Combined Notice of Filings #1, 68319-68320 [2020-23862]

Download as PDF Federal Register / Vol. 85, No. 209 / Wednesday, October 28, 2020 / Notices Dated: October 22, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–23867 Filed 10–27–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission jbell on DSKJLSW7X2PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC21–11–000. Applicants: AL Solar A, LLC, Five Points Solar Park LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act, et al. of AL Solar A, LLC, et al. Filed Date: 10/21/20. Accession Number: 20201021–5148. Comments Due: 5 p.m. ET 11/12/20. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG21–11–000. Applicants: Nutmeg Solar, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Nutmeg Solar, LLC. Filed Date: 10/22/20. Accession Number: 20201022–5078. Comments Due: 5 p.m. ET 11/12/20. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER19–5–005. Applicants: Commonwealth Edison Company, PJM Interconnection, L.L.C. Description: Compliance filing: ComEd submits Compliance Filing in ER19–5 to be effective 6/1/2020. Filed Date: 10/21/20. Accession Number: 20201021–5119. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER19–6–006. Applicants: Delmarva Power & Light Company, PJM Interconnection, L.L.C. Description: Compliance filing: Delmarva submits Compliance Filing in ER19–6 to be effective 6/1/2020. Filed Date: 10/21/20. Accession Number: 20201021–5122. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER19–14–005. Applicants: Baltimore Gas and Electric Company, PJM Interconnection, L.L.C. Description: Compliance filing: BGE submits Compliance Filing in ER19–14 to be effective 6/1/2020. Filed Date: 10/21/20. Accession Number: 20201021–5132. VerDate Sep<11>2014 18:29 Oct 27, 2020 Jkt 253001 Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER19–18–005. Applicants: Atlantic City Electric Company, PJM Interconnection, L.L.C. Description: Compliance filing: ACE submits Compliance Filing in ER19–18 to be effective 6/1/2020. Filed Date: 10/21/20. Accession Number: 20201021–5125. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER19–1475–004. Applicants: Potomac Electric Power Company, PJM Interconnection, L.L.C. Description: Compliance filing: Pepco submits Compliance Filing in ER19– 1475 to be effective 6/1/2020. Filed Date: 10/22/20. Accession Number: 20201022–5081. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER19–1553–005. Applicants: Southern California Edison Company. Description: Compliance filing: Compliance Filing—Appendix XII Stakeholder Review Process to be effective 9/23/2020. Filed Date: 10/22/20. Accession Number: 20201022–5070. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER21–61–001. Applicants: El Paso Electric Company. Description: Compliance filing: WECC Soft Cap Justification to be effective N/A. Filed Date: 10/21/20. Accession Number: 20201021–5130. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER21–173–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: First Revised ISA, Service Agreement No. 1504; Queue No. AE1–178 to be effective 9/21/2020. Filed Date: 10/21/20. Accession Number: 20201021–5126. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER21–174–000. Applicants: Kanstar Transmission, LLC. Description: Tariff Cancellation: Cancellation of Kanstar Database to be effective 10/31/2020. Filed Date: 10/22/20. Accession Number: 20201022–5000. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER21–175–000. Applicants: Midwest Power Transmission Arkansas, LLC. Description: Tariff Cancellation: Cancellation of Midwest Power Transmission Ark. Database to be effective 10/31/2020. Filed Date: 10/22/20. Accession Number: 20201022–5001. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER21–176–000. PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 68319 Applicants: Golden Springs Development Company LLC. Description: Appeal for Relief from Assessed Penalty of Electric of Golden Springs Development Company LLC. Filed Date: 10/19/20. Accession Number: 20201019–5162. Comments Due: 5 p.m. ET 11/9/20. Docket Numbers: ER21–177–000. Applicants: Midcontinent Independent System Operator, Inc., Michigan Electric Transmission Company. Description: § 205(d) Rate Filing: 2020–10–22_SA 3132 METC-Wolverine T–T 1st Rev Appendix to be effective 6/1/2018. Filed Date: 10/22/20. Accession Number: 20201022–5003. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER21–178–000. Applicants: Alabama Power Company. Description: § 205(d) Rate Filing: Amendment to Southern’s Tariff Vol. No. 4 to add JEA BAA Mitigation to be effective 10/23/2020. Filed Date: 10/22/20. Accession Number: 20201022–5041. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER21–179–000. Applicants: Deuel Harvest Wind Energy LLC. Description: § 205(d) Rate Filing: Revised Market-Based Rate Tariff Filing to be effective 12/22/2020. Filed Date: 10/22/20. Accession Number: 20201022–5047. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER21–180–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, Service Agreement No. 5814; Queue No. AD1–041 to be effective 9/29/2020. Filed Date: 10/22/20. Accession Number: 20201022–5052. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER21–181–000. Applicants: Contrail Wind Project, LLC. Description: § 205(d) Rate Filing: Revised Market-Based Rate Tariff to be effective 12/22/2020. Filed Date: 10/22/20. Accession Number: 20201022–5054. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER21–182–000. Applicants: Crescent Wind LLC. Description: § 205(d) Rate Filing: Revised Market-Based Rate Tariff Filing to be effective 12/22/2020. Filed Date: 10/22/20. Accession Number: 20201022–5056. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER21–183–000. E:\FR\FM\28OCN1.SGM 28OCN1 jbell on DSKJLSW7X2PROD with NOTICES 68320 Federal Register / Vol. 85, No. 209 / Wednesday, October 28, 2020 / Notices Applicants: Nutmeg Solar, LLC. Description: Baseline eTariff Filing: Nutmeg Solar, LLC Application for MBR Authority to be effective 11/15/2020. Filed Date: 10/22/20. Accession Number: 20201022–5062. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER21–184–000. Applicants: Alabama Power Company. Description: § 205(d) Rate Filing: Amendment to Southern’s Tariff Vol. No. 4 to remove SCEG BAA Mitigation to be effective 12/31/9998. Filed Date: 10/22/20. Accession Number: 20201022–5064. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER21–185–000. Applicants: Southwestern Electric Power Company. Description: § 205(d) Rate Filing: SWEPCO–ETEC Deep East Loop Contracting Services Agreement— Amended to be effective 10/1/2020. Filed Date: 10/22/20. Accession Number: 20201022–5066. Comments Due: 5 p.m. ET 11/12/20. Docket Numbers: ER21–186–000. Applicants: Tampa Electric Company. Description: § 205(d) Rate Filing: Third Revised Rate Schedule FERC No. 7—Amendment to Exhibit A to be effective 10/22/2020. Filed Date: 10/22/20. Accession Number: 20201022–5080. Comments Due: 5 p.m. ET 11/12/20. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 22, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–23862 Filed 10–27–20; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 18:29 Oct 27, 2020 Jkt 253001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP18–6–000] RH energytrans, LLC; Notice of Request for Extension of Time Take notice that on October 19, 2020, RH energytrans, LLC (RH) requested that the Federal Energy Regulatory Commission (Commission) grant an extension of time, until December 7, 2022, to complete construction of, and place into service, its Meadville and County Line compressor stations in Crawford and Erie Counties, Pennsylvania as authorized in the December 7, 2018 Order Issuing Certificate (Certificate Order).1 Ordering Paragraph B(1) of the Certificate Order required RH to complete the construction of the proposed Risberg Line Project facilities 2 and make them available for service within two years from issuance, or by December 7, 2020.3 On November 22, 2019, the Commission granted RH partial authorization to place into service the pipeline facilities associated with the Risberg Line Project,4 and subsequently, on December 1, 2019, RH placed those facilities into service.5 RH states that it has experienced construction delays due to winter weather, the dissolution of one of its pipeline contractors, and delays resulting from COVID–19 pandemic restrictions. As a result, RH now requests an additional two years, or until December 7, 2022, to complete the authorized construction at the Meadville and County Line compressor stations and make them available for service. This notice establishes a 15-calendar day intervention and comment period deadline. Any person wishing to comment on RH’s request for an extension of time may do so. No reply comments or answers will be considered. If you wish to obtain legal 1 RH energytrans, LLC, 165 FERC 61,218 (2018) (Certificate Order). 2 The Risberg Line Project consists of the conversion of 31.6 miles of existing 8-inch and 12inch natural gas gathering pipeline to transmission service, construction of 28.3 miles of new 12-inch pipeline, conversion of the existing Countyline Compressor station from gathering to transmission service, and construction of a new compressor station at Meadville, PA. 3 Id. at ordering para. (B)(1). 4 RH energytrans, LLC, Docket No. CP18–6–000, Partial Authorization to Commence Service (November 22, 2019). 5 The only authorized facilities not placed into service at that time were the two compressor stations, and the approval was conditioned on RH’s commitment to finalize restoration of the disturbed right-of -way in the spring/summer of 2020. PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 status by becoming a party to the proceedings for this request, you should, on or before the comment date stated below, file a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the Natural Gas Act (18 CFR 157.10).6 As a matter of practice, the Commission itself generally acts on requests for extensions of time to complete construction for Natural Gas Act facilities when such requests are contested before order issuance. For those extension requests that are contested,7 the Commission will aim to issue an order acting on the request within 45 days.8 The Commission will address all arguments relating to whether the applicant has demonstrated there is good cause to grant the extension.9 The Commission will not consider arguments that re-litigate the issuance of the Certificate Order, including whether the Commission properly found the project to be in the public convenience and necessity and whether the Commission’s environmental analysis for the certificate complied with the National Environmental Policy Act.10 At the time a pipeline requests an extension of time, orders on certificates of public convenience and necessity are final and the Commission will not re-litigate their issuance.11 The OEP Director, or his or her designee, will act on those extension requests that are uncontested. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation 6 Only motions to intervene from entities that were party to the underlying proceeding will be accepted. Algonquin Gas Transmission, LLC, 170 FERC 61,144, at P 39 (2020). 7 Contested proceedings are those where an intervenor disputes any material issue of the filing. 18 CFR 385.2201(c)(1) (2020). 8 Algonquin Gas Transmission, LLC, 170 FERC 61,144, at P 40 (2020). 9 Id. P 40. 10 Similarly, the Commission will not re-litigate the issuance of an NGA section 3 authorization, including whether a proposed project is not inconsistent with the public interest and whether the Commission’s environmental analysis for the permit order complied with NEPA. 11 Algonquin Gas Transmission, LLC, 170 FERC 61,144, at P 40 (2020). E:\FR\FM\28OCN1.SGM 28OCN1

Agencies

[Federal Register Volume 85, Number 209 (Wednesday, October 28, 2020)]
[Notices]
[Pages 68319-68320]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-23862]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC21-11-000.
    Applicants: AL Solar A, LLC, Five Points Solar Park LLC.
    Description: Application for Authorization Under Section 203 of the 
Federal Power Act, et al. of AL Solar A, LLC, et al.
    Filed Date: 10/21/20.
    Accession Number: 20201021-5148.
    Comments Due: 5 p.m. ET 11/12/20.

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG21-11-000.
    Applicants: Nutmeg Solar, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status of Nutmeg Solar, LLC.
    Filed Date: 10/22/20.
    Accession Number: 20201022-5078.
    Comments Due: 5 p.m. ET 11/12/20.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER19-5-005.
    Applicants: Commonwealth Edison Company, PJM Interconnection, 
L.L.C.
    Description: Compliance filing: ComEd submits Compliance Filing in 
ER19-5 to be effective 6/1/2020.
    Filed Date: 10/21/20.
    Accession Number: 20201021-5119.
    Comments Due: 5 p.m. ET 11/12/20.

    Docket Numbers: ER19-6-006.
    Applicants: Delmarva Power & Light Company, PJM Interconnection, 
L.L.C.
    Description: Compliance filing: Delmarva submits Compliance Filing 
in ER19-6 to be effective 6/1/2020.
    Filed Date: 10/21/20.
    Accession Number: 20201021-5122.
    Comments Due: 5 p.m. ET 11/12/20.

    Docket Numbers: ER19-14-005.
    Applicants: Baltimore Gas and Electric Company, PJM 
Interconnection, L.L.C.
    Description: Compliance filing: BGE submits Compliance Filing in 
ER19-14 to be effective 6/1/2020.
    Filed Date: 10/21/20.
    Accession Number: 20201021-5132.
    Comments Due: 5 p.m. ET 11/12/20.

    Docket Numbers: ER19-18-005.
    Applicants: Atlantic City Electric Company, PJM Interconnection, 
L.L.C.
    Description: Compliance filing: ACE submits Compliance Filing in 
ER19-18 to be effective 6/1/2020.
    Filed Date: 10/21/20.
    Accession Number: 20201021-5125.
    Comments Due: 5 p.m. ET 11/12/20.

    Docket Numbers: ER19-1475-004.
    Applicants: Potomac Electric Power Company, PJM Interconnection, 
L.L.C.
    Description: Compliance filing: Pepco submits Compliance Filing in 
ER19-1475 to be effective 6/1/2020.
    Filed Date: 10/22/20.
    Accession Number: 20201022-5081.
    Comments Due: 5 p.m. ET 11/12/20.

    Docket Numbers: ER19-1553-005.
    Applicants: Southern California Edison Company.
    Description: Compliance filing: Compliance Filing--Appendix XII 
Stakeholder Review Process to be effective 9/23/2020.
    Filed Date: 10/22/20.
    Accession Number: 20201022-5070.
    Comments Due: 5 p.m. ET 11/12/20.

    Docket Numbers: ER21-61-001.
    Applicants: El Paso Electric Company.
    Description: Compliance filing: WECC Soft Cap Justification to be 
effective N/A.
    Filed Date: 10/21/20.
    Accession Number: 20201021-5130.
    Comments Due: 5 p.m. ET 11/12/20.

    Docket Numbers: ER21-173-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: First Revised ISA, Service 
Agreement No. 1504; Queue No. AE1-178 to be effective 9/21/2020.
    Filed Date: 10/21/20.
    Accession Number: 20201021-5126.
    Comments Due: 5 p.m. ET 11/12/20.

    Docket Numbers: ER21-174-000.
    Applicants: Kanstar Transmission, LLC.
    Description: Tariff Cancellation: Cancellation of Kanstar Database 
to be effective 10/31/2020.
    Filed Date: 10/22/20.
    Accession Number: 20201022-5000.
    Comments Due: 5 p.m. ET 11/12/20.

    Docket Numbers: ER21-175-000.
    Applicants: Midwest Power Transmission Arkansas, LLC.
    Description: Tariff Cancellation: Cancellation of Midwest Power 
Transmission Ark. Database to be effective 10/31/2020.
    Filed Date: 10/22/20.
    Accession Number: 20201022-5001.
    Comments Due: 5 p.m. ET 11/12/20.

    Docket Numbers: ER21-176-000.
    Applicants: Golden Springs Development Company LLC.
    Description: Appeal for Relief from Assessed Penalty of Electric of 
Golden Springs Development Company LLC.
    Filed Date: 10/19/20.
    Accession Number: 20201019-5162.
    Comments Due: 5 p.m. ET 11/9/20.

    Docket Numbers: ER21-177-000.
    Applicants: Midcontinent Independent System Operator, Inc., 
Michigan Electric Transmission Company.
    Description: Sec.  205(d) Rate Filing: 2020-10-22_SA 3132 METC-
Wolverine T-T 1st Rev Appendix to be effective 6/1/2018.
    Filed Date: 10/22/20.
    Accession Number: 20201022-5003.
    Comments Due: 5 p.m. ET 11/12/20.

    Docket Numbers: ER21-178-000.
    Applicants: Alabama Power Company.
    Description: Sec.  205(d) Rate Filing: Amendment to Southern's 
Tariff Vol. No. 4 to add JEA BAA Mitigation to be effective 10/23/2020.
    Filed Date: 10/22/20.
    Accession Number: 20201022-5041.
    Comments Due: 5 p.m. ET 11/12/20.

    Docket Numbers: ER21-179-000.
    Applicants: Deuel Harvest Wind Energy LLC.
    Description: Sec.  205(d) Rate Filing: Revised Market-Based Rate 
Tariff Filing to be effective 12/22/2020.
    Filed Date: 10/22/20.
    Accession Number: 20201022-5047.
    Comments Due: 5 p.m. ET 11/12/20.

    Docket Numbers: ER21-180-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA, Service 
Agreement No. 5814; Queue No. AD1-041 to be effective 9/29/2020.
    Filed Date: 10/22/20.
    Accession Number: 20201022-5052.
    Comments Due: 5 p.m. ET 11/12/20.

    Docket Numbers: ER21-181-000.
    Applicants: Contrail Wind Project, LLC.
    Description: Sec.  205(d) Rate Filing: Revised Market-Based Rate 
Tariff to be effective 12/22/2020.
    Filed Date: 10/22/20.
    Accession Number: 20201022-5054.
    Comments Due: 5 p.m. ET 11/12/20.

    Docket Numbers: ER21-182-000.
    Applicants: Crescent Wind LLC.
    Description: Sec.  205(d) Rate Filing: Revised Market-Based Rate 
Tariff Filing to be effective 12/22/2020.
    Filed Date: 10/22/20.
    Accession Number: 20201022-5056.
    Comments Due: 5 p.m. ET 11/12/20.

    Docket Numbers: ER21-183-000.

[[Page 68320]]

    Applicants: Nutmeg Solar, LLC.
    Description: Baseline eTariff Filing: Nutmeg Solar, LLC Application 
for MBR Authority to be effective 11/15/2020.
    Filed Date: 10/22/20.
    Accession Number: 20201022-5062.
    Comments Due: 5 p.m. ET 11/12/20.

    Docket Numbers: ER21-184-000.
    Applicants: Alabama Power Company.
    Description: Sec.  205(d) Rate Filing: Amendment to Southern's 
Tariff Vol. No. 4 to remove SCEG BAA Mitigation to be effective 12/31/
9998.
    Filed Date: 10/22/20.
    Accession Number: 20201022-5064.
    Comments Due: 5 p.m. ET 11/12/20.

    Docket Numbers: ER21-185-000.
    Applicants: Southwestern Electric Power Company.
    Description: Sec.  205(d) Rate Filing: SWEPCO-ETEC Deep East Loop 
Contracting Services Agreement--Amended to be effective 10/1/2020.
    Filed Date: 10/22/20.
    Accession Number: 20201022-5066.
    Comments Due: 5 p.m. ET 11/12/20.

    Docket Numbers: ER21-186-000.
    Applicants: Tampa Electric Company.
    Description: Sec.  205(d) Rate Filing: Third Revised Rate Schedule 
FERC No. 7--Amendment to Exhibit A to be effective 10/22/2020.
    Filed Date: 10/22/20.
    Accession Number: 20201022-5080.
    Comments Due: 5 p.m. ET 11/12/20.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: October 22, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-23862 Filed 10-27-20; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.