Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Columbia Gulf Transmission, LLC East Lateral Xpress Project, 68063-68065 [2020-23726]
Download as PDF
jbell on DSKJLSW7X2PROD with NOTICES
Federal Register / Vol. 85, No. 208 / Tuesday, October 27, 2020 / Notices
FERC Contact: Anumzziatta
Purchiaroni, (202) 502–6191,
Anumzziatta.purchiaroni@ferc.gov.
Deadline for filing comments, motions
to intervene, and protests: 30 Days from
the date that the Commission issues this
notice. The Commission strongly
encourages electronic filing. Please file
comments, motions to intervene, and
protests using the Commission’s eFiling
system at https://www.ferc.gov/docsfiling/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via U.S. Postal Service must be
addressed to, Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to, Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–10896–025. Comments
emailed to Commission staff are not
considered part of the Commission
record.
In addition to publishing the full text
of this notice in the Federal Register,
the Commission provides all interested
persons an opportunity to view and/or
print the contents of this notice, as well
as other documents in the proceeding
(e.g., license application) via the
internet through the Commission’s
Home Page (https://www.ferc.gov) using
the eLibrary link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document (P–10896). At this time, the
Commission has suspended access to
the Commission’s Public Reference
Room due to the proclamation declaring
a National Emergency concerning the
Novel Coronavirus Disease (COVID–19)
issued by the President on March 13,
2020. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3673 or (202) 502–
8659 (TTY).
Dated: October 21, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–23728 Filed 10–26–20; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
18:26 Oct 26, 2020
Jkt 253001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–527–000]
Notice of Scoping Period Requesting
Comments on Environmental Issues
for the Proposed Columbia Gulf
Transmission, LLC East Lateral Xpress
Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental document, that will
discuss the environmental impacts of
the East Lateral XPress Project involving
construction and operation of facilities
by Columbia Gulf Transmission, LLC
(Columbia Gulf) in St. Mary, Lafourche,
Jefferson, and Plaquemines Parishes,
Louisiana. The Commission will use
this environmental document in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies regarding the
project. As part of the National
Environmental Policy Act (NEPA)
review process, the Commission takes
into account concerns the public may
have about proposals and the
environmental impacts that could result
from its action whenever it considers
the issuance of a Certificate of Public
Convenience and Necessity. This
gathering of public input is referred to
as scoping. The main goal of the scoping
process is to focus the analysis in the
environmental document on the
important environmental issues.
Additional information about the
Commission’s NEPA process is
described below in the NEPA Process
and the Environmental Document
section of this notice.
By this notice, the Commission
requests public comments on the scope
of issues to address in the
environmental document. To ensure
that your comments are timely and
properly recorded, please submit your
comments so that the Commission
receives them in Washington, DC on or
before 5:00 p.m. Eastern Time on
November 20, 2020. Comments may be
submitted in written form. Further
details on how to submit comments are
provided in the Public Participation
section of this notice.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
Your input will help the Commission
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
68063
staff determine what issues they need to
evaluate in the environmental
document. Commission staff will
consider all written comments during
the preparation of the environmental
document.
If you submitted comments on this
project to the Commission before the
opening of this docket on September 24,
2020, you will need to file those
comments in Docket No. CP20–527–000
to ensure they are considered as part of
this proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
easement agreement. You are not
required to enter into an agreement.
However, if the Commission approves
the project, the Natural Gas Act conveys
the right of eminent domain to the
company. Therefore, if you and the
company do not reach an easement
agreement, the pipeline company could
initiate condemnation proceedings in
court. In such instances, compensation
would be determined by a judge in
accordance with state law. The
Commission does not subsequently
grant, exercise, or oversee the exercise
of that eminent domain authority. The
courts have exclusive authority to
handle eminent domain cases; the
Commission has no jurisdiction over
these matters.
Columbia Gulf provided landowners
with a fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ which addresses typically
asked questions, including the use of
eminent domain and how to participate
in the Commission’s proceedings. This
fact sheet along with other landowner
topics of interest are available for
viewing on the FERC website
(www.ferc.gov) under the Natural Gas
Questions or Landowner Topics link.
Public Participation
There are three methods you can use
to submit your comments to the
Commission. Please carefully follow
these instructions so that your
comments are properly recorded. The
Commission encourages electronic filing
of comments and has staff available to
E:\FR\FM\27OCN1.SGM
27OCN1
68064
Federal Register / Vol. 85, No. 208 / Tuesday, October 27, 2020 / Notices
jbell on DSKJLSW7X2PROD with NOTICES
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to FERC Online. Using
eComment is an easy method for
submitting brief, text-only comments on
a project;
(2) You can file your comments
electronically by using the eFiling
feature, which is also on the
Commission’s website (www.ferc.gov)
under the link to FERC Online. With
eFiling, you can provide comments in a
variety of formats by attaching them as
a file with your submission. New
eFiling users must first create an
account by clicking on eRegister. You
will be asked to select the type of filing
you are making; a comment on a
particular project is considered a
‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
Commission. Be sure to reference the
project docket number (CP20–527–000)
on your letter. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
Additionally, the Commission offers a
free service called eSubscription which
makes it easy to stay informed of all
issuances and submittals regarding the
dockets/projects to which you
subscribe. These instant email
notifications are the fastest way to
receive notification and provide a link
to the document files which can reduce
the amount of time you spend
researching proceedings. Go to https://
www.ferc.gov/ferc-online/overview to
register for eSubscription.
Summary of the Proposed Project
Columbia Gulf proposes to construct
and operate two new compressor
stations, a new meter station, and other
appurtenant facilities. The East Lateral
XPress Project would create about 183
million standard cubic feet per day of
incremental natural gas capacity.
According to Columbia Gulf, the
purpose of the proposed project is to
provide a total of 725 million standard
cubic feet per day of firm transportation
capacity, through a combination of
incremental and existing capacity on
Columbia Gulf’s interstate natural gas
pipeline system, to supply feed gas for
VerDate Sep<11>2014
18:26 Oct 26, 2020
Jkt 253001
Venture Global LNG’s Plaquemines LNG
facility in Plaquemines Parish.
The East Lateral XPress Project would
consist of the following facilities:
• 8.1 miles of 30-inch-diameter
pipeline lateral within Barataria Bay in
Jefferson and Plaquemines Parish,
Louisiana;
• a new 23,470-horsepower (hp)
compressor station at an existing
Columbia Gulf abandoned compressor
station site in St. Mary Parish, Louisiana
(Centerville Compressor Station);
• a new 23,470-hp compressor station
adjacent to an existing tie-in facility in
Lafourche Parish, Louisiana (Golden
Meadow Compressor Station);
• one new delivery meter station;
• one new tie-in facility in Barataria
Bay; and
• two new mainline valves.
The general location of the project
facilities is shown in appendix 1.1
Land Requirements for Construction
Construction of the proposed facilities
would disturb about 744 acres of land
for the aboveground facilities and the
pipeline. Construction of the
compressor stations would require a
total of 29.3 acres of land, and
construction of the pipeline facilities in
Barataria Bay would require a total of
714.6 acres of open water/seafloor.
Following construction, Columbia Gulf
would maintain about 500 acres for
permanent operation of the project’s
facilities; the remaining acreage would
be restored and revert to former uses.
NEPA Process and the Environmental
Document
Any environmental document issued
by the Commission will discuss impacts
that could occur as a result of the
construction and operation of the
proposed project under the relevant
general resource areas:
• Geology and soils;
• water resources and wetlands;
• vegetation and wildlife;
• threatened and endangered species;
• cultural resources;
• land use;
• socioeconomics;
• air quality and noise; and
• reliability and safety.
1 The appendices referenced in this notice will
not appear in the Federal Register. Copies of the
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called eLibrary. For instructions on
connecting to eLibrary, refer to the last page of this
notice. At this time, the Commission has suspended
access to the Commission’s Public Reference Room
due to the proclamation declaring a National
Emergency concerning the Novel Coronavirus
Disease (COVID–19), issued by the President on
March 13, 2020. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll free, (886)
208–3676 or TTY (202) 502–8659.
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
Commission staff have already
identified issues that deserve attention
based on a preliminary review of the
proposed facilities and the
environmental information provided by
Columbia Gulf. This preliminary list of
issues may change based on your
comments and our analysis:
• Water resources; and
• essential fish habitat.
Commission staff will also evaluate
reasonable alternatives to the proposed
project or portions of the project and
make recommendations on how to
lessen or avoid impacts on the various
resource areas. Your comments will
help Commission staff identify and
focus on the issues that might have an
effect on the human environment and
potentially eliminate others from further
study and discussion in the
environmental document.
Following this scoping period,
Commission staff will determine
whether to prepare an Environmental
Assessment (EA) or an Environmental
Impact Statement (EIS). The EA or the
EIS will present Commission staff’s
independent analysis of the issues. If
Commission staff prepares an EA, a
Notice of Schedule for the Preparation
of an EA will be issued. The EA may be
issued for an allotted public comment
period. The Commission would
consider timely comments on the EA
before making its decision regarding the
proposed project. If Commission staff
prepares an EIS, a Notice of Intent to
Prepare an EIS/Notice of Schedule will
be issued, which will open up an
additional comment period. Staff will
then prepare a draft EIS which will be
issued for public comment. Commission
staff will consider all timely comments
received during the comment period on
the draft EIS and revise the document,
as necessary, before issuing a final EIS.
Any EA or draft and final EIS will be
available in electronic format in the
public record through eLibrary 2 and the
Commission’s natural gas
environmental documents web page
(https://www.ferc.gov/industries-data/
natural-gas/environment/
environmental-documents). If
eSubscribed, you will receive instant
email notification when the
environmental document is issued.
With this notice, the Commission is
asking agencies with jurisdiction by law
and/or special expertise with respect to
the environmental issues of this project
to formally cooperate in the preparation
of the environmental document.3
2 For instructions on connecting to eLibrary, refer
to the last page of this notice.
3 The Council on Environmental Quality
regulations addressing cooperating agency
E:\FR\FM\27OCN1.SGM
27OCN1
Federal Register / Vol. 85, No. 208 / Tuesday, October 27, 2020 / Notices
Agencies that would like to request
cooperating agency status should follow
the instructions for filing comments
provided under the Public Participation
section of this notice.
Consultation Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, the Commission is
using this notice to initiate consultation
with the applicable State Historic
Preservation Office(s), and to solicit
their views and those of other
government agencies, interested Indian
tribes, and the public on the project’s
potential effects on historic properties.4
The environmental document for this
project will document findings on the
impacts on historic properties and
summarize the status of consultations
under section 106.
Environmental Mailing List
jbell on DSKJLSW7X2PROD with NOTICES
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project and includes a
mailing address with their comments.
Commission staff will update the
environmental mailing list as the
analysis proceeds to ensure that
Commission notices related to this
environmental review are sent to all
individuals, organizations, and
government entities interested in and/or
potentially affected by the proposed
project.
If you need to make changes to your
name/address, or if you would like to
remove your name from the mailing list,
please return the attached ‘‘Mailing List
Update Form’’ (appendix 2).
responsibilities are at Title 40, Code of Federal
Regulations, Section 1501.6.
4 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
VerDate Sep<11>2014
18:26 Oct 26, 2020
Jkt 253001
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
eLibrary link. Click on the eLibrary link,
click on General Search and enter the
docket number in the Docket Number
field. Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or (866)
208–3676, or for TTY, contact (202)
502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Public sessions or site visits will be
posted on the Commission’s calendar
located at https://www.ferc.gov/newsevents/events along with other related
information.
Dated: October 21, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–23726 Filed 10–26–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–507–000]
Transcontinental Gas Pipe Line
Company, LLC; Notice of Schedule for
Environmental Review of the VR–22 to
Shore Abandonment Project
On August 6, 2020, Transcontinental
Gas Pipe Line Company, LLC (Transco)
filed an application in Docket No.
CP20–507–000 requesting authorization
pursuant to Section 7(b) of the Natural
Gas Act to abandon certain natural gas
pipeline facilities. The proposed project
is known as the VR–22 to Shore
Abandonment Project (Project) and
consists of abandoning approximately
12.6 miles of 24-inch-diameter pipeline
in Vermilion Parish, Louisiana, and in
offshore waters of Louisiana State and
Federal offshore waters.
On August 17, 2020, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
68065
instant notice identifies the FERC staff’s
planned schedule for the completion of
the EA for the Project.
Schedule for Environmental Review
Issuance of EA February 18, 2021
90-day Federal Authorization Decision
Deadline May 19, 2021
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
Transco proposes to abandon
approximately 12.6 miles of 24-inchdiameter natural gas transmission
pipeline in Vermilion Parish, Louisiana,
and in offshore waters of Louisiana
State and Federal offshore waters. Of the
12.6 miles, Transco proposes to
abandon approximately 9.9 miles in
place, and abandon about 2.7 miles of
pipeline by removal. Additionally,
Transco would remove equipment
associated with meter station 2278 and
meter station 4640, located on the
Vermilion Block 39 Platform and the
VR–22 B Platform offshore, respectively.
According to Transco, the facilities
proposed for abandonment have not
been utilized since 2019 and it does not
anticipate that any additional gas flow
through these facilities will occur in the
future.
Background
On August 26, 2020, the Commission
issued a Notice of Intent to Prepare an
Environmental Assessment for the
Proposed VR–22 to Shore Abandonment
Project and Request for Comments on
Environmental Issues (NOI). The NOI
was sent to affected landowners; federal,
state, and local government agencies;
elected officials; environmental and
public interest groups; Native American
tribes; other interested parties; and local
libraries and newspapers. We received
no comments on the NOI.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
E:\FR\FM\27OCN1.SGM
27OCN1
Agencies
[Federal Register Volume 85, Number 208 (Tuesday, October 27, 2020)]
[Notices]
[Pages 68063-68065]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-23726]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP20-527-000]
Notice of Scoping Period Requesting Comments on Environmental
Issues for the Proposed Columbia Gulf Transmission, LLC East Lateral
Xpress Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental document, that will discuss
the environmental impacts of the East Lateral XPress Project involving
construction and operation of facilities by Columbia Gulf Transmission,
LLC (Columbia Gulf) in St. Mary, Lafourche, Jefferson, and Plaquemines
Parishes, Louisiana. The Commission will use this environmental
document in its decision-making process to determine whether the
project is in the public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies regarding the project. As part of the National Environmental
Policy Act (NEPA) review process, the Commission takes into account
concerns the public may have about proposals and the environmental
impacts that could result from its action whenever it considers the
issuance of a Certificate of Public Convenience and Necessity. This
gathering of public input is referred to as scoping. The main goal of
the scoping process is to focus the analysis in the environmental
document on the important environmental issues. Additional information
about the Commission's NEPA process is described below in the NEPA
Process and the Environmental Document section of this notice.
By this notice, the Commission requests public comments on the
scope of issues to address in the environmental document. To ensure
that your comments are timely and properly recorded, please submit your
comments so that the Commission receives them in Washington, DC on or
before 5:00 p.m. Eastern Time on November 20, 2020. Comments may be
submitted in written form. Further details on how to submit comments
are provided in the Public Participation section of this notice.
Your comments should focus on the potential environmental effects,
reasonable alternatives, and measures to avoid or lessen environmental
impacts. Your input will help the Commission staff determine what
issues they need to evaluate in the environmental document. Commission
staff will consider all written comments during the preparation of the
environmental document.
If you submitted comments on this project to the Commission before
the opening of this docket on September 24, 2020, you will need to file
those comments in Docket No. CP20-527-000 to ensure they are considered
as part of this proceeding.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this proposed
project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the proposed facilities. The company
would seek to negotiate a mutually acceptable easement agreement. You
are not required to enter into an agreement. However, if the Commission
approves the project, the Natural Gas Act conveys the right of eminent
domain to the company. Therefore, if you and the company do not reach
an easement agreement, the pipeline company could initiate condemnation
proceedings in court. In such instances, compensation would be
determined by a judge in accordance with state law. The Commission does
not subsequently grant, exercise, or oversee the exercise of that
eminent domain authority. The courts have exclusive authority to handle
eminent domain cases; the Commission has no jurisdiction over these
matters.
Columbia Gulf provided landowners with a fact sheet prepared by the
FERC entitled ``An Interstate Natural Gas Facility On My Land? What Do
I Need To Know?'' which addresses typically asked questions, including
the use of eminent domain and how to participate in the Commission's
proceedings. This fact sheet along with other landowner topics of
interest are available for viewing on the FERC website (www.ferc.gov)
under the Natural Gas Questions or Landowner Topics link.
Public Participation
There are three methods you can use to submit your comments to the
Commission. Please carefully follow these instructions so that your
comments are properly recorded. The Commission encourages electronic
filing of comments and has staff available to
[[Page 68064]]
assist you at (866) 208-3676 or [email protected].
(1) You can file your comments electronically using the eComment
feature, which is located on the Commission's website (www.ferc.gov)
under the link to FERC Online. Using eComment is an easy method for
submitting brief, text-only comments on a project;
(2) You can file your comments electronically by using the eFiling
feature, which is also on the Commission's website (www.ferc.gov) under
the link to FERC Online. With eFiling, you can provide comments in a
variety of formats by attaching them as a file with your submission.
New eFiling users must first create an account by clicking on
eRegister. You will be asked to select the type of filing you are
making; a comment on a particular project is considered a ``Comment on
a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the Commission. Be sure to reference the project docket number (CP20-
527-000) on your letter. Submissions sent via the U.S. Postal Service
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC
20426. Submissions sent via any other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
12225 Wilkins Avenue, Rockville, Maryland 20852.
Additionally, the Commission offers a free service called
eSubscription which makes it easy to stay informed of all issuances and
submittals regarding the dockets/projects to which you subscribe. These
instant email notifications are the fastest way to receive notification
and provide a link to the document files which can reduce the amount of
time you spend researching proceedings. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
Summary of the Proposed Project
Columbia Gulf proposes to construct and operate two new compressor
stations, a new meter station, and other appurtenant facilities. The
East Lateral XPress Project would create about 183 million standard
cubic feet per day of incremental natural gas capacity. According to
Columbia Gulf, the purpose of the proposed project is to provide a
total of 725 million standard cubic feet per day of firm transportation
capacity, through a combination of incremental and existing capacity on
Columbia Gulf's interstate natural gas pipeline system, to supply feed
gas for Venture Global LNG's Plaquemines LNG facility in Plaquemines
Parish.
The East Lateral XPress Project would consist of the following
facilities:
8.1 miles of 30-inch-diameter pipeline lateral within
Barataria Bay in Jefferson and Plaquemines Parish, Louisiana;
a new 23,470-horsepower (hp) compressor station at an
existing Columbia Gulf abandoned compressor station site in St. Mary
Parish, Louisiana (Centerville Compressor Station);
a new 23,470-hp compressor station adjacent to an existing
tie-in facility in Lafourche Parish, Louisiana (Golden Meadow
Compressor Station);
one new delivery meter station;
one new tie-in facility in Barataria Bay; and
two new mainline valves.
The general location of the project facilities is shown in appendix
1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of the appendices were sent to all
those receiving this notice in the mail and are available at
www.ferc.gov using the link called eLibrary. For instructions on
connecting to eLibrary, refer to the last page of this notice. At
this time, the Commission has suspended access to the Commission's
Public Reference Room due to the proclamation declaring a National
Emergency concerning the Novel Coronavirus Disease (COVID-19),
issued by the President on March 13, 2020. For assistance, contact
FERC at [email protected] or call toll free, (886) 208-3676
or TTY (202) 502-8659.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facilities would disturb about 744
acres of land for the aboveground facilities and the pipeline.
Construction of the compressor stations would require a total of 29.3
acres of land, and construction of the pipeline facilities in Barataria
Bay would require a total of 714.6 acres of open water/seafloor.
Following construction, Columbia Gulf would maintain about 500 acres
for permanent operation of the project's facilities; the remaining
acreage would be restored and revert to former uses.
NEPA Process and the Environmental Document
Any environmental document issued by the Commission will discuss
impacts that could occur as a result of the construction and operation
of the proposed project under the relevant general resource areas:
Geology and soils;
water resources and wetlands;
vegetation and wildlife;
threatened and endangered species;
cultural resources;
land use;
socioeconomics;
air quality and noise; and
reliability and safety.
Commission staff have already identified issues that deserve
attention based on a preliminary review of the proposed facilities and
the environmental information provided by Columbia Gulf. This
preliminary list of issues may change based on your comments and our
analysis:
Water resources; and
essential fish habitat.
Commission staff will also evaluate reasonable alternatives to the
proposed project or portions of the project and make recommendations on
how to lessen or avoid impacts on the various resource areas. Your
comments will help Commission staff identify and focus on the issues
that might have an effect on the human environment and potentially
eliminate others from further study and discussion in the environmental
document.
Following this scoping period, Commission staff will determine
whether to prepare an Environmental Assessment (EA) or an Environmental
Impact Statement (EIS). The EA or the EIS will present Commission
staff's independent analysis of the issues. If Commission staff
prepares an EA, a Notice of Schedule for the Preparation of an EA will
be issued. The EA may be issued for an allotted public comment period.
The Commission would consider timely comments on the EA before making
its decision regarding the proposed project. If Commission staff
prepares an EIS, a Notice of Intent to Prepare an EIS/Notice of
Schedule will be issued, which will open up an additional comment
period. Staff will then prepare a draft EIS which will be issued for
public comment. Commission staff will consider all timely comments
received during the comment period on the draft EIS and revise the
document, as necessary, before issuing a final EIS. Any EA or draft and
final EIS will be available in electronic format in the public record
through eLibrary \2\ and the Commission's natural gas environmental
documents web page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). If eSubscribed, you will receive
instant email notification when the environmental document is issued.
---------------------------------------------------------------------------
\2\ For instructions on connecting to eLibrary, refer to the
last page of this notice.
---------------------------------------------------------------------------
With this notice, the Commission is asking agencies with
jurisdiction by law and/or special expertise with respect to the
environmental issues of this project to formally cooperate in the
preparation of the environmental document.\3\
[[Page 68065]]
Agencies that would like to request cooperating agency status should
follow the instructions for filing comments provided under the Public
Participation section of this notice.
---------------------------------------------------------------------------
\3\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Section 1501.6.
---------------------------------------------------------------------------
Consultation Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, the Commission is using this notice to initiate
consultation with the applicable State Historic Preservation Office(s),
and to solicit their views and those of other government agencies,
interested Indian tribes, and the public on the project's potential
effects on historic properties.\4\ The environmental document for this
project will document findings on the impacts on historic properties
and summarize the status of consultations under section 106.
---------------------------------------------------------------------------
\4\ The Advisory Council on Historic Preservation's regulations
are at Title 36, Code of Federal Regulations, Part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project and includes a mailing address with their
comments. Commission staff will update the environmental mailing list
as the analysis proceeds to ensure that Commission notices related to
this environmental review are sent to all individuals, organizations,
and government entities interested in and/or potentially affected by
the proposed project.
If you need to make changes to your name/address, or if you would
like to remove your name from the mailing list, please return the
attached ``Mailing List Update Form'' (appendix 2).
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website at www.ferc.gov using the eLibrary link. Click on the
eLibrary link, click on General Search and enter the docket number in
the Docket Number field. Be sure you have selected an appropriate date
range. For assistance, please contact FERC Online Support at
[email protected] or (866) 208-3676, or for TTY, contact (202)
502-8659. The eLibrary link also provides access to the texts of all
formal documents issued by the Commission, such as orders, notices, and
rulemakings.
Public sessions or site visits will be posted on the Commission's
calendar located at https://www.ferc.gov/news-events/events along with
other related information.
Dated: October 21, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-23726 Filed 10-26-20; 8:45 am]