast Line R.R., 272 U.S.
605 (1926).
96 45
92 44
U.S.C. 3501–3520.
CFR part 1320.
94 64 FR 43255 (Aug. 10, 1999).
93 5
PO 00000
Frm 00025
Fmt 4701
Sfmt 4700
69723
E:\FR\FM\03NOR2.SGM
03NOR2
69724
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
United States. Legitimate domestic
objectives, such as safety, are not
considered unnecessary obstacles.98 The
statute also requires consideration of
international standards and, where
appropriate, that they be the basis for
U.S. standards.
FRA has assessed the potential effect
of this final rule on foreign commerce
and believes that its requirements are
consistent with the Trade Agreements
Act. The requirements are safety
standards, which, as noted, are not
considered unnecessary obstacles to
trade.
khammond on DSKJM1Z7X2PROD with RULES2
F. National Environmental Policy Act
FRA is the lead agency for the
preparation of the EIS in compliance
with CEQ’s NEPA-implementing
regulations,99 FRA’s Procedures for
Considering Environmental Impacts,100
and associated environmental laws.
Cooperating agencies in the EIS include
the United States Environmental
Protection Agency (EPA), the Federal
Highway Administration, the Federal
Transit Administration, the STB,
USACE and the United States Fish and
Wildlife Service (USFWS). The Texas
Department of Transportation provided
technical assistance to FRA in the
preparation of the EIS.
FRA published a Notice of Intent
(NOI) to prepare an EIS in the Federal
Register on June 25, 2014.101 The NOI
announced FRA’s intent to prepare an
EIS and the beginning of the scoping
period, provided a brief background on
TCRR’s proposal, and identified the
preliminary contents of the EIS, the
required approvals by the Federal
Government, and procedures expected
for coordination and public
involvement based on NEPA
requirements.
After publication of the NOI, FRA
conducted extended scoping through
January 9, 2015. Notification of the
extended scoping period included an
email to the mailing list, letters to
elected officials, FRA media advisory
and a notice on FRA’s website. FRA also
conducted a series of 12 public scoping
meetings in October and December
2014. A total of 1,943 individuals,
including 118 elected officials, attended
12 public scoping meetings. Additional
details on these public scoping meetings
may be found on FRA’s website.102
98 Public
Law 96–39, 19 U.S.C. 2501 et seq.
CFR 1500–1508.
100 64 FR 28545 (May 26, 1999), as updated in 78
FR 2713 (Jan. 14, 2013).
101 79 FR 36123 (Jun. 24, 2014).
102 FRA. Dallas to Houston High-Speed Rail—
Passenger Service from Houston to Dallas https://
railroads.dot.gov/environmental-reviews/dallashouston-high-speed-rail/dallas-houston-high-speed99 40
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
After scoping, FRA identified the
Build Alternatives described in section
VI. A. Summary of Alternatives
Considered of this final rule, and
evaluated the potential impacts of those
alternatives in the Draft EIS. On
December 22, 2017, EPA published a
Notice of Availability (NOA) for the
Draft EIS in the Federal Register.103
FRA circulated the Draft EIS to affected
local jurisdictions, State and Federal
agencies, tribes, community
organizations and other interested
groups, interested individuals and the
public. The Draft EIS was available for
public review at 24 locations and posted
on the FRA website.104 FRA published
notices that the Draft EIS was available
for review in 27 newspapers throughout
the area of the proposed Dallas to
Houston project and FRA also mailed
notices to 2,722 individuals,
landowners and organizations on the
mailing list.
As required by NEPA, the EIS
identified the purpose and need to
which the agency is responding.105
FRA’s purpose and need was developed
in response to the proposal in the
petition submitted by TCRR, which is
also the basis for FRA’s regulatory
action. Accordingly, in the EIS, FRA
identified that ‘‘the purpose of the
privately proposed Project is to provide
the public with reliable and safe HSR
transportation between Dallas and
Houston.’’ The need is described in
detail in Section 1.2.2, Introduction,
Need of the Final EIS. The Draft EIS
analyzed six end-to-end Build
Alternatives (Alternatives A through F)
and three Houston Terminal Station
Options: The Houston Industrial Site
Station Terminal, the Houston
Northwest Mall Terminal Station, and
the Houston Northwest Transit Center
Terminal Station, as well as the No
Build Alternative. The Build
Alternatives included a terminal station
in Dallas and an intermediate station in
Grimes County. As required by CEQ
regulations,106 the Draft EIS identified
Build Alternative A as the Preferred
Alternative. The Draft EIS did not
identify a preferred Houston Terminal
Station option.
The public comment period for the
Draft EIS ran from December 22, 2017
rail-passenger, Dallas to Houston High-Speed Rail
Scoping Report.
103 82 FR 60723 (Dec. 22, 2017).
104 FRA. Dallas to Houston High-Speed Rail—
Passenger Service from Houston to Dallas https://
railroads.dot.gov/environmental-reviews/dallashouston-high-speed-rail/dallas-houston-high-speedrail-passenger, Draft Environmental Impact
Statement.
105 40 CFR 1502.13.
106 40 CFR 1502.14.
PO 00000
Frm 00026
Fmt 4701
Sfmt 4700
through March 9, 2018. FRA conducted
11 public hearings to accept agency and
public comments on the Draft EIS
during the comment period. FRA
received a total of 25,309 comments
from approximately 6,000 individuals.
A total of 2,971 individuals, including
84 elected officials, attended the 11
public hearings. See Section 9.6, Public
and Agency Involvement, Draft EIS of
the Final EIS for more information on
the public comment period and hearing
format.
FRA reviewed and assessed all
comments (written and oral) received
during the public comment period on
the Draft EIS through the preparation of
the Final EIS. These comments helped
to inform FRA’s development of the
Final EIS. FRA responded to all public
comments in the Final EIS.
The Final EIS identifies, evaluates,
and documents the potential
environmental and socioeconomic
effects of FRA’s proposed action. This
includes implementing TCRR’s
proposed HSR service between Dallas
and Houston as described in TCRR’s
petition, which is the only future
operating location TCRR has identified
to FRA. As required by CEQ
regulations,107 the Final EIS identified
Build Alternative A (comprised of
Segments 1, 2A, 3A, 4, and 5) and the
Houston Northwest Mall Terminal
Station Option as the Preferred
Alternative.
FRA’s rulemaking would enable the
safe operation of TCRR’s HSR system in
locations other than between Dallas and
Houston, even though FRA is aware of
no proposal to operate such service.
Thus, the Final EIS also evaluates and
documents the reasonably foreseeable
potential beneficial and adverse
environmental impacts of implementing
TCRR’s HSR system in any location
within the United States.108 However, as
TCRR has not proposed to operate in
any other location, discussion of
location-specific impacts, other than the
service proposed in TCRR’s rulemaking
petition and conceptual engineering,
would be speculative.
FRA signed the Final EIS on May 15,
2020, and EPA published an NOA for
the EIS in the Federal Register on May
29, 2020.109 FRA also circulated the
Final EIS to affected local jurisdictions,
State and Federal agencies, tribes,
community organizations and other
interested groups, interested individuals
and the public. The Final EIS was made
available for public review at 24
107 40
CFR 1502.14.
3.1.2, Impacts of the TCRR HSR
System Independent of Location of the Final EIS.
109 85 FR 32390 (May 29, 2020).
108 Section
E:\FR\FM\03NOR2.SGM
03NOR2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
locations and was posted on the FRA
website.110 FRA also provided 25 print
copies and 200 electronic copies (via
USB flash drive) of the Final EIS to the
public, upon request. The NOA was
published in 26 newspapers throughout
the area of the proposed Dallas to
Houston project and mailed notices to
5,018 individuals, landowners and
organizations on the mailing list.
1. Summary of Comments on the Final
EIS
FRA reviewed and analyzed
comments received since the Final EIS
was released on May 29, 2020. FRA
received a total of 96 comment
submissions from approximately 76
individuals, agencies, businesses, and/
or organizations between May 29, 2020
and July 28, 2020. Submissions were
categorized by comment topic, which
resulted in some submissions being split
into multiple comments, and in total
FRA received 143 comments. In general,
comments were regarding impacts to
transportation, cultural resources, build
alternatives, project viability, general
project support or opposition, or the
overall NEPA process. Comments
received have raised no new substantive
issues relevant to environmental
concerns from those received during the
public comment period of the Draft EIS
(see Appendix H, Response to Draft EIS
Comments of the Final EIS) or on topics
not already addressed within the Final
EIS. However, several comments raised
issues that warrant clarification or
correction here, specifically comments
related to the capital cost of TCRR’s
proposed Dallas to Houston project, and
safety concerns related to electrical
arcing from the HSR system and
proximity to natural gas pipelines.
Several commenters noted that capital
costs publicly reported by TCRR in
April 2020 ($30 billion) differ from the
capital costs reported in the Final EIS
($16–19 billion). The capital costs
estimate in the Final EIS (Section
3.14.5.2.3, Socioeconomics and
Community Facilities, Economic
Impacts) includes construction labor,
materials, indirect costs, and
approximately $2.6 billion for systems
and rolling stock.
Additional information provided by
TCRR clarified that the $30 billion
capital costs reported by Texas Central
Board Chairman Drayton McLane in an
April 8, 2020, letter was based on the
overall conservative project costs. This
value included the direct costs to
design, construct, and commission the
rail system as portrayed in the Final EIS,
but also other indirect costs excluded
from the Final EIS analysis (e.g., land
acquisition, litigation, property taxes,
insurance, financing costs, and
increased costs of foreign supply). TCRR
also reported that the $30 billion
included contingency and increased
escalation of costs.
FRA believes that the increased
escalation costs could result in larger
economic benefits than what was
identified in the Final EIS. Therefore,
the escalation values in the $16 billion
and $19 billion ($2019) projections from
the Final EIS represent a more
conservative estimate of the potential
beneficial impacts.
Comments regarding safety concerns
related to electrical arcing from the HSR
system and proximity to natural gas
pipelines were similar to the comments
FRA received on those topics in
response to the NPRM. FRA notes that
proximity to pipelines was addressed in
the Final EIS (See Section 3.9, Utilities
and Energy) and in the detailed
discussion in response to comments in
section IV. C. General Safety Oversight,
69725
of this final rule. As discussed in
section IV. H. Electrical Arcing from the
Overhead Catenary System, of this final
rule, this occurrence is part of the
normal operation of an electrical
traction power system like the one
proposed by TCRR, and by itself does
not pose any particular safety risk. FRA
does not believe there is a potential
environmental impact or safety concern
as a result of this phenomenon that
requires assessment under NEPA.
Clarifications and/or updates to the
Final EIS text, some of which were
identified in comments submitted on
the Final EIS, are included in the Final
EIS Errata and Updated Information.111
2. Potential Environmental Impacts
The Final EIS assessed the potential
beneficial and adverse environmental
impacts of FRA’s proposed rulemaking.
The Final EIS considered impacts from
TCRR’s proposed project, the
approximately 240-mile, for-profit, HSR
system connecting Dallas and Houston
based on JRC’s Tokaido Shinkansen
system technology, as described in
Section 2.2, Alternatives Considered,
Proposed HSR Infrastructure and
Operations of the Final EIS and in the
rulemaking petition submitted by TCRR.
The HSR service between Dallas and
Houston is the only proposed service or
future operating location TCRR has
identified to FRA and therefore FRA
determined it was appropriate to
evaluate the potential project-specific
impacts of this proposed service. The
potential impacts that would result from
implementing the proposed project are
identified and discussed in Chapter 3.0,
Affected Environment and
Environmental Consequences and
Chapter 4, Indirect and Cumulative
Impacts, of the Final EIS and are
summarized below in Table 4.
TABLE 4—SUMMARY OF POTENTIAL DIRECT IMPACTS 112
Evaluation criteria
Measure
Build alts. A–F
Houston Terminal
Station options
Total
Air Quality (Final EIS Section 3.2)
Air Quality Impacts .......................................................................
N/A ..................
Net emissions benefit for permanent operations, temporary
construction impacts.
khammond on DSKJM1Z7X2PROD with RULES2
Water Quality (Final EIS Section 3.3)
Impaired Waterbodies—303(d) List .............................................
Impaired Waterbodies with TMDLs ..............................................
Impaired Waterbodies Total .........................................................
Active Public Water System Wells ...............................................
Groundwater Wells .......................................................................
110 FRA. Dallas to Houston High-Speed Rail—
Passenger Service from Houston to Dallas https://
railroads.dot.gov/environmental-reviews/dallashouston-high-speed-rail/dallas-houston-high-speed-
VerDate Sep<11>2014
21:33 Nov 02, 2020
Jkt 253001
Feet .................
Feet .................
Feet .................
Count ...............
Count ...............
344.7–517.4
485.3
830–1,002.7
1
7–13
rail-passenger, Final Environmental Impact
Statement.
111 FRA. Dallas to Houston High-Speed Rail—
Passenger Service from Houston to Dallas https://
PO 00000
Frm 00027
Fmt 4701
Sfmt 4700
0
0
0
0
0
344.7–517.4
485.3
830–1,002.7
1
7–13
railroads.dot.gov/environmental-reviews/dallashouston-high-speed-rail/dallas-houston-high-speedrail-passenger, Record of Decision Attachments,
Final EIS Errata and Updated Information.
E:\FR\FM\03NOR2.SGM
03NOR2
69726
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
TABLE 4—SUMMARY OF POTENTIAL DIRECT IMPACTS 112—Continued
Evaluation criteria
Measure
Reservoir/Dam Crossings ............................................................
Count ...............
Houston Terminal
Station options
Build alts. A–F
Total
0
0
0
Count ...............
Count ...............
9–12
0
0
0
9–12
0
Count ...............
Count ...............
275–295
1
0
0
275–295
1
Count ...............
Count ...............
0
0
0
0
0
0
0–6
3–8
0–2
297–332
158–173
3–6
0
0
325–328
1,058–1,452
0
0
0
0–1.6
0–0.1
0
83,459–90,942
34,839–45,631
44.3–61.1
47.4–66.0
27.9–36.4
21.1–29.3
0
0–0.1
0–0.1
0
0–0.1
NA
NA
557–657.0
132–133.1
479–589.1
196–225.0
689–790.1
63–76.0
126–155.0
0
0
0
0
12–13
74–89
87–102
22–37
2
8
2
10–11
1
0
0
0
3
8
2
10–11
27
102–158
59–80
16.6–46.9
5.0–27.2
0–1
NA
0
0
0
0
0
0
22–25
27
102–158
59–80
16.6–46.9
5.0–27.2
0–1
22–25
Noise and Vibration (Final EIS Section 3.4)
Severe Noise Impact:
Residential ............................................................................
Institutional ............................................................................
Moderate Noise Impact:
Residential ............................................................................
Institutional ............................................................................
Vibration Impact:
Residential ............................................................................
Institutional ............................................................................
Hazardous Materials and Solid Waste (Final EIS Section 3.5)
Low-Risk Hazardous Material Sites .............................................
Moderate-Risk Hazardous Material Sites ....................................
High-Risk Hazardous Material Sites ............................................
Count ...............
Count ...............
Count ...............
297–326
155–165
3–4
Natural Ecological Systems and Protected Species (Final EIS Section 3.6) 113
Protected Species Modeled Habitat—Temporary .......................
Protected Species Modeled Habitat—Permanent .......................
Acres ...............
Acres ...............
325–328
1,058–1,452
Waters of the U.S. (Final EIS Section 3.7)
Stream Crossings—Temporary ....................................................
Stream Crossings—Permanent ...................................................
Wetlands—Temporary .................................................................
Wetlands—Permanent .................................................................
Waterbodies—Temporary ............................................................
Waterbodies—Permanent ............................................................
Feet .................
Feet .................
Acres ...............
Acres ...............
Acres ...............
Acres ...............
83,459–90,942
34,839–45,631
44.3–61.1
47.4–64.4
27.9–36.3
21.1–29.3
Floodplains (Final EIS Section 3.8)
Impacts to 100-Year Floodplain ...................................................
Impacts to 500-Year Floodplain ...................................................
Permanent Impacts to 100-Year and 500-Year Floodplains .......
Temporary Impacts to 100-Year and 500-Year Floodplains .......
Total Acres of Impacted Floodplain .............................................
Total Number of Bridge/Viaduct Crossings of FEMA Zone AE ...
Total Number of Bridge/Viaduct Crossings of FEMA Zone A .....
Acres
Acres
Acres
Acres
Acres
Count
Count
...............
...............
...............
...............
...............
...............
...............
557–657
132–133
479–589
196–225
689–790
63–76
126–155
Utilities and Energy (Final EIS Section 3.9)
New Electric TPSS Connections .................................................
Electric Utility Pole Adjustments ..................................................
Total Electric Connections and Adjustment .................................
Abandoned Oil and Gas Wells ....................................................
Count
Count
Count
Count
...............
...............
...............
...............
12–13
74–89
87–102
22–37
Aesthetics and Scenic Resources (Final EIS Section 3.10)
Total
Total
Total
Total
Number
Number
Number
Number
of
of
of
of
Beneficial 114 .....................................................
Neutral ..............................................................
Adverse .............................................................
Adverse Visual Resource Impacts ...................
Count
Count
Count
Count
...............
...............
...............
...............
khammond on DSKJM1Z7X2PROD with RULES2
Transportation (Final EIS Section 3.11)
Rail Crossings 115 .........................................................................
Road Modifications 116 (Public and Private) ................................
Road Modifications 117 (Public only) ............................................
Length added to Public Roads (miles) ........................................
Length removed from Public Roads (miles) ................................
Impacts to airports 118 ..................................................................
Number of Intersections at LOS E or F .......................................
VerDate Sep<11>2014
21:33 Nov 02, 2020
Jkt 253001
PO 00000
Frm 00028
Count ...............
Count ...............
Count ...............
Miles ................
Miles ................
Count ...............
Count ...............
Fmt 4701
Sfmt 4700
E:\FR\FM\03NOR2.SGM
03NOR2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
69727
TABLE 4—SUMMARY OF POTENTIAL DIRECT IMPACTS 112—Continued
Evaluation criteria
Measure
Houston Terminal
Station options
Build alts. A–F
Total
Elderly and Handicapped (Final EIS Section 3.12)
Elderly and Handicapped Impacts ...............................................
NA ...................
Proposed project would be designed, constructed and operated in compliance with ADA; therefore, there would be no
impacts related to accessibility of the HSR system for the
elderly and handicapped.
Land Use (Final EIS Section 3.13)
Existing Land Use Conversion—Temporary ................................
Existing Land Use Conversion—Permanent ...............................
Special Status Farmland—Temporary .........................................
Special Status Farmland—Permanent .........................................
Special Status Farmland—Indirect 119 .........................................
Displacement—Commercial (primary) .........................................
Displacement—Residence (primary) ...........................................
Displacement—Community Facilities (primary) 120 ......................
Estimated Permanent Parcel Acquisitions ...................................
Estimated Temporary Parcel Acquisitions ...................................
Estimated Structure Acquisitions—Agriculture ............................
Estimated Structure Acquisitions—Commercial ..........................
Estimated Structure Acquisitions—Community Facilities ............
Estimated Structure Acquisitions—Cultural/Civic Resources ......
Estimated Structure Acquisitions—Oil and Gas ..........................
Estimated Structure Acquisitions—Residence .............................
Estimated Structure Acquisitions—Transportation and Utilities ..
Acres
Acres
Acres
Acres
Acres
Count
Count
Count
Count
Count
Count
Count
Count
Count
Count
Count
Count
...............
...............
...............
...............
...............
...............
...............
...............
...............
...............
...............
...............
...............
...............
...............
...............
...............
2,393.2–2,592.4
6,610.0–7,295.6
1,459.8–1,719.4
3,483.5–3,764.3
697.3–888.2
42–65
235–269
2–3
1,731–1,847
258–277
196–230
12–18
0
1–2
12–17
49–54
0–1
0–27.4
75.8–92.2
0.0
0.0
0.0
14–22
0
0
25–43
0–1
0
0–1
0
0
0
0
0
2,393.2–2,619.8
6,685.8–7,387.8
1,459.8–1,719.4
3,483.5–3,764.3
697.3–888.2
56–87
235–269
2–3
1,756–1,890
258–278
196–230
12–19
0
1–2
12–17
49–54
0–1
0
4
0–1
0–1
0–1
5–6
Socioeconomics and Community Facilities (Final EIS Section 3.14)
Communities with Disrupted Character and Cohesion ................
Count ...............
Economic Impacts ........................................................................
NA ...................
Positive
Employment .................................................................................
Job Years ........
317,207
Earnings .......................................................................................
2019 billions ....
$14.50
Tax Revenue ................................................................................
N ......................
Positive
Safety 121
Children’s Health and
..................................................
Community Facilities 122 ...............................................................
4
Count ...............
Count ...............
0
5
Electromagnetic Fields (Final EIS Section 3.15)
Electromagnetic Field (EMF) Impacts ..........................................
NA ...................
No EMI or adverse EMF exposure would occur.
Safety and Security (Final EIS Section 3.16)
Permanent Road Modifications resulting in 1 minute or more in
additional through travel time.
Permanent Road Modifications reducing through travel time by
1 minute or more.
Total fire and EMS service areas bisected by construction ........
Fire and EMS providers with high potential for construction effects.
Fire and EMS providers with localized potential for construction
effects.
Count ...............
8–13
0
8–13
Count ...............
0–1
0
0–1
Count ...............
Count ...............
51–57
3–5
0
0
51–57
3–5
Count ...............
6–8
0
6–8
0–2
0
0–2
Count ...............
80–81
5–7
85–88
Count ...............
Count ...............
NA ...................
118–119
5
No
8–14
1
No
126–133
5
No
Recreational Facilities (Final EIS Section 3.17)
khammond on DSKJM1Z7X2PROD with RULES2
Parks ............................................................................................
Count ...............
Environmental Justice (Final EIS Section 3.18)
Number of Minority and/or Low-Income block groups intersected by the Study Area.
Number of all block groups intersected by the Study Area .........
Identified Minority and/or Low-Income Communities ...................
Disproportionately High and Adverse Impact to Minority and/or
Low-Income Communities.
VerDate Sep<11>2014
21:33 Nov 02, 2020
Jkt 253001
PO 00000
Frm 00029
Fmt 4701
Sfmt 4700
E:\FR\FM\03NOR2.SGM
03NOR2
69728
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
TABLE 4—SUMMARY OF POTENTIAL DIRECT IMPACTS 112—Continued
Evaluation criteria
Measure
Build alts. A–F
Houston Terminal
Station options
Total
Cultural Resources (Final EIS Section 3–19)
Adverse Impacts to Historic Properties .......................................
Count ...............
11–14
0–1
11–15
9,173.4–9,718.4
2,585.8–2,848.3
1,456.9–1,485.0
2,284.0–2,484.4
2,697.5–2,806.7
1,591.3–1,981.9
4,472.1–4,786.6
2,907.9–3,036.8
55.3–81.4
2,182.0–2,761.1
6,764.5–7,021.2
4,990.8–5,454.7
0a
0–103.9
0
3.0–19.2
0
0
0
3.0–47.0
3.0–16.2
0
0
11–51
0
0
9,173.4–9,822.4
2,585.8–2,848.3
1,459.9–1,504.0
2,284.0–2,484.4
2,697.5–2,806.7
1,591.3–1,981.9
4,475.1–4,833.6
2,910.9–3,053.0
55.3–81.4
2,182.0–2,761.1
6,775.5–7,072.2
4,990.8–5,454.7
0a
Soils and Geology (Final EIS Section 3.20)
LOD Area .....................................................................................
Shrink-Swell Potential—Low ........................................................
Shrink-Swell Potential—Moderate ...............................................
Shrink-Swell Potential—High .......................................................
Shrink-Swell Potential—Very High ...............................................
Erosion Potential—Low ................................................................
Erosion Potential—Moderate .......................................................
Erosion Potential—High ...............................................................
Corrosion Potential—Low ............................................................
Corrosion Potential—Moderate ....................................................
Corrosion Potential—High ............................................................
Prime Farmland Soils ...................................................................
Surface Mines 123 .........................................................................
Acres
Acres
Acres
Acres
Acres
Acres
Acres
Acres
Acres
Acres
Acres
Acres
Count
...............
...............
...............
...............
...............
...............
...............
...............
...............
...............
...............
...............
...............
Green House Gas Emissions (Final EIS Section 3.21)
GHG Emissions ............................................................................
khammond on DSKJM1Z7X2PROD with RULES2
G. Executive Order 12898
(Environmental Justice)
In accordance with E.O. 12898 and
USDOT Order 5610.2(a), FRA is
112 Section references within this table are to the
sections of the Final EIS.
113 Threatened and Endangered Species acreages
include habitat for species with modeled habitat
that may be impacted, including Houston toad,
large-fruited sand verbena and Navasota ladies’tresses. Threatened and endangered species in the
Study Area that may be impacted but that do not
have modeled habitat include the interior least tern
and the whooping crane.
114 A single landscape unit is shared between
Segment 5 and the Houston Terminal Station
Options; therefore, the total number of beneficial
landscape units is the same as Build Alternative A.
115 Totals for rail impacts do not include rail at
Houston Terminal Stations. Totals also include
DART-owned rail lines in Dallas County.
116 Road modifications reflect the number of
reroutes, road adjustments, or road over rail
constructions that would occur. Some roads are
affected by multiple modifications (such as IH–45).
Modifications do not reflect total number of roads
but total number of road construction sites.
117 Shared access roads are included in roadway
modification lengths. Shared access roads will be
developed to provide for maintenance, emergency
response access, and private property access, with
a corresponding reduction in the number of new
public roads to decrease burden on roadway
authorities. Shared access roads would be
constructed and maintained by TCRR.
118 Anxiety Aerodrome would be directly
impacted by Segment 3B, which are part of
Alternatives B and E.
119 Indirect impacts to special status farmland in
Section 3.13, Land Use of the Final EIS are defined
as a 25-foot setback added to the LOD to account
for indirect loss of productive farmland to
accommodate the use of farm and ranch equipment
or impacts such as induced wind and changes in
irrigation.
120 The ‘‘Community Facilities’’ category in
Section 3.14, Socioeconomics and Community
VerDate Sep<11>2014
21:33 Nov 02, 2020
Jkt 253001
NA ...................
No long-term increases in GHG emissions; would likely
reduce GHG emissions by shifting the modes of travel
required to identify and address
minority and low-income populations
that are affected by disproportionately
high and adverse impacts by a Federal
action and to provide opportunities for
meaningful participation. As part of the
preparation of the EIS, persons who
have a potential interest in the proposed
Dallas to Houston project, including
members of minority and low-income
populations, were invited to participate
in the environmental review process.
FRA identified and addressed the
potential effects of the alternatives on
minority and low-income populations
in Section 3.18, Environmental Justice
in the Final EIS. FRA conducted
specific outreach efforts to connect with
potentially impacted minority and lowFacilities of the Final EIS, encompasses categories
of affected structures and facilities that are broken
down into more defined categories within Section
3.13, Land Use of the Final EIS, therefore values
between the two sections are not identical. Refer to
the Section for a complete definition of each
category.
121 Children’s health and safety impacts are the
result of temporary construction effects. These
impacts will no longer exist once construction has
ended.
122 The ‘‘Community Facilities’’ category in
Section 3.14, Socioeconomics and Community
Facilities of the Final EIS, encompasses categories
of affected structures and facilities that are broken
down into more defined categories within Section
3.13, Land Use of the Final EIS, therefore values
between the two sections are not identical. Refer to
the Section for a complete definition of each
category.
123 The Midlothian Quarry and Plant in Ellis
County was identified at approximately one-halfmile west of Segment 2A. Exact limits would need
to be field-verified to confirm or discount presence
in the Study Area.
PO 00000
Frm 00030
Fmt 4701
Sfmt 4700
income populations in the Study Area
and to bring awareness of the proposed
project to communities or individuals;
gather additional feedback on the
potential impacts of the proposed
project; and identify appropriate
mitigation for minority and low-income
populations.
Five neighborhoods or communities
identified in minority and/or lowincome block groups would be
potentially impacted: Downtown Dallas,
Le May and Le Forge neighborhood,
Hash Road and Nail Drive, Plantation
Forest and the Houston Terminal
Station Option area (including Spring
Branch Super Neighborhood). The EIS
identified disproportionately high and
adverse effects to minority and/or lowincome communities near the station
locations in Dallas and Houston related
to air-quality impacts during
construction, as well as effects related to
structure displacement and parcel
acquisition, and disruption to
community cohesion for the Le May and
Le Forge neighborhood, Hash Road and
Nail Drive, and Plantation Forest
communities. All identified locations
where there would be
disproportionately high and adverse
effects would be on Segment 1 and
Segment 5, which are common to all
Build Alternatives.
TCRR will mitigate adverse air quality
effects during construction through use
of dust suppression techniques, wetting
and covering construction materials
transported near homes or businesses,
limiting construction vehicle travel
E:\FR\FM\03NOR2.SGM
03NOR2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
speeds and idling of construction
equipment, and by complying with the
Texas Low Emission Diesel Fuel
Program, as identified in the Mitigation
Commitments. TCRR will mitigate
localized impacts to the Le May and Le
Forge neighborhood, the Hash Road and
Nail Drive neighborhood and the
Plantation Forest neighborhood by
implementing mitigation developed
based on consultation with community
members, as identified in the Mitigation
Commitments. Mitigation includes
making offers to acquire all properties
and attempts to relocate within
proximity or in the same neighborhood
(for the Le May and Le Forge
neighborhood), extending the notice to
vacate period, and offering personal
relocation assistance. After
implementation of mitigation measures,
there would be no disproportionately
high and adverse impacts to minority
and/or low-income populations as a
result of the Build Alternatives and
Houston Terminal Station Options.
khammond on DSKJM1Z7X2PROD with RULES2
H. Clean Air Act/Air Quality General
Conformity
The Clean Air Act of 1970 (as
amended) requires Federal agencies to
determine the conformity of proposed
actions with respect to State
Implementation Plans for attainment of
air quality goals.124 As detailed in
Section 3.2, Affected Environment and
Environmental Consequences, Air
Quality of the Final EIS, FRA assessed
air quality impacts through an analysis
of emissions that would occur during
construction and operation of the
proposed Dallas to Houston project for
a general conformity analysis.125 FRA
has determined that the predicted
annual pollutant emissions during the
5-year construction period in
nonattainment areas (Dallas-Fort Worth
[DFW], Houston-Galveston-Brazoria
[HGB], and Freestone and Anderson
Counties nonattainment area [FRE])
generated by the proposed project are all
below general conformity de minimis
threshold values and no conformity
determination is required.
I. Section 106 of the National Historic
Preservation Act
Section 106 of the National Historic
Preservation Act (NHPA) and its
implementing regulations 126 require
that prior to issuing Federal funding,
partial funding, permitting, licensing,
approval or taking other action, Federal
agencies must take into account the
124 Clean
Air Act, 42 U.S.C. 7401 et seq. (1970).
CFR part 51, subpart W, and 40 CFR part
93, subpart B.
126 36 CFR 800.
125 40
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
effects of their undertakings on historic
properties and provide the Advisory
Council on Historic Preservation
(ACHP) an opportunity to comment on
the undertaking.127 FRA determined
that the undertaking would adversely
affect historic properties. However,
because FRA is not able to fully
determine effects to historic properties
prior to this final rule, consistent with
36 CFR 800.14(b)(1)(ii), FRA, in
consultation with the Texas Historical
Commission (THC), ACHP, USACE,
TCRR, and other consulting parties,
developed a Programmatic Agreement
(PA) for the undertaking. The PA
establishes the process that governs the
resolution of adverse effects from the
undertaking.
FRA provided consulting parties with
an opportunity to review and comment
on the draft PA prior to the release of
the Final EIS and provided the public
an opportunity to review the draft PA by
appending the draft PA to the Final EIS.
During the 30-day public review from
May 29, 2020, through June 29, 2020,
FRA received a total of four comments
that were specific to the PA. These
include one comment from THC, two
comments from consulting parties, and
one comment from the public. In
response to these comments, FRA added
two new consulting parties to the PA.
The executed PA is available on FRA’s
website.128
J. Department of Transportation Act
Section 4(f) Determination
Section 4(f) of the USDOT Act of 1966
prohibits USDOT agencies from
approving the use of a Section 4(f)
property unless: The agency determines
that there is no feasible or prudent
alternative to such use, and a project
includes all possible planning to
minimize harm to the property resulting
from such use; or a finding can be made
that a project, including any measure(s)
to minimize harm, has a de minimis, or
minimal, impact on the Section 4(f)
property.129
Based on the evaluation contained
within Chapter 7.0, Section 4(f) and
Section 6(f) Evaluation of the Final EIS,
FRA determines that there is no prudent
and feasible alternative to the use of
three properties protected by Section
4(f): DA.023 (Cadiz Street Underpass
and Overpass), Dallas; DA.076a
127 54
U.S.C. 306108.
Dallas to Houston High-Speed Rail—
Passenger Service from Houston to Dallas https://
railroads.dot.gov/environmental-reviews/dallashouston-high-speed-rail/dallas-houston-high-speedrail-passenger, Record of Decision Attachments,
Section 106 Programmatic Agreement.
129 49 U.S.C. 303.
128 FRA.
PO 00000
Frm 00031
Fmt 4701
Sfmt 4700
69729
(Guiberson Corporation), Dallas; and
DA.110b (Linfield Elementary School).
All possible planning to minimize
harm, identified through consultation
with officials with jurisdiction, was
incorporated through TCRR’s design
refinements to reduce or eliminate
impacts to Section 4(f) properties where
reasonably feasible.
FRA provided the Section 4(f)
evaluation to U.S. Department of the
Interior (DOI) and shared it with the
officials with jurisdiction for the Section
4(f) properties with the May 29, 2020,
release of the Final EIS. DOI did not
comment on FRA’s Final Section 4(f)
Evaluation.
K. Endangered Species Act/Section 7
U.S. Fish and Wildlife Service Biological
Opinion
Under the Endangered Species Act
(ESA) of 1973 as amended,130 the
USFWS has the authority to list and
monitor the status of species whose
populations are threatened or
endangered, and including the
ecosystems on which they depend.
Section 7 of the ESA requires that
Federal agencies consult with the
USFWS to ensure projects they
authorize, fund or carry out would not
jeopardize the continued existence of an
endangered or threatened species or
destroy or adversely modify designated
critical habitat.
As described in Section 3.6, Natural
Ecological Systems and Protected
Species, of the Final EIS, FRA
determined the proposed Dallas to
Houston project would have ‘‘no effect’’
on the West Indian manatee (Trichechus
manatus), golden-cheeked warbler
(Setophaga [Dendroica] chrysoparia),
Texas fawnsfoot (Truncilla macrodon),
and Texas prairie dawn (Hymenoxys
texana) because suitable habitat (or
modeled habitat) was not identified
within the Action Area. FRA
determined it ‘‘may affect, but is not
likely to adversely affect’’ the Houston
toad (Anaxyrus houstonensis), interior
least tern (Sterna antillarum), whooping
crane (Grus americana) based on the
results of presence/absence species
surveys and the implementation of
avoidance and mitigation measures.
FRA determined it ‘‘may affect, and is
likely to adversely affect’’ due to the
presence of Navasota ladies’-tresses
(Spiranthes parksii) within the Study
Area and the potential for large-fruited
sand verbena (Abronia marcocarpa) in
unsurveyed areas.
On November 14, 2019, FRA
submitted a Biological Assessment (BA)
to USFWS as part of formal consultation
130 16
E:\FR\FM\03NOR2.SGM
U.S.C. 1531, et seq.
03NOR2
69730
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
under Section 7(a)(2) of the ESA.
USFWS issued a Biological Opinion
(BO) detailing mitigation measures for
the proposed Dallas to Houston project
on July 8, 2020 (02ETTX00–2019–F–
2135).131 The BO found that the
proposed Dallas to Houston project
would not likely jeopardize the
continued existence of the federally
endangered large-fruited sand-verbena
or the federally endangered Navasota
ladies’-tresses, and includes the
following conservation measures: TCRR
will offset the loss of large-fruited sandverbena habitat by conserving acres
under permanent protection within the
species’ known geographic range; TCRR
will offset the loss of Navasota ladies’tresses habitat by conserving acres
under permanent protection within the
species’ known geographic range; and
TCRR will institute measures to avoid
and minimize potential impacts to the
25 Navasota ladies’-tresses individuals
found during species-specific surveys in
Madison County.
The BO provided concurrence with
FRA’s determination that the proposed
Dallas to Houston project ‘‘may affect,
but is not likely to adversely affect’’ the
interior least tern, whooping crane, and
the Houston toad due to implementation
of avoidance and minimization
measures detailed in Appendix A of the
BO. The BO also included additional
conservation recommendations specific
to the large-fruited sand-verbena;
Navasota ladies’-tresses; landscaping to
benefit the large-fruited sand-verbena,
Navasota ladies’-tresses, and/or their
habitats; the candidate species, Texas
fawnsfoot; and avian species including
migratory birds. TCRR has agreed to
comply with the BO.
L. Executive Order 11990 Preservation
of the Nation’s Wetlands (Executive
Order 11990 & DOT Order 5660.1a)
khammond on DSKJM1Z7X2PROD with RULES2
For projects that are undertaken,
financed, or assisted by Federal
agencies, potential impact to wetlands
are considered under E.O. 11990,
Protection of Wetlands. The objective of
E.O. 11990 is to minimize the
destruction, loss or degradation of
wetlands while enhancing and
protecting the natural and beneficial
131 FRA. Dallas to Houston High-Speed Rail—
Passenger Service from Houston to Dallas https://
railroads.dot.gov/environmental-reviews/dallashouston-high-speed-rail/dallas-houston-high-speedrail-passenger, Record of Decision Attachments,
Biological Opinion. FRA has since reinitiated
consultation for the limited purpose of addressing
TCRR’s recent identification of locations for
permittee responsible mitigation. The reinitiation
follows TCRR’s consultation with the USACE Fort
Worth District as part of the Clean Water Act
permitting process and does not affect the BO.
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
values.132 DOT Order 5660.1a sets forth
DOT policy for interpreting E.O. 11990
and requires that transportation projects
‘‘located in or having an impact on
wetlands’’ should be conducted to
assure protection of the Nation’s
wetlands.
In addition, the USACE and EPA have
statutory responsibilities under Section
404 of the Clean Water Act (CWA).133
Under this Act, discharges of dredged or
fill material into waters of the U.S. may
require permit authorization. Section
401 of the CWA regulates the discharge
of pollutants into waters of the U.S. and
is enforced by the Texas Commission on
Environmental Quality (TCEQ). The
USACE has statutory authority under
Section 10 of the Rivers and Harbors Act
to regulate the construction of any
structure in or over a navigable water of
the U.S. and for any structure or work
that affects the course, location or
condition of the navigable waterbody.134
Section 14 of the Rivers and Harbors
Act, commonly referred to as Section
408, requires approval from USACE to
alter a USACE federally authorized civil
works project.135
As detailed within Section 3.7,
Affected Environment and
Environmental Consequences, Waters of
the U.S. of the Final EIS, impacts would
occur within waters of the U.S. during
the construction and operation of the
proposed Dallas to Houston project.
TCRR, in coordination with the USACE
Fort Worth and Galveston Districts, is
developing the final design to avoid and
minimize impacts to waters of the U.S.,
as practicable. However, due to the
linear nature and the curvature
restrictions associated with the
operation of the HSR system, some
crossings would be unavoidable.
Impacts to waters of the U.S. would
require Section 404/401/10 CWA
permits and Section 408 permissions
from USACE and TCEQ that would
include permit provisions to avoid,
minimize, and mitigate impacts. TCRR
has agreed to implement compliance
and mitigation measures to offset effects
of construction within the wetlands and
waters of the U.S.136
132 The White House, E.O. 11990—Protection of
Wetlands, 42 FR 2696.1, Office of the White House
Press Secretary, 1977.
133 33 U.S.C. 1251 et seq.
134 33 U.S.C. 403.
135 33 U.S.C. 408.
136 FRA. Dallas to Houston High-Speed Rail—
Passenger Service from Houston to Dallas https://
railroads.dot.gov/environmental-reviews/dallashouston-high-speed-rail/dallas-houston-high-speedrail-passenger, Record of Decision Attachments,
Mitigation Commitments.
PO 00000
Frm 00032
Fmt 4701
Sfmt 4700
M. Floodplain Management (Executive
Order 11988 & DOT Order 5650.2)
E.O. 11988, Floodplain Management
requires Federal agencies avoid adverse
impacts on floodplains to the extent
possible, determine whether reasonable
alternatives exist that avoid impacts to
floodplains, and avoid situations that
would support floodplain development
if a practicable alternative exists.137
USDOT Order 5650.2 (Floodplain
Management and Protection) establishes
policies and procedures for
transportation projects regarding
floodplain impacts that include
avoiding and minimizing, where
practicable or reasonable, adverse
impacts to floodplains and restoring and
preserving natural and beneficial
floodplain functions that are adversely
impacted by transportation projects.138
As detailed within 3.8, Affected
Environment and Environmental
Consequences, Floodplains of the Final
EIS, FRA determined that the proposed
Dallas to Houston project would impact
748 acres of 100-year and 500-year
regulatory floodplains. During
construction, the footprint of the LOD
additional workspace area, laydown
yards and construction workspace
would have a temporary impact to the
floodplains. The HSR track and
supporting facilities (e.g., permanent
roads, parking areas, access/
maintenance areas, terminals, and nonvegetated embankments) would also
result in a permanent impact to the
floodplain system and a permanent
increase in impervious cover and an
increase in ground compaction in those
areas during operations.
TCRR’s proposed design would
minimize potential increases to the
floodplain elevations by retaining
existing water surface elevations where
feasible to avoid impacting the available
flood storage and minimizing fill in
sensitive areas. Many regulatory
floodplains and unregulated stream
segments would be fully spanned and
potential impacts avoided. TCRR will
implement best management practices
for construction and operation within
floodplains as detailed in the Mitigation
Commitments.
N. Executive Order 13175 (Tribal
Consultation)
FRA has evaluated this final rule in
accordance with the principles and
criteria contained in E.O. 13175,
‘‘Consultation and Coordination with
Indian Tribal Governments,’’ dated
137 44 CFR 9, Floodplain Management and
Protection of Wetlands, 2003.
138 USDOT, Floodplain Management and
Protection, DOT 5650.2, 1979.
E:\FR\FM\03NOR2.SGM
03NOR2
khammond on DSKJM1Z7X2PROD with RULES2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
November 6, 2000. This final rule will
not have a substantial direct effect on
one or more Indian tribes, will not
impose substantial direct compliance
costs on Indian tribal governments, and
will not preempt tribal laws. Therefore,
the funding and consultation
requirements of E.O. 13175 do not
apply, and a tribal summary impact
statement is not required.
resources.140 FRA has determined this
regulatory action will not burden the
development or use of domestically
produced energy resources.
O. Unfunded Mandates Reform Act of
1995
Under section 201 of the Unfunded
Mandates Reform Act of 1995 (Pub. L.
104–4, 2 U.S.C. 1531), each Federal
agency ‘‘shall, unless otherwise
prohibited by law, assess the effects of
Federal regulatory actions on State,
local, and tribal governments, and the
private sector (other than to the extent
that such regulations incorporate
requirements specifically set forth in
law).’’ Section 202 of the Act (2 U.S.C.
1532) further requires that ‘‘before
promulgating any general notice of
proposed rulemaking that is likely to
result in the promulgation of any rule
that includes any Federal mandate that
may result in expenditure by State,
local, and tribal governments, in the
aggregate, or by the private sector, of
$100,000,000 or more (adjusted
annually for inflation) in any 1 year, and
before promulgating any final rule for
which a general notice of proposed
rulemaking was published, the agency
shall prepare a written statement’’
detailing the effect on State, local, and
tribal governments and the private
sector. This final rule will not result in
the expenditure, in the aggregate, of
$100,000,000 or more (as adjusted
annually for inflation) in any one year,
and thus preparation of such a
statement is not required.
The Rule
For the reasons discussed in the
preamble, FRA adds part 299 to chapter
II, subtitle B of title 49, Code of Federal
Regulations as follows:
■ 1. Part 299 is added to read as follows:
P. Energy Impact
E.O. 13211, ‘‘Actions Concerning
Regulations That Significantly Affect
Energy Supply, Distribution, or Use,’’
requires Federal agencies to prepare a
Statement of Energy Effects for any
‘‘significant energy action.’’ 139 FRA has
evaluated this final rule in accordance
with E.O. 13211 and determined that
this regulatory action is not a
‘‘significant energy action’’ within the
meaning of the E.O.
E.O. 13783, ‘‘Promoting Energy
Independence and Economic Growth,’’
requires Federal agencies to review
regulations to determine whether they
potentially burden the development or
use of domestically produced energy
resources, with particular attention to
oil, natural gas, coal, and nuclear energy
Subpart C—Track Safety Standards
Sec.
299.301 Restoration or renewal of track
under traffic conditions.
299.303 Measuring track not under load.
299.305 Drainage.
299.307 Vegetation.
299.309 Classes of track: operating speed
limits.
299.311 Track geometry; general.
299.313 Track geometry; performance
based.
299.315 Curves; elevations and speed
limitations.
299.317 Track strength.
299.319 Track fixation and support.
299.321 Defective rails.
299.323 Continuous welded rail (CWR)
plan.
299.325 Continuous welded rail (CWR);
general.
299.327 Rail end mismatch.
139 66
FR 28355 (May 22, 2001).
VerDate Sep<11>2014
18:02 Nov 02, 2020
List of Subjects in 49 CFR Part 299
High-speed rail, Incorporation by
reference, Railroad safety, Reporting and
recordkeeping requirements, Tokaido
Shinkansen.
PART 299—TEXAS CENTRAL
RAILROAD HIGH–SPEED RAIL
SAFETY STANDARDS
Subpart A—General Requirements
Sec.
299.1 Purpose and scope.
299.3 Applicability.
299.5 Definitions.
299.7 Responsibility for compliance.
299.9 Notifications and filings.
299.11 Electronic recordkeeping.
299.13 System description.
299.15 Special approvals.
299.17 Incorporation by reference.
Subpart B—Signal and Trainset Control
System
Sec.
299.201 Technical PTC system
requirements.
299.203 PTC system required.
299.205 PTC System Certification.
299.207 PTC Safety Plan content
requirements.
299.209 PTC system use and failures.
299.211 Communications and security
requirements.
299.213 Records retention.
299.215 Operations and Maintenance
Manual.
140 82
Jkt 253001
PO 00000
FR 16093 (Mar. 31, 2017).
Frm 00033
Fmt 4701
Sfmt 4700
69731
299.329 Rail joints and torch cut rails.
299.331 Turnouts and crossings generally.
299.333 Frog guard rails and guard faces;
gauge.
299.335 Derails.
299.337 Automated vehicle-based
inspection systems.
299.339 Daily sweeper inspection.
299.341 Inspection of rail in service.
299.343 Initial inspection of new rail and
welds.
299.345 Visual inspections; right-of-way.
299.347 Special inspections.
299.349 Inspection records.
299.351 Qualifications for track
maintenance and inspection personnel.
299.353 Personnel qualified to supervise
track restoration and renewal.
299.355 Personnel qualified to inspect
track.
299.357 Personnel qualified to inspect and
restore continuous welded rail.
Subpart D—Rolling Stock
Sec.
299.401 Clearance requirements.
299.403 Trainset structure.
299.405 Trainset interiors.
299.407 Glazing.
299.409 Brake system.
299.411 Bogies and suspension system.
299.413 Fire safety.
299.415 Doors.
299.417 Emergency lighting.
299.419 Emergency communication.
299.421 Emergency roof access.
299.423 Markings and instructions for
emergency egress and rescue access.
299.425 Low-location emergency exit path
marking.
299.427 Emergency egress windows.
299.429 Rescue access windows.
299.431 Driver’s controls and cab layout.
299.433 Exterior lights.
299.435 Electrical system design.
299.437 Automated monitoring.
299.439 Event recorders.
299.441 Trainset electronic hardware and
software safety.
299.443 Safety appliances.
299.445 Trainset inspection, testing, and
maintenance requirements.
299.447 Movement of defective equipment.
Subpart E—Operating Rules
Sec.
299.501 Purpose.
299.503 Operating rules; filing and
recordkeeping.
299.505 Programs of operational tests and
inspections; recordkeeping.
299.507 Program of instruction on operating
rules; recordkeeping.
Subpart F—System Qualification Tests
Sec.
299.601 Responsibility for verification
demonstrations and tests.
299.603 Preparation of system-wide
qualification test plan.
299.605 Functional and performance
qualification tests.
299.607 Pre-revenue service systems
integration testing.
299.609 Vehicle/track system qualification.
299.611 Simulated revenue operations.
299.613 Verification of compliance.
E:\FR\FM\03NOR2.SGM
03NOR2
69732
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
Subpart G—Inspection, Testing, and
Maintenance Program
Sec.
299.701 General requirements.
299.703 Compliance.
299.705 Standard procedures for safely
performing inspection, testing, and
maintenance, or repairs.
299.707 Maintenance intervals.
299.709 Quality control program.
299.711 Inspection, testing, and
maintenance program format.
299.713 Program approval procedures.
Appendix A to Part 299—Criteria for
Certification of Crashworthy Event Recorder
Memory Module
Appendix B to Part 299—Cab Noise Test
Protocol
Authority: 49 U.S.C. 20103, 20107, 20133,
20141, 20302–20303, 20306, 20701–20702,
21301–21302, 21304; 28 U.S.C. 2461, note;
and 49 CFR 1.89.
Subpart A—General Requirements
§ 299.1
Purpose and scope.
This part prescribes minimum Federal
safety standards for the high-speed
transportation system described in
detail in § 299.13, known as Texas
Central Railroad, LLC and hereinafter
referred to as the ‘‘railroad.’’ The
purpose of this part is to prevent
accidents, casualties, and property
damage which could result from
operation of this system.
khammond on DSKJM1Z7X2PROD with RULES2
§ 299.3
Applicability.
(a) This part applies only to the
railroad, as described in § 299.13.
(b) Except as stated in paragraph (c)
of this section, this part, rather than the
generally applicable Federal railroad
safety regulations, shall apply to the
railroad.
(c) The following Federal railroad
safety regulations found in Title 49 of
the Code of Federal Regulations, and
any amendments are applicable to the
railroad.
(1) Part 207, Railroad Police Officers;
(2) Part 209, Railroad Safety
Enforcement Procedures;
(3) Part 210, Railroad Noise Emission
Compliance Regulations;
(4) Part 211, Rules of Practice;
(5) Part 212, State Safety Participation
Regulations;
(6) Part 214, Railroad Workplace
Safety, except § 214.339;
(7) Part 216, Special Notice and
Emergency Order Procedures;
(8) Part 218, Railroad Operating
Practices;
(9) Part 219, Control of Alcohol and
Drug Use;
(10) Part 220, Radio Standards and
Procedures;
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
(11) Part 225, Railroad Accidents/
Incidents: Reports, Classification, and
Investigations;
(12) Part 227, Occupational Noise
Exposure except § 227.119(c)(10) and
(11) with respect to the railroad’s highspeed trainsets only, which shall
comply with 299.431(h) and (i);
(13) Part 228, Hours of Service of
Railroad Employees;
(14) Part 233, Signal Systems
Reporting Requirements;
(15) Part 235, Instructions Governing
Applications for Approval of a
Discontinuance or Material
Modification of a Signal System or
Relief from the Requirements of Part
236, except § 235.7;
(16) Part 236, Installation, Inspection,
Maintenance and Repair of Signal and
Train Control System, Devices, and
Appliances, subparts A through G, as
excepted by the railroad’s PTC Safety
Plan (PTCSP) under § 299.201(d);
(17) Part 237, Railroad Bridge Safety
Standards;
(18) Part 239, Passenger Train
Emergency Preparedness;
(19) Part 240, Qualification and
Certification of Locomotive Engineers;
(20) Part 242, Qualification and
Certification of Train Conductors;
(21) Part 243, Training, Qualification,
and Oversight for Safety-Related
Railroad Employees;
(22) Part 270, System Safety Program
(23) Part 272, Critical Incident Stress
Plans; and
(24) The following parts shall apply to
the railroad’s maintenance-of-way
equipment as it is used in work trains,
rescue operations, yard movements, and
other non-passenger functions:
(i) Part 215, Railroad Freight Car
Safety Standards;
(ii) Part 223, Glazing Standards;
(iii) Part 229, Railroad Locomotive
Safety Standards, except—
(A) Section 229.71. Instead, the
railroad’s maintenance-of-way
equipment shall comply with
§ 299.401(b), except for the sweeper
vehicle, which shall have a clearance
above top of rail no less than 35 mm
(1.77 inches).
(B) Section 229.73. Instead, the
railroad’s maintenance-of-way
equipment shall be designed so as to be
compatible with the railroad’s track
structure under subpart C of this part.
(iv) Part 231, Railroad Safety
Appliance Standards; and,
(v) Part 232, Railroad Power Brakes
and Drawbars.
(d) The Federal railroad safety statutes
apply to all railroads, as defined in 49
U.S.C. 20102. The railroad covered by
this part is a railroad under that
definition. Therefore, the Federal
PO 00000
Frm 00034
Fmt 4701
Sfmt 4700
railroad safety statutes, Subtitle V of
Title 49 of the United States Code, apply
directly to the railroad. However,
pursuant to authority granted under 49
U.S.C. 20306, FRA has exempted the
railroad from certain requirements of 49
U.S.C. ch. 203.
§ 299.5
Definitions.
As used in this part—
Absolute block means a block of track
circuits in which no trainset is
permitted to enter while occupied
by another trainset.
Adjusting/de-stressing means the
procedure by which a rail’s neutral
temperature is readjusted to the
desired value. It typically consists
of cutting the rail and removing rail
anchoring devices, which provides
for the necessary expansion and
contraction, and then re-assembling
the track.
Administrator means the Administrator
of the FRA or the Administrator’s
delegate.
Associate Administrator means FRA’s
Associate Administrator for Safety
and Chief Safety Officer, or that
person’s delegate.
Automatic train control (ATC) means
the signaling system, composed of
ground and on-board equipment.
The on-board equipment
continually receives a signal from
the ground equipment. ATC onboard equipment controls the
trainset speed to prevent train-totrain collisions and overspeed
derailments.
ATC cut-out mode means the mode of
ATC on-board equipment used for
emergency operations to disable the
ATC on-board equipment on the
trainset.
ATC main line mode means the mode of
ATC on-board equipment which
controls trainset speed on
mainlines.
ATC overrun protection means an
overlay of the ATC shunting mode
to prevent overrun at the end of a
track.
ATC shunting mode means the mode of
ATC on-board equipment which
restricts the trainsets maximum
speed to 30 km/h (19 mph).
Brake, air means a combination of
devices operated by compressed air,
arranged in a system and controlled
electrically or pneumatically, by
means of which the motion of a
train or trainset is retarded or
arrested.
Brake, disc means a retardation system
used on the passenger trainsets that
utilizes flat discs as the braking
surface.
E:\FR\FM\03NOR2.SGM
03NOR2
khammond on DSKJM1Z7X2PROD with RULES2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
Brake, electric means a trainset braking
system in which the kinetic energy
of a moving trainset is used to
generate electric current at the
traction motors, which is then
returned into the catenary system.
Brake, emergency application means a
brake application initiated by a deenergized brake command and is
retrievable when there is no
malfunction that initiates an
automatic emergency brake
application. An emergency brake
application can be initiated by the
driver or automatically by ATC. An
emergency brake application, as
defined here, is equivalent to a fullservice brake application in the U.S.
Brake, urgent application means an
irretrievable brake application
designed to minimize the braking
distance. An urgent brake
application, as defined here, is the
equivalent of an emergency brake
application in the U.S.
Bogie means an assembly that supports
the weight of the carbody and
which incorporates the suspension,
wheels and axles, traction motors
and friction brake components.
Each unit of a trainset is equipped
with two bogies. In the U.S., a bogie
is commonly referred to as a truck.
Broken rail means a partial or complete
separation of an otherwise
continuous section of running rail,
excluding rail joints, expansion
joints, and insulated joints.
Buckling incident/buckling rail means
the formation of a lateral
misalignment caused by high
longitudinal compressive forces in a
rail sufficient in magnitude to
exceed the track geometry
alignment safety limits defined in
§ 299.311.
Buckling-prone condition means a track
condition that can result in the
track being laterally displaced due
to high compressive forces caused
by critical rail temperature
combined with insufficient track
strength and/or train dynamics.
Cab means the compartment or space
within a trainset that is designed to
be occupied by a driver and contain
an operating console for exercising
control over the trainset.
Cab car means a rail vehicle at the
leading or trailing end, or both, of
a trainset which has a driver’s cab
and is intended to carry passengers,
baggage, or mail. A cab car may or
may not have propelling motors.
Cab end structure means the main
support projecting upward from the
underframe at the cab end of a
trainset.
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
Cab signal means a signal located in the
driver’s compartment or cab,
indicating a condition affecting the
movement of a trainset.
Calendar day means a time period
running from one midnight to the
next midnight on a given date.
Cant deficiency means the additional
height, which if added to the outer
rail in a curve, at the designated
vehicle speed, would provide a
single resultant force, due to the
combined effects of weight and
centrifugal force on the vehicle,
having a direction perpendicular to
the plane of the track.
Continuous welded rail (CWR) means
rail that has been welded together
into lengths exceeding 122 m (400
feet). Rail installed as CWR remains
CWR, regardless of whether a joint
is installed into the rail at a later
time.
Consist, fixed means a semipermanently coupled trainset that is
arranged with each unit in a
specific location and orientation
within the trainset.
Core system, high-speed means the
safety-critical systems, sub-systems,
and procedures required for a highspeed system operation that assures
a safe operation as required within
this part.
Crewmember means a railroad employee
called to perform service covered by
49 U.S.C. 21103.
Critical buckling stress means the
minimum stress necessary to
initiate buckling of a structural
member.
Desired rail installation temperature
range means the rail temperature
range in a specific geographical
area, at which forces in CWR
installed in that temperature range
should not cause a track buckle in
extreme heat, or a pull-apart during
extreme cold weather.
Disturbed track means the disturbance
of the roadbed or ballast section, as
a result of track maintenance or any
other event, which reduces the
lateral or longitudinal resistance of
the track, or both.
Driver means any person who controls
the movement of a trainset(s) from
the cab, and is required to be
certified under 49 CFR part 240. A
driver, as used in this part, is
equivalent to a locomotive engineer.
Employee or railroad employee means
an individual who is engaged or
compensated by the railroad or by
a contractor to the railroad to
perform any of the duties defined in
this part.
Event recorder means a device, designed
to resist tampering, that monitors
PO 00000
Frm 00035
Fmt 4701
Sfmt 4700
69733
and records data, as detailed in
§§ 299.439 and 236.1005(d) of this
chapter, over the most recent 48
hours of operation of the trainset.
Expansion joint means a piece of special
trackwork designed to absorb heatinduced expansion and contraction
of the rails.
General control center means the
location where the general control
center staff work.
General control center staff means
qualified individuals located in the
general control center who are
responsible for the safe operation of
the railroad’s high-speed passenger
rail system. The duties of
individuals who work at the general
control center include: Trainset
movement control, crew logistic
management, signaling, passenger
services, rolling stock logistic
management, and right-of-way
maintenance management.
Glazing, end-facing means any exterior
glazing installed in a trainset cab
located where a line perpendicular
to the exterior surface glazing
material makes horizontal angle of
50 degrees or less with the
longitudinal center line of the rail
vehicle in which the panel is
installed. A glazing panel that
curves so as to meet the definition
for both side-facing and end-facing
glazing is end-facing glazing.
Glazing, exterior means a glazing panel
that is an integral part of the
exterior skin of a rail vehicle with
a surface exposed to the outside
environment.
Glazing, side-facing means any glazing
located where a line perpendicular
to the exterior surface of the panel
makes an angle of more than 50
degrees with the longitudinal center
line of the rail vehicle in which the
panel is installed.
High voltage means an electrical
potential of more than 150 volts.
In passenger service/in revenue service
means a trainset that is carrying, or
available to carry, passengers.
Passengers need not have paid a
fare in order for the trainset to be
considered in passenger or in
revenue service.
In service means, when used in
connection with a trainset, a
trainset subject to this part that is in
revenue service, unless the
equipment—
(1) Is being handled in accordance
with § 299.447, as applicable;
(2) Is in a repair shop or on a repair
track;
(3) Is on a storage track and is not
carrying passengers; or,
E:\FR\FM\03NOR2.SGM
03NOR2
khammond on DSKJM1Z7X2PROD with RULES2
69734
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
(4) Is parked at a station location and
has been properly secured in
accordance with §§ 299.409(n) and
299.431(d).
Insulated joint, glued means a rail joint
located at the end of a track circuit
designed to insulate electrical
current from the signal system in
the rail.
Interior fitting means any component in
the passenger compartment which
is mounted to the floor, ceiling,
sidewalls, or end walls and projects
into the passenger compartment
more than 25 mm (1 in.) from the
surface or surfaces to which it is
mounted. Interior fittings do not
include side and end walls, floors,
door pockets, or ceiling lining
materials, for example.
Intermediate car means a passenger car
or unit of a trainset located between
cab cars which may or may not
have propelling motors.
L/V ratio means the ratio of the lateral
force that any wheel exerts on an
individual rail to the vertical force
exerted by the same wheel on the
rail.
Lateral means the horizontal direction
perpendicular to the direction of
travel.
Locomotive means a piece of on-track
rail equipment, other than hi-rail,
specialized maintenance, or other
similar equipment, which may
consist of one or more units
operated from a single control stand
with one or more propelling motors
designed for moving other
passenger equipment; with one or
more propelling motors designed to
transport freight or passenger
traffic, or both; or without
propelling motors but with one or
more control stands.
Longitudinal means in a direction
parallel to the direction of travel of
a rail vehicle.
Marking/delineator means a visible
notice, sign, symbol, line or trace.
N700 means the N700 series trainset
that is based on trainsets currently
in, or future variants operated on,
JRC’s Tokaido Shinkansen system,
or any unit thereof.
Occupied volume means the volume of
a passenger car or a unit in a
trainset where passengers or
crewmembers are normally located
during service operation, such as
the cab and passenger seating areas.
The entire width of a vehicle’s end
compartment that contains a control
stand is an occupied volume. A
vestibule is typically not considered
occupied.
On-board attendant means a qualified
individual on a trainset that is
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
responsible for coordination with a
station platform attendant to assure
safety during passenger boarding
and alighting within a station. An
on-board attendant, as used in this
part, is equivalent to a passenger
conductor.
Override means to climb over the
normal coupling or side buffers and
linking mechanism and impact the
end of the adjoining rail vehicle or
unit above the underframe.
Overrun protection coil means track
circuit cables placed short of
turnouts, or crossovers within
stations and trainset maintenance
facilities to prevent unauthorized
route access.
Passenger car means a unit of a trainset
intended to provide transportation
for members of the general public.
A cab car and an intermediate car
are considered passenger cars.
Passenger compartment means an area
of a passenger car that consists of a
seating area and any vestibule that
is connected to the seating area by
an open passageway.
Passenger equipment means the N700
series trainset that is based on
trainsets currently in, or future
variants operated on, JRC’s Tokaido
Shinkansen system, or any unit
thereof.
Permanent deformation means the
undergoing of a permanent change
in shape of a structural member of
a rail vehicle.
PTC means positive train control as
further described in § 299.201.
Qualified individual means a person
that has successfully completed all
instruction, training, and
examination programs required by
both the employer and this part,
and that the person, therefore, may
reasonably be expected to perform
his or her duties proficiently in
compliance with all Federal
railroad safety laws, regulations,
and orders.
Rail neutral temperature is the
temperature at which the rail is
neither in compression nor tension.
Rail temperature means the temperature
of the rail, measured with a rail
thermometer.
Rail vehicle means railroad rolling
stock, including, but not limited to,
passenger and maintenance
vehicles.
Railroad equipment means all trains,
trainsets, rail cars, locomotives, and
on-track maintenance vehicles
owned or used by the railroad.
Railroad, the means the company, also
known as the Texas Central
Railroad, LLC, which is the entity
that will operate and maintain the
PO 00000
Frm 00036
Fmt 4701
Sfmt 4700
high-speed rail system initially
connecting Dallas to Houston,
Texas, and is responsible for
compliance with all aspects of this
rule.
Repair point means a location
designated by the railroad where
repairs of the type necessary occur
on a regular basis. A repair point
has, or should have, the facilities,
tools, and personnel qualified to
make the necessary repairs. A repair
point need not be staffed
continuously.
Representative car/area means a car/
area that shares the relevant
characteristics as the car(s)/area(s) it
represents (i.e., same signage/
marking layout, and charging light
system for passive systems or light
fixtures and power system for
electrically powered systems).
Rollover strength means the strength
provided to protect the structural
integrity of a rail vehicle in the
event the vehicle leaves the track
and impacts the ground on its side
or roof.
Safety appliance means an appliance,
required under 49 U.S.C. ch. 203,
excluding power brakes. The term
includes automatic couplers,
handbrakes, crew steps, handholds,
handrails, or ladder treads made of
steel or a material of equal or
greater mechanical strength used by
the traveling public or railroad
employees that provides a means
for safe coupling, uncoupling, or
ascending or descending passenger
equipment.
Safety-critical means a component,
system, software, or task that, if not
available, defective, not
functioning, not functioning
correctly, not performed, or not
performed correctly, increases the
risk of damage to railroad
equipment or injury to a passenger,
railroad employee, or other person.
Search, valid means a continuous
inspection for internal rail defects
where the equipment performs as
intended and equipment responses
are interpreted by a qualified
individual as defined in subpart C.
Semi-permanently coupled means
coupled by means of a drawbar or
other coupling mechanism that
requires tools to perform the
coupling or uncoupling operation.
Coupling and uncoupling of each
semi-permanently coupled unit in a
trainset can be performed safely
only while at a trainset
maintenance facility where
personnel can safely get under a
unit or between units, or other
location under the protections of
E:\FR\FM\03NOR2.SGM
03NOR2
khammond on DSKJM1Z7X2PROD with RULES2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
subpart B of part 218 of this
chapter.
Side sill means that portion of the
underframe or side at the bottom of
the rail vehicle side wall.
Shinkansen, Tokaido means the highspeed rail system operated by the
Central Japan Railway Company
between Tokyo and Shin-Osaka,
Japan, that is fully dedicated and
grade separated.
Slab track means railroad track
structure in which the rails are
attached to and supported by a bed
or slab, usually of concrete (or
asphalt), which acts to transfer the
load and provide track stability.
Spall, glazing means small pieces of
glazing that fly off the back surface
of the glazing when an object strikes
the front surface.
Speed, maximum approved means the
maximum trainset speed approved
by FRA based upon the
qualification tests conducted under
§ 299.609(g).
Speed, maximum authorized means the
speed at which trainsets are
permitted to travel safely, as
determined by all operating
conditions and signal indications.
Speed, maximum safe operating means
the highest speed at which trainset
braking may occur without thermal
damage to the discs.
Station platform attendant means a
qualified individual positioned on
the station platform in close
proximity to the train protection
switches while a trainset is
approaching and departing a
station, and is responsible for
coordination with an on-board
attendant to assure safety during
passenger boarding and alighting
within a station.
Superelevation means the actual
elevation of the outside rail above
the inside rail.
Sweeper vehicle means a rail vehicle
whose function is to detect
obstacles within the static
construction gauge prior to the start
of daily revenue service.
Tight track means CWR which is in a
considerable amount of
compression.
Track acceleration measurement system
(TAMS) means an on-track, vehicleborne technology used to measure
lateral and vertical carbody
accelerations.
Track geometry measurement system
(TGMS) means an on-track, vehicleborne technology used to measure
track surface, twist, crosslevel,
alignment, and gauge.
Track lateral resistance means the
resistance provided to the rail/
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
crosstie structure against lateral
displacement.
Track longitudinal resistance means the
resistance provided by the rail
anchors/rail fasteners and the
ballast section to the rail/crosstie
structure against longitudinal
displacement.
Track, non-ballasted means a track
structure not supported by ballast
in which the rails are directly
supported by concrete or steel
structures. Non-ballasted track can
include slab track and track
structures where the rails are
directly fixed to steel bridges or to
servicing pits within trainset
maintenance facilities.
Train means a trainset, or locomotive or
locomotive units coupled with or
without cars.
Train-induced forces means the vertical,
longitudinal, and lateral dynamic
forces which are generated during
train movement and which can
contribute to the buckling potential
of the rail.
Train protection switch means a safety
device located on station platforms
and on safe walkways along the
right-of-way. The train protection
switch is tied directly into the ATC
system and is used in the event that
trainsets in the immediate area
must be stopped.
Trainset means a passenger train
including the cab cars and
intermediate cars that are semipermanently coupled to operate as
a single consist. The individual
units of a trainset are uncoupled
only for emergencies or
maintenance conducted in repair
facilities.
Trainset maintenance facility means a
location equipped with the special
tools, equipment, and qualified
individuals capable of conducting
pre-service inspections and regular
inspections on the trainsets in
accordance with the railroad’s
inspection, testing, and
maintenance program. Trainset
maintenance facilities are also
considered repair points.
Transponder means a wayside
component of the ATC system used
to provide trainset position
correction on the mainline or to
provide an overlay of overrun
protection within a trainset
maintenance facility.
Underframe means the lower horizontal
support structure of a rail vehicle.
Unit, trainset means a cab car or
intermediate car of a trainset.
Vestibule means an area of a passenger
car that normally does not contain
seating, is located adjacent to a side
PO 00000
Frm 00037
Fmt 4701
Sfmt 4700
69735
exit door, and is used in passing
from a seating area to a side exit
door.
Yard means a system of tracks within
defined limits and outside of the
territory controlled by signals,
which can be used for the making
up of non-passenger trains or the
storing of maintenance-of-way
equipment.
Yield strength means the ability of a
structural member to resist a change
in length caused by an applied load.
Exceeding the yield strength will
cause permanent deformation of the
member.
§ 299.7
Responsibility for compliance.
(a) The railroad shall not—
(1) Use, haul, or permit to be used or
hauled on its line(s) any trainset—
(i) With one or more defects not in
compliance with this part; or
(ii) That has not been inspected and
tested as required by a provision of this
part.
(2) Operate over any track, except as
provided in paragraph (e) of this
section, with one or more conditions not
in compliance this part, if the railroad
has actual knowledge of the facts giving
rise to the violation, or a reasonable
person acting in the circumstances and
exercising reasonable care would have
that knowledge.
(3) Violate any other provision of this
part or any provision of the applicable
FRA regulations listed under § 299.3(c).
(b) For purposes of this rule, a trainset
shall be considered in use prior to the
trainset’s departure as soon as it has
received, or should have received the
inspection required under this part for
movement and is ready for service.
(c) Although many of the
requirements of this part are stated in
terms of the duties of the railroad, when
any person (including, but not limited
to, a contractor performing safetyrelated tasks under contract to the
railroad subject to this part) performs
any function required by this part, that
person (whether or not the railroad) is
required to perform that function in
accordance with this part.
(d) For purposes of this part, the
railroad shall be responsible for
compliance with all track safety
provisions set forth in subpart C of this
part. When the railroad and/or its
assignee have actual knowledge of the
facts giving rise to a violation, or a
reasonable person acting in the
circumstances and exercising reasonable
care would have knowledge that the
track does not comply with the
requirements of this part, it shall—
(1) Bring the track into compliance;
(2) Halt operations over that track; or
E:\FR\FM\03NOR2.SGM
03NOR2
69736
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
(3) Continue operations over the
segment of non-complying track in
accordance with the provisions of
§ 299.309(b) or (c).
(e) The FRA Administrator may hold
the railroad, the railroad’s contractor, or
both responsible for compliance with
the requirements of this part and subject
to civil penalties.
§ 299.9
Notifications and filings.
All notifications and filings to the
FRA required by this part shall be
submitted to the Associate
Administrator for Railroad Safety and
Chief Safety Officer, 1200 New Jersey
Avenue SE, Washington, DC 20590,
unless otherwise specified.
khammond on DSKJM1Z7X2PROD with RULES2
§ 299.11
Electronic recordkeeping.
The railroad’s electronic
recordkeeping shall be retained such
that—
(a) The railroad maintains an
information technology security
program adequate to ensure the integrity
of the electronic data storage system,
including the prevention of
unauthorized access to the program
logic or individual records;
(b) The program and data storage
system must be protected by a security
system that utilizes an employee
identification number and password, or
a comparable method, to establish
appropriate levels of program access
meeting all of the following standards:
(1) No two individuals have the same
electronic identity; and
(2) A record cannot be deleted or
altered by any individual after the
record is certified by the employee who
created the record.
(c) Any amendment to a record is
either—
(1) Electronically stored apart from
the record that it amends; or
(2) Electronically attached to the
record as information without changing
the original record;
(d) Each amendment to a record
uniquely identifies the person making
the amendment;
(e) The system employed by the
railroad for data storage permits
reasonable access and retrieval; and
(f) Information retrieved from the
system can be easily produced in a
printed format which can be readily
provided to FRA representatives in a
timely manner and authenticated by a
designated representative of the railroad
as a true and accurate copy of the
railroad’s records if requested to do so
by FRA representatives.
§ 299.13
System description.
(a) General. This section describes the
components, operations, equipment,
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
and systems of the railroad’s high-speed
rail system. The railroad shall adhere to
the following general requirements:
(1) The railroad shall not exceed the
maximum trainset speed approved by
FRA under § 299.609(g) while in
revenue service, up to a maximum
speed of 330 km/h (205 mph).
(2) The railroad shall not transport or
permit to be transported in revenue
service any product that has been
established to be a hazardous material
pursuant to 49 CFR part 172, as
amended.
(3) The railroad shall not conduct
scheduled right-of-way maintenance on
a section of the right-of-way prior to that
section of the right-of-way being cleared
of all revenue service trainsets
(including any trainset repositioning
moves), and proper action is taken by
the general control center staff to protect
incursion into established maintenance
zones by revenue trainsets.
Additionally, the railroad shall not
commence revenue service prior to
completion of the maintenance
activities, that section of the right-ofway being cleared of all maintenance-ofway equipment. Further, the railroad is
prohibited from commencing revenue
operations until after conclusion of the
daily sweeper inspection, under
§ 299.339, and the general control center
returning the signal and trainset control
system to the state required to protect
revenue operations.
(b) Right-of-way. (1) The railroad shall
operate on a completely dedicated rightof-way and shall not operate or conduct
joint operations with any other freight
equipment, other than the railroad’s
maintenance-of-way equipment, or
passenger rail equipment. Only the
railroad’s high-speed trainsets approved
for revenue operations under this part,
and any equipment required for
construction, maintenance, and rescue
purposes may be operated over the
railroad’s right-of-way.
(2) There shall be no public highwayrail grade crossings. Animal and nonrailroad equipment crossings shall be
accomplished by means of an underpass
or overpass. Private at-grade crossings
shall be for the exclusive use by the
railroad and shall be limited to track
Classes H0 and H1.
(3) The railroad shall develop and
comply with a right-of-way barrier plan.
The right-of-way barrier plan shall be
maintained at the system headquarters
and will be made available to FRA upon
request. At a minimum, the plan will
contain provisions in areas of
demonstrated need for the prevention
of—
(i) Vandalism;
PO 00000
Frm 00038
Fmt 4701
Sfmt 4700
(ii) Launching of objects from
overhead bridges or structures onto the
path of trainsets;
(iii) Intrusion of vehicles from
adjacent rights-of-way; and
(iv) Unauthorized access to the rightof-way.
(4) The entire perimeter of the
system’s right-of-way, except for
elevated structures such as bridges and
viaducts, shall be permanently fenced.
Elevated structures shall be equipped
with walkways and safety railing.
(5) The railroad shall install intrusion
detectors in accordance with the
requirements set forth in subpart B of
this part.
(6) The railroad shall install rain,
flood, and wind detectors in locations
identified by the railroad, based on
relevant criteria used by JRC to provide
adequate warning of when operational
restrictions are required due to adverse
weather conditions. Operating
restrictions shall be defined in the
railroad’s operating rules.
(7) Access to the right-of-way for
maintenance-of-way staff shall be
provided on both sides of the right-ofway in accordance with the inspection,
testing, and maintenance program. This
access shall be protected against entry
by unauthorized persons.
(8) Provisions shall be made to permit
emergency personnel to access the rightof-way in accordance with the
Emergency Preparedness Plan pursuant
to part 239 of this chapter. This access
shall be protected against entry by
unauthorized persons.
(9) Throughout the length of the rightof-way, the railroad shall install
walkways located at a safe distance from
the tracks at a minimum distance of 2.0
m (6.56 feet) from the field side of the
outside rail for a design speed of 330
km/h (205 mph). The walkways shall be
used primarily for track and right-ofway inspection, but may be used for
emergency evacuation or rescue access.
(10) Access to the right-of-way by
maintenance-of-way personnel shall not
be allowed during revenue operations
unless the access is outside the
minimum safe distance defined in
§ 299.13(b)(9). In the event of
unscheduled maintenance or repair,
emergency access will be provided
under specific circumstances allowed
under the railroad’s operating rules and
the inspection, testing, and maintenance
program.
(11) The railroad shall record all
difficulties and special situations
regarding geology, hydrology,
settlement, landslide, concrete, and
quality criteria that arise during
construction of the right-of-way. After
construction, the railroad shall monitor
E:\FR\FM\03NOR2.SGM
03NOR2
khammond on DSKJM1Z7X2PROD with RULES2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
the stability and quality standards of
structures such as bridges, viaducts, and
earth structures.
(12) The railroad shall make available
for review by the FRA the track layout
drawings which show, at a minimum,
the following information:
(i) Length of straight sections, spirals
and curves, curve radius,
superelevation, superelevation
variations, gradients, and vertical curve
radii;
(ii) Turnouts and crossover location,
technology, and geometry;
(iii) Maximum operating speed and
allowable cant deficiencies;
(iv) Signal boxes, Go/No-Go signals,
and communication devices;
(v) Details and arrangement of track
circuitry;
(vi) Power feeding equipment
including sectionalization, and return
routing;
(vii) Location of accesses to the rightof-way; and
(viii) The railroad shall also submit
the specifications for the track layout,
permissible track forces, components
such as rail, ballast, ties, rail fasteners,
and switches.
(13) Protection devices shall be
installed on all highway bridge
overpasses in accordance with the rightof-way plan in paragraph (b)(3) of this
section.
(14) There shall be no movable
bridges in the railroad’s system.
Stationary rail bridges located over
highways or navigable waterways shall
have their foundations, piers, or other
support structure appropriately
protected against the impact of road
vehicles or water-borne vessels.
(15) Train protection switches shall be
installed at regular intervals on both
sides of the right-of-way at intervals
defined by the railroad and at intervals
not to exceed 60 m (197 feet) on
platforms within stations. These devices
shall act directly on the ATC system.
(16) The railroad shall use the design
wheel and rail profiles, service-proven
on the Tokaido Shinkansen system, or
alternate wheel and rail profiles
approved by FRA.
(c) Railroad system safety—(1)
Inspection, testing, and maintenance
procedures and criteria. The railroad
shall develop, implement, and use a
system of inspection, testing,
maintenance procedures and criteria,
under subpart G of this part, which are
initially based on the Tokaido
Shinkansen system service-proven
procedures and criteria, to ensure the
integrity and safe operation of the
railroad’s rolling stock, infrastructure,
and signal and trainset control system.
The railroad may, subject to FRA review
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
and approval, implement inspection,
testing, maintenance procedures and
criteria, incorporating new or emerging
technology, under § 299.713(c)(4).
(2) Operating practices. The railroad
shall develop, implement, and use
operating rules, which meet the
standards set forth in subpart E of this
part and which are based on practices
and procedures proven on the Tokaido
Shinkansen system to ensure the
integrity and safe operation of the
railroad’s system. The railroad shall
have station platform attendants on the
platform in close proximity to the train
protection switches required by
paragraph (b)(15) of this section, while
trainsets are approaching and departing
the station. The railroad’s operating
rules shall require coordination between
on-board crew and station platform
attendants to assure safety during
passenger boarding and alighting from
trainsets at stations.
(3) Personnel qualification
requirements. The railroad shall
develop, implement, and use a training
and testing program, which meets the
requirements set forth in this part and
part 243 of this chapter, to ensure that
all personnel, including railroad
employees and employees of railroad
contractors, possess the skills and
knowledge necessary to effectively
perform their duties.
(4) System qualification tests. The
railroad shall develop, implement, and
use a series of operational and design
tests, which meet the standards set forth
in subpart F of this part, to demonstrate
the safe operation of system
components, and the system as a whole.
(d) Track and infrastructure. (1) The
railroad shall construct its track and
infrastructure to meet all material and
operational design criteria, within
normal acceptable construction
tolerances, and to meet the requirements
set forth in subpart C of this part.
(2) The railroad shall operate on
nominal standard gauge, 1,435 mm (56.5
inches), track.
(3) The railroad shall install and
operate on double track throughout the
mainlines, with a minimum nominal
distance between track centerlines of 4
m (13.1 feet) for operating speeds up to
170 km/h (106 mph) (track Classes up
to H4) and 4.2 m (13.8 feet) for operating
speeds greater than 170 km/h (106 mph)
(track Classes H5 and above). Generally,
each track will be used for a single
direction of traffic, and trainset will not
overtake each other on mainline tracks
(except at non-terminal station
locations). The railroad may install
crossover connections between the
double track at each station, and at
regular intervals along the line to permit
PO 00000
Frm 00039
Fmt 4701
Sfmt 4700
69737
flexibility in trainset operations,
maintenance, and emergency rescue.
(4) The railroad’s main track (track
Classes H4 and above) shall consist of
continuous welded rail. Once installed,
the rail shall be field-welded to form
one continuous track segment except
rail expansion joints and where gluedinsulated joints are necessary for
signaling purposes. The rail shall be JIS
E 1101 60 kg rail, as specified in JIS E
1101:2001(E) as amended by JIS E
1101:2006(E), and JIS E 1101:2012(E)
(all incorporated by reference, see
§ 299.17).
(5) In yards and maintenance
facilities, where operations will be at
lower speeds, the railroad shall install
either JIS E 1101 50kgN rail or JIS E
1101 60 kg rail as specified in JIS E
1101:2001(E) as amended by JIS E
1101:2006(E), and JIS E 1101:2012(E)
(all incorporated by reference, see
§ 299.17).
(6) The railroad shall use either
ballasted or non-ballasted track to
support the track structure, as
appropriate for the intended high-speed
system.
(i) Except as noted in paragraph
(c)(6)(ii) of this section, for ballasted
mainline track structure, the railroad
shall install pre-stressed concrete ties.
(ii) For special track work such as
turnouts and expansion joints, and at
transitions to bridges, and for nonballasted track, the railroad shall install
either pre-stressed, composite ties, or
use direct fixation. Detailed
requirements are included in subpart C
of this part.
(7) Turnouts, expansion joints and
glued-insulated joints shall be of the
proven design as used on the Tokaido
Shinkansen system.
(8) The trainsets and stations shall be
designed to permit level platform
boarding for passengers and crew at all
side entrance doors. Provisions for high
level boarding shall be made at all
locations in trainset maintenance
facilities where crew and maintenance
personnel are normally required to
access or disembark trainsets.
(e) Signal and trainset control
systems. (1) The railroad’s signal and
trainset control systems, shall be based
upon the service-proven system utilized
on the Tokaido Shinkansen system and
shall include an automatic train control
(ATC) system, interlocking equipment,
and wayside equipment, including:
track circuits, transponders, and Go/NoGo signals in stations and trainset
maintenance facilities.
(2) The railroad’s signaling system
shall extend beyond the mainline into
trainset maintenance facilities and be
E:\FR\FM\03NOR2.SGM
03NOR2
khammond on DSKJM1Z7X2PROD with RULES2
69738
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
designed to prevent collisions at all
speeds.
(3) The ATC system shall be designed
with a redundant architecture utilizing
an intrinsic fail-safe design concept.
(4) The trainset braking curves shall
be determined by the on-board
equipment based on the ATC signal
from the ground facility and on-board
database that includes the alignment
and rolling stock performance data. The
on-board equipment shall generate the
braking command based upon the
trainset location, speed, and braking
curves.
(5) The ATC on-board equipment
shall have three modes: mainline,
shunting, and cut-out.
(i) Mainline mode shall be used for
operations on mainlines and for
entering into the trainset maintenance
facilities. The mainline mode of ATC
on-board equipment shall provide the
following functions:
(A) Prevent train-to-train collisions;
and
(B) Prevent overspeed derailments.
(ii) Shunting mode shall be used to
protect movements within trainset
maintenance facilities and for
emergency operations as required by the
operating rules. When operating in
shunting mode, the trainset shall be
restricted to a maximum speed of 30
km/h.
(iii) Cut-out mode shall be used for
emergency operations and/or in the
event of an ATC system failure as
required by the operating rules.
(6) Interlocking equipment shall
prevent the movement of trainsets
through a switch in an improper
position and command switch-and-lock
movements on mainlines and within
trainset maintenance facilities.
(7) Track circuits shall be used to
provide broken rail detection.
(8) Overrun protection coils shall be
used at mainline turnouts, crossovers
within stations and trainset
maintenance facilities to prevent
unauthorized route access.
(9) Transponders shall be used on the
mainline to provide trainset position
correction. Transponders may be used
to provide an overlay of overrun
protection within a trainset
maintenance facility.
(10) Go/No-Go signals shall be used in
stations for shunting and emergency
operations and in trainset maintenance
facilities to provide trainset movement
authority.
(11) The railroad shall include an
intrusion detection system as required
by paragraph (b)(3) and (5) of this
section that shall interface with the ATC
system and have the capability to stop
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
the trainset under specified intrusion
scenarios.
(f) Communications. (1) The railroad
shall install a dedicated communication
system along the right-of-way to
transmit data, telephone, and/or radio
communications that is completely
isolated and independent of the signal
and trainset control system. To ensure
transmission reliability, the system shall
include back-up transmission routes.
(2) For trainset operation and
maintenance, the railroad shall install—
(i) A portable radio system for
maintenance and service use; and
(ii) A trainset radio, which shall
facilitate communication between each
trainset and the general control center.
(g) Rolling stock. (1) The railroad’s
rolling stock shall be designed,
operated, and maintained in accordance
with the requirements set forth in
subparts D, E, and G of this part.
(2) The railroad shall utilize bidirectional, fixed-consist, electric
multiple unit (EMU), high-speed
trainsets based on the N700.
(3) Each trainset shall be equipped
with wheel slide control.
(4) Each trainset shall be equipped
with two electrically connected
pantographs. The position of the
pantographs (up or down) shall be
displayed in the driver’s cab.
(5) The driver’s cab shall be a full
width and dedicated cab and shall be
arranged to enhance safety of operation,
range of vision, visibility and readability
of controls and indicators, accessibility
of controls, and climate control.
(6) The railroad’s passenger
equipment brake system shall be based
on the N700’s design and shall meet the
following standards:
(i) Each trainset shall be equipped
with an electronically controlled brake
system that shall ensure that each unit
in the trainset responds independently
to a brake command. The brake
command shall be transmitted through
the on-board internal trainset control
network, as well as through the trainline
for redundancy.
(A) Motorized cars shall be equipped
with regenerative and electronically
controlled pneumatic brakes. The
system shall be designed to maximize
the use of regenerative brakes.
(B) Non-motorized cars shall be
equipped with electronically controlled
pneumatic brakes.
(C) The friction brakes on each bogie
shall be cheek mounted disc brakes.
(D) Each car shall be equipped with
an electronic and pneumatic brake
control unit and a main reservoir. The
system shall be designed that in the
event of a failure of an electronic control
unit in a car, brake control shall be
PO 00000
Frm 00040
Fmt 4701
Sfmt 4700
provided by the electronic control unit
on the adjacent car. Each car in the
trainset shall be equipped with a backup
wheel slide protection controller that
will provide wheel slide protection in
the event of a wheel slide protection
controller failure.
(ii) The braking system shall be
designed with the following brake
controls: Service, emergency, urgent,
and rescue brake.
(iii) The service and emergency brake
shall be applied automatically by ATC
or manually by the driver.
(iv) The urgent brake control shall be
independent of the service and
emergency brake control and shall be
automatically applied if the trainset is
parted. Application of the urgent brake
shall produce an irretrievable stop. The
urgent brake force shall be designed to
vary according to speed in order to
minimize the braking distance and
avoid excessive demand of adhesion at
higher speeds.
(v) A disabled trainset shall be
capable of having its brake system
controlled electronically by a rescue
trainset.
(vi) Independent of the driver’s brake
handle in the cab, each trainset shall be
equipped with two urgent brake
switches in each cab car, accessible only
to the crew; located adjacent to the door
control station and that can initiate an
urgent brake application. If door control
stations are provided in intermediate
cars that are accessible only to crew
members, then the urgent brake
switches must also be included adjacent
to the door control stations.
(vii) The railroad shall establish a
maximum safe operating speed to
address brake failures that occur in
revenue service as required by
§ 299.409(f)(4). In the event of any
friction brake failure on a trainset, the
speed shall be limited by ATC on-board
equipment in accordance with the brake
failure switch position selected by the
driver and as required by § 299.447.
§ 299.15
Special approvals.
(a) General. The following procedures
govern consideration and action upon
requests for special approval of
alternative standards to this part.
(b) Petitions for special approval of
alternative standard. Each petition for
special approval of an alternative
standard shall contain—
(1) The name, title, address, and
telephone number of the primary person
to be contacted with regard to review of
the petition;
(2) The alternative proposed, in detail,
to be substituted for the particular
requirements of this part; and
E:\FR\FM\03NOR2.SGM
03NOR2
khammond on DSKJM1Z7X2PROD with RULES2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
(3) Appropriate data or analysis, or
both, establishing that the alternative
will provide at least an equivalent level
of safety.
(c) Petitions for special approval of
alternative compliance. Each petition
for special approval of alternative
compliance shall contain—
(1) The name, title, address, and
telephone number of the primary person
to be contacted with regard to the
petition;
(2) High-speed core systems and
system components of special design
shall be deemed to comply with this
part, if the FRA Associate Administrator
determines under paragraph (d) of this
section that the core system or system
components provide at least an
equivalent level of safety in the
environment defined within § 299.13
with respect to the protection of railroad
employees and the public. In making a
determination under paragraph (d) of
this section the Associate Administrator
shall consider, as a whole, all of those
elements of casualty prevention or
mitigation relevant to the integrity of the
core system or components that are
addressed by the requirements of this
part.
(d) Petition contents. The Associate
Administrator may only make a finding
of equivalent safety and compliance
with this part, based upon a submission
of data and analysis sufficient to
support that determination. The petition
shall include—
(1) The information required by
§ 299.15(b) or (c), as appropriate;
Information, including detailed
drawings and materials specifications,
sufficient to describe the actual
construction and function of the core
systems or system components of
special design;
(2) A quantitative risk assessment,
incorporating the design information
and engineering analysis described in
this paragraph, demonstrating that the
core systems or system components, as
utilized in the service environment
defined in § 299.13, presents no greater
hazard of serious personal injury than
existing core system or system
components that conform to the specific
requirements of this part.
(e) Federal Register notice. FRA will
publish a notice in the Federal Register
concerning each petition under
paragraphs (b) and (c) of this section.
(f) Comment. Not later than 30 days
from the date of publication of the
notice in the Federal Register
concerning a petition under paragraphs
(b) and (c) of this section, any person
may comment on the petition.
(1) Each comment shall set forth
specifically the basis upon which it is
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
made, and contain a concise statement
of the interest of the commenter in the
proceeding.
(2) Each comment shall be submitted
to the U.S. Department of
Transportation, Docket Operations (M–
30), West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue SE,
Washington, DC 20590, and shall
contain the assigned docket number for
that proceeding. The form of such
submission may be in written or
electronic form consistent with the
standards and requirements established
by the Federal Docket Management
System and posted on its website at
https://www.regulations.gov.
(g) Disposition of petitions. (1) FRA
will conduct a hearing on a petition in
accordance with the procedures
provided in § 211.25 of this chapter.
(2) If FRA finds that the petition
complies with the requirements of this
section or that the proposed plan is
acceptable the petition will be granted,
normally within 90 days of its receipt.
If the petition is neither granted nor
denied within 90 days, the petition
remains pending for decision. FRA may
attach special conditions to the approval
of the petition. Following the approval
of a petition, FRA may reopen
consideration of the petition for cause
stated.
(3) If FRA finds that the petition does
not comply with the requirements of
this section, or that the proposed plan
is not acceptable or that the proposed
changes are not justified, or both, the
petition will be denied, normally within
90 days of its receipt.
(4) When FRA grants or denies a
petition, or reopens consideration of the
petition, written notice is sent to the
petitioner and other interested parties.
§ 299.17
Incorporation by reference.
Certain material is incorporated by
reference into this part with the
approval of the Director of the Federal
Register under 5 U.S.C. 552(a) and 1
CFR part 51. All approved material is
available for inspection at Federal
Railroad Administration, Docket Clerk,
1200 New Jersey Avenue SE,
Washington, DC 20590 (telephone: 202–
493–6052); email: FRALegal@dot.gov
and is available from the sources
indicated in this section. It is also
available for inspection at the National
Archives and Records Administration
(NARA). For information on the
availability of this material at NARA,
email fedreg.legal@nara.gov or go to
www.archives.gov/federal-register/cfr/
ibr-locations.html.
(a) ASTM International, 100 Barr
Harbor Drive, PO Box C700, West
PO 00000
Frm 00041
Fmt 4701
Sfmt 4700
69739
Conshohocken, PA 19428–2959,
www.astm.org.
(1) ASTM D 4956–07ε1, Standard
Specification for Retroreflective
Sheeting for Traffic Control, approved
March 15, 2007; into § 299.423.
(2) ASTM E 810–03, Standard Test
Method for Coefficient of Retroreflection
of Retroreflective Sheeting Utilizing the
Coplanar Geometry, approved February
10, 2003; into § 299.423.
(3) ASTM E 2073–07, Standard Test
Method for Photopic Luminance of
Photoluminescent (Phosphorescent)
Markings, approved July 1, 2007; into
§ 299.423.
(b) Japanese Standards Association 3–
13–12 Mita, Minato-ku, Tokyo, 108–
0073, Japan, www.jsa.or.jp (Japanese
site), or www.jsa.or.jp/en (English site).
(1) JIS B 8265:2010(E) ‘‘Construction
of pressure vessels-general principles,’’
Published December 27, 2010, Second
English edition, published December
2013; into § 299.409.
(2) JIS E 1101:2001(E), ‘‘Flat bottom
railway rails and special rails for
switches and crossings of non-treated
steel,’’ Published March 21, 2001,
Second English edition, published
August 2008; into § 299.13(d).
(3) JIS E 1101:2006(E) ‘‘Flat bottom
railway rails and special rails for
switches and crossings of non-treated
steel,’’ (Amendment 1), Published
March 27, 2006, First English edition,
published December 2006; into
§ 299.13(d).
(4) JIS E 1101:2012(E) ‘‘Flat bottom
railway rails and special rails for
switches and crossings of non-treated
steel,’’ (Amendment 2), Published
February 20, 2012, First English edition,
May 2012; into § 299.13(d).
(5) JIS E 7105:2006(E), ‘‘Rolling
Stock—Test methods of static load for
body structures,’’ Published February 6,
2006, First English edition published
May 2010; into § 299.403(b).
(6) JIS E 7105:2011(E), ‘‘Rolling
Stock—Test methods of static load for
body structures,’’ (Amendment 1)
Published September 7, 2011, First
English edition, published December
2011; into § 299.403(b).
Subpart B—Signal and Trainset
Control System
§ 299.201 Technical PTC system
requirements.
(a) The railroad shall comply with all
applicable requirements under 49 U.S.C.
20157, including, but not limited to, the
statutory requirement to fully
implement an FRA-certified PTC system
prior to commencing revenue service.
(b) The railroad’s PTC system shall be
designed to prevent train-to-train
E:\FR\FM\03NOR2.SGM
03NOR2
69740
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
collisions, over-speed derailments,
incursions into established work zone
limits, and movements of trainset
through switches left in the wrong
position, reliably and functionally, in
accordance with § 236.1005(a) and (c)
through (f) of this chapter.
(c) The railroad is authorized to
conduct field testing of its PTC system
on its system, prior to obtaining PTC
System Certification from FRA, in
accordance with its system-wide
qualification test plan under § 299.603.
During any field testing of its
uncertified PTC system and regression
testing of its FRA-certified PTC system,
FRA may oversee the railroad’s testing,
audit any applicable test plans and
procedures, and impose additional
testing conditions that FRA believes
may be necessary for the safety of
trainset operations.
(d) The railroad is not exempted from
compliance with any requirement of
subparts A through G of 49 CFR part
236, or 49 CFR parts 233 and 235,
unless the railroad’s FRA-approved
PTCSP provides for such an exemption.
(e)(1) All materials filed in accordance
with this subpart must be in the English
language, or have been translated into
English and attested as true and correct.
(2) Each filing referenced in this
subpart may include a request for full or
partial confidentiality in accordance
with § 209.11 of this chapter. If
confidentiality is requested as to a
portion of any applicable document,
then in addition to the filing
requirements under § 209.11 of this
chapter, the person filing the document
shall also file a copy of the original
unredacted document, marked to
indicate which portions are redacted in
the document’s confidential version
without obscuring the original
document’s contents.
§ 299.203
PTC system required.
The railroad shall not commence
revenue service prior to installing and
making operative its FRA-certified PTC
system.
khammond on DSKJM1Z7X2PROD with RULES2
§ 299.205
PTC System Certification.
(a) Prior to operating its PTC system
in revenue service, the railroad must
first obtain a PTC System Certification
from FRA by submitting an acceptable
PTCSP and obtaining FRA’s approval of
its PTCSP.
(b) Each PTCSP requirement under
this subpart shall be supported by
information and analysis sufficient to
establish that the PTC system meets the
requirements of § 236.1005(a) and (c)
through (f) of this chapter.
(c) If the Associate Administrator
finds that the PTCSP and its supporting
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
documentation support a finding that
the PTC system complies with
§ 236.1005(a) and (c) through (f) of this
chapter and § 299.211, the Associate
Administrator shall approve the PTCSP.
If the Associate Administrator approves
the PTCSP, the railroad shall receive
PTC System Certification for its PTC
system and shall implement the PTC
system according to the PTCSP.
(d) Issuance of a PTC System
Certification is contingent upon FRA’s
confidence in the implementation and
operation of the subject PTC system.
This confidence may be based on FRAmonitored field testing or an
independent assessment performed in
accordance with § 236.1017 of this
chapter.
(e)(1) As necessary to ensure safety,
FRA may attach special conditions to its
certification of the railroad’s PTC
System.
(2) After granting a PTC System
Certification, FRA may reconsider the
PTC System Certification upon
revelation of any of the following factors
concerning the contents of the PTCSP:
(i) Potential error or fraud;
(ii) Potentially invalidated
assumptions determined as a result of
in-service experience or one or more
unsafe events calling into question the
safety analysis supporting the approval.
(3) During FRA’s reconsideration in
accordance with this paragraph, the PTC
system may remain in use if otherwise
consistent with the applicable law and
regulations, and FRA may impose
special conditions for use of the PTC
system.
(4) After FRA’s reconsideration in
accordance with this paragraph, FRA
may:
(i) Dismiss its reconsideration and
continue to recognize the existing PTC
System Certification;
(ii) Allow continued operations under
such conditions the Associate
Administrator deems necessary to
ensure safety; or
(iii) Revoke the PTC System
Certification and direct the railroad to
cease operations.
(f) FRA shall be afforded reasonable
access to monitor, test, and inspect
processes, procedures, facilities,
documents, records, design and testing
materials, artifacts, training materials
and programs, and any other
information used in the design,
development, manufacture, test,
implementation, and operation of the
system, as well as interview any
personnel.
(g) Information that has been certified
under the auspices of a foreign
regulatory entity recognized by the
Associate Administrator may, at the
PO 00000
Frm 00042
Fmt 4701
Sfmt 4700
Associate Administrator’s sole
discretion, be accepted as
independently verified and validated
and used to support the railroad’s
PTCSP.
(h) The railroad shall file its PTCSP in
FRA’s Secure Information Repository at
https://sir.fra.dot.gov, consistent with
§ 299.201(e).
§ 299.207 PTC Safety Plan content
requirements.
(a) The railroad’s PTCSP shall contain
the following elements:
(1) A hazard log consisting of a
comprehensive description of all safetyrelevant hazards of the PTC system,
specific to implementation on the
railroad, including maximum threshold
limits for each hazard (for unidentified
hazards, the threshold shall be exceeded
at one occurrence);
(2) A description of the safety
assurance concepts that are to be used
for system development, including an
explanation of the design principles and
assumptions;
(3) A risk assessment of the as-built
PTC system;
(4) A hazard mitigation analysis,
including a complete and
comprehensive description of each
hazard and the mitigation techniques
used;
(5) A complete description of the
safety assessment and Verification and
Validation processes applied to the PTC
system, their results, and whether these
processes address the safety principles
described in appendix C to part 236 of
this chapter directly, using other safety
criteria, or not at all;
(6) A complete description of the
railroad’s training plan for railroad, and
contractor employees and supervisors
necessary to ensure safe and proper
installation, implementation, operation,
maintenance, repair, inspection, testing,
and modification of the PTC system;
(7) A complete description of the
specific procedures and test equipment
necessary to ensure the safe and proper
installation, implementation, operation,
maintenance, repair, inspection, testing,
and modification of the PTC system on
the railroad and establish safety-critical
hazards are appropriately mitigated.
These procedures, including calibration
requirements, shall be consistent with
or explain deviations from the
equipment manufacturer’s
recommendations;
(8) A complete description of the
configuration or revision control
measures designed to ensure that the
railroad or its contractor does not
adversely affect the safety-functional
requirements and that safety-critical
hazard mitigation processes are not
E:\FR\FM\03NOR2.SGM
03NOR2
khammond on DSKJM1Z7X2PROD with RULES2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
compromised as a result of any such
change;
(9) A complete description of all
initial implementation testing
procedures necessary to establish that
safety-functional requirements are met
and safety-critical hazards are
appropriately mitigated;
(10) A complete description of all
post-implementation testing (validation)
and monitoring procedures, including
the intervals necessary to establish that
safety-functional requirements, safetycritical hazard mitigation processes, and
safety-critical tolerances are not
compromised over time, through use, or
after maintenance (adjustment, repair,
or replacement) is performed;
(11) A complete description of each
record necessary to ensure the safety of
the system that is associated with
periodic maintenance, inspections,
tests, adjustments, repairs, or
replacements, and the system’s resulting
conditions, including records of
component failures resulting in safetyrelevant hazards (see § 299.213);
(12) A safety analysis to determine
whether, when the system is in
operation, any risk remains of an
unintended incursion into a roadway
work zone due to human error. If the
analysis reveals any such risk, the
PTCSP shall describe how that risk will
be mitigated;
(13) A complete description of how
the PTC system will enforce authorities
and signal indications;
(14) A complete description of how
the PTC system will appropriately and
timely enforce all integrated hazard
detectors in accordance with § 236.1005
of this chapter;
(15) The documents and information
required under § 299.211;
(16) A summary of the process for the
product supplier or vendor to promptly
and thoroughly report any safetyrelevant failures or previously
unidentified hazards to the railroad,
including when another user of the
product experiences a safety-relevant
failure or discovers a previously
unidentified hazard;
(17) Documentation establishing—by
design, data, or other analysis—that the
PTC system meets the fail-safe operation
criteria under paragraph (b)(4)(v) of
appendix C to part 236 of this chapter;
and,
(18) An analysis establishing that the
PTC system will be operated at a level
of safety comparable to that achieved
over the 5-year period prior to the
submission of the railroad’s PTCSP by
other train control systems that perform
PTC functions, and which have been
utilized on high-speed rail systems with
similar technical and operational
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
characteristics in the United States or in
foreign service.
(b) As the railroad’s PTC system may
be considered a standalone system
pursuant to § 236.1015(e)(3) of this
chapter, the following requirements
apply:
(1) The PTC system shall reliably
execute the functions required by
§ 236.1005 of this chapter and be
demonstrated to do so to FRA’s
satisfaction; and
(2) The railroad’s PTCSP shall
establish, with a high degree of
confidence, that the system will not
introduce any hazards that have not
been sufficiently mitigated.
(c) When determining whether the
PTCSP fulfills the requirements under
this section, the Associate
Administrator may consider all
available evidence concerning the
reliability of the proposed system.
(d) When reviewing the issue of the
potential data errors (for example, errors
arising from data supplied from other
business systems needed to execute the
braking algorithm, survey data needed
for location determination, or
mandatory directives issued through the
computer-aided dispatching system),
the PTCSP must include a careful
identification of each of the risks and a
discussion of each applicable
mitigation. In an appropriate case, such
as a case in which the residual risk after
mitigation is substantial, the Associate
Administrator may require submission
of a quantitative risk assessment
addressing these potential errors.
(e) The railroad must comply with the
applicable requirements under
§ 236.1021 of this chapter prior to
modifying a safety-critical element of an
FRA-certified PTC system.
(f) If a PTCSP applies to a PTC system
designed to replace an existing certified
PTC system, the PTCSP will be
approved provided that the PTCSP
establishes with a high degree of
confidence that the new PTC system
will provide a level of safety not less
than the level of safety provided by the
system to be replaced.
§ 299.209
PTC system use and failures.
(a) When any safety-critical PTC
system component fails to perform its
intended function, the cause must be
determined and the faulty component
adjusted, repaired, or replaced without
undue delay. Until repair of such
essential components is completed, the
railroad shall take appropriate action as
specified in its PTCSP.
(b) Where a trainset that is operating
in, or is to be operated within, a PTCequipped track segment experiences a
PTC system failure or the PTC system is
PO 00000
Frm 00043
Fmt 4701
Sfmt 4700
69741
otherwise cut out while en route (i.e.,
after the trainset has departed its initial
terminal), the trainset may only
continue in accordance with all of the
following:
(1) Except as provided in paragraph
(b)(4) of this section, when no absolute
block protection is established, the
trainset may proceed at a speed not to
exceed restricted speed.
(2) When absolute block protection
can be established in advance of the
trainset, the trainset may proceed at a
speed not to exceed 120 km/h (75 mph),
and the trainset shall not exceed
restricted speed until the absolute block
in advance of the trainset is established.
(3) A report of the failure or cut-out
must be made to a designated railroad
officer of the railroad as soon as safe and
practicable.
(4) Where the PTC system is the
exclusive method of delivering
mandatory directives, an absolute block
must be established in advance of the
trainset as soon as safe and practicable,
and the trainset shall not exceed
restricted speed until the absolute block
in advance of the trainset is established.
(5) Where the failure or cut-out is a
result of a defective onboard PTC
apparatus, the trainset may be moved in
passenger service only to the next
forward location where the necessary
repairs can be made; however, if the
next forward location where the
necessary repairs can be made does not
have the facilities to handle the safe
unloading of passengers, the trainset
may be moved past the repair location
in service only to the next forward
passenger station in order to facilitate
the unloading of passengers. When the
passengers have been safely unloaded,
the defective trainset shall be moved to
the nearest location where the onboard
PTC apparatus can be repaired or
exchanged.
(c) The railroad shall comply with all
provisions in its PTCSP for each PTC
system it uses and shall operate within
the scope of initial operational
assumptions and predefined changes
identified.
(d) The normal functioning of any
safety-critical PTC system must not be
interfered with in testing or otherwise
without first taking measures to provide
for the safe movement of trainsets that
depend on the normal functioning of the
system.
(e) The railroad shall comply with the
reporting requirements under
§ 236.1029(h) of this chapter.
(f) The railroad and the PTC system
vendors and/or suppliers must comply
with each applicable requirement under
§ 236.1023 of this chapter.
E:\FR\FM\03NOR2.SGM
03NOR2
69742
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
§ 299.211 Communications and security
requirements.
(a) All wireless communications
between the office, wayside, and
onboard components in a PTC system
shall provide cryptographic message
integrity and authentication.
(b) Cryptographic keys required under
this section shall—
(1) Use an algorithm approved by the
National Institute of Standards or a
similarly recognized and FRA-approved
standards body;
(2) Be distributed using manual or
automated methods, or a combination of
both; and
(3) Be revoked—
(i) If compromised by unauthorized
disclosure of the cleartext key; or
(ii) When the key algorithm reaches
its lifespan as defined by the standards
body responsible for approval of the
algorithm.
(c) The cleartext form of the
cryptographic keys shall be protected
from unauthorized disclosure,
modification, or substitution, except
during key entry when the cleartext
keys and key components may be
temporarily displayed to allow visual
verification. When encrypted keys or
key components are entered, the
cryptographically protected cleartext
key or key components shall not be
displayed.
(d) Access to cleartext keys shall be
protected by a tamper-resistant
mechanism.
(e) If the railroad elects to also
provide cryptographic message
confidentiality, it shall:
(1) Comply with the same
requirements for message integrity and
authentication under this section; and
(2) Only use keys meeting or
exceeding the security strength required
to protect the data as defined in the
railroad’s PTCSP.
(f) The railroad, or its vendor or
supplier, shall have a prioritized service
restoration and mitigation plan for
scheduled and unscheduled
interruptions of service. This plan shall
be made available to FRA upon request,
without undue delay, for restoration of
communication services that support
PTC system services.
khammond on DSKJM1Z7X2PROD with RULES2
§ 299.213
Records retention.
(a) The railroad shall maintain at a
designated office on the railroad—
(1) A current copy of each FRAapproved PTCSP that it holds;
(2) Adequate documentation to
demonstrate that the PTCSP meets the
safety requirements of this RPA,
including the risk assessment;
(3) An Operations and Maintenance
Manual, pursuant to § 299.215; and
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
(4) Training and testing records
pursuant to § 236.1043(b) of this
chapter.
(b) Results of inspections and tests
specified in the PTCSP must be
recorded pursuant to § 236.110 of this
chapter.
(c) Each contractor providing services
relating to the testing, maintenance, or
operation of the railroad’s PTC system
shall maintain at a designated office
training records required under
§§ 236.1043(b) of this chapter, and
299.207(a)(6).
(d) After the PTC system is placed in
service, the railroad shall maintain a
database of all safety-relevant hazards as
set forth in its PTCSP and those that had
not been previously identified in its
PTCSP. If the frequency of the safetyrelevant hazards exceeds the threshold
set forth in its PTCSP, then the railroad
shall—
(1) Report the inconsistency in
writing to FRA’s Secure Information
Repository at https://sir.fra.dot.gov,
within 15 days of discovery;
(2) Take prompt countermeasures to
reduce the frequency of each safetyrelevant hazard to below the threshold
set forth in its PTCSP; and
(3) Provide a final report when the
inconsistency is resolved to FRA’s
Secure Information Repository at
https://sir.fra.dot.gov, on the results of
the analysis and countermeasures taken
to reduce the frequency of the safetyrelevant hazard(s) below the threshold
set forth in its PTCSP.
§ 299.215
Manual.
Operations and Maintenance
(a) The railroad shall catalog and
maintain all documents as specified in
its PTCSP for the operation, installation,
maintenance, repair, modification,
inspection, and testing of the PTC
system and have them in one
Operations and Maintenance Manual,
readily available to persons required to
perform such tasks and for inspection
by FRA and FRA-certified state
inspectors.
(b) Plans required for proper
maintenance, repair, inspection, and
testing of safety-critical PTC systems
must be adequate in detail and must be
made available for inspection by FRA
and FRA-certified state inspectors
where such PTC systems are deployed
or maintained. They must identify all
software versions, revisions, and
revision dates. Plans must be legible and
correct.
(c) Hardware, software, and firmware
revisions must be documented in the
Operations and Maintenance Manual
according to the railroad’s configuration
management control plan and any
PO 00000
Frm 00044
Fmt 4701
Sfmt 4700
additional configuration/revision
control measures specified in its PTCSP.
(d) Safety-critical components,
including spare equipment, must be
positively identified, handled, replaced,
and repaired in accordance with the
procedures specified in the railroad’s
PTCSP.
(e) The railroad shall designate in its
Operations and Maintenance Manual an
appropriate railroad officer responsible
for issues relating to scheduled
interruptions of service.
Subpart C—Track Safety Standards
§ 299.301 Restoration or renewal of track
under traffic conditions.
(a) Restoration or renewal of track,
other than in yards and trainset
maintenance facilities, under traffic
conditions is prohibited.
(b) Restoration or renewal of track
under traffic conditions on track Class
H2 in trainset maintenance facilities is
limited to the replacement of worn,
broken, or missing components or
fastenings that do not affect the safe
passage of trainset.
(c) The following activities are
expressly prohibited on track Class H2
in trainset maintenance facilities under
traffic conditions:
(1) Any work that interrupts rail
continuity, e.g., as in joint bar
replacement or rail replacement;
(2) Any work that adversely affects
the lateral or vertical stability of the
track with the exception of spot tamping
an isolated condition where not more
than 4.5 m (15 feet) of track are involved
at any one time and the ambient air
temperature is not above 35°C (95°F);
and
(3) Removal and replacement of the
rail fastenings on more than one tie at
a time within 4.5 m (15 feet).
§ 299.303
Measuring track not under load.
When unloaded track is measured to
determine compliance with
requirements of this part, evidence of
rail movement, if any, that occurs while
the track is loaded shall be added to the
measurements of the unloaded track.
§ 299.305
Drainage.
Each drainage or other water carrying
facility under or immediately adjacent
to the roadbed shall be maintained and
kept free of obstruction, to
accommodate expected water flow for
the area concerned.
§ 299.307
Vegetation.
Vegetation on railroad property which
is on or immediately adjacent to
roadbed shall be controlled so that it
does not—
E:\FR\FM\03NOR2.SGM
03NOR2
69743
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
(a) Become a fire hazard to trackcarrying structures;
(b) Obstruct visibility of railroad signs
and signals along the right-of-way;
(c) Interfere with railroad employees
performing normal trackside duties;
(d) Prevent proper functioning of
signal and communication lines; or
(e) Prevent railroad employees from
visually inspecting moving equipment
from their normal duty stations.
§ 299.309 Classes of track: operating
speed limits.
(a) Except as provided in paragraph
(b) of this section and as otherwise
provided in this part, the following
maximum allowable operating speeds
apply—
TABLE 1 TO PARAGRAPH (a)
Over track that
meets all of the
requirements
prescribed in this
part for—
The maximum
allowable operating
speed in km/h (mph)
Class H0 track ..........
Class H1 track ..........
20 (12)
30 (19)
TABLE 1 TO PARAGRAPH (a)—
Continued
Over track that
meets all of the
requirements
prescribed in this
part for—
The maximum
allowable operating
speed in km/h (mph)
Class
Class
Class
Class
Class
Class
70 (44)
120 (75)
170 (106)
230 (143)
285 (177)
330 (205)
H2
H3
H4
H5
H6
H7
track
track
track
track
track
track
..........
..........
..........
..........
..........
..........
(b) Except as provided in paragraph
(c) of this section, if a segment of track
does not meet all of the requirements for
its intended Class, it is to be reclassified
to the next lower track Class for which
it does meet all of the requirements of
this part. However, if the segment of
track does not at least meet the
requirements for track Class H1 track,
operations may continue at Class H1
speeds for a period of not more than 30
days without bringing the track into
compliance, under the authority of an
individual designated under § 299.353,
after that individual determines that
operations may safely continue and
subject to any limiting conditions
specified by such individual.
(c) If a segment of track designated as
track Class H0 does not meet all of the
requirements for its intended class,
operations may continue at Class H0
speeds for a period of not more than 30
days without bringing the track into
compliance, under the authority of an
individual designated under § 299.353,
after that individual determines that
operations may safely continue and
subject to any limiting conditions
specified by such individual.
(d) No high-speed passenger trainset
shall operate over track Class H0.
§ 299.311
Track geometry; general.
If the values listed in the following
table are exceeded, the railroad shall
initiate remedial action. A reduction in
operating speed so that the condition
complies with the limits listed for a
lower speed shall constitute bringing
the track into compliance.
TABLE 1 TO § 299.311
Track geometry parameter (millimeter (mm))
Track class
Gauge is measured between the heads of the
rails at right angles to the rails in a plane 14
mm (0.55 inches) below the top of the rail
head and may not exceed—.
The deviation from uniformity1 of the mid-chord
offset on either rail for a 10 meter (m) chord
(alignment) may not be more than—.
The deviation from uniform profile on either rail
at the mid-ordinate of a 10 m chord (surface)
may not be more than—.
The deviation from uniform crosslevel at any
point on tangent and curved track may not be
more than—.
The difference in crosslevel between any two
points 2.5 meters (8.2 feet) apart (twist) may
not be more than—.
H0
H1
H2
H3
H4
H5
H6
H7
Min. ................
1429
1429
1429
1429
1429
1429
1429
1429
Max. ...............
10 m chord ....
1454
38
1454
31
1454
31
1454
14
1454
12
1454
10
1454
8
1454
7
10 m chord ....
40
40
40
27
22
18
15
13
........................
50
26
26
22
18
14
9
9
2.5 m ..............
26
26
26
22
18
14
9
9
1 Uniformity for alignment at any point along the track is established by averaging the measured mid-chord offset values for a 10 m (32.8 feet)
chord for nine consecutive points that are centered around that point and spaced at 2.5 m (8.2 feet) intervals.
khammond on DSKJM1Z7X2PROD with RULES2
§ 299.313
based.
Track geometry; performance
TABLE 1 TO PARAGRAPH (a)
(a) For all track of Class H4 and above,
vibration in the lateral and vertical
directions measured on the carbody of
a vehicle representative of the service
fleet traveling at a speed no less than 10
km/h (6.2 mph) below the maximum
speed permitted for the class of track,
shall not exceed the limits prescribed in
the following table:
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
Carbody acceleration limits 1 2
Lateral vibration 3
Vertical vibration 3
≤ 0.35 g peak-to-peak
1 sec window ............
excluding peaks < 50
msec.
≤ 0.45g peak-to-peak
1 sec window
excluding peaks < 50
msec
1 Carbody
accelerations in the vertical and
lateral directions shall be measured by
accelerometers oriented and located in accordance with § 299.337(c)(3).
PO 00000
Frm 00045
Fmt 4701
Sfmt 4700
2 Acceleration measurements shall be processed through an LPF with a minimum cut-off
frequency of 10 Hz. The sample rate for acceleration data shall be at least 200 samples per
second.
3 Peak-to-peak accelerations shall be measured as the algebraic difference between the
two extreme values of measured acceleration
in any 1-second time period, excluding any
peak lasting less than 50 milliseconds.
(b) If the carbody acceleration
requirements are not met on a segment
of track, the segment of track is to be
reclassified to the next lower Class of
track for which it does meet the
requirements of this part.
E:\FR\FM\03NOR2.SGM
03NOR2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
§ 299.315 Curves; elevation and speed
limitations.
(a) The maximum elevation of the
outside rail of a curve may not be more
than 200 mm (7-7/8 inches). The outside
rail of a curve may not be lower than the
inside rail by design, except when
engineered to address specific track or
operating conditions; the limits in
§ 299.311 apply in all cases.
(b) The maximum allowable posted
timetable operating speed for each curve
is determined by the following formula:
khammond on DSKJM1Z7X2PROD with RULES2
Where—
Vmax = Maximum allowable posted timetable
operating speed (km/h).
Ea = Actual elevation of the outside rail
(mm). Actual elevation, Ea, for each 50meter track segment in the body of the
curve is determined by averaging the
elevation for 11 points through the
segment at 5-meter spacing. If the curve
length is less than 50-meters, average the
points through the full length of the body
of the curve.
Eu = Qualified cant deficiency (mm) of the
vehicle type.
R = Radius of curve (m). Radius of curve, R,
is determined by averaging the radius of
the curve over the same track segment as
the elevation.
(c) All vehicles are considered
qualified for operating on track with a
cant deficiency, Eu, not exceeding 75
mm (3 inches).
(d) Each vehicle type must be
approved by FRA, under § 299.609, to
operate on track with a qualified cant
deficiency, Eu, greater than 75 mm (3
inches). Each vehicle type must
demonstrate in a ready-for-service load
condition, compliance with the
requirements of either paragraph (d)(1)
or (2) of this section.
(1) When positioned on a track with
a uniform superelevation equal to the
proposed cant deficiency:
(i) No wheel of the vehicle unloads to
a value less than 60 percent of its static
value on perfectly level track; and
(ii) For passenger cars, the roll angle
between the floor of the equipment and
the horizontal does not exceed 8.6
degrees; or
(2) When operating through a constant
radius curve at a constant speed
corresponding to the proposed cant
deficiency, and a test plan is submitted
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
and approved by FRA in accordance
with § 299.609(d)—
(i) The steady-state (average) load on
any wheel, throughout the body of the
curve, is not less than 60 percent of its
static value on perfectly level track; and
(ii) For passenger cars, the steadystate (average) lateral acceleration
measured on the floor of the carbody
does not exceed 0.15g.
(e) The railroad shall transmit the
results of the testing specified in
paragraph (d) of this section to FRA in
accordance with §§ 299.9 and 299.613
requesting approval under § 299.609(g)
for the vehicle type to operate at the
desired curving speeds allowed under
the formula in paragraph (b) of this
section. The request shall be made in
writing and shall contain, at a
minimum, the following information:
(1) A description of the vehicle type
involved, including schematic diagrams
of the suspension system(s) and the
estimated location of the center of
gravity above top of rail; and
(2) The test procedure, including the
load condition under which the testing
was performed, and description of the
instrumentation used to qualify the
vehicle type, as well as the maximum
values for wheel unloading and roll
angles or accelerations that were
observed during testing.
Note 1 to paragraph (e)(2). The test
procedure may be conducted whereby all the
wheels on one side (right or left) of the
vehicle are raised to the proposed cant
deficiency and lowered, and then the vertical
wheel loads under each wheel are measured
and a level is used to record the angle
through which the floor of the vehicle has
been rotated.
(f) Upon FRA approval of the request
to approve the vehicle type to operate at
the desired curving speeds allowed
under the formula in paragraph (b) of
this section, the railroad shall notify
FRA in accordance with § 299.9 in
writing no less than 30 calendar days
prior to the proposed implementation of
the approved higher curving speeds
allowed under the formula in paragraph
(b) of this section. The notification shall
contain, at a minimum, identification of
the track segment(s) on which the
higher curving speeds are to be
implemented.
(g) As used in this section, and
§ 299.609, vehicle type means like
vehicles with variations in their
physical properties, such as suspension,
PO 00000
Frm 00046
Fmt 4701
Sfmt 4700
mass, interior arrangements, and
dimensions that do not result in
significant changes to their dynamic
characteristics.
§ 299.317
Track strength.
(a) Track shall have a sufficient
vertical strength to withstand the
maximum vehicle loads generated at
maximum permissible trainset speeds,
cant deficiencies and surface
limitations. For purposes of this section,
vertical track strength is defined as the
track capacity to constrain vertical
deformations so that the track shall,
under maximum load, remain in
compliance with the track performance
and geometry requirements of this part.
(b) Track shall have sufficient lateral
strength to withstand the maximum
thermal and vehicle loads generated at
maximum permissible trainset speeds,
cant deficiencies and lateral alignment
limitations. For purposes of this section
lateral track strength is defined as the
track capacity to constrain lateral
deformations so that track shall, under
maximum load, remain in compliance
with the track performance and
geometry requirements of this part.
§ 299.319
Track fixation and support.
(a) Crossties, if used shall be of
concrete or composite construction,
unless otherwise approved by FRA
under § 299.15, for all tracks over which
trainsets run in revenue service.
(b) Each 25 m (82 feet) segment of
track that contains crossties shall have—
(1) A sufficient number of crossties to
provide effective support that will—
(i) Hold gauge within limits
prescribed in § 299.311;
(ii) Maintain surface within the limits
prescribed in § 299.311;
(iii) Maintain alignment within the
limits prescribed in § 299.311; and
(iv) Maintain longitudinal rail
restraint.
(2) The minimum number and type of
crossties specified in paragraph (b)(4) of
this section and described in paragraph
(c) or (d) of this section, as applicable,
effectively distributed to support the
entire segment;
(3) At least one non-defective crosstie
of the type specified in paragraphs (c)
and (d) of this section that is located at
a joint location as specified in paragraph
(e) of this section; and
(4) The minimum number of crossties
as indicated in the following table:
E:\FR\FM\03NOR2.SGM
03NOR2
ER03NO20.000
69744
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
69745
TABLE 1 TO PARAGRAPH (b)(4)
Non-ballasted
bridge
Track class
Other than on non-ballasted bridge & turnout
H0 .................................................................................
H1 .................................................................................
H2 .................................................................................
H3 .................................................................................
H4–H7 ...........................................................................
20 ..................................................................................
28 ..................................................................................
31, unless inside a TMF, then 28 ................................
35 ..................................................................................
39 ..................................................................................
Turnout
26
36
36
40
45
24
33
33
37
41
(c) Crossties, other than concrete,
counted to satisfy the requirements set
forth in paragraph (b)(4) of this section
shall not be—
(1) Broken through;
(2) Split or otherwise impaired to the
extent the crossties will allow the
ballast to work through, or will not hold
spikes or rail fasteners;
(3) Deteriorated so that the tie plate or
base of rail can move laterally 9.5 mm
(3⁄8 inch) relative to the crossties;
(4) Cut by the tie plate through more
than 40 percent of a crosstie’s thickness;
(5) Configured with less than 2 rail
holding spikes or fasteners per tie plate;
or
(6) Unable, due to insufficient fastener
toeload, to maintain longitudinal
restraint and maintain rail hold down
and gauge.
(d) Concrete crossties counted to
satisfy the requirements set forth in
paragraph (b)(4) of this section shall not
be—
(1) Broken through or deteriorated to
the extent that prestressing material is
visible;
(2) Deteriorated or broken off in the
vicinity of the shoulder or insert so that
the fastener assembly can either pull out
or move laterally more than 9.5 mm (3⁄8
inch) relative to the crosstie;
(3) Deteriorated such that the base of
either rail can move laterally more than
9.5 mm (3⁄8 inch) relative to the crosstie;
(4) Deteriorated so that rail seat
abrasion is sufficiently deep so as to
cause loss of rail fastener toeload;
(5) Deteriorated such that the
crosstie’s fastening or anchoring system
is unable to maintain longitudinal rail
restraint, or maintain rail hold down, or
maintain gauge due to insufficient
fastener toeload; or
(6) Configured with less than two
fasteners on the same rail.
(2) Each rail joint in Classes H2 and
H3 track shall be supported by at least
one crosstie specified in paragraphs (c)
and (d) of this section whose centerline
is within 0.92 m (36.2 inches) as shown
in Figure 2 to this paragraph.
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
PO 00000
Frm 00047
Fmt 4701
Sfmt 4700
(e) Classes H0 and H1 track shall have
one crosstie whose centerline is within
0.61 m (24 inches) of each rail joint
(end) location. Classes H2 and H3 track
shall have one crosstie whose centerline
is within 0.46 m (18 inches) of each rail
joint (end) location. Classes H4–H7
track shall have one crosstie whose
centerline is within 0.32 m (12.6 inches)
of each rail joint (end) location. The
relative position of these crossties is
described in the following three
diagrams:
(1) Each rail joint in Classes H0 and
H1 track shall be supported by at least
one crosstie specified in paragraphs (c)
and (d) of this section whose centerline
is within 1.22 m (48 inches) as shown
in Figure 1 to this paragraph.
E:\FR\FM\03NOR2.SGM
03NOR2
ER03NO20.001
khammond on DSKJM1Z7X2PROD with RULES2
Minimum number of non-defective crossties
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
(3) Each rail joint in Classes H4–H7
track shall be supported by at least one
crosstie specified in paragraphs (c) and
(d) of this section whose centerline is
within 0.64 m (25.2 inches) as shown in
Figure 3 to this paragraph.
(f) In Class H3 track there shall be at
least two non-defective ties each side of
a defective tie.
(g) In Classes H4 to H7 track and at
any expansion joints there shall be at
least three non-defective ties each side
of a defective tie.
(h) Defective ties shall be replaced in
accordance with the railroad’s
inspection, testing, and maintenance
program.
(i) Track shall be fastened by a system
of components that effectively
maintains gauge within the limits
prescribed in § 299.311. Each
component of each such system shall be
evaluated to determine whether gauge is
effectively being maintained.
(j) For track constructed without
crossties, such as slab track and track
connected directly to bridge structural
components, track over servicing pits,
etc., the track structure shall be
sufficient to maintain the geometry
limits specified in § 299.311.
inspection, testing, and maintenance
program shall include identification of
rail defect types, definition of the
inspection criteria, time required for
verification and the corresponding
remedial action.
(b) When the railroad learns that a rail
in that track contains any of the defects
listed in the railroad’s inspection,
testing, and maintenance program, a
person designated under § 299.353 or
§ 299.355 shall determine whether the
track may continue in use. If the
designated person determines that the
track may continue in use, operation
over the defective rail is not permitted
until—
(1) The rail is replaced or repaired; or
(2) The remedial action prescribed in
the inspection, testing, and maintenance
program is initiated.
initial CWR plan shall be filed 60 days
prior to installation of any CWR track.
The effective date of the plan is the date
the plan is filed with FRA.
(c) The railroad’s existing plan shall
remain in effect until the railroad’s new
plan is developed and filed with FRA.
Defective rails.
(a) The railroad’s inspection, testing,
and maintenance program shall include
a description of defective rails
consistent with the practice on the
Tokaido Shinkansen system. The
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
Continuous welded rail (CWR)
(a) The railroad shall have in effect
and comply with a plan that contains
written procedures which address: The
installation, adjustment, maintenance,
and inspection of CWR; and inspection
of CWR joints.
(b) The railroad shall file its CWR
plan with FRA pursuant to § 299.9. The
PO 00000
Frm 00048
Fmt 4701
Sfmt 4700
Continuous welded rail (CWR);
The railroad shall comply with the
contents of the CWR plan developed
under § 299.323. The plan shall contain
the following elements—
(a) Procedures for the installation and
adjustment of CWR which include—
(1) Designation of a desired rail
installation temperature range for the
geographic area in which the CWR is
located;
(2) De-stressing procedures/methods
which address proper attainment of the
desired rail installation temperature
range when adjusting CWR; and
(3) Glued insulated or expansion joint
installation and maintenance
procedures.
(b) Rail anchoring, if used, or
fastening requirements that will provide
sufficient restraint to limit longitudinal
rail and crosstie movement to the extent
practical, and that specifically address
E:\FR\FM\03NOR2.SGM
03NOR2
ER03NO20.003
§ 299.321
§ 299.323
plan.
§ 299.325
general.
ER03NO20.002
khammond on DSKJM1Z7X2PROD with RULES2
69746
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
CWR rail anchoring or fastening
patterns on bridges, bridge approaches,
and at other locations where possible
longitudinal rail and crosstie movement
associated with normally expected
trainset-induced forces—is restricted.
(c) CWR joint installation and
maintenance procedures.
(d) Procedures which specifically
address maintaining a desired rail
installation temperature range when
cutting CWR including rail repairs, intrack welding, and in conjunction with
adjustments made in the area of tight
track, a track buckle, or a pull-apart.
(e) Procedures which control trainset
speed on CWR track when—
(1) Maintenance work, track
rehabilitation, track construction, or any
other event occurs which disturbs the
roadbed or ballast section and reduces
the lateral or longitudinal resistance of
the track; and
(2) The difference between the rail
temperature and the rail neutral
temperature is in a range that causes
buckling-prone conditions to be present
at a specific location.
(f) Procedures which prescribe when
and where physical track inspections
are to be performed under extreme
temperature conditions.
(g) Scheduling and procedures for
inspections to detect cracks and other
indications of potential failures in CWR
joints.
(h) The railroad shall have in effect a
comprehensive training program for the
application of these written CWR
procedures, with provisions for periodic
retraining for those individuals
designated as qualified in accordance
with this subpart to supervise the
installation, adjustment, and
maintenance of CWR track and to
perform inspections of CWR track.
69747
(i) The plan shall prescribe and
require compliance with recordkeeping
requirements necessary to provide an
adequate history of track constructed
with CWR. At a minimum, these records
shall include—
(1) The rail laying temperature,
location, and date of CWR installations.
Each record shall be retained until the
rail neutral temperature has been
adjusted; and
(2) A record of any CWR installation
or maintenance work that does not
conform to the written procedures. Such
record must include the location of the
rail and be maintained until the CWR is
brought into conformance with such
procedures.
§ 299.327
Rail end mismatch.
Any mismatch of rails at joints may
not be more than that prescribed by the
following table:
TABLE 1 TO § 299.327
Any mismatch of rails at joints may
not be more than the following:
Track class
On the tread of
the rail ends
(mm)
H0 ................................................................................................................................................................
H1–H2 ..........................................................................................................................................................
H3–H7 ..........................................................................................................................................................
khammond on DSKJM1Z7X2PROD with RULES2
§ 299.329
Rail joints and torch cut rails.
(a) Each rail joint, insulated joint,
expansion joint, and compromise joint
shall be of a structurally sound design
and appropriate dimensions for the rail
on which it is applied.
(b) If a joint bar is cracked, broken, or
permits excessive vertical movement of
either rail when all bolts are tight, it
shall be replaced.
(c) Except for glued-insulated joints,
each joint bar shall be held in position
by track bolts tightened to allow the
joint bar to firmly support the abutting
rail ends. For track Classes H0 to H3
track bolts shall be tightened, as
required, to allow longitudinal
movement of the rail in the joint to
accommodate expansion and
contraction due to temperature
variations.
(d) Except as provided in paragraph
(e) of this section, each rail shall be
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
bolted with at least two bolts at each
joint.
(e) Clamped joint bars may be used for
temporary repair during emergency
situations, and speed over that rail end
and the time required to replace the
joint bar must not exceed the limits
specified in the inspection, testing, and
maintenance program.
(f) No rail shall have a bolt hole which
is torch cut or burned.
(g) No joint bar shall be reconfigured
by torch cutting.
(h) No rail having a torch cut or flame
cut end may be used.
§ 299.331 Turnouts and crossings
generally.
(a) In turnouts and track crossings, the
fastenings shall be intact and
maintained to keep the components
securely in place. Also, each switch,
frog, and guard rail shall be kept free of
PO 00000
Frm 00049
Fmt 4701
Sfmt 4700
On the gauge side
of the rail ends
(mm)
6
4
2
5
4
2
obstructions that may interfere with the
passage of wheels. Use of rigid rail
crossings at grade is limited to track
Classes H0, H1, and H2.
(b) The track through and on each
side of track crossings and turnouts
shall be designed to restrain rail
movement affecting the position of
switch points and frogs.
(c) Each flangeway at turnouts shall
be at least 39 mm (1.5 inches) wide.
(d) For all turnouts and track
crossings, the railroad shall prepare
inspection and maintenance
requirements to be included in the
railroad’s inspection, testing, and
maintenance program.
§ 299.333 Frog guard rails and guard
faces; gauge.
The guard check and guard face gages
in frogs shall be within the limits
prescribed in the following table:
E:\FR\FM\03NOR2.SGM
03NOR2
69748
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
TABLE 1 TO § 299.333
Track class
Guard check gage
The distance between the gauge line of a frog
to the guard line 1 of its guard rail or guarding
face, measured across the track at right
angles to the gauge line,2 may not be less
than—
Guard face gage
The distance between the guard lines,1
measured across the track at right angles to
the gauge line,2 may not be more than—
H0–H7 ................................................................
1,393 mm .........................................................
1,358 mm.
1A
Derails.
(a) Derails shall be installed at
locations where maintenance-of-way
equipment can access track other than
Class H0, in a configuration intended to
derail the un-controlled equipment
away from the mainline and at a
distance from the point of intersection
with the mainline that will not foul the
dynamic envelope of the mainline.
(b) Each derail shall be clearly visible
to railroad personnel operating rail
equipment on the affected track and to
railroad personnel working adjacent to
the affected track. When in a locked
position, a derail shall be free of any lost
motion that would allow it to be
operated without removal of the lock.
(c) Each derail shall be maintained
and function as intended.
(d) Each derail shall be properly
installed for the rail to which it is
applied.
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
(e) If a track is equipped with a derail
it shall be in the derailing position
except as provided in the railroad’s
operating rules, special instructions, or
changed to permit movement.
§ 299.337 Automated vehicle-based
inspection systems.
(a) A qualifying Track Geometry
Measurement System (TGMS) and a
qualifying Track Acceleration
Measurement System (TAMS) shall be
operated over the route at the following
frequency:
(1) For track Class H3, at least twice
per calendar year with not less than 120
days between inspections; and
(2) For track Classes H4, H5, H6, and
H7, at least twice within any 60-day
period with not less than 12 days
between inspections.
(b) The qualifying TGMS shall meet or
exceed minimum design requirements
which specify that—
PO 00000
Frm 00050
Fmt 4701
Sfmt 4700
(1) Track geometry measurements
shall be taken no more than 1 meter (3.3
feet) away from the contact point of
wheels carrying a vertical load of no less
than 4,500 kg (10,000 lb) per wheel;
(2) Track geometry measurements
shall be taken and recorded on a
distance-based sampling interval not
exceeding 0.60 m (2 feet), preferably
0.30 m (1 foot);
(3) Calibration procedures and
parameters are assigned to the system
which assures that measured and
recorded values accurately represent
track conditions. Track geometry
measurements recorded by the system
shall not differ on repeated runs at the
same site at the same speed more than
3 mm (1⁄8 inch); and
(4) The TGMS shall be capable of
measuring and processing the necessary
track geometry parameters to determine
compliance with §§ 299.311 and
299.315.
E:\FR\FM\03NOR2.SGM
03NOR2
ER03NO20.004
khammond on DSKJM1Z7X2PROD with RULES2
§ 299.335
ER03NO20.005
line along that side of the flangeway which is nearer to the center of the track and at the same elevation as the gage line.
2 A line 14 mm (0.55 inches) below the top of the center line of the head of the running rail, or corresponding location of the tread portion of
the track structure.
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
(c) A qualifying TAMS shall be on a
vehicle having dynamic response
characteristics that are representative of
other vehicles assigned to the service
and shall—
(1) Be operated at the revenue speed
profile in accordance with § 299.309;
(2) Be capable of measuring and
processing carbody acceleration
parameters to determine compliance
with Carbody Acceleration Limits per
§ 299.313; and
(3) Monitor lateral and vertical
accelerations of the carbody. The
accelerometers shall be attached to the
carbody on or under the floor of the
vehicle, as near the center of a bogie as
practicable.
(d) The qualifying TGMS and TAMS
shall be capable of producing, within 24
hours of the inspection, output reports
that—
(1) Provide a continuous plot, on a
constant-distance axis, of all measured
track geometry and carbody acceleration
parameters required in paragraph (b)
and (c) of this section;
(2) Provide an exception report
containing a systematic listing of all
track geometry and all acceleration
conditions which constitute an
exception to the class of track over the
segment surveyed.
(e) The output reports required under
paragraph (d) of this section shall
contain sufficient location identification
information which enables field
personnel to easily locate indicated
exceptions.
(f) Following a track inspection
performed by a qualifying TGMS or
TAMS, the railroad shall, institute
remedial action for all exceptions to the
class of track in accordance with the
railroad’s inspection, testing, and
maintenance program.
(g) The railroad shall maintain for a
period of one year following an
inspection performed by a qualifying
TGMS and TAMS, a copy of the plot
and the exception report for the track
segment involved, and additional
records which—
(1) Specify the date the inspection
was made and the track segment
involved; and,
(2) Specify the location, remedial
action taken, and the date thereof, for all
listed exceptions to the class.
khammond on DSKJM1Z7X2PROD with RULES2
§ 299.339
Daily sweeper inspection.
A sweeper vehicle shall be operated
each morning after the overnight
maintenance over all tracks except track
Class H2 in stations, prior to
commencing revenue service over that
track. The sweeper vehicle shall operate
at a speed no greater than 120 km/h (75
mph) to conduct a visual inspection to
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
ensure the right-of-way is clear of
obstacles within the clearance envelope
and to identify conditions that could
cause accidents, and shall have a
minimum clearance of no less than 35
mm above top of rail.
§ 299.341
Inspection of rail in service.
(a) Prior to revenue service the
railroad shall submit written procedures
for the inspection of rails in accordance
with the inspection, testing, and
maintenance program.
(b) On track Classes H4 to H7, and H2
within stations, a continuous search for
internal defects shall be made of all rail
within 180 days after initiation of
revenue service and, thereafter, at least
annually, with not less than 240 days
between inspections.
(c) Each defective rail shall be marked
with a highly visible marking on both
sides of the rail.
(d) Inspection equipment shall be
capable of detecting defects between
joint bars and within the area enclosed
by joint bars.
(e) If the person assigned to operate
the rail defect detection equipment
being used determines that, due to rail
surface conditions, a valid search for
internal defects could not be made over
a particular length of track, the test on
that particular length of track cannot be
considered as a search for internal
defects under this section.
(f) When the railroad learns, through
inspection or otherwise, that a rail in
that track contains any of the defects in
accordance with § 299.321, a qualified
individual designated under § 299.353
or § 299.355 shall determine whether or
not the track may continue in use. If the
qualified individual so designated
determines that the track may continue
in use, operation over the defective rail
is not permitted until—
(1) The rail is replaced; or
(2) The remedial action as prescribed
in § 299.321 has been taken.
(g) The person assigned to operate the
rail defect detection equipment must be
a qualified operator as defined in this
subpart and have demonstrated
proficiency in the rail flaw detection
process for each type of equipment the
operator is assigned.
§ 299.343
welds.
Initial inspection of new rail and
(a) The railroad shall provide for the
initial inspection of newly
manufactured rail, and for initial
inspection of new welds made in either
new or used rail. The railroad may
demonstrate compliance with this
section by providing for—
(1) Mill inspection. A continuous
inspection at the rail manufacturer’s
PO 00000
Frm 00051
Fmt 4701
Sfmt 4700
69749
mill shall constitute compliance with
the requirement for initial inspection of
new rail, provided that the inspection
equipment meets the applicable
requirements as specified under the
railroad’s inspection, testing, and
maintenance program and § 299.321.
The railroad shall obtain a copy of the
manufacturer’s report of inspection and
retain it as a record until the rail
receives its first scheduled inspection
under § 299.341;
(2) Welding plant inspection. A
continuous inspection at a welding
plant, if conducted in accordance with
the provisions of paragraph (a)(1) of this
section, and accompanied by a plant
operator’s report of inspection which is
retained as a record by the railroad,
shall constitute compliance with the
requirements for initial inspection of
new rail and plant welds, or of new
plant welds made in used rail; and
(3) Inspection of field welds. Initial
inspection of new field welds, either
those joining the ends of CWR strings or
those made for isolated repairs, shall be
conducted before the start of revenue
service in accordance with the railroad’s
inspection, testing, and maintenance
program. The initial inspection may be
conducted by means of portable test
equipment. The railroad shall retain a
record of such inspections until the
welds receive their first scheduled
inspection under § 299.341.
(b) Each defective rail found during
inspections conducted under paragraph
(a)(3) of this section shall be marked
with highly visible markings on both
sides of the rail and the appropriate
remedial action as set forth in § 299.341
will apply.
§ 299.345
Visual inspections; right of way.
(a) General. All track shall be visually
inspected in accordance with the
schedule prescribed in paragraph (c) of
this section by an individual qualified
under this subpart. The visual
inspection shall be conducted in
accordance with the requirements set
forth in the inspection, testing, and
maintenance program under subpart G
of this part.
(b) Inspection types and frequency—
(1) Safe walkway inspection. Except for
track located inside trainset
maintenance facilities and MOW yards
and the associated portions of the rightof-way, the right-of-way and all track
shall be inspected from the safe
walkway during daytime hours, in
accordance with the following
conditions:
(i) Ballasted track shall be inspected
at least once every two weeks, with a
minimum of six calendar days in
between inspections.
E:\FR\FM\03NOR2.SGM
03NOR2
khammond on DSKJM1Z7X2PROD with RULES2
69750
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
(ii) Non-ballasted track shall be
inspected at least once every four
weeks, with a minimum of twelve
calendar days in between inspections.
(iii) No two consecutive visual
inspections from the safe walkway shall
be performed from the same safe
walkway. Safe walkway inspections
shall alternate between safe walkways
on each side of the right-of-way.
(iv) In stations, the safe walkway
inspection may be performed from
either the safe walkway or the station
platform.
(v) An additional on-track visual
inspection conducted during
maintenance hours under paragraph
(b)(2) of this section performed in place
of a visual inspection from the safe
walkway under paragraph (b)(1) of this
section will satisfy the visual inspection
requirement of paragraph (b)(1) of this
section. However, a safe walkway visual
inspection performed under paragraph
(b)(1) of this section cannot replace an
on-track visual inspection conducted
during maintenance hours under
paragraph (b)(2) of this section.
(vi) Except for paragraph (b)(1)(v) of
this section, inspections performed
under paragraph (b)(1) of this section
shall not occur during the same week as
inspections performed under paragraph
(b)(2) of this section.
(vii) In the event a safe walkway
visual inspection is not possible on a
given day due to extreme weather, the
inspection may be conducted from the
cab of a trainset or as an on-track visual
inspection on that day in accordance
with the inspection, testing, and
maintenance program.
(2) On-track inspections; other than
trainset maintenance facilities and
MOW yards. Except for track located
inside trainset maintenance facilities
and MOW yards and the associated
portions of the right-of-way, on-track
visual inspections, conducted on foot
during maintenance hours, shall be
performed on all track in accordance
with the following conditions:
(i) Ballasted track shall be inspected
at least once every two weeks, with a
minimum of six calendar days in
between inspections.
(ii) Non-ballasted track shall be
inspected at least once every four
weeks, with a minimum of twelve
calendar days in between inspections.
(iii) Turn-outs and track crossings on
ballasted track shall be inspected at
least once a week, with a minimum of
three calendar days in between
inspections.
(iv) Turn-outs and track crossings on
non-ballasted track shall be inspected at
least once every two weeks, with a
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
minimum of six calendar days in
between inspections.
(3) On-track inspections; trainset
maintenance facilities and MOW yards.
For track located inside trainset
maintenance facilities and MOW yards
and the associated portions of the rightof-way, including turn-outs and track
crossings, on-track visual inspections,
conducted on foot, shall be performed
on all track in accordance with the
following conditions:
(i) Ballasted track shall be inspected
at least once during any 60-day period,
with a minimum of twelve calendar
days in between inspections.
(ii) Non-ballasted track shall be
inspected at least once within any 120day period, with a minimum of twentyfour calendar days in between
inspections.
(iii) On-track safety shall be
established in accordance with 49 CFR
part 214 of this chapter, except for 49
CFR 214.339.
(4) Visual inspections from trainset
cab. Visual inspections from trainset cab
shall be performed for the right-of-way
and track for track Class H3 and above,
except for track leading to a trainset
maintenance facility, at least twice
weekly with a minimum of two calendar
days between inspections.
(c) If a deviation from the
requirements of this subpart is found
during the visual inspection, remedial
action shall be initiated immediately in
accordance with the railroad’s
inspection, testing, and maintenance
program required under subpart G of
this part.
§ 299.347
Special inspections.
(a) In the event of fire, flood, severe
storm, temperature extremes, or other
occurrence which might have damaged
track structure, a special inspection
shall be made of the track and right-ofway involved as soon as possible after
the occurrence, prior to the operation of
any trainset over that track.
(b) Should a trainset be between
stations when an event such as those
described in paragraph (a) of this
section occurs, that trainset may
proceed to the next forward station at
restricted speed, in accordance with the
railroad’s operating rules and
inspection, testing, and maintenance
program.
§ 299.349
Inspection records.
(a) The railroad shall keep a record of
each inspection required to be
performed on that track under this
subpart.
(b) Except as provided in paragraph (f)
of this section, each record of an
inspection under §§ 299.325 and
PO 00000
Frm 00052
Fmt 4701
Sfmt 4700
299.345 shall be prepared on the day the
inspection is made and signed by the
person making the inspection.
(c) Records shall specify the track
inspected, date of inspection, location,
and nature of any deviation from the
requirements of this part, name of
qualified individual who made the
inspection, and the remedial action, if
any, taken by the person making the
inspection.
(d) Rail inspection records shall
specify the date of inspection, the
location and nature of any internal
defects found, name of qualified
individual who made the inspection,
the remedial action taken and the date
thereof, and the location of any intervals
of track not tested pursuant to § 299.341
of this part. The railroad shall retain a
rail inspection record for at least two
years after the inspection and for one
year after remedial action is taken.
(e) The railroad shall make inspection
records required by this section
available for inspection and copying by
the FRA.
(f) For purposes of compliance with
the requirements of this section, the
railroad may maintain and transfer
records through electronic transmission,
storage, and retrieval provided that—
(1) The electronic system is compliant
with the requirements of § 299.11;
(2) The electronic storage of each
record shall be initiated by the person
making the inspection within 24 hours
following the completion of that
inspection; and
(3) Track inspection records shall be
kept available to persons who
performed the inspection and to persons
performing subsequent inspections.
(g) Each track/vehicle performance
record required under § 299.337 shall be
made available for inspection and
copying by the FRA.
§ 299.351 Qualifications for track
maintenance and inspection personnel.
(a) General. The railroad shall
designate qualified individuals
responsible for the maintenance and
inspection of track in compliance with
the safety requirements prescribed in
this subpart. Each designated
individual, including contractors and
their employees, must meet the
minimum qualifications set forth in this
subpart.
(b) Recordkeeping. In addition to the
requirements contained in § 243.203 of
this chapter, the railroad shall also
maintain, with respect to the
designation of individuals under this
subpart, the track inspection records
made by each individual as required by
§ 299.349.
E:\FR\FM\03NOR2.SGM
03NOR2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
§ 299.353 Personnel qualified to supervise
track restoration and renewal.
Each individual designated to
supervise restorations and renewals of
track, shall have—
(a) Successfully completed a course
offered by the employer or by a college
level engineering program,
supplemented by special on-the-job
training emphasizing the techniques to
be employed in the supervision,
restoration, and renewal of high-speed
track;
(b) Demonstrated to the railroad, at
least once per calendar year, that the
individual—
(1) Knows and understands the
requirements of this subpart that apply
to the restoration and renewal of the
track for which he or she is responsible;
(2) Can detect deviations from those
requirements; and
(3) Can prescribe appropriate
remedial action to correct or safely
compensate for those deviations.
(c) Written authorization from the
railroad or the employer to prescribe
remedial actions to correct or safely
compensate for deviations from the
requirements of this subpart and shall
have successfully completed a recorded
examination on this subpart as part of
the qualification process.
khammond on DSKJM1Z7X2PROD with RULES2
§ 299.355
track.
Personnel qualified to inspect
Each individual designated to inspect
track for defects, shall have—
(a) Successfully completed a course
offered by the railroad or by a college
level engineering program,
supplemented by special on-the-job
training emphasizing the techniques to
be employed in the inspection of highspeed track;
(b) Demonstrated to the railroad, at
least once per calendar year, that the
individual—
(1) Knows and understands the
requirements of this subpart that apply
to the inspection of the track for which
he or she is responsible;
(2) Can detect deviations from those
requirements; and
(3) Can prescribe appropriate
remedial action to correct or safely
compensate for those deviations.
(c) Written authorization from the
railroad or the employer to prescribe
remedial actions to correct or safely
compensate for deviations from the
requirements in this subpart and shall
have successfully completed a recorded
examination on this subpart as part of
the qualification process.
continuous welded rail (CWR) or
supervise the installation, adjustment,
and maintenance of CWR in accordance
with the written procedures established
by the railroad shall have—
(a) Current qualifications under either
§ 299.353 or 299.355;
(b) Successfully completed a training
course of at least eight hours duration
specifically developed for the
application of written CWR procedures
issued by the railroad;
(c) Demonstrated to the railroad that
the individual—
(1) Knows and understands the
requirements of those written CWR
procedures;
(2) Can detect deviations from those
requirements; and
(3) Can prescribe appropriate
remedial action to correct or
compensate for those deviations safely.
(d) Written authorization from the
railroad or the employer to prescribe
remedial actions to correct or safely
compensate for deviations from the
requirements in those procedures and
must have successfully completed a
recorded examination on those
procedures as part of the qualification
process. The recorded examination may
be written, or in the form of a computer
file with the results of an interactive
training course.
Subpart D—Rolling Stock
§ 299.401
Clearance requirements.
(a) General. The rolling stock shall be
designed to meet all applicable
clearance requirements of the railroad.
The railroad shall make its clearance
diagrams available to FRA upon request.
(b) Clearance above top of rail. No
part or appliance of a trainset except the
wheels, sander tips, wheel guards, and
other components designed to be in the
path of the wheel (i.e., above the rail
and aligned inside the wheel width
path) may be less than 60 mm (2.36
inches) above the top of rail.
(c) Obstacle deflector. The leading
end of a trainset shall be equipped with
an obstacle deflector that extends across
both rails of the track. The minimum
clearance above the rail of the obstacle
deflector shall be 76 mm (3 inches), and
the maximum clearance shall be 229
mm (9 inches).
(d) Flexible wheel guards. The lead
axle of a trainset shall be equipped with
flexible wheel guards mounted on the
bogie below the primary suspension
with a maximum clearance above the
rail of 15 mm (0.59 inches).
§ 299.357 Personnel qualified to inspect
and restore continuous welded rail.
§ 299.403
Individuals designated under
§ 299.353 or 299.355 that inspect
(a) Occupied volume integrity. To
demonstrate resistance to loss of
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
PO 00000
Trainset structure.
Frm 00053
Fmt 4701
Sfmt 4700
69751
occupied volume, the trainsets shall
comply with both the compression load
requirement in paragraph (b) of this
section and the dynamic collision
requirements in paragraph (c) of this
section.
(b) Compression load requirement.
The end compression load shall be
applied to the vehicle as defined in JIS
E 7105:2006(E) as amended by JIS E
7105:2011(E) (all incorporated by
reference, see § 299.17), with an end
load magnitude no less than 980 kN
(220,300 lbf) without permanent
deformation of the occupied volume.
(c) Dynamic collision scenario. In
addition to the requirements of
paragraph (b) of this section, occupied
volume integrity shall also be
demonstrated for the trainset through an
evaluation of a dynamic collision
scenario in which a moving trainset
impacts a proxy object under the
following conditions:
(1) The initially-moving trainset is
made up of the equipment undergoing
evaluation at its AW0 ready-to-run
weight.
(2) The scenario shall be evaluated on
tangent, level track.
(3) The trainset shall have an initial
velocity of 32 km/h (20 mph) and shall
not be braked.
(4) The proxy object shall have the
following characteristics:
(i) The object shall be a solid circular
cylinder that weighs 6350 kg (14,000
pounds);
(ii) The object shall have a width of
914 mm (36 inches) and a diameter of
1219 mm (48 inches);
(iii) The axis of the cylinder shall be
perpendicular to the direction of
trainset motion and parallel to the
ground; and
(iv) The center of the object shall be
located 762 mm (30 inches) above the
top of the underframe.
(5) Two collision configurations shall
be evaluated.
(i) The center of the object shall be
located 483 mm (19 inches) from the
longitudinal centerline of the trainset;
and
(ii) The center of the object shall be
aligned with the side of the cab car at
the point of maximum width.
(6) The model used to demonstrate
compliance with the dynamic collision
requirements must be validated. Model
validation shall be demonstrated and
submitted to FRA for review and
approval.
(7) As a result of the impact described
in paragraphs (c)(5)(i) and (ii) of this
section—
(i) One of the following two
conditions must be met for the occupied
volume:
E:\FR\FM\03NOR2.SGM
03NOR2
khammond on DSKJM1Z7X2PROD with RULES2
69752
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
(A) There shall be no more than 254
mm (10 inches) of longitudinal
permanent deformation; or
(B) Global vehicle shortening shall not
exceed 1 percent over any 4.6 m (15feet) length of occupied volume.
(ii) Compliance with each of the
following conditions shall also be
demonstrated for the cab after the
impact:
(A) Each seat provided for an
employee regularly assigned to occupy
the cab, and any floor-mounted seat in
the cab, shall maintain a survival space
where there is no intrusion for a
minimum of 305 mm (12 inches) from
each edge of the seat. Walls or other
items originally within this defined
space shall not further intrude more
than 38 mm (1.5 inches) towards the
seat under evaluation.
(B) There shall be a clear exit path for
the occupants of the cab;
(C) The vertical height of the cab
(floor to ceiling) shall not be reduced by
more than 20 percent; and
(D) The operating console shall not
have moved closer to the driver’s seat by
more than 51 mm (2 inches).
(d) Equipment override. (1) Using the
dynamic collision scenarios described
in paragraph (c) of this section, and with
all units in the trainset positioned at
their nominal running heights, the anticlimbing performance shall be evaluated
for each of the following sets of initial
conditions:
(2) For the initial conditions specified
in paragraphs (c)(1) through (3) of this
section, compliance with the following
conditions shall be demonstrated after a
dynamic impact:
(i) The relative difference in elevation
between the underframes of the
connected equipment shall not change
by more than 102 mm (4 inches); and
(ii) The tread of any wheel of the
trainset shall not rise above the top of
rail by more than 102 mm (4 inches).
(e) Roof and side structure integrity.
To demonstrate roof and side structure
integrity, each passenger car shall
comply with the following:
(1) Rollover strength. (i) Each
passenger car shall be designed to rest
on its side and be uniformly supported
at the top and bottom cords of the
vehicle side. The allowable stress in the
structural members of the occupied
volumes for this condition shall be onehalf yield or one-half the critical
buckling stress, whichever is less. Local
yielding to the outer skin of the
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
passenger car is allowed provided that
the resulting deformations in no way
intrude upon the occupied volume of
the car.
(ii) Each passenger car shall also be
designed to rest on its roof so that any
damage in occupied areas is limited to
roof extrusions. Other than roof
extrusions, the allowable stress in the
structural members of the occupied
volumes for this condition shall be onehalf yield or one-half the critical
buckling stress, whichever is less. Local
yielding to the outer skin, including the
floor structure, of the car is allowed
provided that the resulting deformations
in no way intrude upon the occupied
volume of the car. Deformation to the
roof extrusions is allowed to the extent
necessary to permit the vehicle to be
supported directly on the top chords of
the sides and ends.
(2) Side structure. (i) The sum of the
section moduli about a longitudinal
axis, taken at the weakest horizontal
section between the side sill and roof,
of the extrusions on each side of the car
located between the inside edge of the
doors shall be not less than 3.95 x 105
mm3 (24.1 in3).
(ii) The sum of the section moduli
about a transverse axis, taken at the
weakest horizontal section on each side
of the car located between body corners
shall be not less than 2.64 x 105 mm3
(16.1 in3).
(iii) The minimum section moduli or
thicknesses specified in paragraph
(f)(2)(i) of this section shall be adjusted
in proportion to the ratio of the yield
strength of the material used to a value
of 172 MPa (25 ksi).
(iv) The combined thickness of the
skin of the side structure extrusions
shall not be less than 3 mm (0.125 inch)
nominal thickness. The thicknesses
shall be adjusted in proportion to the
ratio of the yield strength of the material
used to a value of 172 MPa (25 ksi).
(f) Bogie-to-carbody attachment. (1)
The bogie-to-carbody attachment shall
utilize the service-proven design as used
on the N700.
(2) The bogie shall be securely
attached to the carbody and designed to
operate without failure under the
operating conditions of the railroad,
including expected mechanical shocks
and vibrations.
§ 299.405
Trainset interiors.
(a) Interior fittings. Interior fittings of
trainsets shall be—
PO 00000
Frm 00054
Fmt 4701
Sfmt 4700
(1) Securely attached and designed to
operate without failure under the
conditions typically found in passenger
rail equipment including expected
mechanical vibrations, and shock.
(2) To the extent possible, all interior
fittings shall be recessed or flush
mounted. Corners and/or sharp edges
shall be either avoided or padded to
mitigate the consequence of impact with
such surfaces.
(b) Luggage stowage. (1) Luggage
stowage racks shall slope downward in
the outboard direction at a minimum
ratio of 1:8 with respect to a horizontal
plane to provide lateral restraint for
stowed articles.
(2) Luggage stowage compartments
shall provide longitudinal restraint for
stowed articles.
§ 299.407
Glazing.
(a) General. The railroad shall install
glazing systems compliant with the
requirements defined in this section.
(b) Trainset glazing; end-facing. (1)
Each end-facing exterior window of the
trainset shall comply with the
requirements for large object and
ballistic impact scenarios as defined in
this section.
(2) Each end-facing exterior window
of the trainset shall demonstrate
compliance with the following
requirements for the large object impact
test.
(i) The glazing article shall be
impacted with a cylindrical projectile
that complies with the following design
specifications as depicted in Figure 1 to
paragraph (b)(2)(i)(D) of this section:
(A) The projectile shall be constructed
of aluminum alloy such as ISO 6362–
2:1990, grade 2017A, or its
demonstrated equivalent;
(B) The projectile end cap shall be
made of steel;
(C) The projectile assembly shall
weigh 1 kilogram (kg) (¥0, +0.020 kg)
or 2.2 lbs (¥0, +0.044 lbs) and shall
have a hemispherical tip. Material may
be removed from the interior of the
aluminum portion to adjust the
projectile mass according to the
prescribed tolerance. The hemispherical
tip shall have a milled surface with 1
mm (0.04 inches) grooves; and
(D) The projectile shall have an
overall diameter of 94 mm (3.7 inches)
with a nominal internal diameter of 70
mm (2.76 inches).
E:\FR\FM\03NOR2.SGM
03NOR2
(ii) The test of the glazing article shall
be deemed satisfactory if the test
projectile does not penetrate the glazing
article, the glazing article remains in its
frame, and the witness plate is not
marked by spall.
(iii) A new projectile shall be used for
each test.
(iv) The glazing article to be tested
shall be that which has the smallest area
for each design type. For the test, the
glazing article shall be fixed in a frame
of the same construction as that
mounted on the vehicle.
(v) A minimum of four tests shall be
conducted and all must be deemed
satisfactory. Two tests shall be
conducted with the complete glazing
article at 0 °C ± 0.5 °C (32 °F ± 0.9 °F) and
two tests shall be conducted with the
complete glazing article at 20 °C ± 5 °C
(68 °F ± 9 °F). For the tests to be valid
it shall be demonstrated that the core
temperature of the complete glazing
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
article during each test is within the
required temperature range.
(vi) The test glazing article shall be
mounted at the same angle relative to
the projectile path as it will be to the
direction of travel when mounted on the
vehicle.
(vii) The projectile’s impact velocity
shall equal the maximum operating
speed of the trainset plus 160 km/h (100
mph). The projectile velocity shall be
measured within 4 m (13 feet) of the
point of impact.
(viii) The point of impact shall be at
the geometrical center of the glazing
article.
(3) Representative samples for large
object impact testing of large end-facing
cab glazing articles may be used, instead
of the actual design size provided that
the following conditions are met:
(i) Testing of glazing articles having
dimensions greater than 1,000 mm by
700 mm (39.4 by 27.6 inches), excluding
PO 00000
Frm 00055
Fmt 4701
Sfmt 4700
69753
framing, may be performed using a flat
sample having the same composition as
the glazing article for which compliance
is to be demonstrated. The glazing
manufacturer shall provide
documentation containing its technical
justification that testing a flat sample is
sufficient to verify compliance of the
glazing article with the requirements of
this paragraph.
(ii) Flat sample testing is permitted
only if no surface of the full-size glazing
article contains curvature whose radius
is less than 2,500 mm (98 inches); and
when a complete, finished, glazing
article is laid (convex side uppermost)
on a flat horizontal surface, the distance,
(measured perpendicularly to the flat
surface) between the flat surface and the
inside face of the glazing article is not
greater than 200 mm (8 inches).
(4) End-facing glazing shall
demonstrate sufficient resistance to
spalling, as verified by the large impact
E:\FR\FM\03NOR2.SGM
03NOR2
ER03NO20.006
khammond on DSKJM1Z7X2PROD with RULES2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
khammond on DSKJM1Z7X2PROD with RULES2
69754
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
projectile test under the following
conditions:
(i) An annealed aluminum witness
plate of maximum thickness 0.15 mm
(0.006 inches) and of dimension 500
mm by 500 mm (19.7 by 19.7 inches) is
placed vertically behind the sample
under test, at a horizontal distance of
500 mm (19.7 inches) from the point of
impact in the direction of travel of the
projectile or the distance between the
point of impact of the projectile and the
location of the driver’s eyes in the
driver’s normal operating position,
whichever is less. The center of the
witness plate is aligned with the point
of impact.
(ii) Spalling performance shall be
deemed satisfactory if the aluminum
witness plate is not marked.
(iii) For the purposes of this part,
materials used specifically to protect the
cab occupants from spall (i.e., spall
shields) shall not be required to meet
the flammability and smoke emission
performance requirements of § 299.413.
(5) Each end-facing exterior window
in a cab shall, at a minimum, provide
ballistic penetration resistance that
meets the requirements of appendix A
to part 223 of this chapter.
(c) Trainset glazing; side-facing.
Except as provided in paragraph (d) of
this section, each side-facing exterior
window in a trainset shall comply with
the requirements for Type II glazing as
defined in part 223 of this chapter or
other alternative standard approved by
FRA.
(d) Side-facing breakable glazing. A
side-facing exterior window intended to
be breakable and serve as an emergency
egress window may comply with an
alternative standard approved for use by
FRA under § 299.15.
(e) Certification of Glazing Materials.
Glazing materials shall be certified in
accordance with the following
procedures:
(1) Each manufacturer that provides
glazing materials, intended by the
manufacturer for use in achieving
compliance with the requirements of
this subpart, shall certify that each type
of glazing material being supplied for
this purpose has been successfully
tested in accordance with this section
and that test verification data are
available to the railroad or to FRA upon
request.
(2) Tests performed on glazing
materials for compliance with this part
shall be conducted by either—
(i) An independent third party (lab,
facility, underwriter); or
(ii) The glazing manufacturer,
providing FRA with the opportunity to
witness all tests by written notice, a
minimum of 30 days prior to testing.
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
(3) Any glazing material certified to
meet the requirements of this part shall
be re-certified if any change is made to
the glazing that may affect its
mechanical properties or its mounting
arrangement on the vehicle.
(4) All certification/re-certification
documentation shall be made available
to FRA upon request. The test
verification data shall contain all
pertinent original data logs and
documentation that the selection of
material samples, test set-ups, test
measuring devices, and test procedures
were performed by qualified individuals
using recognized and acceptable
practices and in accordance with this
section.
(5) Glazing shall be marked in the
following manner:
(i) Each end-facing exterior window
in a cab shall be permanently marked,
prior to installation, in such a manner
that the marking is clearly visible after
the material has been installed. The
marking shall include:
(A) The words ‘‘FRA TYPE IHS’’ to
indicate that the material meets the
requirements specified in paragraph (b)
of this section;
(B) The manufacturer of the material;
and
(C) The type or brand identification of
the material.
(ii) Each side-facing exterior window
in a trainset shall be permanently
marked, prior to installation, in such a
manner that the marking is clearly
visible after the material has been
installed. The marking shall include:
(A) The words ‘‘FRA TYPE II’’ to
indicate that the material meets the
requirements specified in paragraph (c)
of this section;
(B) The manufacturer of the material;
and
(C) The type or brand identification of
the material.
(f) Glazing securement. Each exterior
window shall remain in place when
subjected to—
(1) The forces due to air pressure
differences caused when two trainsets
pass at the minimum separation for two
adjacent tracks, while traveling in
opposite directions, each trainset
traveling at the maximum approved
trainset speed in accordance with
§ 299.609(g); and
(2) The impact forces that the exterior
window is required to resist as specified
in this section.
§ 299.409
Brake system.
(a) General. The railroad shall
demonstrate through analysis and
testing the maximum safe operating
speed for its trainsets that results in no
thermal damage to equipment or
PO 00000
Frm 00056
Fmt 4701
Sfmt 4700
infrastructure during normal operation
of the brake system.
(b) Minimum performance
requirement for brake system. Each
trainset’s brake system, under the worstcase adhesion conditions as defined by
the railroad, shall be capable of stopping
the trainset from its maximum operating
speed within the signal spacing existing
on the track over which the trainset is
operating.
(c) Urgent brake system. A trainset
shall be provided with an urgent brake
application feature that produces an
irretrievable stop. An urgent brake
application shall be available at any
time, and shall be initiated by an
unintentional parting of the trainset or
by the trainset crew from the conductor
rooms.
(d) Application/release indication.
The brake system shall be designed so
that an inspector may determine
whether the brake system is functioning
properly without being placed in a
dangerous position on, under or
between the equipment. This
determination may be made through
automated monitoring system that
utilizes sensors to verify that the brakes
have been applied and released.
(e) Passenger brake alarm. (1) A
means to initiate a passenger brake
alarm shall be provided at two locations
in each unit of a trainset. The words
‘‘Passenger Brake Alarm’’ shall be
legibly stenciled or marked on each
device or on an adjacent badge plate.
(2) All passenger brake alarms shall be
installed so as to prevent accidental
activation.
(3) When a passenger brake alarm is
activated, it shall initiate an emergency
brake application. The emergency brake
application can be overridden by the
driver so that the trainset can be
stopped at a safe location.
(4) To retrieve the emergency brake
application described in paragraph
(e)(3) of this section, the driver must
activate appropriate controls to issue a
command for brake application as
specified in the railroad’s operating
rules.
(f) Degraded brake system
performance. The following
requirements address degraded brake
system performance on the railroad’s
high-speed trainsets—
(1) Loss of power or failure of
regenerative brake shall not result in
exceeding the allowable stopping
distance as defined by the railroad;
(2) The available friction braking shall
be adequate to stop the trainset safely
under the operating conditions defined
by the railroad;
E:\FR\FM\03NOR2.SGM
03NOR2
khammond on DSKJM1Z7X2PROD with RULES2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
(3) The operational status of the
trainset brake system shall be displayed
for the driver in the operating cab; and
(4) Under § 299.607(b)(5), the railroad
shall demonstrate through analysis and
testing the maximum speed for safely
operating its trainsets using only the
friction brake system with no thermal
damage to equipment or infrastructure.
The analysis and testing shall also
determine the maximum safe operating
speed for various percentages of
operative friction brakes.
(g) Main reservoir system. The main
reservoirs in a trainset shall be designed
and tested to meet the requirements set
forth in JIS B 8265:2010(E)
(incorporated by reference, see
§ 299.17). Reservoirs shall be certified
based on their size and volume
requirements.
(h) Main reservoir tests. Prior to initial
installation, each main reservoir shall be
subjected to a pneumatic or hydrostatic
pressure test based on the maximum
working pressure defined in paragraph
(g) of this section unless otherwise
established by the railroad’s mechanical
officer. Records of the test date,
location, and pressure shall be
maintained by the railroad for the life of
the equipment. Periodic inspection
requirements for main reservoirs shall
be defined in the railroad’s inspection,
testing, and maintenance program
required under § 299.445.
(i) Brake gauges. All mechanical
gauges and all devices providing
electronic indication of air pressure that
are used by the driver to aid in the
control or braking of a trainset shall be
located so that they can be conveniently
read from the driver’s normal position
during operation of the trainset.
(j) Brake application/release. (1) Brake
actuators shall be designed to provide
brake pad clearance when the brakes are
released.
(2) The minimum brake cylinder
pressure shall be established to provide
adequate adjustment from minimum
service to emergency for proper trainset
operation.
(k) Leakage. The method of inspection
for main reservoir pipe and brake
cylinder pipe leakage shall be
prescribed in the railroad’s inspection,
testing, and maintenance program
required by § 299.445.
(l) Slide alarm. (1) A trainset shall be
equipped with an adhesion control
system designed to automatically adjust
the braking force on each wheel to
prevent sliding during braking.
(2) A wheel slide alarm that is visual
or audible, or both, shall alert the driver
in the operating cab to wheel-slide
conditions on any axle of the trainset.
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
(3) Operating restrictions for a trainset
with wheel slide protection devices that
are not functioning as intended shall be
defined by the railroad under its
requirements for movement of defective
equipment required by § 299.447, and
within the railroad’s operating rules, as
appropriate.
(m) Monitoring and diagnostic system.
Each trainset shall be equipped with a
monitoring and diagnostic system that is
designed to assess the functionality of
the brake system for the entire trainset
automatically. Details of the system
operation and the method of
communication of brake system
functionality prior to the dispatch of the
trainset shall be described in detail in
the railroad’s Operating Rules and
inspection, testing, and maintenance
program required by § 299.445.
(n) Trainset securement. Each trainset
shall be equipped with a means of
securing the equipment, independent of
the friction brake, on the grade
condition defined by the railroad. The
railroad’s operating rules shall define
procedures for trainset securement and
the railroad shall demonstrate that these
procedures effectively secure the
equipment in accordance with
§ 299.607(b)(5).
(o) Rescue operation; brake system. A
trainset’s brake system shall be designed
so as to allow a rescue vehicle or
trainset to control its brakes when the
trainset is disabled.
§ 299.411
Bogies and suspension system.
(a) Wheel climb. (1) Suspension
systems shall be designed to reasonably
prevent wheel climb, wheel unloading,
rail rollover, rail shift, and a vehicle
from overturning to ensure safe, stable
performance and ride quality. These
requirements shall be met—
(i) In all operating environments, and
under all track conditions and loading
conditions as determined by the
railroad; and
(ii) At all track speeds and over all
track qualities consistent with the
requirements in subpart C of this part,
up to the maximum trainset speed and
maximum cant deficiency of the
equipment in accordance with
§ 299.609(g).
(2) All passenger equipment shall
meet the safety performance standards
for suspension systems contained in
§ 299.609(h). In particular—
(i) Vehicle/track system qualification.
All trainsets shall demonstrate safe
operation during vehicle/track system
qualification in accordance with
§ 299.609 and is subject to the
requirements of § 299.315.
PO 00000
Frm 00057
Fmt 4701
Sfmt 4700
69755
(ii) Revenue service operation. All
passenger equipment in service is
subject to the requirements of § 299.315.
(b) Lateral accelerations. The trainsets
shall not operate under conditions that
result in a steady-state lateral
acceleration greater than 0.15g, as
measured parallel to the car floor inside
the passenger compartment.
(c) Journal bearing overheat sensors.
Bearing overheat sensors shall be
provided on all journal bearings on each
trainset.
§ 299.413
Fire safety.
(a) General. All materials used in
constructing the interior of the trainset
shall meet the flammability and smoke
emission characteristics and testing
standards contained in appendix B to
part 238 of this chapter. For purposes of
this section, the interior of the trainset
includes walls, floors, ceilings, seats,
doors, windows, electrical conduits, air
ducts, and any other internal
equipment.
(b) Certification. The railroad shall
require certification that a
representative sample of combustible
materials to be—
(1) Used in constructing a passenger
car or a cab, or
(2) Introduced in a passenger car or a
cab, as part of any kind of rebuild,
refurbishment, or overhaul of the car or
cab, has been tested by a recognized
independent testing laboratory and that
the results show the representative
sample complies with the requirements
of paragraph (a) of this section at the
time it was tested.
(c) Fire safety analysis. The railroad
shall ensure that fire safety
considerations and features in the
design of the trainsets reduce the risk of
personal injury caused by fire to an
acceptable level in its operating
environment using a formal safety
methodology. To this end, the railroad
shall complete a written fire safety
analysis for the passenger equipment
being procured. In conducting the
analysis, the railroad shall—
(1) Identify, analyze, and prioritize
the fire hazards inherent in the design
of the equipment.
(2) Take effective steps to design the
equipment and select materials which
help provide sufficient fire resistance to
reasonably ensure adequate time to
detect a fire and safely evacuate the
passengers and crewmembers, if a fire
cannot be prevented. Factors to consider
include potential ignition sources; the
type, quantity, and location of the
materials; and availability of rapid and
safe egress to the exterior of the
equipment under conditions secure
from fire, smoke, and other hazards.
E:\FR\FM\03NOR2.SGM
03NOR2
khammond on DSKJM1Z7X2PROD with RULES2
69756
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
(3) Reasonably ensure that a
ventilation system in the equipment
does not contribute to the lethality of a
fire.
(4) Identify in writing any trainset
component that is a risk of initiating fire
and which requires overheat protection.
An overheat detector shall be installed
in any component when the analysis
determines that an overheat detector is
necessary.
(5) Identify in writing any unoccupied
trainset compartment that contains
equipment or material that poses a fire
hazard, and analyze the benefit
provided by including a fire or smoke
detection system in each compartment
so identified. A fire or smoke detector
shall be installed in any unoccupied
compartment when the analysis
determines that such equipment is
necessary to ensure sufficient time for
the safe evacuation of passengers and
crewmembers from the trainset. For
purposes of this section, an unoccupied
trainset compartment means any part of
the equipment structure that is not
normally occupied during operation of
the trainset, including a closet, baggage
compartment, food pantry, etc.
(6) Determine whether any occupied
or unoccupied space requires a portable
fire extinguisher and, if so, the proper
type and size of the fire extinguisher for
each location. As required by § 239.101
of this chapter, each passenger car is
required to have a minimum of one
portable fire extinguisher. If the analysis
performed indicates that one or more
additional portable fire extinguishers
are needed, such shall be installed.
(7) Analyze the benefit provided by
including a fixed, automatic firesuppression system in any unoccupied
trainset compartment that contains
equipment or material that poses a fire
hazard, and determine the proper type
and size of the automatic firesuppression system for each such
location. A fixed, automatic firesuppression system shall be installed in
any unoccupied compartment when the
analysis determines that such
equipment is practical and necessary to
ensure sufficient time for the safe
evacuation of passengers and
crewmembers from the trainset.
(8) Explain how safety issues are
resolved in the design of the equipment
and selection of materials to reduce the
risk of each fire hazard.
(9) Describe the analysis and testing
necessary to demonstrate that the fire
protection approach taken in the design
of the equipment and selection of
materials meets the fire protection
requirements of this part.
(d) Inspection, testing, and
maintenance. The railroad shall develop
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
and adopt written procedures for the
inspection, testing, and maintenance of
all fire safety systems and fire safety
equipment on the passenger equipment
it operates under § 299.445(b), and
subpart G of this part. The railroad shall
comply with those procedures that it
designates as mandatory for the safety of
the equipment and its occupants.
§ 299.415
Doors.
(a) Each powered, exterior side door
in a vestibule that is partitioned from
the passenger compartment of a trainset
shall have a manual override device that
is—
(1) Capable of releasing the door to
permit it to be opened without power.
(2) Located such that—
(i) Interior access is provided adjacent
to each manual door release mechanism;
and,
(ii) Exterior access is provided on
each side of each car.
(3) Designed and maintained so that a
person may access and operate the
override device readily without
requiring the use of a tool or other
implement.
(4) The railroad may protect a manual
override device used to open a powered,
exterior door with a cover or a screen.
(5) When a manual override device is
activated, door panel friction, including
seals and hangers, shall allow the doors
to be opened or closed manually with as
low a force as practicable.
(6) The emergency release mechanism
shall require manual reset.
(b) Each passenger car shall have a
minimum of one exterior side door per
side. Each such door shall provide a
minimum clear opening with
dimensions of 813 mm (32 inches)
horizontally by 1,850 mm (72.8 inches)
vertically.
(c) Door exits shall be marked, and
instructions provided for their use, as
specified in § 299.423.
(d) All doors intended for access by
emergency responders shall be marked,
and instructions provided for their use,
as specified in § 299.423.
(e) Vestibule doors and other interior
doors intended for passage through a
passenger car.
(1) General. Except for a door
providing access to a control
compartment each powered vestibule
door and any other powered interior
door intended for passage through a
passenger car shall have a manual
override device that conforms with the
requirements of paragraphs (e)(2) and
(3) of this section.
(2) Manual override devices. Each
manual override device shall be:
(i) Capable of releasing the door to
permit it to be opened without power;
PO 00000
Frm 00058
Fmt 4701
Sfmt 4700
(ii) Located adjacent to the door it
controls; and
(iii) Designed and maintained so that
a person may readily access and operate
the override device from each side of
the door without the use of a tool or
other implement.
(3) Marking and instructions. Each
manual override device and each
retention mechanism shall be marked,
and instructions provided for their use,
as specified in § 299.423.
(f) The status of each powered,
exterior side door in a passenger car
shall be displayed to the driver in the
operating cab. Door interlock sensors
shall be provided to detect trainset
motion and shall be nominally set to
operate at 5 km/h.
(g) All powered exterior side
passenger doors shall—
(1) Be equipped with the serviceproven door safety system utilized by
the N700 or an alternate door safety
system designed subject to a Failure
Modes, Effects, Criticality Analysis
(FMECA);
(2) Be designed with an obstruction
detection system capable of detecting a
rigid flat bar, 6.4 mm (1⁄4 inches) wide
and 76 mm (3 inches) high and a rigid
rod, 9.5 mm (3⁄8 inches) in diameter;
(3) Incorporate an obstruction
detection system sufficient to detect
large obstructions;
(4) Be designed so that activation of
a door by-pass feature does not affect
the operation of the obstruction
detection system on all the other doors
on the trainset;
(5) Have the door control station
located in a secured area that is only
accessible to crewmembers or
maintenance personnel;
(6) Be designed such that the door
open or closed circuit is not affected by
the throttle position; and
(7) Use discrete, dedicated trainlines
for door-open and door-close
commands, door-closed summary
circuit, and no motion, if trainlined.
(h) All powered exterior side door
systems in a trainset shall—
(1) Be designed with a door summary
circuit. The door summary circuit shall
be connected or interlocked to prohibit
the trainset from developing tractive
power if an exterior side door in a
passenger car, other than a door under
the direct physical control of a
crewmember for his or her exclusive
use, is not closed;
(2) Be connected to side door status
indicators located on the exterior of
each unit of the trainset;
(3) Be connected to a door summary
status indicator that is readily viewable
to the driver from his or her normal
position in the operating cab;
E:\FR\FM\03NOR2.SGM
03NOR2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
(4) If equipped with a trainset-wide
door by-pass device, be designed so that
the trainset-wide door by-pass functions
only when activated from the operating
cab of the trainset;
(5) Be equipped with a lock (cut-out/
lock-out) mechanism installed at each
door panel to secure a door in the closed
and locked position. When the lock
mechanism is utilized to secure the door
in the closed position, a door-closed
indication shall be provided to the door
summary circuit; and
(6) Be designed such that a crew key
or other secure device be required to
lock-out an exterior side door to prevent
unauthorized use.
(i)(1) Visual inspections and
functional tests. The inspection and
functional tests required for the door
safety system, including the trainsetwide door by-pass verification, shall be
conducted in accordance with the
railroad’s trainset inspection, testing,
and maintenance program in accordance
with § 299.445, and operating rules
under subpart E.
(2) Face-to-face relief. Crewmembers
taking control of a trainset do not need
to perform a visual inspection or a
functional test of the door by-pass
devices in cases of face-to-face relief of
another trainset crew and notification
by that crew as to the functioning of the
door by-pass devices.
(j) The railroad shall maintain a
record of each door by-pass activation
and each unintended opening of a
powered exterior side door, including
any repair(s) made, in the defect
tracking system as required by
§ 299.445(h).
khammond on DSKJM1Z7X2PROD with RULES2
§ 299.417
Emergency lighting.
(a) General. Emergency lighting shall
be provided in each unit of a trainset.
The emergency lighting system shall be
designed to facilitate the ability of
passengers and trainset crew members,
and/or emergency responders to see and
orient themselves, to identify obstacles,
in order to assist them to safely move
through and out of a passenger rail car.
(1) Emergency lighting shall
illuminate the following areas:
(i) Passenger car aisles, passageways,
and toilets;
(ii) Door emergency exit controls/
manual releases;
(iii) Vestibule floor near the door
emergency exits (to facilitate safe
entrance/exit from the door);
(iv) Within the car diaphragm and
adjacent area; and
(v) Specialty car locations such as
crew offices.
(b) Minimum illumination levels. (1)
A minimum, average illumination level
of 10.7 lux (1 foot-candle) measured at
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
floor level adjacent to each exterior door
and each interior door providing access
to an exterior door (such as a door
opening into a vestibule);
(2) A minimum, average illumination
level of 10.7 lux (1 foot-candle)
measured 635 mm (25 inches) above
floor level along the center of each aisle
and passageway;
(3) A minimum illumination level of
1.1 lux (0.1 foot-candle) measured 635
mm (25 inches) above floor level at any
point along the center of each aisle and
passageway;
(c) Lighting activation. Each
emergency lighting fixture shall activate
automatically or be energized
continuously whenever the car is in
revenue service and normal lighting is
not available.
(d) Independent power source.
Emergency lighting system shall have an
independent power source(s) that is
located in or within one half a car
length of each light fixture it powers.
(e) Functional requirements.
Emergency lighting system components
shall be designed to operate without
failure and capable of remaining
attached under the conditions typically
found in passenger rail equipment
including expected mechanical
vibrations, and shock in accordance
with § 299.405(a)(1), as well as comply
with electromagnetic interference
criteria in § 299.435(e).
(1) All emergency lighting system
components shall be capable to operate
in all railcar orientations.
(2) All emergency lighting system
components shall be capable to operate
when normal power is unavailable for
90 minutes without a loss of more than
40% of the minimum illumination
levels specified in paragraph (b) of this
section.
(f) Inspection. (1) The railroad shall
inspect the emergency lighting system
as required by its inspection, testing,
and maintenance program in accordance
with § 299.445.
(2) If batteries are used as
independent power sources, they shall
have automatic self-diagnostic modules
designed to perform discharge tests.
§ 299.419
Emergency communication.
(a) PA (public address) system. Each
passenger car shall be equipped with a
PA system that provides a means for a
trainset crewmember to communicate
by voice to passengers of his or her
trainset in an emergency situation. The
PA system shall also provide a means
for a trainset crewmember to
communicate by voice in an emergency
situation to persons in the immediate
vicinity of his or her trainset (e.g.,
persons on the station platform). The PA
PO 00000
Frm 00059
Fmt 4701
Sfmt 4700
69757
system may be part of the same system
as the intercom system.
(b) Intercom system. Each passenger
car shall be equipped with an intercom
system that provides a means for
passengers and crewmembers to
communicate by voice with each other
in an emergency situation. Except as
further specified, at least one intercom
that is accessible to passengers without
using a tool or other implement shall be
located in each end (half) of each car.
(c) Marking and instructions. The
following requirements apply to all
units of a trainset:
(1) The location of each intercom
intended for passenger use shall be
conspicuously marked with HPPL
material in accordance with § 299.423;
and
(2) Legible and understandable
operating instructions shall be made of
HPPL material in accordance with
§ 299.423 and posted at or near each
such intercom.
(d) Back-up power. PA and intercom
systems shall have a back-up power
system capable of—
(1) Powering each system to allow
intermittent emergency communication
for a minimum period of 90 minutes.
Intermittent communication shall be
considered equivalent to continuous
communication during the last 15
minutes of the 90-minute minimum
period; and
(2) Operating in all equipment
orientations within 90 degrees of
vertical.
(e) Additional requirements. The PA
and intercom systems shall be designed
to operate without failure and remain
attached under the conditions typically
found in passenger rail equipment
including expected mechanical
vibrations, and shock in accordance
with § 299.405(a)(1), as well as comply
with electromagnetic interference
criteria in § 299.435(e).
§ 299.421
Emergency roof access.
(a) Number and dimensions. Each
passenger car shall have a minimum of
two emergency roof access locations,
each providing a minimum opening of
660 mm (26 inches) longitudinally (i.e.,
parallel to the longitudinal axis of the
car) by 610 mm (24 inches) laterally.
(b) Means of access. Emergency roof
access shall be provided by means of a
conspicuously marked structural weak
point in the roof for access by properly
equipped emergency response
personnel.
(c) Location. Emergency roof access
locations shall be situated so that when
a car is on its side—
(1) One emergency access location is
situated as close as practicable within
E:\FR\FM\03NOR2.SGM
03NOR2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
each half of the roof as divided top from
bottom; and
(2) One emergency access location is
situated as close as practicable within
each half of the roof as divided left from
right. (See Figure 1 to this paragraph.)
(d) Obstructions. The ceiling space
below each emergency roof access
location shall be free from wire, cabling,
conduit, and piping. This space shall
also be free of any rigid secondary
structure (e.g., a diffuser or diffuser
support, lighting back fixture, mounted
PA equipment, or luggage rack) where
practicable. It shall be permissible to cut
through interior panels, liners, or other
non-rigid secondary structures after
making the cutout hole in the roof,
provided any such additional cutting
necessary to access the interior of the
vehicle permits a minimum opening of
the dimensions specified in paragraph
(a) of this section to be maintained.
(e) Marking instructions. Each
emergency roof access location shall be
conspicuously marked with
retroreflective material of contrasting
color meeting the minimum
requirements specified in § 299.423.
Legible and understandable instructions
shall be posted at or near each such
location.
trainset crewmembers to make positive
identification of emergency exits.
(1) Each interior emergency exit sign
and emergency exit locator sign shall be
conspicuous (i.e., clearly recognizable/
distinguishable) or become conspicuous
to passengers and trainset crewmembers
immediately and automatically upon
the loss of power for normal lighting,
from a minimum distance of 1.52 m (5
feet).
(2) The signs and markings shall
operate independently of the car’s
normal and emergency lighting systems,
for a minimum of 90 minutes after loss
of all power for normal lighting.
(3) An emergency exit locator sign
shall be located in close proximity of
each emergency exit and shall work in
conjunction with the emergency exit
sign. The location of the sign,
directional arrow(s), or wording shall
guide passengers and trainset
crewmembers to the emergency exit
route.
(c) Rescue access signage/marking
systems. (1) Rescue access signage and
marking systems shall enable emergency
responders to make positive
identification of rescue access points.
(2) Rescue access information for
emergency responders placed on the
exterior of the carbody shall, at a
minimum, consist of the following:
(i) Each door intended for use by
emergency responders for rescue access
shall be identified with emergency
access signs, symbols, or other
conspicuous marking consisting of
retroreflective material that complies
with paragraphs (d) and (e) of this
section.
(ii) Rescue access door control locator
signs/markings and instructions;
(A) Each door intended for use by
emergency responders for rescue access
shall have operating instructions for
opening the door from outside the car
placed on or immediately adjacent to
the door on the carbody. If a power door
does not function with an integral
release mechanism, the instructions
shall indicate the location of the exterior
manual door control.
(B) Each power door intended for use
by emergency responders for rescue
access which has a non-integral release
mechanism located away from the door,
shall have a door control sign/marking
placed at the location of this control that
provides instructions for emergency
operation, either as part of the access
sign/marking or as another sign/
marking.
(C) Each car equipped with manual
doors shall have operating instructions
for opening the door from the exterior,
either as part of the access sign/marking
or as another sign/marking.
(iii) Rescue access window locator
signs/markings and instructions; and
(A) Each rescue access window shall
be identified with a unique
retroreflective and easily recognizable
sign, symbol, or other conspicuous
marking that complies with paragraphs
(d) and (e) of this section.
(B) Signs, symbols, or marking shall
be placed at the bottom of each such
window, on each window, or adjacent
khammond on DSKJM1Z7X2PROD with RULES2
§ 299.423 Markings and instructions for
emergency egress and rescue access.
(a) General. Instructions and markings
shall be provided in each unit of a
trainset in accordance with the
minimum requirements of this section
to provide instructions for passengers
and trainset crewmembers regarding
emergency egress, and rescue access
instructions for emergency responders.
(b) Visual identity and recognition.
Emergency exit signage/marking
systems shall enable passengers and
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
PO 00000
Frm 00060
Fmt 4701
Sfmt 4700
E:\FR\FM\03NOR2.SGM
03NOR2
ER03NO20.007
69758
khammond on DSKJM1Z7X2PROD with RULES2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
to each window, utilizing arrows, where
necessary, to clearly designate rescue
assess window location. Legible and
understandable window-access
instructions, including any pictogram/
instructions for removing the window,
shall be posted at or near each rescue
access window.
(iv) Roof access locator signs/
markings and instructions.
(A) The location of each emergency
access point provided on the roof of a
passenger car shall be clearly marked
with retroreflective material of
contrasting color that complies with
paragraphs (d) and (e) of this section.
(B) Legible and understandable
instructions shall be posted at or near
each such location.
(C) If emergency roof access is
provided by means of a structural weak
point:
(1) The retroreflective material shall
clearly mark the line along which the
roof skin shall be cut; and
(2) A sign plate with a retroreflective
border shall also state:
CAUTION—DO NOT USE FLAME
CUTTING DEVICES.
CAUTION—WARN PASSENGERS
BEFORE CUTTING.
CUT ALONG DASHED LINE TO
GAIN ACCESS.
ROOF CONSTRUCTION—[STATE
RELEVANT DETAILS].
(d) Color contrast. Exterior signs/
markings shall provide luminance
contrast ratio of not less than 0.5, as
measured by a color-corrected
photometer.
(e) Materials—(1) Retroreflective
material. Exterior emergency rescue
access locator signs/markings shall be
constructed of retroreflective material
that conforms to the specifications for
Type I material sheeting, as specified in
ASTM D 4956–07 ε1 (incorporated by
reference, see § 299.17), as tested in
accordance with ASTM E 810–03
(incorporated by reference, see
§ 299.17).
(2) HPPL materials. All HPPL
materials used in finished component
configurations shall comply with the
minimum luminance criterion of 7.5
mcd/m2 after 90 minutes when tested
according to the provisions of ASTM E
2073–07 (incorporated by reference, see
§ 299.17), with the following three
modifications:
(i) Activation. The HPPL material
shall be activated with a fluorescent
lamp of 40W or less and a color
temperature of 4000–4500K that
provides no more than 10.7 lux (1 fc) of
illumination as measured on the
material surface. The activation period
shall be for no more than 60 minutes.
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
(ii) Luminance. The photopic
luminance of all specimens of the HPPL
material shall be measured with a
luminance meter as defined in section
5.2 of ASTM E 2073–07, a minimum of
90 minutes after activation has ceased.
(iii) Luminance in mcd/m2. The test
report shall include a luminance
measurement 90 minutes after
activation has ceased.
(f) Recordkeeping. (1) The railroad
shall retain a copy of the car
manufacturer/supplier provided
independent laboratory certified test
report results showing that the
illuminance or luminance
measurements, as appropriate, on the
active area of the signage/marking
component. Such records shall be kept
until all cars with those components are
retired, transferred, leased, or conveyed
to another railroad for use in revenue
service. A copy of such records shall be
transferred to the accepting railroad
along with any such cars.
(2) The railroad shall retain a copy of
the railroad-approved illuminance test
plan(s) and test results until the next
periodic test, or other test specified in
accordance with the railroad’s
inspection, testing, and maintenance
program is conducted on a
representative car/area, or until all cars
of that type are retired, or are
transferred, leased, or conveyed to
another railroad. A copy of such records
shall be transferred to the accepting
railroad along with such car(s).
(3) The railroad shall retain a copy of
the certified independent laboratory test
report results that certify that the
retroreflective material complies with
Type I materials per ASTM D–4956–
07 ε1 until all cars containing the
retroreflective material are retired, or are
transferred, leased, or conveyed to
another railroad. A copy of such records
shall be provided to the accepting
railroad along with any car(s) that are
transferred, leased, or conveyed.
§ 299.425 Low-location emergency exit
path marking.
(a) General. Low-location emergency
exit path marking (LLEEPM) shall be
provided in each unit of a trainset. The
LLEEPM system shall be designed to
identify the location of primary door
exits and the exit path to be used to
reach such doors by passengers and
trainset crewmembers under conditions
of darkness when normal and
emergency sources of illumination are
obscured by smoke or are inoperative.
(b) Visual identity and recognition.
The LLEEPM system shall be
conspicuous (i.e., clearly recognizable/
distinguishable), or become
conspicuous immediately and
PO 00000
Frm 00061
Fmt 4701
Sfmt 4700
69759
automatically from a low-location upon
loss of power for normal lighting, and
under the minimum general emergency
light illumination levels as specified in
§ 299.423.
(c) Signage and markings. At a
minimum, the LLEEPM system shall
have the following three components:
(1) Primary door exit signs. (i) Each
primary door exit shall be clearly
marked with an exit sign;
(ii) The exit sign shall be visible from
a low-location from the exit along the
exit path; and
(iii) Each exit sign shall be located on
or immediately adjacent to each door
and placed between 152.4 and 457.2
mm (6 and 18 inches) above the floor.
(2) Primary door exit marking/
delineators. (i) The location of the exit
path shall be marked using electrically
powered (active) marking/delineators or
light fixtures, HPPL (passive) marking/
delineators or a combination of these
two systems.
(ii) The requirements in this section
apply for both electrical and HPPL
components, whether installed on the
walls, floors, or seat assemblies.
(iii) Each primary door shall be
marked on or around the door’s
operating handle.
(3) Exit path marking/delineators. (i)
The marking/delineator components
shall be positioned so as to identify an
exit path to all primary exits that is
clearly visible and easily recognizable
from any seat or compartment in the
trainset, when normal lighting and
emergency lighting are unavailable in
conditions of darkness and/or smoke.
(ii) Markings/delineators shall be
located on the floor or no higher than
457.2 mm (18 inches) on the seat
assembly, or walls/partitions of aisles,
and/or passageways.
(iii) Changes in the direction of the
exit path shall be indicated by the
LLEEPM and be placed within 102 mm
(4 inches) of the corner of the exit path.
(d) Material—(1) HPPL passive
systems. HPPL strip marking/delineator
material used for LLEEPM components
shall be capable of providing a
minimum luminance level of 7.5 mcd/
m2, measured 90 minutes after normal
power has ceased.
(2) Electroluminescent marking/
delineator strips. The luminance value
of the electroluminescent (EL) marking/
delineator strip shall be at least 1,000
mcd/m2, as measured on the strip
surface.
(e) Conspicuity of markings. LLEEPM
signs shall comply with the text, color
and respective illuminance or
luminance requirements specified in
§ 299.423 and in this section.
E:\FR\FM\03NOR2.SGM
03NOR2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
(f) Emergency performance duration.
The LLEEPM system shall operate
independently of the car’s normal and
emergency lighting systems for 90
minutes after loss of all power for
normal lighting.
(g) Recordkeeping. (1) The railroad
shall retain a copy of the car
manufacturer/supplier provided
certified independent laboratory test
report results showing that the
illuminance or luminance
measurements, as appropriate, on the
active area of the signage/marking/
delineator component comply with the
criteria specified in § 299.423 and in
this section.
(2) The railroad shall retain a copy of
the railroad-approved illuminance test
plan(s) and test results until the next
periodic test, or other test specified in
accordance with the railroad’s
inspection, testing, and maintenance
program and ensure that tests are
conducted on a representative car, or
until all cars of that type are retired,
transferred, leased, or conveyed to
another railroad. A copy of such records
shall be provided to the accepting
railroads along with any car(s) that are
transferred, leased, or conveyed.
(3) Illegible, broken, damaged,
missing, or non-functioning components
of the LLEEPM system, including the
(b) Ease of operability. Each
emergency egress window shall be
designed to permit rapid and easy
removal from the inside of the car
during an emergency situation using a
hammer designed to break the glazing
that shall be located adjacent to each
emergency egress window. The railroad
shall inspect for the presence of the
emergency hammers each day prior to
the trainset being placed into service in
accordance with § 299.711(b).
(c) Dimensions. Except as provided in
paragraph (f) of this section, each
emergency egress window in a
passenger car shall have an
unobstructed opening with minimum
dimensions of 660 mm (26 inches)
horizontally by 610 mm (24 inches)
vertically. A seatback is not an
obstruction if it can be moved away
from the window opening without using
a tool or other implement.
(d) Marking and instructions. (1) Each
emergency egress window shall be
conspicuously and legibly marked with
luminescent material on the inside of
each car to facilitate passenger egress as
specified in § 299.423.
(2) Legible and understandable
operating instructions, including
instructions for removing the emergency
egress window shall be made of
luminescent material, shall be posted at
or near each such emergency egress
window as specified in § 299.423.
(e) Obstructions. If emergency egress
window removal may be hindered by
the presence of a seatback, headrest,
luggage rack, or other fixture, the
instructions shall state the method for
allowing rapid and easy removal of the
emergency egress window, taking into
account the fixture(s), and this portion
of the instructions may be in written or
pictorial format.
(f) Additional emergency egress
windows. Any emergency egress
window in addition to the minimum
number required by paragraph (a) of this
section that has been designated for use
by the railroad need not comply with
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
PO 00000
Frm 00062
Fmt 4701
Sfmt 4700
normal and emergency power systems,
shall be reported and repaired in
accordance with the railroad’s
inspection, testing, and maintenance
program as specified in § 299.445.
§ 299.427
Emergency egress windows.
(a) Number and location. Each unit in
a trainset shall have a minimum of four
emergency egress windows. At least one
emergency egress window shall be
located in each side of each end (half)
of the car, in a staggered configuration
where practicable. (See Figure 1 to this
paragraph.)
the minimum dimension requirements
in paragraph (c) of this section, but must
otherwise comply with all requirements
in this subpart applicable to emergency
egress windows.
§ 299.429
Rescue access windows.
(a) General. Each emergency egress
window required by § 299.427 shall also
serve as a means of rescue access.
(b) Ease of operability. Each rescue
access window must be capable of being
removed without unreasonable delay by
an emergency responder using tools or
implements that are commonly
available to the responder in a passenger
trainset emergency.
(c) Marking and instructions. (1) Each
rescue access window shall be marked
with retroreflective material on the
exterior of each car as specified in
§ 299.423. A unique and easily
recognizable symbol, sign, or other
conspicuous marking shall also be used
to identify each such window.
(2) Legible and understandable
window-access instructions, including
E:\FR\FM\03NOR2.SGM
03NOR2
ER03NO20.008
khammond on DSKJM1Z7X2PROD with RULES2
69760
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
instructions for removing the window,
shall be posted at or near each rescue
access window as specified in
§ 299.423.
khammond on DSKJM1Z7X2PROD with RULES2
§ 299.431
Driver’s controls and cab layout.
(a) Driver controls and cab layout.
Driver controls and cab layout shall
replicate that used in the N700, unless
otherwise approved by FRA.
(b) Cab seating. Each seat provided for
an employee regularly assigned to
occupy a cab and any floor-mounted
seat in the cab shall be securely attached
in accordance with § 299.405.
(c) Cab interior surface. Sharp edges
and corners shall be eliminated from the
interior of the cab, and interior surfaces
of the cab likely to be impacted by an
employee during a collision or
derailment shall be padded with shockabsorbent material.
(d) Cab securement. Trainset interior
cab doors shall be equipped with the
following:
(1) A secure and operable device to
lock the door from the outside that does
not impede egress from the cab; and
(2) A securement device on each cab
door that is capable of securing the door
from inside of the cab.
(e) Cab glazing serviceability. Endfacing cab windows of the lead trainset
cab shall be free of cracks, breaks, or
other conditions that obscure the view
of the right-of-way for the crew from
their normal position in the cab.
(f) Floors of cabs, passageways, and
compartments. Floors of cabs,
passageways, and compartments shall
be kept free from oil, water, waste or
any obstruction that creates a slipping,
tripping or fire hazard. Floors shall be
properly treated to provide secure
footing.
(g) Cab environmental control. Each
lead cab in a trainset shall be heated and
air conditioned. The HVAC system shall
be inspected and maintained to ensure
that it operates properly and meets the
railroad’s performance standard which
shall be defined in the inspection,
testing, and maintenance program.
(h) Trainset cab noise. Performance
standards for the railroad’s trainsets—
(1) The average noise levels in the
trainset cab shall be less than or equal
to 85 dB(A) when the trainset is
operating at maximum approved
trainset speed as approved under
§ 299.609(g). Compliance with this
paragraph (h)(1) shall be demonstrated
during the pre-revenue service system
integration testing as required by
§ 299.607.
(2) The railroad shall not make any
alterations during maintenance or
modifications to the cab, that cause the
average sound level to exceed the
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
requirements in paragraph (h)(1) of this
section.
(3) The railroad or manufacturer shall
follow the test protocols set forth in
appendix B to this part to determine
compliance with paragraph (h)(1) of this
section, and, to the extent reasonably
necessary to evaluate the effect of
alterations during maintenance, to
determine compliance with paragraph
(h)(2) of this section.
(i) Maintenance of trainset cabs. (1) If
the railroad receives an excessive noise
report, and if the condition giving rise
to the noise is not required to be
immediately corrected under this part,
the railroad shall maintain a record of
the report, and repair or replace the item
identified as substantially contributing
to the noise:
(i) On or before the next periodic
inspection required by the railroad’s
inspection, testing, and maintenance
program under subpart G; or
(ii) If the railroad determines that the
repair or replacement of the item
requires significant shop or material
resources that are not readily available,
at the time of the next major equipment
repair commonly used for the particular
type of maintenance needed.
(2) The railroad has an obligation to
respond to an excessive noise report
that a trainset-cab-occupant files. The
railroad meets its obligation to respond
to an excessive noise report, as set forth
in paragraph (i)(1) of this section, if the
railroad makes a good faith effort to
identify the cause of the reported noise,
and where the railroad is successful in
determining the cause, if the railroad
repairs or replaces the items that cause
the noise.
(3)(i) The railroad shall maintain a
written or electronic record of any
excessive noise report, inspection, test,
maintenance, replacement, or repair
completed pursuant to paragraph (i) of
this section, and the date on which that
inspection, test, maintenance,
replacement, or repair occurred. If the
railroad elects to maintain an electronic
record, the railroad must satisfy the
conditions listed in § 299.11.
(ii) The railroad shall retain these
records for a period of one year.
(iii) The railroad shall establish an
internal, auditable, monitorable system
that contains these records.
(j) Trainset sanitation facilities for
employees. Sanitation facilities shall be
provided for crewmembers either:
(1) On the trainset, that meet
otherwise applicable sanitation
standards, which are accessible at
frequent intervals during the course of
their work shift; or
PO 00000
Frm 00063
Fmt 4701
Sfmt 4700
69761
(2) Ready access to railroad-provided
sanitation facilities outside of the
trainset.
(k) Speed indicators. (1) Each trainset
controlling cab shall be equipped with
a speed indicator which is—
(i) Accurate within ±2 km/h (1.24
miles per hour) for speed lower than 30
km/h (18.6 miles per hour), then
increasing linearly up to ±12 km/h (7.5
miles per hour) at 500 km/h (311 miles
per hour); and
(ii) Clearly readable from the driver’s
normal position under all light
conditions.
(2) The speed indicator shall be based
on a system of independent on-board
speed measurement sources
guaranteeing the accuracy level
specified in paragraph (a)(1) of this
section under all operational conditions.
The system shall be automatically
monitored for inconsistencies and the
driver shall be automatically notified of
any inconsistency potentially
compromising this accuracy level.
(3) The speed indicator shall be
calibrated periodically as defined in the
railroad’s inspection, testing, and
maintenance program.
(l) Cab lights. (1) Each trainset cab
shall have cab lights which will provide
sufficient illumination for the control
instruments, meters, and gauges to
enable the driver to make accurate
readings from his or her normal
positions in the cab. These lights shall
be located, constructed, and maintained
so that light shines only on those parts
requiring illumination and does not
interfere with the driver’s vision of the
track and signals. Each trainset cab shall
also have a conveniently located light
that can be readily turned on and off by
the driver operating the trainset and that
provides sufficient illumination for
them to read trainset orders and
timetables.
(2) Cab passageways and
compartments shall be illuminated.
§ 299.433
Exterior lights.
(a) Headlights. Each leading end of a
trainset shall be equipped with two or
more headlights.
(1) Each headlight shall produce
80,000 candela.
(2) Headlights shall be arranged to
illuminate signs in the right-of-way.
(3) Headlights shall be recognized 600
m (1,968 feet) ahead of the cab car by
a driver in another trainset or a
maintenance person standing in the
right-of-way under clear weather
conditions.
(b) Taillights (marking devices). (1)
The trailing end of the trainset shall be
equipped with two red taillights;
(2) Each taillight shall be located at
least 1.2 m (3.9 feet) above rail;
E:\FR\FM\03NOR2.SGM
03NOR2
69762
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
(3) Each taillight shall be recognizable
200 m (656 feet) ahead of the cab car by
a driver in another trainset or a
maintenance person standing in the
right-of-way under clear weather
conditions;
(4) Taillights of the trailing end of the
trainset shall be on when the trainset is
in operation;
(5) Taillights shall not be on in the
direction of trainset travel, except if the
driver shall re-position the trainset in a
station. Such re-positioning operations
shall be done in accordance with the
railroad’s operating rules; and
(6) In an emergency situation, the
headlight on the rear of the trainset may
serve as the taillights in accordance
with the railroad’s operating rules.
khammond on DSKJM1Z7X2PROD with RULES2
§ 299.435
Electrical system design.
(a) Overhead collector systems. (1)
Pantographs shall be so arranged that
they can be operated from the driver’s
normal position in the cab. Pantographs
that automatically rise when released
shall have an automatic locking device
to secure them in the down position.
(2) Each overhead collector system,
including the pantograph, shall be
equipped with a means to electrically
ground any uninsulated parts to prevent
the risk of electrical shock when
working on the system.
(3) Means shall be provided to permit
the driver to determine that the
pantograph is in its lowest position, and
for securing the pantograph if necessary,
without the need to mount the roof of
the trainset.
(4) Each trainset equipped with a
pantograph operating on an overhead
collection system shall also be equipped
with a means to safely lower the
pantograph in the event of an
emergency. If an emergency pole is used
for this purpose, that part of the pole
which can be safely handled shall be
marked to so indicate. This pole shall be
protected from moisture and damage
when not in use. Means of securement
and electrical isolation of a damaged
pantograph, when it cannot be
performed automatically, shall be
addressed in the railroad’s operating
rules.
(b) Circuit protection. (1) Each
auxiliary circuit shall be provided with
a circuit breaker or equivalent currentlimiting devices located as near as
practicable to the point of connection to
the source of power for that circuit.
Such protection may be omitted from
circuits controlling safety-critical
devices.
(2) The 25-kV main power line shall
be protected with a lightning arrestor,
automatic circuit breaker, and overload
relay. The lightning arrestor shall be run
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
by the most direct path possible to
ground with a connection to ground of
not less than No. 6 AWG. These
overload protection devices shall be
housed in an enclosure designed
specifically for that purpose with the arc
chute vented directly to outside air.
(3) Auxiliary power supply (440
VAC), providing power distribution,
shall be provided with both overload
and ground fault protection.
(c) Main battery system. (1) The main
batteries shall be isolated from the cab
and passenger seating areas by a noncombustible barrier.
(2) If batteries have the potential to
vent explosive gases, the batteries shall
be adequately ventilated to prevent
accumulation of explosive
concentrations of these gases.
(3) Battery chargers shall be designed
to protect against overcharging.
(4) Battery circuits shall include an
emergency battery cut-off switch to
completely disconnect the energy stored
in the batteries from the load.
(d) Capacitors for high-energy storage.
(1) Capacitors, if provided, shall be
isolated from the cab and passenger
seating areas by a non-combustible
barrier.
(2) Capacitors shall be designed to
protect against overcharging and
overheating.
(e) Electromagnetic interference (EMI)
and electromagnetic compatibility
(EMC). (1) The railroad shall ensure
electromagnetic compatibility of the
safety-critical equipment systems with
their environment. Electromagnetic
compatibility can be achieved through
equipment design or changes to the
operating environment.
(2) The electronic equipment shall not
produce electrical noise that interferes
with trainline control and
communications or with wayside
signaling systems.
(3) To contain electromagnetic
interference emissions, suppression of
transients shall be at the source
wherever possible.
(4) Electrical and electronic systems
of equipment shall be capable of
operation in the presence of external
electromagnetic noise sources.
(5) All electronic equipment shall be
self-protected from damage or improper
operation, or both, due to high voltage
transients and long-term over-voltage or
under-voltage conditions. This includes
protection from both power frequency
and harmonic effects as well as
protection from radio frequency signals
into the microwave frequency range.
(f) Insulation or grounding of metal
parts. All unguarded noncurrentcarrying metal parts subject to becoming
PO 00000
Frm 00064
Fmt 4701
Sfmt 4700
charged shall be grounded or thoroughly
insulated.
(g) High voltage markings: doors,
cover plates, or barriers. External
surfaces of all doors, cover plates, or
barriers providing direct access to high
voltage equipment shall be
conspicuously and legibly marked
‘‘DANGER–HIGH VOLTAGE’’ or with
the word ‘‘DANGER’’ and the normal
voltage carried by the parts so protected.
Labels shall be retro-reflective.
(h) Hand-operated switches. All handoperated switches carrying currents
with a potential of more than 150 volts
that may be operated while under load
shall be covered and shall be operative
from the outside of the cover. Means
shall be provided to show whether the
switches are open or closed. Switches
that should not be operated while under
load shall be conspicuously and legibly
marked with the words ‘‘must not be
operated under load’’ and the voltage
carried.
(i) Conductors; jumpers; cable
connections. (1) Conductor sizes shall
be selected on the basis of currentcarrying capacity, mechanical strength,
temperature, flexibility requirements,
and maximum allowable voltage drop.
Current-carrying capacity shall be
derated for grouping and for operating
temperature.
(2) Jumpers and cable connections
between trainset units shall be located
and guarded to provide sufficient
vertical clearance. They may not hang
with one end free.
(3) Cable and jumper connections
between trainset units may not have any
of the following conditions:
(i) Broken or badly chafed insulation;
(ii) Broken plugs, receptacles,
terminals, or trainline pins; and
(iii) Broken or protruding strands of
wire.
(j) Traction motors. All traction
motors shall be in proper working order,
or safely cut-out.
§ 299.437
Automated monitoring.
(a) Each trainset shall be equipped to
monitor the performance of the
following systems or components:
(1) Reception of cab and trainset
control signals;
(2) Electric brake status;
(3) Friction brake status;
(4) Fire detection systems, if so
equipped;
(5) Auxiliary power status;
(6) Wheelslide;
(7) On-board bearing-temperature
sensors;
(8) Door open/closed status; and
(9) Bogie vibration detection.
(b) When any of the monitored
parameters are out of predetermined
E:\FR\FM\03NOR2.SGM
03NOR2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
limits, an alert shall be sent
immediately to the driver. The railroad’s
operating rules shall control trainset
movement when the monitored
parameters are out of predetermined
limits.
(c) The railroad shall develop
appropriate operating rules to address
driver and equipment performance in
the event that the automatic monitoring
system becomes defective.
(d) The monitoring system shall be
designed with an automatic self-test
feature that notifies the driver that the
monitoring capability is functioning
correctly and alerts the driver when a
system failure occurs.
khammond on DSKJM1Z7X2PROD with RULES2
§ 299.439
Event recorders.
(a) Duty to equip and record. Each
trainset shall be equipped with an
operative event recorder that monitors
and records as a minimum all safety
data required by paragraph (b) of this
section. The event recorder shall record
the most recent 48 hours of operational
data of the trainset on which it is
installed.
(b) Equipment requirements. Event
recorders shall monitor and record data
elements or information needed to
support the data elements required by
paragraph (c) of this section. The data
shall be recorded with at least the
accuracy required of the indicators
displaying any of the required data
elements to the driver.
(c) Data elements. The event recorder
shall be equipped with a certified
crashworthy event recorder memory
module that meets the requirements of
appendix A to this part. The certified
event recorder memory module shall be
mounted for its maximum protection.
The event recorder shall record, and the
certified crashworthy event recorder
memory module shall retain, the
following data elements or information
needed to support the data elements:
(1) Trainset speed;
(2) Selected direction of motion;
(3) Date and time;
(4) Distance traveled;
(5) Throttle position;
(6) Applications and operations of the
trainset brake system, including urgent
and emergency applications. The system
shall record, or provide a means of
determining, that a brake application or
release resulted from manipulation of
brake controls at the position normally
occupied by the driver. In the case of a
brake application or release that is
responsive to a command originating
from or executed by an on-board
computer (e.g., electronic braking
system controller, controlling cab
electronic control system, or trainset
control computer), the system shall
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
record, or provide a means of
determining, the involvement of any
such computer;
(7) Applications and operations of the
regenerative brake;
(8) Cab signal aspect(s);
(9) Urgent brake application(s);
(10) Passenger brake alarm request;
(11) Wheel slip/slide alarm activation
(with a property-specific minimum
duration);
(12) Trainset number;
(13) Trainset tractive effort (positive
and negative);
(14) Trainset brake cylinder pressures;
(15) Cruise control on/off, if so
equipped and used;
(16) Bogie vibration detection;
(17) Door status opened/closed; and
(18) Safety-critical trainset control
data routed to the controlling driver’s
display with which the driver is
required to comply, specifically
including text messages conveying
mandatory directives and maximum
authorized speed. The specific
information format, content, and
proposed duration for retention of such
data shall be specified in the PTC Safety
Plan submitted for the trainset control
system under subpart B, subject to FRA
approval. If it can be calibrated against
other data required by this part, such
trainset control data may, at the election
of the railroad, be retained in a separate
certified crashworthy memory module.
(d) Response to defective equipment.
A trainset on which the event recorder
has been taken out of service may
remain in-service only until the next
pre-service inspection. A trainset with
an inoperative event recorder is not
deemed to be in improper condition,
unsafe to operate, or a non-complying
trainset under § 299.447.
(e) Annual tests. (1) The railroad’s
inspection, testing, and maintenance
program under subpart G of this part
shall require annual testing of the event
recorder. All testing under this section
shall be performed at intervals that do
not exceed 368 calendar days.
(2) A microprocessor-based event
recorder with a self-monitoring feature
equipped to verify that all data elements
required by this part are recorded,
requires further maintenance and testing
only if either of the following conditions
exist:
(i) The self-monitoring feature
displays an indication of a failure. If a
failure is displayed, further
maintenance and testing must be
performed until a subsequent test is
successful. When a successful test is
accomplished, a record, in any medium,
shall be made of that fact and of any
maintenance work necessary to achieve
the successful result. This record shall
PO 00000
Frm 00065
Fmt 4701
Sfmt 4700
69763
be available at the location where the
trainset is maintained until a record of
a subsequent successful test is filed; or
(ii) A download of the event recorder,
taken within the preceding 30 days and
reviewed for the previous 48 hours of
trainset operation, reveals a failure to
record a regularly recurring data
element or reveals that any required
data element is not representative of the
actual operations of the trainset during
this time period. If the review is not
successful, further maintenance and
testing shall be performed until a
subsequent test is successful. When a
successful test is accomplished, a
record, in any medium, shall be made
of that fact and of any maintenance
work necessary to achieve the
successful result. This record shall be
kept at the location where the trainset
is maintained until a record of a
subsequent successful test is filed. The
download shall be taken from
information stored in the certified
crashworthy crash hardened event
recorder memory module.
(f) Preserving accident data. If any
trainset equipped with an event
recorder, or any other trainset mounted
recording device or devices designed to
record information concerning the
functioning of a trainset, is involved in
an accident/incident that is required to
be reported to FRA under part 225 of
this chapter, the railroad shall, to the
extent possible, and to the extent
consistent with the safety of life and
property, preserve the data recorded by
each such device for analysis by FRA in
accordance with § 299.11. This
preservation requirement permits the
railroad to extract and analyze such
data, provided the original downloaded
data file, or an unanalyzed exact copy
of it, shall be retained in secure custody
and shall not be utilized for analysis or
any other purpose except by direction of
FRA or the National Transportation
Safety Board. This preservation
requirement shall expire one (1) year
after the date of the accident/incident
unless FRA or the Board notifies the
railroad in writing that the data are
desired for analysis.
(g) Relationship to other laws.
Nothing in this section is intended to
alter the legal authority of law
enforcement officials investigating
potential violation(s) of Federal or State
criminal law(s), and nothing in this
chapter is intended to alter in any way
the priority of National Transportation
Safety Board investigations under 49
U.S.C. 1131 and 1134, nor the authority
of the Secretary of Transportation to
investigate railroad accidents under 49
U.S.C. 5121, 5122, 20107, 20111, 20112,
20505, 20702, 20703, and 20902.
E:\FR\FM\03NOR2.SGM
03NOR2
69764
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
(h) Disabling event recorders. Any
individual who willfully disables an
event recorder, or who tampers with or
alters the data recorded by such a device
is subject to civil penalty as provided in
part 218 of this chapter, and to
disqualification from performing safetysensitive functions on a railroad under
subpart D of part 209 of this chapter.
khammond on DSKJM1Z7X2PROD with RULES2
§ 299.441 Trainset electronic hardware and
software safety.
(a) Purpose and scope. The
requirements of this section apply to all
safety-critical electronic control
systems, subsystems, and components
on the trainsets, except for on-board
signaling and trainset control system
components that must meet the software
safety requirements defined in subpart B
of this part.
(b) Applicability. (1) The trainsets
shall utilize the service-proven safetycritical electronic control systems,
subsystems, and components as used on
the N700 to control and monitor safetycritical components.
(2) Any modifications to the existing
service-proven safety-critical electronic
control systems, subsystems, and
components shall be subject to the
requirements defined in paragraph (c) of
this section.
(i) The railroad shall assure that the
suppliers of new or modified safetycritical systems, subsystems, and
components utilize an industry
recognized hardware and software
development process which is evaluated
and certified by an independent thirdparty assessor authorized by the
industry standard utilized.
(ii) The railroad shall require that all
suppliers submit the certifications and
audit results as applicable. All such
certifications shall be made available to
FRA upon request.
(3) Any major upgrades or
introduction of new safety-critical
technology shall be subject to
§ 299.613(d).
(c) Electronic hardware and software
safety program. The railroad shall
develop and maintain a written
electronic hardware and software safety
program to guide the design,
development, testing, integration, and
verification of all new or modified
safety-critical trainset hardware and
software.
(1) Hardware and software safety
program description. The hardware and
software safety program shall include a
description of how the following will be
implemented to ensure safety and
reliability:
(i) The hardware and software design
process;
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
(ii) The hardware and software design
documentation;
(iii) The hardware and software
hazard analysis;
(iv) Hardware and software safety
reviews;
(v) Hardware and software hazard
monitoring and tracking;
(vi) Hardware and software
integration safety testing;
(vii) Demonstration of overall
hardware and software system safety as
part of the pre-revenue service testing of
the equipment; and
(viii) Safety-critical changes and
failures.
(2) Safety analysis. The hardware and
software safety program shall be based
on a formal safety methodology that
includes a FMECA; verification and
validation testing for all hardware and
software components and their
interfaces; and comprehensive hardware
and software integration testing to
ensure that the hardware and software
system functions as intended.
(3) Compliance. The railroad shall
comply with the elements of its
hardware and software safety program
that affect the safety of the passenger
trainset.
(4) Safety-critical changes and
failures. Whenever a planned safetycritical design change is made to the
safety-critical electronic control
systems, subsystems and components
(the products) that are in use by the
railroad and subject to this subpart, the
railroad shall—
(i) Notify FRA in accordance with
§ 299.9 of the design changes made by
the product supplier;
(ii) Ensure that the safety analysis
required under paragraph (c)(2) of this
section is updated as required;
(iii) Conduct all safety-critical
changes in a manner that allows the
change to be audited;
(iv) Document all arrangements with
suppliers for notification of all
electronic safety-critical changes as well
as safety-critical failures in the
supplier’s system, subsystem, or
components, and the reasons for that
change or failure from the suppliers,
whether or not the railroad has
experienced a failure of that safetycritical system, sub-system, or
component;
(v) Specify the railroad’s procedures
for action upon receipt of notification of
a safety-critical change or failure of an
electronic system, sub-system, or
component, and until the upgrade or
revision has been installed;
(vi) Identify all configuration/revision
control measures designed to ensure
that safety-functional requirements and
safety-critical hazard mitigation
PO 00000
Frm 00066
Fmt 4701
Sfmt 4700
processes are not compromised as a
result of any such change, and that any
such change can be audited;
(vii) Require suppliers to provide
notification of all electronic safetycritical changes as well as safety-critical
failures in the supplier’s system,
subsystem, or components;
(ix) Document all arrangements with
suppliers for notification of any and all
electronic safety-critical changes as well
as safety-critical failures in the
supplier’s system, subsystem, or
components.
(d) Specific requirements. Hardware
and software that controls or monitors a
trainset’s primary braking system shall
either—
(1) Fail safely by initiating an
emergency or urgent brake application
in the event of a hardware or software
failure that could impair the ability of
the driver to apply or release the brakes;
or
(2) Provide the driver access to direct
manual control of the primary braking
system (emergency or urgent braking).
(e) Inspection, testing, and
maintenance records. The inspection,
testing, and maintenance conducted by
the railroad in accordance with
§ 299.445 shall be recorded in hardcopy
or stored electronically. Electronic
recordkeeping or automated tracking
systems, subject to the provisions
contained in § 299.11, may be utilized to
store and maintain any testing or
training record required by this subpart.
Results of product testing conducted by
a vendor in support of a safety analysis
shall be provided to and recorded by the
railroad.
(1) The testing records shall contain
all of the following:
(i) The name of the railroad;
(ii) The location and date that the test
was conducted;
(iii) The equipment tested;
(iv) The results of tests;
(v) The repairs or replacement of
equipment;
(vi) Any preventative adjustments
made; and
(vii) The condition in which the
equipment is left.
(2) Each record shall be—
(i) Signed by the employee
conducting the test, or electronically
coded, or identified by the automated
test equipment number;
(ii) Filed in the office of a supervisory
official having jurisdiction, unless
otherwise noted; and
(iii) Available for inspection and
copying by FRA.
(3) The results of the testing
conducted in accordance with this
section shall be retained as follows:
(i) The results of tests that pertain to
installation or modification of a product
E:\FR\FM\03NOR2.SGM
03NOR2
khammond on DSKJM1Z7X2PROD with RULES2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
shall be retained for the life-cycle of the
product tested and may be kept in any
office designated by the railroad;
(ii) The results of periodic tests
required for the maintenance or repair
of the product tested shall be retained
until the next record is filed and in no
case less than one year; and
(iii) The results of all other tests and
training shall be retained until the next
record is filed and in no case less than
one year.
(f) Review of safety analysis. (1) Prior
to the initial planned use of a new
product as defined by paragraphs (b)(2)
or (3) of this section, the railroad shall
notify FRA in accordance with § 299.9
of the intent to place this product in
service. The notification shall provide a
description of the product, and identify
the location where the complete safety
analysis documentation and the testing
are maintained.
(2) The railroad shall maintain and
make available to FRA upon request all
railroad or vendor documentation used
to demonstrate that the product meets
the safety requirements of the safety
analysis for the life-cycle of the product.
(g) Hazard tracking. After a new
product is placed in service in
accordance with paragraphs (b)(2) or (3)
of this section, the railroad shall
maintain a database of all safetyrelevant hazards encountered with the
product. The database shall include all
hazards identified in the safety analysis
and those that had not been previously
identified in the safety analysis. If the
frequency of the safety-relevant hazards
exceeds the threshold set forth in the
safety analysis, then the railroad shall—
(1) Report the inconsistency to the
Associate Administrator, within 15 days
of discovery in accordance with § 299.9;
(2) Take immediate countermeasures
to reduce the frequency of the safetyrelevant hazard(s) below the threshold
set forth in the safety analysis;
(3) Provide a final report to the
Associate Administrator, on the results
of the analysis and countermeasures
taken to mitigate the hazard to meet the
threshold set forth in the safety analysis
when the problem is resolved. For
hazards not identified in the safety
analysis the threshold shall be exceeded
at one occurrence; and
(4) Electronic or automated tracking
systems used to meet the requirements
contained in paragraph (g) of this
section shall be in accordance with
§ 299.11.
(h) Operations and maintenance
manual. The railroad shall maintain all
supplier or vendor documents
pertaining to the operation, installation,
maintenance, repair, modification,
inspection, and testing of the safety-
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
critical electronic control systems,
subsystems and components.
(i) Training and qualification
program. Under § 299.13(c)(3), the
railroad shall establish and implement a
training and qualification program for
the safety-critical electronic control
systems, subsystems, and components
subject to subpart G of this part prior to
the safety-critical electronic control
systems, subsystems, and components
being placed in use.
(j) Operating personnel training. The
training program required by
§ 299.13(c)(3) for any driver or other
person who participates in the operation
of a trainset using the safety-critical
electronic control systems, subsystems
and components shall address all the
following elements:
(1) Familiarization with the electronic
control system equipment on-board the
trainset and the functioning of that
equipment as part of the system and in
relation to other on-board systems under
that person’s control;
(2) Any actions required of the
operating personnel to enable or enter
data into the system and the role of that
function in the safe operation of the
trainset;
(3) Sequencing of interventions by the
system, including notification,
enforcement, and recovery from the
enforcement as applicable;
(4) Railroad operating rules applicable
to control systems, including provisions
for movement and protection of any
unequipped passenger equipment, or
passenger equipment with failed or cutout controls;
(5) Means to detect deviations from
proper functioning of on-board
electronic control system equipment
and instructions explaining the proper
response to be taken regarding control of
the trainset and notification of
designated railroad personnel; and
(6) Information needed to prevent
unintentional interference with the
proper functioning of on-board
electronic control equipment.
§ 299.443
Safety appliances.
(a) Couplers. (1) The leading and
trailing ends of each trainset shall be
equipped with an automatic rescue
coupler that couples on impact.
(i) Uncoupling of the rescue coupler
shall be done only at a trainset
maintenance facility or other location
where personnel can safely get under or
between units.
(ii) The leading and the trailing ends
of a trainset are not required to be
equipped with sill steps or end or side
handholds.
(2) The leading and trailing end
couplers and uncoupling devices may
PO 00000
Frm 00067
Fmt 4701
Sfmt 4700
69765
be stored within a removable shrouded
housing.
(3) Leading and trailing automatic
couplers of trainsets shall be compatible
with the railroad’s rescue vehicles. A
coupler adaptor can be used to meet this
requirement.
(4) The railroad shall develop and
implement rescue procedures that
assure employee safety during rescue
operations and shall be contained in the
railroad’s operating rules.
(5) Each unit within a trainset shall be
semi-permanently coupled and shall
only be uncoupled at a trainset
maintenance facility or other locations
identified by the railroad where the
protections afforded in subpart B of part
218 of this chapter can be applied.
(6) The ends of units in a trainset that
are semi-permanently coupled are not
required to be equipped with automatic
couplers, sill steps, end handholds or
side handholds.
(b) Crew access. (1) Each trainset shall
provide a minimum of two (2) locations
per side, where crew members can
board or disembark the trainset safely
from ground level.
(2) Each location used for crew access
shall be equipped with retractable stairs
with handrails designed for safe access
to the trainset from ground level.
§ 299.445 Trainset inspection, testing, and
maintenance requirements.
(a) General. (1) The railroad shall
develop a written inspection program
for the rolling stock, in accordance with
and approved under the requirements of
§ 299.713. As further specified in this
section, the program shall describe in
detail the procedures, equipment, and
other means necessary for the safe
operation of the passenger equipment,
including all inspections set forth in
paragraph (e) of this section. This
information shall include a detailed
description of the methods of ensuring
accurate records of required inspections.
(2) The initial inspection, testing, and
maintenance program submitted under
§ 299.713 shall, as a minimum, address
the specific safety inspections contained
in paragraphs (e)(1) through (4) of this
section. The railroad may submit the
procedures detailing the bogie
inspections or general overhaul
requirements contained in paragraph
(e)(3) and (4) of this section,
respectively, at a later date than the
initial inspection, testing, and
maintenance program, but not less than
180 days prior to the scheduled date of
the first bogie inspection or general
overhaul.
(b) Identification of safety-critical
items. In addition to safety critical items
identified under § 299.711(b), on-board
E:\FR\FM\03NOR2.SGM
03NOR2
khammond on DSKJM1Z7X2PROD with RULES2
69766
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
emergency equipment, emergency backup systems, trainset exits and trainset
safety-critical hardware and software
systems in accordance with § 299.441
shall be deemed safety-critical.
(c) Compliance. The railroad shall
adopt and comply with the approved
inspection, testing, and maintenance
program in accordance with § 299.703.
(d) General condition. The inspection,
testing, and maintenance program shall
ensure that all systems and components
of the equipment are free of conditions
that endanger the safety of the crew,
passengers, or equipment. These
conditions include, but are not limited
to the following:
(1) A continuous accumulation of oil
or grease;
(2) Improper functioning of a
component;
(3) A crack, break, excessive wear,
structural defect, or weakness of a
component;
(4) A leak;
(5) Use of a component or system
under conditions that exceed those for
which the component or system is
designed to operate; and
(6) Insecure attachment of a
component.
(e) Specific safety inspections. The
program under paragraph (a) of this
section shall specify that all passenger
trainsets shall receive thorough safety
inspections by qualified individuals
designated by the railroad at regular
intervals. At a minimum, and in
addition to the annual tests required for
event recorder under § 299.439(e), the
following shall be performed on each
trainset:
(1) Pre-service inspections. (i) Each
trainset in use shall be inspected at least
once every two calendar days by
qualified individuals at a location where
there is a repair pit and access to the top
of the trainset. The inspection shall
verify the correct operation of on-board
safety systems defined in the inspection,
testing, and maintenance program. If
any of the conditions defined as safetycritical in paragraph (b) of this section
and § 299.711(b) are found during this
inspection, the trainset shall not be put
into service until that condition is
rectified. The pre-service inspection
shall include the following:
(A) Functional tests to determine the
status of application and release of the
service, emergency, and urgent air
brakes using the monitoring system;
(B) Operational tests of the exterior
doors; and
(C) A review of the log of on-board
ATC equipment.
(ii) If the existence of any safetycritical conditions cannot be determined
by use of an automated monitoring
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
system, the railroad shall perform a
visual inspection to determine if the
condition exists.
(2) Regular inspections. The railroad
shall perform a regular inspection on all
trainsets in accordance with the test
procedures and inspection criteria
established in paragraph (a) of this
section and at the intervals defined by
paragraph (f) of this section. If any of the
conditions defined as safety-critical in
paragraph (b) of this section and
§ 299.711(b) are found during this
inspection, the trainset shall not be put
into service until that condition is
rectified.
(3) Bogie inspections. The railroad
shall perform a bogie inspection on all
trainsets in accordance with the test
procedures and inspection criteria
established in paragraph (a) of this
section and at the intervals defined by
paragraph (f) of this section. If any of the
conditions defined as safety-critical in
paragraph (b) of this section and
§ 299.711(b) are found during this
inspection, the trainset shall not be put
into service until that condition is
rectified.
(4) General overhaul. The railroad
shall perform a general overhaul on all
trainsets in accordance with the test
procedures and inspection criteria
established in paragraph (a) of this
section and at the intervals defined by
paragraph (f) of this section. If any of the
conditions defined as safety-critical in
paragraph (b) of this section and
§ 299.711(b) are found during this
inspection, the trainset shall not be put
into service until that condition is
rectified.
(f) Maintenance intervals. The
railroad’s program established pursuant
to paragraph (a) of this section shall
include the railroad’s scheduled
maintenance intervals for all specific
safety inspections in paragraph (e) of
this section, as required by § 299.707.
(g) Training and qualification
program. The railroad shall establish a
training and qualification program as
defined in § 299.13(c)(3) to qualify
individuals to perform inspections,
testing, and maintenance on the
equipment. Only qualified individuals
shall perform inspections, testing, and
maintenance of the equipment.
(h) Reporting and tracking of repairs
to defective trainsets. The railroad shall
have in place prior to start of operations
a reporting and tracking system for
passenger trainsets with a defect not in
conformance with this subpart. The
reporting and tracking system shall
record the following information:
(1) The identification number of the
defective unit within a trainset, and
trainset identification number;
PO 00000
Frm 00068
Fmt 4701
Sfmt 4700
(2) The date the defect was
discovered;
(3) The nature of the defect;
(4) The determination made by a
qualified individual whether the
equipment is safe to run;
(5) The name of the qualified
individual making such a
determination;
(6) Any operating restrictions placed
on the equipment; and
(7) Repairs made and the date that
they were completed.
(i) Retention of records. At a
minimum, the railroad shall keep the
records described in paragraph (j) of
each required inspection under this
section in accordance with § 299.11.
Each record shall be maintained for at
least one year from the date of the
inspection.
(j) Availability of records. The railroad
shall make defect reporting and tracking
records available to FRA upon request.
(k) Brake system repair points. The
railroad shall designate brake system
repair points in the inspection, testing,
and maintenance program required by
paragraph (a) of this section. No trainset
shall depart a brake system repair point
unless that trainset has a 100 percent
operational brake system.
§ 299.447 Movement of defective
equipment.
(a) A trainset with one or more
conditions not in compliance with the
list of safety critical defects identified in
accordance with § 299.445(b) during a
pre-service inspection required by
§ 299.445(e)(1) shall not be moved in
revenue service and shall only be
moved in accordance with paragraph (e)
of this section.
(b) Except as provided in paragraph
(c) of this section, and after departure in
compliance with the pre-service
inspection required by § 299.445(e)(1), a
trainset with one or more conditions not
in compliance with the list of safety
critical defects identified in accordance
with §§ 299.445(b) and 299.711(b) may
be moved in revenue service only after
the railroad has complied with all of the
following:
(1) A qualified individual determines
that it is safe to move the trainset,
consistent with the railroad’s operating
rules;
(i) If appropriate, these
determinations may be made based
upon a description of the defective
condition provided by a crewmember.
(ii) If the determinations required by
this paragraph are made by an off-site
qualified individual based on a
description of the defective condition by
on-site personnel, then a qualified
individual shall perform a physical
E:\FR\FM\03NOR2.SGM
03NOR2
khammond on DSKJM1Z7X2PROD with RULES2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
inspection of the defective equipment,
at the first location possible, in
accordance with the railroad’s
inspection, testing, and maintenance
program and operating rules, to verify
the description of the defect provided
by the on-site personnel.
(2) The qualified individual who
made the determination in paragraph
(b)(1) of this section, notifies the driver
in charge of movement of the trainset,
in accordance with the railroad’s
operating rules, of the maximum
authorized speed, authorized
destination, and any other operational
restrictions that apply to the movement
of the non-compliant trainset. This
notification may be achieved through
the tag required by paragraph (b)(3) of
this section; and
(3) A tag bearing the words ‘‘noncomplying trainset’’ and containing the
following information, are securely
attached to the control stand on each
control cab of the trainset:
(i) The trainset number and unit or car
number;
(ii) The name of the qualified
individual making the determination in
paragraph (b)(1) of this section;
(iii) The location and date of the
inspection that led to the discovery of
the non-compliant item;
(iv) A description of each defect;
(v) Movement restrictions, if any;
(vi) The authorized destination of the
trainset; and
(vii) The signature, if possible, as well
as the job title and location of the
person making the determinations
required by this section.
(4) Automated tracking systems used
to meet the tagging requirements
contained in paragraph (b)(3) of this
section may be reviewed and monitored
by FRA at any time to ensure the
integrity of the system. FRA’s Associate
Administrator may prohibit or revoke
the railroad’s ability to utilize an
automated tracking system in lieu of
tagging if FRA finds that the automated
tracking system is not properly secure,
is inaccessible to FRA or the railroad’s
employees, or fails to track or monitor
the movement of defective equipment
adequately. Such a determination will
be made in writing and will state the
basis for such action.
(c) A trainset that develops a noncomplying condition in service may
continue in revenue service, so long as
the requirements of paragraph (b) of this
section are otherwise fully met, until the
next pre-service inspection.
(d) In the event of an in-service failure
of the braking system, the trainset may
proceed in accordance with the
railroad’s operating rules relating to the
percentage of operative brakes and at a
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
speed no greater than the maximum
authorized speed as determined by
§ 299.409(f)(4) so long as the
requirements of paragraph (b) of this
section are otherwise fully met, until the
next pre-service inspection.
(e) A non-complying trainset may be
moved without passengers within a
trainset maintenance facility, at speeds
not to exceed 16 km/h (10 mph),
without meeting the requirements of
paragraph (a) of this section where the
movement is solely for the purpose of
repair. The railroad shall ensure that the
movement is made safely.
(f) Nothing in this section authorizes
the movement of equipment subject to
a Special Notice for Repair under part
216 of this chapter unless the movement
is made in accordance with the
restrictions contained in the Special
Notice.
Subpart E—Operating Rules
§ 299.501
Purpose.
Through the requirements of this
subpart, FRA learns the condition of the
operating rules and practices in use by
the railroad. The rules and practices
covered by this subpart include the
procedures for instruction and testing of
all employees involved with the
movement of rail vehicles, including
drivers, on-board attendants, station
platform attendants, general control
center staff, and all maintenance staff,
which are necessary to ensure that they
possess the requisite skill and
knowledge of the rules and operating
practices to maintain the safety of the
system.
§ 299.503 Operating rules; filing and
recordkeeping.
(a) Prior to commencing operations,
the railroad shall develop a code of
operating rules, timetables, and
timetable special instructions. The
initial code of operating rules,
timetables, and timetable special
instructions shall be based on practices
and procedures proven on the Tokaido
Shinkansen system.
(b) The railroad shall keep one copy
of its current code of operating rules,
timetables, timetable special instruction,
at its system headquarters, and shall
make them available to FRA for
inspection and copying during normal
business hours. If the railroad elects to
maintain an electronic record, the
railroad must satisfy the conditions
listed in § 299.11.
§ 299.505 Programs of operational tests
and inspections; recordkeeping.
(a) Requirement to conduct
operational tests and inspections. The
railroad shall periodically conduct
PO 00000
Frm 00069
Fmt 4701
Sfmt 4700
69767
operational tests and inspections to
determine the extent of employee
knowledge, application, and compliance
with its code of operating rules,
timetables, and timetable special
instructions in accordance with a
written program retained at its system
headquarters.
(b) Railroad and railroad testing
officer responsibilities. (1) Each railroad
officer who conducts operational tests
and inspections (railroad testing officer)
shall—
(i) Be qualified on the railroad’s
operating rules in accordance with
§ 299.507;
(ii) Be qualified on the operational
testing and inspection program
requirements and procedures relevant to
the testing and inspections the officer
will conduct;
(iii) Receive appropriate field training,
as necessary to achieve proficiency, on
each operational test or inspection that
the officer is authorized to conduct; and
(iv) Conduct operational tests and
inspections in accordance with the
railroad’s program of operational tests
and inspections.
(2) The railroad shall maintain a
record documenting qualification of
each railroad testing officer. The record
shall be retained by the railroad and
shall be made available to
representatives of the FRA for
inspection and copying during normal
business hours. If the railroad elects to
maintain an electronic record, the
railroad must satisfy the conditions
listed in § 299.11.
(c) Written program of operational
tests and inspections. Within 30 days of
commencing operations, the railroad
shall have a written program of
operational tests and inspections in
effect. The railroad shall maintain one
copy of its current program for periodic
performance of the operational tests and
inspections required by paragraph (a) of
this section, and shall maintain one
copy of each subsequent amendment to
the program as amendments are made.
These records shall be retained at the
system headquarters of the railroad for
three calendar years after the end of the
calendar year to which they relate.
These records shall be made available to
representatives of the FRA for
inspection and copying during normal
business hours. The program shall—
(1) Provide for operational testing and
inspection under the various operating
conditions on the railroad;
(2) Describe each type of operational
test and inspection adopted, including
the means and procedures used to carry
it out;
(3) State the purpose of each type of
operational test and inspection;
E:\FR\FM\03NOR2.SGM
03NOR2
khammond on DSKJM1Z7X2PROD with RULES2
69768
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
(4) State the frequency with which
each type of operational test and
inspection is conducted;
(5) The program shall address with
particular emphasis those operating
rules that cause or are likely to cause the
most accidents or incidents, such as
those accidents or incidents identified
in the six-month reviews and the annual
summaries as required under
paragraphs (e) and (f) of this section;
(6) Identify the officer(s) by name and
job title responsible for ensuring that the
program of operational tests and
inspections is properly implemented
and is responsible for overseeing the
entire program. The responsibilities of
such officer(s) shall include, but not be
limited to, ensuring that the railroad’s
testing officers are directing their efforts
in an appropriate manner to reduce
accidents/incidents and that all required
reviews and summaries are completed;
and
(7) Include a schedule for making the
program fully operative within 210 days
after it begins.
(d) Records. (1) The railroad shall
keep a written or electronic record of
the date, time, place, and result of each
operational test and inspection that was
performed in accordance with its
program. Each record shall specify the
officer administering the test and
inspection and each employee tested.
These records shall be retained at the
system headquarters of the railroad for
one calendar year after the end of the
calendar year to which they relate.
These records shall be made available to
representatives of the FRA for
inspection and copying during normal
business hours.
(2) The railroad shall retain one copy
of its current program for periodic
performance of the operational tests and
inspections required by paragraph (a) of
this section and one copy of each
subsequent amendment to such
program. These records shall be retained
for three calendar years after the end of
the calendar year to which they relate at
the system headquarters where the tests
and inspections are conducted. These
records shall be made available to
representatives of the FRA for
inspection and copying during normal
business hours.
(e) Reviews of tests and inspections
and adjustments to the program of
operational tests—(1) Reviews by the
railroad. Not less than once every 180
days the railroad’s designated officer(s)
shall conduct periodic reviews and
analyses as provided in this paragraph
and shall retain, at its system
headquarters, one copy of the reviews.
Each such review shall be completed
within 30 days of the close of the
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
period. The designated officer(s) shall
conduct a written review of—
(i) The operational testing and
inspection data for the system to
determine compliance by the railroad
testing officers with its program of
operational tests and inspections
required by paragraph (c) of this section.
At a minimum, this review shall include
the name of each railroad testing officer,
the number of tests and inspections
conducted by each officer, and whether
the officer conducted the minimum
number of each type of test or
inspection required by the railroad’s
program;
(ii) Accident/incident data, the results
of prior operational tests and
inspections, and other pertinent safety
data for the system to identify the
relevant operating rules related to those
accidents/incidents that occurred
during the period. Based upon the
results of that review, the designated
officer(s) shall make any necessary
adjustments to the tests and inspections
required of railroad officers for the
subsequent period(s); and
(iii) Implementation of the program of
operational tests and inspections from a
system perspective, to ensure that it is
being utilized as intended, that the other
reviews provided for in this paragraph
have been properly completed, that
appropriate adjustments have been
made to the distribution of tests and
inspections required, and that the
railroad testing officers are
appropriately directing their efforts.
(2) Records retention. The records of
reviews required in paragraphs (e)(1) of
this section shall be retained for a
period of one year after the end of the
calendar year to which they relate and
shall be made available to
representatives of FRA for inspection
and copying during normal business
hours.
(f) Annual summary on operational
tests and inspections. Before March 1 of
each calendar year, the railroad shall
retain, at its system headquarters, one
copy of a written summary of the
following with respect to its previous
year’s activities: The number, type, and
result of each operational test and
inspection that was conducted as
required by paragraphs (a) and (c) of this
section. These records shall be retained
for three calendar years after the end of
the calendar year to which they relate
and shall be made available to
representatives of FRA for inspection
and copying during normal business
hours.
(g) Electronic recordkeeping. Nothing
in this section precludes the railroad
from maintaining the information
required to be retained under this part
PO 00000
Frm 00070
Fmt 4701
Sfmt 4700
in an electronic format provided that the
railroad satisfy the conditions listed in
§ 299.11.
(h) Disapproval of program. Upon
review of the program of operational
tests and inspections required by this
section, the Associate Administrator for
Safety may, for cause stated, disapprove
the program in whole or in part.
Notification of such disapproval shall be
made in writing and specify the basis
for the disapproval decision. If the
Associate Administrator for Safety
disapproves the program—
(1) The railroad has 35 days from the
date of the written notification of such
disapproval to—
(i) Amend its program; or
(ii) Provide a written response in
support of the program to the Associate
Administrator for Safety. If the
Associate Administrator for Safety still
disapproves the program in whole or in
part after receiving the railroad’s written
response, the railroad shall amend its
program.
(2) A failure to adequately amend the
program will be considered a failure to
implement a program under this
subpart.
§ 299.507 Program of instruction on
operating rules; recordkeeping.
(a) To ensure that each railroad
employee whose activities are governed
by the railroad’s operating rules
understands those rules, the railroad
periodically shall instruct each such
employee on the meaning and
application of its operating rules with a
written program developed under
§ 299.13(c)(3) and retained at its system
headquarters.
(b) Prior to commencing operations,
the railroad shall file and retain one
copy of its current program for the
periodic instruction of its employees as
required by paragraph (a) of this section
and shall file and retain one copy of any
amendment to that program as
amendments are made. These records
shall be retained at the railroad’s system
headquarters for one calendar year after
the end of the calendar year to which
they relate. These records shall be made
available to representatives of the FRA
for inspection and copying during
normal business hours. This program
shall—
(1) Describe the means and
procedures used for instruction of the
various classes of affected employees;
(2) State the frequency of instruction
and the basis for determining that
frequency;
(3) Include a schedule for completing
the initial instruction of employees who
are already employed when the program
begins;
E:\FR\FM\03NOR2.SGM
03NOR2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
(4) Begin on the date of commencing
operations; and
(5) Provide for initial instruction of
each employee hired after the program
begins.
(c) The railroad is authorized to retain
by electronic recordkeeping its program
for periodic instruction of its employees
on operating rules, provided that the
requirements stated in § 299.11 are
satisfied.
Subpart F—System Qualification Tests
§ 299.601 Responsibility for verification
demonstrations and tests.
The railroad shall comply with the
pre-revenue qualification tests and
verification requirements set forth in
this subpart to demonstrate the overall
safety of the system, prior to revenue
operations.
khammond on DSKJM1Z7X2PROD with RULES2
§ 299.603 Preparation of system-wide
qualification test plan.
(a) Prior to execution of any tests as
defined in this subpart, the railroad
shall develop a system-wide
qualification test plan, that identifies
the tests that will be carried out, to
demonstrate the operability of all
system elements, including track and
infrastructure, signal and trainset
control system, communications, rolling
stock, software, and operating practices,
and the system as a whole.
(b) The system-wide qualification test
plan shall be submitted to FRA in
accordance with § 299.9 for review at
least 180 days prior to testing. FRA shall
notify the railroad, in writing, within 45
days of receipt of the railroad’s
submission, and identify any
deficiencies in the test plan. FRA will
notify the railroad of any procedures to
be submitted for review. The plan shall
include the following:
(1) A list of all tests to be conducted;
(2) A summary statement of the test
objectives;
(3) A planned schedule for
conducting the tests which indicates the
sequence of testing and
interdependencies; and
(4) The approach taken for—
(i) Verifying results of installation
tests performed by contractors and
manufacturers;
(ii) Functional and performance
qualification testing of individual
safety-related equipment, facilities, and
subsystems in accordance with
§ 299.605;
(iii) Pre-revenue service system
integration testing of the system per
§ 299.607, that includes vehicle/track
system qualification testing per
§ 299.609;
(iv) Simulated revenue operations of
the system per § 299.611;
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
(v) Compliance with operating rules
as per subpart E of this part;
(vi) Training and qualification of all
personnel involved in the test program
to conduct tests safely and in
accordance with operating rules;
(vii) Verification of all emergency
preparedness procedures; and
(viii) Field testing of the railroad’s
uncertified PTC system and regression
testing of its FRA-certified PTC system,
under § 299.201.
(c) The railroad shall adopt and
comply with the system-wide
qualification test plan, including
completion of all tests required by the
plan.
(d) After FRA review of the systemwide test plan, detailed test procedures
as required by paragraph (b) of this
section shall be submitted 15 days prior
to testing to FRA in accordance with
§ 299.9 for review.
(e) Each test procedure shall include
the following elements:
(1) A clear statement of the test
objectives. One of the principal test
objectives shall be to demonstrate that
the railroad’s system meets the safety
design and performance requirements
specified in this part when operated in
the environment in which it will be
used;
(2) Any special safety precautions to
be observed during the testing;
(3) A description of the railroad
property or facilities to be used to
conduct the tests;
(4) Prerequisites for conducting each
test;
(5) A detailed description of how the
tests are to be conducted. This
description shall include—
(i) An identification of the systems
and equipment to be tested;
(ii) The method by which the systems
and equipment shall be tested;
(iii) The instrumentation to be used
and calibration procedures;
(iv) The means by which the test
results will be recorded, analyzed and
reported to FRA;
(v) A description of the information or
data to be obtained;
(vi) A description of how the
information or data obtained is to be
analyzed or used;
(vii) A description of any criteria to be
used as safety limits during the testing;
(viii) The criteria to be used to
evaluate performance of the systems and
equipment. If system qualification is to
be based on extrapolation of less than
full-level testing results, the analysis
done to justify the validity of the
extrapolation shall be described; and
(ix) Inspection, testing, and
maintenance procedures to be followed
to ensure that testing is conducted
safely.
PO 00000
Frm 00071
Fmt 4701
Sfmt 4700
69769
(f) The railroad shall provide FRA
notice at least 30 days in advance of the
times and places of any domestic testing
and notice at least 90 days in advance
for testing not conducted domestically
to permit FRA observation of such tests.
§ 299.605 Functional and performance
qualification tests.
The railroad shall conduct functional
and performance qualification tests,
prior to commencing revenue
operations, to verify that all safetycritical components meet all functional
and all performance specifications.
§ 299.607 Pre-revenue service system
integration testing.
(a) Prior to commencing revenue
operations, the railroad shall conduct
tests of the trainsets throughout the
system to—
(1) Verify mechanical positioning of
the overhead catenary system; and
(2) Verify performance of the trainset,
track, and signal and trainset control
systems.
(b) The railroad shall demonstrate safe
operation of the system during normal
and degraded-mode operating
conditions. At a minimum, the
following operation tests shall be
performed:
(1) Slow-speed operation of a trainset;
(2) Verification of correct overhead
catenary and pantograph interaction;
(3) Verification of trainset clearance at
structures and passenger platforms;
(4) Incremental increase of trainset
speed;
(5) Performance tests on trainsets to
verify braking rates in accordance with
§ 299.409;
(6) Verification of vehicle noise;
(7) Verification of correct vehicle
suspension characteristics;
(8) Vehicle/track system qualification
as defined in § 299.609;
(9) Load tests with vehicles to verify
relay settings and signal and
communication system immunization;
(10) Monitoring of utility supply
circuits and telephone circuits to ensure
the adequacy of power supplies, and to
verify that transient-related disturbances
are within acceptable limits;
(11) Verification of vehicle detection
due to shunting of signal system
circuits;
(12) Verification of safe operation of
the signal and trainset control system as
required by subpart B of this part;
(13) Tests of trainset radio reception
during system-wide vehicle operation;
and
(14) Verification of electromagnetic
interference/electromagnetic
compatibility between various
subsystems.
E:\FR\FM\03NOR2.SGM
03NOR2
69770
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
khammond on DSKJM1Z7X2PROD with RULES2
§ 299.609 Vehicle/track system
qualification.
(a) General. All vehicles types
intended to operate in revenue service
shall be qualified for operation in
accordance with this subpart. A
qualification program shall be used to
demonstrate that the vehicle/track
system will not exceed the wheel/rail
force safety limits, and the carbody and
bogie acceleration criteria specified in
paragraph (h) of this section—
(1) At any speed up to and including
10 km/h (6 mph) above the proposed
maximum operating speed; and
(2) On track meeting the requirements
for the class of track associated with the
proposed maximum operating speed as
defined in § 299.309. For purposes of
qualification testing, speeds may exceed
the maximum allowable operating speed
for the class of track in accordance with
the test plan approved by FRA.
(b) New vehicle/track system
qualification. Vehicle types not
previously qualified under this subpart
shall be qualified in accordance with
the requirements of this paragraph (b).
(1) Carbody acceleration. For vehicle
types intended to operate in revenue
service at track class H4 speeds or
above, qualification testing conducted
over a representative segment of the
route shall demonstrate that the vehicle
type will not exceed the carbody lateral
and vertical acceleration safety limits
specified in paragraph (h) of this
section.
(2) Bogie lateral acceleration. For
vehicle types intended to operate at
track class H4 speeds or above,
qualification testing conducted over a
representative segment of the route shall
demonstrate that the vehicle type will
not exceed the bogie lateral acceleration
safety limit specified in paragraph (h) of
this section.
(3) Measurement of wheel/rail forces.
For vehicle types intended to operate at
track class H4 speeds or above,
qualification testing conducted over a
representative segment of the route shall
demonstrate that the vehicle type will
not exceed the wheel/rail force safety
limits specified in paragraph (h) of this
section.
(c) Previously qualified vehicle/track
system. Vehicle/track systems
previously qualified under this subpart
for a track class and cant deficiency on
one route may be qualified for operation
at the same class and cant deficiency on
another route through testing to
demonstrate compliance with paragraph
(a) of this section in accordance with the
following:
(1) Carbody acceleration. For vehicle
types intended to operate at track class
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
H4 speeds and above, qualification
testing conducted over a representative
segment of the new route shall
demonstrate that the vehicle type will
not exceed the carbody lateral and
vertical acceleration safety limits
specified in paragraph (h) of this
section.
(2) Bogie lateral acceleration. For
vehicle types intended to operate at
track class H4 speeds or above,
measurement of bogie lateral
acceleration during qualification testing
shall demonstrate that the vehicle type
will not exceed the bogie lateral
acceleration safety limit specified in
paragraph (h) of this section.
Measurement of bogie lateral
acceleration, if conducted, shall be
performed over a representative segment
of the new route.
(d) Vehicle/track system qualification
testing plan. To obtain the data required
to support the qualification program
outlined in paragraphs (b) and (c) of this
section, the railroad shall submit a
qualification testing plan as required by
§ 299.603(b) at least 60 days prior to
testing, requesting approval to conduct
the testing at the desired speeds and
cant deficiencies. This test plan shall
provide for a test program sufficient to
evaluate the operating limits of the track
and vehicle type and shall include—
(1) Identification of the representative
segment of the route for qualification
testing;
(2) Consideration of the operating
environment during qualification
testing, including operating practices
and conditions, the signal system, and
trainset on adjacent tracks;
(3) The maximum angle found on the
gauge face of the designed (newlyprofiled) wheel flange referenced with
respect to the axis of the wheelset that
will be used for the determination of the
Single Wheel L/V Ratio safety limit
specified in paragraph (h) of this
section; and
(4) A target maximum testing speed in
accordance with paragraph (a) of this
section and the maximum testing cant
deficiency.
(e) Qualification testing. Upon FRA
approval of the vehicle/track system
qualification testing plan, qualification
testing shall be conducted in two
sequential stages as required in this
subpart.
(1) Stage-one testing shall include
demonstration of acceptable vehicle
dynamic response of the subject vehicle
as speeds are incrementally increased—
(i) On a segment of tangent track, from
acceptable track class H4 speeds to the
target maximum test speed; and
PO 00000
Frm 00072
Fmt 4701
Sfmt 4700
(ii) On a segment of curved track,
from the speeds corresponding to 76
mm (3 inches) of cant deficiency to the
maximum testing cant deficiency.
(2) When stage-one testing has
successfully demonstrated a maximum
safe operating speed and cant
deficiency, stage-two testing shall
commence with the subject equipment
over a representative segment of the
route as identified in paragraph (d)(1) of
this section.
(i) A test run shall be conducted over
the route segment at the speed the
railroad will request FRA to approve for
such service.
(ii) An additional test run shall be
conducted at 10 km/h (6 mph) above
this speed.
(3) When conducting stage-one and
stage-two testing, if any of the
monitored safety limits are exceeded on
any segment of track, testing may
continue provided that the track
location(s) where any of the limits are
exceeded be identified and test speeds
be limited at the track location(s) until
corrective action is taken. Corrective
action may include making adjustments
to the track, to the vehicle, or to both of
these system components.
(4) Prior to the start of the
qualification testing program, a
qualifying Track Geometry
Measurement System (TGMS) shall be
operated over the intended route within
30 calendar days prior to the start of the
qualification testing program to verify
compliance with the track geometry
limits specified in § 299.311.
(f) Qualification testing results. The
railroad shall submit a report to FRA
detailing all the results of the
qualification program in accordance
with § 299.613. The report shall be
submitted at least 60 days prior to the
intended operation of the equipment in
revenue service over the route.
(g) Cant deficiency. Based on the test
results and all other required
submissions, FRA will approve a
maximum trainset speed and value of
cant deficiency for revenue service,
normally within 45 days of receipt of all
the required information. FRA may
impose conditions necessary for safely
operating at the maximum approved
trainset speed and cant deficiency.
(h) Vehicle/track interaction
regulatory limits. The following vehicle/
track interaction regulatory limits shall
not be exceeded during qualification
testing in accordance with this section.
BILLING CODE 4910–06–P
E:\FR\FM\03NOR2.SGM
03NOR2
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
PO 00000
Frm 00073
Fmt 4701
Sfmt 4725
E:\FR\FM\03NOR2.SGM
03NOR2
69771
ER03NO20.009
khammond on DSKJM1Z7X2PROD with RULES2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
VerDate Sep<11>2014
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
18:02 Nov 02, 2020
Jkt 253001
PO 00000
Frm 00074
Fmt 4701
Sfmt 4725
E:\FR\FM\03NOR2.SGM
03NOR2
ER03NO20.010
khammond on DSKJM1Z7X2PROD with RULES2
69772
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
§ 299.611
Simulated revenue operations.
(a) The railroad shall conduct
simulated revenue operations for a
minimum period of two weeks prior to
revenue operations to verify overall
system performance, and provide
operating and maintenance experience.
(b) The railroad shall maintain a log
of tests conducted during the simulated
revenue operations period. This log of
tests shall identify any problems
encountered during testing, and actions
necessary to correct defects in
workmanship, materials, equipment,
design, or operating parameters.
(c) The railroad shall implement all
actions necessary to correct safety
defects, as identified by the log prior to
the initiation of revenue service.
khammond on DSKJM1Z7X2PROD with RULES2
§ 299.613
Verification of compliance.
(a) The railroad shall prepare a report
detailing the results of functional and
performance qualification tests, prerevenue service system integration
testing, and vehicle/track system
qualification tests required under
§§ 299.605, 299.607, and 299.609
respectively. The report shall identify
any problems encountered during
testing, and alternative actions
necessary to correct defects in
workmanship, materials, equipment,
design, or operating parameters.
(b) The railroad shall implement all
actions necessary to correct defects, as
identified by the report.
(c) The railroad shall submit the
report(s) required by paragraph (a) of
this section to FRA prior to commencing
simulated revenue operations and at
least 60 days prior to the intended start
of full revenue service per § 299.609(f).
(d)(1) Prior to implementing a major
upgrade to any safety-critical system
component or sub-system, or prior to
introducing any new safety-critical
technology, the railroad shall submit for
FRA approval the detailed test
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
procedures and/or analysis in
accordance with § 299.603(d).
(2) The railroad shall prepare a report
detailing the results of functional and
performance qualification tests, prerevenue service system integration
testing, and vehicle/track system
qualification tests required under
§§ 299.605, 299.607, and 299.609
respectively pertaining to a major
upgrade to any safety-critical system
component or sub-system, or
introduction of any new safety-critical
technology. The report shall identify
any problems encountered during
testing, and alternative actions
necessary to correct defects in
workmanship, materials, equipment,
design, or operating parameters.
Subpart G—Inspection, Testing, and
Maintenance Program
§ 299.701
General requirements.
Under the procedures provided in
§ 299.713, the railroad shall obtain FRA
approval of a written inspection, testing,
and maintenance program. The program
shall provide detailed information,
consistent with the requirements set
forth in §§ 299.337 through 299.349, and
299.445(a), on the inspection, testing,
and maintenance procedures necessary
for the railroad to safely operate its
system. This information shall include a
detailed description of—
(a) Safety inspection procedures,
intervals, and criteria;
(b) Test procedures and intervals;
(c) Scheduled preventive maintenance
intervals;
(d) Maintenance procedures; and
(e) Special testing equipment or
measuring devices required to perform
safety inspections and tests.
§ 299.703
Compliance.
After the railroad’s inspection, testing,
and maintenance program is approved
by FRA pursuant to the requirements
and procedures set forth in § 299.713,
PO 00000
Frm 00075
Fmt 4701
Sfmt 4700
the railroad shall adopt and comply
with the program, and shall perform—
(a) All inspections and tests described
in the program in accordance with the
procedures and criteria that the railroad
identified as safety-critical; and
(b) All maintenance tasks and
procedures described in the program in
accordance with the procedures and
intervals that the railroad identified as
safety-critical.
§ 299.705 Standard procedures for safely
performing inspection, testing, and
maintenance, or repairs.
(a) The railroad shall establish written
standard procedures for performing all
safety-critical or potentially hazardous
inspection, testing, maintenance, and
repair tasks. These standard procedures
shall—
(1) Describe in detail each step
required to safely perform the task;
(2) Describe the knowledge necessary
to safely perform the task;
(3) Describe any precautions that shall
be taken to safely perform the task;
(4) Describe the use of any safety
equipment necessary to perform the
task;
(5) Be approved by the railroad’s
official responsible for safety;
(6) Be enforced by the railroad’s
supervisors responsible for
accomplishing the tasks; and
(7) Be reviewed annually by the
railroad. The railroad shall provide
written notice to FRA in accordance
with § 299.9 at least one month prior to
the annual review. If the Associate
Administrator or their designee
indicates a desire to be present, the
railroad shall provide a scheduled date
and location for the annual review. If
the Associate Administrator requests the
annual review be performed on another
date but the railroad and the Associate
Administrator are unable to agree on a
date for rescheduling, the annual review
may be performed as scheduled.
E:\FR\FM\03NOR2.SGM
03NOR2
ER03NO20.011
BILLING CODE 4910–06–C
69773
69774
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
(b) The inspection, testing, and
maintenance program required by this
section is not intended to address and
should not include procedures to
address employee working conditions
that arise in the course of conducting
the inspections, tests, and maintenance
set forth in the program. When
reviewing the railroad’s program, FRA
does not intend to review or approve
any portion of the program that relates
to employee working conditions.
§ 299.707
Maintenance intervals.
(a) The initial scheduled maintenance
intervals shall be based on those in
effect on the Tokaido Shinkansen
system as required under § 299.13(c)(1).
(b) The maintenance interval of
safety-critical components shall be
changed only when justified by
accumulated, verifiable operating data,
and approved by FRA under paragraph
§ 299.713.
§ 299.709
Quality control program.
The railroad shall establish an
inspection, testing, and maintenance
quality control program enforced by the
railroad or its contractor(s) to reasonably
ensure that inspections, testing, and
maintenance are performed in
accordance with inspection, testing, and
maintenance program established under
this subpart.
§ 299.711 Inspection, testing, and
maintenance program format.
The submission to FRA for each
identified subsystem shall consist of
two parts—
(a) The complete inspection, testing,
and maintenance program, in its
entirety, including all required
information prescribed in § 299.701, and
all information and procedures required
for the railroad and its personnel to
implement the program.
(b) A condensed version of the
program that contains only those items
identified as safety-critical, per
§ 299.703 submitted for approval by
FRA under § 299.713.
khammond on DSKJM1Z7X2PROD with RULES2
§ 299.713
Program approval procedure.
(a) Submission. Except as provided in
§ 299.445(a)(2), the railroad shall submit
for approval an inspection, testing, and
maintenance program as described in
§ 299.711(b) not less than 180 days prior
to pre-revenue service system
integration testing. The program shall be
submitted to FRA in accordance with
§ 299.9. If the railroad seeks to amend
an approved program as described in
§ 299.711(b), the railroad shall file with
FRA in accordance with § 299.9 for
approval of such amendment not less
than 60 days prior to the proposed
effective date of the amendment. A
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
program responsive to the requirements
of this subpart or any amendment to the
program shall not be implemented prior
to FRA approval.
(b) Contents. Each program or
amendment shall contain:
(1) The information prescribed in
§ 299.701 for such program or
amendment; and
(2) The name, title, address, and
telephone number of the primary person
to be contacted with regard to review of
the program, its content, or
amendments.
(c) Approval. (1) Within 90 days of
receipt of the initial inspection, testing,
and maintenance program, FRA will
review the program. The Associate
Administrator will notify the primary
railroad contact person in writing
whether the inspection, testing, and
maintenance program is approved and,
if not approved, the specific points in
which the program is deficient.
Deficiencies identified shall be
addressed as directed by FRA prior to
implementing the program.
(2) FRA will review each proposed
amendment to the program that relaxes
an FRA-approved requirement within
45 days of receipt. The Associate
Administrator will then notify the
primary railroad contact person in
writing whether the proposed
amendment has been approved by FRA
and, if not approved, the specific points
in which the proposed amendment is
deficient. The railroad shall correct any
deficiencies as directed by FRA prior to
implementing the amendment. For
amendments proposing to make an
FRA-approved program requirement
more stringent, the railroad is permitted
to implement the amendment prior to
obtaining FRA approval.
(3) Following initial approval of a
program or amendment, FRA may
reopen consideration of the program or
amendment for cause stated.
(4) The railroad may, subject to FRA
review and approval under § 299.15,
implement inspection, testing,
maintenance procedures and criteria,
incorporating new or emerging
technology.
Appendix A to Part 299—Criteria for
Certification of Crashworthy Event
Recorder Memory Module
Section 299.439(c) requires that trainsets
be equipped with an event recorder that
includes a certified crashworthy event
recorder memory module. This appendix
prescribes the requirements for certifying an
event recorder memory module (ERMM) as
crashworthy, including the performance
criteria and test sequence for establishing the
crashworthiness of the ERMM as well as the
marking of the event recorder containing the
crashworthy ERMM.
PO 00000
Frm 00076
Fmt 4701
Sfmt 4700
A. General Requirements
(a) Each manufacturer that represents its
ERMM as crashworthy shall, by marking it as
specified in section B of this appendix,
certify that the ERMM meets the performance
criteria contained in this appendix and that
test verification data are available to the
railroad or to FRA upon request.
(b) The test verification data shall contain,
at a minimum, all pertinent original data logs
and documentation that the test sample
preparation, test set up, test measuring
devices and test procedures were performed
by designated, qualified individuals using
recognized and acceptable practices. Test
verification data shall be retained by the
manufacturer or its successor as long as the
specific model of ERMM remains in service
on any trainset.
(c) A crashworthy ERMM shall be marked
by its manufacturer as specified in section B
of this appendix.
B. Marking Requirements
(a) The outer surface of the event recorder
containing a certified crashworthy ERMM
shall be colored international orange. In
addition, the outer surface shall be inscribed,
on the surface allowing the most visible area,
in black letters on an international orange
background, using the largest type size that
can be accommodated, with the words
‘‘CERTIFIED DOT CRASHWORTHY’’,
followed by the ERMM model number (or
other such designation), and the name of the
manufacturer of the event recorder. This
information may be displayed as follows:
CERTIFIED DOT CRASHWORTHY
Event Recorder Memory Module Model
Number
Manufacturer’s Name
Marking ‘‘CERTIFIED DOT
CRASHWORTHY’’ on an event recorder
designed for installation in the railroad’s
trainsets is the certification that all
performance criteria contained in this
appendix have been met and all functions
performed by, or on behalf of, the
manufacturer whose name appears as part of
the marking, conform to the requirements
specified in this appendix.
(b) Retro-reflective material shall be
applied to the edges of each visible external
surface of an event recorder containing a
certified crashworthy ERMM.
C. Performance Criteria for the ERMM
An ERMM is crashworthy if it has been
successfully tested for survival under
conditions of fire, impact shock, static crush,
fluid immersion, and hydro-static pressure
contained in one of the two tables shown in
this section of appendix B. (See Tables 1 and
2.) Each ERMM must meet the individual
performance criteria in the sequence
established in section D of this appendix. A
performance criterion is deemed to be met if,
after undergoing a test established in this
appendix B for that criterion, the ERMM has
preserved all of the data stored in it. The data
set stored in the ERMM to be tested shall
include all the recording elements required
by § 299.439(c). The following tables describe
alternative performance criteria that may be
used when testing an ERMM’s
E:\FR\FM\03NOR2.SGM
03NOR2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
crashworthiness. A manufacturer may utilize
either table during its testing but may not
69775
combine the criteria contained in the two
tables.
TABLE 1 TO APPENDIX A OF PART 299—ACCEPTABLE PERFORMANCE CRITERIA—OPTION A
Parameter
Value
Duration
Fire, High Temperature ..................
Fire, Low Temperature ..................
Impact Shock .................................
Static Crush ...................................
Fluid Immersion .............................
750 °C (1400 °F) ..........................
260 °C (500 °F) ............................
55g ................................................
110kN (25,000 lbf) ........................
#1 Diesel, #2 Diesel, Water, Salt
Water, Lube Oil.
Fire Fighting Fluid .........................
60 minutes ....................................
10 hours.
100 ms ..........................................
5 minutes.
Any single fluid, 48 hours.
Depth equivalent = 15 m. (50 ft.)
48 hours at nominal temperature
of 25 °C (77 °F).
Hydrostatic Pressure .....................
Remarks
10 minutes, following immersion
above.
Heat source: Oven.
⁄ sine crash pulse.
12
Immersion followed by 48 hours in
a dry location without further
disturbance.
TABLE 2 TO APPENDIX A TO PART 299—ACCEPTABLE PERFORMANCE CRITERIA—OPTION B
Parameter
Value
Duration
Fire, High Temperature ..................
Fire, Low Temperature ..................
Impact Shock—Option 1 ................
Impact Shock—Option 2 ................
Static Crush ...................................
1,000 °C (1,832 °F) ......................
260 °C (500 °F) ............................
23gs ..............................................
55gs ..............................................
111.2kN (25,000 lbf), 44.5kN
(10,000 lbf).
#1 Diesel, #2 Diesel, Water, Salt
Water, Lube Oil, Fire Fighting
Fluid.
46.62 psig (= 30.5 m. or 100 ft.) ..
60 minutes ....................................
10 hours ........................................
250 ms.
100 ms ..........................................
5 minutes. (single ‘‘squeeze’’) ......
Fluid Immersion .............................
Hydrostatic Pressure .....................
D. Testing Sequence
khammond on DSKJM1Z7X2PROD with RULES2
In order to reasonably duplicate the
conditions an event recorder may encounter,
the ERMM shall meet the various
performance criteria, described in section C
of this appendix, in a set sequence. (See
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
Frm 00077
Fmt 4701
Heat source: Open flame.
Heat source: Oven.
⁄ sine crash pulse.
Applied to 25% of surface of largest face.
12
48 hours each.
48 hours at nominal temperature
of 25 °C (77 °F).
Figure 1). If all tests are done in the set
sequence (single branch testing), the same
ERMM must be utilized throughout. If a
manufacturer opts for split branch testing,
each branch of the test must be conducted
using an ERMM of the same design type as
PO 00000
Remarks
Sfmt 4700
used for the other branch. Both alternatives
are deemed equivalent, and the choice of
single branch testing or split branch testing
may be determined by the party representing
that the ERMM meets the standard.
E:\FR\FM\03NOR2.SGM
03NOR2
Federal Register / Vol. 85, No. 213 / Tuesday, November 3, 2020 / Rules and Regulations
E. Testing Exception
B. Test Site Requirements
If a new model ERMM represents an
evolution or upgrade from an older model
ERMM that was previously tested and
certified as meeting the performance criteria
contained in section C of this appendix, the
new model ERMM need only be tested for
compliance with those performance criteria
contained in section C of this appendix that
are potentially affected by the upgrade or
modification. FRA will consider a
performance criterion not to be potentially
affected if a preliminary engineering analysis
or other pertinent data establishes that the
modification or upgrade will not change the
performance of the older model ERMM
against the performance criterion in question.
The manufacturer shall retain and make
available to FRA upon request any analysis
or data relied upon to satisfy the
requirements of this paragraph to sustain an
exception from testing.
The test shall meet the following
requirements:
(a) The passenger trainset shall be tested
over a representative segment of the railroad
and shall not be tested in any site specifically
designed to artificially lower in-cab noise
levels.
(b) All windows, doors, cabinets, seals,
etc., must be installed in the trainset cab and
be closed.
(c) The heating, ventilation and air
conditioning (HVAC) system or a dedicated
heating or air conditioner system must be
operating on high, and the vents must be
open and unobstructed.
khammond on DSKJM1Z7X2PROD with RULES2
Appendix B to Part 299—Cab Noise
Test Protocol
This appendix prescribes the procedures
for the in-cab noise measurements for highspeed trainsets at speed. The purpose of the
cab noise testing is to ensure that the noise
levels within the cab of the trainset meet the
minimum requirements defined within
§ 299.431(h).
A. Measurement Instrumentation
The instrumentation used shall conform to
the requirements prescribed in appendix H to
part 229 of this chapter.
VerDate Sep<11>2014
18:02 Nov 02, 2020
Jkt 253001
C. Procedures for Measurement
(a) LAeq,T is defined as the A-weighted,
equivalent sound level for a duration of T
seconds, and the sound level meter shall be
set for A-weighting with slow response.
(b) The sound level meter shall be
calibrated with the acoustic calibrator
immediately before and after the in-cab tests.
The calibration levels shall be recorded.
(c) Any change in the before and after
calibration level(s) shall be less than 0.5 dB.
(d) The sound level meter shall be located:
(1) Laterally as close as practicable to the
longitudinal centerline of the cab, adjacent to
the driver’s seat,
(2) Longitudinally at the center of the
driver’s nominal seating position, and
(3) At a height 1219 mm (48 inches) above
the floor.
(e) The sound measurements shall be taken
autonomously within the cab.
PO 00000
Frm 00078
Fmt 4701
Sfmt 9990
(f) The sound level shall be recorded at the
maximum approved trainset speed (0/¥3
km/h).
(g) After the passenger trainset speed has
become constant at the maximum test speed
and the in-cab noise is continuous, LAeq,T
shall be measured, either directly or using a
1 second sampling interval, for a minimum
duration of 30 seconds at the measurement
position (LAeq, 30s).
D. Reporting
To demonstrate compliance, the railroad
shall prepare and submit a test report in
accordance with § 299.613. As a minimum
that report shall contain—
(a) Name(s) of person(s) conducting the
test, and the date of the test.
(b) Description of the passenger trainset
cab being tested, including: Car number and
date of manufacture.
(c) Description of sound level meter and
calibrator, including: Make, model, type,
serial number, and manufacturer’s calibration
date.
(d) The recorded measurement during
calibration and for the microphone location
during operating conditions.
(e) The recorded measurements taken
during the conduct of the test.
(f) Other information as appropriate to
describe the testing conditions and
procedure.
Issued in Washington, DC.
Quintin Kendall,
Deputy Administrator.
[FR Doc. 2020–20388 Filed 11–2–20; 8:45 am]
BILLING CODE 4910–06–P
E:\FR\FM\03NOR2.SGM
03NOR2
ER03NO20.012
69776
Agencies
[Federal Register Volume 85, Number 213 (Tuesday, November 3, 2020)]
[Rules and Regulations]
[Pages 69700-69776]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-20388]
[[Page 69699]]
Vol. 85
Tuesday,
No. 213
November 3, 2020
Part II
Department of Transportation
-----------------------------------------------------------------------
Federal Railroad Administration
-----------------------------------------------------------------------
49 CFR Part 299
Texas Central Railroad High-Speed Rail Safety Standards; Final Rule
Federal Register / Vol. 85 , No. 213 / Tuesday, November 3, 2020 /
Rules and Regulations
[[Page 69700]]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
49 CFR Part 299
[Docket No. FRA-2019-0068, Notice 5]
RIN 2130-AC84
Texas Central Railroad High-Speed Rail Safety Standards
AGENCY: Federal Railroad Administration (FRA), Department of
Transportation (DOT).
ACTION: Final rule; rule of particular applicability and record of
decision.
-----------------------------------------------------------------------
SUMMARY: This final rule of particular applicability (RPA) establishes
safety standards for the Texas Central Railroad (TCRR or the railroad)
high-speed rail (HSR) system. These standards are not intended for
general application in the railroad industry, but apply only to the
TCRR system planned for development in the State of Texas. This rule
takes a systems approach to safety, and so includes standards that
address the aspects of the TCRR HSR system consistent with the
regulatory framework for the general system, but in a manner
appropriate to TCRR's technology and application, including signal and
trainset control, track, rolling stock, operating practices, system
qualifications, and maintenance. The TCRR HSR system is planned to
operate from Houston to Dallas, on dedicated track, with no grade
crossings, at speeds not to exceed 330 km/h (205 mph). The TCRR rolling
stock, track, and core systems will replicate the Tokaido Shinkansen
HSR system operated by the Central Japan Railway Company (JRC), and
will be used exclusively for revenue passenger service.
DATES: Effective date. This final rule is effective December 3, 2020.
Incorporation by reference. The incorporation by reference of the
standards listed in the rule is approved by the Director of the Federal
Register as of December 3, 2020.
ADDRESSES: Docket: For access to the docket to read background
documents or comments received, go to https://www.regulations.gov at any
time.
FOR FURTHER INFORMATION CONTACT: For issues related to the technical
safety requirements: Frederick Mottley, Systems Engineer, at (617) 494-
3160; Devin Rouse, Mechanical Engineer, at (202) 493-6185; or Michael
Hunter, Attorney Adviser, at (202) 493-0368. For issues related to the
Record of Decision: Kevin Wright, Environmental Protection Specialist
at (202) 493-0845; or Kathryn Johnson, Attorney Adviser, at (202) 493-
0407.
SUPPLEMENTARY INFORMATION:
Table of Contents
I. Executive Summary
II. Statutory Authority
III. Proceedings to Date
IV. Discussion of Comments Received on the NPRM
A. Context and Overview
B. Regulatory Approach
C. General Safety Oversight
D. Interference With the Union Pacific Railroad
E. Track Safety
F. Crashworthiness and Occupant Protection
G. Reissuance of NPRM
H. Electrical Arcing From the Overhead Catenary System
I. Right-of-Way Barrier Protection
J. Emergency Response
K. Noise Emission and Vibration
L. Eminent Domain
M. Regulatory Evaluation
N. Enforcement
V. Discussion of Final Rule and Regulatory Changes
A. Non-Substantive Corrections
B. Evaluation of Substantive Changes
1. Sec. 299.5 Definitions
2. Subpart B--Signal and Trainset Control System
3. Sec. 299.345 Visual Inspections; Right-of-Way
4. Sec. 299.347 Special Inspections
5. Sec. 299.713 Program Approval Procedures
C. Trainset Image Recording System
D. Decision Under 49 U.S.C. 20306, Exemption for Technological
Improvements
E. Incorporation by Reference
VI. FRA's Record of Decision
A. Summary of Alternatives Considered
1. No Build Alternative
2. Build Alternatives
B. Environmentally Preferable Alternative
1. Environmentally Preferable Build Alternative
2. Environmentally Preferable Houston Station Option
C. Mitigation Commitments
VII. Regulatory Impact and Notices
A. Executive Orders 12866 and 13771, and DOT Regulatory Policies
and Procedures
B. Regulatory Flexibility Act and Executive Order 13272;
Regulatory Flexibility Assessment
C. Paperwork Reduction Act
D. Federalism Implications
E. International Trade Impact Assessment
F. National Environmental Policy Act
G. Executive Order 12898 (Environmental Justice)
H. Clean Air Act/Air Quality General Conformity
I. Section 106 of the National Historic Preservation Act
J. Department of Transportation Act Section 4(f) Determination
K. Endangered Species Act/Section 7 U.S. Fish and Wildlife
Service Biological Opinion
L. Executive Order 11990 Preservation of the Nation's Wetlands
(Executive Order 11990 & DOT Order 5660.1a)
M. Floodplain Management (Executive Order 11988 & DOT Order
5650.2)
N. Executive Order 13175 (Tribal Consultation)
O. Unfunded Mandates Reform Act of 1995
P. Energy Impact
I. Executive Summary
On August 30, 2019, FRA granted TCRR's rulemaking petition
(petition), which was submitted April 16, 2016.\1\ The petition
proposed comprehensive safety requirements for the application of JRC's
Tokaido Shinkansen technology, and its associated design and
engineering principals. TCRR's petition represented that the regulatory
requirements offered by TCRR translate the technological and
operational aspects of the JRC Tokaido Shinkansen system in a manner
that can be regulated under a framework similar to other US passenger
rail operations while maintaining the integrity of the safety case
developed by JRC over 50 years of experience operating high-speed
trains.
---------------------------------------------------------------------------
\1\ TCRR supplemented its petition in August 2016, and submitted
an updated petition in September 2017.
---------------------------------------------------------------------------
The Tokaido Shinkansen system first went into service on October 1,
1964, under the operation of the Japanese National Railways (JNR). On
April 1, 1987, JNR was privatized and split into six passenger
railroads and a freight railroad. JRC took over operations of the
Tokaido Shinkansen system in Central Japan, and is still operating the
system today. In over 50 years of Tokaido Shinkansen system operations,
JNR, and now JRC, have optimized operations to a very high level of
safety and performance. The Tokaido Shinkansen system has moved over 6
billion passengers without a passenger fatality or injury due to
trainset accidents such as a derailment or collision.
TCRR intends to implement a high-speed passenger rail system by
using the Tokaido Shinkansen system's service-proven technology and by
replicating JRC's operational and maintenance practices and procedures.
TCRR plans to implement the latest, service-proven derivative of the
N700 trainset and other core systems currently in use on the Tokaido
Shinkansen line,\2\ which have been refined for high-speed operations
over the last 50+ years. TCRR plans to adapt the N700 series trainset
and supporting systems in a manner suitable for the Texas environment
and operate under a regulatory framework that
[[Page 69701]]
enables FRA to provide effective safety oversight.
---------------------------------------------------------------------------
\2\ Subsequent references to ``N700'' or ``N700 series
trainset'' are meant to refer to the N700 series trainset currently
in, or future variants approved for, use.
---------------------------------------------------------------------------
FRA has evaluated the economic burden that the final rule would
have on TCRR. Discussion of this can be found under section VII. A.
Executive Orders 12866 and 13771, and DOT Regulatory Policies and
Procedures. FRA concluded that because this final rule generally
includes only voluntary actions, or alternative action that would be
voluntary, the final rule does not impart additional burdens on TCRR.
Further, this document also contains FRA's Record of Decision with
respect to the environmental review conducted pursuant to the National
Environmental Policy Act (NEPA), as discussed in section VI. FRA's
Record of Decision.
Except for the changes discussed under sections V. A. Non-
substantive Corrections and V. B. Evaluation of Substantive Changes,
FRA is adopting the rule text of the NPRM otherwise unchanged in this
final rule.
II. Statutory Authority
Under the Federal railroad safety laws, FRA has jurisdiction over
all railroads, as defined in 49 U.S.C. 20102, except urban rapid
transit operations that are not connected to the general railroad
system of transportation (general system). Moreover, FRA considers a
standalone intercity railroad line to be part of the general system,
even if it is not physically connected to other railroads (as FRA has
previously stated with respect to the Alaska Railroad; 49 CFR part 209,
appendix A). FRA considers the contemplated TCRR system as intercity
passenger rail, not urban rapid transit. Accordingly, the TCRR system
will be subject to FRA jurisdiction, whether it connects to the general
system or not. Please see FRA's policy statement, contained at 49 CFR
part 209, appendix A, discussing in greater detail FRA's jurisdiction
over passenger railroads, which includes discussion on how FRA
characterizes passenger operations.
FRA has a regulatory program in place, pursuant to its statutory
authority, to address equipment, track, operating practices, and human
factors in the existing, conventional railroad environment. However,
significant operational and equipment differences exist between TCRR's
system and existing passenger operations in the United States. In many
of the railroad safety disciplines, FRA's existing regulations do not
address the safety concerns and operational peculiarities of the TCRR
system. Therefore, to allow TCRR to operate as envisioned, an
alternative regulatory approach is required to provide safety
oversight.
III. Proceedings to Date
On March 10, 2020, FRA published a notice of proposed rulemaking
(NPRM).\3\ The NPRM proposed safety standards to enable safe operations
and an alternate method for Federal safety oversight. The NPRM also
opened the public comment period, which was initially scheduled to
close on May 11, 2020.
---------------------------------------------------------------------------
\3\ 85 FR 14036.
---------------------------------------------------------------------------
On March 12, 2020, FRA announced that it was holding three public
hearings on the NPRM, and was conducting proceedings under 49 U.S.C.
20306.\4\ Those hearings were to be held in Dallas, Navasota, and
Houston, Texas, between March 31 and April 2, 2020. However, in light
of the President's March 13, 2020, national emergency declaration,
Proclamation on Declaring a National Emergency Concerning the Novel
Coronavirus Disease (COVID-19) public health emergency, and the Centers
for Disease Control and Prevention (CDC) guidance to cancel mass
gatherings of people,\5\ FRA postponed the three public hearings on
March 30, 2020.\6\
---------------------------------------------------------------------------
\4\ 85 FR 14449.
\5\ See https://www.cdc.gov/coronavirus/2019-ncov/community/large-events/mass-gatheringsready-for-covid-19.html.
\6\ 85 FR 17527.
---------------------------------------------------------------------------
On April 16, 2020, FRA announced, consistent with CDC guidance
advising against in-person gatherings, that it decided to convene the
three public hearings, and to conduct proceedings under 49 U.S.C.
20306, telephonically between May 4th through 6th, 2020.\7\ The choice
to conduct these hearings telephonically represented merely a change in
the manner of public engagement. Also, in the same announcement, FRA
extended the comment period to May 26, 2020, so that members of the
public would have adequate time to review and provide written comments
on the transcripts of the three public hearings conducted. Further, FRA
addressed the numerous requests it received to not hold ``virtual
hearings,'' due to concerns over the lack of reliable high-speed
internet access, and/or to postpone hearings until they can be safely
held in-person.
---------------------------------------------------------------------------
\7\ 85 FR 21159.
---------------------------------------------------------------------------
In response to public comments, FRA explained that it decided to
hold telephonic hearings, capable of accommodating the same number of
participants as previously scheduled in-person hearings, as it was
consistent with ensuring public health and that no technology beyond a
telephone was necessary for participation. Moreover, FRA explained that
there was no need to further postpone the public hearings or further
extend the comment period given the extensive public outreach already
conducted related to this proposed rule, and the supplementary nature
of the public hearings as related to the opportunity to provide
detailed written comments on the proposed rule.
FRA conducted the three telephonic public hearings, and proceedings
under 49 U.S.C. 20306, as scheduled and the comment period closed on
May 26, 2020. FRA is aware of concerns that the publication of the
final environmental impact statement (EIS) effectively cut off the
comment period for the NPRM on May 15, 2020. Those concerns are
unfounded. The Final EIS stated that--
As of the execution of this Final EIS on May 15, 2020, oral
comments made during the public hearings and written comments
submitted to the Docket have raised no new substantive issues
relevant to environmental concerns from those received during the
public comment period of the Draft EIS (discussed in Section 9.6.2,
Public and Agency Involvement, Draft EIS Comment Period, and
Appendix H, Response to Draft EIS Comments) or on topics not already
covered within this Final EIS. FRA will continue to evaluate
comments received during the comment period for the Proposed
Rulemaking. FRA will address comments on technical safety
requirements proposed in the NPRM in the Final Rule, which will be
published in the Federal Register.\8\
---------------------------------------------------------------------------
\8\ See Docket FRA-2019-0068, Final Environmental Impact
Statement at ES-5.
It is clear from the text of the Final EIS that FRA did not close
the rulemaking comment period on May 15, 2020. Rather, FRA informed the
public that FRA was not able to consider in the Final EIS comments
submitted on the NPRM that were received by FRA after May 15, 2020.
This was necessary to allow for printing and distribution of the Final
EIS. However, the text of the Final EIS clarified that FRA continued to
consider comments submitted during the rulemaking comment period.
IV. Discussion of Comments Received on the NPRM 9
---------------------------------------------------------------------------
\9\ Comments submitted regarding the Final EIS are addressed
below, under section VII. F. National Environmental Policy Act.
---------------------------------------------------------------------------
During the 77-day comment period, FRA received 287 written
submissions providing comments on the NPRM and had fifty-two
individuals provide testimony during the three days of public hearings.
As discussed below, not all comments necessitated a response in this
final rule, but all comments were carefully and thoroughly considered.
Although FRA's responses to comments, discussed below, generally
[[Page 69702]]
address issues raised in comments critical of the rulemaking or TCRR,
or both, FRA also received comments supportive of the rulemaking or
TCRR, or both. Commenters providing support ranged from members of the
public, to various railroad or railroad-related associations, to State
and Federal elected officials. As these supportive commenters did not
raise any substantive issues regarding the technical safety
requirements proposed in the NPRM, FRA has not provided a response to
those comments in this final rule.
FRA also received comments requesting that FRA either extend the
comment period or otherwise postpone the issuance of this final rule,
or objecting to the telephonic hearing format or the notice provided
for the public hearings. These comments are addressed above, in section
III. Proceedings to Date.
FRA did not provide responses in this final rule to comments that
were considered either outside the scope of the rulemaking, or that
raised issues that were previously raised to FRA as part of the
environmental review process, which FRA addressed and responded to in
the Final EIS released on May 29, 2020, available for review on FRA's
website for the environmental review of the proposed Dallas to Houston
High-Speed Rail.\10\
---------------------------------------------------------------------------
\10\ FRA. Dallas to Houston High-Speed Rail--Passenger Service
from Houston to Dallas https://railroads.dot.gov/environmental-reviews/dallas-houston-high-speed-rail/dallas-houston-high-speed-rail-passenger, Final Environmental Impact Statement.
---------------------------------------------------------------------------
FRA's responses below address the remaining comments received.
These comments were either critical of the rulemaking or raised issues
necessitating further explanation or clarification. As multiple
commenters raised similar issues, FRA organized its responses so that
like-issues are grouped together.
A. Context and Overview
FRA received comments regarding the timing of the rulemaking in
relation to the timing of the EIS. Commenters expressed confusion over
how the rulemaking and NEPA processes, and the final rule and the EIS
relate to each other. Commenters were concerned about FRA granting a
``safety permit'' without conducting surveys of the entire right-of-way
(ROW), or other types of analyses (such as a hazard analysis). In
addition, commenters raised concerns about the timing of coordination
with other Federal agencies that may need to occur before or during
construction.
As discussed in the NPRM, TCRR approached FRA in March of 2014,
seeking assistance in understanding how FRA would or could apply its
regulations to a high-speed passenger railroad system that replicated
the Tokaido Shinkansen HSR system, as operated by JRC.\11\ On June 25,
2014, FRA published a Notice of Intent to prepare an Environmental
Impact Statement in the Federal Register.\12\ On December 22, 2017, FRA
published its Draft EIS and opened its comment period.\13\ FRA stated
in the Draft EIS that FRA's regulations at the time did not address
safety requirements comprehensively for passenger train operations
above 150 mph, such as TCRR's contemplated operation. As such, FRA
would need to take some form of regulatory action to ensure the
contemplated system would be operated safely, such as issuing an RPA,
imposing requirements or conditions by order(s) or waiver(s), or taking
some other form of regulatory action.\14\ This regulatory action
constitutes a Major Federal Action requiring review under NEPA.\15\
---------------------------------------------------------------------------
\11\ 85 FR 14036, 14038.
\12\ 79 FR 36123.
\13\ 82 FR 60723 and FRA. Dallas to Houston High-Speed Rail--
Passenger Service from Houston to Dallas https://railroads.dot.gov/environmental-reviews/dallas-houston-high-speed-rail/dallas-houston-high-speed-rail-passenger, Draft Environmental Impact Statement.
\14\ While this statement was accurate at the time of
publication of the Draft EIS in December 2017, it was incomplete.
The Final EIS clarified that it was not just the proposed speed of
the TCRR's passenger operations that require FRA regulatory action.
As described in the Final EIS, FRA's existing regulations do not
adequately address the safety concerns and operational
characteristics of TCRR's proposed HSR system. FRA. Dallas to
Houston High-Speed Rail--Passenger Service from Houston to Dallas
https://railroads.dot.gov/environmental-reviews/dallas-houston-high-speed-rail/dallas-houston-high-speed-rail-passenger, Final
Environmental Impact Statement, Chapter 1.0, Introduction.
Subsequent to the publication of the Draft EIS, in November 2018,
FRA published a final rule establishing safety standards for
passenger operations up to 220 miles per hour.
\15\ FRA. Dallas to Houston High-Speed Rail--Passenger Service
from Houston to Dallas https://railroads.dot.gov/environmental-reviews/dallas-houston-high-speed-rail/dallas-houston-high-speed-rail-passenger, Final Environmental Impact Statement, Abstract.
---------------------------------------------------------------------------
The purpose of the NEPA process is to inform the decisionmaker and
the public of the potential environmental impacts that may result from
the proposed action. As such, the EIS must be finalized before the
agency takes the action that is the subject of the environmental
review. The Final EIS itself, while a meaningful milestone in the NEPA
process, does not permit construction or operations. Rather, the EIS
enables FRA to reach a decision that is informed by an understanding of
the potential environmental impacts of this rulemaking.
The analysis of potential environmental impacts in the EIS is based
on TCRR's conceptual engineering design, which is contained in
conceptual engineering reports prepared by TCRR and appended to the
Draft and Final EIS. While the conceptual engineering design has been
appropriately used to inform the NEPA process, TCRR must complete more
thorough engineering and design work to facilitate construction. TCRR
will need to consider the agreed upon mitigation and compliance
measures \16\ and the requirements of this rule as it advances the
engineering design. In addition, TCRR must follow all applicable
Federal, State, and local requirements, which are separate from FRA's
jurisdiction. This includes the Surface Transportation Board (STB),
which issued a decision on July 16, 2020, finding that the operation
proposed by TCRR is subject to STB jurisdiction.\17\
---------------------------------------------------------------------------
\16\ FRA. Dallas to Houston High-Speed Rail--Passenger Service
from Houston to Dallas https://railroads.dot.gov/environmental-reviews/dallas-houston-high-speed-rail/dallas-houston-high-speed-rail-passenger, Record of Decision Attachments, Mitigation
Commitments.
\17\ Surface Transportation Board Decision, Texas Central
Railroad and Infrastructure, Inc. & Texas Central Railroad, LLC-
Petition for Exemption-Passenger Rail Line Between Dallas and
Houston, Tex., July 16, 2020, Docket No. FD 36025. STB also found
that TCRR must file an application under 49 U.S.C. 10901 and 49 CFR
part 1150 to seek STB authority to construct and operate its
proposed system.
---------------------------------------------------------------------------
FRA does not grant any kind of construction approval or permit.
Neither does this final rule, by itself, grant any permission or
authority for TCRR to operate. Furthermore, this rulemaking does not
relieve TCRR of its responsibilities to design, construct and operate a
safe railroad. It merely provides alternatives to certain requirements
and safety standards, which are more appropriate for the technology and
system proposed by TCRR. TCRR must design, operate and maintain its
system in compliance with this regulation.
What this final rule does is establish the minimum Federal safety
requirements with which TCRR must comply. The publication of this final
rule is the beginning for TCRR, not the end, of its continuous
obligation to demonstrate compliance with the regulation. FRA will
continue to provide safety oversight throughout TCRR's development and
testing phases, in addition to during revenue operations. In this
manner, the expectations for compliance are no
[[Page 69703]]
different for TCRR than any other railroad under FRA jurisdiction.
Prior to commencing actual revenue operations, TCRR will need to
demonstrate that all the safety critical components system work
together as a single, integrated system, pursuant to subpart F of this
rule.\18\ This involves a number of points of compliance that TCRR will
work through over the coming years.
---------------------------------------------------------------------------
\18\ See the discussion of System Qualification in the NPRM at
85 FR 14036, 14044.
---------------------------------------------------------------------------
To underscore this point, there are several significant
requirements that TCRR must meet. For example, TCRR must demonstrate
that the trainset meets the requisite crashworthiness and occupant
protection requirements as established under subpart D.\19\ Also, TCRR
must have its positive train control (PTC) system certified in
accordance with 49 U.S.C. 20157 and subpart B of this final rule.\20\
Further, TCRR must train and qualify its employees performing safety
sensitive functions before those employees engage in their respective
work (i.e., drivers will need to be certified under 49 CFR part 240,
maintenance employees will need to be qualified in accordance with
TCRR's training program established under 49 CFR part 243, etc.).\21\
Moreover, not only initially, but continuously thereafter, TCRR must
demonstrate that its track meets the track safety standards outlined in
subpart C. In addition, not only must TCRR comply with the technical
safety requirements established in this final rule, it also must comply
with the other regulations identified under Sec. 299.3(c), such as
part 214, Railroad Workplace Safety; part 219, Control of Alcohol and
Drug Use; part 228, Hours of Service of Railroad Employees; and part
270, System Safety Program.
---------------------------------------------------------------------------
\19\ See the discussion of crashworthiness and occupant
protection under Trainset Structure of the NPRM at 85 FR 14036,
14039, and under section IV. F. Crashworthiness and Occupant
Protection of this final rule.
\20\ Please also see the discussion of Automatic Train Control
System in the NPRM. 85 FR 14036, 14041.
\21\ Please also see section IV. C. 8. Personnel Qualification
in the NPRM at 85 FR 14036, 14045, and section IV. G. Reissuance of
NPRM of this final rule.
---------------------------------------------------------------------------
FRA notes that there were questions and concerns raised with
respect to the lack of interoperability of the system. However, lack of
interoperability is not, per se, a bar to operation in the U.S. It is
true that FRA stated in 2016 that it did not envision a network of
standalone, non-interoperable HSR systems comprising the nationwide
network, but this perspective was built largely on historical
precedence and should not be interpreted as a prohibition in any way.
And in 2018, FRA stated that standalone systems should continue to be
regulated comprehensively (such as through a rule of particular
applicability or other specific regulatory action(s)), and on a case-
by-case basis, as it is prudent due to the small number of potential
operations and the potential for significant differences in their
design.\22\ Since then, FRA has not seen a proliferation of non-
interoperable systems in the U.S. In fact, FRA has seen more potential
conventional (steel-wheel-on-steel-rail) operations avail themselves of
the Tier III requirements rather than pursuing the more arduous and
costly route of being a standalone system. For example, Amtrak's next-
generation Acela is in the process of demonstrating that its new
trainsets comply with the Tier III requirements. XpressWest, is
attempting to conduct Tier III operations between Victorville, CA and
Las Vegas, NV (the XpressWest bullet train). And while FRA generally
considers matters in the context of the established interoperable
general railroad system, FRA's mission is to enable safe, reliable, and
efficient movement of people and goods by rail, regardless of the
technology used.
---------------------------------------------------------------------------
\22\ 83 FR 59182, 59186.
---------------------------------------------------------------------------
B. Regulatory Approach
Several commenters asked why FRA elected to pursue a rule of
particular applicability for TCRR. Initially, FRA notes that taking
action to provide a regulatory framework to govern the operation of the
system proposed by TCRR is consistent with FRA's mission is to enable
safe, reliable, and efficient movement of people and goods by rail.
Further, as FRA stated when granting the petition to undertake the
rulemaking, TCRR's petition demonstrated that TCRR's system would
replicate the system and operations of the Tokaido Shinkansen, as
operated by JRC, allowing TCRR to take advantage of that system's
exemplary 50-year safety record. (Docket FRA-2019-0068, FRA Letter
Granting Petition).
As discussed under section III. Regulatory Approach of the NPRM,
FRA explained that it was taking this approach as it was consistent
with its statement in the Passenger Equipment Safety Standards final
rule, published November 21, 2018.\23\ FRA considers TCRR a standalone
system, as its tracks are not physically connected to the rest of the
general system, and would be prohibited from doing so by this
regulation. FRA stated in 2018 that a standalone system's regulation
would have to bring together all aspects of railroad safety (such as
operating practices, signal and trainset control, and track) that must
be applied to the individual system.\24\ Such an approach covers more
than passenger equipment, and would likely necessitate particular ROW
intrusion protection and other safety requirements not typically
addressed in FRA's more general regulations. With this regulation, FRA
continues to believe that addressing proposals for standalone HSR
systems in this manner is prudent. Entities considering standalone
operations voluntarily assume the higher costs of building new and
dedicated infrastructure, knowing they cannot take advantage of the
cost savings from sharing existing infrastructure.
---------------------------------------------------------------------------
\23\ 85 FR 14036, 14037; 83 FR 59182.
\24\ 83 FR 59182, 59186.
---------------------------------------------------------------------------
Alternatively, FRA could have issued a comprehensive set of waivers
from FRA's existing regulations, to the extent permitted by law, under
49 U.S.C. 20103(b), in order to provide regulatory approval to the
operation. However, in this case, electing to develop and publish a
comprehensive regulation is more efficient. Such a regulation, in
addition to providing regulatory approval, institutes a comprehensive
regulatory framework, that provides TCRR clarity on the minimum Federal
safety standards that it must comply with through technology-
specific,\25\ performance-based requirements. In addition, it provides
the railroad a higher degree of regulatory certainty than waivers, as
waivers are revocable, subject to changing conditions, and necessitate
renewal, generally every five years. Further, by issuing an RPA, FRA is
able to protect the integrity of the system, by establishing regulatory
requirements codifying the service-proven technological, operational,
and maintenance aspects of the Tokaido Shinkansen HSR system operated
by JRC.
---------------------------------------------------------------------------
\25\ Note, FRA typically tries to craft regulations so that they
are technology-neutral and performance-based. Because TCRR's safety
case is derived from the use of JRC's technology, and operational
and maintenance practices, this regulation was written specifically
for that technology to maintain the integrity of the baseline safety
case.
---------------------------------------------------------------------------
C. General Safety Oversight
FRA received a number of comments, both written oral, concerning a
lack of adequate safety oversight for TCRR. The commenters expressed
general concerns regarding the safe construction of the system, and
more specific concerns with construction of the system where it
intersects various pipelines. In addition, commenters expressed
concerns that no
[[Page 69704]]
one agency would be responsible for the overall safety of the system
and for the perceived lack of coordination between three specific
Federal agencies: FRA, the Pipeline and Hazardous Materials Safety
Administration (PHMSA), and the Federal Energy Regulatory Commission
(FERC). As these comments are closely related, FRA will address them
together.
DOT does not have plenary authority to regulate every aspect of
transportation and is limited to the authority granted to it by
Congress. Accordingly, the same is true for each of DOT's operating
administrations--the regulatory authority for each one is limited at
the Federal level by the scope of authority granted by Congress.
As discussed above in section II. Statutory Authority, FRA's
authority to regulate the railroad industry is established in 49 U.S.C.
ch. 201. FRA has jurisdiction over all railroads, as defined in 49
U.S.C. 20102, except urban rapid transit operations that are not
connected to the general railroad system of transportation. Notably,
FRA has broad authority to regulate every area of railroad safety. 49
U.S.C. 20103. But, there must be a nexus to railroad safety for FRA to
regulate. However, FRA does not exercise jurisdiction under all of its
regulations to the full extent permitted by statute. Based on its
knowledge of where the safety problems were occurring at the time of
its regulatory action, and its assessment of the practical limitations
on its role, FRA decided to regulate something less than the total
universe of railroads.\26\
---------------------------------------------------------------------------
\26\ 49 CFR part 209, Appendix A.
---------------------------------------------------------------------------
While FRA's jurisdiction is broad, it is not unlimited, and there
are some areas where FRA defers to another entity. In practice, FRA
exercises its authority through regulations on matters where safety is
most effectively addressed at the Federal level, and is necessary to
ensure unimpeded interstate commerce, or explicitly required by
statute. Some elements of safety are more effectively addressed by
other levels of government (i.e., State or local), or by industry
itself through the development and maintenance of industry standards
and recommended practices. For example, the civil construction of a
railroad and its structures are more effectively addressed by State and
local requirements that take into account the geotechnical, seismic,
and hydrological conditions associated with a local environment. While
FRA could assert its safety authority over the design and construction
of a railroad bridge, for example, these specific requirements are more
effectively addressed and monitored at the State and local level.
Similarly, in railroad repair shop environments, where railroads
perform maintenance on their equipment, the Occupational Safety and
Health Administration provides Federal safety oversight of the work
conditions within the shop environment, even though it is a railroad
facility and railroad employees are involved.
With that said, FRA clarifies that there is no one agency that is
responsible for every aspect of safety as it relates to TCRR. To ensure
proper safety of the system, each Federal, State, and local authority
must perform its part. FRA will certainly oversee railroad safety where
conditions might impact the safe operation of the system, but other
agencies will also play a role. Where there are intersections among
agencies, appropriate coordination must occur to ensure that the proper
agency or entity is enforcing the correct requirements (whether
Federal, State, or local), at the appropriate time. In the same spirit,
where non-governmental organizations have a potential nexus of safety
considerations (e.g., TCRR operations adjacent to Union Pacific
Railroad (UPRR) operations), it is expected that those organizations
coordinate appropriately with each other in good faith.
In turning to the specific issues raised about safety oversight of
the construction of the system, and the safety of the TCRR system in
relation to pipelines in the vicinity, FRA clarifies that where a
condition impacts the safe operation of the railroad, FRA could
intervene to ensure the condition is properly remediated. Although FRA
has not exercised its jurisdiction in this area (civil construction),
FRA would not be precluded from doing so, should the need arise, to
ensure railroad safety. The particular facts of a situation would
dictate the appropriate authority to handle the issue.
Generally, TCRR is obligated to comply with PHMSA's safety
requirements, including those related to pipeline damage, electrical
emissions, and cathodic protection, where there are pipeline crossings.
FERC has no jurisdiction or decision-making authority over the
construction or operation of TCRR's system. FERC-regulated pipelines
occur in the vicinity of the alignment, and relocation and/or
maintenance activities of these utilities during the construction of
the system may require FERC involvement by the applicable utility
providers. PHMSA and FERC requirements are discussed in more detail in
Section 3.9.2, Utilities and Energy, Regulatory Context of the Final
EIS.\27\
---------------------------------------------------------------------------
\27\ FRA. Dallas to Houston High-Speed Rail--Passenger Service
from Houston to Dallas https://railroads.dot.gov/environmental-reviews/dallas-houston-high-speed-rail/dallas-houston-high-speed-rail-passenger, Final Environmental Impact Statement.
---------------------------------------------------------------------------
All natural gas utility providers, including Atmos Energy, are
required to operate in accordance with operational safety regulations,
including regulations promulgated by PHMSA, and would have to consider
how external factors might impact their operational safety as the
parties communicate and coordinate during planning and development. Id.
It is not necessary for FRA to coordinate with PHMSA or FERC in
order to develop the minimum Federal railroad safety requirements
contained in this final rule. As discussed above, FERC has no
involvement during the development of minimum Federal safety standards
for the operation of the TCRR system. As TCRR advances from the
conceptual engineering that was the basis for the environmental
analysis in the Final EIS to design engineering, more detailed
information will become available about pipelines that may need to be
relocated, which would be subject to FERC jurisdiction. In addition,
TCRR is already required to comply with PHMSA requirements regarding
pipeline safety applicable to utility crossings, relocations, and/or
maintenance activities involving natural gas or hazardous liquid
transportation pipelines impacted by TCRR's system. FRA is unaware of
any need to amend PHMSA's requirements in light of the contemplated
TCRR system.
Although no coordination was necessary, FRA has nonetheless
coordinated with both FERC and PHMSA after receiving the public
comments regarding pipeline safety and in response to the expressed
lack of coordination. Both the EIS and the development of the safety
standards in this final rule represent only the beginning of
coordination on these issues common to any linear construction project,
and FRA would expect TCRR to continue and, as necessary expand, this
coordination and engagement as TCRR moves forward.
D. Interference With the Union Pacific Railroad
A number of comments received were focused on the potential impacts
to conventional track circuits and signaling technology caused by
TCRR's electrified railroad. UPRR submitted
[[Page 69705]]
comments expressing these concerns to both the Draft EIS and the
NPRM.\28\
---------------------------------------------------------------------------
\28\ See Section 3.15, Electromagnetic Fields of the Final EIS
for a discussion of the potential impacts associated with the
generation of electromagnetic fields.
---------------------------------------------------------------------------
FRA notes that the matter of potential interference to conventional
track circuits and signaling technology, whether from traction power
systems,\29\ or other known sources, is a matter that is not unique to
the contemplated TCRR operation. The effects and potential interference
that can be caused by rail vehicle traction power systems are well-
established, and require design-specific and local environmental
information to assess. To date, FRA has not promulgated specific
regulations addressing the use of traction power systems on railroads
holistically, as the matter has been effectively handled by industry
standards, local or utility requirements (if applicable), and
contractual responsibilities. In this final rule FRA does not deviate
from this practice and therefore is not regulating TCRR's traction
power system.
---------------------------------------------------------------------------
\29\ A tractive power system is a system that provides a means
to produce tractive effort to a trainset or motive power unit, i.e.,
the propulsion system. Most traction power systems utilize the
transmission of direct current (DC) or alternating current (AC)
electricity by means of an overhead wire or powered third rail to
convert electrical energy to tractive effort (the force that
accelerates a vehicle along a track).
---------------------------------------------------------------------------
Electrified railroads and transit systems operate over and adjacent
to rail lines using conventional track circuitry and signaling
technology throughout the U.S., including FRA-regulated operations on
the Northeast Corridor, and in Pennsylvania, Chicago, northern Indiana,
Denver, and San Francisco (specifically the electrification of
Caltrain's commuter rail service, currently in progress). Furthermore,
numerous light-rail and transit operations utilize traction power
systems that operate adjacent to, or in some cases directly on, FRA-
regulated properties utilizing conventional signaling technology (e.g.,
Utah Transit Authority's mid-Jordan extension). FRA points to numerous
examples that UPRR itself, operates over or adjacent to 25kVA
electrified track, including most notably Denver's A-line, which
operates on electrified track directly adjacent to UPRR utilizing the
same PTC technology.
Several commenters, including UPRR, provided broad language
concerning the need to address potential electromagnetic interference
(EMI), but provided no specific justification as to why current
industry practice, or the requirements proposed within the NPRM were
insufficient. FRA believes the high-level language used by the
commenters to describe the hazard, unaccompanied by any supporting
technical data, underscores a lack of understanding of the subject
matter.
Although commenters did not specify the mechanism by which traction
power systems may introduce risk, they may be concerned with the
potential for voltages to be induced into parallel conductors (i.e.,
UPRR's track) which, in turn, could interfere with rudimentary circuit
designs and technology being employed by UPRR for track circuit
occupancy and grade crossing activation circuits. Commenter references
to interference with UPRR's PTC system may likewise relate to the
potential for induced voltage that could lead to a track circuit
appearing to be unoccupied even though a train may actually be shunting
the circuit. This typically occurs with more primitive DC and AC
technologies, if not designed to account for such conditions, as those
types of primitive technologies cannot decipher the induced voltage
from the circuit's own power source. FRA notes that while this is
certainly a hazard that must be addressed, such site-specific issues
can only be addressed as TCRR proceeds from conceptual to detailed
design phases. It is FRA's expectation that TCRR and any affected
stakeholders will collaboratively address any potential impacts in the
same manner as all other projects have, to date.
Although FRA believes the matter is sufficiently addressed under
its current regulatory framework, this final rule addresses traction
power system EMI and electromagnetic compatibility (EMC) as it relates
to safety critical equipment and systems employed by TCRR. See Sec.
299.435(e). This requirement is an adaptation of the electrical systems
requirements for Tier II trainsets in 49 CFR 238.425. TCRR proposed
applying these requirements to be consistent with deliberations by the
Railroad Safety Advisory Committee on a recommended expansion of FRA's
Tier III requirements in a future rulemaking. UPRR commented on this
requirement contained in the NPRM, but did not understand the
requirement, its context, or origins. The requirement under Sec.
299.435(e) is not intended to provide a means for UPRR to negate its
responsibilities to ensure that its own systems are designed to protect
against undesired inputs and potential interference, as UPRR's
suggested modifications and commentary recommend, but rather to
illustrate the due diligence performed through the development of the
rulemaking. Both FRA and TCRR recognized the importance of EMI/EMC for
electrified high-speed railroads, and the inclusion of this requirement
will ensure TCRR is responsive to the issue.
UPRR also raised concern over sightlines being reduced at a
particular highway-rail grade crossing on UPRR's system due to the
possible future placement of a TCRR viaduct support column. UPRR's
concern is based on the conceptual engineering provided as part of the
environmental review process. Similar to the above discussion on
possible EMI with UPRR's signal system, FRA would expect that the two
railroads work together, and with the owner of the roadway, to identify
and mitigate any hazards associated with reduced sightlines at any
impacted highway-rail grade crossing, once final designs are developed.
In addition, FRA expects that any localized risk presented regarding
these issues would be identified in TCRR's risk-based hazard analysis
program under part 270 and mitigated appropriately.
E. Track Safety
Several commenters raised concerns with the potential for buckling
of the track structure due to high ambient temperatures in Texas during
the summer. These general concerns were supplemented by comments that
soil conditions and curvature in the alignment could exacerbate this
potential. Many cited challenges UPRR has faced in this regard to
support their concerns. A certain set of commenters further argued that
an expert report had identified ``sharp curves'' in the alignment as a
potential risk when compared to tangent track; while it is factually
correct that the probability of rail buckling is higher for a curve
compared to tangent track, the commenters seem to have mischaracterized
this relationship in this particular instance to support their point.
In either case, this regulation addresses this risk in a manner that is
consistent with how this risk is managed for all railroads under FRA's
jurisdiction, and when combined with JRC's adopted practice, provides a
level of engineering and internal rail stress management that is
superior to most, if not all, North American practice.
The continuous welded rail (CWR) program, as proposed in the NPRM,
is a translation and an adaptation of JRC's designs, standards, and
procedures. Like the track and CWR requirements applicable to railroads
on the general system under 49 CFR part 213, the track and CWR
requirements in this rule are independent of the specific environmental
conditions over which they are applied. The governing site-specific
geotechnical, drainage, and
[[Page 69706]]
weather conditions will drive the detailed design of the track and its
support structure in order to achieve and maintain compliance with the
regulatory requirements. (Please see the discussion under section IV.
A. Context and Overview of this final rule.) These safety requirements
set the standards that must be maintained by the track and track
structure design. In addition, these safety requirements set the
operational limitations associated with various track conditions. In
effect, these represent variables that the railroad must consider when
determining its final designs. If it is not possible to attain the
required alignment geometry or maintain a specific track class due to
site specific conditions, then the design operating speed must reflect
what is safely achievable. Concurrently, safe operational limits will
also be validated by comprehensive dynamic tests of the actual revenue
trainsets over the entire line, as required under Subpart F. While the
variables at play in this rule are specific to TCRR (based on JRC's
designs), the fundamental railroad engineering principles and design
process is not. To be clear, the conceptual engineering report included
as part of the Final EIS does not represent the final design of TCRR's
alignment and track structure. This regulation will help TCRR establish
a safe, detailed design.
The track safety standards under Subpart C of the final rule
translate the track safety standards as implemented on JRC's Tokaido
Shinkansen HSR system for TCRR's HSR system. As discussed in the NPRM,
the Tokaido Shinkansen's technical safety requirements were developed
over many years, and have been highly optimized in conjunction with the
rest of the system (i.e., signal and train control, and rolling stock),
since service began over 50 years ago. The primary reason for adopting
the Tokaido Shinkansen's technical safety requirements for TCRR is to
ensure the safety of the TCRR operation by protecting the integrity of
the system as established by JRC. These requirements are, in many
cases, more stringent than requirements under 49 CFR part 213 that were
developed for operation of a broad range of equipment (freight and
passenger) over the general network.
Furthermore, the approach JRC takes to manage internal rail stress
in the Tokaido Shinkansen system is very different than standard North
American practice. The final rule requires TCRR to comply with the JRC
approach, to ensure that the integrity of the safety case behind the
Tokaido Shinkansen can be maintained. In addition to the comprehensive
use of well-designed expansion joints and other engineering means
intended to manage internal rail stress caused by thermal (and other)
loads, the regulation requires procedures, operational restrictions, or
both, for high temperature scenarios that are more advanced and
conservative than those employed by North American railroads. For
example, these procedures require TCRR to monitor rail temperature
continuously, which is far more stringent than the ``average''
temperature approach often used by most railroads. Likewise, a system
of reference markers is required to be used on the field side of all
track to help proactively identify any track shift that might occur.
The ties and fastener system, and the ballast, are specifically
engineered for the tonnage and speed of the equipment operating over it
to provide maximum resistance to track buckling. This is superior to
the practice of most U.S. railroads, which have to design to a general
standard since a variety of equipment traverses their track. The
comprehensive monitoring of track conditions through temperature,
geometry and ride quality readings, in addition to traditional visual
inspections, enables the railroad to analyze the conditions of the rail
in a manner that is far superior to using only visual observation as
suggested by commenters.
A number of comments also focused on the effects that heat can have
on CWR, and the fact that alignment curvature can increase horizontal
rail forces which could, in-turn, lead to buckling if the track is not
sufficiently restrained and internal rail stress is not managed
effectively. Many comments focus on concerns associated with a specific
curve referred to as the ``Hockley curve.'' These comments primarily
stem from Delta Troy Interests, LTD. (Delta Troy), and its commissioned
study conducted by the Virginia consulting firm R.L. Banks &
Associates, Inc.\30\ (RLBA). These comments and the RLBA study attempt
to connect an increased probability for buckling to occur in non-
tangent (curved) track, and particularly with the Hockley curve, with
the fact that non-tangent rail can experience higher lateral rail
forces due to thermal expansion. This specific portion of the proposed
alignment does not represent a geometrically challenging portion, but
Delta Troy indicated that its concern for this portion of proposed
alignment is underscored by the fact that it traverses a site of a
planned real estate development by the company.
---------------------------------------------------------------------------
\30\ See https://www.rlbadc.com.
---------------------------------------------------------------------------
The commissioned RLBA study loosely connects the concern of track
buckling with the fact that this particular curve includes a radius
that could be near the allowable limit for maximum speed operation.
Delta Troy, RLBA, and other commenters, insinuate that a different
alignment would enable TCRR to avoid ``numerous sharp curves.'' Whether
intentional or not, the comments and RLBA analysis ignore the fact that
the Hockley curve (and other similar curves designed to allow for
maximum design speed of a high-speed train), by nature, utilize a curve
radius that is not fairly compared to the high-degree curvature that
can pose a risk for track buckling, particularly when compared to
freight railroads that utilize a more economical focused approach to
CWR management. To insinuate that the curves are ``sharp,'' and thus
intrinsically unsafe as proposed, is simply not true.
The RLBA study attempts to describe the effects of curvature on the
potential for track buckling. However, this is an issue that is not
unique to TCRR, and there are various means by which track can be
designed to address and mitigate these concerns safely. Further, while
the RLBA study recognized that the NPRM contained a requirement for the
railroad to develop a CWR plan to address internal rail stress related
to CWR, the study incorrectly asserts that FRA should dictate specific
alignment geometry as a matter of safety. This is not appropriate or
necessary, as the safety concern is addressed by the track safety
standards and CWR requirements, as described above. Moreover, this
final rule addresses these issues in the same manner as all other U.S.
railroad operations subject to FRA's jurisdiction.
F. Crashworthiness and Occupant Protection
Some commenters raised concerns regarding the crashworthiness
requirements proposed in the NPRM. An examination of these comments,
however, suggests that they stem from an incomplete reading of the
NRPM. FRA proposed to retain the crashworthiness and occupant
requirements established by JRC intended to address potential residual
risks to the operation and to ensure the trainset can handle the
expected operational loads experienced in the intended service
environment.\31\ While these requirements are not directly comparable
to standard U.S. practice, as the NPRM explains, the service
[[Page 69707]]
environment of TCRR's contemplated system is vastly different and
presents significantly less risk than conventional North American
railroad rights-of-way. Id. To adhere to requirements based on hazards
that have otherwise been heavily mitigated or eliminated would require
significant modification to the existing service-proven trainset design
by changing the weight and dynamic characteristics, making it
effectively a new trainset design, which would negate the service-
proven nature of the system.
---------------------------------------------------------------------------
\31\ 85 FR 14036, 14039.
---------------------------------------------------------------------------
Some commenters asserted that FRA is exempting TCRR from any
crashworthiness requirements so that the N700 series trainset
technology could be imported. This assertion, however, is not supported
by the requirements proposed in the NPRM, as FRA makes clear that its
approach is to ensure that the trainset is safe for the environment in
which it will operate. To this end, FRA is including additional
requirements that are not inherent in the JRC approach to trainset
structure design. These requirements include a dynamic collision
scenario analysis that is designed to address the residual risks that
could potentially exist within the TCRR operating environment.\32\ Of
particular note, in this instance, is the inclusion of the steel coil
collision scenario outlined in Sec. 299.403(c). Despite the safety
record of JRC's Tokaido Shinkansen system, FRA believes that the North
American environment poses unique risks with respect to potential
objects that might somehow enter the protected ROW, either by accident
or on purpose. In this case, FRA believes that requiring dynamic
collision scenario analysis using the 14,000-lbs steel coil scenario
derived from existing requirements to protect against risks presented
by grade crossings can serve as a conservative surrogate for potential
hazards that might be present on the TCRR ROW (e.g., feral hogs, stray
livestock, unauthorized disposal of refuse). With the inclusion of this
dynamic collision scenario, and adaptations of existing U.S.
requirements on emergency systems and fire safety, FRA believes it has
reasonably addressed risks unique to the TCRR operating environment in
a manner that appropriately considers crashworthiness and occupant
protection standards for the operating environment intended, while at
the same time keeping intact the service-proven nature of the
equipment.
---------------------------------------------------------------------------
\32\ This reference to ``operating environment'' or
``environment in which the equipment will operate'' or other similar
references, means, in this discussion, the fully dedicated, fully
grade-separated ROW that is not comingled with any other type of
equipment (freight or passenger).
---------------------------------------------------------------------------
G. Reissuance of NPRM
UPRR commented \33\ that FRA needs to re-notice the proposed rule
so that it: (1) Adequately considers the safety impact on already
existing railroads that will intersect and/or run adjacent to the
proposed system; (2) specifically evaluates whether modification of
each safety-critical aspect of the Japanese Shinkansen system is needed
in order to transplant and implement them in the United States; and (3)
provides sufficient detail to enable the public to understand the
safety standards, operational requirements, or regulatory framework
applicable to TCRR fully. UPRR's comments express concern that the NPRM
``lacks any analysis of the potential disruption to other railroad
operations and infrastructure and the consequential safety and economic
impacts to communities and the region,'' and the NPRM ``focuses solely
on the safety of [TCRR's] operations and neglects to consider the
potential impact on safety of current rail operations; operations that
are fully compliant with existing FRA regulations.'' \34\
---------------------------------------------------------------------------
\33\ Docket No. FRA-2019-0068, Document ID: FRA-2019-0068-0316.
\34\ Id.
---------------------------------------------------------------------------
FRA received a similar comment from Delta Troy.\35\ Delta Troy
identified six ``deficiencies'' that ``plague the safety analysis'' in
the NPRM, and elaborated that any attempt to fix the deficiencies in a
final rule would be so extensive that the final would look nothing like
the NPRM and therefore would not be a ``logical outgrowth'' of the
NPRM, thus necessitating FRA to re-notice the proposed rule. The six
areas identified by Delta Troy are that the NPRM: (1) Failed to
adequately evaluate possible EMI from TCRR to the adjacent UPRR rail
line; \36\ (2) unreasonably assumed exigent circumstances will not
require coupling or uncoupling; \37\ (3) failed to examine the safety
impact of TCRR's grade separation proposal on the adjacent UPRR rail
line; \38\ (4) failed to acknowledge or examine the possible increase
in truck traffic and grade crossing usage due to TCRR's proposed
viaduct; \39\ (5) did not recognize that a different alignment could
alleviate the risks of heat-induced track buckling and slow orders;
\40\ and (6) ignored the context and local circumstances in which
proposed operations will occur.\41\
---------------------------------------------------------------------------
\35\ Docket No. FRA-2019-0068, Document ID: FRA-2019-0068-0315.
\36\ See section IV. D. Interference with the Union Pacific
Railroad of this final rule.
\37\ See sections IV. J. Emergency Response and V. D. Decision
under 49 U.S.C. 20306, Exemption for technological improvements of
this final rule.
\38\ See section IV. D. Interference with the Union Pacific
Railroad of this final rule.
\39\ See section IV. D. Interference with the Union Pacific
Railroad of this final rule.
\40\ See section IV. E. Track Safety of this final rule.
\41\ See section IV. J. Emergency Response of this final rule.
---------------------------------------------------------------------------
FRA responds to Delta Troy's six identified ``deficiencies'' in
other areas of this final rule, and so FRA will address UPRR's concerns
here. Primarily, UPRR expressed concern with possible EMI resulting
from TCRR's contemplated system, along with potential increased risk at
certain grade crossings, which is addressed in section IV. D.
Interference with the Union Pacific Railroad. What remains are
essentially concerns regarding whether the requirements of the rule, as
they were proposed, properly account for the effect on safety of
adjacent railroads, that FRA has somehow deprived the public of a
meaningful opportunity to comment, and that the requirements are
consistent with the requirements of JRC.
UPRR stated in its comment that the NPRM was conclusory in its
approach in ``importing'' the Shinkansen's regulatory framework without
properly accounting for the effect on the safety of other existing rail
operations or of the costs imposed on those other rail operations.\42\
However, FRA expects that the final rule framework would have no direct
bearing on the safety of UPRR's operation, assuming it is in compliance
with its own requirements to protect its systems from electrical
interference. FRA makes clear that it is imposing its own regulatory
regime on TCRR. As discussed above, this rulemaking is translating the
safety-critical technical requirements as implemented on JRC's Tokaido
Shinkansen system to allow FRA to provide effect safety oversight, as
discussed in the NPRM.\43\
---------------------------------------------------------------------------
\42\ See also section IV. M. Regulatory Evaluation of this final
rule.
\43\ 84 FR 14036.
---------------------------------------------------------------------------
UPRR also stated that FRA has deprived the public of a meaningful
opportunity to comment. FRA disagrees and has clearly met the minimum
requirements of the Administrative Procedure Act (APA). Under 5 U.S.C.
553(b)(3), when engaged in rulemaking, an agency is required to provide
notice of a proposed rulemaking to the public through publication in
the Federal Register, and shall, among other things, include either the
terms or substance of the proposed rule, or a description of the
subjects and issues involved. The NPRM, as it explained, was based on
the petition and associated supporting
[[Page 69708]]
technical information, all of which was made available for public
review and scrutiny.\44\ In addition, the NPRM exceeded the statutory
requirement to provide merely the substance of the proposed rule, by
providing the entirety of the proposed rule text for critical
examination by interested members of the public.
---------------------------------------------------------------------------
\44\ 85 FR 14036, 14038.
---------------------------------------------------------------------------
In a related concern, UPRR stated that it was unclear what FRA
meant when it used the terms ``shall be based on'' in the regulatory
text, when referring to requirements for TCRR. For example, under Sec.
299.707, FRA is requiring that TCRR's initial maintenance schedules,
included as part of its inspection, testing, and maintenance program,
be based on those maintenance schedules in effect on JRC's Tokaido
Shinkansen system. UPRR asserted that the use of this reference created
ambiguity to the degree that it denied the public a meaningful
opportunity to comment. Again, FRA disagrees. FRA is unclear as to what
ambiguity exists in light of the information in the rulemaking docket,
in both meeting presentations and associated section analyses, provided
by TCRR.\45\ FRA placed this information in the docket, to allow
interested members of the public to scrutinize and provide comment. As
part of those documents, the maintenance intervals in effect on JRC at
the time of submittal of the documents was included. As part of the
inspection, testing, and maintenance program review and approval
process under this final rule, TCRR must demonstrate how its initial
maintenance intervals replicate those of JRC. FRA would expect TCRR to
include the most current maintenance intervals in use by JRC for the
Tokaido Shinkansen.
---------------------------------------------------------------------------
\45\ For example, the following provides information on
maintenance intervals associated with rolling stock: Docket No. FRA-
2019-0068, Document IDs. FRA-2019-0068-0016 ``2017--Exhibit C-8
Subpart J Section Analysis (Inspection Testing and Maintenance),''
FRA-2019-0068-0022 ``2017--Presentation M10P04--N700 Bogie ITM (CI
redacted),'' and FRA-2019-0068-0024 ``JRCs Practice on Movement of
Defective Equipment (CI redacted).''
---------------------------------------------------------------------------
Along with the claims discussed above, UPRR raised several comments
regarding some of the regulatory text associated with Sec. Sec.
299.13(c)(3), 299.207, 299.209, 299.215, 299.341, and 299.351-299.357.
The concerns were focused on ensuring that the language of those
sections, as proposed in the NPRM, would be consistent with similar
requirements for JRC's Tokaido Shinkansen system so that TCRR would be
able to replicate the Tokaido Shinkansen properly. UPRR was concerned
that FRA did not ensure this consistency and asked FRA to explain in
detail whatever differences might exist in a reissued NPRM so that the
public could meaningfully participate in the rulemaking process.
FRA believes that UPRR does not understand fully what FRA stated in
the NPRM, nor what the rule text is accomplishing for the above-cited
sections of this final rule. As discussed in the NPRM, TCRR's petition
represented that the regulatory requirements offered by TCRR were
translated from the technological and operational aspects of the JRC
Tokaido Shinkansen.\46\ Each of the above-cited sections referenced by
UPRR are either technological or operational in nature.
---------------------------------------------------------------------------
\46\ 85 FR 14036.
---------------------------------------------------------------------------
First, as it relates to the personnel training requirements under
Sec. 299.13(c)(3), it is unclear to FRA what precise misunderstanding
UPRR has about this proposed requirement. Section 299.13(c)(3) requires
TCRR to comply with part 243, which is a performance-based regulation
that is designed to accommodate myriad different railroad job functions
and personnel qualifications. This part provides a railroad with broad
autonomy in determining how its safety-critical employees are
categorized and does not dictate in any way the required level of
training or qualification of employees as UPRR seems to suggest. Part
243 is designed to help ensure that safety critical roles and
qualifications are identified, and that proper adherence to an adequate
training program is maintained and documented. JRC's training and
qualification program is very thorough and comprehensive and far
exceeds the level of employee training, development, and hands-on
experience practiced by most, if not all, North American rail
operators. As such, TCRR should have no difficulty complying with the
requirements of part 243, and TCRR should be able to leverage fully
JRC's proven approach to personnel training and qualification.
In a similar vein, UPRR's comment regarding the PTC Safety Plan
Content Requirements in Sec. 299.207 is equally perplexing. The PTC
requirements proposed are derived from 49 CFR part 236, subpart I, but
modified to reflect only those requirements common to all systems, and
specific to standalone systems, such as TCRR's. PTC is not a technology
itself, but rather a set of performance requirements that establish the
minimum functionality a train control system must have, the most
fundamental of which are required by statute. PTC terminology used in
this context is unique to the U.S. statutory and regulatory
requirements. The PTC Safety Plan (PTCSP) is the primary means by which
the railroad demonstrates compliance with the requirements in subpart B
of this final rule. And, as long as TCRR's train control system, as
implemented in Texas, meets the minimum performance and functionality
requirements of subpart B, what requirements exist in Japan are
irrelevant in relation to PTC, especially as Japan has no equivalent
PTC requirement. To put it another way, subpart B requires that TCRR
demonstrate that its PTC system, as implemented and installed in Texas,
fulfill the minimum safety requirements--it is not intended to prove
JRC's technology or its implementation. Likewise, paragraph (a)(6)
dictates that TCRR demonstrate the adequacy of its program, but it does
not prescribe how TCRR must do so. In this respect, any pertinent
training or qualifications required for the successful implementation
of JRC's Automatic Train Control (ATC) technology would be expected to
be articulated within TCRR's plan and consistent with JRC's training.
With respect to Sec. Sec. 299.209 and 299.215, these sections were
not specifically included in TCRR's petition. However, in TCRR's
petition, TCRR stated that it would comply with subpart I of 49 CFR
part 236, in toto. As further explained in the NRPM, FRA stated that it
was tailoring the requirements of part 236, subpart I, to TCRR's
standalone PTC system.\47\ Sections 299.209 and 299.215 contain
virtually equivalent requirements as Sec. Sec. 236.1029 and 236.1039.
And with respect to the cited track sections, Sec. Sec. 299.341, and
299.351-299.357, TCRR provided FRA the language for these sections,
again representing in its petition that they translate the
technological and operational aspects of JRC's Tokaido Shinkansen.
---------------------------------------------------------------------------
\47\ 85 FR 14036, 14041.
---------------------------------------------------------------------------
In addition, part 299, subpart B of this final rule is a
performance standard. This provides TCRR appropriate flexibility in how
it complies with the requirements, allowing TCRR to replicate the
service-proven, safety-critical aspects of JRC's Tokaido Shinkansen. In
its regulatory language, FRA is not requiring TCRR to deviate from JRC
practice, but expects TCRR to remain consistent with JRC practice.
In addition to the six ``deficiencies'' noted above, Delta Troy
also commented that FRA's NPRM was deficient and contrary to the APA in
that it did not provide adequate notice in the docket of an ``economic
analysis,''
[[Page 69709]]
and that the NPRM was based on a ``world that no longer exists.''
In support of its assertion that FRA failed to provide adequate
notice of an ``economic analysis'' in accord with the APA, Delta Troy
argues that it could not find any type of economic analysis despite
FRA's repeated mentioning of such an analysis during the telephonic
hearings held on May 4-6, 2020. Delta Troy cited to the transcript of
the May 6th hearing, noting that on page 3 of the transcript the
Hearing Officer stated that the ``purpose of tonight's hearing is for
FRA to listen to any interested party's comments on the technical
safety requirements proposed in the NPRM along with the associated
economic analysis published in the rule's online docket.'' \48\
Further, Delta Troy explained that it examined the NPRM and could not
find an economic analysis contained in the NPRM, nor in the rulemaking
docket.
---------------------------------------------------------------------------
\48\ 05.06.2020--TCRR Telephonic Hearing Transcript at page 3,
available at www.regulations.gov, Docket No. FRA-2019-0068, Docket
ID: FRA-2019-0068-0300.
---------------------------------------------------------------------------
FRA disagrees. FRA provided its evaluation of the regulatory burden
on the regulated entity in the NPRM as it is required to under
Executive Order (E.O.) 12866.\49\
---------------------------------------------------------------------------
\49\ Section V. A. Executive Orders 12866, 13771, and DOT
Regulatory Policies and Procedures of the NPRM. 85 FR 14036, 14047.
---------------------------------------------------------------------------
In support of its claim that the ``NPRM must be replaced as it is
based on a world that no longer exists,'' Delta Troy invokes the
coronavirus disease 2019 (COVID-19) public health emergency. Delta Troy
asserted that the future of intercity travel will be dramatically
different from the recent past. It further asserted that the decision
to move forward with the rulemaking was based on projected ridership
and train designs that were developed prior to the COVID-19 public
health emergency, and thus now must be re-evaluated in light of the
current global situation, and no final rule should be issued until the
re-evaluation is complete.
While FRA agrees that these are unprecedented times, it disagrees
that the rulemaking is obsolete. As explained in section IV. B.
Regulatory Approach of this final rule, FRA advanced the rulemaking
because TCRR's proposal: (1) Is consistent with FRA's mission is to
enable safe, reliable, and efficient movement of people and goods by
rail; and (2) demonstrated that the proposed system would replicate the
system and operations of the Tokaido Shinkansen system and its 50-year
safety record. This rulemaking removes the government barrier to
private industry seeking to bring transportation innovations to the
United States; FRA's analysis in an E.O. 12866 context properly relates
to the effects of government regulatory burdens, and not whether TCRR's
proposed operation is financially viable. In addition, the analysis
performed under E.O. 12866 as part of the NPRM and this final rule do
not rely on ridership estimates or other projections of demand.
To the commenter's assertion that train design must be reevaluated
due to the pandemic, the technical safety requirements identified in
the NPRM remain valid. FRA is not amending any of its other passenger
equipment safety regulations to mandate train designs account for any
form of social distancing. FRA expects the railroads and the public to
abide by protocols and guidance issued by other Federal agencies, and
State and local governments, and does not believe that rulemaking is
appropriate.
H. Electrical Arcing From the Overhead Catenary System
A number of commenters raised concern about the ``sparking'' effect
often associated with electrified trains. This concern was tied to the
fact Atmos Energy maintains a natural gas compression station near the
contemplated TCRR alignment, and that a ``spark'' from a passing high-
speed train could in-turn ignite some volume of gas present at either
the compression station, or pipelines along the route. However, no
specific context or evidence was provided to elaborate why the design
or operation of either the railroad, the compression station, or a
pipeline, provides for a specific risk to adjacent property.
The ``spark'' often associated with electrified train systems is
caused when there is a separation between the power source (the
catenary system) and its collector (the pantograph on the roof of the
train). When this separation occurs, it is possible for current to
continue to flow between the power source and collector. In these
situations, the high voltage ionizes the air and causes what is known
as an electrical arc or ``spark'' between the two components. This
occurrence is part of the normal operation of an electrical traction
power system like the one proposed by TCRR, and by itself does not pose
any particular safety risk. Existing FRA regulations do not cover
electrical arcing because of the lack of a particular safety risk.
Further, the JRC technology and maintenance practice that is being
adopted by TCRR has refined this interface to minimize this arcing
effect significantly, and to a degree that is not comparable to what
might be witnessed on light-rail or other conventional U.S. electrified
operations.
FRA does not believe that this issue requires regulatory action
within this rule. However, as this issue has been raised, FRA expects
TCRR to work with Atmos Energy, and any other entity to examine the
risk, and take whatever precautionary measures that are necessary. To
this extent, FRA would expect TCRR appropriately addresses this risk
within the context of its System Safety Program, and is willing to
provide assistance in coordinating with external entities or
regulators, as appropriate.
I. Right-of-Way Barrier Protection
A certain number of comments were raised concerning ROW protection
and the potential use of barriers in certain situations. These comments
primarily involved the ability of feral hogs to access the track, but
also raised questions regarding the protection of TCRR structures and
track from UPRR derailments.
With respect to general ROW protection, and specifically the risk
posed by local feral hogs, FRA notes that safety is generally
established through multiple fronts. In this case, in addition to
requirements for ROW protection within this rule under Sec.
299.13(b)(3), FRA also points to its crashworthiness discussion in
section IV. F. Crashworthiness and Occupant Protection, above. Most
notably, in developing the requirements of this final rule, both FRA
and TCRR considered the potential for differences between the Japanese
and U.S. operating environments. The existence of animals and other
potential obstructions supports the adoption of the final rule
requirement to verify the crashworthiness of the trainset structure to
protect against the residual risk that might exist beyond even the best
ROW protection measures.
As it relates to protection of TCRR structures or ROW from
potential incursions due to UPRR derailments, such mitigations are not
covered under FRA's current regulations, and protection of bridge piers
is typically driven by industry or local standard. Factors that would
drive such decisions are highly variable based on specific site
conditions (e.g., track centers, curvature, difference in height
between top-of-rail, etc.) and cannot be adequately addressed globally.
FRA expects that once structural designs exist, any localized risk
presented would be identified in TCRR's risk-based hazard analysis
program under part 270 and mitigated appropriately.
[[Page 69710]]
J. Emergency Response
As part of the public hearing process, several comments were
received with respect to emergency response and access for first
responders. These comments largely articulated concerns regarding the
effect that the absence of certain safety requirements might have on
first responders' ability to get inside a trainset, the impact
construction might generally have on emergency response times, the
ability of first responders to access the ROW, and coordination with
local first responders to ensure adequate capability to respond to an
emergency on the high-speed railroad. Comments related to the first
topic, the ability first responders gaining access to a trainset, are
addressed in the discussion regarding safety appliances under section
V. D. Decision under 49 U.S.C. 20306, Exemption for technological
improvements of this final rule. Those comments related to potential
disruptions to normal emergency response routes caused by construction
are outside the scope of this rulemaking.\50\ FRA defers to local and
State officials in the coordination of potential road closures or other
impacts to potential emergency response times caused by construction.
---------------------------------------------------------------------------
\50\ While outside the scope of rulemaking FRA considered
potential disruptions to emergency response routes in Section
3.16.5.2.2, Safety and Security, Build Alternatives of the Final
EIS. TCRR has agreed to implement mitigation to address potential
delays. See Section 3.16.6.2, Safety and Security, Mitigation
Measures of the Final EIS, SS-MM#1, Model Construction Impacts on
Emergency Response Times of the Final EIS.
---------------------------------------------------------------------------
As it relates to comments regarding ROW access and TCRR
coordination with local first responders, FRA notes that the NPRM
proposed to apply all Passenger Train Emergency Preparedness
requirements contained within 49 CFR part 239, and is doing so in this
final rule. Right-of-way access, coordination, and establishment of the
emergency equipment needs and training requirements for local first
responders are a part of the planning process required by part 239.
Many of these specific planning activities cannot begin in earnest
until final ROW designs are developed. This rule only establishes the
planning requirements, with the execution of those requirements
naturally occurring at a later time, and is identical to the
requirements with which all other passenger railroads in the U.S. must
comply.
A number of commenters objected to TCRR's limited early engagement
with local first responders. Specifically, commenters raised concern
with TCRR having asked the local first responders what equipment the
first responders thought would be necessary in responding to an
emergency on the railroad. Commenters expressed disappointment that
TCRR was not advising the local first responders as to the type of
equipment TCRR would expect the first responders to have. In addition,
commenters noted that TCRR has not provided a list of necessary or
required equipment to the local first responders. This appears to be a
byproduct of misunderstanding the level of maturity of the system, and
the fact that only conceptual design exists at this stage. The actions
taken by TCRR at this early stage demonstrate a proactive approach to
the matter, and will help inform the railroad on the capability of the
local first responders along the alignment. This knowledge will benefit
TCRR as it continues to develop the engineering design, and situations
such as ladder height, emergency egress and equipment needs, and ROW
access capability.
K. Noise Emission and Vibration
Several commenters raised concerns about the noise emission and
vibration that will be caused by the passing of the trainset once in
service. With respect to noise emission, when looking at Sec.
299.3(c)(3) as proposed in the NPRM and in this final rule, TCRR must
comply with 49 CFR part 210, Railroad Noise Emission Compliance
Regulations, which prescribes minimum compliance regulations for
enforcement of the Railroad Noise Emission Standards established by the
Environmental Protection Agency in 40 CFR part 201.
There are no required vibration standards for railroads. However,
FRA evaluated the potential impacts resulting from vibration during
construction and operation of the HSR system in the Final EIS, and
found that while there may be some annoyance impacts due to vibration
during construction, no vibration impacts due to operations are
anticipated. Nevertheless, the Final EIS identified mitigation measures
for potential noise and vibration impacts, which includes compliance
with local regulations on noise and vibration as well as conducting
additional noise and vibration assessments and monitoring noise and
vibration during operations testing.\51\ In addition, where
construction activities such as pile driving for structures and
vibratory compaction for ground improvements would occur within 50 feet
of underground utilities, TCRR would coordinate with the utilities to
identify where relocation and/or encasement would be needed to avoid
vibration damage from nearby construction, and compensate the utilities
for such work.\52\ TCRR has agreed to implement the identified
mitigation. See section VI. C. Mitigation Commitments, of this final
rule.
---------------------------------------------------------------------------
\51\ FRA. Dallas to Houston High-Speed Rail--Passenger Service
from Houston to Dallas https://railroads.dot.gov/environmental-reviews/dallas-houston-high-speed-rail/dallas-houston-high-speed-rail-passenger, Final Environmental Impact Statement, Section 3.4.,
Noise and Vibration.
\52\ Id. at 3.4-33.
---------------------------------------------------------------------------
L. Eminent Domain
One commenter raised the issue of eminent domain and asked FRA what
influence its Federal actions would have on any eminent domain issue.
To the best of FRA's knowledge, eminent domain powers under the Fifth
Amendment of the U.S. Constitution are not involved. FRA understands
the eminent domain issues to be centered on the interpretation of
various Texas State statutes. FRA defers to the State of Texas to
interpret its own statutes.
M. Regulatory Evaluation
Several commenters discussed the financial feasibility of TCRR and
stated that FRA did not take this into account when it issued the NPRM.
However, it is outside FRA's regulatory scope to consider the economic
viability of a specific railroad project, so it was not addressed as
part of the NPRM.\53\ FRA's economic analysis in the NPRM evaluates the
impact of the Federal regulatory burden on TCRR operations.\54\ FRA's
responsibility is to ensure that the railroad industry is operating in
a safe manner, not to examine the economic viability of a specific
project.
---------------------------------------------------------------------------
\53\ 85 FR 14036, 14048, FN 10.
\54\ In addition, as required by NEPA, FRA considered as part of
the EIS the overall direct and indirect impacts to the socioeconomic
environment that may occur as a result of TCRR's construction and
operation of its proposed project, including employment and
earnings, property impacts, property tax and net change in tax
revenue. FRA. Dallas to Houston High-Speed Rail--Passenger Service
from Houston to Dallas https://railroads.dot.gov/environmental-reviews/dallas-houston-high-speed-rail/dallas-houston-high-speed-rail-passenger, Final Environmental Impact Statement, Section
3.14.5.2.3, Economic Impacts.
---------------------------------------------------------------------------
In addition, several commenters asserted that FRA did not
adequately account for the costs in its economic analysis. As discussed
in the NPRM, FRA concluded that since TCRR's compliance with the
requirements in this rulemaking are voluntary, the rulemaking does not
impose any additional Federal regulatory burdens.\55\ Costs such as
equipment design,
[[Page 69711]]
equipment changes, associated studies, and other costs are costs
voluntarily assumed by TCRR to create the specific system contemplated
by this rule. TCRR petitioned FRA for a rulemaking so it could create a
unique HSR system, which does not meet Tier III passenger equipment
requirements.
---------------------------------------------------------------------------
\55\ 85 FR 14036, 14047.
---------------------------------------------------------------------------
UPRR commented that the rulemaking did not address the effect of
the implementation of TCRR's system and on the safety of other
entities. UPRR further stated that although TCRR's actions may be
considered voluntary, TCRR's system would introduce outside
interference on adjacent railroads, which require action and incur cost
to address. FRA understands that there could be costs to existing
railroads when an adjacent railroad begins operations, these costs will
not necessarily occur and FRA is unable to estimate them. These costs
are speculative and are difficult to determine because the final
designs for the TCRR project are not yet developed. Therefore, these
costs are not included in FRA's economic analysis. Further, as
explained above in response to UPRR concerns regarding potential
interference, FRA expects that the final rule framework would have no
direct bearing on the safety of UPRR's operation.
Several commenters also stated that the requirements, as proposed
in the NPRM, would have an impact on small entities and FRA did not
account for this within its regulatory flexibility analysis. FRA, in
conjunction with the Small Business Administration (SBA), has developed
a definition of small entities that is used when evaluating the
economic impact of regulations. Commuter railroads serving populations
of 50,000 or less are considered to be small entities, therefore TCRR
is not a small entity and the regulation will not impact any small
entities. For further information, please see FRA's discussion of its
regulatory flexibility analysis, as required by the Regulatory
Flexibility Act \56\ and E.O. 13272,\57\ under section V. B. Regulatory
Flexibility Act and Executive Order 13272; Regulatory Flexibility
Assessment of the NPRM \58\ and section VII. B. Regulatory Flexibility
Act and Executive Order 13272; Regulatory Flexibility Assessment of
this final rule.
---------------------------------------------------------------------------
\56\ 5 U.S.C. 601 et seq.
\57\ 67 FR 53461 (Aug. 16, 2002).
\58\ 85 FR 14036, 14048.
---------------------------------------------------------------------------
N. Enforcement
As stated in the NPRM under section IV. F. Enforcement, FRA will
publish a civil penalty schedule on its website.\59\ Because such
penalty schedules are statements of agency policy, notice and comment
are not required prior to their issuance, nor are they required to be
published in the CFR.\60\ Although not required, FRA solicited comment
on this subject, but did not receive any comments on the types of
actions or omissions under each regulatory section that would subject a
person to the assessment of a civil penalty.
---------------------------------------------------------------------------
\59\ 85 FR 14036, 14046.
\60\ 5 U.S.C. 553(b)(3)(A).
---------------------------------------------------------------------------
FRA also clarifies that other enforcement tools, such as emergency
orders, individual liability actions, or compliance orders, are
available for FRA to use, as necessary, in providing safety oversight
of TCRR.
V. Discussion of Final Rule and Regulatory Changes
A. Non-Substantive Corrections
TCRR, in its comments, pointed out a few instances where FRA had
inadvertently included (or failed to include) certain regulatory text
that was not submitted in the proposed rule text included with TCRR's
petition. In response, FRA is modifying the final rule, but these
changes are not substantive.
Under proposed Sec. 299.301(b), FRA included maintenance-of-way
(MOW) yards (locations where MOW equipment is stored) when discussing
restoration or renewal of track class H2. As track within MOW yards
will be classified only as track class H0, it was not correct for FRA
to include a reference to yards in this provision. Accordingly, in this
final rule, FRA has removed ``yards and'' from paragraph (b).
Under proposed Sec. 299.345, FRA converted a table appearing in
TCRR's petition to rule text. The table depicted the frequency of
certain types of required track inspections. In converting the table to
text, FRA clarified the requirements contained in the table. However,
in doing so, there were also some inadvertent errors in the NPRM rule
text. Under Sec. 299.345(b)(1), which contains the requirements for
safe walkway inspections, FRA failed to include the text from footnote
1 to Sec. 2xx.343(c) from the TCRR petition's rule text. The footnote
permitted a visual inspection during overnight hours and, in the event
of extreme weather, from the trainset cab in lieu of a safe walkway
inspection. To correct this oversight, FRA is adding new paragraph
(b)(1)(vii), which permits a visual inspection from the trainset cab or
an on-track visual inspection in lieu of a safe walkway inspection in
the event of extreme weather. FRA slightly modified the language to
make clear that an inspection during the overnight hours is considered
an on-track visual inspection.
In addition, under Sec. 299.345(b)(2), FRA proposed requirements
for on-track inspections for track other than track located within
Train Maintenance Facilities (TMFs) and MOW yards. Proposed paragraph
(b)(2)(iii) specified that turn-outs and track crossings were to be
inspected at least once a week, with a minimum of three calendar days
between inspections. However, FRA inadvertently failed to distinguish
between turn-outs and track crossing on ballasted track versus on non-
ballasted track. In this final rule, FRA is making that distinction by
clarifying that the requirements of Sec. 299.345(b)(2)(iii) apply only
to turn-outs and rail crossings on ballasted track. FRA has added new
paragraph (b)(2)(iv) for non-ballasted track, which specifies that
turn-outs and rail crossings on non-ballasted track shall have an on-
track inspection conducted at least once every two weeks, with a
minimum of six calendar days between inspections. This is consistent
with the rule text in TCRR's petition.
Under Sec. 299.345(b)(3), FRA inadvertently restricted the conduct
of on-track inspections to ``during maintenance hours.'' Under Sec.
299.301(b), track maintenance in MOW yards and TMFs is not restricted
to maintenance hours, as it is for mainline track under Sec.
299.301(a). As such, track inspections can be conducted under traffic
conditions, so long as proper on-track safety is provided as required
under 49 CFR part 214. Under Sec. 299.3(c), TCRR must comply with 49
CFR part 214 for on-track safety, with the exception of Sec. 214.339.
Accordingly, in this final rule, FRA removed ``during maintenance
hours'' from Sec. 299.345(b)(3) and added new paragraph (b)(3)(iii) to
make explicit the requirement that 49 CFR part 214 (with the exception
of Sec. 214.339) be followed for on-track safety within the TMFs and
MOW yards when on-track inspections are performed under traffic
conditions. Nothing in this discussion should be construed as affecting
the general prohibition under Sec. 299.301(a) of performing on-track
maintenance or inspections of track, other than track in MOW yards and
TMFs, under traffic conditions. In those locations, MOW work and
revenue service must still be
[[Page 69712]]
temporally separated, as discussed in the NRPM.\61\
---------------------------------------------------------------------------
\61\ 85 FR 14036, 14038 and 14043.
---------------------------------------------------------------------------
Under proposed Sec. 299.609(a), FRA inadvertently left out the
word ``types'' after vehicle. In this final rule, FRA has added the
word ``types'' to clarify the requirement, which is consistent with FRA
practice regarding vehicle/track interaction qualification.
In addition to the above changes, FRA also made several minor
technical changes. Under Sec. 299.315(g), FRA removed an incorrect
cross-reference to Sec. 299.337 as the term ``vehicle type'' is not
used in Sec. 299.337. Under Sec. 299.407(d), FRA changed ``emergency
window exit'' to ``emergency egress window'' for consistency of term
use. FRA made the same change for the same reason to Sec. 299.427.
Finally, under Sec. 299.439(b), FRA fixed an incorrect reference to
``this paragraph'' and correctly changed the reference to ``paragraph
(c) of this section.''
B. Evaluation of Substantive Changes
1. Sec. 299.5 Definitions
In its comments, TCRR requested that FRA make some changes to the
rule text to help remove ambiguity. Under Sec. 299.5, TCRR requested
that FRA amend the proposed definition of ``passenger equipment.'' In
support of its request, TCRR stated that the proposed definition
implied that TCRR's trainsets would be approved for use on JRC's
Tokaido Shinkansen HSR system, which TCRR commented is not correct.
While TCRR's trainset will be based on current or future variants of
the N700 series trainset approved for use on the Tokaido Shinkansen HSR
system, TCRR's trainset itself will not be approved for use on the
Tokaido Shinkansen HSR system, as it has fewer passenger cars than what
JRC runs. Accordingly, TCRR requested that FRA change the definition of
``passenger equipment'' to mean the N700 series trainset that is based
on trainsets currently in service, or future variants operated on,
JRC's Tokaido Shinkansen system, or any unit thereof. FRA agrees and
has made the change in this final rule. To be clear, the term
``passenger equipment'' is referring to the N700 series passenger
trainset that TCRR will operate on its system, which is based on the
trainset in use presently, or future variants thereof, by JRC on the
Tokaido Shinkansen HSR system. What is important is not whether the
TCRR trainset has been approved for use on the Tokaido Shinkansen HSR
system, but that it is based on that technology and complies with the
requirements of this rule.
In addition, under Sec. 299.5, TCRR requested that FRA amend the
proposed definition of ``in passenger service/in revenue service.'' In
support of its request, TCRR pointed to proposed Sec. 299.13(a)(3),
which discussed and defined the requirement for temporally separating
scheduled ROW maintenance from revenue passenger operations. TCRR
raised a concern in its comment that leaving a passenger trainset
properly secured in a station overnight during MOW operations could run
afoul of the temporal separation requirement. TCRR further explained
that its understanding of the temporal separation requirement under
Sec. 299.13(a)(3), as proposed in the NPRM, is that the ROW must be
cleared of all revenue service trainsets (including any trainset
repositioning moves) in order to ensure trainsets cannot be moved into
established maintenance zones. Moreover, TCRR stated that it would not
consider a parked, properly secured trainset in a station location to
be a revenue service trainset because it would not be actively carrying
or available to carry passengers. TCRR further stated that a trainset
could be considered available to carry passengers, and thus considered
``in passenger service/in revenue service'' only after receiving power
from the overhead catenary system and receiving a pre-departure
inspection by the driver. And, as overhead catenary power will be
restored to the ROW only after it has been cleared of MOW equipment,
with the general control center returning the signal and trainset
control system to the state required to protect revenue operations, a
trainset could not be considered ``in passenger service/in revenue
service'' during MOW operations, thus accomplishing the temporal
separation required by the rule. Accordingly, to codify this
understanding, TCRR requested that FRA add to the definition of ``in
passenger service/in revenue service'' a carve-out that a trainset that
is parked and properly secured within a station overnight is not
considered to be in revenue service, and thereby it does not need to be
cleared from the ROW prior to MOW operations commencing.
The purpose of the temporal separation requirement is two-fold: (1)
Protection of passengers in the high-speed trainsets from a collision
with heavy MOW equipment; and (2) protection of the MOW employees
performing work within the ROW from the risk of being struck by a high-
speed trainset. In both situations, the risk involves a moving high-
speed trainset. As discussed in the NPRM, removal of overhead catenary
power to those sections of the ROW where MOW operations are occurring
or planned to occur is a requirement,\62\ and without overhead catenary
power, a high-speed trainset is incapable of generating tractive power,
so those two risks, a collision between a high-speed trainset carrying
passengers and MOW equipment, and MOW employees being struck by a high-
speed trainset, are heavily mitigated.
---------------------------------------------------------------------------
\62\ 85 FR 14036, 14043.
---------------------------------------------------------------------------
However, when looking at the requirements for temporal separation
under Sec. 299.13(a)(3), there is a requirement that the railroad must
complete its trainset repositioning moves prior to the commencement of
MOW operations. Trainset repositioning moves are not considered ``in
passenger service/in revenue service,'' but rather considered ``in
service,'' as that term was defined in the NPRM, as trainsets being
repositioned would not necessarily be available to carry passengers. In
addition, as scheduled MOW operations \63\ occur outside of revenue
service hours, FRA would expect trainsets to be loaded with passengers
or available to carry passengers, and thus would not consider trainsets
outside of revenue service hours to be ``in passenger service/in
revenue service.'' But, they may be considered ``in service.''
---------------------------------------------------------------------------
\63\ Unscheduled or emergency MOW operations during revenue
service hours to repair a broken rail, for example, requires TCRR to
halt revenue service over the affected portion of the right-of-way
until the repair work is completed and has been inspected. See Sec.
299.301(a) (prohibiting the restoration or renewal of track under
traffic conditions that is located other than in TMFs and MOW
yards).
---------------------------------------------------------------------------
Accordingly, FRA is adopting the proposed definition of ``in
passenger service/in revenue service'' in this final rule unchanged.
But, FRA is amending the definition of ``in service'' to include a
fourth exception to address the situation where TCRR has a trainset
parked in a station location that is properly secured and has been
deemed not in service by the railroad (meaning TCRR is not intending on
repositioning or otherwise moving the trainset until the cessation of
MOW operations).
2. Subpart B--Signal and Trainset Control System
In its response to the NPRM, TCRR provided several comments and
suggested edits with respect to FRA's proposed requirements for a PTC
system, the certification process, and TCRR's interpretation of how
those requirements should apply to its proposed use of the Tokaido
[[Page 69713]]
Shinkansen ATC technology. FRA finds that many of these comments appear
to originate from a misunderstanding of how the term ``system'' is used
and what, exactly, FRA must certify under 49 U.S.C. 20157,
Implementation of positive train control systems.
TCRR commented on Sec. 299.201(c) and asserted that it does not
anticipate the need for any regression testing \64\ before FRA
certifies TCRR's PTC system. In support of its assertion, TCRR stated
that TCRR's system will be based on the service-proven Tokaido
Shinkansen ATC system, and TCRR does not anticipate that any changes
will be made to safety-critical software prior to obtaining PTC System
Certification from FRA. Further, while TCRR does not believe regression
testing would be necessary prior to its initial installation of ATC and
FRA certification, TCRR does believe regression testing is appropriate
for potential changes to its ATC technology that could possibly occur
in the future.
---------------------------------------------------------------------------
\64\ Regression testing is used to ensure that previously tested
software still performs as intended after a change to that software.
---------------------------------------------------------------------------
As proposed in the NPRM, Sec. 299.201(c) generally authorizes TCRR
to conduct field testing of its uncertified PTC system and field
regression testing of its FRA-certified PTC system, which could
encompass, for example, future modifications to ATC functionality. As
proposed, paragraph (c) was not intended to specify what type of tests
are required in either instance. The exact tests to be performed are to
be defined by the railroad in the development of its PTCSP,
particularly with respect to the content requirements in Sec.
299.207(a)(7), (a)(9), and (a)(10). TCRR must demonstrate that its PTC
system, as built, fulfills the requirements contained in subpart B. The
distinction that TCRR's proposed PTC system is based on a service-
proven technology has no bearing in this instance. Under the statutory
mandate, FRA must certify that a railroad's PTC system complies with
the applicable PTC regulations (in this instance, 49 CFR part 299,
subpart B), not the theoretical capability of the technology.\65\ What
constitutes safety-critical software has yet to be defined in detail by
TCRR, as required under Sec. 299.441, and the changes required to be
made to the existing ATC software (whether on the executive or
application side) have yet to be described.
---------------------------------------------------------------------------
\65\ 49 U.S.C. 20157(h).
---------------------------------------------------------------------------
As such, although the term ``regression testing'' in paragraph (c)
is used in the context of post-certification field testing, this is not
intended to suggest that this is the only circumstance that would call
for regression testing, as several railroads have performed regression
testing on an ongoing basis before and after obtaining PTC System
Certification from FRA. FRA does not agree with TCRR's reading of Sec.
299.201(c) as requiring regression testing; that paragraph merely
authorizes TCRR to conduct various levels of field testing, including
regression testing. FRA believes the necessary level of testing and
validation should be determined as TCRR's system is developed and
implemented, as required under Sec. 299.207.
In its comments, TCRR also asserts that because it plans to use an
existing signaling system, the requirement to include a ``description
of the safety assurance concepts that are to be used for system
development, including an explanation of the design principles and
assumptions'' within TCRR's PTCSP (see Sec. 299.207(a)(2)) should only
apply only to modifications to its system. TCRR contends that because
the system was developed long ago, these principles would not apply in
the same manner as they would to a system that is under development.
TCRR recommends that paragraph (a)(2) be modified to refer only to
safety-critical changes to the ATC system, not the initial version of
TCRR's ATC system. FRA disagrees with this perspective.
TCRR is correct that the core safety assurance concepts, design
principles, and design assumptions are fundamental to the development
of any new system, but they are also equally important in the
implementation of existing technology. These core concepts, principles,
and assumptions provide a baseline for safety assurance that govern the
safe implementation of a system, whether proven or novel. In the case
of TCRR, although the ATC system used on JRC's Tokaido Shinkansen HSR
system was developed years ago, FRA would expect that the fundamental
concepts (e.g., fail safe), essential design principles, and any
assumptions critical to the safety case of the system are understood by
TCRR in a manner that can be articulated as part of its PTCSP. If TCRR
cannot articulate these fundamental concepts, FRA would question how
TCRR intends to ensure that the application and installation of the
system in Texas is performed correctly. FRA acknowledges that JRC's
Tokaido Shinkansen ATC technology has an extraordinary safety record,
but TCRR must provide sufficient information in its PTCSP for FRA to
certify that the ATC system in Texas fulfills the requirements under 49
CFR part 299, subpart B.
With respect to the requirement to include a complete description
of TCRR's verification and validation process in its PTCSP, under Sec.
299.207(a)(5), TCRR proposed that operational data from JRC's Tokaido
Shinkansen HSR system would serve to adequately demonstrate that the
technology and its functions, as conceived by JRC, have been
successfully validated. FRA suspects that TCRR's interpretation comes
from its perception that this requirement, and the corresponding
requirement in 49 CFR 236.1015(d)(5), are intended for the validation
and verification of a new system under development. FRA would like to
make clear that a verification and validation process is essential to
the implementation of any system, whether new or previously certified.
The actual application of a technology is just as important as its
theoretical performance. In this respect, even railroads that are
implementing previously certified and type-approved PTC systems have
substantial verification and validation processes and tests to ensure
that the system, once installed, functions as designed and intended.
Operational data from the existing JRC operation would not suffice in
this case. As an example, a technology may be proven to effectively
enforce civil speeds (i.e., speed limits), but if the installation or
application design is not correct, the cab signal code or track chart
could allow for a maximum authorized speed that is not consistent with
the safe civil speed required for a particular curve. Errors such as
this are not uncommon when considering the volume of work that must be
performed to install a system on hundreds (or thousands) of miles of
track, and thus the verification and validation process is critical for
the safe implementation of any train control system.
In its comments, TCRR further recommended changes to Sec.
299.207(a)(18) to specifically reference the Tokaido Shinkansen system
as being the baseline for comparison with TCRR's system. However, the
modification is unnecessary for TCRR to reference the Tokaido
Shinkansen as the baseline for comparison. As TCRR correctly
identified, this requirement is derived from 49 CFR 236.1007(c)(1). FRA
believes that, when possible, the RPA and the existing PTC requirements
for high-speed service should be consistent. TCRR will be able to
comply with Sec. 299.207(a)(18), as the provision permits TCRR to use
foreign service data in its PTCSP.
FRA is updating the language under Sec. 299.209(e) to directly
reference Sec. 236.1029(h). The language of
[[Page 69714]]
Sec. 299.209(e) as proposed in the NPRM was based on the language of
Sec. 236.1029(h), so the requirement to report has not changed. This
is consistent with other sections under subpart B.
In addition, in its comments, TCRR acknowledges that proposed Sec.
299.211 would establish certain security requirements for a PTC system
utilizing wireless communications. Although TCRR does not currently
intend for its ATC system to utilize wireless communications, TCRR
comments that it does not object to retaining this provision in case it
utilizes wireless communications in the future. Accordingly, FRA will
retain the language under proposed Sec. 299.211, as it mirrors the
existing PTC requirements under Sec. 236.1033.
3. Sec. 299.345 Visual Inspections; Right-of-Way
Under Sec. 299.345(b)(3)(i) and (ii), TCRR asked for the
inspection frequency to be reduced from twice to once during the
relevant period. As proposed, Sec. 299.345(b)(3)(i) and (ii) require
TCRR to inspect track within TMFs and MOW yards twice during a 60-day
period for ballasted track and twice during a 120-day period for non-
ballasted track. TCRR commented that although the rule language as
proposed was consistent with the rule text provided with TCRR's
petition, it is not wholly consistent with JRC practice. According to
TCRR, JRC's practice is to inspect this type of track only once during
the relevant periods (a 60-day period for ballasted track and a 120-day
period for non-ballasted track). FRA recognizes that the language as
proposed under Sec. 299.345(b)(3)(i) and (ii) appears to contain
requirements more stringent than what JRC requires on the Tokaido
Shinkansen HSR system. Therefore, consistent with FRA and TCRR's goal
to replicate JRC's requirements as closely as possible, FRA has made
the requested change.
4. Sec. 299.347 Special Inspections
TCRR requested in its comments that FRA amend the language of
proposed Sec. 299.347. As proposed, Sec. 299.347 contains
requirements for TCRR to conduct a special inspection of its track and
ROW prior to the operation of a trainset in the event of fire, flood,
severe storm, or temperature extremes that could damage the track
structure. TCRR pointed out, though, that the language of proposed
Sec. 299.347 prohibits movement of a trainset, regardless of location
in the ROW (e.g., between stations), until an inspection has been
performed. TCRR also stated that JRC has certain operating rules that
would permit movement of a trainset to the next forward station
location prior to an inspection so long as specific criteria were met.
TCRR offered as an example if operations were suspended due to a heavy
rainfall, defined by an amount of rain measured by that segment's
rainfall gauge over a specific time interval preceding the trainset
movement, a trainset would be allowed to move to the next station at a
speed not to exceed 30 km/h (18.6 mph). Accordingly, TCRR requested
that FRA amend the language of this section to require inspections of
the track and ROW to be performed as soon as possible after the
occurrence of a fire, flood, severe storm, temperature extremes, or
other types of events that may cause damage to the track structure, in
accordance with the railroad's inspection, testing, and maintenance
program, and operating rules.
FRA agrees that an event may occur while a trainset is en route
between stations that would halt the operation of the trainset prior to
reaching the next station and trigger a special inspection, as proposed
in the NPRM under Sec. 299.347. Because of this, FRA has updated this
section in the final rule. FRA has designated the previously
undesignated text as paragraph (a) and added a new paragraph (b) to
allow a trainset that is between stations to proceed to the next
forward station at restricted speed, not to exceed 30 km/h (18.6 mph)
after an event contemplated by this section occurs. This allows for the
movement of passengers to a station so they are not stranded in the ROW
until an inspection of the track and ROW can be performed. However, FRA
makes clear that no trainset may depart a station location until a
special inspection of the effected track and ROW can be performed. This
new paragraph (b) is only to permit the movement of passengers to the
next station that would otherwise be stranded between station
locations. Should the track and/or ROW be discovered to be damaged so
as to put the safety of the passengers in jeopardy, then the movement
is expected to stop until the track is inspected by a qualified person,
and the qualified person makes a determination that movement can safely
proceed.
5. Sec. 299.713 Program Approval Procedures
TCRR further requested that FRA amend the language of Sec.
299.713(c)(2) as proposed in the NPRM. As proposed, Sec. 299.713(c)(2)
provided the procedures for approval of amendments to the inspection,
testing, and maintenance program. Any amendment that relaxes an FRA-
approved requirement will be reviewed by FRA within 45 days of receipt
of the amendment, by which time FRA will notify TCRR whether the
amendment is approved, or if not approved, stating the specific points
in which the amendment is deficient. Crucial to this part of the
paragraph was that the railroad could not implement the amendment until
FRA had approved it. The proposed paragraph further stated that if the
railroad wanted to amend the program by making an FRA-approved
requirement more stringent, the railroad could implement the amendment
prior to receiving FRA approval on the amendment.
Although TCRR generally accepted that the language would address
many possible amendments, TCRR commented that there may be situations
where it is unclear as to whether the proposed inspection, testing, and
maintenance program amendment is making an FRA-approved requirement
more stringent or relaxed. Thus, TCRR requested FRA change the language
of proposed paragraph (c)(2), such that if the railroad proposes to
amend an FRA-approved program requirement that TCRR deems to be more
stringent, the railroad is permitted to act immediately to implement
the amendment prior to obtaining FRA approval.
FRA is not adopting TCRR's recommendation because FRA finds the
language to be sufficiently clear and expects that most situations, as
TCRR has acknowledged, will be straightforward in their resolution. For
example, if TCRR wishes to perform inspections more frequently than
required in its inspection, testing, and maintenance program, FRA would
consider TCRR's proposed action as more stringent than what is
required. Conversely, if TCRR wishes to perform inspections less
frequently than required in its inspection program, testing, and
maintenance program, FRA would consider TCRR's proposed action as less
stringent than what is required, and TCRR must have FRA approval before
implementing the change. When there is a question as to whether TCRR's
proposed action is making a requirement more stringent or relaxed, FRA
would expect TCRR to either treat the action as relaxing, triggering
FRA review, or to contact FRA to inquire.
C. Trainset Image Recording System
In the NPRM, FRA proposed to make applicable to TCRR the
requirement to have an image recording system installed on its
trainsets, consistent with FRA's Locomotive Image and Audio Recording
Devices for Passenger Trains
[[Page 69715]]
NPRM.\66\ As discussed in the TCRR NPRM, FRA stated that once the image
recording device rulemaking was finalized, that FRA would make
conforming changes to this final rule's regulatory text. However, as
FRA has not yet published the image recording devices final rule, FRA
will make any necessary changes to this regulation as part of that
rulemaking.
---------------------------------------------------------------------------
\66\ 85 FR 14036, 14041; (84 FR 35712, Jul. 24, 2019).
---------------------------------------------------------------------------
D. Decision Under 49 U.S.C. 20306, Exemption for Technological
Improvements
As discussed in the NPRM, FRA's safety appliance regulation is
based on longstanding statutory requirements for individual railroad
cars used in general service. These requirements are primarily intended
to keep railroad employees safe while performing their essential job
functions. Historically, these duties have revolved around the practice
of building trains by switching individual cars or groups of cars, and
are not directly applicable to how modern high-speed passenger
equipment is designed and operated. The application of such appliances
would require a significant redesign of HSR equipment, and would create
aerodynamic problems, particularly with respect to associated noise
emissions. In the NPRM, FRA proposed to exempt TCRR from statutory
requirements that are not applicable or practical for inclusion on its
high-speed trainset technology, pursuant to the authority granted under
49 U.S.C. 20306.\67\
---------------------------------------------------------------------------
\67\ 85 FR 14036, 14040.
---------------------------------------------------------------------------
Rather than apply legacy requirements that are inappropriate for
the proposed equipment's design and service environment, this final
rule focuses on how to provide a safe environment for crews as it
pertains to the N700 series trainset, and modern high-speed operations
throughout the world. In this respect, this final rule defines specific
safety appliance performance requirements applicable to this semi-
permanently coupled trainset. By focusing on the job functions this
approach is expected to: Improve safety for crews and railroad
employees; provide flexibility for superior designs based on modern
ergonomics; and allow for elimination of appliances when their
functionality is moot (e.g., riding on side sill steps despite an
inability to couple/decouple cars). FRA believes it is appropriate to
grant relief under the discretionary process established under 49
U.S.C. 20306 and adopts these requirements under its statutory
authority as part of this rulemaking.
As part of the hearing held on May 4, 2020, FRA conducted
proceedings under 49 U.S.C. 20306 to determine whether to invoke its
discretionary authority to provide relief to TCRR from certain
requirements of 49 U.S.C. ch. 203 for its planned operation of high-
speed trainsets built to the requirements contained in this final rule.
Under 49 U.S.C. 20306, FRA may exempt TCRR from the above-identified
statutory requirements based on evidence received and findings
developed at a hearing demonstrating that the statutory requirements
``preclude the development or implementation of more efficient railroad
transportation equipment or other transportation innovations under
existing law.''
In its rulemaking petition, TCRR requested FRA exercise its
discretionary authority under 49 U.S.C. 20306 to exempt its high-speed
passenger rail trainsets from the requirements of 49 U.S.C. 20302,
which mandates that railroad vehicles be equipped with: (1) Secure sill
steps and efficient hand brakes; (2) secure grab irons or handholds on
vehicle ends and sides for greater security to individuals coupling and
uncoupling vehicles; and (3) the standard height of drawbars. See 49
U.S.C. 20302(a)(1)(B), (a)(2), and (a)(3). On May 14, 2020, FRA granted
similar relief under 49 U.S.C. 20306 to exempt Amtrak's new high-speed
passenger rail trainsets,\68\ based on evidence presented at a public
hearing held on December 11, 2019. TCRR also testified at this hearing
in support of Amtrak's petition and noted its pending need for similar
technological exemption. FRA notes no substantive differences in the
justification for exemption between TCRR and Amtrak, as both requests
pertain to the implementation of modern high-speed passenger rail
trainsets. FRA believes its exemption for such technology under
Amtrak's petition could be extended to any similar high-speed passenger
rail trainset technology, but given the unique nature of this
rulemaking, and the overlap in timing between TCRR's petition and FRA's
decision to grant Amtrak's petition, FRA felt it was appropriate to
conduct proceedings under 49 U.S.C. 20306 as part of the hearing held
on May 4, 2020. By taking this approach, FRA could ensure transparency
and provide ample opportunity for comment from those most affected by
the TCRR proposal.
---------------------------------------------------------------------------
\68\ See docket FRA-2019-0066.
---------------------------------------------------------------------------
In support of its request for an exemption, TCRR noted in its
petition that safety appliances such as sill steps, or end or side
handholds, are typically used in conventional North American practice
by maintenance personnel who ride the side of trainsets in yards or
maintenance facilities for marshalling operations. The N700 series
trainset, as described in this final rule, is a fixed-consist trainset
where trainset make-up only occurs in defined locations where
maintenance personnel can safely climb on, under, or between the
equipment, consistent with the protections afforded under 49 CFR part
218.
In addition, the leading and trailing ends of the N700 series
trainset are equipped with an automatic coupler located behind a
removable shroud. These couplers, as proposed by TCRR, will only be
used for rescue operations in accordance with TCRR's operating rules,
and provide for the safe coupling of one trainset to another (i.e.,
each end will have automatic self-centering couplers that couple to
other trainsets on impact, and uncouple by mechanisms that do not
require a person to go between trainsets or activate a traditional
uncoupling lever). Further, as proposed, level boarding will be
provided at all locations in trainset maintenance facilities where crew
and maintenance personnel are normally required to access or disembark
trainsets. Moreover, because the equipment is a fixed-consist trainset
in which individual vehicles are semi-permanently coupled and, as noted
above, individual vehicles can only be disconnected in repair
facilities where personnel can work on, under, or between units under
protections consistent with 49 CFR part 218, having drawbars at the
statutorily prescribed height is unnecessary.
As such, there is not a functional need to equip the ends of the
trainsets with sill steps, end or side handholds, or uncoupling levers.
As this technology is intended to operate at high-speeds, the inclusion
of these appurtenances would have a significant and detrimental impact
on the aerodynamics of the trainset. This increase in the aerodynamic
footprint would negatively impact both efficiency and aerodynamic noise
emissions.
TCRR also noted that trainset securement will be provided by the
use of wheel chocks in addition to stringent operating rules and
procedures, which will be consistent with the service-proven procedures
utilized on the Tokaido Shinkansen system. In addition, as proposed in
the NPRM, TCRR will be required to demonstrate, as part of its vehicle
qualification procedures, that the procedures
[[Page 69716]]
effectively secure the trainset (see Sec. 299.607).
In sum, TCRR asserted that requiring compliance with the identified
statutory requirements would serve to preclude the development or
implementation of more efficient railroad transportation equipment or
other transportation innovations under existing law.
During the hearing conducted on May 4, 2020, TCRR provided
testimony in support of its exemption request, which reiterated its
position stated in its rulemaking petition, which is summarized
below.\69\
---------------------------------------------------------------------------
\69\ See 05.04.2020--TCRR Telephonic Hearing Transcript at page
17-30, available at www.regulations.gov, Docket No. FRA-2019-0068,
Document ID: 2019-0068-0291.
---------------------------------------------------------------------------
TCRR testified that, with respect to couplers being able to couple
automatically on impact and capable of being uncoupled without the
necessity of an individual going between ends of vehicles, that the
inter-car connections and coupling mechanisms on TCRR's trainsets are
different than those envisioned by 49 U.S.C. 20302(a)(1)(A). TCRR
explained that its trainsets can only be separated at a maintenance
facility, as the separation of the trainset requires special tools and
procedures to safety disconnect the inter-car mechanical and electrical
connections. Separation at a maintenance facility also provides
railroad employees needing to go between individual cars proper safety
protection. Further, TCRR testified that its trainsets will be equipped
with rescue couplers at each end of the trainset in the event a
trainset needs to be rescued from the ROW. These rescue couplers are
located within a removable shroud at each end of the train set, and are
automatic couplers, in that they couple upon impact.
With respect to 49 U.S.C. 20302(a)(2), which requires secure grab
irons or handholds on the ends and sides of vehicles for greater
security for individuals involved with coupling and uncoupling
vehicles, TCRR testified that these are not necessary due to the
coupling arrangement of its trainset, described above. TCRR further
testified that inclusion of these safety appliances would have a
significant and detrimental impact on the aerodynamic performance of
the trainset and significantly increase the aerodynamic noise generated
from the trainset. TCRR stated that providing an exemption from these
requirements is consistent with the treatment of similar equipment.
TCRR further testified with respect to 49 U.S.C. 20302(a)(3), which
requires drawbars to be of a standard height as specified by FRA
regulation, that TCRR will not conduct any type of joint operation with
conventional freight or passenger equipment. Accordingly, as TCRR
testified, there is no need to have couplers at a standard height, as
TCRR's trainsets will have no need to couple to dissimilar equipment.
TCRR next testified with respect to 49 U.S.C. 20302(a)(1)(B), which
requires vehicles to be equipped with secure sill steps and efficient
handbrakes, that TCRR's trainset will not be equipped with a handbrake.
TCRR further testified that its unattended trainsets will be secured
through a combination of an urgent brake application, which is
equivalent to an emergency brake application in the U.S., and the use
of wheel chocks. According to TCRR's testimony, this is reflective of
JRC's practice on the Tokaido Shinkansen system, which has a
demonstrated safety record. TCRR also testified that its operating
rules will also define securement procedures, which will be based on
the service-proven procedures employed by JRC.
TCRR also testified that sill steps and vertical handholds are not
necessary for railroad employees to access or disembark from its
trainsets. TCRR offered that it will have provisions for high-level
boarding at all locations (passenger stations and maintenance
facilities) an employee could be expected to access or disembark a
trainset.
As noted above, FRA received several comments regarding TCRR's
request for exemption. Some comments concerned the effect that the lack
of identified safety appliances would have on the ability for TCRR to
separate a train in the event of an emergency, while other comments
concerned the impact that the absence of said appliance would have to
emergency egress and first responder access to the trainset. In both
instances, while FRA deeply appreciates the commenters' concerns with
respect to the efficacy of emergency response, assisting in emergency
rescue access is not the purpose of the safety appliances in question,
and in many ways, what TCRR has proposed exceeds common practice for
emergency passenger egress and first responder rescue access within the
U.S.
In addition, FRA would like to address the comments related to the
separation of trains in an emergency. While semi-permanently coupled
passenger equipment is virtually universal for high-speed operations,
it is also very common throughout conventional passenger and freight
operations throughout the U.S., most often seen in Multiple Unit (MU)
trainset operations and articulated freight cars (e.g., double-stack
well car sets). It is not common practice to break a train apart as
part of an emergency procedure. Rescue of an entire disabled trainset
is the most common scenario, and TCRR will be equipping its lead units
with rescue couplers and other appliances to allow for a disabled
trainset to be towed, if necessary. If a train is disabled such that
intermediate uncoupling would be required to move it, it would
typically be more appropriate to evacuate the impaired train either to
a safe location, or by cross-transfer to another trainset, pursuant to
the railroad's emergency plans. FRA notes that it is not the intent of
the safety appliance requirements to prevent the use of semi-
permanently coupled or articulated rail vehicles, whether by statute or
regulation. Rather, the purpose of these appliances is to ensure that
railroad personnel are provided the means to perform their duties
safely, particularly where coupling or switching are common place.
Notably, while the absence of such practice reduces the operational
flexibility afforded to the railroad, it also serves to reduce the
hazards that railroad personnel are exposed to, which, in itself, is a
worthwhile application of safe practice being proposed for TCRR.
Notwithstanding FRA's prior statements on this topic, FRA received
several comments expressing concern over first responder access to a
trainset that is not equipped with traditional safety appliances. As
discussed previously, safety appliances are primarily for railroad
employee protection. Other rescue access and emergency egress systems
are relied on to facilitate the entry of first responders into a
trainset, and evacuation of passengers off a trainset, such as rescue
access/emergency egress windows and doors, and roof spots, to name a
few. See, generally, subpart D--Rolling Stock. Although safety
appliances, if present, may be used for rescue access and emergency
egress, it is not the primary function of these appliances. In
addition, the safety appliances that would typically be utilized to
access a trainset are not required under statute, and in virtually all
cases, are insufficient for emergency egress and access needs.
Safety appliances as not required to be part of the required
emergency systems for passenger equipment. Generally, it is FRA's
position that the safest location for a passenger during an emergency
is within the trainset or passenger car. There are limited
circumstances where an evacuation to an adjacent car would be
necessary, and
[[Page 69717]]
only in a life-threatening scenario is passenger self-evacuation off a
train necessary. In addition, FRA also generally assumes that first
responders will have certain equipment with them when responding to an
emergency involving a train, to include ladders, axes, portable jaws-
of-life, and other access-gaining tools. Furthermore, TCRR's proposal
includes the use of deployable ladders with handrails to facilitate
egress and access from the trainset to ground level in the event of an
emergency or other appropriate situation. The use of such on-board
ladders, while not required by this regulation, provide a superior
means to get on or off the trainset in such scenarios than any
traditional safety appliance, particularly for first responders.
Further, not all emergencies require an immediate stopping of the
trainset, as it may be more efficient to meet first responders at a
dedicated location (such as a station location, or a location where
access has been specifically planned for) to permit easier access to
the trainset. Understandably, FRA is also aware that there may be
emergency situations that will not permit continued travel along the
ROW, such as a derailment of the equipment.
FRA also received a comment from Delta Troy challenging the
legality of virtual hearings to satisfy the hearing requirement of 49
U.S.C. 20306.\70\ In its comment, Delta Troy argued that virtual
hearings are not an adequate or sufficient replacement for the value of
a public hearing during notice-and-comment rulemaking, in addition to
the statutory requirement that findings under 49 U.S.C. 20306 be based
on evidence developed ``at a hearing.'' In support of its position,
Delta Troy stated that conducting a virtual hearing would necessarily
limit and truncate public engagement and discourse. And that ``untold
members of the public'' would be precluded from participation because
they lack adequate internet access, whether due to financial,
technological, or other reasons. In conclusion, Delta Troy stated that
a virtual hearing would not meet the requirements of 49 U.S.C. 20306,
nor would it comport with ``the spirit of public comment'' as described
in the APA. FRA disagrees and notes that 49 U.S.C. 20306 is silent as
to the manner in which hearings may be conducted. As discussed under
section III. Proceedings to Date, the telephonic hearings that FRA
conducted represented only a change in the way information was
exchanged. Further, the change to a telephonic hearing was made
specifically to address the internet reliability concerns raised by
Delta Troy and other commenters.
---------------------------------------------------------------------------
\70\ See FRA Docket No. FRA-2019-0068, Document ID: FRA-2019-
0068-0039.
---------------------------------------------------------------------------
Based on the evidence developed at the hearing, including
supporting information provided in TCRR's rulemaking petition, FRA is
providing TCRR with its requested relief, as not doing so would
preclude the development or implementation of more efficient railroad
transportation equipment. FRA makes clear, though, that this relief
will be in effect for high-speed trainsets, used only on TCRR's system,
for the life of each variation put into service. If the equipment is
sold or transferred to any other entity in the U.S., that entity would
have to request its own relief under 49 U.S.C. 20306.
E. Incorporation by Reference
FRA is incorporating by reference six Japanese Industrial Standards
(JIS) and three ASTM International (ASTM) standards. As required by 1
CFR 51.5, FRA has summarized the standards it is incorporating by
reference and has shown the reasonable availability of those standards
here. The Japanese Industrial Standards are reasonably available to all
interested parties online at www.jsa.or.jp (Japanese site), or
www.jsa.or.jp/en (English site). In addition, the ASTM standards are
reasonably available to all interested parties online at www.astm.org.
In Sec. 299.13(d)(4) and (5), FRA incorporates by reference three
versions of JIS E 1101, ``Flat bottom railway rails and special rails
for switches and crossings of non-treated steel.'' JIS E 1101:2001
addresses the manufacturing of the steel rail. It specifies the quality
and tests for flat bottom railway rails of non-treated steel, with a
calculated mass of 30 kg/m or more, and special rails for those railway
switches and crossings. JIS E 1101:2006 and JIS E 1101:2012 amend JIS E
1101:2001 by updating references to other cited standards (e.g.,
updating the title to the cited reference), updating references to
specific clauses within a cited standard, or by deleting a reference to
a cited standard. By incorporating these standards by reference, TCRR
will be required to use rail that is manufactured to the same
specifications as the rail used on the Tokaido Shinkansen system, which
will help ensure that the rail side of the wheel-rail interface remains
identical to that used on the service-proven high-speed lines of JRC.
Under Sec. 299.403(b), FRA incorporates by reference two versions
of JIS E 7105 ``Rolling Stock--Test methods of static load for body
structures.'' JIS E 7105:2006 addresses test methods for trainset
carbodies. It specifies the test methods of static load for confirming
strength, rigidity, and the like of body structures for passenger
stock, such as electric railcars, internal combustion railcars, and
passenger cars, principally. JIS E 7105:2011 amends JIS E 7105:2006 by
updating references to other cited standards (e.g., updating the title
to the cited reference), updating references to specific clauses within
a cited standard, or by updating specifications from the 2006 version.
By incorporating these standards by reference, FRA will maintain the
same strength and rigidity of TCRR's trainset carbody structure. This
will help preserve the occupied volume from premature degradation due
to typical in-service loads and vibration.
Under Sec. 299.409(g), FRA incorporates by reference JIS B
8265:2010 ``Construction of pressure vessels general principles.'' JIS
B 8265:2010 addresses manufacturing of pressure vessels and specifies
certain requirements for the construction and fixtures of pressure
vessels with the design pressure of less than 30 MPa. By incorporating
this standard by reference, FRA will ensure that the pressurized air
reservoirs used in TCRR's trainset are designed and constructed to the
same service-proven standard as used in the N700 trainsets currently
operated on the Tokaido Shinkansen system.
Under Sec. 299.423(e)(1) and (f)(3), FRA incorporates by reference
ASTM D 4956-07[epsiv]1 ``Standard Specification for
Retroreflective Sheeting for Traffic Control,'' approved March 15,
2007. ASTM D 4956-07[epsiv]1 covers flexible, nonexposed
glass bead lens and microprismatic, retroreflective sheeting designed
for use on traffic control signs, delineators, barricades, and other
devices.
Under Sec. 299.423(e)(1), FRA incorporates by reference ASTM E
810-03 ``Standard Test Method for Coefficient of Retroreflection of
Retroreflective Sheeting Utilizing the Coplanar Geometry,'' approved
February 10, 2003. Test method ASTM E 810-03 describes an instrument
measurement of the retroreflective performance of retroreflective
sheeting. Under Sec. 299.423(e)(2), FRA incorporates by reference ASTM
E 2073-07 ``Standard Test Method for Photopic Luminance of
Photoluminescent (Phosphorescent) Markings,'' approved July 1, 2007.
FRA also incorporates by reference Section 5.2 of ASTM E 2073-07 under
Sec. 299.423(e)(2) and Sec. 299.423(e)(2)(ii). Test method ASTM E
2073-07 covers a procedure for determining the photopic luminance of
photoluminescent (phosphorescent) markings. It does not cover scotopic
or mesopic measurements. Incorporation
[[Page 69718]]
of the three ASTM standards by reference is to ensure that the
materials used for interior and exterior emergency markings can provide
adequate photoluminescence or retroreflectivity. As the markings
utilizing these materials will be relied on during emergencies (either
for passenger egress or first responder access), it is important that
the marking can be easily identified and followed should the emergency
occur during hours of limited visibility, with possible degradation or
complete loss of interior lighting. The standards either provide
performance specifications for design and manufacture, or provide the
testing methods.
VI. FRA's Record of Decision
This final rule constitutes the Record of Decision (ROD) for FRA's
publication of an RPA, pursuant to NEPA and the NEPA implementing
regulations from the Council on Environmental Quality (CEQ).\71\ In
making its decision to proceed with the RPA, FRA considered the
information and analysis included in the Draft and Final EIS, public
and agency comments submitted on the Draft and Final EIS for Dallas to
Houston High-Speed Rail, technical supporting information, and public
and agency comments submitted on the NPRM.
---------------------------------------------------------------------------
\71\ 40 CFR 1500-1508.
---------------------------------------------------------------------------
As required by CEQ regulations,\72\ in addition to the Agency's
decision, this final rule and ROD sets forth a summary of the
alternatives considered by FRA in reaching its decision, including the
environmentally preferable alternative, and identifies the mitigation
measures to be implemented.
---------------------------------------------------------------------------
\72\ 40 CFR 1505.2.
---------------------------------------------------------------------------
A. Summary of Alternatives Considered
TCRR identified its intent to construct and operate a high-speed
rail system between Dallas and Houston in its rulemaking petition.
Therefore, while FRA's decision is whether to publish an RPA (or take
other regulatory action necessary for the implementation of the Tokaido
Shinkansen technology within the U.S.), FRA also identified and
evaluated six end-to-end Build Alternatives in the Draft and Final EIS
to understand the potential impacts that could result if FRA publishes
the RPA and TCRR advances the proposed Dallas to Houston project.
To identify the six end-to-end Build Alternatives evaluated in the
Draft and Final EIS, FRA completed a two-step alternatives development
process. Section 2.4, Alternatives Considered, Development and
Evaluation of Proposed Corridors of the Final EIS, summarizes the
process FRA undertook to identify four corridor alternatives. The
Dallas to Houston High-Speed Rail Project, Corridor Alternatives
Analysis Technical Report, which describes the corridor analysis in
detail, is available on FRA's website.\73\
---------------------------------------------------------------------------
\73\ FRA. Dallas to Houston High-Speed Rail--Passenger Service
from Houston to Dallashttps://railroads.dot.gov/environmental-reviews/dallas-houston-high-speed-rail/dallas-houston-high-speed-rail-passenger.
---------------------------------------------------------------------------
Section 2.5, Alternatives Considered, Development and Evaluation of
Initial Alignment, Station and TMF Alternatives of the Final EIS,
details the process that FRA undertook to identify the six build
alternatives that were evaluated in the Draft and Final EIS. The
complete analysis of alignment alternatives is described in the Dallas
to Houston High Speed Rail Project, Alignment Alternatives Analysis
Report, also available on FRA's website.
1. No Build Alternative
As required by NEPA, the Final EIS included the No Build
Alternative, also known as the alternative of no action, in its
analysis as the baseline for comparison with Build Alternatives A
through F and the three Houston Terminal Station Options. Under the No
Build Alternative, FRA would not publish an RPA or take other
regulatory action necessary for the implementation of the Tokaido
Shinkansen technology within the U.S.; therefore, TCRR would not
construct nor be able to operate the HSR system and associated
facilities. Travel between Dallas and Houston would continue via
existing highway (IH-45) and airport (Dallas Fort Worth International
Airport [DFW], Dallas Love Field Airport [DAL], George Bush
Intercontinental Airport [IAH] and William P. Hobby Airport [HOU])
infrastructure. See Section 2.61, Alternatives Considered, No Build
Alternative of the Final EIS for a full description of the No Build
Alternative.
2. Build Alternatives
The two-step alternatives development process resulted in the six
end-to-end Build Alternatives, A through F, considered in the Draft and
Final EIS. For analytical purposes, each alternative was divided into
segments, as depicted on Figure 2-28 of the Final EIS.\74\ Table 1
identifies the segments that create each Build Alternative. In addition
to the track alignments, the limits of disturbance evaluated for each
Build Alternative contains the infrastructure necessary to support HSR
operations including stations, TMFs, MOW Facilities, signaling and
communications infrastructure, Traction Power Substations (TPSS),
sectioning posts, and sub-sectioning posts. See Section 2.6.2,
Alternatives Considered, Build Alternatives of the Final EIS for
complete descriptions of the alternatives and associated
infrastructure.
---------------------------------------------------------------------------
\74\ FRA. Dallas to Houston High-Speed Rail--Passenger Service
from Houston to Dallas https://railroads.dot.gov/environmental-reviews/dallas-houston-high-speed-rail/dallas-houston-high-speed-rail-passenger, Final Environmental Impact Statement.
---------------------------------------------------------------------------
The Final EIS analyzed the three stations proposed by TCRR, the
Dallas Terminal Station, Brazos Valley Intermediate Station in Grimes
County, and the Houston Terminal Station (which included three station
location options in Houston). Stations and platforms would be designed
to accommodate planned future operations. Two TMFs would be located
near the terminal stations to serve as cleaning and maintenance
facilities for the HSR trainsets. Each would occupy approximately 100
acres and include sidings for trainset storage, trainset car washes and
other facilities. Seven MOW facilities would be located every 15 to 46
miles along the HSR ROW. Each MOW facility would be approximately 35
acres and have sidings for MOW equipment and sweeper vehicles.
Signaling and communications infrastructure would typically be between
0.1 and 0.3 acre and spaced no more than 25 miles apart along the
alignment. Radio towers approximately 50 feet tall would be spaced at
approximately 6-mile intervals. Approximately 14 TPSSs, including 2 at
the TMFs, would be spaced between 10 and 25 miles apart, generally
adjacent to or within 1 mile of existing 138 kV transmission line. The
TPSSs would have a footprint of approximately 6 acres with a substation
building of approximately 2,200 square feet. An anticipated 11
sectioning posts and nine sub-sectioning posts would be placed between
the TPSSs. Each would have a footprint of approximately one half to one
acre each, with a small electrical building (approximately 1,600 square
feet).
Table 1--Build Alternatives A Through F
------------------------------------------------------------------------
Build alternative Segment
------------------------------------------------------------------------
Alternative A........................... 1, 2A, 3A, 4, 5.
Alternative B........................... 1, 2A, 3B, 4, 5.
Alternative C........................... 1, 2A, 3C, 5.
Alternative D........................... 1, 2B, 3A, 4, 5.
Alternative E........................... 1, 2B, 3B, 4, 5.
Alternative F........................... 1, 2B, 3C, 5.
------------------------------------------------------------------------
[[Page 69719]]
Segment 1 is located in Dallas County and is common to all Build
Alternatives. The segment is approximately 18-miles and includes the
Dallas Terminal Station, Dallas TMF and a TPSS. Segment 2A, located in
Ellis County beginning about 1.5 miles south of the Ellis County Line,
is approximately 23 miles in length. Segment 2A includes one MOW
facility and one TPSS. Segment 2B is also located in Ellis County and
is approximately 23 miles in length. Segment 2B includes one MOW
facility and one TPSS. Segment 3A is located in Ellis and Navarro
counties. It is approximately 30 miles in length and includes one
siding-off track and two TPSSs. Segment 3B is also located in Ellis and
Navarro counties and is approximately 31 miles in length. Segment 3B
includes one siding off track and one TPSS. Segment 3C, approximately
113 miles long, is located in Navarro, Freestone, Leon, Madison and
Grimes counties. Segment 3C includes two MOW facilities, one siding off
track and six TPSSs. Segment 4 is located in Freestone, Limestone,
Leon, Madison and Grimes counties. It is approximately 80 miles in
length and includes two MOW facilities, two siding off tracks and four
TPSSs. Segment 5, at approximately 84 miles, is common to all Build
Alternatives. It is located in Grimes, Waller and Harris counties.
Segment 5 includes the Brazos Valley Intermediate Station, one TMF, two
MOW facilities, one siding off track and four TPSSs.
In addition, as detailed in Section 2.5.2.3, Alternatives
Considered, Houston Terminal Station Options of the Final EIS, three
terminal station options, including the Industrial Site, Northwest Mall
and Northwest Transit Center were considered for the Houston Terminal
Station located in northwest Houston within the vicinity of US 290, IH-
10 and IH-610 north of Post Oak Road, west of IH-610 and just north of
Hempstead Road.
B. Environmentally Preferable Alternative
The environmentally preferable alternative is the alternative that
is least damaging to the environment or that best protects, preserves,
and enhances historic, cultural, and natural resources.\75\ After
considering the comparative analysis of the potential impacts of the No
Build Alternative, Build Alternatives A-F, and the three Houston
Terminal Station options presented in the Final EIS, FRA finds that
Build Alternative A (comprised of Segments 1, 2A, 3A, 4, and 5) and the
Houston Northwest Mall Terminal Station Option, which were identified
as the Preferred Alternative in the Final EIS, are the environmentally
preferable alternatives that provide the best balance to transportation
goals while minimizing physical impacts to the built and natural
environment.\76\
---------------------------------------------------------------------------
\75\ CEQ's Forty Most Asked Questions Concerning CEQ's National
Environmental Policy Act Regulations, 46 FR 18026 (Mar. 23, 1981, as
amended 1986).
\76\ See Section 2.7, Alternatives Considered, Preferred
Alternative of the Final EIS for a more detailed comparison of the
potential environmental impacts that differentiate the Build
Alternatives and Houston Terminal Station Options.
---------------------------------------------------------------------------
1. Environmentally Preferable Build Alternative
For many resource areas, there are no distinguishable differences
in impacts among Build Alternatives A-F.\77\ When the environmental
impacts of Build Alternatives A-F are compared, Build Alternative A
would have the overall fewest permanent impacts to the socioeconomic,
natural, physical, and cultural resources environment, including
generally fewer permanent acquisitions and displacements, and impacts
to transportation, floodplains, and waters of the U.S.
---------------------------------------------------------------------------
\77\ Including air quality, elderly and handicapped,
socioeconomic, electromagnetic field, environmental justice,
vibration, aesthetics and visual, and greenhouse gas emissions.
---------------------------------------------------------------------------
In addition, Segment 2B, a component of Build Alternatives D, E,
and F, would cross U.S. Army Corps of Engineers (USACE) fee land.
Coordination with USACE identified that the USACE National Non-
Recreation Outgrant Policy would prevent USACE from carrying forward
Segment 2B in the USACE evaluation criteria, as there is a viable
alternative not on federal property. Environmental resources that
differentiate Build Alternatives A, B, and C are presented in Table 2.
---------------------------------------------------------------------------
\78\ Specific impacts are not included in this comparison table
if they are equal across Build Alternatives A, B and C. Section
references within this table are to sections of the Final EIS.
\79\ Threatened and Endangered Species acreages include habitat
for species with mapped habitat that may be impacted, including the
Houston toad, large-fruited sand verbena, and Navasota ladies'-
tresses. Threatened and endangered species in the Study Area that
may be impacted, but that do not have mapped habitat, include the
interior least tern and the whooping crane.
\80\ Road modifications reflect the number of reroutes, road
adjustments, or road over rail constructions that would occur. Some
roads are affected by multiple modifications (such as IH-45).
Modifications do not reflect total number of roads, but total number
of road construction sites.
\81\ Shared access roads are included in roadway modification
lengths. Shared access roads will be developed to provide for
maintenance, emergency response access, and private property access
with a corresponding reduction in the number of new public roads to
decrease burden on roadway authorities. Shared access roads would be
constructed and maintained by TCRR.
\82\ Anxiety Aerodrome would be directly impacted by Segment 3B,
which is part of Alternatives B and E. Indirect impacts to special
status farmland in Section 3.13, Land Use of the Final EIS are
defined as a 25-foot setback added to the LOD to account for
indirect loss of productive farmland to accommodate the use of farm
and ranch equipment or impacts such as induced wind and changes in
irrigation.
Table 2--Comparison of Build Alternatives A, B and C \78\
----------------------------------------------------------------------------------------------------------------
Evaluation criteria Measure Alt A Alt B Alt C
----------------------------------------------------------------------------------------------------------------
Water Quality (Section 3.3)
----------------------------------------------------------------------------------------------------------------
Impaired Waterbodies--303(d) List..... Feet.................... 344.7 517.4 496
Impaired Waterbodies Total............ Feet.................... 830.0 1,002.7 981.3
Groundwater Wells..................... Count................... 9 13 7
----------------------------------------------------------------------------------------------------------------
Noise and Vibration (Section 3.4)
----------------------------------------------------------------------------------------------------------------
Severe Noise Impact:
Residential....................... Count................... 10 12 10
Moderate Noise Impact:
Residential....................... Count................... 280 290 275
----------------------------------------------------------------------------------------------------------------
Hazardous Materials and Solid Waste (Section 3.5)
----------------------------------------------------------------------------------------------------------------
Low-Risk Hazardous Material Sites..... Count................... 297 298 326
[[Page 69720]]
Moderate-Risk Hazardous Material Sites Count................... 155 155 165
----------------------------------------------------------------------------------------------------------------
Natural Ecological Systems and Protected Species (Section 3.6) 79
----------------------------------------------------------------------------------------------------------------
Protected Species Modeled Habitat-- Acres................... 328 328 325
Temporary.
Protected Species Modeled Habitat-- Acres................... 1,058 1,058 1,452
Permanent.
----------------------------------------------------------------------------------------------------------------
Waters of the U.S. (Section 3.7)
----------------------------------------------------------------------------------------------------------------
Stream Crossings--Temporary........... Feet.................... 83,459 83,791 90,942
Stream Crossings--Permanent........... Feet.................... 38,898 45,631 35,096
Wetlands--Temporary................... Acres................... 59.5 59.0 44.3
Wetlands--Permanent................... Acres................... 50.0 47.4 63.4
Waterbodies--Temporary................ Acres................... 33.5 36.3 30.4
Waterbodies--Permanent................ Acres................... 27.6 27.2 21.1
----------------------------------------------------------------------------------------------------------------
Floodplains (Section 3.8)
----------------------------------------------------------------------------------------------------------------
Impacts to 100-Year Floodplain........ Acres................... 616 557 642
Impacts to 500-Year Floodplain........ Acres................... 132 132 133
Permanent Impacts to 100-Year and 500- Acres................... 529 479 579
Year Floodplains.
Temporary Impacts to 100-Year and 500- Acres................... 219 210 196
Year Floodplains.
Total Acres of Impacted Floodplain.... Acres................... 748 689 775
Total Number of Bridge/Viaduct Count................... 63 63 71
Crossings of FEMA Zone AE.
Total Number of Bridge/Viaduct Count................... 126 142 137
Crossings of FEMA Zone A.
----------------------------------------------------------------------------------------------------------------
Utilities and Energy (Section 3.9)
----------------------------------------------------------------------------------------------------------------
New Electric TPSS Connections......... Count................... 13 12 13
Electric Utility Pole Adjustments..... Count................... 85 85 74
Total Electric Connections and Count................... 98 97 87
Adjustment.
Abandoned Oil and Gas Wells........... Count................... 37 37 22
----------------------------------------------------------------------------------------------------------------
Aesthetics and Scenic Resources (Section 3.10)
----------------------------------------------------------------------------------------------------------------
Total Number of Adverse Visual Count................... 11 11 10
Resource Impacts.
----------------------------------------------------------------------------------------------------------------
Transportation (Section 3.11)
----------------------------------------------------------------------------------------------------------------
Road Modifications \80\ (Public and Count................... 138 150 102
Private).
Road Modifications \81\ (Public only). Count................... 59 66 79
Length added to Public Roads (miles).. Miles................... 16.8 21.4 46.9
Length removed from Public Roads Miles................... 5.1 5.0 27.2
(miles).
Impacts to airports \82\.............. Count................... 0 1 0
----------------------------------------------------------------------------------------------------------------
Land Use (Section 3.13)
----------------------------------------------------------------------------------------------------------------
LU Conversion--Temporary.............. Acres................... 2,553.4 2,532.9 2,393.2
LU Conversion--Permanent.............. Acres................... 6,619.8 6,814.0 7,295.6
Special Status Farmland--Temporary.... Acres................... 1,710.8 1,690.4 1,459.8
Special Status Farmland--Permanent.... Acres................... 3,534.5 3,764.3 3,573.4
Special Status Farmland--Indirect \5\. Acres................... 847.5 888.2 697.3
Displacement--Commercial (primary).... Count................... 42 42 65
Displacement--Residence (primary)..... Count................... 235 255 239
Displacement--Community Facilities Count................... 2 2 3
(primary).
Estimated Permanent Parcel Count................... 1,731 1,814 1,789
Acquisitions.
Estimated Temporary Parcel Count................... 272 277 259
Acquisitions.
Estimated Structure Acquisitions-- Count................... 196 223 196
Agriculture.
Estimated Structure Acquisitions-- Count................... 12 12 18
Commercial.
Estimated Structure Acquisitions-- Count................... 2 2 1
Cultural/Civic Resources.
Estimated Structure Acquisitions--Oil Count................... 12 12 17
and Gas.
Estimated Structure Acquisitions-- Count................... 49 50 51
Residence.
Estimated Structure Acquisitions-- Count................... 0 0 1
Transportation and Utilities.
----------------------------------------------------------------------------------------------------------------
Safety and Security (Section 3.16)
----------------------------------------------------------------------------------------------------------------
Permanent Road Modifications resulting Count................... 12 13 9
in 1 minute or more in additional
through travel time.
Total fire and EMS service areas Count................... 56 57 51
bisected by construction.
Fire and EMS providers with high Count................... 3 4 5
potential for construction effects.
Fire and EMS providers with localized Count................... 8 7 6
potential for construction effects.
----------------------------------------------------------------------------------------------------------------
[[Page 69721]]
Recreational Facilities (Section 3.17)
----------------------------------------------------------------------------------------------------------------
Parks................................. Count................... 0 0 1
----------------------------------------------------------------------------------------------------------------
Environmental Justice (Section 3.18)
----------------------------------------------------------------------------------------------------------------
Number of Minority and/or Low-Income Count................... 80 80 81
block groups intersected by the Study
Area.
Number of all block groups intersected Count................... 118 118 119
by the Study Area.
----------------------------------------------------------------------------------------------------------------
Cultural Resources (Section 3.19)
----------------------------------------------------------------------------------------------------------------
Adverse Impacts to Historic Properties Count................... 14 14 13
----------------------------------------------------------------------------------------------------------------
Soils and Geology (Section 3.20)
----------------------------------------------------------------------------------------------------------------
LOD Area.............................. Acres................... 9,173.4 9,347.1 9,689.0
Shrink-Swell Potential--Low........... Acres................... 2,593.6 2,585.8 2,848.3
Shrink-Swell Potential--Moderate...... Acres................... 1,458.4 1,465.1 1,485.0
Shrink-Swell Potential--High.......... Acres................... 2,284.0 2,477.1 2,471.2
Shrink-Swell Potential--Very High..... Acres................... 2,727.9 2,697.5 2,781.8
Erosion Potential--Low................ Acres................... 1,611.6 1,591.3 1,914.1
Erosion Potential--Moderate........... Acres................... 4,511.2 4,619.9 4,786.6
Erosion Potential--High............... Acres................... 2,963.5 3,036.8 2,907.9
Corrosion Potential--Low.............. Acres................... 55.3 71.8 81.4
Corrosion Potential--Moderate......... Acres................... 2,204.8 2,182.0 2,761.1
Corrosion Potential--High............. Acres................... 6,824.5 6,992.5 6,764.5
Prime Farmland Soils.................. Acres................... 5,245.3 5,454.7 5,033.2
----------------------------------------------------------------------------------------------------------------
Source: AECOM, 2019.
2. Environmentally Preferable Houston Station Option
Like the Build Alternatives, for most resource areas, there are no
distinguishable differences among the Houston Terminal Station Options.
When the environmental impacts of each station option are compared, the
Houston Industrial Site Terminal Station Option would have fewer
permanent impacts to the socioeconomic, natural, physical, and cultural
resources environment. However, the Houston Industrial Site Terminal
Station Option would require the use of a resource protected by Section
4(f) of the Department Transportation Act,\83\ which the other Houston
Terminal Station Options would not.\84\ Because of the special
consideration given to resources protected under Section 4(f), FRA
finds that the Houston Industrial Site Terminal Station Option is not
environmentally preferable.
---------------------------------------------------------------------------
\83\ 49 U.S.C. 303.
\84\ See Chapter 7.0, Section 4(f) and Section 6(f) Evaluation,
of the Final EIS.
---------------------------------------------------------------------------
When the environmental impacts of Houston Northwest Mall Terminal
Station Option and Northwest Transit Center Terminal Station Option are
compared, the Houston Northwest Mall Terminal Station Option would have
fewer permanent impacts to the socioeconomic, natural, physical, and
cultural resources environment, as shown in Table 3.
---------------------------------------------------------------------------
\85\ Section references within this table are to sections of the
Final EIS.
Table 3--Comparison of Houston Northwest Transit Center Terminal Station Options and Houston Northwest Mall
Terminal Station Option \85\
----------------------------------------------------------------------------------------------------------------
Northwest
Evaluation criteria Measure Transit Center Northwest Mall
----------------------------------------------------------------------------------------------------------------
Hazardous Materials and Solid Waste (Section 3.5)
----------------------------------------------------------------------------------------------------------------
Low-Risk Hazardous Material Sites............. Count........................... 6 0
Moderate-Risk Hazardous Material Sites........ Count........................... 8 3
High-Risk Hazardous Material Sites............ Count........................... 0 0
----------------------------------------------------------------------------------------------------------------
Waters of the U.S. (Section 3.7)
----------------------------------------------------------------------------------------------------------------
Wetlands--Temporary........................... Acres........................... 1.6 0.0
Waterbodies--Temporary........................ Acres........................... 0.10 0.0
----------------------------------------------------------------------------------------------------------------
Transportation (Section 3.11)
----------------------------------------------------------------------------------------------------------------
Intersections at LOS E or F................... Count........................... 22 24
----------------------------------------------------------------------------------------------------------------
[[Page 69722]]
Land Use (Section 3.13)
----------------------------------------------------------------------------------------------------------------
LU Conversion--Temporary...................... Acres........................... 11.8 27.4
LU Conversion--Permanent...................... Acres........................... 88.7 75.8
Displacement--Commercial (primary)............ Count........................... 15 22
Displacement--Community Facility (primary).... Count........................... 1 0
Estimated Permanent Parcel Acquisitions....... Count........................... 43 40
Estimated Temporary Parcel Acquisitions....... Count........................... 0 1
Estimated Structure Acquisitions--Commercial.. Count........................... 0 1
----------------------------------------------------------------------------------------------------------------
Socioeconomics and Community Facilities (Section 3.14)
----------------------------------------------------------------------------------------------------------------
Community Facility............................ Count........................... 1 0
----------------------------------------------------------------------------------------------------------------
Cultural Resources (Section 3.19)
----------------------------------------------------------------------------------------------------------------
Adverse Impacts to Historic Properties........ Count........................... 1 0
----------------------------------------------------------------------------------------------------------------
Source: AECOM 2019.
C. Mitigation Commitments
FRA identified compliance and mitigation measures based upon
identification of best practices and technical consideration of the
likely success in implementation, Agency consultations, comments on the
Draft and Final EIS, regulatory requirements, and input from TCRR.
These mitigation commitments would avoid, minimize, mitigate, or
compensate for the potential adverse impacts related to the
construction and/or operation of TCRR's proposed Dallas to Houston
project.
TCRR has agreed to implement the compliance and mitigation measures
identified in the Dallas to Houston High-Speed Rail Mitigation
Commitments, which is located on FRA's website.\86\ The compliance and
mitigation measures were also included in the Final EIS. In addition,
TCRR is responsible for adhering to applicable Federal, State, and
local laws, ordinances and requirements. TCRR has agreed to maintain an
environmental compliance system to serve as a database of compliance
and mitigation commitments and provide accountability and transparency
to environmental regulatory agencies. TCRR will also prepare a
quarterly report that summarizes the status of implementing compliance
and mitigation measures by geographic area, mitigation activities
completed, significant upcoming activities, and any corrective actions
taken for any instances of non-compliance. TCRR will make the quarterly
report available to the public by posting it on the TCRR website.
---------------------------------------------------------------------------
\86\ FRA. Dallas to Houston High-Speed Rail--Passenger Service
from Houston to Dallas https://railroads.dot.gov/environmental-reviews/dallas-houston-high-speed-rail/dallas-houston-high-speed-rail-passenger, Record of Decision Attachments, Mitigation
Commitments.
---------------------------------------------------------------------------
VII. Regulatory Impact and Notices
A. Executive Orders 12866 and 13771, and DOT Regulatory Policies and
Procedures
The TCRR high-speed system is modeled on JRC's Tokaido Shinkansen
HSR system, which does not meet many of the requirements under the
Passenger Equipment Safety Standards (Tier III) final rule.\87\ TCRR
desires to maintain the safety record of the Tokaido Shinkansen HSR
system, so it is imperative that the systems approach to safety and the
philosophy of the JRC system be implemented in the United States. As
such, TCRR is requesting, through this rulemaking, that it comply with
regulations that are different, and in some instances, more stringent
than the Tier III requirements.
---------------------------------------------------------------------------
\87\ 83 FR 59182 (Nov. 21, 2018).
---------------------------------------------------------------------------
FRA has a regulatory program that addresses equipment, track,
operating practices, and human factors in the existing, conventional
railroad environment. However, significant operational and equipment
differences exist between the system contemplated by TCRR and other
passenger operations in the United States. In many of the railroad
safety disciplines, FRA's existing regulations do not address the
operational characteristics of TCRR's system. Therefore, to ensure that
this new system will operate safely, minimum Federal safety standards
must be in place when TCRR commences operations.
Through this final rule, FRA will regulate the TCRR system as a
standalone system. FRA stated in the Tier III final rule that a
standalone system would have to combine all aspects of railroad safety
(such as operating practices, signal and train control, and track) that
must be applied to the individual system. Such an approach covers more
than passenger equipment and would likely necessitate particular ROW
intrusion protection and other safety requirements not adequately
addressed in FRA's regulations. Without this final rule, TCRR would not
be allowed to implement its system as it does not meet many of the
requirements of FRA's existing regulations of general applicability.
Accordingly, by enabling private activity that would otherwise be
prohibited, this final rule is an E.O. 13771 deregulatory action.
E.O. 12866 requires agencies to account for additional regulatory
burdens that a particular regulatory action would have on a regulated
entity. In the rulemaking context, under E.O. 12866, two similar forms
of regulatory action (e.g., a rulemaking versus a waiver process) could
have substantially different burdens on a regulated entity. For this
reason, the methodology used to evaluate burdens of a particular
regulatory action on a regulated entity under E.O. 12866 will differ
from the methodology used under NEPA to assess the potential
environmental impacts that may result from the regulatory action. For
more information regarding the NEPA process, please see section VII. F.
National Environmental
[[Page 69723]]
Policy Act, or the Final EIS which has been included in the rulemaking
docket (Docket No. FRA-2019-0068, Final Environmental Impact
Statement).
This final rule though, as an RPA, was not subject to review under
E.O. 12866, as that applies only to rules of general applicability.
Accordingly, FRA concluded that because this final rule generally
includes only voluntary actions or alternative actions that would be
voluntary, the final rule does not impart additional burdens on
regulated entities, specifically TCRR. Even though not subject to E.O.
12866 review, FRA has provided a qualitative discussion on the costs,
benefits, and alternatives considered, which can be found under section
V. A. Executive Orders 12866 and 13771, and DOT Regulatory Policies and
Procedures of the NPRM.\88\ Responses to comments on FRA's regulatory
evaluation are under section IV. M. Regulatory Evaluation of this final
rule.
---------------------------------------------------------------------------
\88\ 85 FR 14036, 14047.
---------------------------------------------------------------------------
B. Regulatory Flexibility Act and Executive Order 13272; Regulatory
Flexibility Assessment
The Regulatory Flexibility Act of 1980 \89\ and E.O. 13272 \90\
require agency review of proposed and final rules to assess their
impacts on small entities. An agency must prepare a Final Regulatory
Flexibility Analysis unless it determines and certifies that a rule, if
promulgated, would not have a significant economic impact on a
substantial number of small entities.
---------------------------------------------------------------------------
\89\ 5 U.S.C. 601 et seq.
\90\ 67 FR 53461, Aug. 16, 2002.
---------------------------------------------------------------------------
``Small entity'' is defined in 5 U.S.C. 601 as a small business
concern that is independently owned and operated, and is not dominant
in its field of operation. The SBA has authority to regulate issues
related to small businesses, and stipulates in its size standards that
a ``small entity'' in the railroad industry is a for profit ``line-haul
railroad'' that has fewer than 1,500 employees, a ``short line
railroad'' with fewer than 500 employees, or a ``commuter rail system''
with annual receipts of less than seven million dollars.\91\ In
addition, section 601(5) of the Small Business Act defines ``small
entities'' as governments of cities, counties, towns, townships,
villages, school districts, or special districts with populations less
than 50,000 that operate railroads. Federal agencies may adopt their
own size standards for small entities in consultation with SBA and in
conjunction with public comment. Thus, in consultation with SBA, FRA
has published a final statement of agency policy that formally
establishes ``small entities'' or ``small businesses'' as railroads,
contractors, and shippers that meet the revenue requirements of a Class
III railroad--$20 million or less in inflation-adjusted annual
revenue--and commuter railroads or small government jurisdictions that
serve populations of 50,000 or less.
---------------------------------------------------------------------------
\91\ ``Size Eligibility Provisions and Standards,'' 13 CFR part
121, subpart A.
---------------------------------------------------------------------------
As this final rule applies only to one railroad, TCRR, which
provides intercity rail passenger service between Dallas and Houston,
Texas, which have populations larger than 50,000 people, TCRR is not
considered a small entity.
FRA invited all interested parties to submit comments, data, and
information demonstrating the potential economic impact on any small
entity that would result from the adoption of the final rule. During
the comment period, FRA did not receive any comments from the public or
stakeholders regarding the impact that the final rule would have on
small entities.
Accordingly, the Administrator of FRA hereby certifies that this
final rule will not have a significant economic impact on a substantial
number of small entities.
C. Paperwork Reduction Act
In accordance with the Paperwork Reduction Act of 1995,\92\ and its
implementing regulations,\93\ when information collection requirements
pertain to nine or fewer entities, Office of Management and Budget
(OMB) approval of the collection requirements is not required. This
regulation pertains to one railroad, and therefore, OMB approval of the
paperwork collection requirements in this final rule is not required.
---------------------------------------------------------------------------
\92\ 44 U.S.C. 3501-3520.
\93\ 5 CFR part 1320.
---------------------------------------------------------------------------
D. Federalism Implications
E.O. 13132, ``Federalism,'' \94\ requires FRA to develop an
accountable process to ensure ``meaningful and timely input by State
and local officials in the development of regulatory policies that have
federalism implications.'' ``Policies that have federalism
implications'' are defined in the E.O. to include regulations that have
``substantial direct effects on the States, on the relationship between
the national government and the States, or on the distribution of power
and responsibilities among the various levels of government.'' Under
E.O. 13132, an agency may not issue a regulation with federalism
implications that imposes substantial direct compliance costs and that
is not required by statute, unless the Federal Government provides the
funds necessary to pay the direct compliance costs incurred by State
and local governments, or the agency consults with State and local
government officials early in the process of developing the regulation.
Where a regulation has federalism implications and preempts State law,
the agency seeks to consult with State and local officials in the
process of developing the regulation.
---------------------------------------------------------------------------
\94\ 64 FR 43255 (Aug. 10, 1999).
---------------------------------------------------------------------------
This final rule has been analyzed under the principles and criteria
contained in E.O. 13132. This final rule will not have a substantial
effect on the States or their political subdivisions, and it will not
affect the relationships between the Federal Government and the States
or their political subdivisions, or the distribution of power and
responsibilities among the various levels of government. In addition,
FRA has determined that this regulatory action will not impose
substantial direct compliance costs on the States or their political
subdivisions. Therefore, the consultation and funding requirements of
E.O. 13132 do not apply.
However, the final rule arising from this rulemaking could have
preemptive effect by operation of law under certain provisions of the
Federal railroad safety statutes, specifically the former Federal
Railroad Safety Act of 1970,\95\ and the former Locomotive Boiler
Inspection Act (LIA).\96\ Section 20106 provides that States may not
adopt or continue in effect any law, regulation, or order related to
railroad safety or security that covers the subject matter of a
regulation prescribed or order issued by the Secretary of
Transportation (with respect to railroad safety matters) or the
Secretary of Homeland Security (with respect to railroad security
matters), except when the State law, regulation, or order qualifies
under the ``essentially local safety or security hazard'' exception to
section 20106. Moreover, the former LIA has been interpreted by the
Supreme Court as preempting the field concerning locomotive safety.\97\
---------------------------------------------------------------------------
\95\ Repealed and recodified at 49 U.S.C. 20106.
\96\ 45 U.S.C. 22-34, repealed and recodified at 49 U.S.C.
20701-20703.
\97\ See Napier v. Atlantic Coast Line R.R., 272 U.S. 605
(1926).
---------------------------------------------------------------------------
E. International Trade Impact Assessment
The Trade Agreements Act of 1979 prohibits Federal agencies from
engaging in any standards or related activities that create unnecessary
obstacles to the foreign commerce of the
[[Page 69724]]
United States. Legitimate domestic objectives, such as safety, are not
considered unnecessary obstacles.\98\ The statute also requires
consideration of international standards and, where appropriate, that
they be the basis for U.S. standards.
---------------------------------------------------------------------------
\98\ Public Law 96-39, 19 U.S.C. 2501 et seq.
---------------------------------------------------------------------------
FRA has assessed the potential effect of this final rule on foreign
commerce and believes that its requirements are consistent with the
Trade Agreements Act. The requirements are safety standards, which, as
noted, are not considered unnecessary obstacles to trade.
F. National Environmental Policy Act
FRA is the lead agency for the preparation of the EIS in compliance
with CEQ's NEPA-implementing regulations,\99\ FRA's Procedures for
Considering Environmental Impacts,100 and associated
environmental laws. Cooperating agencies in the EIS include the United
States Environmental Protection Agency (EPA), the Federal Highway
Administration, the Federal Transit Administration, the STB, USACE and
the United States Fish and Wildlife Service (USFWS). The Texas
Department of Transportation provided technical assistance to FRA in
the preparation of the EIS.
---------------------------------------------------------------------------
\99\ 40 CFR 1500-1508.
\100\ 64 FR 28545 (May 26, 1999), as updated in 78 FR 2713 (Jan.
14, 2013).
---------------------------------------------------------------------------
FRA published a Notice of Intent (NOI) to prepare an EIS in the
Federal Register on June 25, 2014.\101\ The NOI announced FRA's intent
to prepare an EIS and the beginning of the scoping period, provided a
brief background on TCRR's proposal, and identified the preliminary
contents of the EIS, the required approvals by the Federal Government,
and procedures expected for coordination and public involvement based
on NEPA requirements.
---------------------------------------------------------------------------
\101\ 79 FR 36123 (Jun. 24, 2014).
---------------------------------------------------------------------------
After publication of the NOI, FRA conducted extended scoping
through January 9, 2015. Notification of the extended scoping period
included an email to the mailing list, letters to elected officials,
FRA media advisory and a notice on FRA's website. FRA also conducted a
series of 12 public scoping meetings in October and December 2014. A
total of 1,943 individuals, including 118 elected officials, attended
12 public scoping meetings. Additional details on these public scoping
meetings may be found on FRA's website.\102\
---------------------------------------------------------------------------
\102\ FRA. Dallas to Houston High-Speed Rail--Passenger Service
from Houston to Dallas https://railroads.dot.gov/environmental-reviews/dallas-houston-high-speed-rail/dallas-houston-high-speed-rail-passenger, Dallas to Houston High-Speed Rail Scoping Report.
---------------------------------------------------------------------------
After scoping, FRA identified the Build Alternatives described in
section VI. A. Summary of Alternatives Considered of this final rule,
and evaluated the potential impacts of those alternatives in the Draft
EIS. On December 22, 2017, EPA published a Notice of Availability (NOA)
for the Draft EIS in the Federal Register.\103\ FRA circulated the
Draft EIS to affected local jurisdictions, State and Federal agencies,
tribes, community organizations and other interested groups, interested
individuals and the public. The Draft EIS was available for public
review at 24 locations and posted on the FRA website.\104\ FRA
published notices that the Draft EIS was available for review in 27
newspapers throughout the area of the proposed Dallas to Houston
project and FRA also mailed notices to 2,722 individuals, landowners
and organizations on the mailing list.
---------------------------------------------------------------------------
\103\ 82 FR 60723 (Dec. 22, 2017).
\104\ FRA. Dallas to Houston High-Speed Rail--Passenger Service
from Houston to Dallas https://railroads.dot.gov/environmental-reviews/dallas-houston-high-speed-rail/dallas-houston-high-speed-rail-passenger, Draft Environmental Impact Statement.
---------------------------------------------------------------------------
As required by NEPA, the EIS identified the purpose and need to
which the agency is responding.\105\ FRA's purpose and need was
developed in response to the proposal in the petition submitted by
TCRR, which is also the basis for FRA's regulatory action. Accordingly,
in the EIS, FRA identified that ``the purpose of the privately proposed
Project is to provide the public with reliable and safe HSR
transportation between Dallas and Houston.'' The need is described in
detail in Section 1.2.2, Introduction, Need of the Final EIS. The Draft
EIS analyzed six end-to-end Build Alternatives (Alternatives A through
F) and three Houston Terminal Station Options: The Houston Industrial
Site Station Terminal, the Houston Northwest Mall Terminal Station, and
the Houston Northwest Transit Center Terminal Station, as well as the
No Build Alternative. The Build Alternatives included a terminal
station in Dallas and an intermediate station in Grimes County. As
required by CEQ regulations,\106\ the Draft EIS identified Build
Alternative A as the Preferred Alternative. The Draft EIS did not
identify a preferred Houston Terminal Station option.
---------------------------------------------------------------------------
\105\ 40 CFR 1502.13.
\106\ 40 CFR 1502.14.
---------------------------------------------------------------------------
The public comment period for the Draft EIS ran from December 22,
2017 through March 9, 2018. FRA conducted 11 public hearings to accept
agency and public comments on the Draft EIS during the comment period.
FRA received a total of 25,309 comments from approximately 6,000
individuals. A total of 2,971 individuals, including 84 elected
officials, attended the 11 public hearings. See Section 9.6, Public and
Agency Involvement, Draft EIS of the Final EIS for more information on
the public comment period and hearing format.
FRA reviewed and assessed all comments (written and oral) received
during the public comment period on the Draft EIS through the
preparation of the Final EIS. These comments helped to inform FRA's
development of the Final EIS. FRA responded to all public comments in
the Final EIS.
The Final EIS identifies, evaluates, and documents the potential
environmental and socioeconomic effects of FRA's proposed action. This
includes implementing TCRR's proposed HSR service between Dallas and
Houston as described in TCRR's petition, which is the only future
operating location TCRR has identified to FRA. As required by CEQ
regulations,\107\ the Final EIS identified Build Alternative A
(comprised of Segments 1, 2A, 3A, 4, and 5) and the Houston Northwest
Mall Terminal Station Option as the Preferred Alternative.
---------------------------------------------------------------------------
\107\ 40 CFR 1502.14.
---------------------------------------------------------------------------
FRA's rulemaking would enable the safe operation of TCRR's HSR
system in locations other than between Dallas and Houston, even though
FRA is aware of no proposal to operate such service. Thus, the Final
EIS also evaluates and documents the reasonably foreseeable potential
beneficial and adverse environmental impacts of implementing TCRR's HSR
system in any location within the United States.\108\ However, as TCRR
has not proposed to operate in any other location, discussion of
location-specific impacts, other than the service proposed in TCRR's
rulemaking petition and conceptual engineering, would be speculative.
---------------------------------------------------------------------------
\108\ Section 3.1.2, Impacts of the TCRR HSR System Independent
of Location of the Final EIS.
---------------------------------------------------------------------------
FRA signed the Final EIS on May 15, 2020, and EPA published an NOA
for the EIS in the Federal Register on May 29, 2020.\109\ FRA also
circulated the Final EIS to affected local jurisdictions, State and
Federal agencies, tribes, community organizations and other interested
groups, interested individuals and the public. The Final EIS was made
available for public review at 24
[[Page 69725]]
locations and was posted on the FRA website.\110\ FRA also provided 25
print copies and 200 electronic copies (via USB flash drive) of the
Final EIS to the public, upon request. The NOA was published in 26
newspapers throughout the area of the proposed Dallas to Houston
project and mailed notices to 5,018 individuals, landowners and
organizations on the mailing list.
---------------------------------------------------------------------------
\109\ 85 FR 32390 (May 29, 2020).
\110\ FRA. Dallas to Houston High-Speed Rail--Passenger Service
from Houston to Dallas https://railroads.dot.gov/environmental-reviews/dallas-houston-high-speed-rail/dallas-houston-high-speed-rail-passenger, Final Environmental Impact Statement.
---------------------------------------------------------------------------
1. Summary of Comments on the Final EIS
FRA reviewed and analyzed comments received since the Final EIS was
released on May 29, 2020. FRA received a total of 96 comment
submissions from approximately 76 individuals, agencies, businesses,
and/or organizations between May 29, 2020 and July 28, 2020.
Submissions were categorized by comment topic, which resulted in some
submissions being split into multiple comments, and in total FRA
received 143 comments. In general, comments were regarding impacts to
transportation, cultural resources, build alternatives, project
viability, general project support or opposition, or the overall NEPA
process. Comments received have raised no new substantive issues
relevant to environmental concerns from those received during the
public comment period of the Draft EIS (see Appendix H, Response to
Draft EIS Comments of the Final EIS) or on topics not already addressed
within the Final EIS. However, several comments raised issues that
warrant clarification or correction here, specifically comments related
to the capital cost of TCRR's proposed Dallas to Houston project, and
safety concerns related to electrical arcing from the HSR system and
proximity to natural gas pipelines.
Several commenters noted that capital costs publicly reported by
TCRR in April 2020 ($30 billion) differ from the capital costs reported
in the Final EIS ($16-19 billion). The capital costs estimate in the
Final EIS (Section 3.14.5.2.3, Socioeconomics and Community Facilities,
Economic Impacts) includes construction labor, materials, indirect
costs, and approximately $2.6 billion for systems and rolling stock.
Additional information provided by TCRR clarified that the $30
billion capital costs reported by Texas Central Board Chairman Drayton
McLane in an April 8, 2020, letter was based on the overall
conservative project costs. This value included the direct costs to
design, construct, and commission the rail system as portrayed in the
Final EIS, but also other indirect costs excluded from the Final EIS
analysis (e.g., land acquisition, litigation, property taxes,
insurance, financing costs, and increased costs of foreign supply).
TCRR also reported that the $30 billion included contingency and
increased escalation of costs.
FRA believes that the increased escalation costs could result in
larger economic benefits than what was identified in the Final EIS.
Therefore, the escalation values in the $16 billion and $19 billion
($2019) projections from the Final EIS represent a more conservative
estimate of the potential beneficial impacts.
Comments regarding safety concerns related to electrical arcing
from the HSR system and proximity to natural gas pipelines were similar
to the comments FRA received on those topics in response to the NPRM.
FRA notes that proximity to pipelines was addressed in the Final EIS
(See Section 3.9, Utilities and Energy) and in the detailed discussion
in response to comments in section IV. C. General Safety Oversight, of
this final rule. As discussed in section IV. H. Electrical Arcing from
the Overhead Catenary System, of this final rule, this occurrence is
part of the normal operation of an electrical traction power system
like the one proposed by TCRR, and by itself does not pose any
particular safety risk. FRA does not believe there is a potential
environmental impact or safety concern as a result of this phenomenon
that requires assessment under NEPA.
Clarifications and/or updates to the Final EIS text, some of which
were identified in comments submitted on the Final EIS, are included in
the Final EIS Errata and Updated Information.\111\
---------------------------------------------------------------------------
\111\ FRA. Dallas to Houston High-Speed Rail--Passenger Service
from Houston to Dallas https://railroads.dot.gov/environmental-reviews/dallas-houston-high-speed-rail/dallas-houston-high-speed-rail-passenger, Record of Decision Attachments, Final EIS Errata and
Updated Information.
---------------------------------------------------------------------------
2. Potential Environmental Impacts
The Final EIS assessed the potential beneficial and adverse
environmental impacts of FRA's proposed rulemaking. The Final EIS
considered impacts from TCRR's proposed project, the approximately 240-
mile, for-profit, HSR system connecting Dallas and Houston based on
JRC's Tokaido Shinkansen system technology, as described in Section
2.2, Alternatives Considered, Proposed HSR Infrastructure and
Operations of the Final EIS and in the rulemaking petition submitted by
TCRR. The HSR service between Dallas and Houston is the only proposed
service or future operating location TCRR has identified to FRA and
therefore FRA determined it was appropriate to evaluate the potential
project-specific impacts of this proposed service. The potential
impacts that would result from implementing the proposed project are
identified and discussed in Chapter 3.0, Affected Environment and
Environmental Consequences and Chapter 4, Indirect and Cumulative
Impacts, of the Final EIS and are summarized below in Table 4.
Table 4--Summary of Potential Direct Impacts \112\
----------------------------------------------------------------------------------------------------------------
Houston Terminal
Evaluation criteria Measure Build alts. A-F Station options Total
----------------------------------------------------------------------------------------------------------------
Air Quality (Final EIS Section 3.2)
----------------------------------------------------------------------------------------------------------------
Air Quality Impacts.............. N/A................. Net emissions benefit for permanent operations,
temporary construction impacts.
----------------------------------------------------------------------------------------------------------------
Water Quality (Final EIS Section 3.3)
----------------------------------------------------------------------------------------------------------------
Impaired Waterbodies--303(d) List Feet................ 344.7-517.4 0 344.7-517.4
Impaired Waterbodies with TMDLs.. Feet................ 485.3 0 485.3
Impaired Waterbodies Total....... Feet................ 830-1,002.7 0 830-1,002.7
Active Public Water System Wells. Count............... 1 0 1
Groundwater Wells................ Count............... 7-13 0 7-13
[[Page 69726]]
Reservoir/Dam Crossings.......... Count............... 0 0 0
----------------------------------------------------------------------------------------------------------------
Noise and Vibration (Final EIS Section 3.4)
----------------------------------------------------------------------------------------------------------------
Severe Noise Impact:
Residential.................. Count............... 9-12 0 9-12
Institutional................ Count............... 0 0 0
Moderate Noise Impact:
Residential.................. Count............... 275-295 0 275-295
Institutional................ Count............... 1 0 1
Vibration Impact:
Residential.................. Count............... 0 0 0
Institutional................ Count............... 0 0 0
----------------------------------------------------------------------------------------------------------------
Hazardous Materials and Solid Waste (Final EIS Section 3.5)
----------------------------------------------------------------------------------------------------------------
Low-Risk Hazardous Material Sites Count............... 297-326 0-6 297-332
Moderate-Risk Hazardous Material Count............... 155-165 3-8 158-173
Sites.
High-Risk Hazardous Material Count............... 3-4 0-2 3-6
Sites.
----------------------------------------------------------------------------------------------------------------
Natural Ecological Systems and Protected Species (Final EIS Section 3.6) \113\
----------------------------------------------------------------------------------------------------------------
Protected Species Modeled Acres............... 325-328 0 325-328
Habitat--Temporary.
Protected Species Modeled Acres............... 1,058-1,452 0 1,058-1,452
Habitat--Permanent.
----------------------------------------------------------------------------------------------------------------
Waters of the U.S. (Final EIS Section 3.7)
----------------------------------------------------------------------------------------------------------------
Stream Crossings--Temporary...... Feet................ 83,459-90,942 0 83,459-90,942
Stream Crossings--Permanent...... Feet................ 34,839-45,631 0 34,839-45,631
Wetlands--Temporary.............. Acres............... 44.3-61.1 0 44.3-61.1
Wetlands--Permanent.............. Acres............... 47.4-64.4 0-1.6 47.4-66.0
Waterbodies--Temporary........... Acres............... 27.9-36.3 0-0.1 27.9-36.4
Waterbodies--Permanent........... Acres............... 21.1-29.3 0 21.1-29.3
----------------------------------------------------------------------------------------------------------------
Floodplains (Final EIS Section 3.8)
----------------------------------------------------------------------------------------------------------------
Impacts to 100-Year Floodplain... Acres............... 557-657 0 557-657.0
Impacts to 500-Year Floodplain... Acres............... 132-133 0-0.1 132-133.1
Permanent Impacts to 100-Year and Acres............... 479-589 0-0.1 479-589.1
500-Year Floodplains.
Temporary Impacts to 100-Year and Acres............... 196-225 0 196-225.0
500-Year Floodplains.
Total Acres of Impacted Acres............... 689-790 0-0.1 689-790.1
Floodplain.
Total Number of Bridge/Viaduct Count............... 63-76 NA 63-76.0
Crossings of FEMA Zone AE.
Total Number of Bridge/Viaduct Count............... 126-155 NA 126-155.0
Crossings of FEMA Zone A.
----------------------------------------------------------------------------------------------------------------
Utilities and Energy (Final EIS Section 3.9)
----------------------------------------------------------------------------------------------------------------
New Electric TPSS Connections.... Count............... 12-13 0 12-13
Electric Utility Pole Adjustments Count............... 74-89 0 74-89
Total Electric Connections and Count............... 87-102 0 87-102
Adjustment.
Abandoned Oil and Gas Wells...... Count............... 22-37 0 22-37
----------------------------------------------------------------------------------------------------------------
Aesthetics and Scenic Resources (Final EIS Section 3.10)
----------------------------------------------------------------------------------------------------------------
Total Number of Beneficial \114\. Count............... 2 1 3
Total Number of Neutral.......... Count............... 8 0 8
Total Number of Adverse.......... Count............... 2 0 2
Total Number of Adverse Visual Count............... 10-11 0 10-11
Resource Impacts.
----------------------------------------------------------------------------------------------------------------
Transportation (Final EIS Section 3.11)
----------------------------------------------------------------------------------------------------------------
Rail Crossings \115\............. Count............... 27 0 27
Road Modifications \116\ (Public Count............... 102-158 0 102-158
and Private).
Road Modifications \117\ (Public Count............... 59-80 0 59-80
only).
Length added to Public Roads Miles............... 16.6-46.9 0 16.6-46.9
(miles).
Length removed from Public Roads Miles............... 5.0-27.2 0 5.0-27.2
(miles).
Impacts to airports \118\........ Count............... 0-1 0 0-1
Number of Intersections at LOS E Count............... NA 22-25 22-25
or F.
----------------------------------------------------------------------------------------------------------------
[[Page 69727]]
Elderly and Handicapped (Final EIS Section 3.12)
----------------------------------------------------------------------------------------------------------------
Elderly and Handicapped Impacts.. NA.................. Proposed project would be designed, constructed and
operated in compliance with ADA; therefore, there would
be no impacts related to accessibility of the HSR
system for the elderly and handicapped.
----------------------------------------------------------------------------------------------------------------
Land Use (Final EIS Section 3.13)
----------------------------------------------------------------------------------------------------------------
Existing Land Use Conversion-- Acres............... 2,393.2-2,592.4 0-27.4 2,393.2-2,619.8
Temporary.
Existing Land Use Conversion-- Acres............... 6,610.0-7,295.6 75.8-92.2 6,685.8-7,387.8
Permanent.
Special Status Farmland-- Acres............... 1,459.8-1,719.4 0.0 1,459.8-1,719.4
Temporary.
Special Status Farmland-- Acres............... 3,483.5-3,764.3 0.0 3,483.5-3,764.3
Permanent.
Special Status Farmland--Indirect Acres............... 697.3-888.2 0.0 697.3-888.2
\119\.
Displacement--Commercial Count............... 42-65 14-22 56-87
(primary).
Displacement--Residence (primary) Count............... 235-269 0 235-269
Displacement--Community Count............... 2-3 0 2-3
Facilities (primary) \120\.
Estimated Permanent Parcel Count............... 1,731-1,847 25-43 1,756-1,890
Acquisitions.
Estimated Temporary Parcel Count............... 258-277 0-1 258-278
Acquisitions.
Estimated Structure Acquisitions-- Count............... 196-230 0 196-230
Agriculture.
Estimated Structure Acquisitions-- Count............... 12-18 0-1 12-19
Commercial.
Estimated Structure Acquisitions-- Count............... 0 0 0
Community Facilities.
Estimated Structure Acquisitions-- Count............... 1-2 0 1-2
Cultural/Civic Resources.
Estimated Structure Acquisitions-- Count............... 12-17 0 12-17
Oil and Gas.
Estimated Structure Acquisitions-- Count............... 49-54 0 49-54
Residence.
Estimated Structure Acquisitions-- Count............... 0-1 0 0-1
Transportation and Utilities.
----------------------------------------------------------------------------------------------------------------
Socioeconomics and Community Facilities (Final EIS Section 3.14)
----------------------------------------------------------------------------------------------------------------
Communities with Disrupted Count............... 4 0 4
Character and Cohesion.
--------------------------------------------------------
Economic Impacts................. NA.................. Positive
--------------------------------------------------------
Employment....................... Job Years........... 317,207
--------------------------------------------------------
Earnings......................... 2019 billions....... $14.50
--------------------------------------------------------
Tax Revenue...................... N................... Positive
--------------------------------------------------------
Children's Health and Safety Count............... 0 0-1 0-1
\121\.
Community Facilities \122\....... Count............... 5 0-1 5-6
----------------------------------------------------------------------------------------------------------------
Electromagnetic Fields (Final EIS Section 3.15)
----------------------------------------------------------------------------------------------------------------
Electromagnetic Field (EMF) NA.................. No EMI or adverse EMF exposure would occur.
Impacts.
----------------------------------------------------------------------------------------------------------------
Safety and Security (Final EIS Section 3.16)
----------------------------------------------------------------------------------------------------------------
Permanent Road Modifications Count............... 8-13 0 8-13
resulting in 1 minute or more in
additional through travel time.
Permanent Road Modifications Count............... 0-1 0 0-1
reducing through travel time by
1 minute or more.
Total fire and EMS service areas Count............... 51-57 0 51-57
bisected by construction.
Fire and EMS providers with high Count............... 3-5 0 3-5
potential for construction
effects.
Fire and EMS providers with Count............... 6-8 0 6-8
localized potential for
construction effects.
----------------------------------------------------------------------------------------------------------------
Recreational Facilities (Final EIS Section 3.17)
----------------------------------------------------------------------------------------------------------------
Parks............................ Count............... 0-2 0 0-2
----------------------------------------------------------------------------------------------------------------
Environmental Justice (Final EIS Section 3.18)
----------------------------------------------------------------------------------------------------------------
Number of Minority and/or Low- Count............... 80-81 5-7 85-88
Income block groups intersected
by the Study Area.
Number of all block groups Count............... 118-119 8-14 126-133
intersected by the Study Area.
Identified Minority and/or Low- Count............... 5 1 5
Income Communities.
Disproportionately High and NA.................. No No No
Adverse Impact to Minority and/
or Low-Income Communities.
----------------------------------------------------------------------------------------------------------------
[[Page 69728]]
Cultural Resources (Final EIS Section 3-19)
----------------------------------------------------------------------------------------------------------------
Adverse Impacts to Historic Count............... 11-14 0-1 11-15
Properties.
----------------------------------------------------------------------------------------------------------------
Soils and Geology (Final EIS Section 3.20)
----------------------------------------------------------------------------------------------------------------
LOD Area......................... Acres............... 9,173.4-9,718.4 0-103.9 9,173.4-9,822.4
Shrink-Swell Potential--Low...... Acres............... 2,585.8-2,848.3 0 2,585.8-2,848.3
Shrink-Swell Potential--Moderate. Acres............... 1,456.9-1,485.0 3.0-19.2 1,459.9-1,504.0
Shrink-Swell Potential--High..... Acres............... 2,284.0-2,484.4 0 2,284.0-2,484.4
Shrink-Swell Potential--Very High Acres............... 2,697.5-2,806.7 0 2,697.5-2,806.7
Erosion Potential--Low........... Acres............... 1,591.3-1,981.9 0 1,591.3-1,981.9
Erosion Potential--Moderate...... Acres............... 4,472.1-4,786.6 3.0-47.0 4,475.1-4,833.6
Erosion Potential--High.......... Acres............... 2,907.9-3,036.8 3.0-16.2 2,910.9-3,053.0
Corrosion Potential--Low......... Acres............... 55.3-81.4 0 55.3-81.4
Corrosion Potential--Moderate.... Acres............... 2,182.0-2,761.1 0 2,182.0-2,761.1
Corrosion Potential--High........ Acres............... 6,764.5-7,021.2 11-51 6,775.5-7,072.2
Prime Farmland Soils............. Acres............... 4,990.8-5,454.7 0 4,990.8-5,454.7
Surface Mines \123\.............. Count............... 0 \a\ 0 0 \a\
----------------------------------------------------------------------------------------------------------------
Green House Gas Emissions (Final EIS Section 3.21)
----------------------------------------------------------------------------------------------------------------
GHG Emissions.................... NA.................. No long-term increases in GHG emissions; would likely
reduce GHG emissions by shifting the modes of travel
----------------------------------------------------------------------------------------------------------------
G. Executive Order 12898 (Environmental Justice)
---------------------------------------------------------------------------
\112\ Section references within this table are to the sections
of the Final EIS.
\113\ Threatened and Endangered Species acreages include habitat
for species with modeled habitat that may be impacted, including
Houston toad, large-fruited sand verbena and Navasota ladies'-
tresses. Threatened and endangered species in the Study Area that
may be impacted but that do not have modeled habitat include the
interior least tern and the whooping crane.
\114\ A single landscape unit is shared between Segment 5 and
the Houston Terminal Station Options; therefore, the total number of
beneficial landscape units is the same as Build Alternative A.
\115\ Totals for rail impacts do not include rail at Houston
Terminal Stations. Totals also include DART-owned rail lines in
Dallas County.
\116\ Road modifications reflect the number of reroutes, road
adjustments, or road over rail constructions that would occur. Some
roads are affected by multiple modifications (such as IH-45).
Modifications do not reflect total number of roads but total number
of road construction sites.
\117\ Shared access roads are included in roadway modification
lengths. Shared access roads will be developed to provide for
maintenance, emergency response access, and private property access,
with a corresponding reduction in the number of new public roads to
decrease burden on roadway authorities. Shared access roads would be
constructed and maintained by TCRR.
\118\ Anxiety Aerodrome would be directly impacted by Segment
3B, which are part of Alternatives B and E.
\119\ Indirect impacts to special status farmland in Section
3.13, Land Use of the Final EIS are defined as a 25-foot setback
added to the LOD to account for indirect loss of productive farmland
to accommodate the use of farm and ranch equipment or impacts such
as induced wind and changes in irrigation.
\120\ The ``Community Facilities'' category in Section 3.14,
Socioeconomics and Community Facilities of the Final EIS,
encompasses categories of affected structures and facilities that
are broken down into more defined categories within Section 3.13,
Land Use of the Final EIS, therefore values between the two sections
are not identical. Refer to the Section for a complete definition of
each category.
\121\ Children's health and safety impacts are the result of
temporary construction effects. These impacts will no longer exist
once construction has ended.
\122\ The ``Community Facilities'' category in Section 3.14,
Socioeconomics and Community Facilities of the Final EIS,
encompasses categories of affected structures and facilities that
are broken down into more defined categories within Section 3.13,
Land Use of the Final EIS, therefore values between the two sections
are not identical. Refer to the Section for a complete definition of
each category.
\123\ The Midlothian Quarry and Plant in Ellis County was
identified at approximately one-half-mile west of Segment 2A. Exact
limits would need to be field-verified to confirm or discount
presence in the Study Area.
---------------------------------------------------------------------------
In accordance with E.O. 12898 and USDOT Order 5610.2(a), FRA is
required to identify and address minority and low-income populations
that are affected by disproportionately high and adverse impacts by a
Federal action and to provide opportunities for meaningful
participation. As part of the preparation of the EIS, persons who have
a potential interest in the proposed Dallas to Houston project,
including members of minority and low-income populations, were invited
to participate in the environmental review process.
FRA identified and addressed the potential effects of the
alternatives on minority and low-income populations in Section 3.18,
Environmental Justice in the Final EIS. FRA conducted specific outreach
efforts to connect with potentially impacted minority and low-income
populations in the Study Area and to bring awareness of the proposed
project to communities or individuals; gather additional feedback on
the potential impacts of the proposed project; and identify appropriate
mitigation for minority and low-income populations.
Five neighborhoods or communities identified in minority and/or
low-income block groups would be potentially impacted: Downtown Dallas,
Le May and Le Forge neighborhood, Hash Road and Nail Drive, Plantation
Forest and the Houston Terminal Station Option area (including Spring
Branch Super Neighborhood). The EIS identified disproportionately high
and adverse effects to minority and/or low-income communities near the
station locations in Dallas and Houston related to air-quality impacts
during construction, as well as effects related to structure
displacement and parcel acquisition, and disruption to community
cohesion for the Le May and Le Forge neighborhood, Hash Road and Nail
Drive, and Plantation Forest communities. All identified locations
where there would be disproportionately high and adverse effects would
be on Segment 1 and Segment 5, which are common to all Build
Alternatives.
TCRR will mitigate adverse air quality effects during construction
through use of dust suppression techniques, wetting and covering
construction materials transported near homes or businesses, limiting
construction vehicle travel
[[Page 69729]]
speeds and idling of construction equipment, and by complying with the
Texas Low Emission Diesel Fuel Program, as identified in the Mitigation
Commitments. TCRR will mitigate localized impacts to the Le May and Le
Forge neighborhood, the Hash Road and Nail Drive neighborhood and the
Plantation Forest neighborhood by implementing mitigation developed
based on consultation with community members, as identified in the
Mitigation Commitments. Mitigation includes making offers to acquire
all properties and attempts to relocate within proximity or in the same
neighborhood (for the Le May and Le Forge neighborhood), extending the
notice to vacate period, and offering personal relocation assistance.
After implementation of mitigation measures, there would be no
disproportionately high and adverse impacts to minority and/or low-
income populations as a result of the Build Alternatives and Houston
Terminal Station Options.
H. Clean Air Act/Air Quality General Conformity
The Clean Air Act of 1970 (as amended) requires Federal agencies to
determine the conformity of proposed actions with respect to State
Implementation Plans for attainment of air quality goals.\124\ As
detailed in Section 3.2, Affected Environment and Environmental
Consequences, Air Quality of the Final EIS, FRA assessed air quality
impacts through an analysis of emissions that would occur during
construction and operation of the proposed Dallas to Houston project
for a general conformity analysis.\125\ FRA has determined that the
predicted annual pollutant emissions during the 5-year construction
period in nonattainment areas (Dallas-Fort Worth [DFW], Houston-
Galveston-Brazoria [HGB], and Freestone and Anderson Counties
nonattainment area [FRE]) generated by the proposed project are all
below general conformity de minimis threshold values and no conformity
determination is required.
---------------------------------------------------------------------------
\124\ Clean Air Act, 42 U.S.C. 7401 et seq. (1970).
\125\ 40 CFR part 51, subpart W, and 40 CFR part 93, subpart B.
---------------------------------------------------------------------------
I. Section 106 of the National Historic Preservation Act
Section 106 of the National Historic Preservation Act (NHPA) and
its implementing regulations \126\ require that prior to issuing
Federal funding, partial funding, permitting, licensing, approval or
taking other action, Federal agencies must take into account the
effects of their undertakings on historic properties and provide the
Advisory Council on Historic Preservation (ACHP) an opportunity to
comment on the undertaking.\127\ FRA determined that the undertaking
would adversely affect historic properties. However, because FRA is not
able to fully determine effects to historic properties prior to this
final rule, consistent with 36 CFR 800.14(b)(1)(ii), FRA, in
consultation with the Texas Historical Commission (THC), ACHP, USACE,
TCRR, and other consulting parties, developed a Programmatic Agreement
(PA) for the undertaking. The PA establishes the process that governs
the resolution of adverse effects from the undertaking.
---------------------------------------------------------------------------
\126\ 36 CFR 800.
\127\ 54 U.S.C. 306108.
---------------------------------------------------------------------------
FRA provided consulting parties with an opportunity to review and
comment on the draft PA prior to the release of the Final EIS and
provided the public an opportunity to review the draft PA by appending
the draft PA to the Final EIS. During the 30-day public review from May
29, 2020, through June 29, 2020, FRA received a total of four comments
that were specific to the PA. These include one comment from THC, two
comments from consulting parties, and one comment from the public. In
response to these comments, FRA added two new consulting parties to the
PA. The executed PA is available on FRA's website.\128\
---------------------------------------------------------------------------
\128\ FRA. Dallas to Houston High-Speed Rail--Passenger Service
from Houston to Dallas https://railroads.dot.gov/environmental-reviews/dallas-houston-high-speed-rail/dallas-houston-high-speed-rail-passenger, Record of Decision Attachments, Section 106
Programmatic Agreement.
---------------------------------------------------------------------------
J. Department of Transportation Act Section 4(f) Determination
Section 4(f) of the USDOT Act of 1966 prohibits USDOT agencies from
approving the use of a Section 4(f) property unless: The agency
determines that there is no feasible or prudent alternative to such
use, and a project includes all possible planning to minimize harm to
the property resulting from such use; or a finding can be made that a
project, including any measure(s) to minimize harm, has a de minimis,
or minimal, impact on the Section 4(f) property.\129\
---------------------------------------------------------------------------
\129\ 49 U.S.C. 303.
---------------------------------------------------------------------------
Based on the evaluation contained within Chapter 7.0, Section 4(f)
and Section 6(f) Evaluation of the Final EIS, FRA determines that there
is no prudent and feasible alternative to the use of three properties
protected by Section 4(f): DA.023 (Cadiz Street Underpass and
Overpass), Dallas; DA.076a (Guiberson Corporation), Dallas; and DA.110b
(Linfield Elementary School).
All possible planning to minimize harm, identified through
consultation with officials with jurisdiction, was incorporated through
TCRR's design refinements to reduce or eliminate impacts to Section
4(f) properties where reasonably feasible.
FRA provided the Section 4(f) evaluation to U.S. Department of the
Interior (DOI) and shared it with the officials with jurisdiction for
the Section 4(f) properties with the May 29, 2020, release of the Final
EIS. DOI did not comment on FRA's Final Section 4(f) Evaluation.
K. Endangered Species Act/Section 7 U.S. Fish and Wildlife Service
Biological Opinion
Under the Endangered Species Act (ESA) of 1973 as amended,\130\ the
USFWS has the authority to list and monitor the status of species whose
populations are threatened or endangered, and including the ecosystems
on which they depend. Section 7 of the ESA requires that Federal
agencies consult with the USFWS to ensure projects they authorize, fund
or carry out would not jeopardize the continued existence of an
endangered or threatened species or destroy or adversely modify
designated critical habitat.
---------------------------------------------------------------------------
\130\ 16 U.S.C. 1531, et seq.
---------------------------------------------------------------------------
As described in Section 3.6, Natural Ecological Systems and
Protected Species, of the Final EIS, FRA determined the proposed Dallas
to Houston project would have ``no effect'' on the West Indian manatee
(Trichechus manatus), golden-cheeked warbler (Setophaga [Dendroica]
chrysoparia), Texas fawnsfoot (Truncilla macrodon), and Texas prairie
dawn (Hymenoxys texana) because suitable habitat (or modeled habitat)
was not identified within the Action Area. FRA determined it ``may
affect, but is not likely to adversely affect'' the Houston toad
(Anaxyrus houstonensis), interior least tern (Sterna antillarum),
whooping crane (Grus americana) based on the results of presence/
absence species surveys and the implementation of avoidance and
mitigation measures. FRA determined it ``may affect, and is likely to
adversely affect'' due to the presence of Navasota ladies'-tresses
(Spiranthes parksii) within the Study Area and the potential for large-
fruited sand verbena (Abronia marcocarpa) in unsurveyed areas.
On November 14, 2019, FRA submitted a Biological Assessment (BA) to
USFWS as part of formal consultation
[[Page 69730]]
under Section 7(a)(2) of the ESA. USFWS issued a Biological Opinion
(BO) detailing mitigation measures for the proposed Dallas to Houston
project on July 8, 2020 (02ETTX00-2019-F-2135).\131\ The BO found that
the proposed Dallas to Houston project would not likely jeopardize the
continued existence of the federally endangered large-fruited sand-
verbena or the federally endangered Navasota ladies'-tresses, and
includes the following conservation measures: TCRR will offset the loss
of large-fruited sand-verbena habitat by conserving acres under
permanent protection within the species' known geographic range; TCRR
will offset the loss of Navasota ladies'-tresses habitat by conserving
acres under permanent protection within the species' known geographic
range; and TCRR will institute measures to avoid and minimize potential
impacts to the 25 Navasota ladies'-tresses individuals found during
species-specific surveys in Madison County.
---------------------------------------------------------------------------
\131\ FRA. Dallas to Houston High-Speed Rail--Passenger Service
from Houston to Dallas https://railroads.dot.gov/environmental-reviews/dallas-houston-high-speed-rail/dallas-houston-high-speed-rail-passenger, Record of Decision Attachments, Biological Opinion.
FRA has since reinitiated consultation for the limited purpose of
addressing TCRR's recent identification of locations for permittee
responsible mitigation. The reinitiation follows TCRR's consultation
with the USACE Fort Worth District as part of the Clean Water Act
permitting process and does not affect the BO.
---------------------------------------------------------------------------
The BO provided concurrence with FRA's determination that the
proposed Dallas to Houston project ``may affect, but is not likely to
adversely affect'' the interior least tern, whooping crane, and the
Houston toad due to implementation of avoidance and minimization
measures detailed in Appendix A of the BO. The BO also included
additional conservation recommendations specific to the large-fruited
sand-verbena; Navasota ladies'-tresses; landscaping to benefit the
large-fruited sand-verbena, Navasota ladies'-tresses, and/or their
habitats; the candidate species, Texas fawnsfoot; and avian species
including migratory birds. TCRR has agreed to comply with the BO.
L. Executive Order 11990 Preservation of the Nation's Wetlands
(Executive Order 11990 & DOT Order 5660.1a)
For projects that are undertaken, financed, or assisted by Federal
agencies, potential impact to wetlands are considered under E.O. 11990,
Protection of Wetlands. The objective of E.O. 11990 is to minimize the
destruction, loss or degradation of wetlands while enhancing and
protecting the natural and beneficial values.\132\ DOT Order 5660.1a
sets forth DOT policy for interpreting E.O. 11990 and requires that
transportation projects ``located in or having an impact on wetlands''
should be conducted to assure protection of the Nation's wetlands.
---------------------------------------------------------------------------
\132\ The White House, E.O. 11990--Protection of Wetlands, 42 FR
2696.1, Office of the White House Press Secretary, 1977.
---------------------------------------------------------------------------
In addition, the USACE and EPA have statutory responsibilities
under Section 404 of the Clean Water Act (CWA).\133\ Under this Act,
discharges of dredged or fill material into waters of the U.S. may
require permit authorization. Section 401 of the CWA regulates the
discharge of pollutants into waters of the U.S. and is enforced by the
Texas Commission on Environmental Quality (TCEQ). The USACE has
statutory authority under Section 10 of the Rivers and Harbors Act to
regulate the construction of any structure in or over a navigable water
of the U.S. and for any structure or work that affects the course,
location or condition of the navigable waterbody.\134\ Section 14 of
the Rivers and Harbors Act, commonly referred to as Section 408,
requires approval from USACE to alter a USACE federally authorized
civil works project.\135\
---------------------------------------------------------------------------
\133\ 33 U.S.C. 1251 et seq.
\134\ 33 U.S.C. 403.
\135\ 33 U.S.C. 408.
---------------------------------------------------------------------------
As detailed within Section 3.7, Affected Environment and
Environmental Consequences, Waters of the U.S. of the Final EIS,
impacts would occur within waters of the U.S. during the construction
and operation of the proposed Dallas to Houston project. TCRR, in
coordination with the USACE Fort Worth and Galveston Districts, is
developing the final design to avoid and minimize impacts to waters of
the U.S., as practicable. However, due to the linear nature and the
curvature restrictions associated with the operation of the HSR system,
some crossings would be unavoidable. Impacts to waters of the U.S.
would require Section 404/401/10 CWA permits and Section 408
permissions from USACE and TCEQ that would include permit provisions to
avoid, minimize, and mitigate impacts. TCRR has agreed to implement
compliance and mitigation measures to offset effects of construction
within the wetlands and waters of the U.S.\136\
---------------------------------------------------------------------------
\136\ FRA. Dallas to Houston High-Speed Rail--Passenger Service
from Houston to Dallas https://railroads.dot.gov/environmental-reviews/dallas-houston-high-speed-rail/dallas-houston-high-speed-rail-passenger, Record of Decision Attachments, Mitigation
Commitments.
---------------------------------------------------------------------------
M. Floodplain Management (Executive Order 11988 & DOT Order 5650.2)
E.O. 11988, Floodplain Management requires Federal agencies avoid
adverse impacts on floodplains to the extent possible, determine
whether reasonable alternatives exist that avoid impacts to
floodplains, and avoid situations that would support floodplain
development if a practicable alternative exists.\137\ USDOT Order
5650.2 (Floodplain Management and Protection) establishes policies and
procedures for transportation projects regarding floodplain impacts
that include avoiding and minimizing, where practicable or reasonable,
adverse impacts to floodplains and restoring and preserving natural and
beneficial floodplain functions that are adversely impacted by
transportation projects.\138\
---------------------------------------------------------------------------
\137\ 44 CFR 9, Floodplain Management and Protection of
Wetlands, 2003.
\138\ USDOT, Floodplain Management and Protection, DOT 5650.2,
1979.
---------------------------------------------------------------------------
As detailed within 3.8, Affected Environment and Environmental
Consequences, Floodplains of the Final EIS, FRA determined that the
proposed Dallas to Houston project would impact 748 acres of 100-year
and 500-year regulatory floodplains. During construction, the footprint
of the LOD additional workspace area, laydown yards and construction
workspace would have a temporary impact to the floodplains. The HSR
track and supporting facilities (e.g., permanent roads, parking areas,
access/maintenance areas, terminals, and non-vegetated embankments)
would also result in a permanent impact to the floodplain system and a
permanent increase in impervious cover and an increase in ground
compaction in those areas during operations.
TCRR's proposed design would minimize potential increases to the
floodplain elevations by retaining existing water surface elevations
where feasible to avoid impacting the available flood storage and
minimizing fill in sensitive areas. Many regulatory floodplains and
unregulated stream segments would be fully spanned and potential
impacts avoided. TCRR will implement best management practices for
construction and operation within floodplains as detailed in the
Mitigation Commitments.
N. Executive Order 13175 (Tribal Consultation)
FRA has evaluated this final rule in accordance with the principles
and criteria contained in E.O. 13175, ``Consultation and Coordination
with Indian Tribal Governments,'' dated
[[Page 69731]]
November 6, 2000. This final rule will not have a substantial direct
effect on one or more Indian tribes, will not impose substantial direct
compliance costs on Indian tribal governments, and will not preempt
tribal laws. Therefore, the funding and consultation requirements of
E.O. 13175 do not apply, and a tribal summary impact statement is not
required.
O. Unfunded Mandates Reform Act of 1995
Under section 201 of the Unfunded Mandates Reform Act of 1995 (Pub.
L. 104-4, 2 U.S.C. 1531), each Federal agency ``shall, unless otherwise
prohibited by law, assess the effects of Federal regulatory actions on
State, local, and tribal governments, and the private sector (other
than to the extent that such regulations incorporate requirements
specifically set forth in law).'' Section 202 of the Act (2 U.S.C.
1532) further requires that ``before promulgating any general notice of
proposed rulemaking that is likely to result in the promulgation of any
rule that includes any Federal mandate that may result in expenditure
by State, local, and tribal governments, in the aggregate, or by the
private sector, of $100,000,000 or more (adjusted annually for
inflation) in any 1 year, and before promulgating any final rule for
which a general notice of proposed rulemaking was published, the agency
shall prepare a written statement'' detailing the effect on State,
local, and tribal governments and the private sector. This final rule
will not result in the expenditure, in the aggregate, of $100,000,000
or more (as adjusted annually for inflation) in any one year, and thus
preparation of such a statement is not required.
P. Energy Impact
E.O. 13211, ``Actions Concerning Regulations That Significantly
Affect Energy Supply, Distribution, or Use,'' requires Federal agencies
to prepare a Statement of Energy Effects for any ``significant energy
action.'' \139\ FRA has evaluated this final rule in accordance with
E.O. 13211 and determined that this regulatory action is not a
``significant energy action'' within the meaning of the E.O.
---------------------------------------------------------------------------
\139\ 66 FR 28355 (May 22, 2001).
---------------------------------------------------------------------------
E.O. 13783, ``Promoting Energy Independence and Economic Growth,''
requires Federal agencies to review regulations to determine whether
they potentially burden the development or use of domestically produced
energy resources, with particular attention to oil, natural gas, coal,
and nuclear energy resources.\140\ FRA has determined this regulatory
action will not burden the development or use of domestically produced
energy resources.
---------------------------------------------------------------------------
\140\ 82 FR 16093 (Mar. 31, 2017).
---------------------------------------------------------------------------
List of Subjects in 49 CFR Part 299
High-speed rail, Incorporation by reference, Railroad safety,
Reporting and recordkeeping requirements, Tokaido Shinkansen.
The Rule
For the reasons discussed in the preamble, FRA adds part 299 to
chapter II, subtitle B of title 49, Code of Federal Regulations as
follows:
0
1. Part 299 is added to read as follows:
PART 299--TEXAS CENTRAL RAILROAD HIGH-SPEED RAIL SAFETY STANDARDS
Subpart A--General Requirements
Sec.
299.1 Purpose and scope.
299.3 Applicability.
299.5 Definitions.
299.7 Responsibility for compliance.
299.9 Notifications and filings.
299.11 Electronic recordkeeping.
299.13 System description.
299.15 Special approvals.
299.17 Incorporation by reference.
Subpart B--Signal and Trainset Control System
Sec.
299.201 Technical PTC system requirements.
299.203 PTC system required.
299.205 PTC System Certification.
299.207 PTC Safety Plan content requirements.
299.209 PTC system use and failures.
299.211 Communications and security requirements.
299.213 Records retention.
299.215 Operations and Maintenance Manual.
Subpart C--Track Safety Standards
Sec.
299.301 Restoration or renewal of track under traffic conditions.
299.303 Measuring track not under load.
299.305 Drainage.
299.307 Vegetation.
299.309 Classes of track: operating speed limits.
299.311 Track geometry; general.
299.313 Track geometry; performance based.
299.315 Curves; elevations and speed limitations.
299.317 Track strength.
299.319 Track fixation and support.
299.321 Defective rails.
299.323 Continuous welded rail (CWR) plan.
299.325 Continuous welded rail (CWR); general.
299.327 Rail end mismatch.
299.329 Rail joints and torch cut rails.
299.331 Turnouts and crossings generally.
299.333 Frog guard rails and guard faces; gauge.
299.335 Derails.
299.337 Automated vehicle-based inspection systems.
299.339 Daily sweeper inspection.
299.341 Inspection of rail in service.
299.343 Initial inspection of new rail and welds.
299.345 Visual inspections; right-of-way.
299.347 Special inspections.
299.349 Inspection records.
299.351 Qualifications for track maintenance and inspection
personnel.
299.353 Personnel qualified to supervise track restoration and
renewal.
299.355 Personnel qualified to inspect track.
299.357 Personnel qualified to inspect and restore continuous welded
rail.
Subpart D--Rolling Stock
Sec.
299.401 Clearance requirements.
299.403 Trainset structure.
299.405 Trainset interiors.
299.407 Glazing.
299.409 Brake system.
299.411 Bogies and suspension system.
299.413 Fire safety.
299.415 Doors.
299.417 Emergency lighting.
299.419 Emergency communication.
299.421 Emergency roof access.
299.423 Markings and instructions for emergency egress and rescue
access.
299.425 Low-location emergency exit path marking.
299.427 Emergency egress windows.
299.429 Rescue access windows.
299.431 Driver's controls and cab layout.
299.433 Exterior lights.
299.435 Electrical system design.
299.437 Automated monitoring.
299.439 Event recorders.
299.441 Trainset electronic hardware and software safety.
299.443 Safety appliances.
299.445 Trainset inspection, testing, and maintenance requirements.
299.447 Movement of defective equipment.
Subpart E--Operating Rules
Sec.
299.501 Purpose.
299.503 Operating rules; filing and recordkeeping.
299.505 Programs of operational tests and inspections;
recordkeeping.
299.507 Program of instruction on operating rules; recordkeeping.
Subpart F--System Qualification Tests
Sec.
299.601 Responsibility for verification demonstrations and tests.
299.603 Preparation of system-wide qualification test plan.
299.605 Functional and performance qualification tests.
299.607 Pre-revenue service systems integration testing.
299.609 Vehicle/track system qualification.
299.611 Simulated revenue operations.
299.613 Verification of compliance.
[[Page 69732]]
Subpart G--Inspection, Testing, and Maintenance Program
Sec.
299.701 General requirements.
299.703 Compliance.
299.705 Standard procedures for safely performing inspection,
testing, and maintenance, or repairs.
299.707 Maintenance intervals.
299.709 Quality control program.
299.711 Inspection, testing, and maintenance program format.
299.713 Program approval procedures.
Appendix A to Part 299--Criteria for Certification of Crashworthy Event
Recorder Memory Module
Appendix B to Part 299--Cab Noise Test Protocol
Authority: 49 U.S.C. 20103, 20107, 20133, 20141, 20302-20303,
20306, 20701-20702, 21301-21302, 21304; 28 U.S.C. 2461, note; and 49
CFR 1.89.
Subpart A--General Requirements
Sec. 299.1 Purpose and scope.
This part prescribes minimum Federal safety standards for the high-
speed transportation system described in detail in Sec. 299.13, known
as Texas Central Railroad, LLC and hereinafter referred to as the
``railroad.'' The purpose of this part is to prevent accidents,
casualties, and property damage which could result from operation of
this system.
Sec. 299.3 Applicability.
(a) This part applies only to the railroad, as described in Sec.
299.13.
(b) Except as stated in paragraph (c) of this section, this part,
rather than the generally applicable Federal railroad safety
regulations, shall apply to the railroad.
(c) The following Federal railroad safety regulations found in
Title 49 of the Code of Federal Regulations, and any amendments are
applicable to the railroad.
(1) Part 207, Railroad Police Officers;
(2) Part 209, Railroad Safety Enforcement Procedures;
(3) Part 210, Railroad Noise Emission Compliance Regulations;
(4) Part 211, Rules of Practice;
(5) Part 212, State Safety Participation Regulations;
(6) Part 214, Railroad Workplace Safety, except Sec. 214.339;
(7) Part 216, Special Notice and Emergency Order Procedures;
(8) Part 218, Railroad Operating Practices;
(9) Part 219, Control of Alcohol and Drug Use;
(10) Part 220, Radio Standards and Procedures;
(11) Part 225, Railroad Accidents/Incidents: Reports,
Classification, and Investigations;
(12) Part 227, Occupational Noise Exposure except Sec.
227.119(c)(10) and (11) with respect to the railroad's high-speed
trainsets only, which shall comply with 299.431(h) and (i);
(13) Part 228, Hours of Service of Railroad Employees;
(14) Part 233, Signal Systems Reporting Requirements;
(15) Part 235, Instructions Governing Applications for Approval of
a Discontinuance or Material Modification of a Signal System or Relief
from the Requirements of Part 236, except Sec. 235.7;
(16) Part 236, Installation, Inspection, Maintenance and Repair of
Signal and Train Control System, Devices, and Appliances, subparts A
through G, as excepted by the railroad's PTC Safety Plan (PTCSP) under
Sec. 299.201(d);
(17) Part 237, Railroad Bridge Safety Standards;
(18) Part 239, Passenger Train Emergency Preparedness;
(19) Part 240, Qualification and Certification of Locomotive
Engineers;
(20) Part 242, Qualification and Certification of Train Conductors;
(21) Part 243, Training, Qualification, and Oversight for Safety-
Related Railroad Employees;
(22) Part 270, System Safety Program
(23) Part 272, Critical Incident Stress Plans; and
(24) The following parts shall apply to the railroad's maintenance-
of-way equipment as it is used in work trains, rescue operations, yard
movements, and other non-passenger functions:
(i) Part 215, Railroad Freight Car Safety Standards;
(ii) Part 223, Glazing Standards;
(iii) Part 229, Railroad Locomotive Safety Standards, except--
(A) Section 229.71. Instead, the railroad's maintenance-of-way
equipment shall comply with Sec. 299.401(b), except for the sweeper
vehicle, which shall have a clearance above top of rail no less than 35
mm (1.77 inches).
(B) Section 229.73. Instead, the railroad's maintenance-of-way
equipment shall be designed so as to be compatible with the railroad's
track structure under subpart C of this part.
(iv) Part 231, Railroad Safety Appliance Standards; and,
(v) Part 232, Railroad Power Brakes and Drawbars.
(d) The Federal railroad safety statutes apply to all railroads, as
defined in 49 U.S.C. 20102. The railroad covered by this part is a
railroad under that definition. Therefore, the Federal railroad safety
statutes, Subtitle V of Title 49 of the United States Code, apply
directly to the railroad. However, pursuant to authority granted under
49 U.S.C. 20306, FRA has exempted the railroad from certain
requirements of 49 U.S.C. ch. 203.
Sec. 299.5 Definitions.
As used in this part--
Absolute block means a block of track circuits in which no trainset is
permitted to enter while occupied by another trainset.
Adjusting/de-stressing means the procedure by which a rail's neutral
temperature is readjusted to the desired value. It typically consists
of cutting the rail and removing rail anchoring devices, which provides
for the necessary expansion and contraction, and then re-assembling the
track.
Administrator means the Administrator of the FRA or the Administrator's
delegate.
Associate Administrator means FRA's Associate Administrator for Safety
and Chief Safety Officer, or that person's delegate.
Automatic train control (ATC) means the signaling system, composed of
ground and on-board equipment. The on-board equipment continually
receives a signal from the ground equipment. ATC on-board equipment
controls the trainset speed to prevent train-to-train collisions and
overspeed derailments.
ATC cut-out mode means the mode of ATC on-board equipment used for
emergency operations to disable the ATC on-board equipment on the
trainset.
ATC main line mode means the mode of ATC on-board equipment which
controls trainset speed on mainlines.
ATC overrun protection means an overlay of the ATC shunting mode to
prevent overrun at the end of a track.
ATC shunting mode means the mode of ATC on-board equipment which
restricts the trainsets maximum speed to 30 km/h (19 mph).
Brake, air means a combination of devices operated by compressed air,
arranged in a system and controlled electrically or pneumatically, by
means of which the motion of a train or trainset is retarded or
arrested.
Brake, disc means a retardation system used on the passenger trainsets
that utilizes flat discs as the braking surface.
[[Page 69733]]
Brake, electric means a trainset braking system in which the kinetic
energy of a moving trainset is used to generate electric current at the
traction motors, which is then returned into the catenary system.
Brake, emergency application means a brake application initiated by a
de-energized brake command and is retrievable when there is no
malfunction that initiates an automatic emergency brake application. An
emergency brake application can be initiated by the driver or
automatically by ATC. An emergency brake application, as defined here,
is equivalent to a full-service brake application in the U.S.
Brake, urgent application means an irretrievable brake application
designed to minimize the braking distance. An urgent brake application,
as defined here, is the equivalent of an emergency brake application in
the U.S.
Bogie means an assembly that supports the weight of the carbody and
which incorporates the suspension, wheels and axles, traction motors
and friction brake components. Each unit of a trainset is equipped with
two bogies. In the U.S., a bogie is commonly referred to as a truck.
Broken rail means a partial or complete separation of an otherwise
continuous section of running rail, excluding rail joints, expansion
joints, and insulated joints.
Buckling incident/buckling rail means the formation of a lateral
misalignment caused by high longitudinal compressive forces in a rail
sufficient in magnitude to exceed the track geometry alignment safety
limits defined in Sec. 299.311.
Buckling-prone condition means a track condition that can result in the
track being laterally displaced due to high compressive forces caused
by critical rail temperature combined with insufficient track strength
and/or train dynamics.
Cab means the compartment or space within a trainset that is designed
to be occupied by a driver and contain an operating console for
exercising control over the trainset.
Cab car means a rail vehicle at the leading or trailing end, or both,
of a trainset which has a driver's cab and is intended to carry
passengers, baggage, or mail. A cab car may or may not have propelling
motors.
Cab end structure means the main support projecting upward from the
underframe at the cab end of a trainset.
Cab signal means a signal located in the driver's compartment or cab,
indicating a condition affecting the movement of a trainset.
Calendar day means a time period running from one midnight to the next
midnight on a given date.
Cant deficiency means the additional height, which if added to the
outer rail in a curve, at the designated vehicle speed, would provide a
single resultant force, due to the combined effects of weight and
centrifugal force on the vehicle, having a direction perpendicular to
the plane of the track.
Continuous welded rail (CWR) means rail that has been welded together
into lengths exceeding 122 m (400 feet). Rail installed as CWR remains
CWR, regardless of whether a joint is installed into the rail at a
later time.
Consist, fixed means a semi-permanently coupled trainset that is
arranged with each unit in a specific location and orientation within
the trainset.
Core system, high-speed means the safety-critical systems, sub-systems,
and procedures required for a high-speed system operation that assures
a safe operation as required within this part.
Crewmember means a railroad employee called to perform service covered
by 49 U.S.C. 21103.
Critical buckling stress means the minimum stress necessary to initiate
buckling of a structural member.
Desired rail installation temperature range means the rail temperature
range in a specific geographical area, at which forces in CWR installed
in that temperature range should not cause a track buckle in extreme
heat, or a pull-apart during extreme cold weather.
Disturbed track means the disturbance of the roadbed or ballast
section, as a result of track maintenance or any other event, which
reduces the lateral or longitudinal resistance of the track, or both.
Driver means any person who controls the movement of a trainset(s) from
the cab, and is required to be certified under 49 CFR part 240. A
driver, as used in this part, is equivalent to a locomotive engineer.
Employee or railroad employee means an individual who is engaged or
compensated by the railroad or by a contractor to the railroad to
perform any of the duties defined in this part.
Event recorder means a device, designed to resist tampering, that
monitors and records data, as detailed in Sec. Sec. 299.439 and
236.1005(d) of this chapter, over the most recent 48 hours of operation
of the trainset.
Expansion joint means a piece of special trackwork designed to absorb
heat-induced expansion and contraction of the rails.
General control center means the location where the general control
center staff work.
General control center staff means qualified individuals located in the
general control center who are responsible for the safe operation of
the railroad's high-speed passenger rail system. The duties of
individuals who work at the general control center include: Trainset
movement control, crew logistic management, signaling, passenger
services, rolling stock logistic management, and right-of-way
maintenance management.
Glazing, end-facing means any exterior glazing installed in a trainset
cab located where a line perpendicular to the exterior surface glazing
material makes horizontal angle of 50 degrees or less with the
longitudinal center line of the rail vehicle in which the panel is
installed. A glazing panel that curves so as to meet the definition for
both side-facing and end-facing glazing is end-facing glazing.
Glazing, exterior means a glazing panel that is an integral part of the
exterior skin of a rail vehicle with a surface exposed to the outside
environment.
Glazing, side-facing means any glazing located where a line
perpendicular to the exterior surface of the panel makes an angle of
more than 50 degrees with the longitudinal center line of the rail
vehicle in which the panel is installed.
High voltage means an electrical potential of more than 150 volts.
In passenger service/in revenue service means a trainset that is
carrying, or available to carry, passengers. Passengers need not have
paid a fare in order for the trainset to be considered in passenger or
in revenue service.
In service means, when used in connection with a trainset, a trainset
subject to this part that is in revenue service, unless the equipment--
(1) Is being handled in accordance with Sec. 299.447, as
applicable;
(2) Is in a repair shop or on a repair track;
(3) Is on a storage track and is not carrying passengers; or,
[[Page 69734]]
(4) Is parked at a station location and has been properly secured
in accordance with Sec. Sec. 299.409(n) and 299.431(d).
Insulated joint, glued means a rail joint located at the end of a track
circuit designed to insulate electrical current from the signal system
in the rail.
Interior fitting means any component in the passenger compartment which
is mounted to the floor, ceiling, sidewalls, or end walls and projects
into the passenger compartment more than 25 mm (1 in.) from the surface
or surfaces to which it is mounted. Interior fittings do not include
side and end walls, floors, door pockets, or ceiling lining materials,
for example.
Intermediate car means a passenger car or unit of a trainset located
between cab cars which may or may not have propelling motors.
L/V ratio means the ratio of the lateral force that any wheel exerts on
an individual rail to the vertical force exerted by the same wheel on
the rail.
Lateral means the horizontal direction perpendicular to the direction
of travel.
Locomotive means a piece of on-track rail equipment, other than hi-
rail, specialized maintenance, or other similar equipment, which may
consist of one or more units operated from a single control stand with
one or more propelling motors designed for moving other passenger
equipment; with one or more propelling motors designed to transport
freight or passenger traffic, or both; or without propelling motors but
with one or more control stands.
Longitudinal means in a direction parallel to the direction of travel
of a rail vehicle.
Marking/delineator means a visible notice, sign, symbol, line or trace.
N700 means the N700 series trainset that is based on trainsets
currently in, or future variants operated on, JRC's Tokaido Shinkansen
system, or any unit thereof.
Occupied volume means the volume of a passenger car or a unit in a
trainset where passengers or crewmembers are normally located during
service operation, such as the cab and passenger seating areas. The
entire width of a vehicle's end compartment that contains a control
stand is an occupied volume. A vestibule is typically not considered
occupied.
On-board attendant means a qualified individual on a trainset that is
responsible for coordination with a station platform attendant to
assure safety during passenger boarding and alighting within a station.
An on-board attendant, as used in this part, is equivalent to a
passenger conductor.
Override means to climb over the normal coupling or side buffers and
linking mechanism and impact the end of the adjoining rail vehicle or
unit above the underframe.
Overrun protection coil means track circuit cables placed short of
turnouts, or crossovers within stations and trainset maintenance
facilities to prevent unauthorized route access.
Passenger car means a unit of a trainset intended to provide
transportation for members of the general public. A cab car and an
intermediate car are considered passenger cars.
Passenger compartment means an area of a passenger car that consists of
a seating area and any vestibule that is connected to the seating area
by an open passageway.
Passenger equipment means the N700 series trainset that is based on
trainsets currently in, or future variants operated on, JRC's Tokaido
Shinkansen system, or any unit thereof.
Permanent deformation means the undergoing of a permanent change in
shape of a structural member of a rail vehicle.
PTC means positive train control as further described in Sec. 299.201.
Qualified individual means a person that has successfully completed all
instruction, training, and examination programs required by both the
employer and this part, and that the person, therefore, may reasonably
be expected to perform his or her duties proficiently in compliance
with all Federal railroad safety laws, regulations, and orders.
Rail neutral temperature is the temperature at which the rail is
neither in compression nor tension.
Rail temperature means the temperature of the rail, measured with a
rail thermometer.
Rail vehicle means railroad rolling stock, including, but not limited
to, passenger and maintenance vehicles.
Railroad equipment means all trains, trainsets, rail cars, locomotives,
and on-track maintenance vehicles owned or used by the railroad.
Railroad, the means the company, also known as the Texas Central
Railroad, LLC, which is the entity that will operate and maintain the
high-speed rail system initially connecting Dallas to Houston, Texas,
and is responsible for compliance with all aspects of this rule.
Repair point means a location designated by the railroad where repairs
of the type necessary occur on a regular basis. A repair point has, or
should have, the facilities, tools, and personnel qualified to make the
necessary repairs. A repair point need not be staffed continuously.
Representative car/area means a car/area that shares the relevant
characteristics as the car(s)/area(s) it represents (i.e., same
signage/marking layout, and charging light system for passive systems
or light fixtures and power system for electrically powered systems).
Rollover strength means the strength provided to protect the structural
integrity of a rail vehicle in the event the vehicle leaves the track
and impacts the ground on its side or roof.
Safety appliance means an appliance, required under 49 U.S.C. ch. 203,
excluding power brakes. The term includes automatic couplers,
handbrakes, crew steps, handholds, handrails, or ladder treads made of
steel or a material of equal or greater mechanical strength used by the
traveling public or railroad employees that provides a means for safe
coupling, uncoupling, or ascending or descending passenger equipment.
Safety-critical means a component, system, software, or task that, if
not available, defective, not functioning, not functioning correctly,
not performed, or not performed correctly, increases the risk of damage
to railroad equipment or injury to a passenger, railroad employee, or
other person.
Search, valid means a continuous inspection for internal rail defects
where the equipment performs as intended and equipment responses are
interpreted by a qualified individual as defined in subpart C.
Semi-permanently coupled means coupled by means of a drawbar or other
coupling mechanism that requires tools to perform the coupling or
uncoupling operation. Coupling and uncoupling of each semi-permanently
coupled unit in a trainset can be performed safely only while at a
trainset maintenance facility where personnel can safely get under a
unit or between units, or other location under the protections of
[[Page 69735]]
subpart B of part 218 of this chapter.
Side sill means that portion of the underframe or side at the bottom of
the rail vehicle side wall.
Shinkansen, Tokaido means the high-speed rail system operated by the
Central Japan Railway Company between Tokyo and Shin-Osaka, Japan, that
is fully dedicated and grade separated.
Slab track means railroad track structure in which the rails are
attached to and supported by a bed or slab, usually of concrete (or
asphalt), which acts to transfer the load and provide track stability.
Spall, glazing means small pieces of glazing that fly off the back
surface of the glazing when an object strikes the front surface.
Speed, maximum approved means the maximum trainset speed approved by
FRA based upon the qualification tests conducted under Sec.
299.609(g).
Speed, maximum authorized means the speed at which trainsets are
permitted to travel safely, as determined by all operating conditions
and signal indications.
Speed, maximum safe operating means the highest speed at which trainset
braking may occur without thermal damage to the discs.
Station platform attendant means a qualified individual positioned on
the station platform in close proximity to the train protection
switches while a trainset is approaching and departing a station, and
is responsible for coordination with an on-board attendant to assure
safety during passenger boarding and alighting within a station.
Superelevation means the actual elevation of the outside rail above the
inside rail.
Sweeper vehicle means a rail vehicle whose function is to detect
obstacles within the static construction gauge prior to the start of
daily revenue service.
Tight track means CWR which is in a considerable amount of compression.
Track acceleration measurement system (TAMS) means an on-track,
vehicle-borne technology used to measure lateral and vertical carbody
accelerations.
Track geometry measurement system (TGMS) means an on-track, vehicle-
borne technology used to measure track surface, twist, crosslevel,
alignment, and gauge.
Track lateral resistance means the resistance provided to the rail/
crosstie structure against lateral displacement.
Track longitudinal resistance means the resistance provided by the rail
anchors/rail fasteners and the ballast section to the rail/crosstie
structure against longitudinal displacement.
Track, non-ballasted means a track structure not supported by ballast
in which the rails are directly supported by concrete or steel
structures. Non-ballasted track can include slab track and track
structures where the rails are directly fixed to steel bridges or to
servicing pits within trainset maintenance facilities.
Train means a trainset, or locomotive or locomotive units coupled with
or without cars.
Train-induced forces means the vertical, longitudinal, and lateral
dynamic forces which are generated during train movement and which can
contribute to the buckling potential of the rail.
Train protection switch means a safety device located on station
platforms and on safe walkways along the right-of-way. The train
protection switch is tied directly into the ATC system and is used in
the event that trainsets in the immediate area must be stopped.
Trainset means a passenger train including the cab cars and
intermediate cars that are semi-permanently coupled to operate as a
single consist. The individual units of a trainset are uncoupled only
for emergencies or maintenance conducted in repair facilities.
Trainset maintenance facility means a location equipped with the
special tools, equipment, and qualified individuals capable of
conducting pre-service inspections and regular inspections on the
trainsets in accordance with the railroad's inspection, testing, and
maintenance program. Trainset maintenance facilities are also
considered repair points.
Transponder means a wayside component of the ATC system used to provide
trainset position correction on the mainline or to provide an overlay
of overrun protection within a trainset maintenance facility.
Underframe means the lower horizontal support structure of a rail
vehicle.
Unit, trainset means a cab car or intermediate car of a trainset.
Vestibule means an area of a passenger car that normally does not
contain seating, is located adjacent to a side exit door, and is used
in passing from a seating area to a side exit door.
Yard means a system of tracks within defined limits and outside of the
territory controlled by signals, which can be used for the making up of
non-passenger trains or the storing of maintenance-of-way equipment.
Yield strength means the ability of a structural member to resist a
change in length caused by an applied load. Exceeding the yield
strength will cause permanent deformation of the member.
Sec. 299.7 Responsibility for compliance.
(a) The railroad shall not--
(1) Use, haul, or permit to be used or hauled on its line(s) any
trainset--
(i) With one or more defects not in compliance with this part; or
(ii) That has not been inspected and tested as required by a
provision of this part.
(2) Operate over any track, except as provided in paragraph (e) of
this section, with one or more conditions not in compliance this part,
if the railroad has actual knowledge of the facts giving rise to the
violation, or a reasonable person acting in the circumstances and
exercising reasonable care would have that knowledge.
(3) Violate any other provision of this part or any provision of
the applicable FRA regulations listed under Sec. 299.3(c).
(b) For purposes of this rule, a trainset shall be considered in
use prior to the trainset's departure as soon as it has received, or
should have received the inspection required under this part for
movement and is ready for service.
(c) Although many of the requirements of this part are stated in
terms of the duties of the railroad, when any person (including, but
not limited to, a contractor performing safety-related tasks under
contract to the railroad subject to this part) performs any function
required by this part, that person (whether or not the railroad) is
required to perform that function in accordance with this part.
(d) For purposes of this part, the railroad shall be responsible
for compliance with all track safety provisions set forth in subpart C
of this part. When the railroad and/or its assignee have actual
knowledge of the facts giving rise to a violation, or a reasonable
person acting in the circumstances and exercising reasonable care would
have knowledge that the track does not comply with the requirements of
this part, it shall--
(1) Bring the track into compliance;
(2) Halt operations over that track; or
[[Page 69736]]
(3) Continue operations over the segment of non-complying track in
accordance with the provisions of Sec. 299.309(b) or (c).
(e) The FRA Administrator may hold the railroad, the railroad's
contractor, or both responsible for compliance with the requirements of
this part and subject to civil penalties.
Sec. 299.9 Notifications and filings.
All notifications and filings to the FRA required by this part
shall be submitted to the Associate Administrator for Railroad Safety
and Chief Safety Officer, 1200 New Jersey Avenue SE, Washington, DC
20590, unless otherwise specified.
Sec. 299.11 Electronic recordkeeping.
The railroad's electronic recordkeeping shall be retained such
that--
(a) The railroad maintains an information technology security
program adequate to ensure the integrity of the electronic data storage
system, including the prevention of unauthorized access to the program
logic or individual records;
(b) The program and data storage system must be protected by a
security system that utilizes an employee identification number and
password, or a comparable method, to establish appropriate levels of
program access meeting all of the following standards:
(1) No two individuals have the same electronic identity; and
(2) A record cannot be deleted or altered by any individual after
the record is certified by the employee who created the record.
(c) Any amendment to a record is either--
(1) Electronically stored apart from the record that it amends; or
(2) Electronically attached to the record as information without
changing the original record;
(d) Each amendment to a record uniquely identifies the person
making the amendment;
(e) The system employed by the railroad for data storage permits
reasonable access and retrieval; and
(f) Information retrieved from the system can be easily produced in
a printed format which can be readily provided to FRA representatives
in a timely manner and authenticated by a designated representative of
the railroad as a true and accurate copy of the railroad's records if
requested to do so by FRA representatives.
Sec. 299.13 System description.
(a) General. This section describes the components, operations,
equipment, and systems of the railroad's high-speed rail system. The
railroad shall adhere to the following general requirements:
(1) The railroad shall not exceed the maximum trainset speed
approved by FRA under Sec. 299.609(g) while in revenue service, up to
a maximum speed of 330 km/h (205 mph).
(2) The railroad shall not transport or permit to be transported in
revenue service any product that has been established to be a hazardous
material pursuant to 49 CFR part 172, as amended.
(3) The railroad shall not conduct scheduled right-of-way
maintenance on a section of the right-of-way prior to that section of
the right-of-way being cleared of all revenue service trainsets
(including any trainset repositioning moves), and proper action is
taken by the general control center staff to protect incursion into
established maintenance zones by revenue trainsets. Additionally, the
railroad shall not commence revenue service prior to completion of the
maintenance activities, that section of the right-of-way being cleared
of all maintenance-of-way equipment. Further, the railroad is
prohibited from commencing revenue operations until after conclusion of
the daily sweeper inspection, under Sec. 299.339, and the general
control center returning the signal and trainset control system to the
state required to protect revenue operations.
(b) Right-of-way. (1) The railroad shall operate on a completely
dedicated right-of-way and shall not operate or conduct joint
operations with any other freight equipment, other than the railroad's
maintenance-of-way equipment, or passenger rail equipment. Only the
railroad's high-speed trainsets approved for revenue operations under
this part, and any equipment required for construction, maintenance,
and rescue purposes may be operated over the railroad's right-of-way.
(2) There shall be no public highway-rail grade crossings. Animal
and non-railroad equipment crossings shall be accomplished by means of
an underpass or overpass. Private at-grade crossings shall be for the
exclusive use by the railroad and shall be limited to track Classes H0
and H1.
(3) The railroad shall develop and comply with a right-of-way
barrier plan. The right-of-way barrier plan shall be maintained at the
system headquarters and will be made available to FRA upon request. At
a minimum, the plan will contain provisions in areas of demonstrated
need for the prevention of--
(i) Vandalism;
(ii) Launching of objects from overhead bridges or structures onto
the path of trainsets;
(iii) Intrusion of vehicles from adjacent rights-of-way; and
(iv) Unauthorized access to the right-of-way.
(4) The entire perimeter of the system's right-of-way, except for
elevated structures such as bridges and viaducts, shall be permanently
fenced. Elevated structures shall be equipped with walkways and safety
railing.
(5) The railroad shall install intrusion detectors in accordance
with the requirements set forth in subpart B of this part.
(6) The railroad shall install rain, flood, and wind detectors in
locations identified by the railroad, based on relevant criteria used
by JRC to provide adequate warning of when operational restrictions are
required due to adverse weather conditions. Operating restrictions
shall be defined in the railroad's operating rules.
(7) Access to the right-of-way for maintenance-of-way staff shall
be provided on both sides of the right-of-way in accordance with the
inspection, testing, and maintenance program. This access shall be
protected against entry by unauthorized persons.
(8) Provisions shall be made to permit emergency personnel to
access the right-of-way in accordance with the Emergency Preparedness
Plan pursuant to part 239 of this chapter. This access shall be
protected against entry by unauthorized persons.
(9) Throughout the length of the right-of-way, the railroad shall
install walkways located at a safe distance from the tracks at a
minimum distance of 2.0 m (6.56 feet) from the field side of the
outside rail for a design speed of 330 km/h (205 mph). The walkways
shall be used primarily for track and right-of-way inspection, but may
be used for emergency evacuation or rescue access.
(10) Access to the right-of-way by maintenance-of-way personnel
shall not be allowed during revenue operations unless the access is
outside the minimum safe distance defined in Sec. 299.13(b)(9). In the
event of unscheduled maintenance or repair, emergency access will be
provided under specific circumstances allowed under the railroad's
operating rules and the inspection, testing, and maintenance program.
(11) The railroad shall record all difficulties and special
situations regarding geology, hydrology, settlement, landslide,
concrete, and quality criteria that arise during construction of the
right-of-way. After construction, the railroad shall monitor
[[Page 69737]]
the stability and quality standards of structures such as bridges,
viaducts, and earth structures.
(12) The railroad shall make available for review by the FRA the
track layout drawings which show, at a minimum, the following
information:
(i) Length of straight sections, spirals and curves, curve radius,
superelevation, superelevation variations, gradients, and vertical
curve radii;
(ii) Turnouts and crossover location, technology, and geometry;
(iii) Maximum operating speed and allowable cant deficiencies;
(iv) Signal boxes, Go/No-Go signals, and communication devices;
(v) Details and arrangement of track circuitry;
(vi) Power feeding equipment including sectionalization, and return
routing;
(vii) Location of accesses to the right-of-way; and
(viii) The railroad shall also submit the specifications for the
track layout, permissible track forces, components such as rail,
ballast, ties, rail fasteners, and switches.
(13) Protection devices shall be installed on all highway bridge
overpasses in accordance with the right-of-way plan in paragraph (b)(3)
of this section.
(14) There shall be no movable bridges in the railroad's system.
Stationary rail bridges located over highways or navigable waterways
shall have their foundations, piers, or other support structure
appropriately protected against the impact of road vehicles or water-
borne vessels.
(15) Train protection switches shall be installed at regular
intervals on both sides of the right-of-way at intervals defined by the
railroad and at intervals not to exceed 60 m (197 feet) on platforms
within stations. These devices shall act directly on the ATC system.
(16) The railroad shall use the design wheel and rail profiles,
service-proven on the Tokaido Shinkansen system, or alternate wheel and
rail profiles approved by FRA.
(c) Railroad system safety--(1) Inspection, testing, and
maintenance procedures and criteria. The railroad shall develop,
implement, and use a system of inspection, testing, maintenance
procedures and criteria, under subpart G of this part, which are
initially based on the Tokaido Shinkansen system service-proven
procedures and criteria, to ensure the integrity and safe operation of
the railroad's rolling stock, infrastructure, and signal and trainset
control system. The railroad may, subject to FRA review and approval,
implement inspection, testing, maintenance procedures and criteria,
incorporating new or emerging technology, under Sec. 299.713(c)(4).
(2) Operating practices. The railroad shall develop, implement, and
use operating rules, which meet the standards set forth in subpart E of
this part and which are based on practices and procedures proven on the
Tokaido Shinkansen system to ensure the integrity and safe operation of
the railroad's system. The railroad shall have station platform
attendants on the platform in close proximity to the train protection
switches required by paragraph (b)(15) of this section, while trainsets
are approaching and departing the station. The railroad's operating
rules shall require coordination between on-board crew and station
platform attendants to assure safety during passenger boarding and
alighting from trainsets at stations.
(3) Personnel qualification requirements. The railroad shall
develop, implement, and use a training and testing program, which meets
the requirements set forth in this part and part 243 of this chapter,
to ensure that all personnel, including railroad employees and
employees of railroad contractors, possess the skills and knowledge
necessary to effectively perform their duties.
(4) System qualification tests. The railroad shall develop,
implement, and use a series of operational and design tests, which meet
the standards set forth in subpart F of this part, to demonstrate the
safe operation of system components, and the system as a whole.
(d) Track and infrastructure. (1) The railroad shall construct its
track and infrastructure to meet all material and operational design
criteria, within normal acceptable construction tolerances, and to meet
the requirements set forth in subpart C of this part.
(2) The railroad shall operate on nominal standard gauge, 1,435 mm
(56.5 inches), track.
(3) The railroad shall install and operate on double track
throughout the mainlines, with a minimum nominal distance between track
centerlines of 4 m (13.1 feet) for operating speeds up to 170 km/h (106
mph) (track Classes up to H4) and 4.2 m (13.8 feet) for operating
speeds greater than 170 km/h (106 mph) (track Classes H5 and above).
Generally, each track will be used for a single direction of traffic,
and trainset will not overtake each other on mainline tracks (except at
non-terminal station locations). The railroad may install crossover
connections between the double track at each station, and at regular
intervals along the line to permit flexibility in trainset operations,
maintenance, and emergency rescue.
(4) The railroad's main track (track Classes H4 and above) shall
consist of continuous welded rail. Once installed, the rail shall be
field-welded to form one continuous track segment except rail expansion
joints and where glued-insulated joints are necessary for signaling
purposes. The rail shall be JIS E 1101 60 kg rail, as specified in JIS
E 1101:2001(E) as amended by JIS E 1101:2006(E), and JIS E 1101:2012(E)
(all incorporated by reference, see Sec. 299.17).
(5) In yards and maintenance facilities, where operations will be
at lower speeds, the railroad shall install either JIS E 1101 50kgN
rail or JIS E 1101 60 kg rail as specified in JIS E 1101:2001(E) as
amended by JIS E 1101:2006(E), and JIS E 1101:2012(E) (all incorporated
by reference, see Sec. 299.17).
(6) The railroad shall use either ballasted or non-ballasted track
to support the track structure, as appropriate for the intended high-
speed system.
(i) Except as noted in paragraph (c)(6)(ii) of this section, for
ballasted mainline track structure, the railroad shall install pre-
stressed concrete ties.
(ii) For special track work such as turnouts and expansion joints,
and at transitions to bridges, and for non-ballasted track, the
railroad shall install either pre-stressed, composite ties, or use
direct fixation. Detailed requirements are included in subpart C of
this part.
(7) Turnouts, expansion joints and glued-insulated joints shall be
of the proven design as used on the Tokaido Shinkansen system.
(8) The trainsets and stations shall be designed to permit level
platform boarding for passengers and crew at all side entrance doors.
Provisions for high level boarding shall be made at all locations in
trainset maintenance facilities where crew and maintenance personnel
are normally required to access or disembark trainsets.
(e) Signal and trainset control systems. (1) The railroad's signal
and trainset control systems, shall be based upon the service-proven
system utilized on the Tokaido Shinkansen system and shall include an
automatic train control (ATC) system, interlocking equipment, and
wayside equipment, including: track circuits, transponders, and Go/No-
Go signals in stations and trainset maintenance facilities.
(2) The railroad's signaling system shall extend beyond the
mainline into trainset maintenance facilities and be
[[Page 69738]]
designed to prevent collisions at all speeds.
(3) The ATC system shall be designed with a redundant architecture
utilizing an intrinsic fail-safe design concept.
(4) The trainset braking curves shall be determined by the on-board
equipment based on the ATC signal from the ground facility and on-board
database that includes the alignment and rolling stock performance
data. The on-board equipment shall generate the braking command based
upon the trainset location, speed, and braking curves.
(5) The ATC on-board equipment shall have three modes: mainline,
shunting, and cut-out.
(i) Mainline mode shall be used for operations on mainlines and for
entering into the trainset maintenance facilities. The mainline mode of
ATC on-board equipment shall provide the following functions:
(A) Prevent train-to-train collisions; and
(B) Prevent overspeed derailments.
(ii) Shunting mode shall be used to protect movements within
trainset maintenance facilities and for emergency operations as
required by the operating rules. When operating in shunting mode, the
trainset shall be restricted to a maximum speed of 30 km/h.
(iii) Cut-out mode shall be used for emergency operations and/or in
the event of an ATC system failure as required by the operating rules.
(6) Interlocking equipment shall prevent the movement of trainsets
through a switch in an improper position and command switch-and-lock
movements on mainlines and within trainset maintenance facilities.
(7) Track circuits shall be used to provide broken rail detection.
(8) Overrun protection coils shall be used at mainline turnouts,
crossovers within stations and trainset maintenance facilities to
prevent unauthorized route access.
(9) Transponders shall be used on the mainline to provide trainset
position correction. Transponders may be used to provide an overlay of
overrun protection within a trainset maintenance facility.
(10) Go/No-Go signals shall be used in stations for shunting and
emergency operations and in trainset maintenance facilities to provide
trainset movement authority.
(11) The railroad shall include an intrusion detection system as
required by paragraph (b)(3) and (5) of this section that shall
interface with the ATC system and have the capability to stop the
trainset under specified intrusion scenarios.
(f) Communications. (1) The railroad shall install a dedicated
communication system along the right-of-way to transmit data,
telephone, and/or radio communications that is completely isolated and
independent of the signal and trainset control system. To ensure
transmission reliability, the system shall include back-up transmission
routes.
(2) For trainset operation and maintenance, the railroad shall
install--
(i) A portable radio system for maintenance and service use; and
(ii) A trainset radio, which shall facilitate communication between
each trainset and the general control center.
(g) Rolling stock. (1) The railroad's rolling stock shall be
designed, operated, and maintained in accordance with the requirements
set forth in subparts D, E, and G of this part.
(2) The railroad shall utilize bi-directional, fixed-consist,
electric multiple unit (EMU), high-speed trainsets based on the N700.
(3) Each trainset shall be equipped with wheel slide control.
(4) Each trainset shall be equipped with two electrically connected
pantographs. The position of the pantographs (up or down) shall be
displayed in the driver's cab.
(5) The driver's cab shall be a full width and dedicated cab and
shall be arranged to enhance safety of operation, range of vision,
visibility and readability of controls and indicators, accessibility of
controls, and climate control.
(6) The railroad's passenger equipment brake system shall be based
on the N700's design and shall meet the following standards:
(i) Each trainset shall be equipped with an electronically
controlled brake system that shall ensure that each unit in the
trainset responds independently to a brake command. The brake command
shall be transmitted through the on-board internal trainset control
network, as well as through the trainline for redundancy.
(A) Motorized cars shall be equipped with regenerative and
electronically controlled pneumatic brakes. The system shall be
designed to maximize the use of regenerative brakes.
(B) Non-motorized cars shall be equipped with electronically
controlled pneumatic brakes.
(C) The friction brakes on each bogie shall be cheek mounted disc
brakes.
(D) Each car shall be equipped with an electronic and pneumatic
brake control unit and a main reservoir. The system shall be designed
that in the event of a failure of an electronic control unit in a car,
brake control shall be provided by the electronic control unit on the
adjacent car. Each car in the trainset shall be equipped with a backup
wheel slide protection controller that will provide wheel slide
protection in the event of a wheel slide protection controller failure.
(ii) The braking system shall be designed with the following brake
controls: Service, emergency, urgent, and rescue brake.
(iii) The service and emergency brake shall be applied
automatically by ATC or manually by the driver.
(iv) The urgent brake control shall be independent of the service
and emergency brake control and shall be automatically applied if the
trainset is parted. Application of the urgent brake shall produce an
irretrievable stop. The urgent brake force shall be designed to vary
according to speed in order to minimize the braking distance and avoid
excessive demand of adhesion at higher speeds.
(v) A disabled trainset shall be capable of having its brake system
controlled electronically by a rescue trainset.
(vi) Independent of the driver's brake handle in the cab, each
trainset shall be equipped with two urgent brake switches in each cab
car, accessible only to the crew; located adjacent to the door control
station and that can initiate an urgent brake application. If door
control stations are provided in intermediate cars that are accessible
only to crew members, then the urgent brake switches must also be
included adjacent to the door control stations.
(vii) The railroad shall establish a maximum safe operating speed
to address brake failures that occur in revenue service as required by
Sec. 299.409(f)(4). In the event of any friction brake failure on a
trainset, the speed shall be limited by ATC on-board equipment in
accordance with the brake failure switch position selected by the
driver and as required by Sec. 299.447.
Sec. 299.15 Special approvals.
(a) General. The following procedures govern consideration and
action upon requests for special approval of alternative standards to
this part.
(b) Petitions for special approval of alternative standard. Each
petition for special approval of an alternative standard shall
contain--
(1) The name, title, address, and telephone number of the primary
person to be contacted with regard to review of the petition;
(2) The alternative proposed, in detail, to be substituted for the
particular requirements of this part; and
[[Page 69739]]
(3) Appropriate data or analysis, or both, establishing that the
alternative will provide at least an equivalent level of safety.
(c) Petitions for special approval of alternative compliance. Each
petition for special approval of alternative compliance shall contain--
(1) The name, title, address, and telephone number of the primary
person to be contacted with regard to the petition;
(2) High-speed core systems and system components of special design
shall be deemed to comply with this part, if the FRA Associate
Administrator determines under paragraph (d) of this section that the
core system or system components provide at least an equivalent level
of safety in the environment defined within Sec. 299.13 with respect
to the protection of railroad employees and the public. In making a
determination under paragraph (d) of this section the Associate
Administrator shall consider, as a whole, all of those elements of
casualty prevention or mitigation relevant to the integrity of the core
system or components that are addressed by the requirements of this
part.
(d) Petition contents. The Associate Administrator may only make a
finding of equivalent safety and compliance with this part, based upon
a submission of data and analysis sufficient to support that
determination. The petition shall include--
(1) The information required by Sec. 299.15(b) or (c), as
appropriate; Information, including detailed drawings and materials
specifications, sufficient to describe the actual construction and
function of the core systems or system components of special design;
(2) A quantitative risk assessment, incorporating the design
information and engineering analysis described in this paragraph,
demonstrating that the core systems or system components, as utilized
in the service environment defined in Sec. 299.13, presents no greater
hazard of serious personal injury than existing core system or system
components that conform to the specific requirements of this part.
(e) Federal Register notice. FRA will publish a notice in the
Federal Register concerning each petition under paragraphs (b) and (c)
of this section.
(f) Comment. Not later than 30 days from the date of publication of
the notice in the Federal Register concerning a petition under
paragraphs (b) and (c) of this section, any person may comment on the
petition.
(1) Each comment shall set forth specifically the basis upon which
it is made, and contain a concise statement of the interest of the
commenter in the proceeding.
(2) Each comment shall be submitted to the U.S. Department of
Transportation, Docket Operations (M-30), West Building Ground Floor,
Room W12-140, 1200 New Jersey Avenue SE, Washington, DC 20590, and
shall contain the assigned docket number for that proceeding. The form
of such submission may be in written or electronic form consistent with
the standards and requirements established by the Federal Docket
Management System and posted on its website at https://www.regulations.gov.
(g) Disposition of petitions. (1) FRA will conduct a hearing on a
petition in accordance with the procedures provided in Sec. 211.25 of
this chapter.
(2) If FRA finds that the petition complies with the requirements
of this section or that the proposed plan is acceptable the petition
will be granted, normally within 90 days of its receipt. If the
petition is neither granted nor denied within 90 days, the petition
remains pending for decision. FRA may attach special conditions to the
approval of the petition. Following the approval of a petition, FRA may
reopen consideration of the petition for cause stated.
(3) If FRA finds that the petition does not comply with the
requirements of this section, or that the proposed plan is not
acceptable or that the proposed changes are not justified, or both, the
petition will be denied, normally within 90 days of its receipt.
(4) When FRA grants or denies a petition, or reopens consideration
of the petition, written notice is sent to the petitioner and other
interested parties.
Sec. 299.17 Incorporation by reference.
Certain material is incorporated by reference into this part with
the approval of the Director of the Federal Register under 5 U.S.C.
552(a) and 1 CFR part 51. All approved material is available for
inspection at Federal Railroad Administration, Docket Clerk, 1200 New
Jersey Avenue SE, Washington, DC 20590 (telephone: 202-493-6052);
email: [email protected] and is available from the sources indicated in
this section. It is also available for inspection at the National
Archives and Records Administration (NARA). For information on the
availability of this material at NARA, email [email protected] or
go to www.archives.gov/federal-register/cfr/ibr-locations.html.
(a) ASTM International, 100 Barr Harbor Drive, PO Box C700, West
Conshohocken, PA 19428-2959, www.astm.org.
(1) ASTM D 4956-07[egr]\1\, Standard Specification for
Retroreflective Sheeting for Traffic Control, approved March 15, 2007;
into Sec. 299.423.
(2) ASTM E 810-03, Standard Test Method for Coefficient of
Retroreflection of Retroreflective Sheeting Utilizing the Coplanar
Geometry, approved February 10, 2003; into Sec. 299.423.
(3) ASTM E 2073-07, Standard Test Method for Photopic Luminance of
Photoluminescent (Phosphorescent) Markings, approved July 1, 2007; into
Sec. 299.423.
(b) Japanese Standards Association 3-13-12 Mita, Minato-ku, Tokyo,
108-0073, Japan, www.jsa.or.jp (Japanese site), or www.jsa.or.jp/en
(English site).
(1) JIS B 8265:2010(E) ``Construction of pressure vessels-general
principles,'' Published December 27, 2010, Second English edition,
published December 2013; into Sec. 299.409.
(2) JIS E 1101:2001(E), ``Flat bottom railway rails and special
rails for switches and crossings of non-treated steel,'' Published
March 21, 2001, Second English edition, published August 2008; into
Sec. 299.13(d).
(3) JIS E 1101:2006(E) ``Flat bottom railway rails and special
rails for switches and crossings of non-treated steel,'' (Amendment 1),
Published March 27, 2006, First English edition, published December
2006; into Sec. 299.13(d).
(4) JIS E 1101:2012(E) ``Flat bottom railway rails and special
rails for switches and crossings of non-treated steel,'' (Amendment 2),
Published February 20, 2012, First English edition, May 2012; into
Sec. 299.13(d).
(5) JIS E 7105:2006(E), ``Rolling Stock--Test methods of static
load for body structures,'' Published February 6, 2006, First English
edition published May 2010; into Sec. 299.403(b).
(6) JIS E 7105:2011(E), ``Rolling Stock--Test methods of static
load for body structures,'' (Amendment 1) Published September 7, 2011,
First English edition, published December 2011; into Sec. 299.403(b).
Subpart B--Signal and Trainset Control System
Sec. 299.201 Technical PTC system requirements.
(a) The railroad shall comply with all applicable requirements
under 49 U.S.C. 20157, including, but not limited to, the statutory
requirement to fully implement an FRA-certified PTC system prior to
commencing revenue service.
(b) The railroad's PTC system shall be designed to prevent train-
to-train
[[Page 69740]]
collisions, over-speed derailments, incursions into established work
zone limits, and movements of trainset through switches left in the
wrong position, reliably and functionally, in accordance with Sec.
236.1005(a) and (c) through (f) of this chapter.
(c) The railroad is authorized to conduct field testing of its PTC
system on its system, prior to obtaining PTC System Certification from
FRA, in accordance with its system-wide qualification test plan under
Sec. 299.603. During any field testing of its uncertified PTC system
and regression testing of its FRA-certified PTC system, FRA may oversee
the railroad's testing, audit any applicable test plans and procedures,
and impose additional testing conditions that FRA believes may be
necessary for the safety of trainset operations.
(d) The railroad is not exempted from compliance with any
requirement of subparts A through G of 49 CFR part 236, or 49 CFR parts
233 and 235, unless the railroad's FRA-approved PTCSP provides for such
an exemption.
(e)(1) All materials filed in accordance with this subpart must be
in the English language, or have been translated into English and
attested as true and correct.
(2) Each filing referenced in this subpart may include a request
for full or partial confidentiality in accordance with Sec. 209.11 of
this chapter. If confidentiality is requested as to a portion of any
applicable document, then in addition to the filing requirements under
Sec. 209.11 of this chapter, the person filing the document shall also
file a copy of the original unredacted document, marked to indicate
which portions are redacted in the document's confidential version
without obscuring the original document's contents.
Sec. 299.203 PTC system required.
The railroad shall not commence revenue service prior to installing
and making operative its FRA-certified PTC system.
Sec. 299.205 PTC System Certification.
(a) Prior to operating its PTC system in revenue service, the
railroad must first obtain a PTC System Certification from FRA by
submitting an acceptable PTCSP and obtaining FRA's approval of its
PTCSP.
(b) Each PTCSP requirement under this subpart shall be supported by
information and analysis sufficient to establish that the PTC system
meets the requirements of Sec. 236.1005(a) and (c) through (f) of this
chapter.
(c) If the Associate Administrator finds that the PTCSP and its
supporting documentation support a finding that the PTC system complies
with Sec. 236.1005(a) and (c) through (f) of this chapter and Sec.
299.211, the Associate Administrator shall approve the PTCSP. If the
Associate Administrator approves the PTCSP, the railroad shall receive
PTC System Certification for its PTC system and shall implement the PTC
system according to the PTCSP.
(d) Issuance of a PTC System Certification is contingent upon FRA's
confidence in the implementation and operation of the subject PTC
system. This confidence may be based on FRA-monitored field testing or
an independent assessment performed in accordance with Sec. 236.1017
of this chapter.
(e)(1) As necessary to ensure safety, FRA may attach special
conditions to its certification of the railroad's PTC System.
(2) After granting a PTC System Certification, FRA may reconsider
the PTC System Certification upon revelation of any of the following
factors concerning the contents of the PTCSP:
(i) Potential error or fraud;
(ii) Potentially invalidated assumptions determined as a result of
in-service experience or one or more unsafe events calling into
question the safety analysis supporting the approval.
(3) During FRA's reconsideration in accordance with this paragraph,
the PTC system may remain in use if otherwise consistent with the
applicable law and regulations, and FRA may impose special conditions
for use of the PTC system.
(4) After FRA's reconsideration in accordance with this paragraph,
FRA may:
(i) Dismiss its reconsideration and continue to recognize the
existing PTC System Certification;
(ii) Allow continued operations under such conditions the Associate
Administrator deems necessary to ensure safety; or
(iii) Revoke the PTC System Certification and direct the railroad
to cease operations.
(f) FRA shall be afforded reasonable access to monitor, test, and
inspect processes, procedures, facilities, documents, records, design
and testing materials, artifacts, training materials and programs, and
any other information used in the design, development, manufacture,
test, implementation, and operation of the system, as well as interview
any personnel.
(g) Information that has been certified under the auspices of a
foreign regulatory entity recognized by the Associate Administrator
may, at the Associate Administrator's sole discretion, be accepted as
independently verified and validated and used to support the railroad's
PTCSP.
(h) The railroad shall file its PTCSP in FRA's Secure Information
Repository at https://sir.fra.dot.gov, consistent with Sec.
299.201(e).
Sec. 299.207 PTC Safety Plan content requirements.
(a) The railroad's PTCSP shall contain the following elements:
(1) A hazard log consisting of a comprehensive description of all
safety-relevant hazards of the PTC system, specific to implementation
on the railroad, including maximum threshold limits for each hazard
(for unidentified hazards, the threshold shall be exceeded at one
occurrence);
(2) A description of the safety assurance concepts that are to be
used for system development, including an explanation of the design
principles and assumptions;
(3) A risk assessment of the as-built PTC system;
(4) A hazard mitigation analysis, including a complete and
comprehensive description of each hazard and the mitigation techniques
used;
(5) A complete description of the safety assessment and
Verification and Validation processes applied to the PTC system, their
results, and whether these processes address the safety principles
described in appendix C to part 236 of this chapter directly, using
other safety criteria, or not at all;
(6) A complete description of the railroad's training plan for
railroad, and contractor employees and supervisors necessary to ensure
safe and proper installation, implementation, operation, maintenance,
repair, inspection, testing, and modification of the PTC system;
(7) A complete description of the specific procedures and test
equipment necessary to ensure the safe and proper installation,
implementation, operation, maintenance, repair, inspection, testing,
and modification of the PTC system on the railroad and establish
safety-critical hazards are appropriately mitigated. These procedures,
including calibration requirements, shall be consistent with or explain
deviations from the equipment manufacturer's recommendations;
(8) A complete description of the configuration or revision control
measures designed to ensure that the railroad or its contractor does
not adversely affect the safety-functional requirements and that
safety-critical hazard mitigation processes are not
[[Page 69741]]
compromised as a result of any such change;
(9) A complete description of all initial implementation testing
procedures necessary to establish that safety-functional requirements
are met and safety-critical hazards are appropriately mitigated;
(10) A complete description of all post-implementation testing
(validation) and monitoring procedures, including the intervals
necessary to establish that safety-functional requirements, safety-
critical hazard mitigation processes, and safety-critical tolerances
are not compromised over time, through use, or after maintenance
(adjustment, repair, or replacement) is performed;
(11) A complete description of each record necessary to ensure the
safety of the system that is associated with periodic maintenance,
inspections, tests, adjustments, repairs, or replacements, and the
system's resulting conditions, including records of component failures
resulting in safety-relevant hazards (see Sec. 299.213);
(12) A safety analysis to determine whether, when the system is in
operation, any risk remains of an unintended incursion into a roadway
work zone due to human error. If the analysis reveals any such risk,
the PTCSP shall describe how that risk will be mitigated;
(13) A complete description of how the PTC system will enforce
authorities and signal indications;
(14) A complete description of how the PTC system will
appropriately and timely enforce all integrated hazard detectors in
accordance with Sec. 236.1005 of this chapter;
(15) The documents and information required under Sec. 299.211;
(16) A summary of the process for the product supplier or vendor to
promptly and thoroughly report any safety-relevant failures or
previously unidentified hazards to the railroad, including when another
user of the product experiences a safety-relevant failure or discovers
a previously unidentified hazard;
(17) Documentation establishing--by design, data, or other
analysis--that the PTC system meets the fail-safe operation criteria
under paragraph (b)(4)(v) of appendix C to part 236 of this chapter;
and,
(18) An analysis establishing that the PTC system will be operated
at a level of safety comparable to that achieved over the 5-year period
prior to the submission of the railroad's PTCSP by other train control
systems that perform PTC functions, and which have been utilized on
high-speed rail systems with similar technical and operational
characteristics in the United States or in foreign service.
(b) As the railroad's PTC system may be considered a standalone
system pursuant to Sec. 236.1015(e)(3) of this chapter, the following
requirements apply:
(1) The PTC system shall reliably execute the functions required by
Sec. 236.1005 of this chapter and be demonstrated to do so to FRA's
satisfaction; and
(2) The railroad's PTCSP shall establish, with a high degree of
confidence, that the system will not introduce any hazards that have
not been sufficiently mitigated.
(c) When determining whether the PTCSP fulfills the requirements
under this section, the Associate Administrator may consider all
available evidence concerning the reliability of the proposed system.
(d) When reviewing the issue of the potential data errors (for
example, errors arising from data supplied from other business systems
needed to execute the braking algorithm, survey data needed for
location determination, or mandatory directives issued through the
computer-aided dispatching system), the PTCSP must include a careful
identification of each of the risks and a discussion of each applicable
mitigation. In an appropriate case, such as a case in which the
residual risk after mitigation is substantial, the Associate
Administrator may require submission of a quantitative risk assessment
addressing these potential errors.
(e) The railroad must comply with the applicable requirements under
Sec. 236.1021 of this chapter prior to modifying a safety-critical
element of an FRA-certified PTC system.
(f) If a PTCSP applies to a PTC system designed to replace an
existing certified PTC system, the PTCSP will be approved provided that
the PTCSP establishes with a high degree of confidence that the new PTC
system will provide a level of safety not less than the level of safety
provided by the system to be replaced.
Sec. 299.209 PTC system use and failures.
(a) When any safety-critical PTC system component fails to perform
its intended function, the cause must be determined and the faulty
component adjusted, repaired, or replaced without undue delay. Until
repair of such essential components is completed, the railroad shall
take appropriate action as specified in its PTCSP.
(b) Where a trainset that is operating in, or is to be operated
within, a PTC-equipped track segment experiences a PTC system failure
or the PTC system is otherwise cut out while en route (i.e., after the
trainset has departed its initial terminal), the trainset may only
continue in accordance with all of the following:
(1) Except as provided in paragraph (b)(4) of this section, when no
absolute block protection is established, the trainset may proceed at a
speed not to exceed restricted speed.
(2) When absolute block protection can be established in advance of
the trainset, the trainset may proceed at a speed not to exceed 120 km/
h (75 mph), and the trainset shall not exceed restricted speed until
the absolute block in advance of the trainset is established.
(3) A report of the failure or cut-out must be made to a designated
railroad officer of the railroad as soon as safe and practicable.
(4) Where the PTC system is the exclusive method of delivering
mandatory directives, an absolute block must be established in advance
of the trainset as soon as safe and practicable, and the trainset shall
not exceed restricted speed until the absolute block in advance of the
trainset is established.
(5) Where the failure or cut-out is a result of a defective onboard
PTC apparatus, the trainset may be moved in passenger service only to
the next forward location where the necessary repairs can be made;
however, if the next forward location where the necessary repairs can
be made does not have the facilities to handle the safe unloading of
passengers, the trainset may be moved past the repair location in
service only to the next forward passenger station in order to
facilitate the unloading of passengers. When the passengers have been
safely unloaded, the defective trainset shall be moved to the nearest
location where the onboard PTC apparatus can be repaired or exchanged.
(c) The railroad shall comply with all provisions in its PTCSP for
each PTC system it uses and shall operate within the scope of initial
operational assumptions and predefined changes identified.
(d) The normal functioning of any safety-critical PTC system must
not be interfered with in testing or otherwise without first taking
measures to provide for the safe movement of trainsets that depend on
the normal functioning of the system.
(e) The railroad shall comply with the reporting requirements under
Sec. 236.1029(h) of this chapter.
(f) The railroad and the PTC system vendors and/or suppliers must
comply with each applicable requirement under Sec. 236.1023 of this
chapter.
[[Page 69742]]
Sec. 299.211 Communications and security requirements.
(a) All wireless communications between the office, wayside, and
onboard components in a PTC system shall provide cryptographic message
integrity and authentication.
(b) Cryptographic keys required under this section shall--
(1) Use an algorithm approved by the National Institute of
Standards or a similarly recognized and FRA-approved standards body;
(2) Be distributed using manual or automated methods, or a
combination of both; and
(3) Be revoked--
(i) If compromised by unauthorized disclosure of the cleartext key;
or
(ii) When the key algorithm reaches its lifespan as defined by the
standards body responsible for approval of the algorithm.
(c) The cleartext form of the cryptographic keys shall be protected
from unauthorized disclosure, modification, or substitution, except
during key entry when the cleartext keys and key components may be
temporarily displayed to allow visual verification. When encrypted keys
or key components are entered, the cryptographically protected
cleartext key or key components shall not be displayed.
(d) Access to cleartext keys shall be protected by a tamper-
resistant mechanism.
(e) If the railroad elects to also provide cryptographic message
confidentiality, it shall:
(1) Comply with the same requirements for message integrity and
authentication under this section; and
(2) Only use keys meeting or exceeding the security strength
required to protect the data as defined in the railroad's PTCSP.
(f) The railroad, or its vendor or supplier, shall have a
prioritized service restoration and mitigation plan for scheduled and
unscheduled interruptions of service. This plan shall be made available
to FRA upon request, without undue delay, for restoration of
communication services that support PTC system services.
Sec. 299.213 Records retention.
(a) The railroad shall maintain at a designated office on the
railroad--
(1) A current copy of each FRA-approved PTCSP that it holds;
(2) Adequate documentation to demonstrate that the PTCSP meets the
safety requirements of this RPA, including the risk assessment;
(3) An Operations and Maintenance Manual, pursuant to Sec.
299.215; and
(4) Training and testing records pursuant to Sec. 236.1043(b) of
this chapter.
(b) Results of inspections and tests specified in the PTCSP must be
recorded pursuant to Sec. 236.110 of this chapter.
(c) Each contractor providing services relating to the testing,
maintenance, or operation of the railroad's PTC system shall maintain
at a designated office training records required under Sec. Sec.
236.1043(b) of this chapter, and 299.207(a)(6).
(d) After the PTC system is placed in service, the railroad shall
maintain a database of all safety-relevant hazards as set forth in its
PTCSP and those that had not been previously identified in its PTCSP.
If the frequency of the safety-relevant hazards exceeds the threshold
set forth in its PTCSP, then the railroad shall--
(1) Report the inconsistency in writing to FRA's Secure Information
Repository at https://sir.fra.dot.gov, within 15 days of discovery;
(2) Take prompt countermeasures to reduce the frequency of each
safety-relevant hazard to below the threshold set forth in its PTCSP;
and
(3) Provide a final report when the inconsistency is resolved to
FRA's Secure Information Repository at https://sir.fra.dot.gov, on the
results of the analysis and countermeasures taken to reduce the
frequency of the safety-relevant hazard(s) below the threshold set
forth in its PTCSP.
Sec. 299.215 Operations and Maintenance Manual.
(a) The railroad shall catalog and maintain all documents as
specified in its PTCSP for the operation, installation, maintenance,
repair, modification, inspection, and testing of the PTC system and
have them in one Operations and Maintenance Manual, readily available
to persons required to perform such tasks and for inspection by FRA and
FRA-certified state inspectors.
(b) Plans required for proper maintenance, repair, inspection, and
testing of safety-critical PTC systems must be adequate in detail and
must be made available for inspection by FRA and FRA-certified state
inspectors where such PTC systems are deployed or maintained. They must
identify all software versions, revisions, and revision dates. Plans
must be legible and correct.
(c) Hardware, software, and firmware revisions must be documented
in the Operations and Maintenance Manual according to the railroad's
configuration management control plan and any additional configuration/
revision control measures specified in its PTCSP.
(d) Safety-critical components, including spare equipment, must be
positively identified, handled, replaced, and repaired in accordance
with the procedures specified in the railroad's PTCSP.
(e) The railroad shall designate in its Operations and Maintenance
Manual an appropriate railroad officer responsible for issues relating
to scheduled interruptions of service.
Subpart C--Track Safety Standards
Sec. 299.301 Restoration or renewal of track under traffic
conditions.
(a) Restoration or renewal of track, other than in yards and
trainset maintenance facilities, under traffic conditions is
prohibited.
(b) Restoration or renewal of track under traffic conditions on
track Class H2 in trainset maintenance facilities is limited to the
replacement of worn, broken, or missing components or fastenings that
do not affect the safe passage of trainset.
(c) The following activities are expressly prohibited on track
Class H2 in trainset maintenance facilities under traffic conditions:
(1) Any work that interrupts rail continuity, e.g., as in joint bar
replacement or rail replacement;
(2) Any work that adversely affects the lateral or vertical
stability of the track with the exception of spot tamping an isolated
condition where not more than 4.5 m (15 feet) of track are involved at
any one time and the ambient air temperature is not above 35[deg]C
(95[deg]F); and
(3) Removal and replacement of the rail fastenings on more than one
tie at a time within 4.5 m (15 feet).
Sec. 299.303 Measuring track not under load.
When unloaded track is measured to determine compliance with
requirements of this part, evidence of rail movement, if any, that
occurs while the track is loaded shall be added to the measurements of
the unloaded track.
Sec. 299.305 Drainage.
Each drainage or other water carrying facility under or immediately
adjacent to the roadbed shall be maintained and kept free of
obstruction, to accommodate expected water flow for the area concerned.
Sec. 299.307 Vegetation.
Vegetation on railroad property which is on or immediately adjacent
to roadbed shall be controlled so that it does not--
[[Page 69743]]
(a) Become a fire hazard to track-carrying structures;
(b) Obstruct visibility of railroad signs and signals along the
right-of-way;
(c) Interfere with railroad employees performing normal trackside
duties;
(d) Prevent proper functioning of signal and communication lines;
or
(e) Prevent railroad employees from visually inspecting moving
equipment from their normal duty stations.
Sec. 299.309 Classes of track: operating speed limits.
(a) Except as provided in paragraph (b) of this section and as
otherwise provided in this part, the following maximum allowable
operating speeds apply--
Table 1 to paragraph (a)
------------------------------------------------------------------------
Over track that meets all of the The maximum allowable
requirements prescribed in this part operating speed in km/h
for-- (mph)
------------------------------------------------------------------------
Class H0 track............................ 20 (12)
Class H1 track............................ 30 (19)
Class H2 track............................ 70 (44)
Class H3 track............................ 120 (75)
Class H4 track............................ 170 (106)
Class H5 track............................ 230 (143)
Class H6 track............................ 285 (177)
Class H7 track............................ 330 (205)
------------------------------------------------------------------------
(b) Except as provided in paragraph (c) of this section, if a
segment of track does not meet all of the requirements for its intended
Class, it is to be reclassified to the next lower track Class for which
it does meet all of the requirements of this part. However, if the
segment of track does not at least meet the requirements for track
Class H1 track, operations may continue at Class H1 speeds for a period
of not more than 30 days without bringing the track into compliance,
under the authority of an individual designated under Sec. 299.353,
after that individual determines that operations may safely continue
and subject to any limiting conditions specified by such individual.
(c) If a segment of track designated as track Class H0 does not
meet all of the requirements for its intended class, operations may
continue at Class H0 speeds for a period of not more than 30 days
without bringing the track into compliance, under the authority of an
individual designated under Sec. 299.353, after that individual
determines that operations may safely continue and subject to any
limiting conditions specified by such individual.
(d) No high-speed passenger trainset shall operate over track Class
H0.
Sec. 299.311 Track geometry; general.
If the values listed in the following table are exceeded, the
railroad shall initiate remedial action. A reduction in operating speed
so that the condition complies with the limits listed for a lower speed
shall constitute bringing the track into compliance.
Table 1 to Sec. 299.311
--------------------------------------------------------------------------------------------------------------------------------------------------------
Track geometry parameter (millimeter (mm)) Track class H0 H1 H2 H3 H4 H5 H6 H7
--------------------------------------------------------------------------------------------------------------------------------------------------------
Gauge is measured between the heads of the Min............................... 1429 1429 1429 1429 1429 1429 1429 1429
rails at right angles to the rails in a
plane 14 mm (0.55 inches) below the top of
the rail head and may not exceed--.
Max............................... 1454 1454 1454 1454 1454 1454 1454 1454
The deviation from uniformity\1\ of the mid- 10 m chord........................ 38 31 31 14 12 10 8 7
chord offset on either rail for a 10 meter
(m) chord (alignment) may not be more than--
.
The deviation from uniform profile on either 10 m chord........................ 40 40 40 27 22 18 15 13
rail at the mid-ordinate of a 10 m chord
(surface) may not be more than--.
The deviation from uniform crosslevel at any .................................. 50 26 26 22 18 14 9 9
point on tangent and curved track may not
be more than--.
The difference in crosslevel between any two 2.5 m............................. 26 26 26 22 18 14 9 9
points 2.5 meters (8.2 feet) apart (twist)
may not be more than--.
--------------------------------------------------------------------------------------------------------------------------------------------------------
\1\ Uniformity for alignment at any point along the track is established by averaging the measured mid-chord offset values for a 10 m (32.8 feet) chord
for nine consecutive points that are centered around that point and spaced at 2.5 m (8.2 feet) intervals.
Sec. 299.313 Track geometry; performance based.
(a) For all track of Class H4 and above, vibration in the lateral
and vertical directions measured on the carbody of a vehicle
representative of the service fleet traveling at a speed no less than
10 km/h (6.2 mph) below the maximum speed permitted for the class of
track, shall not exceed the limits prescribed in the following table:
Table 1 to paragraph (a)
------------------------------------------------------------------------
Carbody acceleration limits 1 2
-------------------------------------------------------------------------
Lateral vibration \3\ Vertical vibration \3\
------------------------------------------------------------------------
<= 0.35 g peak-to-peak.................... <= 0.45g peak-to-peak
1 sec window.............................. 1 sec window
excluding peaks < 50 msec................. excluding peaks < 50 msec
------------------------------------------------------------------------
\1\ Carbody accelerations in the vertical and lateral directions shall
be measured by accelerometers oriented and located in accordance with
Sec. 299.337(c)(3).
\2\ Acceleration measurements shall be processed through an LPF with a
minimum cut-off frequency of 10 Hz. The sample rate for acceleration
data shall be at least 200 samples per second.
\3\ Peak-to-peak accelerations shall be measured as the algebraic
difference between the two extreme values of measured acceleration in
any 1-second time period, excluding any peak lasting less than 50
milliseconds.
(b) If the carbody acceleration requirements are not met on a
segment of track, the segment of track is to be reclassified to the
next lower Class of track for which it does meet the requirements of
this part.
[[Page 69744]]
Sec. 299.315 Curves; elevation and speed limitations.
(a) The maximum elevation of the outside rail of a curve may not be
more than 200 mm (7-7/8 inches). The outside rail of a curve may not be
lower than the inside rail by design, except when engineered to address
specific track or operating conditions; the limits in Sec. 299.311
apply in all cases.
(b) The maximum allowable posted timetable operating speed for each
curve is determined by the following formula:
[GRAPHIC] [TIFF OMITTED] TR03NO20.000
Where--
Vmax = Maximum allowable posted timetable operating speed
(km/h).
Ea = Actual elevation of the outside rail (mm). Actual
elevation, Ea, for each 50-meter track segment in the
body of the curve is determined by averaging the elevation for 11
points through the segment at 5-meter spacing. If the curve length
is less than 50-meters, average the points through the full length
of the body of the curve.
Eu = Qualified cant deficiency (mm) of the vehicle type.
R = Radius of curve (m). Radius of curve, R, is determined by
averaging the radius of the curve over the same track segment as the
elevation.
(c) All vehicles are considered qualified for operating on track
with a cant deficiency, Eu, not exceeding 75 mm (3 inches).
(d) Each vehicle type must be approved by FRA, under Sec. 299.609,
to operate on track with a qualified cant deficiency, Eu,
greater than 75 mm (3 inches). Each vehicle type must demonstrate in a
ready-for-service load condition, compliance with the requirements of
either paragraph (d)(1) or (2) of this section.
(1) When positioned on a track with a uniform superelevation equal
to the proposed cant deficiency:
(i) No wheel of the vehicle unloads to a value less than 60 percent
of its static value on perfectly level track; and
(ii) For passenger cars, the roll angle between the floor of the
equipment and the horizontal does not exceed 8.6 degrees; or
(2) When operating through a constant radius curve at a constant
speed corresponding to the proposed cant deficiency, and a test plan is
submitted and approved by FRA in accordance with Sec. 299.609(d)--
(i) The steady-state (average) load on any wheel, throughout the
body of the curve, is not less than 60 percent of its static value on
perfectly level track; and
(ii) For passenger cars, the steady-state (average) lateral
acceleration measured on the floor of the carbody does not exceed
0.15g.
(e) The railroad shall transmit the results of the testing
specified in paragraph (d) of this section to FRA in accordance with
Sec. Sec. 299.9 and 299.613 requesting approval under Sec. 299.609(g)
for the vehicle type to operate at the desired curving speeds allowed
under the formula in paragraph (b) of this section. The request shall
be made in writing and shall contain, at a minimum, the following
information:
(1) A description of the vehicle type involved, including schematic
diagrams of the suspension system(s) and the estimated location of the
center of gravity above top of rail; and
(2) The test procedure, including the load condition under which
the testing was performed, and description of the instrumentation used
to qualify the vehicle type, as well as the maximum values for wheel
unloading and roll angles or accelerations that were observed during
testing.
Note 1 to paragraph (e)(2). The test procedure may be conducted
whereby all the wheels on one side (right or left) of the vehicle
are raised to the proposed cant deficiency and lowered, and then the
vertical wheel loads under each wheel are measured and a level is
used to record the angle through which the floor of the vehicle has
been rotated.
(f) Upon FRA approval of the request to approve the vehicle type to
operate at the desired curving speeds allowed under the formula in
paragraph (b) of this section, the railroad shall notify FRA in
accordance with Sec. 299.9 in writing no less than 30 calendar days
prior to the proposed implementation of the approved higher curving
speeds allowed under the formula in paragraph (b) of this section. The
notification shall contain, at a minimum, identification of the track
segment(s) on which the higher curving speeds are to be implemented.
(g) As used in this section, and Sec. 299.609, vehicle type means
like vehicles with variations in their physical properties, such as
suspension, mass, interior arrangements, and dimensions that do not
result in significant changes to their dynamic characteristics.
Sec. 299.317 Track strength.
(a) Track shall have a sufficient vertical strength to withstand
the maximum vehicle loads generated at maximum permissible trainset
speeds, cant deficiencies and surface limitations. For purposes of this
section, vertical track strength is defined as the track capacity to
constrain vertical deformations so that the track shall, under maximum
load, remain in compliance with the track performance and geometry
requirements of this part.
(b) Track shall have sufficient lateral strength to withstand the
maximum thermal and vehicle loads generated at maximum permissible
trainset speeds, cant deficiencies and lateral alignment limitations.
For purposes of this section lateral track strength is defined as the
track capacity to constrain lateral deformations so that track shall,
under maximum load, remain in compliance with the track performance and
geometry requirements of this part.
Sec. 299.319 Track fixation and support.
(a) Crossties, if used shall be of concrete or composite
construction, unless otherwise approved by FRA under Sec. 299.15, for
all tracks over which trainsets run in revenue service.
(b) Each 25 m (82 feet) segment of track that contains crossties
shall have--
(1) A sufficient number of crossties to provide effective support
that will--
(i) Hold gauge within limits prescribed in Sec. 299.311;
(ii) Maintain surface within the limits prescribed in Sec.
299.311;
(iii) Maintain alignment within the limits prescribed in Sec.
299.311; and
(iv) Maintain longitudinal rail restraint.
(2) The minimum number and type of crossties specified in paragraph
(b)(4) of this section and described in paragraph (c) or (d) of this
section, as applicable, effectively distributed to support the entire
segment;
(3) At least one non-defective crosstie of the type specified in
paragraphs (c) and (d) of this section that is located at a joint
location as specified in paragraph (e) of this section; and
(4) The minimum number of crossties as indicated in the following
table:
[[Page 69745]]
Table 1 to Paragraph (b)(4)
----------------------------------------------------------------------------------------------------------------
Minimum number of non-defective crossties
-----------------------------------------------------------------------------------------------------------------
Other than on non-ballasted Non-ballasted
Track class bridge & turnout bridge Turnout
----------------------------------------------------------------------------------------------------------------
H0............................................ 20.............................. 26 24
H1............................................ 28.............................. 36 33
H2............................................ 31, unless inside a TMF, then 28 36 33
H3............................................ 35.............................. 40 37
H4-H7......................................... 39.............................. 45 41
----------------------------------------------------------------------------------------------------------------
(c) Crossties, other than concrete, counted to satisfy the
requirements set forth in paragraph (b)(4) of this section shall not
be--
(1) Broken through;
(2) Split or otherwise impaired to the extent the crossties will
allow the ballast to work through, or will not hold spikes or rail
fasteners;
(3) Deteriorated so that the tie plate or base of rail can move
laterally 9.5 mm (\3/8\ inch) relative to the crossties;
(4) Cut by the tie plate through more than 40 percent of a
crosstie's thickness;
(5) Configured with less than 2 rail holding spikes or fasteners
per tie plate; or
(6) Unable, due to insufficient fastener toeload, to maintain
longitudinal restraint and maintain rail hold down and gauge.
(d) Concrete crossties counted to satisfy the requirements set
forth in paragraph (b)(4) of this section shall not be--
(1) Broken through or deteriorated to the extent that prestressing
material is visible;
(2) Deteriorated or broken off in the vicinity of the shoulder or
insert so that the fastener assembly can either pull out or move
laterally more than 9.5 mm (\3/8\ inch) relative to the crosstie;
(3) Deteriorated such that the base of either rail can move
laterally more than 9.5 mm (\3/8\ inch) relative to the crosstie;
(4) Deteriorated so that rail seat abrasion is sufficiently deep so
as to cause loss of rail fastener toeload;
(5) Deteriorated such that the crosstie's fastening or anchoring
system is unable to maintain longitudinal rail restraint, or maintain
rail hold down, or maintain gauge due to insufficient fastener toeload;
or
(6) Configured with less than two fasteners on the same rail.
(e) Classes H0 and H1 track shall have one crosstie whose
centerline is within 0.61 m (24 inches) of each rail joint (end)
location. Classes H2 and H3 track shall have one crosstie whose
centerline is within 0.46 m (18 inches) of each rail joint (end)
location. Classes H4-H7 track shall have one crosstie whose centerline
is within 0.32 m (12.6 inches) of each rail joint (end) location. The
relative position of these crossties is described in the following
three diagrams:
(1) Each rail joint in Classes H0 and H1 track shall be supported
by at least one crosstie specified in paragraphs (c) and (d) of this
section whose centerline is within 1.22 m (48 inches) as shown in
Figure 1 to this paragraph.
[GRAPHIC] [TIFF OMITTED] TR03NO20.001
(2) Each rail joint in Classes H2 and H3 track shall be supported
by at least one crosstie specified in paragraphs (c) and (d) of this
section whose centerline is within 0.92 m (36.2 inches) as shown in
Figure 2 to this paragraph.
[[Page 69746]]
[GRAPHIC] [TIFF OMITTED] TR03NO20.002
(3) Each rail joint in Classes H4-H7 track shall be supported by at
least one crosstie specified in paragraphs (c) and (d) of this section
whose centerline is within 0.64 m (25.2 inches) as shown in Figure 3 to
this paragraph.
[GRAPHIC] [TIFF OMITTED] TR03NO20.003
(f) In Class H3 track there shall be at least two non-defective
ties each side of a defective tie.
(g) In Classes H4 to H7 track and at any expansion joints there
shall be at least three non-defective ties each side of a defective
tie.
(h) Defective ties shall be replaced in accordance with the
railroad's inspection, testing, and maintenance program.
(i) Track shall be fastened by a system of components that
effectively maintains gauge within the limits prescribed in Sec.
299.311. Each component of each such system shall be evaluated to
determine whether gauge is effectively being maintained.
(j) For track constructed without crossties, such as slab track and
track connected directly to bridge structural components, track over
servicing pits, etc., the track structure shall be sufficient to
maintain the geometry limits specified in Sec. 299.311.
Sec. 299.321 Defective rails.
(a) The railroad's inspection, testing, and maintenance program
shall include a description of defective rails consistent with the
practice on the Tokaido Shinkansen system. The inspection, testing, and
maintenance program shall include identification of rail defect types,
definition of the inspection criteria, time required for verification
and the corresponding remedial action.
(b) When the railroad learns that a rail in that track contains any
of the defects listed in the railroad's inspection, testing, and
maintenance program, a person designated under Sec. 299.353 or Sec.
299.355 shall determine whether the track may continue in use. If the
designated person determines that the track may continue in use,
operation over the defective rail is not permitted until--
(1) The rail is replaced or repaired; or
(2) The remedial action prescribed in the inspection, testing, and
maintenance program is initiated.
Sec. 299.323 Continuous welded rail (CWR) plan.
(a) The railroad shall have in effect and comply with a plan that
contains written procedures which address: The installation,
adjustment, maintenance, and inspection of CWR; and inspection of CWR
joints.
(b) The railroad shall file its CWR plan with FRA pursuant to Sec.
299.9. The initial CWR plan shall be filed 60 days prior to
installation of any CWR track. The effective date of the plan is the
date the plan is filed with FRA.
(c) The railroad's existing plan shall remain in effect until the
railroad's new plan is developed and filed with FRA.
Sec. 299.325 Continuous welded rail (CWR); general.
The railroad shall comply with the contents of the CWR plan
developed under Sec. 299.323. The plan shall contain the following
elements--
(a) Procedures for the installation and adjustment of CWR which
include--
(1) Designation of a desired rail installation temperature range
for the geographic area in which the CWR is located;
(2) De-stressing procedures/methods which address proper attainment
of the desired rail installation temperature range when adjusting CWR;
and
(3) Glued insulated or expansion joint installation and maintenance
procedures.
(b) Rail anchoring, if used, or fastening requirements that will
provide sufficient restraint to limit longitudinal rail and crosstie
movement to the extent practical, and that specifically address
[[Page 69747]]
CWR rail anchoring or fastening patterns on bridges, bridge approaches,
and at other locations where possible longitudinal rail and crosstie
movement associated with normally expected trainset-induced forces--is
restricted.
(c) CWR joint installation and maintenance procedures.
(d) Procedures which specifically address maintaining a desired
rail installation temperature range when cutting CWR including rail
repairs, in-track welding, and in conjunction with adjustments made in
the area of tight track, a track buckle, or a pull-apart.
(e) Procedures which control trainset speed on CWR track when--
(1) Maintenance work, track rehabilitation, track construction, or
any other event occurs which disturbs the roadbed or ballast section
and reduces the lateral or longitudinal resistance of the track; and
(2) The difference between the rail temperature and the rail
neutral temperature is in a range that causes buckling-prone conditions
to be present at a specific location.
(f) Procedures which prescribe when and where physical track
inspections are to be performed under extreme temperature conditions.
(g) Scheduling and procedures for inspections to detect cracks and
other indications of potential failures in CWR joints.
(h) The railroad shall have in effect a comprehensive training
program for the application of these written CWR procedures, with
provisions for periodic retraining for those individuals designated as
qualified in accordance with this subpart to supervise the
installation, adjustment, and maintenance of CWR track and to perform
inspections of CWR track.
(i) The plan shall prescribe and require compliance with
recordkeeping requirements necessary to provide an adequate history of
track constructed with CWR. At a minimum, these records shall include--
(1) The rail laying temperature, location, and date of CWR
installations. Each record shall be retained until the rail neutral
temperature has been adjusted; and
(2) A record of any CWR installation or maintenance work that does
not conform to the written procedures. Such record must include the
location of the rail and be maintained until the CWR is brought into
conformance with such procedures.
Sec. 299.327 Rail end mismatch.
Any mismatch of rails at joints may not be more than that
prescribed by the following table:
Table 1 to Sec. 299.327
------------------------------------------------------------------------
Any mismatch of rails at joints may
not be more than the following:
-------------------------------------
Track class On the tread of On the gauge side
the rail ends of the rail ends
(mm) (mm)
------------------------------------------------------------------------
H0................................ 6 5
H1-H2............................. 4 4
H3-H7............................. 2 2
------------------------------------------------------------------------
Sec. 299.329 Rail joints and torch cut rails.
(a) Each rail joint, insulated joint, expansion joint, and
compromise joint shall be of a structurally sound design and
appropriate dimensions for the rail on which it is applied.
(b) If a joint bar is cracked, broken, or permits excessive
vertical movement of either rail when all bolts are tight, it shall be
replaced.
(c) Except for glued-insulated joints, each joint bar shall be held
in position by track bolts tightened to allow the joint bar to firmly
support the abutting rail ends. For track Classes H0 to H3 track bolts
shall be tightened, as required, to allow longitudinal movement of the
rail in the joint to accommodate expansion and contraction due to
temperature variations.
(d) Except as provided in paragraph (e) of this section, each rail
shall be bolted with at least two bolts at each joint.
(e) Clamped joint bars may be used for temporary repair during
emergency situations, and speed over that rail end and the time
required to replace the joint bar must not exceed the limits specified
in the inspection, testing, and maintenance program.
(f) No rail shall have a bolt hole which is torch cut or burned.
(g) No joint bar shall be reconfigured by torch cutting.
(h) No rail having a torch cut or flame cut end may be used.
Sec. 299.331 Turnouts and crossings generally.
(a) In turnouts and track crossings, the fastenings shall be intact
and maintained to keep the components securely in place. Also, each
switch, frog, and guard rail shall be kept free of obstructions that
may interfere with the passage of wheels. Use of rigid rail crossings
at grade is limited to track Classes H0, H1, and H2.
(b) The track through and on each side of track crossings and
turnouts shall be designed to restrain rail movement affecting the
position of switch points and frogs.
(c) Each flangeway at turnouts shall be at least 39 mm (1.5 inches)
wide.
(d) For all turnouts and track crossings, the railroad shall
prepare inspection and maintenance requirements to be included in the
railroad's inspection, testing, and maintenance program.
Sec. 299.333 Frog guard rails and guard faces; gauge.
The guard check and guard face gages in frogs shall be within the
limits prescribed in the following table:
[[Page 69748]]
Table 1 to Sec. 299.333
------------------------------------------------------------------------
Guard check gage
The distance
between the gauge Guard face gage
line of a frog to The distance
the guard line \1\ between the guard
of its guard rail lines,\1\
Track class or guarding face, measured across
measured across the track at right
the track at right angles to the
angles to the gauge line,\2\ may
gauge line,\2\ may not be more than--
not be less than--
------------------------------------------------------------------------
H0-H7........................... 1,393 mm.......... 1,358 mm.
------------------------------------------------------------------------
\1\ A line along that side of the flangeway which is nearer to the
center of the track and at the same elevation as the gage line.
\2\ A line 14 mm (0.55 inches) below the top of the center line of the
head of the running rail, or corresponding location of the tread
portion of the track structure.
[GRAPHIC] [TIFF OMITTED] TR03NO20.004
[GRAPHIC] [TIFF OMITTED] TR03NO20.005
Sec. 299.335 Derails.
(a) Derails shall be installed at locations where maintenance-of-
way equipment can access track other than Class H0, in a configuration
intended to derail the un-controlled equipment away from the mainline
and at a distance from the point of intersection with the mainline that
will not foul the dynamic envelope of the mainline.
(b) Each derail shall be clearly visible to railroad personnel
operating rail equipment on the affected track and to railroad
personnel working adjacent to the affected track. When in a locked
position, a derail shall be free of any lost motion that would allow it
to be operated without removal of the lock.
(c) Each derail shall be maintained and function as intended.
(d) Each derail shall be properly installed for the rail to which
it is applied.
(e) If a track is equipped with a derail it shall be in the
derailing position except as provided in the railroad's operating
rules, special instructions, or changed to permit movement.
Sec. 299.337 Automated vehicle-based inspection systems.
(a) A qualifying Track Geometry Measurement System (TGMS) and a
qualifying Track Acceleration Measurement System (TAMS) shall be
operated over the route at the following frequency:
(1) For track Class H3, at least twice per calendar year with not
less than 120 days between inspections; and
(2) For track Classes H4, H5, H6, and H7, at least twice within any
60-day period with not less than 12 days between inspections.
(b) The qualifying TGMS shall meet or exceed minimum design
requirements which specify that--
(1) Track geometry measurements shall be taken no more than 1 meter
(3.3 feet) away from the contact point of wheels carrying a vertical
load of no less than 4,500 kg (10,000 lb) per wheel;
(2) Track geometry measurements shall be taken and recorded on a
distance-based sampling interval not exceeding 0.60 m (2 feet),
preferably 0.30 m (1 foot);
(3) Calibration procedures and parameters are assigned to the
system which assures that measured and recorded values accurately
represent track conditions. Track geometry measurements recorded by the
system shall not differ on repeated runs at the same site at the same
speed more than 3 mm (\1/8\ inch); and
(4) The TGMS shall be capable of measuring and processing the
necessary track geometry parameters to determine compliance with
Sec. Sec. 299.311 and 299.315.
[[Page 69749]]
(c) A qualifying TAMS shall be on a vehicle having dynamic response
characteristics that are representative of other vehicles assigned to
the service and shall--
(1) Be operated at the revenue speed profile in accordance with
Sec. 299.309;
(2) Be capable of measuring and processing carbody acceleration
parameters to determine compliance with Carbody Acceleration Limits per
Sec. 299.313; and
(3) Monitor lateral and vertical accelerations of the carbody. The
accelerometers shall be attached to the carbody on or under the floor
of the vehicle, as near the center of a bogie as practicable.
(d) The qualifying TGMS and TAMS shall be capable of producing,
within 24 hours of the inspection, output reports that--
(1) Provide a continuous plot, on a constant-distance axis, of all
measured track geometry and carbody acceleration parameters required in
paragraph (b) and (c) of this section;
(2) Provide an exception report containing a systematic listing of
all track geometry and all acceleration conditions which constitute an
exception to the class of track over the segment surveyed.
(e) The output reports required under paragraph (d) of this section
shall contain sufficient location identification information which
enables field personnel to easily locate indicated exceptions.
(f) Following a track inspection performed by a qualifying TGMS or
TAMS, the railroad shall, institute remedial action for all exceptions
to the class of track in accordance with the railroad's inspection,
testing, and maintenance program.
(g) The railroad shall maintain for a period of one year following
an inspection performed by a qualifying TGMS and TAMS, a copy of the
plot and the exception report for the track segment involved, and
additional records which--
(1) Specify the date the inspection was made and the track segment
involved; and,
(2) Specify the location, remedial action taken, and the date
thereof, for all listed exceptions to the class.
Sec. 299.339 Daily sweeper inspection.
A sweeper vehicle shall be operated each morning after the
overnight maintenance over all tracks except track Class H2 in
stations, prior to commencing revenue service over that track. The
sweeper vehicle shall operate at a speed no greater than 120 km/h (75
mph) to conduct a visual inspection to ensure the right-of-way is clear
of obstacles within the clearance envelope and to identify conditions
that could cause accidents, and shall have a minimum clearance of no
less than 35 mm above top of rail.
Sec. 299.341 Inspection of rail in service.
(a) Prior to revenue service the railroad shall submit written
procedures for the inspection of rails in accordance with the
inspection, testing, and maintenance program.
(b) On track Classes H4 to H7, and H2 within stations, a continuous
search for internal defects shall be made of all rail within 180 days
after initiation of revenue service and, thereafter, at least annually,
with not less than 240 days between inspections.
(c) Each defective rail shall be marked with a highly visible
marking on both sides of the rail.
(d) Inspection equipment shall be capable of detecting defects
between joint bars and within the area enclosed by joint bars.
(e) If the person assigned to operate the rail defect detection
equipment being used determines that, due to rail surface conditions, a
valid search for internal defects could not be made over a particular
length of track, the test on that particular length of track cannot be
considered as a search for internal defects under this section.
(f) When the railroad learns, through inspection or otherwise, that
a rail in that track contains any of the defects in accordance with
Sec. 299.321, a qualified individual designated under Sec. 299.353 or
Sec. 299.355 shall determine whether or not the track may continue in
use. If the qualified individual so designated determines that the
track may continue in use, operation over the defective rail is not
permitted until--
(1) The rail is replaced; or
(2) The remedial action as prescribed in Sec. 299.321 has been
taken.
(g) The person assigned to operate the rail defect detection
equipment must be a qualified operator as defined in this subpart and
have demonstrated proficiency in the rail flaw detection process for
each type of equipment the operator is assigned.
Sec. 299.343 Initial inspection of new rail and welds.
(a) The railroad shall provide for the initial inspection of newly
manufactured rail, and for initial inspection of new welds made in
either new or used rail. The railroad may demonstrate compliance with
this section by providing for--
(1) Mill inspection. A continuous inspection at the rail
manufacturer's mill shall constitute compliance with the requirement
for initial inspection of new rail, provided that the inspection
equipment meets the applicable requirements as specified under the
railroad's inspection, testing, and maintenance program and Sec.
299.321. The railroad shall obtain a copy of the manufacturer's report
of inspection and retain it as a record until the rail receives its
first scheduled inspection under Sec. 299.341;
(2) Welding plant inspection. A continuous inspection at a welding
plant, if conducted in accordance with the provisions of paragraph
(a)(1) of this section, and accompanied by a plant operator's report of
inspection which is retained as a record by the railroad, shall
constitute compliance with the requirements for initial inspection of
new rail and plant welds, or of new plant welds made in used rail; and
(3) Inspection of field welds. Initial inspection of new field
welds, either those joining the ends of CWR strings or those made for
isolated repairs, shall be conducted before the start of revenue
service in accordance with the railroad's inspection, testing, and
maintenance program. The initial inspection may be conducted by means
of portable test equipment. The railroad shall retain a record of such
inspections until the welds receive their first scheduled inspection
under Sec. 299.341.
(b) Each defective rail found during inspections conducted under
paragraph (a)(3) of this section shall be marked with highly visible
markings on both sides of the rail and the appropriate remedial action
as set forth in Sec. 299.341 will apply.
Sec. 299.345 Visual inspections; right of way.
(a) General. All track shall be visually inspected in accordance
with the schedule prescribed in paragraph (c) of this section by an
individual qualified under this subpart. The visual inspection shall be
conducted in accordance with the requirements set forth in the
inspection, testing, and maintenance program under subpart G of this
part.
(b) Inspection types and frequency--(1) Safe walkway inspection.
Except for track located inside trainset maintenance facilities and MOW
yards and the associated portions of the right-of-way, the right-of-way
and all track shall be inspected from the safe walkway during daytime
hours, in accordance with the following conditions:
(i) Ballasted track shall be inspected at least once every two
weeks, with a minimum of six calendar days in between inspections.
[[Page 69750]]
(ii) Non-ballasted track shall be inspected at least once every
four weeks, with a minimum of twelve calendar days in between
inspections.
(iii) No two consecutive visual inspections from the safe walkway
shall be performed from the same safe walkway. Safe walkway inspections
shall alternate between safe walkways on each side of the right-of-way.
(iv) In stations, the safe walkway inspection may be performed from
either the safe walkway or the station platform.
(v) An additional on-track visual inspection conducted during
maintenance hours under paragraph (b)(2) of this section performed in
place of a visual inspection from the safe walkway under paragraph
(b)(1) of this section will satisfy the visual inspection requirement
of paragraph (b)(1) of this section. However, a safe walkway visual
inspection performed under paragraph (b)(1) of this section cannot
replace an on-track visual inspection conducted during maintenance
hours under paragraph (b)(2) of this section.
(vi) Except for paragraph (b)(1)(v) of this section, inspections
performed under paragraph (b)(1) of this section shall not occur during
the same week as inspections performed under paragraph (b)(2) of this
section.
(vii) In the event a safe walkway visual inspection is not possible
on a given day due to extreme weather, the inspection may be conducted
from the cab of a trainset or as an on-track visual inspection on that
day in accordance with the inspection, testing, and maintenance
program.
(2) On-track inspections; other than trainset maintenance
facilities and MOW yards. Except for track located inside trainset
maintenance facilities and MOW yards and the associated portions of the
right-of-way, on-track visual inspections, conducted on foot during
maintenance hours, shall be performed on all track in accordance with
the following conditions:
(i) Ballasted track shall be inspected at least once every two
weeks, with a minimum of six calendar days in between inspections.
(ii) Non-ballasted track shall be inspected at least once every
four weeks, with a minimum of twelve calendar days in between
inspections.
(iii) Turn-outs and track crossings on ballasted track shall be
inspected at least once a week, with a minimum of three calendar days
in between inspections.
(iv) Turn-outs and track crossings on non-ballasted track shall be
inspected at least once every two weeks, with a minimum of six calendar
days in between inspections.
(3) On-track inspections; trainset maintenance facilities and MOW
yards. For track located inside trainset maintenance facilities and MOW
yards and the associated portions of the right-of-way, including turn-
outs and track crossings, on-track visual inspections, conducted on
foot, shall be performed on all track in accordance with the following
conditions:
(i) Ballasted track shall be inspected at least once during any 60-
day period, with a minimum of twelve calendar days in between
inspections.
(ii) Non-ballasted track shall be inspected at least once within
any 120-day period, with a minimum of twenty-four calendar days in
between inspections.
(iii) On-track safety shall be established in accordance with 49
CFR part 214 of this chapter, except for 49 CFR 214.339.
(4) Visual inspections from trainset cab. Visual inspections from
trainset cab shall be performed for the right-of-way and track for
track Class H3 and above, except for track leading to a trainset
maintenance facility, at least twice weekly with a minimum of two
calendar days between inspections.
(c) If a deviation from the requirements of this subpart is found
during the visual inspection, remedial action shall be initiated
immediately in accordance with the railroad's inspection, testing, and
maintenance program required under subpart G of this part.
Sec. 299.347 Special inspections.
(a) In the event of fire, flood, severe storm, temperature
extremes, or other occurrence which might have damaged track structure,
a special inspection shall be made of the track and right-of-way
involved as soon as possible after the occurrence, prior to the
operation of any trainset over that track.
(b) Should a trainset be between stations when an event such as
those described in paragraph (a) of this section occurs, that trainset
may proceed to the next forward station at restricted speed, in
accordance with the railroad's operating rules and inspection, testing,
and maintenance program.
Sec. 299.349 Inspection records.
(a) The railroad shall keep a record of each inspection required to
be performed on that track under this subpart.
(b) Except as provided in paragraph (f) of this section, each
record of an inspection under Sec. Sec. 299.325 and 299.345 shall be
prepared on the day the inspection is made and signed by the person
making the inspection.
(c) Records shall specify the track inspected, date of inspection,
location, and nature of any deviation from the requirements of this
part, name of qualified individual who made the inspection, and the
remedial action, if any, taken by the person making the inspection.
(d) Rail inspection records shall specify the date of inspection,
the location and nature of any internal defects found, name of
qualified individual who made the inspection, the remedial action taken
and the date thereof, and the location of any intervals of track not
tested pursuant to Sec. 299.341 of this part. The railroad shall
retain a rail inspection record for at least two years after the
inspection and for one year after remedial action is taken.
(e) The railroad shall make inspection records required by this
section available for inspection and copying by the FRA.
(f) For purposes of compliance with the requirements of this
section, the railroad may maintain and transfer records through
electronic transmission, storage, and retrieval provided that--
(1) The electronic system is compliant with the requirements of
Sec. 299.11;
(2) The electronic storage of each record shall be initiated by the
person making the inspection within 24 hours following the completion
of that inspection; and
(3) Track inspection records shall be kept available to persons who
performed the inspection and to persons performing subsequent
inspections.
(g) Each track/vehicle performance record required under Sec.
299.337 shall be made available for inspection and copying by the FRA.
Sec. 299.351 Qualifications for track maintenance and inspection
personnel.
(a) General. The railroad shall designate qualified individuals
responsible for the maintenance and inspection of track in compliance
with the safety requirements prescribed in this subpart. Each
designated individual, including contractors and their employees, must
meet the minimum qualifications set forth in this subpart.
(b) Recordkeeping. In addition to the requirements contained in
Sec. 243.203 of this chapter, the railroad shall also maintain, with
respect to the designation of individuals under this subpart, the track
inspection records made by each individual as required by Sec.
299.349.
[[Page 69751]]
Sec. 299.353 Personnel qualified to supervise track restoration and
renewal.
Each individual designated to supervise restorations and renewals
of track, shall have--
(a) Successfully completed a course offered by the employer or by a
college level engineering program, supplemented by special on-the-job
training emphasizing the techniques to be employed in the supervision,
restoration, and renewal of high-speed track;
(b) Demonstrated to the railroad, at least once per calendar year,
that the individual--
(1) Knows and understands the requirements of this subpart that
apply to the restoration and renewal of the track for which he or she
is responsible;
(2) Can detect deviations from those requirements; and
(3) Can prescribe appropriate remedial action to correct or safely
compensate for those deviations.
(c) Written authorization from the railroad or the employer to
prescribe remedial actions to correct or safely compensate for
deviations from the requirements of this subpart and shall have
successfully completed a recorded examination on this subpart as part
of the qualification process.
Sec. 299.355 Personnel qualified to inspect track.
Each individual designated to inspect track for defects, shall
have--
(a) Successfully completed a course offered by the railroad or by a
college level engineering program, supplemented by special on-the-job
training emphasizing the techniques to be employed in the inspection of
high-speed track;
(b) Demonstrated to the railroad, at least once per calendar year,
that the individual--
(1) Knows and understands the requirements of this subpart that
apply to the inspection of the track for which he or she is
responsible;
(2) Can detect deviations from those requirements; and
(3) Can prescribe appropriate remedial action to correct or safely
compensate for those deviations.
(c) Written authorization from the railroad or the employer to
prescribe remedial actions to correct or safely compensate for
deviations from the requirements in this subpart and shall have
successfully completed a recorded examination on this subpart as part
of the qualification process.
Sec. 299.357 Personnel qualified to inspect and restore continuous
welded rail.
Individuals designated under Sec. 299.353 or 299.355 that inspect
continuous welded rail (CWR) or supervise the installation, adjustment,
and maintenance of CWR in accordance with the written procedures
established by the railroad shall have--
(a) Current qualifications under either Sec. 299.353 or 299.355;
(b) Successfully completed a training course of at least eight
hours duration specifically developed for the application of written
CWR procedures issued by the railroad;
(c) Demonstrated to the railroad that the individual--
(1) Knows and understands the requirements of those written CWR
procedures;
(2) Can detect deviations from those requirements; and
(3) Can prescribe appropriate remedial action to correct or
compensate for those deviations safely.
(d) Written authorization from the railroad or the employer to
prescribe remedial actions to correct or safely compensate for
deviations from the requirements in those procedures and must have
successfully completed a recorded examination on those procedures as
part of the qualification process. The recorded examination may be
written, or in the form of a computer file with the results of an
interactive training course.
Subpart D--Rolling Stock
Sec. 299.401 Clearance requirements.
(a) General. The rolling stock shall be designed to meet all
applicable clearance requirements of the railroad. The railroad shall
make its clearance diagrams available to FRA upon request.
(b) Clearance above top of rail. No part or appliance of a trainset
except the wheels, sander tips, wheel guards, and other components
designed to be in the path of the wheel (i.e., above the rail and
aligned inside the wheel width path) may be less than 60 mm (2.36
inches) above the top of rail.
(c) Obstacle deflector. The leading end of a trainset shall be
equipped with an obstacle deflector that extends across both rails of
the track. The minimum clearance above the rail of the obstacle
deflector shall be 76 mm (3 inches), and the maximum clearance shall be
229 mm (9 inches).
(d) Flexible wheel guards. The lead axle of a trainset shall be
equipped with flexible wheel guards mounted on the bogie below the
primary suspension with a maximum clearance above the rail of 15 mm
(0.59 inches).
Sec. 299.403 Trainset structure.
(a) Occupied volume integrity. To demonstrate resistance to loss of
occupied volume, the trainsets shall comply with both the compression
load requirement in paragraph (b) of this section and the dynamic
collision requirements in paragraph (c) of this section.
(b) Compression load requirement. The end compression load shall be
applied to the vehicle as defined in JIS E 7105:2006(E) as amended by
JIS E 7105:2011(E) (all incorporated by reference, see Sec. 299.17),
with an end load magnitude no less than 980 kN (220,300 lbf) without
permanent deformation of the occupied volume.
(c) Dynamic collision scenario. In addition to the requirements of
paragraph (b) of this section, occupied volume integrity shall also be
demonstrated for the trainset through an evaluation of a dynamic
collision scenario in which a moving trainset impacts a proxy object
under the following conditions:
(1) The initially-moving trainset is made up of the equipment
undergoing evaluation at its AW0 ready-to-run weight.
(2) The scenario shall be evaluated on tangent, level track.
(3) The trainset shall have an initial velocity of 32 km/h (20 mph)
and shall not be braked.
(4) The proxy object shall have the following characteristics:
(i) The object shall be a solid circular cylinder that weighs 6350
kg (14,000 pounds);
(ii) The object shall have a width of 914 mm (36 inches) and a
diameter of 1219 mm (48 inches);
(iii) The axis of the cylinder shall be perpendicular to the
direction of trainset motion and parallel to the ground; and
(iv) The center of the object shall be located 762 mm (30 inches)
above the top of the underframe.
(5) Two collision configurations shall be evaluated.
(i) The center of the object shall be located 483 mm (19 inches)
from the longitudinal centerline of the trainset; and
(ii) The center of the object shall be aligned with the side of the
cab car at the point of maximum width.
(6) The model used to demonstrate compliance with the dynamic
collision requirements must be validated. Model validation shall be
demonstrated and submitted to FRA for review and approval.
(7) As a result of the impact described in paragraphs (c)(5)(i) and
(ii) of this section--
(i) One of the following two conditions must be met for the
occupied volume:
[[Page 69752]]
(A) There shall be no more than 254 mm (10 inches) of longitudinal
permanent deformation; or
(B) Global vehicle shortening shall not exceed 1 percent over any
4.6 m (15-feet) length of occupied volume.
(ii) Compliance with each of the following conditions shall also be
demonstrated for the cab after the impact:
(A) Each seat provided for an employee regularly assigned to occupy
the cab, and any floor-mounted seat in the cab, shall maintain a
survival space where there is no intrusion for a minimum of 305 mm (12
inches) from each edge of the seat. Walls or other items originally
within this defined space shall not further intrude more than 38 mm
(1.5 inches) towards the seat under evaluation.
(B) There shall be a clear exit path for the occupants of the cab;
(C) The vertical height of the cab (floor to ceiling) shall not be
reduced by more than 20 percent; and
(D) The operating console shall not have moved closer to the
driver's seat by more than 51 mm (2 inches).
(d) Equipment override. (1) Using the dynamic collision scenarios
described in paragraph (c) of this section, and with all units in the
trainset positioned at their nominal running heights, the anti-climbing
performance shall be evaluated for each of the following sets of
initial conditions:
(2) For the initial conditions specified in paragraphs (c)(1)
through (3) of this section, compliance with the following conditions
shall be demonstrated after a dynamic impact:
(i) The relative difference in elevation between the underframes of
the connected equipment shall not change by more than 102 mm (4
inches); and
(ii) The tread of any wheel of the trainset shall not rise above
the top of rail by more than 102 mm (4 inches).
(e) Roof and side structure integrity. To demonstrate roof and side
structure integrity, each passenger car shall comply with the
following:
(1) Rollover strength. (i) Each passenger car shall be designed to
rest on its side and be uniformly supported at the top and bottom cords
of the vehicle side. The allowable stress in the structural members of
the occupied volumes for this condition shall be one-half yield or one-
half the critical buckling stress, whichever is less. Local yielding to
the outer skin of the passenger car is allowed provided that the
resulting deformations in no way intrude upon the occupied volume of
the car.
(ii) Each passenger car shall also be designed to rest on its roof
so that any damage in occupied areas is limited to roof extrusions.
Other than roof extrusions, the allowable stress in the structural
members of the occupied volumes for this condition shall be one-half
yield or one-half the critical buckling stress, whichever is less.
Local yielding to the outer skin, including the floor structure, of the
car is allowed provided that the resulting deformations in no way
intrude upon the occupied volume of the car. Deformation to the roof
extrusions is allowed to the extent necessary to permit the vehicle to
be supported directly on the top chords of the sides and ends.
(2) Side structure. (i) The sum of the section moduli about a
longitudinal axis, taken at the weakest horizontal section between the
side sill and roof, of the extrusions on each side of the car located
between the inside edge of the doors shall be not less than 3.95 x 105
mm\3\ (24.1 in\3\).
(ii) The sum of the section moduli about a transverse axis, taken
at the weakest horizontal section on each side of the car located
between body corners shall be not less than 2.64 x 105 mm\3\ (16.1
in\3\).
(iii) The minimum section moduli or thicknesses specified in
paragraph (f)(2)(i) of this section shall be adjusted in proportion to
the ratio of the yield strength of the material used to a value of 172
MPa (25 ksi).
(iv) The combined thickness of the skin of the side structure
extrusions shall not be less than 3 mm (0.125 inch) nominal thickness.
The thicknesses shall be adjusted in proportion to the ratio of the
yield strength of the material used to a value of 172 MPa (25 ksi).
(f) Bogie-to-carbody attachment. (1) The bogie-to-carbody
attachment shall utilize the service-proven design as used on the N700.
(2) The bogie shall be securely attached to the carbody and
designed to operate without failure under the operating conditions of
the railroad, including expected mechanical shocks and vibrations.
Sec. 299.405 Trainset interiors.
(a) Interior fittings. Interior fittings of trainsets shall be--
(1) Securely attached and designed to operate without failure under
the conditions typically found in passenger rail equipment including
expected mechanical vibrations, and shock.
(2) To the extent possible, all interior fittings shall be recessed
or flush mounted. Corners and/or sharp edges shall be either avoided or
padded to mitigate the consequence of impact with such surfaces.
(b) Luggage stowage. (1) Luggage stowage racks shall slope downward
in the outboard direction at a minimum ratio of 1:8 with respect to a
horizontal plane to provide lateral restraint for stowed articles.
(2) Luggage stowage compartments shall provide longitudinal
restraint for stowed articles.
Sec. 299.407 Glazing.
(a) General. The railroad shall install glazing systems compliant
with the requirements defined in this section.
(b) Trainset glazing; end-facing. (1) Each end-facing exterior
window of the trainset shall comply with the requirements for large
object and ballistic impact scenarios as defined in this section.
(2) Each end-facing exterior window of the trainset shall
demonstrate compliance with the following requirements for the large
object impact test.
(i) The glazing article shall be impacted with a cylindrical
projectile that complies with the following design specifications as
depicted in Figure 1 to paragraph (b)(2)(i)(D) of this section:
(A) The projectile shall be constructed of aluminum alloy such as
ISO 6362-2:1990, grade 2017A, or its demonstrated equivalent;
(B) The projectile end cap shall be made of steel;
(C) The projectile assembly shall weigh 1 kilogram (kg) (-0, +0.020
kg) or 2.2 lbs (-0, +0.044 lbs) and shall have a hemispherical tip.
Material may be removed from the interior of the aluminum portion to
adjust the projectile mass according to the prescribed tolerance. The
hemispherical tip shall have a milled surface with 1 mm (0.04 inches)
grooves; and
(D) The projectile shall have an overall diameter of 94 mm (3.7
inches) with a nominal internal diameter of 70 mm (2.76 inches).
[[Page 69753]]
[GRAPHIC] [TIFF OMITTED] TR03NO20.006
(ii) The test of the glazing article shall be deemed satisfactory
if the test projectile does not penetrate the glazing article, the
glazing article remains in its frame, and the witness plate is not
marked by spall.
(iii) A new projectile shall be used for each test.
(iv) The glazing article to be tested shall be that which has the
smallest area for each design type. For the test, the glazing article
shall be fixed in a frame of the same construction as that mounted on
the vehicle.
(v) A minimum of four tests shall be conducted and all must be
deemed satisfactory. Two tests shall be conducted with the complete
glazing article at 0 [deg]C 0.5 [deg]C (32 [deg]F 0.9 [deg]F) and two tests shall be conducted with the complete
glazing article at 20 [deg]C 5 [deg]C (68 [deg]F 9 [deg]F). For the tests to be valid it shall be demonstrated
that the core temperature of the complete glazing article during each
test is within the required temperature range.
(vi) The test glazing article shall be mounted at the same angle
relative to the projectile path as it will be to the direction of
travel when mounted on the vehicle.
(vii) The projectile's impact velocity shall equal the maximum
operating speed of the trainset plus 160 km/h (100 mph). The projectile
velocity shall be measured within 4 m (13 feet) of the point of impact.
(viii) The point of impact shall be at the geometrical center of
the glazing article.
(3) Representative samples for large object impact testing of large
end-facing cab glazing articles may be used, instead of the actual
design size provided that the following conditions are met:
(i) Testing of glazing articles having dimensions greater than
1,000 mm by 700 mm (39.4 by 27.6 inches), excluding framing, may be
performed using a flat sample having the same composition as the
glazing article for which compliance is to be demonstrated. The glazing
manufacturer shall provide documentation containing its technical
justification that testing a flat sample is sufficient to verify
compliance of the glazing article with the requirements of this
paragraph.
(ii) Flat sample testing is permitted only if no surface of the
full-size glazing article contains curvature whose radius is less than
2,500 mm (98 inches); and when a complete, finished, glazing article is
laid (convex side uppermost) on a flat horizontal surface, the
distance, (measured perpendicularly to the flat surface) between the
flat surface and the inside face of the glazing article is not greater
than 200 mm (8 inches).
(4) End-facing glazing shall demonstrate sufficient resistance to
spalling, as verified by the large impact
[[Page 69754]]
projectile test under the following conditions:
(i) An annealed aluminum witness plate of maximum thickness 0.15 mm
(0.006 inches) and of dimension 500 mm by 500 mm (19.7 by 19.7 inches)
is placed vertically behind the sample under test, at a horizontal
distance of 500 mm (19.7 inches) from the point of impact in the
direction of travel of the projectile or the distance between the point
of impact of the projectile and the location of the driver's eyes in
the driver's normal operating position, whichever is less. The center
of the witness plate is aligned with the point of impact.
(ii) Spalling performance shall be deemed satisfactory if the
aluminum witness plate is not marked.
(iii) For the purposes of this part, materials used specifically to
protect the cab occupants from spall (i.e., spall shields) shall not be
required to meet the flammability and smoke emission performance
requirements of Sec. 299.413.
(5) Each end-facing exterior window in a cab shall, at a minimum,
provide ballistic penetration resistance that meets the requirements of
appendix A to part 223 of this chapter.
(c) Trainset glazing; side-facing. Except as provided in paragraph
(d) of this section, each side-facing exterior window in a trainset
shall comply with the requirements for Type II glazing as defined in
part 223 of this chapter or other alternative standard approved by FRA.
(d) Side-facing breakable glazing. A side-facing exterior window
intended to be breakable and serve as an emergency egress window may
comply with an alternative standard approved for use by FRA under Sec.
299.15.
(e) Certification of Glazing Materials. Glazing materials shall be
certified in accordance with the following procedures:
(1) Each manufacturer that provides glazing materials, intended by
the manufacturer for use in achieving compliance with the requirements
of this subpart, shall certify that each type of glazing material being
supplied for this purpose has been successfully tested in accordance
with this section and that test verification data are available to the
railroad or to FRA upon request.
(2) Tests performed on glazing materials for compliance with this
part shall be conducted by either--
(i) An independent third party (lab, facility, underwriter); or
(ii) The glazing manufacturer, providing FRA with the opportunity
to witness all tests by written notice, a minimum of 30 days prior to
testing.
(3) Any glazing material certified to meet the requirements of this
part shall be re-certified if any change is made to the glazing that
may affect its mechanical properties or its mounting arrangement on the
vehicle.
(4) All certification/re-certification documentation shall be made
available to FRA upon request. The test verification data shall contain
all pertinent original data logs and documentation that the selection
of material samples, test set-ups, test measuring devices, and test
procedures were performed by qualified individuals using recognized and
acceptable practices and in accordance with this section.
(5) Glazing shall be marked in the following manner:
(i) Each end-facing exterior window in a cab shall be permanently
marked, prior to installation, in such a manner that the marking is
clearly visible after the material has been installed. The marking
shall include:
(A) The words ``FRA TYPE IHS'' to indicate that the material meets
the requirements specified in paragraph (b) of this section;
(B) The manufacturer of the material; and
(C) The type or brand identification of the material.
(ii) Each side-facing exterior window in a trainset shall be
permanently marked, prior to installation, in such a manner that the
marking is clearly visible after the material has been installed. The
marking shall include:
(A) The words ``FRA TYPE II'' to indicate that the material meets
the requirements specified in paragraph (c) of this section;
(B) The manufacturer of the material; and
(C) The type or brand identification of the material.
(f) Glazing securement. Each exterior window shall remain in place
when subjected to--
(1) The forces due to air pressure differences caused when two
trainsets pass at the minimum separation for two adjacent tracks, while
traveling in opposite directions, each trainset traveling at the
maximum approved trainset speed in accordance with Sec. 299.609(g);
and
(2) The impact forces that the exterior window is required to
resist as specified in this section.
Sec. 299.409 Brake system.
(a) General. The railroad shall demonstrate through analysis and
testing the maximum safe operating speed for its trainsets that results
in no thermal damage to equipment or infrastructure during normal
operation of the brake system.
(b) Minimum performance requirement for brake system. Each
trainset's brake system, under the worst-case adhesion conditions as
defined by the railroad, shall be capable of stopping the trainset from
its maximum operating speed within the signal spacing existing on the
track over which the trainset is operating.
(c) Urgent brake system. A trainset shall be provided with an
urgent brake application feature that produces an irretrievable stop.
An urgent brake application shall be available at any time, and shall
be initiated by an unintentional parting of the trainset or by the
trainset crew from the conductor rooms.
(d) Application/release indication. The brake system shall be
designed so that an inspector may determine whether the brake system is
functioning properly without being placed in a dangerous position on,
under or between the equipment. This determination may be made through
automated monitoring system that utilizes sensors to verify that the
brakes have been applied and released.
(e) Passenger brake alarm. (1) A means to initiate a passenger
brake alarm shall be provided at two locations in each unit of a
trainset. The words ``Passenger Brake Alarm'' shall be legibly
stenciled or marked on each device or on an adjacent badge plate.
(2) All passenger brake alarms shall be installed so as to prevent
accidental activation.
(3) When a passenger brake alarm is activated, it shall initiate an
emergency brake application. The emergency brake application can be
overridden by the driver so that the trainset can be stopped at a safe
location.
(4) To retrieve the emergency brake application described in
paragraph (e)(3) of this section, the driver must activate appropriate
controls to issue a command for brake application as specified in the
railroad's operating rules.
(f) Degraded brake system performance. The following requirements
address degraded brake system performance on the railroad's high-speed
trainsets--
(1) Loss of power or failure of regenerative brake shall not result
in exceeding the allowable stopping distance as defined by the
railroad;
(2) The available friction braking shall be adequate to stop the
trainset safely under the operating conditions defined by the railroad;
[[Page 69755]]
(3) The operational status of the trainset brake system shall be
displayed for the driver in the operating cab; and
(4) Under Sec. 299.607(b)(5), the railroad shall demonstrate
through analysis and testing the maximum speed for safely operating its
trainsets using only the friction brake system with no thermal damage
to equipment or infrastructure. The analysis and testing shall also
determine the maximum safe operating speed for various percentages of
operative friction brakes.
(g) Main reservoir system. The main reservoirs in a trainset shall
be designed and tested to meet the requirements set forth in JIS B
8265:2010(E) (incorporated by reference, see Sec. 299.17). Reservoirs
shall be certified based on their size and volume requirements.
(h) Main reservoir tests. Prior to initial installation, each main
reservoir shall be subjected to a pneumatic or hydrostatic pressure
test based on the maximum working pressure defined in paragraph (g) of
this section unless otherwise established by the railroad's mechanical
officer. Records of the test date, location, and pressure shall be
maintained by the railroad for the life of the equipment. Periodic
inspection requirements for main reservoirs shall be defined in the
railroad's inspection, testing, and maintenance program required under
Sec. 299.445.
(i) Brake gauges. All mechanical gauges and all devices providing
electronic indication of air pressure that are used by the driver to
aid in the control or braking of a trainset shall be located so that
they can be conveniently read from the driver's normal position during
operation of the trainset.
(j) Brake application/release. (1) Brake actuators shall be
designed to provide brake pad clearance when the brakes are released.
(2) The minimum brake cylinder pressure shall be established to
provide adequate adjustment from minimum service to emergency for
proper trainset operation.
(k) Leakage. The method of inspection for main reservoir pipe and
brake cylinder pipe leakage shall be prescribed in the railroad's
inspection, testing, and maintenance program required by Sec. 299.445.
(l) Slide alarm. (1) A trainset shall be equipped with an adhesion
control system designed to automatically adjust the braking force on
each wheel to prevent sliding during braking.
(2) A wheel slide alarm that is visual or audible, or both, shall
alert the driver in the operating cab to wheel-slide conditions on any
axle of the trainset.
(3) Operating restrictions for a trainset with wheel slide
protection devices that are not functioning as intended shall be
defined by the railroad under its requirements for movement of
defective equipment required by Sec. 299.447, and within the
railroad's operating rules, as appropriate.
(m) Monitoring and diagnostic system. Each trainset shall be
equipped with a monitoring and diagnostic system that is designed to
assess the functionality of the brake system for the entire trainset
automatically. Details of the system operation and the method of
communication of brake system functionality prior to the dispatch of
the trainset shall be described in detail in the railroad's Operating
Rules and inspection, testing, and maintenance program required by
Sec. 299.445.
(n) Trainset securement. Each trainset shall be equipped with a
means of securing the equipment, independent of the friction brake, on
the grade condition defined by the railroad. The railroad's operating
rules shall define procedures for trainset securement and the railroad
shall demonstrate that these procedures effectively secure the
equipment in accordance with Sec. 299.607(b)(5).
(o) Rescue operation; brake system. A trainset's brake system shall
be designed so as to allow a rescue vehicle or trainset to control its
brakes when the trainset is disabled.
Sec. 299.411 Bogies and suspension system.
(a) Wheel climb. (1) Suspension systems shall be designed to
reasonably prevent wheel climb, wheel unloading, rail rollover, rail
shift, and a vehicle from overturning to ensure safe, stable
performance and ride quality. These requirements shall be met--
(i) In all operating environments, and under all track conditions
and loading conditions as determined by the railroad; and
(ii) At all track speeds and over all track qualities consistent
with the requirements in subpart C of this part, up to the maximum
trainset speed and maximum cant deficiency of the equipment in
accordance with Sec. 299.609(g).
(2) All passenger equipment shall meet the safety performance
standards for suspension systems contained in Sec. 299.609(h). In
particular--
(i) Vehicle/track system qualification. All trainsets shall
demonstrate safe operation during vehicle/track system qualification in
accordance with Sec. 299.609 and is subject to the requirements of
Sec. 299.315.
(ii) Revenue service operation. All passenger equipment in service
is subject to the requirements of Sec. 299.315.
(b) Lateral accelerations. The trainsets shall not operate under
conditions that result in a steady-state lateral acceleration greater
than 0.15g, as measured parallel to the car floor inside the passenger
compartment.
(c) Journal bearing overheat sensors. Bearing overheat sensors
shall be provided on all journal bearings on each trainset.
Sec. 299.413 Fire safety.
(a) General. All materials used in constructing the interior of the
trainset shall meet the flammability and smoke emission characteristics
and testing standards contained in appendix B to part 238 of this
chapter. For purposes of this section, the interior of the trainset
includes walls, floors, ceilings, seats, doors, windows, electrical
conduits, air ducts, and any other internal equipment.
(b) Certification. The railroad shall require certification that a
representative sample of combustible materials to be--
(1) Used in constructing a passenger car or a cab, or
(2) Introduced in a passenger car or a cab, as part of any kind of
rebuild, refurbishment, or overhaul of the car or cab, has been tested
by a recognized independent testing laboratory and that the results
show the representative sample complies with the requirements of
paragraph (a) of this section at the time it was tested.
(c) Fire safety analysis. The railroad shall ensure that fire
safety considerations and features in the design of the trainsets
reduce the risk of personal injury caused by fire to an acceptable
level in its operating environment using a formal safety methodology.
To this end, the railroad shall complete a written fire safety analysis
for the passenger equipment being procured. In conducting the analysis,
the railroad shall--
(1) Identify, analyze, and prioritize the fire hazards inherent in
the design of the equipment.
(2) Take effective steps to design the equipment and select
materials which help provide sufficient fire resistance to reasonably
ensure adequate time to detect a fire and safely evacuate the
passengers and crewmembers, if a fire cannot be prevented. Factors to
consider include potential ignition sources; the type, quantity, and
location of the materials; and availability of rapid and safe egress to
the exterior of the equipment under conditions secure from fire, smoke,
and other hazards.
[[Page 69756]]
(3) Reasonably ensure that a ventilation system in the equipment
does not contribute to the lethality of a fire.
(4) Identify in writing any trainset component that is a risk of
initiating fire and which requires overheat protection. An overheat
detector shall be installed in any component when the analysis
determines that an overheat detector is necessary.
(5) Identify in writing any unoccupied trainset compartment that
contains equipment or material that poses a fire hazard, and analyze
the benefit provided by including a fire or smoke detection system in
each compartment so identified. A fire or smoke detector shall be
installed in any unoccupied compartment when the analysis determines
that such equipment is necessary to ensure sufficient time for the safe
evacuation of passengers and crewmembers from the trainset. For
purposes of this section, an unoccupied trainset compartment means any
part of the equipment structure that is not normally occupied during
operation of the trainset, including a closet, baggage compartment,
food pantry, etc.
(6) Determine whether any occupied or unoccupied space requires a
portable fire extinguisher and, if so, the proper type and size of the
fire extinguisher for each location. As required by Sec. 239.101 of
this chapter, each passenger car is required to have a minimum of one
portable fire extinguisher. If the analysis performed indicates that
one or more additional portable fire extinguishers are needed, such
shall be installed.
(7) Analyze the benefit provided by including a fixed, automatic
fire-suppression system in any unoccupied trainset compartment that
contains equipment or material that poses a fire hazard, and determine
the proper type and size of the automatic fire-suppression system for
each such location. A fixed, automatic fire-suppression system shall be
installed in any unoccupied compartment when the analysis determines
that such equipment is practical and necessary to ensure sufficient
time for the safe evacuation of passengers and crewmembers from the
trainset.
(8) Explain how safety issues are resolved in the design of the
equipment and selection of materials to reduce the risk of each fire
hazard.
(9) Describe the analysis and testing necessary to demonstrate that
the fire protection approach taken in the design of the equipment and
selection of materials meets the fire protection requirements of this
part.
(d) Inspection, testing, and maintenance. The railroad shall
develop and adopt written procedures for the inspection, testing, and
maintenance of all fire safety systems and fire safety equipment on the
passenger equipment it operates under Sec. 299.445(b), and subpart G
of this part. The railroad shall comply with those procedures that it
designates as mandatory for the safety of the equipment and its
occupants.
Sec. 299.415 Doors.
(a) Each powered, exterior side door in a vestibule that is
partitioned from the passenger compartment of a trainset shall have a
manual override device that is--
(1) Capable of releasing the door to permit it to be opened without
power.
(2) Located such that--
(i) Interior access is provided adjacent to each manual door
release mechanism; and,
(ii) Exterior access is provided on each side of each car.
(3) Designed and maintained so that a person may access and operate
the override device readily without requiring the use of a tool or
other implement.
(4) The railroad may protect a manual override device used to open
a powered, exterior door with a cover or a screen.
(5) When a manual override device is activated, door panel
friction, including seals and hangers, shall allow the doors to be
opened or closed manually with as low a force as practicable.
(6) The emergency release mechanism shall require manual reset.
(b) Each passenger car shall have a minimum of one exterior side
door per side. Each such door shall provide a minimum clear opening
with dimensions of 813 mm (32 inches) horizontally by 1,850 mm (72.8
inches) vertically.
(c) Door exits shall be marked, and instructions provided for their
use, as specified in Sec. 299.423.
(d) All doors intended for access by emergency responders shall be
marked, and instructions provided for their use, as specified in Sec.
299.423.
(e) Vestibule doors and other interior doors intended for passage
through a passenger car.
(1) General. Except for a door providing access to a control
compartment each powered vestibule door and any other powered interior
door intended for passage through a passenger car shall have a manual
override device that conforms with the requirements of paragraphs
(e)(2) and (3) of this section.
(2) Manual override devices. Each manual override device shall be:
(i) Capable of releasing the door to permit it to be opened without
power;
(ii) Located adjacent to the door it controls; and
(iii) Designed and maintained so that a person may readily access
and operate the override device from each side of the door without the
use of a tool or other implement.
(3) Marking and instructions. Each manual override device and each
retention mechanism shall be marked, and instructions provided for
their use, as specified in Sec. 299.423.
(f) The status of each powered, exterior side door in a passenger
car shall be displayed to the driver in the operating cab. Door
interlock sensors shall be provided to detect trainset motion and shall
be nominally set to operate at 5 km/h.
(g) All powered exterior side passenger doors shall--
(1) Be equipped with the service-proven door safety system utilized
by the N700 or an alternate door safety system designed subject to a
Failure Modes, Effects, Criticality Analysis (FMECA);
(2) Be designed with an obstruction detection system capable of
detecting a rigid flat bar, 6.4 mm (\1/4\ inches) wide and 76 mm (3
inches) high and a rigid rod, 9.5 mm (\3/8\ inches) in diameter;
(3) Incorporate an obstruction detection system sufficient to
detect large obstructions;
(4) Be designed so that activation of a door by-pass feature does
not affect the operation of the obstruction detection system on all the
other doors on the trainset;
(5) Have the door control station located in a secured area that is
only accessible to crewmembers or maintenance personnel;
(6) Be designed such that the door open or closed circuit is not
affected by the throttle position; and
(7) Use discrete, dedicated trainlines for door-open and door-close
commands, door-closed summary circuit, and no motion, if trainlined.
(h) All powered exterior side door systems in a trainset shall--
(1) Be designed with a door summary circuit. The door summary
circuit shall be connected or interlocked to prohibit the trainset from
developing tractive power if an exterior side door in a passenger car,
other than a door under the direct physical control of a crewmember for
his or her exclusive use, is not closed;
(2) Be connected to side door status indicators located on the
exterior of each unit of the trainset;
(3) Be connected to a door summary status indicator that is readily
viewable to the driver from his or her normal position in the operating
cab;
[[Page 69757]]
(4) If equipped with a trainset-wide door by-pass device, be
designed so that the trainset-wide door by-pass functions only when
activated from the operating cab of the trainset;
(5) Be equipped with a lock (cut-out/lock-out) mechanism installed
at each door panel to secure a door in the closed and locked position.
When the lock mechanism is utilized to secure the door in the closed
position, a door-closed indication shall be provided to the door
summary circuit; and
(6) Be designed such that a crew key or other secure device be
required to lock-out an exterior side door to prevent unauthorized use.
(i)(1) Visual inspections and functional tests. The inspection and
functional tests required for the door safety system, including the
trainset-wide door by-pass verification, shall be conducted in
accordance with the railroad's trainset inspection, testing, and
maintenance program in accordance with Sec. 299.445, and operating
rules under subpart E.
(2) Face-to-face relief. Crewmembers taking control of a trainset
do not need to perform a visual inspection or a functional test of the
door by-pass devices in cases of face-to-face relief of another
trainset crew and notification by that crew as to the functioning of
the door by-pass devices.
(j) The railroad shall maintain a record of each door by-pass
activation and each unintended opening of a powered exterior side door,
including any repair(s) made, in the defect tracking system as required
by Sec. 299.445(h).
Sec. 299.417 Emergency lighting.
(a) General. Emergency lighting shall be provided in each unit of a
trainset. The emergency lighting system shall be designed to facilitate
the ability of passengers and trainset crew members, and/or emergency
responders to see and orient themselves, to identify obstacles, in
order to assist them to safely move through and out of a passenger rail
car.
(1) Emergency lighting shall illuminate the following areas:
(i) Passenger car aisles, passageways, and toilets;
(ii) Door emergency exit controls/manual releases;
(iii) Vestibule floor near the door emergency exits (to facilitate
safe entrance/exit from the door);
(iv) Within the car diaphragm and adjacent area; and
(v) Specialty car locations such as crew offices.
(b) Minimum illumination levels. (1) A minimum, average
illumination level of 10.7 lux (1 foot-candle) measured at floor level
adjacent to each exterior door and each interior door providing access
to an exterior door (such as a door opening into a vestibule);
(2) A minimum, average illumination level of 10.7 lux (1 foot-
candle) measured 635 mm (25 inches) above floor level along the center
of each aisle and passageway;
(3) A minimum illumination level of 1.1 lux (0.1 foot-candle)
measured 635 mm (25 inches) above floor level at any point along the
center of each aisle and passageway;
(c) Lighting activation. Each emergency lighting fixture shall
activate automatically or be energized continuously whenever the car is
in revenue service and normal lighting is not available.
(d) Independent power source. Emergency lighting system shall have
an independent power source(s) that is located in or within one half a
car length of each light fixture it powers.
(e) Functional requirements. Emergency lighting system components
shall be designed to operate without failure and capable of remaining
attached under the conditions typically found in passenger rail
equipment including expected mechanical vibrations, and shock in
accordance with Sec. 299.405(a)(1), as well as comply with
electromagnetic interference criteria in Sec. 299.435(e).
(1) All emergency lighting system components shall be capable to
operate in all railcar orientations.
(2) All emergency lighting system components shall be capable to
operate when normal power is unavailable for 90 minutes without a loss
of more than 40% of the minimum illumination levels specified in
paragraph (b) of this section.
(f) Inspection. (1) The railroad shall inspect the emergency
lighting system as required by its inspection, testing, and maintenance
program in accordance with Sec. 299.445.
(2) If batteries are used as independent power sources, they shall
have automatic self-diagnostic modules designed to perform discharge
tests.
Sec. 299.419 Emergency communication.
(a) PA (public address) system. Each passenger car shall be
equipped with a PA system that provides a means for a trainset
crewmember to communicate by voice to passengers of his or her trainset
in an emergency situation. The PA system shall also provide a means for
a trainset crewmember to communicate by voice in an emergency situation
to persons in the immediate vicinity of his or her trainset (e.g.,
persons on the station platform). The PA system may be part of the same
system as the intercom system.
(b) Intercom system. Each passenger car shall be equipped with an
intercom system that provides a means for passengers and crewmembers to
communicate by voice with each other in an emergency situation. Except
as further specified, at least one intercom that is accessible to
passengers without using a tool or other implement shall be located in
each end (half) of each car.
(c) Marking and instructions. The following requirements apply to
all units of a trainset:
(1) The location of each intercom intended for passenger use shall
be conspicuously marked with HPPL material in accordance with Sec.
299.423; and
(2) Legible and understandable operating instructions shall be made
of HPPL material in accordance with Sec. 299.423 and posted at or near
each such intercom.
(d) Back-up power. PA and intercom systems shall have a back-up
power system capable of--
(1) Powering each system to allow intermittent emergency
communication for a minimum period of 90 minutes. Intermittent
communication shall be considered equivalent to continuous
communication during the last 15 minutes of the 90-minute minimum
period; and
(2) Operating in all equipment orientations within 90 degrees of
vertical.
(e) Additional requirements. The PA and intercom systems shall be
designed to operate without failure and remain attached under the
conditions typically found in passenger rail equipment including
expected mechanical vibrations, and shock in accordance with Sec.
299.405(a)(1), as well as comply with electromagnetic interference
criteria in Sec. 299.435(e).
Sec. 299.421 Emergency roof access.
(a) Number and dimensions. Each passenger car shall have a minimum
of two emergency roof access locations, each providing a minimum
opening of 660 mm (26 inches) longitudinally (i.e., parallel to the
longitudinal axis of the car) by 610 mm (24 inches) laterally.
(b) Means of access. Emergency roof access shall be provided by
means of a conspicuously marked structural weak point in the roof for
access by properly equipped emergency response personnel.
(c) Location. Emergency roof access locations shall be situated so
that when a car is on its side--
(1) One emergency access location is situated as close as
practicable within
[[Page 69758]]
each half of the roof as divided top from bottom; and
(2) One emergency access location is situated as close as
practicable within each half of the roof as divided left from right.
(See Figure 1 to this paragraph.)
[GRAPHIC] [TIFF OMITTED] TR03NO20.007
(d) Obstructions. The ceiling space below each emergency roof
access location shall be free from wire, cabling, conduit, and piping.
This space shall also be free of any rigid secondary structure (e.g., a
diffuser or diffuser support, lighting back fixture, mounted PA
equipment, or luggage rack) where practicable. It shall be permissible
to cut through interior panels, liners, or other non-rigid secondary
structures after making the cutout hole in the roof, provided any such
additional cutting necessary to access the interior of the vehicle
permits a minimum opening of the dimensions specified in paragraph (a)
of this section to be maintained.
(e) Marking instructions. Each emergency roof access location shall
be conspicuously marked with retroreflective material of contrasting
color meeting the minimum requirements specified in Sec. 299.423.
Legible and understandable instructions shall be posted at or near each
such location.
Sec. 299.423 Markings and instructions for emergency egress and
rescue access.
(a) General. Instructions and markings shall be provided in each
unit of a trainset in accordance with the minimum requirements of this
section to provide instructions for passengers and trainset crewmembers
regarding emergency egress, and rescue access instructions for
emergency responders.
(b) Visual identity and recognition. Emergency exit signage/marking
systems shall enable passengers and trainset crewmembers to make
positive identification of emergency exits.
(1) Each interior emergency exit sign and emergency exit locator
sign shall be conspicuous (i.e., clearly recognizable/distinguishable)
or become conspicuous to passengers and trainset crewmembers
immediately and automatically upon the loss of power for normal
lighting, from a minimum distance of 1.52 m (5 feet).
(2) The signs and markings shall operate independently of the car's
normal and emergency lighting systems, for a minimum of 90 minutes
after loss of all power for normal lighting.
(3) An emergency exit locator sign shall be located in close
proximity of each emergency exit and shall work in conjunction with the
emergency exit sign. The location of the sign, directional arrow(s), or
wording shall guide passengers and trainset crewmembers to the
emergency exit route.
(c) Rescue access signage/marking systems. (1) Rescue access
signage and marking systems shall enable emergency responders to make
positive identification of rescue access points.
(2) Rescue access information for emergency responders placed on
the exterior of the carbody shall, at a minimum, consist of the
following:
(i) Each door intended for use by emergency responders for rescue
access shall be identified with emergency access signs, symbols, or
other conspicuous marking consisting of retroreflective material that
complies with paragraphs (d) and (e) of this section.
(ii) Rescue access door control locator signs/markings and
instructions;
(A) Each door intended for use by emergency responders for rescue
access shall have operating instructions for opening the door from
outside the car placed on or immediately adjacent to the door on the
carbody. If a power door does not function with an integral release
mechanism, the instructions shall indicate the location of the exterior
manual door control.
(B) Each power door intended for use by emergency responders for
rescue access which has a non-integral release mechanism located away
from the door, shall have a door control sign/marking placed at the
location of this control that provides instructions for emergency
operation, either as part of the access sign/marking or as another
sign/marking.
(C) Each car equipped with manual doors shall have operating
instructions for opening the door from the exterior, either as part of
the access sign/marking or as another sign/marking.
(iii) Rescue access window locator signs/markings and instructions;
and
(A) Each rescue access window shall be identified with a unique
retroreflective and easily recognizable sign, symbol, or other
conspicuous marking that complies with paragraphs (d) and (e) of this
section.
(B) Signs, symbols, or marking shall be placed at the bottom of
each such window, on each window, or adjacent
[[Page 69759]]
to each window, utilizing arrows, where necessary, to clearly designate
rescue assess window location. Legible and understandable window-access
instructions, including any pictogram/instructions for removing the
window, shall be posted at or near each rescue access window.
(iv) Roof access locator signs/markings and instructions.
(A) The location of each emergency access point provided on the
roof of a passenger car shall be clearly marked with retroreflective
material of contrasting color that complies with paragraphs (d) and (e)
of this section.
(B) Legible and understandable instructions shall be posted at or
near each such location.
(C) If emergency roof access is provided by means of a structural
weak point:
(1) The retroreflective material shall clearly mark the line along
which the roof skin shall be cut; and
(2) A sign plate with a retroreflective border shall also state:
CAUTION--DO NOT USE FLAME CUTTING DEVICES.
CAUTION--WARN PASSENGERS BEFORE CUTTING.
CUT ALONG DASHED LINE TO GAIN ACCESS.
ROOF CONSTRUCTION--[STATE RELEVANT DETAILS].
(d) Color contrast. Exterior signs/markings shall provide luminance
contrast ratio of not less than 0.5, as measured by a color-corrected
photometer.
(e) Materials--(1) Retroreflective material. Exterior emergency
rescue access locator signs/markings shall be constructed of
retroreflective material that conforms to the specifications for Type I
material sheeting, as specified in ASTM D 4956-07 [egr]\1\
(incorporated by reference, see Sec. 299.17), as tested in accordance
with ASTM E 810-03 (incorporated by reference, see Sec. 299.17).
(2) HPPL materials. All HPPL materials used in finished component
configurations shall comply with the minimum luminance criterion of 7.5
mcd/m\2\ after 90 minutes when tested according to the provisions of
ASTM E 2073-07 (incorporated by reference, see Sec. 299.17), with the
following three modifications:
(i) Activation. The HPPL material shall be activated with a
fluorescent lamp of 40W or less and a color temperature of 4000-4500K
that provides no more than 10.7 lux (1 fc) of illumination as measured
on the material surface. The activation period shall be for no more
than 60 minutes.
(ii) Luminance. The photopic luminance of all specimens of the HPPL
material shall be measured with a luminance meter as defined in section
5.2 of ASTM E 2073-07, a minimum of 90 minutes after activation has
ceased.
(iii) Luminance in mcd/m\2\. The test report shall include a
luminance measurement 90 minutes after activation has ceased.
(f) Recordkeeping. (1) The railroad shall retain a copy of the car
manufacturer/supplier provided independent laboratory certified test
report results showing that the illuminance or luminance measurements,
as appropriate, on the active area of the signage/marking component.
Such records shall be kept until all cars with those components are
retired, transferred, leased, or conveyed to another railroad for use
in revenue service. A copy of such records shall be transferred to the
accepting railroad along with any such cars.
(2) The railroad shall retain a copy of the railroad-approved
illuminance test plan(s) and test results until the next periodic test,
or other test specified in accordance with the railroad's inspection,
testing, and maintenance program is conducted on a representative car/
area, or until all cars of that type are retired, or are transferred,
leased, or conveyed to another railroad. A copy of such records shall
be transferred to the accepting railroad along with such car(s).
(3) The railroad shall retain a copy of the certified independent
laboratory test report results that certify that the retroreflective
material complies with Type I materials per ASTM D-4956-07 [egr]\1\
until all cars containing the retroreflective material are retired, or
are transferred, leased, or conveyed to another railroad. A copy of
such records shall be provided to the accepting railroad along with any
car(s) that are transferred, leased, or conveyed.
Sec. 299.425 Low-location emergency exit path marking.
(a) General. Low-location emergency exit path marking (LLEEPM)
shall be provided in each unit of a trainset. The LLEEPM system shall
be designed to identify the location of primary door exits and the exit
path to be used to reach such doors by passengers and trainset
crewmembers under conditions of darkness when normal and emergency
sources of illumination are obscured by smoke or are inoperative.
(b) Visual identity and recognition. The LLEEPM system shall be
conspicuous (i.e., clearly recognizable/distinguishable), or become
conspicuous immediately and automatically from a low-location upon loss
of power for normal lighting, and under the minimum general emergency
light illumination levels as specified in Sec. 299.423.
(c) Signage and markings. At a minimum, the LLEEPM system shall
have the following three components:
(1) Primary door exit signs. (i) Each primary door exit shall be
clearly marked with an exit sign;
(ii) The exit sign shall be visible from a low-location from the
exit along the exit path; and
(iii) Each exit sign shall be located on or immediately adjacent to
each door and placed between 152.4 and 457.2 mm (6 and 18 inches) above
the floor.
(2) Primary door exit marking/delineators. (i) The location of the
exit path shall be marked using electrically powered (active) marking/
delineators or light fixtures, HPPL (passive) marking/delineators or a
combination of these two systems.
(ii) The requirements in this section apply for both electrical and
HPPL components, whether installed on the walls, floors, or seat
assemblies.
(iii) Each primary door shall be marked on or around the door's
operating handle.
(3) Exit path marking/delineators. (i) The marking/delineator
components shall be positioned so as to identify an exit path to all
primary exits that is clearly visible and easily recognizable from any
seat or compartment in the trainset, when normal lighting and emergency
lighting are unavailable in conditions of darkness and/or smoke.
(ii) Markings/delineators shall be located on the floor or no
higher than 457.2 mm (18 inches) on the seat assembly, or walls/
partitions of aisles, and/or passageways.
(iii) Changes in the direction of the exit path shall be indicated
by the LLEEPM and be placed within 102 mm (4 inches) of the corner of
the exit path.
(d) Material--(1) HPPL passive systems. HPPL strip marking/
delineator material used for LLEEPM components shall be capable of
providing a minimum luminance level of 7.5 mcd/m\2\, measured 90
minutes after normal power has ceased.
(2) Electroluminescent marking/delineator strips. The luminance
value of the electroluminescent (EL) marking/delineator strip shall be
at least 1,000 mcd/m\2\, as measured on the strip surface.
(e) Conspicuity of markings. LLEEPM signs shall comply with the
text, color and respective illuminance or luminance requirements
specified in Sec. 299.423 and in this section.
[[Page 69760]]
(f) Emergency performance duration. The LLEEPM system shall operate
independently of the car's normal and emergency lighting systems for 90
minutes after loss of all power for normal lighting.
(g) Recordkeeping. (1) The railroad shall retain a copy of the car
manufacturer/supplier provided certified independent laboratory test
report results showing that the illuminance or luminance measurements,
as appropriate, on the active area of the signage/marking/delineator
component comply with the criteria specified in Sec. 299.423 and in
this section.
(2) The railroad shall retain a copy of the railroad-approved
illuminance test plan(s) and test results until the next periodic test,
or other test specified in accordance with the railroad's inspection,
testing, and maintenance program and ensure that tests are conducted on
a representative car, or until all cars of that type are retired,
transferred, leased, or conveyed to another railroad. A copy of such
records shall be provided to the accepting railroads along with any
car(s) that are transferred, leased, or conveyed.
(3) Illegible, broken, damaged, missing, or non-functioning
components of the LLEEPM system, including the normal and emergency
power systems, shall be reported and repaired in accordance with the
railroad's inspection, testing, and maintenance program as specified in
Sec. 299.445.
Sec. 299.427 Emergency egress windows.
(a) Number and location. Each unit in a trainset shall have a
minimum of four emergency egress windows. At least one emergency egress
window shall be located in each side of each end (half) of the car, in
a staggered configuration where practicable. (See Figure 1 to this
paragraph.)
[GRAPHIC] [TIFF OMITTED] TR03NO20.008
(b) Ease of operability. Each emergency egress window shall be
designed to permit rapid and easy removal from the inside of the car
during an emergency situation using a hammer designed to break the
glazing that shall be located adjacent to each emergency egress window.
The railroad shall inspect for the presence of the emergency hammers
each day prior to the trainset being placed into service in accordance
with Sec. 299.711(b).
(c) Dimensions. Except as provided in paragraph (f) of this
section, each emergency egress window in a passenger car shall have an
unobstructed opening with minimum dimensions of 660 mm (26 inches)
horizontally by 610 mm (24 inches) vertically. A seatback is not an
obstruction if it can be moved away from the window opening without
using a tool or other implement.
(d) Marking and instructions. (1) Each emergency egress window
shall be conspicuously and legibly marked with luminescent material on
the inside of each car to facilitate passenger egress as specified in
Sec. 299.423.
(2) Legible and understandable operating instructions, including
instructions for removing the emergency egress window shall be made of
luminescent material, shall be posted at or near each such emergency
egress window as specified in Sec. 299.423.
(e) Obstructions. If emergency egress window removal may be
hindered by the presence of a seatback, headrest, luggage rack, or
other fixture, the instructions shall state the method for allowing
rapid and easy removal of the emergency egress window, taking into
account the fixture(s), and this portion of the instructions may be in
written or pictorial format.
(f) Additional emergency egress windows. Any emergency egress
window in addition to the minimum number required by paragraph (a) of
this section that has been designated for use by the railroad need not
comply with the minimum dimension requirements in paragraph (c) of this
section, but must otherwise comply with all requirements in this
subpart applicable to emergency egress windows.
Sec. 299.429 Rescue access windows.
(a) General. Each emergency egress window required by Sec. 299.427
shall also serve as a means of rescue access.
(b) Ease of operability. Each rescue access window must be capable
of being removed without unreasonable delay by an emergency responder
using tools or implements that are commonly available to the responder
in a passenger trainset emergency.
(c) Marking and instructions. (1) Each rescue access window shall
be marked with retroreflective material on the exterior of each car as
specified in Sec. 299.423. A unique and easily recognizable symbol,
sign, or other conspicuous marking shall also be used to identify each
such window.
(2) Legible and understandable window-access instructions,
including
[[Page 69761]]
instructions for removing the window, shall be posted at or near each
rescue access window as specified in Sec. 299.423.
Sec. 299.431 Driver's controls and cab layout.
(a) Driver controls and cab layout. Driver controls and cab layout
shall replicate that used in the N700, unless otherwise approved by
FRA.
(b) Cab seating. Each seat provided for an employee regularly
assigned to occupy a cab and any floor-mounted seat in the cab shall be
securely attached in accordance with Sec. 299.405.
(c) Cab interior surface. Sharp edges and corners shall be
eliminated from the interior of the cab, and interior surfaces of the
cab likely to be impacted by an employee during a collision or
derailment shall be padded with shock-absorbent material.
(d) Cab securement. Trainset interior cab doors shall be equipped
with the following:
(1) A secure and operable device to lock the door from the outside
that does not impede egress from the cab; and
(2) A securement device on each cab door that is capable of
securing the door from inside of the cab.
(e) Cab glazing serviceability. End-facing cab windows of the lead
trainset cab shall be free of cracks, breaks, or other conditions that
obscure the view of the right-of-way for the crew from their normal
position in the cab.
(f) Floors of cabs, passageways, and compartments. Floors of cabs,
passageways, and compartments shall be kept free from oil, water, waste
or any obstruction that creates a slipping, tripping or fire hazard.
Floors shall be properly treated to provide secure footing.
(g) Cab environmental control. Each lead cab in a trainset shall be
heated and air conditioned. The HVAC system shall be inspected and
maintained to ensure that it operates properly and meets the railroad's
performance standard which shall be defined in the inspection, testing,
and maintenance program.
(h) Trainset cab noise. Performance standards for the railroad's
trainsets--
(1) The average noise levels in the trainset cab shall be less than
or equal to 85 dB(A) when the trainset is operating at maximum approved
trainset speed as approved under Sec. 299.609(g). Compliance with this
paragraph (h)(1) shall be demonstrated during the pre-revenue service
system integration testing as required by Sec. 299.607.
(2) The railroad shall not make any alterations during maintenance
or modifications to the cab, that cause the average sound level to
exceed the requirements in paragraph (h)(1) of this section.
(3) The railroad or manufacturer shall follow the test protocols
set forth in appendix B to this part to determine compliance with
paragraph (h)(1) of this section, and, to the extent reasonably
necessary to evaluate the effect of alterations during maintenance, to
determine compliance with paragraph (h)(2) of this section.
(i) Maintenance of trainset cabs. (1) If the railroad receives an
excessive noise report, and if the condition giving rise to the noise
is not required to be immediately corrected under this part, the
railroad shall maintain a record of the report, and repair or replace
the item identified as substantially contributing to the noise:
(i) On or before the next periodic inspection required by the
railroad's inspection, testing, and maintenance program under subpart
G; or
(ii) If the railroad determines that the repair or replacement of
the item requires significant shop or material resources that are not
readily available, at the time of the next major equipment repair
commonly used for the particular type of maintenance needed.
(2) The railroad has an obligation to respond to an excessive noise
report that a trainset-cab-occupant files. The railroad meets its
obligation to respond to an excessive noise report, as set forth in
paragraph (i)(1) of this section, if the railroad makes a good faith
effort to identify the cause of the reported noise, and where the
railroad is successful in determining the cause, if the railroad
repairs or replaces the items that cause the noise.
(3)(i) The railroad shall maintain a written or electronic record
of any excessive noise report, inspection, test, maintenance,
replacement, or repair completed pursuant to paragraph (i) of this
section, and the date on which that inspection, test, maintenance,
replacement, or repair occurred. If the railroad elects to maintain an
electronic record, the railroad must satisfy the conditions listed in
Sec. 299.11.
(ii) The railroad shall retain these records for a period of one
year.
(iii) The railroad shall establish an internal, auditable,
monitorable system that contains these records.
(j) Trainset sanitation facilities for employees. Sanitation
facilities shall be provided for crewmembers either:
(1) On the trainset, that meet otherwise applicable sanitation
standards, which are accessible at frequent intervals during the course
of their work shift; or
(2) Ready access to railroad-provided sanitation facilities outside
of the trainset.
(k) Speed indicators. (1) Each trainset controlling cab shall be
equipped with a speed indicator which is--
(i) Accurate within 2 km/h (1.24 miles per hour) for
speed lower than 30 km/h (18.6 miles per hour), then increasing
linearly up to 12 km/h (7.5 miles per hour) at 500 km/h
(311 miles per hour); and
(ii) Clearly readable from the driver's normal position under all
light conditions.
(2) The speed indicator shall be based on a system of independent
on-board speed measurement sources guaranteeing the accuracy level
specified in paragraph (a)(1) of this section under all operational
conditions. The system shall be automatically monitored for
inconsistencies and the driver shall be automatically notified of any
inconsistency potentially compromising this accuracy level.
(3) The speed indicator shall be calibrated periodically as defined
in the railroad's inspection, testing, and maintenance program.
(l) Cab lights. (1) Each trainset cab shall have cab lights which
will provide sufficient illumination for the control instruments,
meters, and gauges to enable the driver to make accurate readings from
his or her normal positions in the cab. These lights shall be located,
constructed, and maintained so that light shines only on those parts
requiring illumination and does not interfere with the driver's vision
of the track and signals. Each trainset cab shall also have a
conveniently located light that can be readily turned on and off by the
driver operating the trainset and that provides sufficient illumination
for them to read trainset orders and timetables.
(2) Cab passageways and compartments shall be illuminated.
Sec. 299.433 Exterior lights.
(a) Headlights. Each leading end of a trainset shall be equipped
with two or more headlights.
(1) Each headlight shall produce 80,000 candela.
(2) Headlights shall be arranged to illuminate signs in the right-
of-way.
(3) Headlights shall be recognized 600 m (1,968 feet) ahead of the
cab car by a driver in another trainset or a maintenance person
standing in the right-of-way under clear weather conditions.
(b) Taillights (marking devices). (1) The trailing end of the
trainset shall be equipped with two red taillights;
(2) Each taillight shall be located at least 1.2 m (3.9 feet) above
rail;
[[Page 69762]]
(3) Each taillight shall be recognizable 200 m (656 feet) ahead of
the cab car by a driver in another trainset or a maintenance person
standing in the right-of-way under clear weather conditions;
(4) Taillights of the trailing end of the trainset shall be on when
the trainset is in operation;
(5) Taillights shall not be on in the direction of trainset travel,
except if the driver shall re-position the trainset in a station. Such
re-positioning operations shall be done in accordance with the
railroad's operating rules; and
(6) In an emergency situation, the headlight on the rear of the
trainset may serve as the taillights in accordance with the railroad's
operating rules.
Sec. 299.435 Electrical system design.
(a) Overhead collector systems. (1) Pantographs shall be so
arranged that they can be operated from the driver's normal position in
the cab. Pantographs that automatically rise when released shall have
an automatic locking device to secure them in the down position.
(2) Each overhead collector system, including the pantograph, shall
be equipped with a means to electrically ground any uninsulated parts
to prevent the risk of electrical shock when working on the system.
(3) Means shall be provided to permit the driver to determine that
the pantograph is in its lowest position, and for securing the
pantograph if necessary, without the need to mount the roof of the
trainset.
(4) Each trainset equipped with a pantograph operating on an
overhead collection system shall also be equipped with a means to
safely lower the pantograph in the event of an emergency. If an
emergency pole is used for this purpose, that part of the pole which
can be safely handled shall be marked to so indicate. This pole shall
be protected from moisture and damage when not in use. Means of
securement and electrical isolation of a damaged pantograph, when it
cannot be performed automatically, shall be addressed in the railroad's
operating rules.
(b) Circuit protection. (1) Each auxiliary circuit shall be
provided with a circuit breaker or equivalent current-limiting devices
located as near as practicable to the point of connection to the source
of power for that circuit. Such protection may be omitted from circuits
controlling safety-critical devices.
(2) The 25-kV main power line shall be protected with a lightning
arrestor, automatic circuit breaker, and overload relay. The lightning
arrestor shall be run by the most direct path possible to ground with a
connection to ground of not less than No. 6 AWG. These overload
protection devices shall be housed in an enclosure designed
specifically for that purpose with the arc chute vented directly to
outside air.
(3) Auxiliary power supply (440 VAC), providing power distribution,
shall be provided with both overload and ground fault protection.
(c) Main battery system. (1) The main batteries shall be isolated
from the cab and passenger seating areas by a non-combustible barrier.
(2) If batteries have the potential to vent explosive gases, the
batteries shall be adequately ventilated to prevent accumulation of
explosive concentrations of these gases.
(3) Battery chargers shall be designed to protect against
overcharging.
(4) Battery circuits shall include an emergency battery cut-off
switch to completely disconnect the energy stored in the batteries from
the load.
(d) Capacitors for high-energy storage. (1) Capacitors, if
provided, shall be isolated from the cab and passenger seating areas by
a non-combustible barrier.
(2) Capacitors shall be designed to protect against overcharging
and overheating.
(e) Electromagnetic interference (EMI) and electromagnetic
compatibility (EMC). (1) The railroad shall ensure electromagnetic
compatibility of the safety-critical equipment systems with their
environment. Electromagnetic compatibility can be achieved through
equipment design or changes to the operating environment.
(2) The electronic equipment shall not produce electrical noise
that interferes with trainline control and communications or with
wayside signaling systems.
(3) To contain electromagnetic interference emissions, suppression
of transients shall be at the source wherever possible.
(4) Electrical and electronic systems of equipment shall be capable
of operation in the presence of external electromagnetic noise sources.
(5) All electronic equipment shall be self-protected from damage or
improper operation, or both, due to high voltage transients and long-
term over-voltage or under-voltage conditions. This includes protection
from both power frequency and harmonic effects as well as protection
from radio frequency signals into the microwave frequency range.
(f) Insulation or grounding of metal parts. All unguarded
noncurrent-carrying metal parts subject to becoming charged shall be
grounded or thoroughly insulated.
(g) High voltage markings: doors, cover plates, or barriers.
External surfaces of all doors, cover plates, or barriers providing
direct access to high voltage equipment shall be conspicuously and
legibly marked ``DANGER-HIGH VOLTAGE'' or with the word ``DANGER'' and
the normal voltage carried by the parts so protected. Labels shall be
retro-reflective.
(h) Hand-operated switches. All hand-operated switches carrying
currents with a potential of more than 150 volts that may be operated
while under load shall be covered and shall be operative from the
outside of the cover. Means shall be provided to show whether the
switches are open or closed. Switches that should not be operated while
under load shall be conspicuously and legibly marked with the words
``must not be operated under load'' and the voltage carried.
(i) Conductors; jumpers; cable connections. (1) Conductor sizes
shall be selected on the basis of current-carrying capacity, mechanical
strength, temperature, flexibility requirements, and maximum allowable
voltage drop. Current-carrying capacity shall be derated for grouping
and for operating temperature.
(2) Jumpers and cable connections between trainset units shall be
located and guarded to provide sufficient vertical clearance. They may
not hang with one end free.
(3) Cable and jumper connections between trainset units may not
have any of the following conditions:
(i) Broken or badly chafed insulation;
(ii) Broken plugs, receptacles, terminals, or trainline pins; and
(iii) Broken or protruding strands of wire.
(j) Traction motors. All traction motors shall be in proper working
order, or safely cut-out.
Sec. 299.437 Automated monitoring.
(a) Each trainset shall be equipped to monitor the performance of
the following systems or components:
(1) Reception of cab and trainset control signals;
(2) Electric brake status;
(3) Friction brake status;
(4) Fire detection systems, if so equipped;
(5) Auxiliary power status;
(6) Wheelslide;
(7) On-board bearing-temperature sensors;
(8) Door open/closed status; and
(9) Bogie vibration detection.
(b) When any of the monitored parameters are out of predetermined
[[Page 69763]]
limits, an alert shall be sent immediately to the driver. The
railroad's operating rules shall control trainset movement when the
monitored parameters are out of predetermined limits.
(c) The railroad shall develop appropriate operating rules to
address driver and equipment performance in the event that the
automatic monitoring system becomes defective.
(d) The monitoring system shall be designed with an automatic self-
test feature that notifies the driver that the monitoring capability is
functioning correctly and alerts the driver when a system failure
occurs.
Sec. 299.439 Event recorders.
(a) Duty to equip and record. Each trainset shall be equipped with
an operative event recorder that monitors and records as a minimum all
safety data required by paragraph (b) of this section. The event
recorder shall record the most recent 48 hours of operational data of
the trainset on which it is installed.
(b) Equipment requirements. Event recorders shall monitor and
record data elements or information needed to support the data elements
required by paragraph (c) of this section. The data shall be recorded
with at least the accuracy required of the indicators displaying any of
the required data elements to the driver.
(c) Data elements. The event recorder shall be equipped with a
certified crashworthy event recorder memory module that meets the
requirements of appendix A to this part. The certified event recorder
memory module shall be mounted for its maximum protection. The event
recorder shall record, and the certified crashworthy event recorder
memory module shall retain, the following data elements or information
needed to support the data elements:
(1) Trainset speed;
(2) Selected direction of motion;
(3) Date and time;
(4) Distance traveled;
(5) Throttle position;
(6) Applications and operations of the trainset brake system,
including urgent and emergency applications. The system shall record,
or provide a means of determining, that a brake application or release
resulted from manipulation of brake controls at the position normally
occupied by the driver. In the case of a brake application or release
that is responsive to a command originating from or executed by an on-
board computer (e.g., electronic braking system controller, controlling
cab electronic control system, or trainset control computer), the
system shall record, or provide a means of determining, the involvement
of any such computer;
(7) Applications and operations of the regenerative brake;
(8) Cab signal aspect(s);
(9) Urgent brake application(s);
(10) Passenger brake alarm request;
(11) Wheel slip/slide alarm activation (with a property-specific
minimum duration);
(12) Trainset number;
(13) Trainset tractive effort (positive and negative);
(14) Trainset brake cylinder pressures;
(15) Cruise control on/off, if so equipped and used;
(16) Bogie vibration detection;
(17) Door status opened/closed; and
(18) Safety-critical trainset control data routed to the
controlling driver's display with which the driver is required to
comply, specifically including text messages conveying mandatory
directives and maximum authorized speed. The specific information
format, content, and proposed duration for retention of such data shall
be specified in the PTC Safety Plan submitted for the trainset control
system under subpart B, subject to FRA approval. If it can be
calibrated against other data required by this part, such trainset
control data may, at the election of the railroad, be retained in a
separate certified crashworthy memory module.
(d) Response to defective equipment. A trainset on which the event
recorder has been taken out of service may remain in-service only until
the next pre-service inspection. A trainset with an inoperative event
recorder is not deemed to be in improper condition, unsafe to operate,
or a non-complying trainset under Sec. 299.447.
(e) Annual tests. (1) The railroad's inspection, testing, and
maintenance program under subpart G of this part shall require annual
testing of the event recorder. All testing under this section shall be
performed at intervals that do not exceed 368 calendar days.
(2) A microprocessor-based event recorder with a self-monitoring
feature equipped to verify that all data elements required by this part
are recorded, requires further maintenance and testing only if either
of the following conditions exist:
(i) The self-monitoring feature displays an indication of a
failure. If a failure is displayed, further maintenance and testing
must be performed until a subsequent test is successful. When a
successful test is accomplished, a record, in any medium, shall be made
of that fact and of any maintenance work necessary to achieve the
successful result. This record shall be available at the location where
the trainset is maintained until a record of a subsequent successful
test is filed; or
(ii) A download of the event recorder, taken within the preceding
30 days and reviewed for the previous 48 hours of trainset operation,
reveals a failure to record a regularly recurring data element or
reveals that any required data element is not representative of the
actual operations of the trainset during this time period. If the
review is not successful, further maintenance and testing shall be
performed until a subsequent test is successful. When a successful test
is accomplished, a record, in any medium, shall be made of that fact
and of any maintenance work necessary to achieve the successful result.
This record shall be kept at the location where the trainset is
maintained until a record of a subsequent successful test is filed. The
download shall be taken from information stored in the certified
crashworthy crash hardened event recorder memory module.
(f) Preserving accident data. If any trainset equipped with an
event recorder, or any other trainset mounted recording device or
devices designed to record information concerning the functioning of a
trainset, is involved in an accident/incident that is required to be
reported to FRA under part 225 of this chapter, the railroad shall, to
the extent possible, and to the extent consistent with the safety of
life and property, preserve the data recorded by each such device for
analysis by FRA in accordance with Sec. 299.11. This preservation
requirement permits the railroad to extract and analyze such data,
provided the original downloaded data file, or an unanalyzed exact copy
of it, shall be retained in secure custody and shall not be utilized
for analysis or any other purpose except by direction of FRA or the
National Transportation Safety Board. This preservation requirement
shall expire one (1) year after the date of the accident/incident
unless FRA or the Board notifies the railroad in writing that the data
are desired for analysis.
(g) Relationship to other laws. Nothing in this section is intended
to alter the legal authority of law enforcement officials investigating
potential violation(s) of Federal or State criminal law(s), and nothing
in this chapter is intended to alter in any way the priority of
National Transportation Safety Board investigations under 49 U.S.C.
1131 and 1134, nor the authority of the Secretary of Transportation to
investigate railroad accidents under 49 U.S.C. 5121, 5122, 20107,
20111, 20112, 20505, 20702, 20703, and 20902.
[[Page 69764]]
(h) Disabling event recorders. Any individual who willfully
disables an event recorder, or who tampers with or alters the data
recorded by such a device is subject to civil penalty as provided in
part 218 of this chapter, and to disqualification from performing
safety-sensitive functions on a railroad under subpart D of part 209 of
this chapter.
Sec. 299.441 Trainset electronic hardware and software safety.
(a) Purpose and scope. The requirements of this section apply to
all safety-critical electronic control systems, subsystems, and
components on the trainsets, except for on-board signaling and trainset
control system components that must meet the software safety
requirements defined in subpart B of this part.
(b) Applicability. (1) The trainsets shall utilize the service-
proven safety-critical electronic control systems, subsystems, and
components as used on the N700 to control and monitor safety-critical
components.
(2) Any modifications to the existing service-proven safety-
critical electronic control systems, subsystems, and components shall
be subject to the requirements defined in paragraph (c) of this
section.
(i) The railroad shall assure that the suppliers of new or modified
safety-critical systems, subsystems, and components utilize an industry
recognized hardware and software development process which is evaluated
and certified by an independent third-party assessor authorized by the
industry standard utilized.
(ii) The railroad shall require that all suppliers submit the
certifications and audit results as applicable. All such certifications
shall be made available to FRA upon request.
(3) Any major upgrades or introduction of new safety-critical
technology shall be subject to Sec. 299.613(d).
(c) Electronic hardware and software safety program. The railroad
shall develop and maintain a written electronic hardware and software
safety program to guide the design, development, testing, integration,
and verification of all new or modified safety-critical trainset
hardware and software.
(1) Hardware and software safety program description. The hardware
and software safety program shall include a description of how the
following will be implemented to ensure safety and reliability:
(i) The hardware and software design process;
(ii) The hardware and software design documentation;
(iii) The hardware and software hazard analysis;
(iv) Hardware and software safety reviews;
(v) Hardware and software hazard monitoring and tracking;
(vi) Hardware and software integration safety testing;
(vii) Demonstration of overall hardware and software system safety
as part of the pre-revenue service testing of the equipment; and
(viii) Safety-critical changes and failures.
(2) Safety analysis. The hardware and software safety program shall
be based on a formal safety methodology that includes a FMECA;
verification and validation testing for all hardware and software
components and their interfaces; and comprehensive hardware and
software integration testing to ensure that the hardware and software
system functions as intended.
(3) Compliance. The railroad shall comply with the elements of its
hardware and software safety program that affect the safety of the
passenger trainset.
(4) Safety-critical changes and failures. Whenever a planned
safety-critical design change is made to the safety-critical electronic
control systems, subsystems and components (the products) that are in
use by the railroad and subject to this subpart, the railroad shall--
(i) Notify FRA in accordance with Sec. 299.9 of the design changes
made by the product supplier;
(ii) Ensure that the safety analysis required under paragraph
(c)(2) of this section is updated as required;
(iii) Conduct all safety-critical changes in a manner that allows
the change to be audited;
(iv) Document all arrangements with suppliers for notification of
all electronic safety-critical changes as well as safety-critical
failures in the supplier's system, subsystem, or components, and the
reasons for that change or failure from the suppliers, whether or not
the railroad has experienced a failure of that safety-critical system,
sub-system, or component;
(v) Specify the railroad's procedures for action upon receipt of
notification of a safety-critical change or failure of an electronic
system, sub-system, or component, and until the upgrade or revision has
been installed;
(vi) Identify all configuration/revision control measures designed
to ensure that safety-functional requirements and safety-critical
hazard mitigation processes are not compromised as a result of any such
change, and that any such change can be audited;
(vii) Require suppliers to provide notification of all electronic
safety-critical changes as well as safety-critical failures in the
supplier's system, subsystem, or components;
(ix) Document all arrangements with suppliers for notification of
any and all electronic safety-critical changes as well as safety-
critical failures in the supplier's system, subsystem, or components.
(d) Specific requirements. Hardware and software that controls or
monitors a trainset's primary braking system shall either--
(1) Fail safely by initiating an emergency or urgent brake
application in the event of a hardware or software failure that could
impair the ability of the driver to apply or release the brakes; or
(2) Provide the driver access to direct manual control of the
primary braking system (emergency or urgent braking).
(e) Inspection, testing, and maintenance records. The inspection,
testing, and maintenance conducted by the railroad in accordance with
Sec. 299.445 shall be recorded in hardcopy or stored electronically.
Electronic recordkeeping or automated tracking systems, subject to the
provisions contained in Sec. 299.11, may be utilized to store and
maintain any testing or training record required by this subpart.
Results of product testing conducted by a vendor in support of a safety
analysis shall be provided to and recorded by the railroad.
(1) The testing records shall contain all of the following:
(i) The name of the railroad;
(ii) The location and date that the test was conducted;
(iii) The equipment tested;
(iv) The results of tests;
(v) The repairs or replacement of equipment;
(vi) Any preventative adjustments made; and
(vii) The condition in which the equipment is left.
(2) Each record shall be--
(i) Signed by the employee conducting the test, or electronically
coded, or identified by the automated test equipment number;
(ii) Filed in the office of a supervisory official having
jurisdiction, unless otherwise noted; and
(iii) Available for inspection and copying by FRA.
(3) The results of the testing conducted in accordance with this
section shall be retained as follows:
(i) The results of tests that pertain to installation or
modification of a product
[[Page 69765]]
shall be retained for the life-cycle of the product tested and may be
kept in any office designated by the railroad;
(ii) The results of periodic tests required for the maintenance or
repair of the product tested shall be retained until the next record is
filed and in no case less than one year; and
(iii) The results of all other tests and training shall be retained
until the next record is filed and in no case less than one year.
(f) Review of safety analysis. (1) Prior to the initial planned use
of a new product as defined by paragraphs (b)(2) or (3) of this
section, the railroad shall notify FRA in accordance with Sec. 299.9
of the intent to place this product in service. The notification shall
provide a description of the product, and identify the location where
the complete safety analysis documentation and the testing are
maintained.
(2) The railroad shall maintain and make available to FRA upon
request all railroad or vendor documentation used to demonstrate that
the product meets the safety requirements of the safety analysis for
the life-cycle of the product.
(g) Hazard tracking. After a new product is placed in service in
accordance with paragraphs (b)(2) or (3) of this section, the railroad
shall maintain a database of all safety-relevant hazards encountered
with the product. The database shall include all hazards identified in
the safety analysis and those that had not been previously identified
in the safety analysis. If the frequency of the safety-relevant hazards
exceeds the threshold set forth in the safety analysis, then the
railroad shall--
(1) Report the inconsistency to the Associate Administrator, within
15 days of discovery in accordance with Sec. 299.9;
(2) Take immediate countermeasures to reduce the frequency of the
safety-relevant hazard(s) below the threshold set forth in the safety
analysis;
(3) Provide a final report to the Associate Administrator, on the
results of the analysis and countermeasures taken to mitigate the
hazard to meet the threshold set forth in the safety analysis when the
problem is resolved. For hazards not identified in the safety analysis
the threshold shall be exceeded at one occurrence; and
(4) Electronic or automated tracking systems used to meet the
requirements contained in paragraph (g) of this section shall be in
accordance with Sec. 299.11.
(h) Operations and maintenance manual. The railroad shall maintain
all supplier or vendor documents pertaining to the operation,
installation, maintenance, repair, modification, inspection, and
testing of the safety-critical electronic control systems, subsystems
and components.
(i) Training and qualification program. Under Sec. 299.13(c)(3),
the railroad shall establish and implement a training and qualification
program for the safety-critical electronic control systems, subsystems,
and components subject to subpart G of this part prior to the safety-
critical electronic control systems, subsystems, and components being
placed in use.
(j) Operating personnel training. The training program required by
Sec. 299.13(c)(3) for any driver or other person who participates in
the operation of a trainset using the safety-critical electronic
control systems, subsystems and components shall address all the
following elements:
(1) Familiarization with the electronic control system equipment
on-board the trainset and the functioning of that equipment as part of
the system and in relation to other on-board systems under that
person's control;
(2) Any actions required of the operating personnel to enable or
enter data into the system and the role of that function in the safe
operation of the trainset;
(3) Sequencing of interventions by the system, including
notification, enforcement, and recovery from the enforcement as
applicable;
(4) Railroad operating rules applicable to control systems,
including provisions for movement and protection of any unequipped
passenger equipment, or passenger equipment with failed or cut-out
controls;
(5) Means to detect deviations from proper functioning of on-board
electronic control system equipment and instructions explaining the
proper response to be taken regarding control of the trainset and
notification of designated railroad personnel; and
(6) Information needed to prevent unintentional interference with
the proper functioning of on-board electronic control equipment.
Sec. 299.443 Safety appliances.
(a) Couplers. (1) The leading and trailing ends of each trainset
shall be equipped with an automatic rescue coupler that couples on
impact.
(i) Uncoupling of the rescue coupler shall be done only at a
trainset maintenance facility or other location where personnel can
safely get under or between units.
(ii) The leading and the trailing ends of a trainset are not
required to be equipped with sill steps or end or side handholds.
(2) The leading and trailing end couplers and uncoupling devices
may be stored within a removable shrouded housing.
(3) Leading and trailing automatic couplers of trainsets shall be
compatible with the railroad's rescue vehicles. A coupler adaptor can
be used to meet this requirement.
(4) The railroad shall develop and implement rescue procedures that
assure employee safety during rescue operations and shall be contained
in the railroad's operating rules.
(5) Each unit within a trainset shall be semi-permanently coupled
and shall only be uncoupled at a trainset maintenance facility or other
locations identified by the railroad where the protections afforded in
subpart B of part 218 of this chapter can be applied.
(6) The ends of units in a trainset that are semi-permanently
coupled are not required to be equipped with automatic couplers, sill
steps, end handholds or side handholds.
(b) Crew access. (1) Each trainset shall provide a minimum of two
(2) locations per side, where crew members can board or disembark the
trainset safely from ground level.
(2) Each location used for crew access shall be equipped with
retractable stairs with handrails designed for safe access to the
trainset from ground level.
Sec. 299.445 Trainset inspection, testing, and maintenance
requirements.
(a) General. (1) The railroad shall develop a written inspection
program for the rolling stock, in accordance with and approved under
the requirements of Sec. 299.713. As further specified in this
section, the program shall describe in detail the procedures,
equipment, and other means necessary for the safe operation of the
passenger equipment, including all inspections set forth in paragraph
(e) of this section. This information shall include a detailed
description of the methods of ensuring accurate records of required
inspections.
(2) The initial inspection, testing, and maintenance program
submitted under Sec. 299.713 shall, as a minimum, address the specific
safety inspections contained in paragraphs (e)(1) through (4) of this
section. The railroad may submit the procedures detailing the bogie
inspections or general overhaul requirements contained in paragraph
(e)(3) and (4) of this section, respectively, at a later date than the
initial inspection, testing, and maintenance program, but not less than
180 days prior to the scheduled date of the first bogie inspection or
general overhaul.
(b) Identification of safety-critical items. In addition to safety
critical items identified under Sec. 299.711(b), on-board
[[Page 69766]]
emergency equipment, emergency back-up systems, trainset exits and
trainset safety-critical hardware and software systems in accordance
with Sec. 299.441 shall be deemed safety-critical.
(c) Compliance. The railroad shall adopt and comply with the
approved inspection, testing, and maintenance program in accordance
with Sec. 299.703.
(d) General condition. The inspection, testing, and maintenance
program shall ensure that all systems and components of the equipment
are free of conditions that endanger the safety of the crew,
passengers, or equipment. These conditions include, but are not limited
to the following:
(1) A continuous accumulation of oil or grease;
(2) Improper functioning of a component;
(3) A crack, break, excessive wear, structural defect, or weakness
of a component;
(4) A leak;
(5) Use of a component or system under conditions that exceed those
for which the component or system is designed to operate; and
(6) Insecure attachment of a component.
(e) Specific safety inspections. The program under paragraph (a) of
this section shall specify that all passenger trainsets shall receive
thorough safety inspections by qualified individuals designated by the
railroad at regular intervals. At a minimum, and in addition to the
annual tests required for event recorder under Sec. 299.439(e), the
following shall be performed on each trainset:
(1) Pre-service inspections. (i) Each trainset in use shall be
inspected at least once every two calendar days by qualified
individuals at a location where there is a repair pit and access to the
top of the trainset. The inspection shall verify the correct operation
of on-board safety systems defined in the inspection, testing, and
maintenance program. If any of the conditions defined as safety-
critical in paragraph (b) of this section and Sec. 299.711(b) are
found during this inspection, the trainset shall not be put into
service until that condition is rectified. The pre-service inspection
shall include the following:
(A) Functional tests to determine the status of application and
release of the service, emergency, and urgent air brakes using the
monitoring system;
(B) Operational tests of the exterior doors; and
(C) A review of the log of on-board ATC equipment.
(ii) If the existence of any safety-critical conditions cannot be
determined by use of an automated monitoring system, the railroad shall
perform a visual inspection to determine if the condition exists.
(2) Regular inspections. The railroad shall perform a regular
inspection on all trainsets in accordance with the test procedures and
inspection criteria established in paragraph (a) of this section and at
the intervals defined by paragraph (f) of this section. If any of the
conditions defined as safety-critical in paragraph (b) of this section
and Sec. 299.711(b) are found during this inspection, the trainset
shall not be put into service until that condition is rectified.
(3) Bogie inspections. The railroad shall perform a bogie
inspection on all trainsets in accordance with the test procedures and
inspection criteria established in paragraph (a) of this section and at
the intervals defined by paragraph (f) of this section. If any of the
conditions defined as safety-critical in paragraph (b) of this section
and Sec. 299.711(b) are found during this inspection, the trainset
shall not be put into service until that condition is rectified.
(4) General overhaul. The railroad shall perform a general overhaul
on all trainsets in accordance with the test procedures and inspection
criteria established in paragraph (a) of this section and at the
intervals defined by paragraph (f) of this section. If any of the
conditions defined as safety-critical in paragraph (b) of this section
and Sec. 299.711(b) are found during this inspection, the trainset
shall not be put into service until that condition is rectified.
(f) Maintenance intervals. The railroad's program established
pursuant to paragraph (a) of this section shall include the railroad's
scheduled maintenance intervals for all specific safety inspections in
paragraph (e) of this section, as required by Sec. 299.707.
(g) Training and qualification program. The railroad shall
establish a training and qualification program as defined in Sec.
299.13(c)(3) to qualify individuals to perform inspections, testing,
and maintenance on the equipment. Only qualified individuals shall
perform inspections, testing, and maintenance of the equipment.
(h) Reporting and tracking of repairs to defective trainsets. The
railroad shall have in place prior to start of operations a reporting
and tracking system for passenger trainsets with a defect not in
conformance with this subpart. The reporting and tracking system shall
record the following information:
(1) The identification number of the defective unit within a
trainset, and trainset identification number;
(2) The date the defect was discovered;
(3) The nature of the defect;
(4) The determination made by a qualified individual whether the
equipment is safe to run;
(5) The name of the qualified individual making such a
determination;
(6) Any operating restrictions placed on the equipment; and
(7) Repairs made and the date that they were completed.
(i) Retention of records. At a minimum, the railroad shall keep the
records described in paragraph (j) of each required inspection under
this section in accordance with Sec. 299.11. Each record shall be
maintained for at least one year from the date of the inspection.
(j) Availability of records. The railroad shall make defect
reporting and tracking records available to FRA upon request.
(k) Brake system repair points. The railroad shall designate brake
system repair points in the inspection, testing, and maintenance
program required by paragraph (a) of this section. No trainset shall
depart a brake system repair point unless that trainset has a 100
percent operational brake system.
Sec. 299.447 Movement of defective equipment.
(a) A trainset with one or more conditions not in compliance with
the list of safety critical defects identified in accordance with Sec.
299.445(b) during a pre-service inspection required by Sec.
299.445(e)(1) shall not be moved in revenue service and shall only be
moved in accordance with paragraph (e) of this section.
(b) Except as provided in paragraph (c) of this section, and after
departure in compliance with the pre-service inspection required by
Sec. 299.445(e)(1), a trainset with one or more conditions not in
compliance with the list of safety critical defects identified in
accordance with Sec. Sec. 299.445(b) and 299.711(b) may be moved in
revenue service only after the railroad has complied with all of the
following:
(1) A qualified individual determines that it is safe to move the
trainset, consistent with the railroad's operating rules;
(i) If appropriate, these determinations may be made based upon a
description of the defective condition provided by a crewmember.
(ii) If the determinations required by this paragraph are made by
an off-site qualified individual based on a description of the
defective condition by on-site personnel, then a qualified individual
shall perform a physical
[[Page 69767]]
inspection of the defective equipment, at the first location possible,
in accordance with the railroad's inspection, testing, and maintenance
program and operating rules, to verify the description of the defect
provided by the on-site personnel.
(2) The qualified individual who made the determination in
paragraph (b)(1) of this section, notifies the driver in charge of
movement of the trainset, in accordance with the railroad's operating
rules, of the maximum authorized speed, authorized destination, and any
other operational restrictions that apply to the movement of the non-
compliant trainset. This notification may be achieved through the tag
required by paragraph (b)(3) of this section; and
(3) A tag bearing the words ``non-complying trainset'' and
containing the following information, are securely attached to the
control stand on each control cab of the trainset:
(i) The trainset number and unit or car number;
(ii) The name of the qualified individual making the determination
in paragraph (b)(1) of this section;
(iii) The location and date of the inspection that led to the
discovery of the non-compliant item;
(iv) A description of each defect;
(v) Movement restrictions, if any;
(vi) The authorized destination of the trainset; and
(vii) The signature, if possible, as well as the job title and
location of the person making the determinations required by this
section.
(4) Automated tracking systems used to meet the tagging
requirements contained in paragraph (b)(3) of this section may be
reviewed and monitored by FRA at any time to ensure the integrity of
the system. FRA's Associate Administrator may prohibit or revoke the
railroad's ability to utilize an automated tracking system in lieu of
tagging if FRA finds that the automated tracking system is not properly
secure, is inaccessible to FRA or the railroad's employees, or fails to
track or monitor the movement of defective equipment adequately. Such a
determination will be made in writing and will state the basis for such
action.
(c) A trainset that develops a non-complying condition in service
may continue in revenue service, so long as the requirements of
paragraph (b) of this section are otherwise fully met, until the next
pre-service inspection.
(d) In the event of an in-service failure of the braking system,
the trainset may proceed in accordance with the railroad's operating
rules relating to the percentage of operative brakes and at a speed no
greater than the maximum authorized speed as determined by Sec.
299.409(f)(4) so long as the requirements of paragraph (b) of this
section are otherwise fully met, until the next pre-service inspection.
(e) A non-complying trainset may be moved without passengers within
a trainset maintenance facility, at speeds not to exceed 16 km/h (10
mph), without meeting the requirements of paragraph (a) of this section
where the movement is solely for the purpose of repair. The railroad
shall ensure that the movement is made safely.
(f) Nothing in this section authorizes the movement of equipment
subject to a Special Notice for Repair under part 216 of this chapter
unless the movement is made in accordance with the restrictions
contained in the Special Notice.
Subpart E--Operating Rules
Sec. 299.501 Purpose.
Through the requirements of this subpart, FRA learns the condition
of the operating rules and practices in use by the railroad. The rules
and practices covered by this subpart include the procedures for
instruction and testing of all employees involved with the movement of
rail vehicles, including drivers, on-board attendants, station platform
attendants, general control center staff, and all maintenance staff,
which are necessary to ensure that they possess the requisite skill and
knowledge of the rules and operating practices to maintain the safety
of the system.
Sec. 299.503 Operating rules; filing and recordkeeping.
(a) Prior to commencing operations, the railroad shall develop a
code of operating rules, timetables, and timetable special
instructions. The initial code of operating rules, timetables, and
timetable special instructions shall be based on practices and
procedures proven on the Tokaido Shinkansen system.
(b) The railroad shall keep one copy of its current code of
operating rules, timetables, timetable special instruction, at its
system headquarters, and shall make them available to FRA for
inspection and copying during normal business hours. If the railroad
elects to maintain an electronic record, the railroad must satisfy the
conditions listed in Sec. 299.11.
Sec. 299.505 Programs of operational tests and inspections;
recordkeeping.
(a) Requirement to conduct operational tests and inspections. The
railroad shall periodically conduct operational tests and inspections
to determine the extent of employee knowledge, application, and
compliance with its code of operating rules, timetables, and timetable
special instructions in accordance with a written program retained at
its system headquarters.
(b) Railroad and railroad testing officer responsibilities. (1)
Each railroad officer who conducts operational tests and inspections
(railroad testing officer) shall--
(i) Be qualified on the railroad's operating rules in accordance
with Sec. 299.507;
(ii) Be qualified on the operational testing and inspection program
requirements and procedures relevant to the testing and inspections the
officer will conduct;
(iii) Receive appropriate field training, as necessary to achieve
proficiency, on each operational test or inspection that the officer is
authorized to conduct; and
(iv) Conduct operational tests and inspections in accordance with
the railroad's program of operational tests and inspections.
(2) The railroad shall maintain a record documenting qualification
of each railroad testing officer. The record shall be retained by the
railroad and shall be made available to representatives of the FRA for
inspection and copying during normal business hours. If the railroad
elects to maintain an electronic record, the railroad must satisfy the
conditions listed in Sec. 299.11.
(c) Written program of operational tests and inspections. Within 30
days of commencing operations, the railroad shall have a written
program of operational tests and inspections in effect. The railroad
shall maintain one copy of its current program for periodic performance
of the operational tests and inspections required by paragraph (a) of
this section, and shall maintain one copy of each subsequent amendment
to the program as amendments are made. These records shall be retained
at the system headquarters of the railroad for three calendar years
after the end of the calendar year to which they relate. These records
shall be made available to representatives of the FRA for inspection
and copying during normal business hours. The program shall--
(1) Provide for operational testing and inspection under the
various operating conditions on the railroad;
(2) Describe each type of operational test and inspection adopted,
including the means and procedures used to carry it out;
(3) State the purpose of each type of operational test and
inspection;
[[Page 69768]]
(4) State the frequency with which each type of operational test
and inspection is conducted;
(5) The program shall address with particular emphasis those
operating rules that cause or are likely to cause the most accidents or
incidents, such as those accidents or incidents identified in the six-
month reviews and the annual summaries as required under paragraphs (e)
and (f) of this section;
(6) Identify the officer(s) by name and job title responsible for
ensuring that the program of operational tests and inspections is
properly implemented and is responsible for overseeing the entire
program. The responsibilities of such officer(s) shall include, but not
be limited to, ensuring that the railroad's testing officers are
directing their efforts in an appropriate manner to reduce accidents/
incidents and that all required reviews and summaries are completed;
and
(7) Include a schedule for making the program fully operative
within 210 days after it begins.
(d) Records. (1) The railroad shall keep a written or electronic
record of the date, time, place, and result of each operational test
and inspection that was performed in accordance with its program. Each
record shall specify the officer administering the test and inspection
and each employee tested. These records shall be retained at the system
headquarters of the railroad for one calendar year after the end of the
calendar year to which they relate. These records shall be made
available to representatives of the FRA for inspection and copying
during normal business hours.
(2) The railroad shall retain one copy of its current program for
periodic performance of the operational tests and inspections required
by paragraph (a) of this section and one copy of each subsequent
amendment to such program. These records shall be retained for three
calendar years after the end of the calendar year to which they relate
at the system headquarters where the tests and inspections are
conducted. These records shall be made available to representatives of
the FRA for inspection and copying during normal business hours.
(e) Reviews of tests and inspections and adjustments to the program
of operational tests--(1) Reviews by the railroad. Not less than once
every 180 days the railroad's designated officer(s) shall conduct
periodic reviews and analyses as provided in this paragraph and shall
retain, at its system headquarters, one copy of the reviews. Each such
review shall be completed within 30 days of the close of the period.
The designated officer(s) shall conduct a written review of--
(i) The operational testing and inspection data for the system to
determine compliance by the railroad testing officers with its program
of operational tests and inspections required by paragraph (c) of this
section. At a minimum, this review shall include the name of each
railroad testing officer, the number of tests and inspections conducted
by each officer, and whether the officer conducted the minimum number
of each type of test or inspection required by the railroad's program;
(ii) Accident/incident data, the results of prior operational tests
and inspections, and other pertinent safety data for the system to
identify the relevant operating rules related to those accidents/
incidents that occurred during the period. Based upon the results of
that review, the designated officer(s) shall make any necessary
adjustments to the tests and inspections required of railroad officers
for the subsequent period(s); and
(iii) Implementation of the program of operational tests and
inspections from a system perspective, to ensure that it is being
utilized as intended, that the other reviews provided for in this
paragraph have been properly completed, that appropriate adjustments
have been made to the distribution of tests and inspections required,
and that the railroad testing officers are appropriately directing
their efforts.
(2) Records retention. The records of reviews required in
paragraphs (e)(1) of this section shall be retained for a period of one
year after the end of the calendar year to which they relate and shall
be made available to representatives of FRA for inspection and copying
during normal business hours.
(f) Annual summary on operational tests and inspections. Before
March 1 of each calendar year, the railroad shall retain, at its system
headquarters, one copy of a written summary of the following with
respect to its previous year's activities: The number, type, and result
of each operational test and inspection that was conducted as required
by paragraphs (a) and (c) of this section. These records shall be
retained for three calendar years after the end of the calendar year to
which they relate and shall be made available to representatives of FRA
for inspection and copying during normal business hours.
(g) Electronic recordkeeping. Nothing in this section precludes the
railroad from maintaining the information required to be retained under
this part in an electronic format provided that the railroad satisfy
the conditions listed in Sec. 299.11.
(h) Disapproval of program. Upon review of the program of
operational tests and inspections required by this section, the
Associate Administrator for Safety may, for cause stated, disapprove
the program in whole or in part. Notification of such disapproval shall
be made in writing and specify the basis for the disapproval decision.
If the Associate Administrator for Safety disapproves the program--
(1) The railroad has 35 days from the date of the written
notification of such disapproval to--
(i) Amend its program; or
(ii) Provide a written response in support of the program to the
Associate Administrator for Safety. If the Associate Administrator for
Safety still disapproves the program in whole or in part after
receiving the railroad's written response, the railroad shall amend its
program.
(2) A failure to adequately amend the program will be considered a
failure to implement a program under this subpart.
Sec. 299.507 Program of instruction on operating rules;
recordkeeping.
(a) To ensure that each railroad employee whose activities are
governed by the railroad's operating rules understands those rules, the
railroad periodically shall instruct each such employee on the meaning
and application of its operating rules with a written program developed
under Sec. 299.13(c)(3) and retained at its system headquarters.
(b) Prior to commencing operations, the railroad shall file and
retain one copy of its current program for the periodic instruction of
its employees as required by paragraph (a) of this section and shall
file and retain one copy of any amendment to that program as amendments
are made. These records shall be retained at the railroad's system
headquarters for one calendar year after the end of the calendar year
to which they relate. These records shall be made available to
representatives of the FRA for inspection and copying during normal
business hours. This program shall--
(1) Describe the means and procedures used for instruction of the
various classes of affected employees;
(2) State the frequency of instruction and the basis for
determining that frequency;
(3) Include a schedule for completing the initial instruction of
employees who are already employed when the program begins;
[[Page 69769]]
(4) Begin on the date of commencing operations; and
(5) Provide for initial instruction of each employee hired after
the program begins.
(c) The railroad is authorized to retain by electronic
recordkeeping its program for periodic instruction of its employees on
operating rules, provided that the requirements stated in Sec. 299.11
are satisfied.
Subpart F--System Qualification Tests
Sec. 299.601 Responsibility for verification demonstrations and
tests.
The railroad shall comply with the pre-revenue qualification tests
and verification requirements set forth in this subpart to demonstrate
the overall safety of the system, prior to revenue operations.
Sec. 299.603 Preparation of system-wide qualification test plan.
(a) Prior to execution of any tests as defined in this subpart, the
railroad shall develop a system-wide qualification test plan, that
identifies the tests that will be carried out, to demonstrate the
operability of all system elements, including track and infrastructure,
signal and trainset control system, communications, rolling stock,
software, and operating practices, and the system as a whole.
(b) The system-wide qualification test plan shall be submitted to
FRA in accordance with Sec. 299.9 for review at least 180 days prior
to testing. FRA shall notify the railroad, in writing, within 45 days
of receipt of the railroad's submission, and identify any deficiencies
in the test plan. FRA will notify the railroad of any procedures to be
submitted for review. The plan shall include the following:
(1) A list of all tests to be conducted;
(2) A summary statement of the test objectives;
(3) A planned schedule for conducting the tests which indicates the
sequence of testing and interdependencies; and
(4) The approach taken for--
(i) Verifying results of installation tests performed by
contractors and manufacturers;
(ii) Functional and performance qualification testing of individual
safety-related equipment, facilities, and subsystems in accordance with
Sec. 299.605;
(iii) Pre-revenue service system integration testing of the system
per Sec. 299.607, that includes vehicle/track system qualification
testing per Sec. 299.609;
(iv) Simulated revenue operations of the system per Sec. 299.611;
(v) Compliance with operating rules as per subpart E of this part;
(vi) Training and qualification of all personnel involved in the
test program to conduct tests safely and in accordance with operating
rules;
(vii) Verification of all emergency preparedness procedures; and
(viii) Field testing of the railroad's uncertified PTC system and
regression testing of its FRA-certified PTC system, under Sec.
299.201.
(c) The railroad shall adopt and comply with the system-wide
qualification test plan, including completion of all tests required by
the plan.
(d) After FRA review of the system-wide test plan, detailed test
procedures as required by paragraph (b) of this section shall be
submitted 15 days prior to testing to FRA in accordance with Sec.
299.9 for review.
(e) Each test procedure shall include the following elements:
(1) A clear statement of the test objectives. One of the principal
test objectives shall be to demonstrate that the railroad's system
meets the safety design and performance requirements specified in this
part when operated in the environment in which it will be used;
(2) Any special safety precautions to be observed during the
testing;
(3) A description of the railroad property or facilities to be used
to conduct the tests;
(4) Prerequisites for conducting each test;
(5) A detailed description of how the tests are to be conducted.
This description shall include--
(i) An identification of the systems and equipment to be tested;
(ii) The method by which the systems and equipment shall be tested;
(iii) The instrumentation to be used and calibration procedures;
(iv) The means by which the test results will be recorded, analyzed
and reported to FRA;
(v) A description of the information or data to be obtained;
(vi) A description of how the information or data obtained is to be
analyzed or used;
(vii) A description of any criteria to be used as safety limits
during the testing;
(viii) The criteria to be used to evaluate performance of the
systems and equipment. If system qualification is to be based on
extrapolation of less than full-level testing results, the analysis
done to justify the validity of the extrapolation shall be described;
and
(ix) Inspection, testing, and maintenance procedures to be followed
to ensure that testing is conducted safely.
(f) The railroad shall provide FRA notice at least 30 days in
advance of the times and places of any domestic testing and notice at
least 90 days in advance for testing not conducted domestically to
permit FRA observation of such tests.
Sec. 299.605 Functional and performance qualification tests.
The railroad shall conduct functional and performance qualification
tests, prior to commencing revenue operations, to verify that all
safety-critical components meet all functional and all performance
specifications.
Sec. 299.607 Pre-revenue service system integration testing.
(a) Prior to commencing revenue operations, the railroad shall
conduct tests of the trainsets throughout the system to--
(1) Verify mechanical positioning of the overhead catenary system;
and
(2) Verify performance of the trainset, track, and signal and
trainset control systems.
(b) The railroad shall demonstrate safe operation of the system
during normal and degraded-mode operating conditions. At a minimum, the
following operation tests shall be performed:
(1) Slow-speed operation of a trainset;
(2) Verification of correct overhead catenary and pantograph
interaction;
(3) Verification of trainset clearance at structures and passenger
platforms;
(4) Incremental increase of trainset speed;
(5) Performance tests on trainsets to verify braking rates in
accordance with Sec. 299.409;
(6) Verification of vehicle noise;
(7) Verification of correct vehicle suspension characteristics;
(8) Vehicle/track system qualification as defined in Sec. 299.609;
(9) Load tests with vehicles to verify relay settings and signal
and communication system immunization;
(10) Monitoring of utility supply circuits and telephone circuits
to ensure the adequacy of power supplies, and to verify that transient-
related disturbances are within acceptable limits;
(11) Verification of vehicle detection due to shunting of signal
system circuits;
(12) Verification of safe operation of the signal and trainset
control system as required by subpart B of this part;
(13) Tests of trainset radio reception during system-wide vehicle
operation; and
(14) Verification of electromagnetic interference/electromagnetic
compatibility between various subsystems.
[[Page 69770]]
Sec. 299.609 Vehicle/track system qualification.
(a) General. All vehicles types intended to operate in revenue
service shall be qualified for operation in accordance with this
subpart. A qualification program shall be used to demonstrate that the
vehicle/track system will not exceed the wheel/rail force safety
limits, and the carbody and bogie acceleration criteria specified in
paragraph (h) of this section--
(1) At any speed up to and including 10 km/h (6 mph) above the
proposed maximum operating speed; and
(2) On track meeting the requirements for the class of track
associated with the proposed maximum operating speed as defined in
Sec. 299.309. For purposes of qualification testing, speeds may exceed
the maximum allowable operating speed for the class of track in
accordance with the test plan approved by FRA.
(b) New vehicle/track system qualification. Vehicle types not
previously qualified under this subpart shall be qualified in
accordance with the requirements of this paragraph (b).
(1) Carbody acceleration. For vehicle types intended to operate in
revenue service at track class H4 speeds or above, qualification
testing conducted over a representative segment of the route shall
demonstrate that the vehicle type will not exceed the carbody lateral
and vertical acceleration safety limits specified in paragraph (h) of
this section.
(2) Bogie lateral acceleration. For vehicle types intended to
operate at track class H4 speeds or above, qualification testing
conducted over a representative segment of the route shall demonstrate
that the vehicle type will not exceed the bogie lateral acceleration
safety limit specified in paragraph (h) of this section.
(3) Measurement of wheel/rail forces. For vehicle types intended to
operate at track class H4 speeds or above, qualification testing
conducted over a representative segment of the route shall demonstrate
that the vehicle type will not exceed the wheel/rail force safety
limits specified in paragraph (h) of this section.
(c) Previously qualified vehicle/track system. Vehicle/track
systems previously qualified under this subpart for a track class and
cant deficiency on one route may be qualified for operation at the same
class and cant deficiency on another route through testing to
demonstrate compliance with paragraph (a) of this section in accordance
with the following:
(1) Carbody acceleration. For vehicle types intended to operate at
track class H4 speeds and above, qualification testing conducted over a
representative segment of the new route shall demonstrate that the
vehicle type will not exceed the carbody lateral and vertical
acceleration safety limits specified in paragraph (h) of this section.
(2) Bogie lateral acceleration. For vehicle types intended to
operate at track class H4 speeds or above, measurement of bogie lateral
acceleration during qualification testing shall demonstrate that the
vehicle type will not exceed the bogie lateral acceleration safety
limit specified in paragraph (h) of this section. Measurement of bogie
lateral acceleration, if conducted, shall be performed over a
representative segment of the new route.
(d) Vehicle/track system qualification testing plan. To obtain the
data required to support the qualification program outlined in
paragraphs (b) and (c) of this section, the railroad shall submit a
qualification testing plan as required by Sec. 299.603(b) at least 60
days prior to testing, requesting approval to conduct the testing at
the desired speeds and cant deficiencies. This test plan shall provide
for a test program sufficient to evaluate the operating limits of the
track and vehicle type and shall include--
(1) Identification of the representative segment of the route for
qualification testing;
(2) Consideration of the operating environment during qualification
testing, including operating practices and conditions, the signal
system, and trainset on adjacent tracks;
(3) The maximum angle found on the gauge face of the designed
(newly-profiled) wheel flange referenced with respect to the axis of
the wheelset that will be used for the determination of the Single
Wheel L/V Ratio safety limit specified in paragraph (h) of this
section; and
(4) A target maximum testing speed in accordance with paragraph (a)
of this section and the maximum testing cant deficiency.
(e) Qualification testing. Upon FRA approval of the vehicle/track
system qualification testing plan, qualification testing shall be
conducted in two sequential stages as required in this subpart.
(1) Stage-one testing shall include demonstration of acceptable
vehicle dynamic response of the subject vehicle as speeds are
incrementally increased--
(i) On a segment of tangent track, from acceptable track class H4
speeds to the target maximum test speed; and
(ii) On a segment of curved track, from the speeds corresponding to
76 mm (3 inches) of cant deficiency to the maximum testing cant
deficiency.
(2) When stage-one testing has successfully demonstrated a maximum
safe operating speed and cant deficiency, stage-two testing shall
commence with the subject equipment over a representative segment of
the route as identified in paragraph (d)(1) of this section.
(i) A test run shall be conducted over the route segment at the
speed the railroad will request FRA to approve for such service.
(ii) An additional test run shall be conducted at 10 km/h (6 mph)
above this speed.
(3) When conducting stage-one and stage-two testing, if any of the
monitored safety limits are exceeded on any segment of track, testing
may continue provided that the track location(s) where any of the
limits are exceeded be identified and test speeds be limited at the
track location(s) until corrective action is taken. Corrective action
may include making adjustments to the track, to the vehicle, or to both
of these system components.
(4) Prior to the start of the qualification testing program, a
qualifying Track Geometry Measurement System (TGMS) shall be operated
over the intended route within 30 calendar days prior to the start of
the qualification testing program to verify compliance with the track
geometry limits specified in Sec. 299.311.
(f) Qualification testing results. The railroad shall submit a
report to FRA detailing all the results of the qualification program in
accordance with Sec. 299.613. The report shall be submitted at least
60 days prior to the intended operation of the equipment in revenue
service over the route.
(g) Cant deficiency. Based on the test results and all other
required submissions, FRA will approve a maximum trainset speed and
value of cant deficiency for revenue service, normally within 45 days
of receipt of all the required information. FRA may impose conditions
necessary for safely operating at the maximum approved trainset speed
and cant deficiency.
(h) Vehicle/track interaction regulatory limits. The following
vehicle/track interaction regulatory limits shall not be exceeded
during qualification testing in accordance with this section.
BILLING CODE 4910-06-P
[[Page 69771]]
[GRAPHIC] [TIFF OMITTED] TR03NO20.009
[[Page 69772]]
[GRAPHIC] [TIFF OMITTED] TR03NO20.010
[[Page 69773]]
[GRAPHIC] [TIFF OMITTED] TR03NO20.011
BILLING CODE 4910-06-C
Sec. 299.611 Simulated revenue operations.
(a) The railroad shall conduct simulated revenue operations for a
minimum period of two weeks prior to revenue operations to verify
overall system performance, and provide operating and maintenance
experience.
(b) The railroad shall maintain a log of tests conducted during the
simulated revenue operations period. This log of tests shall identify
any problems encountered during testing, and actions necessary to
correct defects in workmanship, materials, equipment, design, or
operating parameters.
(c) The railroad shall implement all actions necessary to correct
safety defects, as identified by the log prior to the initiation of
revenue service.
Sec. 299.613 Verification of compliance.
(a) The railroad shall prepare a report detailing the results of
functional and performance qualification tests, pre-revenue service
system integration testing, and vehicle/track system qualification
tests required under Sec. Sec. 299.605, 299.607, and 299.609
respectively. The report shall identify any problems encountered during
testing, and alternative actions necessary to correct defects in
workmanship, materials, equipment, design, or operating parameters.
(b) The railroad shall implement all actions necessary to correct
defects, as identified by the report.
(c) The railroad shall submit the report(s) required by paragraph
(a) of this section to FRA prior to commencing simulated revenue
operations and at least 60 days prior to the intended start of full
revenue service per Sec. 299.609(f).
(d)(1) Prior to implementing a major upgrade to any safety-critical
system component or sub-system, or prior to introducing any new safety-
critical technology, the railroad shall submit for FRA approval the
detailed test procedures and/or analysis in accordance with Sec.
299.603(d).
(2) The railroad shall prepare a report detailing the results of
functional and performance qualification tests, pre-revenue service
system integration testing, and vehicle/track system qualification
tests required under Sec. Sec. 299.605, 299.607, and 299.609
respectively pertaining to a major upgrade to any safety-critical
system component or sub-system, or introduction of any new safety-
critical technology. The report shall identify any problems encountered
during testing, and alternative actions necessary to correct defects in
workmanship, materials, equipment, design, or operating parameters.
Subpart G--Inspection, Testing, and Maintenance Program
Sec. 299.701 General requirements.
Under the procedures provided in Sec. 299.713, the railroad shall
obtain FRA approval of a written inspection, testing, and maintenance
program. The program shall provide detailed information, consistent
with the requirements set forth in Sec. Sec. 299.337 through 299.349,
and 299.445(a), on the inspection, testing, and maintenance procedures
necessary for the railroad to safely operate its system. This
information shall include a detailed description of--
(a) Safety inspection procedures, intervals, and criteria;
(b) Test procedures and intervals;
(c) Scheduled preventive maintenance intervals;
(d) Maintenance procedures; and
(e) Special testing equipment or measuring devices required to
perform safety inspections and tests.
Sec. 299.703 Compliance.
After the railroad's inspection, testing, and maintenance program
is approved by FRA pursuant to the requirements and procedures set
forth in Sec. 299.713, the railroad shall adopt and comply with the
program, and shall perform--
(a) All inspections and tests described in the program in
accordance with the procedures and criteria that the railroad
identified as safety-critical; and
(b) All maintenance tasks and procedures described in the program
in accordance with the procedures and intervals that the railroad
identified as safety-critical.
Sec. 299.705 Standard procedures for safely performing inspection,
testing, and maintenance, or repairs.
(a) The railroad shall establish written standard procedures for
performing all safety-critical or potentially hazardous inspection,
testing, maintenance, and repair tasks. These standard procedures
shall--
(1) Describe in detail each step required to safely perform the
task;
(2) Describe the knowledge necessary to safely perform the task;
(3) Describe any precautions that shall be taken to safely perform
the task;
(4) Describe the use of any safety equipment necessary to perform
the task;
(5) Be approved by the railroad's official responsible for safety;
(6) Be enforced by the railroad's supervisors responsible for
accomplishing the tasks; and
(7) Be reviewed annually by the railroad. The railroad shall
provide written notice to FRA in accordance with Sec. 299.9 at least
one month prior to the annual review. If the Associate Administrator or
their designee indicates a desire to be present, the railroad shall
provide a scheduled date and location for the annual review. If the
Associate Administrator requests the annual review be performed on
another date but the railroad and the Associate Administrator are
unable to agree on a date for rescheduling, the annual review may be
performed as scheduled.
[[Page 69774]]
(b) The inspection, testing, and maintenance program required by
this section is not intended to address and should not include
procedures to address employee working conditions that arise in the
course of conducting the inspections, tests, and maintenance set forth
in the program. When reviewing the railroad's program, FRA does not
intend to review or approve any portion of the program that relates to
employee working conditions.
Sec. 299.707 Maintenance intervals.
(a) The initial scheduled maintenance intervals shall be based on
those in effect on the Tokaido Shinkansen system as required under
Sec. 299.13(c)(1).
(b) The maintenance interval of safety-critical components shall be
changed only when justified by accumulated, verifiable operating data,
and approved by FRA under paragraph Sec. 299.713.
Sec. 299.709 Quality control program.
The railroad shall establish an inspection, testing, and
maintenance quality control program enforced by the railroad or its
contractor(s) to reasonably ensure that inspections, testing, and
maintenance are performed in accordance with inspection, testing, and
maintenance program established under this subpart.
Sec. 299.711 Inspection, testing, and maintenance program format.
The submission to FRA for each identified subsystem shall consist
of two parts--
(a) The complete inspection, testing, and maintenance program, in
its entirety, including all required information prescribed in Sec.
299.701, and all information and procedures required for the railroad
and its personnel to implement the program.
(b) A condensed version of the program that contains only those
items identified as safety-critical, per Sec. 299.703 submitted for
approval by FRA under Sec. 299.713.
Sec. 299.713 Program approval procedure.
(a) Submission. Except as provided in Sec. 299.445(a)(2), the
railroad shall submit for approval an inspection, testing, and
maintenance program as described in Sec. 299.711(b) not less than 180
days prior to pre-revenue service system integration testing. The
program shall be submitted to FRA in accordance with Sec. 299.9. If
the railroad seeks to amend an approved program as described in Sec.
299.711(b), the railroad shall file with FRA in accordance with Sec.
299.9 for approval of such amendment not less than 60 days prior to the
proposed effective date of the amendment. A program responsive to the
requirements of this subpart or any amendment to the program shall not
be implemented prior to FRA approval.
(b) Contents. Each program or amendment shall contain:
(1) The information prescribed in Sec. 299.701 for such program or
amendment; and
(2) The name, title, address, and telephone number of the primary
person to be contacted with regard to review of the program, its
content, or amendments.
(c) Approval. (1) Within 90 days of receipt of the initial
inspection, testing, and maintenance program, FRA will review the
program. The Associate Administrator will notify the primary railroad
contact person in writing whether the inspection, testing, and
maintenance program is approved and, if not approved, the specific
points in which the program is deficient. Deficiencies identified shall
be addressed as directed by FRA prior to implementing the program.
(2) FRA will review each proposed amendment to the program that
relaxes an FRA-approved requirement within 45 days of receipt. The
Associate Administrator will then notify the primary railroad contact
person in writing whether the proposed amendment has been approved by
FRA and, if not approved, the specific points in which the proposed
amendment is deficient. The railroad shall correct any deficiencies as
directed by FRA prior to implementing the amendment. For amendments
proposing to make an FRA-approved program requirement more stringent,
the railroad is permitted to implement the amendment prior to obtaining
FRA approval.
(3) Following initial approval of a program or amendment, FRA may
reopen consideration of the program or amendment for cause stated.
(4) The railroad may, subject to FRA review and approval under
Sec. 299.15, implement inspection, testing, maintenance procedures and
criteria, incorporating new or emerging technology.
Appendix A to Part 299--Criteria for Certification of Crashworthy Event
Recorder Memory Module
Section 299.439(c) requires that trainsets be equipped with an
event recorder that includes a certified crashworthy event recorder
memory module. This appendix prescribes the requirements for
certifying an event recorder memory module (ERMM) as crashworthy,
including the performance criteria and test sequence for
establishing the crashworthiness of the ERMM as well as the marking
of the event recorder containing the crashworthy ERMM.
A. General Requirements
(a) Each manufacturer that represents its ERMM as crashworthy
shall, by marking it as specified in section B of this appendix,
certify that the ERMM meets the performance criteria contained in
this appendix and that test verification data are available to the
railroad or to FRA upon request.
(b) The test verification data shall contain, at a minimum, all
pertinent original data logs and documentation that the test sample
preparation, test set up, test measuring devices and test procedures
were performed by designated, qualified individuals using recognized
and acceptable practices. Test verification data shall be retained
by the manufacturer or its successor as long as the specific model
of ERMM remains in service on any trainset.
(c) A crashworthy ERMM shall be marked by its manufacturer as
specified in section B of this appendix.
B. Marking Requirements
(a) The outer surface of the event recorder containing a
certified crashworthy ERMM shall be colored international orange. In
addition, the outer surface shall be inscribed, on the surface
allowing the most visible area, in black letters on an international
orange background, using the largest type size that can be
accommodated, with the words ``CERTIFIED DOT CRASHWORTHY'', followed
by the ERMM model number (or other such designation), and the name
of the manufacturer of the event recorder. This information may be
displayed as follows:
CERTIFIED DOT CRASHWORTHY
Event Recorder Memory Module Model Number
Manufacturer's Name
Marking ``CERTIFIED DOT CRASHWORTHY'' on an event recorder designed
for installation in the railroad's trainsets is the certification
that all performance criteria contained in this appendix have been
met and all functions performed by, or on behalf of, the
manufacturer whose name appears as part of the marking, conform to
the requirements specified in this appendix.
(b) Retro-reflective material shall be applied to the edges of
each visible external surface of an event recorder containing a
certified crashworthy ERMM.
C. Performance Criteria for the ERMM
An ERMM is crashworthy if it has been successfully tested for
survival under conditions of fire, impact shock, static crush, fluid
immersion, and hydro-static pressure contained in one of the two
tables shown in this section of appendix B. (See Tables 1 and 2.)
Each ERMM must meet the individual performance criteria in the
sequence established in section D of this appendix. A performance
criterion is deemed to be met if, after undergoing a test
established in this appendix B for that criterion, the ERMM has
preserved all of the data stored in it. The data set stored in the
ERMM to be tested shall include all the recording elements required
by Sec. 299.439(c). The following tables describe alternative
performance criteria that may be used when testing an ERMM's
[[Page 69775]]
crashworthiness. A manufacturer may utilize either table during its
testing but may not combine the criteria contained in the two
tables.
Table 1 to Appendix A of Part 299--Acceptable Performance Criteria--Option A
----------------------------------------------------------------------------------------------------------------
Parameter Value Duration Remarks
----------------------------------------------------------------------------------------------------------------
Fire, High Temperature............... 750 [deg]C (1400 60 minutes............. Heat source: Oven.
[deg]F).
Fire, Low Temperature................ 260 [deg]C (500 [deg]F) 10 hours...............
Impact Shock......................... 55g.................... 100 ms................. \1/2\ sine crash pulse.
Static Crush......................... 110kN (25,000 lbf)..... 5 minutes..............
Fluid Immersion...................... #1 Diesel, #2 Diesel, Any single fluid, 48
Water, Salt Water, hours.
Lube Oil.
Fire Fighting Fluid.... 10 minutes, following Immersion followed by
immersion above. 48 hours in a dry
location without
further disturbance.
Hydrostatic Pressure................. Depth equivalent = 15 48 hours at nominal
m. (50 ft.). temperature of 25
[deg]C (77 [deg]F).
----------------------------------------------------------------------------------------------------------------
Table 2 to Appendix A to Part 299--Acceptable Performance Criteria--Option B
----------------------------------------------------------------------------------------------------------------
Parameter Value Duration Remarks
----------------------------------------------------------------------------------------------------------------
Fire, High Temperature............... 1,000 [deg]C (1,832 60 minutes............. Heat source: Open
[deg]F). flame.
Fire, Low Temperature................ 260 [deg]C (500 [deg]F) 10 hours............... Heat source: Oven.
Impact Shock--Option 1............... 23gs................... 250 ms.................
Impact Shock--Option 2............... 55gs................... 100 ms................. \1/2\ sine crash pulse.
Static Crush......................... 111.2kN (25,000 lbf), 5 minutes. (single Applied to 25% of
44.5kN (10,000 lbf). ``squeeze''). surface of largest
face.
Fluid Immersion...................... #1 Diesel, #2 Diesel, 48 hours each..........
Water, Salt Water,
Lube Oil, Fire
Fighting Fluid.
Hydrostatic Pressure................. 46.62 psig (= 30.5 m. 48 hours at nominal
or 100 ft.). temperature of 25
[deg]C (77 [deg]F).
----------------------------------------------------------------------------------------------------------------
D. Testing Sequence
In order to reasonably duplicate the conditions an event
recorder may encounter, the ERMM shall meet the various performance
criteria, described in section C of this appendix, in a set
sequence. (See Figure 1). If all tests are done in the set sequence
(single branch testing), the same ERMM must be utilized throughout.
If a manufacturer opts for split branch testing, each branch of the
test must be conducted using an ERMM of the same design type as used
for the other branch. Both alternatives are deemed equivalent, and
the choice of single branch testing or split branch testing may be
determined by the party representing that the ERMM meets the
standard.
[[Page 69776]]
[GRAPHIC] [TIFF OMITTED] TR03NO20.012
E. Testing Exception
If a new model ERMM represents an evolution or upgrade from an
older model ERMM that was previously tested and certified as meeting
the performance criteria contained in section C of this appendix,
the new model ERMM need only be tested for compliance with those
performance criteria contained in section C of this appendix that
are potentially affected by the upgrade or modification. FRA will
consider a performance criterion not to be potentially affected if a
preliminary engineering analysis or other pertinent data establishes
that the modification or upgrade will not change the performance of
the older model ERMM against the performance criterion in question.
The manufacturer shall retain and make available to FRA upon request
any analysis or data relied upon to satisfy the requirements of this
paragraph to sustain an exception from testing.
Appendix B to Part 299--Cab Noise Test Protocol
This appendix prescribes the procedures for the in-cab noise
measurements for high-speed trainsets at speed. The purpose of the
cab noise testing is to ensure that the noise levels within the cab
of the trainset meet the minimum requirements defined within Sec.
299.431(h).
A. Measurement Instrumentation
The instrumentation used shall conform to the requirements
prescribed in appendix H to part 229 of this chapter.
B. Test Site Requirements
The test shall meet the following requirements:
(a) The passenger trainset shall be tested over a representative
segment of the railroad and shall not be tested in any site
specifically designed to artificially lower in-cab noise levels.
(b) All windows, doors, cabinets, seals, etc., must be installed
in the trainset cab and be closed.
(c) The heating, ventilation and air conditioning (HVAC) system
or a dedicated heating or air conditioner system must be operating
on high, and the vents must be open and unobstructed.
C. Procedures for Measurement
(a) LAeq,T is defined as the A-weighted, equivalent
sound level for a duration of T seconds, and the sound level meter
shall be set for A-weighting with slow response.
(b) The sound level meter shall be calibrated with the acoustic
calibrator immediately before and after the in-cab tests. The
calibration levels shall be recorded.
(c) Any change in the before and after calibration level(s)
shall be less than 0.5 dB.
(d) The sound level meter shall be located:
(1) Laterally as close as practicable to the longitudinal
centerline of the cab, adjacent to the driver's seat,
(2) Longitudinally at the center of the driver's nominal seating
position, and
(3) At a height 1219 mm (48 inches) above the floor.
(e) The sound measurements shall be taken autonomously within
the cab.
(f) The sound level shall be recorded at the maximum approved
trainset speed (0/-3 km/h).
(g) After the passenger trainset speed has become constant at
the maximum test speed and the in-cab noise is continuous,
LAeq,T shall be measured, either directly or using a 1
second sampling interval, for a minimum duration of 30 seconds at
the measurement position (LAeq, 30s).
D. Reporting
To demonstrate compliance, the railroad shall prepare and submit
a test report in accordance with Sec. 299.613. As a minimum that
report shall contain--
(a) Name(s) of person(s) conducting the test, and the date of
the test.
(b) Description of the passenger trainset cab being tested,
including: Car number and date of manufacture.
(c) Description of sound level meter and calibrator, including:
Make, model, type, serial number, and manufacturer's calibration
date.
(d) The recorded measurement during calibration and for the
microphone location during operating conditions.
(e) The recorded measurements taken during the conduct of the
test.
(f) Other information as appropriate to describe the testing
conditions and procedure.
Issued in Washington, DC.
Quintin Kendall,
Deputy Administrator.
[FR Doc. 2020-20388 Filed 11-2-20; 8:45 am]
BILLING CODE 4910-06-P