Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests; Dominion Energy South Carolina, Inc., 68318-68319 [2020-23867]

Download as PDF 68318 Federal Register / Vol. 85, No. 209 / Wednesday, October 28, 2020 / Notices at any time if it determines the factual basis underlying the petition for waiver is incorrect, or the results from the alternate test procedure are unrepresentative of a basic model’s true energy consumption characteristics. 10 CFR 431.401(k)(1). Likewise, Hoshizaki may request that DOE rescind or modify the waiver if Hoshizaki discovers an error in the information provided to DOE as part of its petition, determines that the waiver is no longer needed, or for other appropriate reasons. 10 CFR 431.401(k)(2). (6) Hoshizaki remains obligated to fulfill any certification requirements set forth at 10 CFR part 429. Signed in Washington, DC, on October 22, 2020. Alexander N. Fitzsimmons, Deputy Assistant Secretary for Energy Efficiency, Energy Efficiency and Renewable Energy. [FR Doc. 2020–23818 Filed 10–27–20; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 516–505] jbell on DSKJLSW7X2PROD with NOTICES Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests; Dominion Energy South Carolina, Inc. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Non-project use of project lands and water. b. Project No: 516–505. c. Date Filed: June 12, 2020 and supplemented on September 17, 2020. d. Applicant: Dominion Energy South Carolina, Inc. e. Name of Project: Saluda Hydroelectric Project. f. Location: Lake Murray of the Saluda Hydroelectric Project located in Lexington, Newberry, Richland and Saluda counties, South Carolina. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Mr. Raymond Ammarell, Manager, Dominion Energy South Carolina, Inc., 220 Operation Way, MC A221, Cayce, South Carolina, 29033; phone (803) 217–7322. i. FERC Contact: Ms. Joy Kurtz, 202– 502–6760, joy.kurtz@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: November 21, 2020. The Commission strongly encourages electronic filing. Please file comments, VerDate Sep<11>2014 18:29 Oct 27, 2020 Jkt 253001 motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include the docket number P–516–505. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: The licensee requests Commission approval to grant the Joint Municipal Water and Sewer Commission (JMWSC) permission to use project lands and water within the project boundary on Lake Murray for the construction and operation of a component of a raw water intake facility (facility) to provide public drinking water. The component of the facility proposed to be constructed within the project boundary is a single screened 84′ intake pipe that would extend from the shoreline of Lake Murray into Lake Murray itself. The remaining components of the facility would be constructed outside of the project boundary. Once constructed and operational, the facility would initially withdraw 10 million gallons per day (MGD) from Lake Murray. Subsequently, JMWSC would increase withdrawals made by the facility in 10 MGD increments over time, as needed, up to PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 a maximum of 50 MGD, as water demands dictate. l. Locations of the Application: In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https://ferc.gov) using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO INTERVENE as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. E:\FR\FM\28OCN1.SGM 28OCN1 Federal Register / Vol. 85, No. 209 / Wednesday, October 28, 2020 / Notices Dated: October 22, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–23867 Filed 10–27–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission jbell on DSKJLSW7X2PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC21–11–000. Applicants: AL Solar A, LLC, Five Points Solar Park LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act, et al. of AL Solar A, LLC, et al. Filed Date: 10/21/20. Accession Number: 20201021–5148. Comments Due: 5 p.m. ET 11/12/20. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG21–11–000. Applicants: Nutmeg Solar, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Nutmeg Solar, LLC. Filed Date: 10/22/20. Accession Number: 20201022–5078. Comments Due: 5 p.m. ET 11/12/20. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER19–5–005. Applicants: Commonwealth Edison Company, PJM Interconnection, L.L.C. Description: Compliance filing: ComEd submits Compliance Filing in ER19–5 to be effective 6/1/2020. Filed Date: 10/21/20. Accession Number: 20201021–5119. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER19–6–006. Applicants: Delmarva Power & Light Company, PJM Interconnection, L.L.C. Description: Compliance filing: Delmarva submits Compliance Filing in ER19–6 to be effective 6/1/2020. Filed Date: 10/21/20. Accession Number: 20201021–5122. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER19–14–005. Applicants: Baltimore Gas and Electric Company, PJM Interconnection, L.L.C. Description: Compliance filing: BGE submits Compliance Filing in ER19–14 to be effective 6/1/2020. Filed Date: 10/21/20. Accession Number: 20201021–5132. VerDate Sep<11>2014 18:29 Oct 27, 2020 Jkt 253001 Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER19–18–005. Applicants: Atlantic City Electric Company, PJM Interconnection, L.L.C. Description: Compliance filing: ACE submits Compliance Filing in ER19–18 to be effective 6/1/2020. Filed Date: 10/21/20. Accession Number: 20201021–5125. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER19–1475–004. Applicants: Potomac Electric Power Company, PJM Interconnection, L.L.C. Description: Compliance filing: Pepco submits Compliance Filing in ER19– 1475 to be effective 6/1/2020. Filed Date: 10/22/20. Accession Number: 20201022–5081. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER19–1553–005. Applicants: Southern California Edison Company. Description: Compliance filing: Compliance Filing—Appendix XII Stakeholder Review Process to be effective 9/23/2020. Filed Date: 10/22/20. Accession Number: 20201022–5070. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER21–61–001. Applicants: El Paso Electric Company. Description: Compliance filing: WECC Soft Cap Justification to be effective N/A. Filed Date: 10/21/20. Accession Number: 20201021–5130. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER21–173–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: First Revised ISA, Service Agreement No. 1504; Queue No. AE1–178 to be effective 9/21/2020. Filed Date: 10/21/20. Accession Number: 20201021–5126. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER21–174–000. Applicants: Kanstar Transmission, LLC. Description: Tariff Cancellation: Cancellation of Kanstar Database to be effective 10/31/2020. Filed Date: 10/22/20. Accession Number: 20201022–5000. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER21–175–000. Applicants: Midwest Power Transmission Arkansas, LLC. Description: Tariff Cancellation: Cancellation of Midwest Power Transmission Ark. Database to be effective 10/31/2020. Filed Date: 10/22/20. Accession Number: 20201022–5001. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER21–176–000. PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 68319 Applicants: Golden Springs Development Company LLC. Description: Appeal for Relief from Assessed Penalty of Electric of Golden Springs Development Company LLC. Filed Date: 10/19/20. Accession Number: 20201019–5162. Comments Due: 5 p.m. ET 11/9/20. Docket Numbers: ER21–177–000. Applicants: Midcontinent Independent System Operator, Inc., Michigan Electric Transmission Company. Description: § 205(d) Rate Filing: 2020–10–22_SA 3132 METC-Wolverine T–T 1st Rev Appendix to be effective 6/1/2018. Filed Date: 10/22/20. Accession Number: 20201022–5003. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER21–178–000. Applicants: Alabama Power Company. Description: § 205(d) Rate Filing: Amendment to Southern’s Tariff Vol. No. 4 to add JEA BAA Mitigation to be effective 10/23/2020. Filed Date: 10/22/20. Accession Number: 20201022–5041. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER21–179–000. Applicants: Deuel Harvest Wind Energy LLC. Description: § 205(d) Rate Filing: Revised Market-Based Rate Tariff Filing to be effective 12/22/2020. Filed Date: 10/22/20. Accession Number: 20201022–5047. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER21–180–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, Service Agreement No. 5814; Queue No. AD1–041 to be effective 9/29/2020. Filed Date: 10/22/20. Accession Number: 20201022–5052. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER21–181–000. Applicants: Contrail Wind Project, LLC. Description: § 205(d) Rate Filing: Revised Market-Based Rate Tariff to be effective 12/22/2020. Filed Date: 10/22/20. Accession Number: 20201022–5054. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER21–182–000. Applicants: Crescent Wind LLC. Description: § 205(d) Rate Filing: Revised Market-Based Rate Tariff Filing to be effective 12/22/2020. Filed Date: 10/22/20. Accession Number: 20201022–5056. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER21–183–000. E:\FR\FM\28OCN1.SGM 28OCN1

Agencies

[Federal Register Volume 85, Number 209 (Wednesday, October 28, 2020)]
[Notices]
[Pages 68318-68319]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-23867]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 516-505]


Notice of Application Accepted for Filing and Soliciting 
Comments, Motions To Intervene, and Protests; Dominion Energy South 
Carolina, Inc.

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Non-project use of project lands and water.
    b. Project No: 516-505.
    c. Date Filed: June 12, 2020 and supplemented on September 17, 
2020.
    d. Applicant: Dominion Energy South Carolina, Inc.
    e. Name of Project: Saluda Hydroelectric Project.
    f. Location: Lake Murray of the Saluda Hydroelectric Project 
located in Lexington, Newberry, Richland and Saluda counties, South 
Carolina.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Mr. Raymond Ammarell, Manager, Dominion 
Energy South Carolina, Inc., 220 Operation Way, MC A221, Cayce, South 
Carolina, 29033; phone (803) 217-7322.
    i. FERC Contact: Ms. Joy Kurtz, 202-502-6760, [email protected].
    j. Deadline for filing comments, motions to intervene, and 
protests: November 21, 2020.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at [email protected], (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may 
submit a paper copy. Submissions sent via the U.S. Postal Service must 
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE, Room 1A, Washington, DC 20426. 
Submissions sent via any other carrier must be addressed to: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852. The first page of any filing should 
include the docket number P-516-505. Comments emailed to Commission 
staff are not considered part of the Commission record.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Request: The licensee requests Commission 
approval to grant the Joint Municipal Water and Sewer Commission 
(JMWSC) permission to use project lands and water within the project 
boundary on Lake Murray for the construction and operation of a 
component of a raw water intake facility (facility) to provide public 
drinking water. The component of the facility proposed to be 
constructed within the project boundary is a single screened 84' intake 
pipe that would extend from the shoreline of Lake Murray into Lake 
Murray itself. The remaining components of the facility would be 
constructed outside of the project boundary. Once constructed and 
operational, the facility would initially withdraw 10 million gallons 
per day (MGD) from Lake Murray. Subsequently, JMWSC would increase 
withdrawals made by the facility in 10 MGD increments over time, as 
needed, up to a maximum of 50 MGD, as water demands dictate.
    l. Locations of the Application: In addition to publishing the full 
text of this document in the Federal Register, the Commission provides 
all interested persons an opportunity to view and/or print the contents 
of this document via the internet through the Commission's Home Page 
(https://ferc.gov) using the eLibrary link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. At this time, the Commission has suspended access to the 
Commission's Public Reference Room, due to the proclamation declaring a 
National Emergency concerning the Novel Coronavirus Disease (COVID-19), 
issued by the President on March 13, 2020. For assistance, contact the 
Federal Energy Regulatory Commission at [email protected] or 
call toll-free, (886) 208-3676 or TYY, (202) 502-8659.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title COMMENTS, PROTEST, or MOTION TO INTERVENE as 
applicable; (2) set forth in the heading the name of the applicant and 
the project number of the application to which the filing responds; (3) 
furnish the name, address, and telephone number of the person 
commenting, protesting or intervening; and (4) otherwise comply with 
the requirements of 18 CFR 385.2001 through 385.2005. All comments, 
motions to intervene, or protests must set forth their evidentiary 
basis. Any filing made by an intervenor must be accompanied by proof of 
service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 385.2010.


[[Page 68319]]


    Dated: October 22, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-23867 Filed 10-27-20; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.