Fuel Cell Thermal Energy Output; Bloom Energy Corporation, 67699-67704 [2020-23282]
Download as PDF
Federal Register / Vol. 85, No. 207 / Monday, October 26, 2020 / Proposed Rules
Standards Office, as appropriate. If sending
information directly to the Large Aircraft
Section, International Validation Branch,
send it to the attention of the person
identified in paragraph (j)(2) of this AD.
Information may be emailed to: 9-AVS-AIR730-AMOC@faa.gov. Before using any
approved AMOC, notify your appropriate
principal inspector, or lacking a principal
inspector, the manager of the responsible
Flight Standards Office.
(2) Contacting the Manufacturer: For any
requirement in this AD to obtain instructions
from a manufacturer, the instructions must
be accomplished using a method approved
by the Manager, Large Aircraft Section,
International Validation Branch, FAA; or
EASA; or Airbus SAS’s EASA Design
Organization Approval (DOA). If approved by
the DOA, the approval must include the
DOA-authorized signature.
(3) Required for Compliance (RC): For any
service information referenced in EASA AD
2020–0144 that contains RC procedures and
tests: Except as required by paragraph (i)(2)
of this AD, RC procedures and tests must be
done to comply with this AD; any procedures
or tests that are not identified as RC are
recommended. Those procedures and tests
that are not identified as RC may be deviated
from using accepted methods in accordance
with the operator’s maintenance or
inspection program without obtaining
approval of an AMOC, provided the
procedures and tests identified as RC can be
done and the airplane can be put back in an
airworthy condition. Any substitutions or
changes to procedures or tests identified as
RC require approval of an AMOC.
(j) Related Information
(1) For information about EASA AD 2020–
0144, contact the EASA, Konrad-AdenauerUfer 3, 50668 Cologne, Germany; telephone
+49 221 8999 000; email ADs@
easa.europa.eu; Internet
www.easa.europa.eu. You may find this
EASA AD on the EASA website at https://
ad.easa.europa.eu. You may view this
material at the FAA, Airworthiness Products
Section, Operational Safety Branch, 2200
South 216th St., Des Moines, WA. For
information on the availability of this
material at the FAA, call 206–231–3195. This
material may be found in the AD docket on
the internet at https://www.regulations.gov
by searching for and locating Docket No.
FAA–2020–0969.
(2) For more information about this AD,
contact Kathleen Arrigotti, Aerospace
Engineer, Large Aircraft Section,
International Validation Branch, FAA, 2200
South 216th St., Des Moines, WA 98198;
telephone and fax 206–231–3218; email
kathleen.arrigotti@faa.gov.
Issued on October 16, 2020.
Lance T. Gant,
Director, Compliance & Airworthiness
Division, Aircraft Certification Service.
[FR Doc. 2020–23372 Filed 10–23–20; 8:45 am]
BILLING CODE 4910–13–P
VerDate Sep<11>2014
17:11 Oct 23, 2020
Jkt 253001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
18 CFR Part 292
[Docket Nos. RM21–2–000 and RM20–20–
000]
Fuel Cell Thermal Energy Output;
Bloom Energy Corporation
Federal Energy Regulatory
Commission, Department of Energy.
ACTION: Notice of proposed rulemaking.
AGENCY:
In this Notice of Proposed
Rulemaking, the Federal Energy
Regulatory Commission proposes to
amend the definition of useful thermal
energy output in its regulations
implementing the Public Utility
Regulatory Policies Act of 1978 to
recognize the technical evolution of
cogeneration.
SUMMARY:
DATES:
Comments are due November 25,
2020.
Comments, identified by
docket number, may be filed
electronically at https://www.ferc.gov in
acceptable native applications and
print-to-PDF, but not in scanned or
picture format. For those unable to file
electronically, comments may be filed
by mail or hand-delivery to: Federal
Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE, Washington, DC 20426. The
Comment Procedures Section of this
document contains more detailed filing
procedures.
FOR FURTHER INFORMATION CONTACT:
Lawrence R. Greenfield (Legal
Information), Office of the General
Counsel, Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426, (202) 502–
6415, lawrence.greenfield@ferc.gov
Helen Shepherd (Technical
Information), Office of Energy Market
Regulation, Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426, (202) 502–
6176, helen.shepherd@ferc.gov
Thomas Dautel (Technical Information),
Office of Energy Policy and
Innovation, Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426, (202) 502–
6196, thomas.dautel@ferc.gov
SUPPLEMENTARY INFORMATION:
ADDRESSES:
I. Introduction
1. In this Notice of Proposed
Rulemaking (NOPR), the Federal Energy
Regulatory Commission (Commission)
proposes to revise its regulations
PO 00000
Frm 00016
Fmt 4702
Sfmt 4702
67699
(PURPA Regulations) 1 implementing
sections 201 and 210 of the Public
Utility Regulatory Policies Act of 1978
(PURPA) 2 in light of the development of
Solid Oxide Fuel Cell systems with
integrated natural gas reformation
equipment as a technical evolution of
cogeneration and in response to a
petition for rulemaking submitted by
Bloom Energy Corporation (Bloom
Energy) asking the Commission to take
such action given such development.
2. PURPA was enacted in 1978 as part
of a package of legislative proposals
intended to reduce the country’s
dependence on oil and natural gas,
which at the time were in short supply
and subject to dramatic price increases.3
PURPA sets forth a framework to
encourage the development of
cogeneration facilities that make more
efficient use of the heat produced both
from fossil fuels used in the production
of electricity by using that heat for, e.g.,
industrial purposes, and also from fossil
fuels used for, e.g., industrial purposes
by using that heat for the production of
electricity. As relevant here, as required
by PURPA, a cogeneration facility is a
qualifying facility (QF) if the
Commission determines that the QF
meets certain requirements.4
3. In enacting PURPA, Congress could
not, and did not, predict specific
technological developments that would
occur in future years, but instead
recognized the Commission’s discretion
by directing the Commission to ‘‘from
time to time thereafter revise[ ] such
rules as it determines necessary to
encourage cogeneration.’’ 5 Although in
1978 the predominant form of
cogeneration was a more traditional
combined heat and power, Congress did
not limit the definition of qualifying
cogeneration facilities to the particular
technologies then in existence. Instead,
Congress defined a cogeneration facility
in a more open-ended manner, as a
facility that produces: (1) Electric
energy; and (2) steam or forms of useful
energy, such as heat, which are used for
industrial, commercial, heating or
cooling purpose.6 Congress thus left it
for the Commission to determine the
types of facilities that would qualify as
cogeneration facilities under the statute.
4. Due to innovation and development
in the last decade, Solid Oxide Fuel Cell
1 18
CFR part 292.
U.S.C. 796, 824a–3.
3 Qualifying Facility Rates and Requirements
Implementation Issues Under the Public Utility
Regulatory Policies Act of 1978, Order No. 872, 85
FR 54,638 (Sept. 2, 2020), 172 FERC ¶ 61,041, at P
47 (2020).
4 16 U.S.C. 796(18); 18 CFR 292.203(b), 292.205.
5 16 U.S.C. 824a–3(a).
6 16 U.S.C. 796(18)(A).
2 16
E:\FR\FM\26OCP1.SGM
26OCP1
67700
Federal Register / Vol. 85, No. 207 / Monday, October 26, 2020 / Proposed Rules
systems with integrated natural gas
reformation equipment are now a viable
option for efficient electric energy
cogeneration furthering PURPA’s goal of
encouraging the innovation and
development of cogeneration facilities.
Additionally, the industrial applications
of hydrogen continue to grow, with
distributed production of hydrogen
becoming increasingly important.7 Solid
Oxide Fuel Cell systems with integrated
natural gas reformation equipment
represent ‘‘continuing progress in the
development of efficient electricity
generating technology’’ 8 since the
enactment of PURPA. We find that this
development constitutes a sufficient
change in circumstance since the
Commission’s PURPA regulations were
first promulgated in 1980 9 to warrant
issuing this NOPR.
5. We thus propose to add a new
paragraph (4) to § 292.202(h) of its
PURPA Regulations to amend the
definition of ‘‘[u]seful thermal energy
output’’ of a topping cycle cogeneration
facility to include thermal energy that is
used by a Solid Oxide Fuel Cell system
with an integrated steam hydrocarbon
reformation process for production of
fuel for electricity generation. This
definition would clarify that the thermal
energy produced by a Solid Oxide Fuel
Cell that then uses the thermal energy
it produces to reform methane and
produce hydrogen for electricity
generation is useful thermal energy that
would enable a facility powered by such
fuel cells to be certified as a
cogeneration QF.10 To be clear, this
7 Today almost all the hydrogen produced in the
United States is used for refining petroleum,
treating metals, producing fertilizer, and processing
foods, as the use of hydrogen as a fuel source for
energy generation is currently limited by lack of
infrastructure for hydrogen distribution and
delivery. U.S. Department of Energy, Alternative
Fuels Data Center, Hydrogen Production and
Distribution (Oct 2020), https://afdc.energy.gov/
fuels/hydrogen_production.html#:∼:text=
Natural%20Gas%20Reforming%2
FGasification%3A%20Synthesis,water%20to
%20produce%20additional%20hydrogen. Thus,
using the hydrogen, in this case for electricity
generation, where it is produced represents an
efficient use of that hydrogen.
8 16 U.S.C. 824a–3(n)(1)(A)(iii).
9 Small Power Production and Cogeneration
Facilities—Qualifying Status, Order No. 70, FERC
Stats. & Regs. ¶ 30,134 (cross-referenced at 10 FERC
¶ 61,230), orders on reh’g, Order No. 70–A, FERC
Stats. & Regs. ¶ 30,159 (cross-referenced at 11 FERC
¶ 61,119), order on reh’g, Order No. 70–B, FERC
Stats. & Regs. ¶ 30,176 (cross-referenced at 12 FERC
¶ 61,128), order on reh’g, FERC Stats. & Regs.
¶ 30,192 (1980) (cross-referenced at 12 FERC
¶ 61,306), amending regulations, Order No. 70–D,
FERC Stats. & Regs. ¶ 30,234 (cross-referenced at 14
FERC ¶ 61,076), amending regulations, Order No.
70–E, FERC Stats. & Regs. ¶ 30,274 (1981) (crossreferenced at 15 FERC ¶ 61,281).
10 There are different types of fuel cells, classified
primarily by the kind of electrolyte used, with
different kinds of chemical reactions. The type of
VerDate Sep<11>2014
17:11 Oct 23, 2020
Jkt 253001
NOPR applies only to Solid Oxide Fuel
Cell systems with integrated natural gas
reformation that take in natural gas to
produce hydrogen and to generate
electricity by using steam from the
power generation process to reform the
natural gas to produce the hydrogen that
the Solid Oxide Fuel Cell systems use
to generate electricity.
6. We seek comments on these
proposed reforms 30 days from the date
of publication of the NOPR in the
Federal Register.
II. Background
7. PURPA was part of a legislative
package Congress enacted in 1978 to
address the energy crisis then facing the
country.11 As the Supreme Court
explained in FERC v. Mississippi, in
passing PURPA Congress was aware that
domestic oil production had lagged
behind demand, and the country had
become increasingly dependent on
foreign oil—which could jeopardize the
country’s economy and undermine its
independence.12 Roughly a third of the
nation’s electricity was generated using
oil and natural gas,13 and Congress
concluded that increased reliance on
cogeneration and small power
production could significantly
contribute to conserving this energy.14
As recognized by the Supreme Court,
Congress passed PURPA to address the
consequences of shortages of oil and
natural gas (and electric utilities’
decreasing efficiency in their generating
capacities), which adversely impacted
rates to customers and the economy as
a whole.15
8. Congress enacted PURPA section
210 in 1978 to address the energy crisis
by encouraging the development of QFs
and thereby reducing the country’s
demand for traditional fossil fuels.16 To
accomplish this, section 210(a) directed
that the Commission ‘‘prescribe, and
from time to time thereafter revise, such
rules as [the Commission] determines
necessary to encourage cogeneration
and small power production.’’ 17
chemical reaction determines the temperature range
of operation, and other factors relating to the
suitability of applications. Bloom Energy Petition at
8.
11 See Public Law 95–617, 92 Stat. 3117. In
addition to PURPA, that legislative package
included: The Energy Tax Act of 1978, Public Law
95–618, 92 Stat. 3174; the National Energy
Conservation Policy Act, Public Law 95–619, 92
Stat. 3206; the Powerplant and Industrial Fuel Use
Act of 1978, Public Law 95–620, 92 Stat. 3289; and
the Natural Gas Policy Act of 1978, Public Law 95–
621, 92 Stat. 3351.
12 FERC v. Miss., 456 U.S. 742, 756 (1982).
13 Id. at 745.
14 Id. at 757.
15 Id. at 745–46.
16 Id. at 750.
17 16 U.S.C. 824a–3(a).
PO 00000
Frm 00017
Fmt 4702
Sfmt 4702
9. In 1980, the Commission issued
Order No. 70, which promulgated the
required rules that, as relevant here,
remain in effect today.18 Order No. 70
established the ‘‘criteria and procedures
by which small power producers and
cogeneration facilities can obtain
qualifying status to receive the rate
benefits and exemptions’’ contained in
section 210 of PURPA.19 As relevant
here, the Commission established
criteria for a cogeneration QF, a facility
that, as required by the statute,
‘‘produces electric energy as well as
steam or forms of useful energy (such as
heat) which are used for industrial,
commercial, heating or cooling
purposes.’’ 20
10. In 2005, Congress passed the
Energy Policy Act of 2005 (EPAct
2005).21 Pursuant to section 210 of
PURPA, as modified by section 1253 of
EPAct 2005, the Commission
established regulations to ensure that
new cogeneration QFs are using their
thermal output in a productive and
beneficial manner; that the electrical,
thermal, chemical and mechanical
output of any new cogeneration QFs are
used fundamentally for industrial,
commercial, residential or institutional
purposes; and that there is continuing
progress in the development of efficient
electric energy generating technology.22
In determining whether the thermal
output is used in a ‘‘productive and
beneficial manner,’’ the Commission
stated it would consider factors such as
whether the product produced by the
thermal energy is needed and whether
there is a market for the product.23
11. Unlike more traditional electric
generation that relies on combustion of
fossil fuels to produce electric energy,
fuel cells convert the chemical energy in
hydrogen to electric energy without
combustion. This conversion has been
characterized as a significant
improvement in the efficiency of
electric generation.24 More specifically,
hydrogen fuel enters the anode side of
the fuel cell. Simultaneously, ambient
air enters the cathode side of the fuel
cell. The hydrogen fuel on the anode
18 Order
No. 70, FERC Stats. & Regs. ¶ 30,134.
at 30,933.
20 16 U.S.C. 796(18); accord 18 CFR 292.202(c).
21 Public Law 109–58, 119 Stat. 594, 969–70, as
implemented in Revised Regulations Governing
Small Power Production and Cogeneration
Facilities, Order No. 671, FERC Stats. & Regs.
¶ 31,203 (cross-referenced at 114 FERC ¶ 61,102),
order on reh’g, Order No. 671–A, FERC Stats. &
Regs. ¶ 31,219 (2006) (cross-referenced at 115 FERC
¶ 61,225).
22 16 U.S.C. 824–3(n)(1)(A)(iii).
23 Order No. 671, FERC Stats. & Regs. ¶ 31,203 at
P 17. Here, the relevant product would be
hydrogen.
24 Bloom Energy Petition at 8.
19 Id.
E:\FR\FM\26OCP1.SGM
26OCP1
Federal Register / Vol. 85, No. 207 / Monday, October 26, 2020 / Proposed Rules
attracts oxygen ions from the cathode. In
a Solid Oxide Fuel Cell system with
integrated natural gas reformation
equipment, the resulting
electrochemical reaction provides
electricity, plus heat and steam that is
used to reform natural gas on-site to
produce the hydrogen fuel to fuel the
cell.25
12. If the natural gas reformation
equipment were instead located offsite,
then waste heat (in the form of steam)
from the electricity production by the
Solid Oxide Fuel Cell would not be
available to aid the reformation process
to fuel the cell. In this offsite
reformation scenario, we would expect
the external reformation process to
require additional natural gas to be
burned to create steam so that the
remainder of the input natural gas could
be reformed into hydrogen.26 This
would be inefficient, and inconsistent
with Congress’s goal in enacting
PURPA, as discussed above.
13. Stated another way, integrating
the natural gas reformation process into
a Solid Oxide Fuel Cell generating
facility as described in this NOPR 27
results in significant ‘‘progress in the
development of efficient electric energy
generating technology.’’ 28
III. Commission Proposal
14. As discussed above, the statutory
definition of cogeneration facilities
requires that a cogeneration facility
produce ‘‘(i) electric energy, and (ii)
steam or forms of useful energy (such as
heat) which are used for industrial,
commercial, heating or cooling
purposes. . . .’’ 29 This definition
provides for steam or other forms of
useful energy to be used for, e.g., an
industrial purpose. The creation by a
Solid Oxide Fuel Cell system with an
integrated natural gas reformation
process of a commercially valuable fuel
as described in this NOPR fits within
this definition. Consistent with the
PURPA regulations, Solid Oxide Fuel
Cell systems with integrated natural gas
reformation equipment produce two
forms of energy: Electricity; and the
heat/steam (thermal energy) used to
create the hydrogen (a chemical energy).
15. Currently, the Commission’s
PURPA regulations provide that a
topping-cycle cogeneration facility is a
25 Id.
26 Furthermore, as hydrogen is frequently
compressed or liquified for shipment to the point
of consumption, yet more energy would be needed
for these activities. Id. at 8 & App. B.
27 See supra P 5 (emphasizing the limited scope
of the proposed change in the regulations).
28 Bloom Energy Petition at 1, 3, 7, 16 (citing 16
U.S.C. 824a–3(n)(1)(A)(iii)).
29 16 U.S.C. 796(18)(A).
VerDate Sep<11>2014
17:11 Oct 23, 2020
Jkt 253001
cogeneration facility in which the
energy input to the facility is first used
to produce useful power output and at
least some of the reject heat from the
power production process is then used
to provide useful thermal energy.30
16. Solid Oxide Fuel Cell systems
with integrated natural gas reformation
equipment convert the chemical energy
within natural gas into electricity using
a steam-methane reformation process,31
which converts the natural gas input to
hydrogen, which then reacts with
oxygen in the fuel cell to produce
electricity. The by-product of the fuel
cell’s production of electricity is heat
and steam, some of which is used in the
steam-methane reformation process to
convert more methane into hydrogen,
which the fuel cells use, in combination
with oxygen from the air, to produce
electricity.
17. A cogeneration QF is one that
‘‘produces electric energy as well as
steam or forms of useful energy (such as
heat) which are used for industrial,
commercial, heating or cooling
purposes.’’ 32 Consistent with these
regulations, Solid Oxide Fuel Cell
systems with integrated natural gas
reformation equipment generate two
forms of useful energy—electricity, and
heat/steam (thermal energy) that is used
to produce hydrogen (a chemical
energy). Commission regulations
provide three categories of useful
thermal output of a topping-cycle
cogenerator. They are thermal energy:
(1) That is ‘‘made available to an
industrial or commercial process . . .;
(2) that is used in a heating application
. . .; or (3) that is used in a space
cooling application .’’ 33 We propose to
amend our regulations to provide that
the production of heat/steam by a Solid
Oxide Fuel Cell system for use in an
integrated natural gas reformation
process to produce hydrogen is an
industrial process that, as described in
this NOPR, yields a ‘‘useful thermal
energy output’’ that entitles such a
system to be considered a topping cycle
cogeneration facility that qualifies,
30 18
CFR 292.202(d).
gas manufacturers also produce
hydrogen from natural gas using a steam-methane
reformation process, but must produce their own
steam, usually through combustion of some of the
input natural gas. Because the buyers of the
resulting hydrogen are usually remote from the
industrial gas manufacturer, this hydrogen is either
compressed or liquified in order to transport the
hydrogen to the end user. Integrating the natural gas
steam reformation process into a Solid Oxide Fuel
Cell system increases efficiency and avoids the
energy loss of external reformation, and
compression or liquefaction for surface
transportation. Bloom Energy Petition at 8 & App.
B.
32 16 U.S.C. 796(18).
33 18 CFR 292.202(h).
31 Industrial
PO 00000
Frm 00018
Fmt 4702
Sfmt 4702
67701
subject to meeting the other relevant
requirements,34 to be a QF. The recent
technological advances in utilizing the
thermal energy from a Solid Oxide Fuel
Cell in an integrated steam hydrocarbon
reformation process were not known or
anticipated when the Commission
adopted its original definitions for
useful thermal energy, but that fact
should not stand in the way of the
Commission now recognizing such
advances and responding accordingly.35
18. In sum, recognizing technological
advancements over the past 40 years
and Congress’s commitment to
‘‘continuing progress in the
development of efficient electric energy
generating technology,’’ 36 and in light
of the development and
commercialization of Solid Oxide Fuel
Cell systems with integrated natural gas
reformation equipment since the
original adoption of the PURPA
regulations, we propose to amend
§ 292.202(h) of the PURPA Regulations
by adding a new paragraph to provide
that useful thermal energy output
includes the thermal energy ‘‘that is
used by a solid oxide fuel cell system
with an integrated steam hydrocarbon
reformation process for production of
fuel for electricity generation.’’
19. In proposing this change to its
regulations, the Commission does not
propose to revise § 292.205(d) of the
PURPA Regulations, which establishes
additional criteria for new cogeneration
facilities seeking to sell electric energy
pursuant to PURPA section 210.37 The
Commission proposes that any new
cogeneration facility that is a solid oxide
fuel cell system with an integrated
steam hydrocarbon reformation process
would be required to satisfy the existing
34 See
18 CFR 292.203(b), 292.205.
recognize that in EG&G, Inc., 16 FERC
¶ 61,060, at 61,104 (1981), the Commission stated
that, for cogeneration, ‘‘the use of thermal energy
must be completely independent of the power
production process.’’ That order did not involve
fuel cells and in any event was issued under the
regulations then effective, see id. at 61,103–04,
which we propose to revise in this NOPR, to now
allow—for a Solid Oxide Fuel Cell system with an
integrated natural gas reformation process—the
production of hydrogen to be considered an
industrial process that yields a ‘‘useful thermal
energy output’’ that entitles such a system to be
considered a topping cycle cogeneration facility
that qualifies, subject to meeting the other relevant
requirements, as a QF.
36 16 U.S.C. 824a–3(n)(1)(A)(iii).
37 18 CFR 292.205(d); see also 18 CFR
292.205(d)(4) (‘‘For purposes of paragraphs (d)(1)
and (2) of this section, a new cogeneration facility
of 5 MW or smaller will be presumed to satisfy the
requirements of those paragraphs.’’). That
presumption, we note, is a rebuttable presumption,
though. Revised Regulations Governing Small
Power Production and Cogeneration Facilities,
Order No. 671, 114 FERC ¶ 61,102, at PP 26, 60,
order on reh’g, Order No. 671–A, 115 FERC ¶ 61,225
(2006).
35 We
E:\FR\FM\26OCP1.SGM
26OCP1
67702
Federal Register / Vol. 85, No. 207 / Monday, October 26, 2020 / Proposed Rules
criteria of § 292.205(d) of the PURPA
Regulations if it seeks to make sales of
electric energy pursuant to PURPA
section 210.
IV. Information Collection Statement
20. The Paperwork Reduction Act 38
requires each federal agency to seek and
obtain the Office of Management and
Budget’s (OMB) approval before
undertaking a collection of information
(including reporting, record keeping,
and public disclosure requirements)
directed to ten or more persons or
contained in a rule of general
Public Reporting Burden: In this
NOPR, the Commission proposes to
revise its regulations implementing
PURPA. The proposed change is to
provide that useful thermal energy
outputs will now include the thermal
energy ‘‘that is used by a solid oxide
fuel cell system with an integrated
steam hydrocarbon reformation process
for production of fuel for electricity
generation.’’ The estimated changes to
the burden and cost of the information
collection affected by this NOPR, i.e.,
the FERC Form No. 556, follow.40
applicability. OMB regulations require
approval of certain information
collection requirements contemplated
by proposed rules (including deletion,
revision, or implementation of new
requirements).39 Upon approval of a
collection of information, OMB will
assign an OMB control number and an
expiration date. Respondents subject to
the filing requirements of a rule will not
be penalized for failing to respond to the
collection of information unless the
collection of information displays a
valid OMB control number.
FERC–556, CERTIFICATION OF QUALIFYING FACILITY STATUS FOR A SMALL POWER PRODUCTION OR COGENERATION
FACILITY, PROPOSED CHANGES DUE TO NOPR IN DOCKET NOS. RM21–2–000 AND RM20–20–000 41
Number of
respondents
Annual
number of
responses per
respondent
Total number
of responses
(2)
(1) * (2) = (3)
Average
burden hours
& cost per
response
Facility type
Filing tpe
Cogeneration Facility ≤1 MW 42 ............
Self-certification ....
5
43 600
3,000
Cogeneration Facility >1 MW ...............
Self-certification ....
5
20
100
Cogeneration Facility >1 MW ...............
Application for
FERC certification.
5
1
15
........................
(1)
FERC–556, Total additional burden and cost due to NOPR in
RM21–2 and RM20–20.
...............................
Title: FERC–556, Certification of
Qualifying Facility (QF) Status for a
Small Power Production or
Cogeneration Facility.
Action: Revisions to existing
information collection FERC–556.44
OMB Control No.: 1902–0075.
Respondents: Facilities that are selfcertifying their status as a cogenerator or
that are submitting an application for
Commission certification of their status
as a cogenerator; and electric utilities,
state regulatory authorities, or other
entities submitting comments on, or
protests to, the self-certification or
application for Commission
certification.
Frequency of Information: Ongoing.
Necessity of Information: The
Commission proposes the changes in
this NOPR in order to revise its
implementation of PURPA in light of
38 44
U.S.C. 3501–21.
5 CFR 1320.11.
40 The changes to the FERC Form No. 556,
adopted in Order No. 872 are pending OMB review
(under ICR #202006–1902–004). Those changes are
separate and are not addressed in this NOPR.
41 The figures in this table reflect estimated
changes to the current OMB-approved inventory for
the FERC Form No. 556 (approved by OMB on
November 18, 2019). This table only reflects
cogeneration facilities because small power
production facilities will not be affected by the
proposed changes in the NOPR. The Commission
39 See
VerDate Sep<11>2014
17:11 Oct 23, 2020
Jkt 253001
(4)
Total annual
burden hours
& total annual
cost
Annual cost
per
respondent
($)
(3) * (4) = (5)
(5) ÷ (1)
4,500 hrs.;
$373,500.
1,500 hrs.;
$12,450.
250 hrs.;
$20,750.
$74,700
5
1.5 hrs.;
$124.50.
1.5 hrs.;
$124.50.
50 hrs.; $4,150
3,105
........................
6,250 hrs.;
$406,700.
........................
2,490
4,150
technological advancements in electric
generation since the enactment of
PURPA in 1978.
Internal Review: The Commission has
reviewed the proposed changes and has
determined that such changes are
necessary. These requirements conform
to the Commission’s ongoing need for
efficient information collection,
communication, and management
within the energy industry, in light of
technological advancements in electric
generation.
Interested persons may obtain
information on the reporting
requirements by contacting the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426
[Attention: Ellen Brown, Office of the
Executive Director], by email to
DataClearance@ferc.gov, or by phone
(202) 502–8663.
Please send comments concerning the
collection of information and the
associated burden estimates to: Office of
Information and Regulatory Affairs,
Office of Management and Budget
[Attention: Federal Energy Regulatory
Commission Desk Officer]. Due to
security concerns, comments should be
sent directly to www.reginfo.gov/public/
do/PRAMain. Comments submitted to
OMB should be sent within 30 days of
publication of this proposed rule in the
Federal Register and should refer to
FERC–556 (OMB Control No. 1902–
0075).
staff believes that the industry is similarly situated
to the Commission in terms of wages and benefits.
Therefore, cost estimates are based on FERC’s 2020
average hourly wage (and benefits) of $83.00/hour.
42 Such facilities are not required to file but have
the choice whether to do so.
43 Bloom Energy has stated they have 600
facilities, with an average size of 0.6 MW, see
Bloom Energy Petition at 14, which, if they all were
in fact to file, would result in as many as 600 selfcertifications of below 1 MW facilities. The
Commission accordingly will adopt a conservative
approach and estimate 600 such responses over the
course of a year, which is especially conservative
given that the Commission’s regulations do not
require below-1 MW facilities to submit selfcertifications.
44 The FERC Form No. 556 is not being revised,
but respondents with Solid Oxide Fuel Cell systems
with integrated natural gas reformation equipment
who are self-certifying or requesting Commission
certification as a cogenerator will use the FERC
Form No. 556. On page 8, item 6a of the FERC Form
No. 556, those respondents should indicate ‘‘Fossil
fuel, natural gas (not waste).’’
PO 00000
Frm 00019
Fmt 4702
Sfmt 4702
V. Environmental Analysis
21. The Commission is required to
prepare an Environmental Assessment
or an Environmental Impact Statement
for any action that may have a
significant adverse effect on the human
E:\FR\FM\26OCP1.SGM
26OCP1
Federal Register / Vol. 85, No. 207 / Monday, October 26, 2020 / Proposed Rules
environment.45 Whether and how the
revisions proposed here, however,
would affect QF development and the
environment is speculative.
22. The proposed changes to the
PURPA Regulations do not authorize or
fund particular generation that may
happen to qualify as QFs, nor do they
license or issue permits for operation of
generation that may happen to qualify
as QFs; such generation can be built and
operated independent of, i.e., without,
QF certification. They do not authorize
or prohibit a generator’s use of any
particular technologies or fuels, nor do
they mandate or limit where QFs should
or should not be built. They do not
exempt QFs from any Federal, state or
local environmental, siting, or other
similar laws or regulatory requirements.
Given these facts any environmental
impact analysis of the revisions
proposed here would be speculative and
not meaningfully inform the
Commission or the public of the
revisions’ impact on QF development
or, correspondingly, of any associated
potential impacts on the environment;
there are, in short, no reasonably
foreseeable environmental impacts for
the Commission to consider.46
Moreover, the revisions proposed here
would apply only to a limited number
of QFs: Solid Oxide Fuel Cell systems
with integrated natural gas reformation
equipment. Therefore, the Commission
will not prepare an environmental
document.
VI. Regulatory Flexibility Act Analysis
23. The Regulatory Flexibility Act of
1980 (RFA) 47 generally requires a
description and analysis of proposed
rules that will have significant
economic impact on a substantial
number of small entities. In lieu of
preparing a regulatory flexibility
analysis, an agency may certify that a
proposed rule will not have a significant
economic impact on a substantial
number of small entities.48
24. The Small Business
Administration’s (SBA) Office of Size
Standards develops the numerical
definition of a small business.49 The
45 Regulations Implementing National
Environmental Policy Act of 1969, Order No. 486,
52 FR 47,897 (Dec. 17, 1987), FERC Stats. & Regs.
Preambles 1986–1990 ¶ 30,783 (1987) (crossreferenced at 41 FERC ¶ 61,284).
46 While courts have held that NEPA requires
‘‘reasonable forecasting,’’ an agency is not required
‘‘to engage in speculative analysis’’ or ‘‘to do the
impractical, if not enough information is available
to permit meaningful consideration.’’ N. Plains Res.
Council v. Surface Transp. Board, 668 F.3d 1067,
1078 (9th Cir. 2011).
47 5 U.S.C. 601–12.
48 5 U.S.C. 605(b).
49 13 CFR 121.101.
VerDate Sep<11>2014
17:11 Oct 23, 2020
Jkt 253001
SBA size standard for electric utilities is
based on the number of employees,
including affiliates.50 Under SBA’s
current size standards, the threshold for
a small entity (including its affiliates) is
250 employees for cogeneration in the
NAICS 51 category:
NAICS Code 221118 for Other Electric
Power Generation
25. The Commission does not expect
the proposed revision, if adopted, to
affect a substantial number of small
entities. This proposed rule directly
affects only certain QFs, i.e., those that
are Solid Oxide Fuel Cell systems with
integrated natural gas reformation
equipment; this proposed rule is
voluntary. That is, this proposed rule
expands the types of cogenerators that
would be eligible to qualify as QFs to
include Solid Oxide Fuel Cell systems
with integrated natural gas reformation
equipment, but this proposed rule does
not require Solid Oxide Fuel Cell
systems with integrated natural gas
reformation equipment to file for QF
certification. The Commission does not
anticipate that the number of affected
small entities would be substantial, nor
does the Commission expect that any
additional reporting burden or cost
imposed on QFs, regardless of their
status as a small or large business,
would be significant.52
VII. Comment Procedures
26. The Commission invites interested
persons to submit comments on the
matters and issues proposed in this
document to be adopted, including any
related matters or alternative proposals
that commenters may wish to discuss.
Comments are due November 25, 2020.
Comments must refer to Docket Nos.
RM21–2–000 and RM20–20–000, and
must include the commenter’s name,
the organization the commenter
represents, if applicable, and the
commenter’s address.
27. The Commission encourages
comments to be filed electronically via
the eFiling link on the Commission’s
website at https://www.ferc.gov. The
50 SBA Final Rule on ‘‘Small Business Size
Standards: Utilities,’’ 78 FR 77, 343 (Dec. 23, 2013).
51 The North American Industry Classification
System (NAICS) is an industry classification system
that Federal statistical agencies use to categorize
businesses for the purpose of collecting, analyzing,
and publishing statistical data related to the U.S.
economy. United States Census Bureau, North
American Industry Classification System, https://
www.census.gov/eos/www/naics/ (accessed October
4, 2020).
52 The average cost per response is estimated to
vary from $124.50 to $4,150. The cost per
respondent will vary based on the respondent’s
number of facilities and related requests for selfcertification and applications for Commission
certification (with an estimated cost ranging from
$2,490 to $74,700 per respondent).
PO 00000
Frm 00020
Fmt 4702
Sfmt 4702
67703
Commission accepts most standard
word processing formats. Documents
created electronically using word
processing software should be filed in
native applications or print-to-PDF
format and not in a scanned format.
Commenters filing electronically do not
need to make a paper filing.
28. Commenters that are not able to
file comments electronically must send
an original of their comments to:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE, Washington, DC 20426.
29. All comments will be placed in
the Commission’s public files and may
be viewed, printed, or downloaded
remotely as described in the Document
Availability section below. Commenters
on this proposal are not required to
serve copies of their comments on other
commenters.
VIII. Document Availability
30. In addition to publishing the full
text of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov). At this time, the
Commission has suspended access to
the Commission’s Public Reference
Room due to the President’s March 13,
2020 proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19).
31. From the Commission’s Home
Page on the internet, this information is
available on eLibrary. The full text of
this document is available on eLibrary
in PDF and Microsoft Word format for
viewing, printing, and/or downloading.
To access this document in eLibrary,
type the docket number excluding the
last three digits of this document in the
docket number field.
32. User assistance is available for
eLibrary and the Commission’s website
during normal business hours from the
Commission’s Online Support at 202–
502–6652 (toll free at 1–866–208–3676)
or email at ferconlinesupport@ferc.gov,
or the Public Reference Room at (202)
502–8371. Email the Public Reference
Room at public.referenceroom@ferc.gov.
List of Subjects in 18 CFR Part 292
Electric power plants, Electric
utilities, Reporting and recordkeeping
requirements.
By direction of the Commission.
Issued: October 15, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
In consideration of the foregoing, the
Commission proposes to amend part
E:\FR\FM\26OCP1.SGM
26OCP1
67704
Federal Register / Vol. 85, No. 207 / Monday, October 26, 2020 / Proposed Rules
292, chapter I, title 18, Code of Federal
Regulations, as follows.
PART 292—REGULATIONS UNDER
SECTIONS 201 AND 210 OF THE
PUBLIC UTILITY REGULATORY
POLICIES ACT OF 1978 WITH REGARD
TO SMALL POWER PRODUCTION AND
COGENERATION
1. The authority citation for part 292
continues to read as follows:
■
Authority: 16 U.S.C. 791a-825r, 2601–
2645; 31 U.S.C. 9701; 42 U.S.C. 7101–7352.
2. Amend § 292.202 by:
a. revising paragraphs (h)(2) and (3);
and
■ b. adding paragraph (h)(4).
The revisions and addition read as
follows:
■
■
§ 292.202
Definitions.
*
*
*
*
*
(h) * * *
(2) That is used in a heating
application (e.g., space heating,
domestic hot water heating);
(3) That is used in a space cooling
application (i.e., thermal energy used by
an absorption chiller); or
(4) That is used by a solid oxide fuel
cell system with an integrated steam
hydrocarbon reformation process for
production of fuel for electricity
generation.
*
*
*
*
*
[FR Doc. 2020–23282 Filed 10–23–20; 8:45 am]
BILLING CODE 6717–01–P
NATIONAL LABOR RELATIONS
BOARD
29 CFR Part 102
RIN 3142–AA17
Representation-Case Procedures:
Voter List Contact Information;
Absentee Ballots for Employees on
Military Leave; Reopening of Comment
Period
AGENCY:
National Labor Relations
Board.
Proposed rule; extension of
comment period.
ACTION:
By this Notice of Proposed
Rulemaking, the National Labor
SUMMARY:
VerDate Sep<11>2014
17:11 Oct 23, 2020
Jkt 253001
Relations Board (NLRB) is announcing a
reopening of the period to submit
comments to the initial comments (or
reply comments) to the Notice of
Proposed Rulemaking issued in the
Federal Register on July 29, 2020. On
October 5, 2020, the NLRB issued a
press release indicating the Board was
extending the comment period for
replies to initial comments from October
13, 2020 to October 27, 2020.
DATES: The reply comment period for
the proposed rule published July 29,
2020, at 85 FR 45553, is reopened.
Reply comments to the Notice of
Proposed Rulemaking must be received
by the Board on or before October 27,
2020.
ADDRESSES:
Internet—Federal eRulemaking Portal.
Electronic comments may be submitted
through https://www.regulations.gov.
Delivery—Comments should be
submitted by mail or hand delivery to:
Roxanne L. Rothschild, Executive
Secretary, National Labor Relations
Board, 1015 Half Street SE, Washington,
DC 20570–0001. Because of security
precautions, the Board continues to
experience delays in U.S. mail delivery.
You should take this into consideration
when preparing to meet the deadline for
submitting comments. The Board
encourages electronic filing. It is not
necessary to send comments if they
have been filed electronically with
regulations.gov. If you send comments,
the Board recommends that you confirm
receipt of your delivered comments by
contacting (202) 273–1940 (this is not a
toll-free number). Individuals with
hearing impairments may call 1–866–
315–6572 (TTY/TDD).
Only comments submitted through
https://www.regulations.gov, hand
delivered, or mailed will be accepted; ex
parte communications received by the
Board will be made part of the
rulemaking record and will be treated as
comments only insofar as appropriate.
Comments will be available for public
inspection at https://
www.regulations.gov and during normal
business hours (8:30 a.m. to 5 p.m. EST)
at the above address.
The Board will post, as soon as
practicable, all comments received on
https://www.regulations.gov without
PO 00000
Frm 00021
Fmt 4702
Sfmt 9990
making any changes to the comments,
including any personal information
provided. The website https://
www.regulations.gov is the Federal
eRulemaking portal, and all comments
posted there are available and accessible
to the public. The Board requests that
comments include full citations or
internet links to any authority relied
upon. The Board cautions commenters
not to include personal information
such as Social Security numbers,
personal addresses, telephone numbers,
and email addresses in their comments,
as such submitted information will
become viewable by the public via the
https://www.regulations.gov website. It is
the commenter’s responsibility to
safeguard his or her information.
Comments submitted through https://
www.regulations.gov will not include
the commenter’s email address unless
the commenter chooses to include that
information as part of his or her
comment.
FOR FURTHER INFORMATION CONTACT:
Roxanne Rothschild, Executive
Secretary, National Labor Relations
Board, 1015 Half Street SE, Washington,
DC 20570–0001, (202) 273–1940 (this is
not a toll-free number), 1–866–315–6572
(TTY/TDD).
The
National Labor Relations Board
(‘‘NLRB’’ or ‘‘Board’’) published a
Notice of Proposed Rulemaking in the
Federal Register on July 29, 2020,
seeking comments from the public
regarding amending the Board’s rules
and regulations to eliminate the
requirement that employers must, as
part of the Board’s voter list
requirement, provide available personal
email addresses and available home and
personal cellular telephone numbers of
all eligible voters. It also proposes an
amendment providing for absentee mail
ballots for employees who are on
military leave.
SUPPLEMENTARY INFORMATION:
Dated: October 5, 2020.
Roxanne L. Rothschild,
Executive Secretary.
[FR Doc. 2020–22332 Filed 10–23–20; 8:45 am]
BILLING CODE 7545–01–P
E:\FR\FM\26OCP1.SGM
26OCP1
Agencies
[Federal Register Volume 85, Number 207 (Monday, October 26, 2020)]
[Proposed Rules]
[Pages 67699-67704]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-23282]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
18 CFR Part 292
[Docket Nos. RM21-2-000 and RM20-20-000]
Fuel Cell Thermal Energy Output; Bloom Energy Corporation
AGENCY: Federal Energy Regulatory Commission, Department of Energy.
ACTION: Notice of proposed rulemaking.
-----------------------------------------------------------------------
SUMMARY: In this Notice of Proposed Rulemaking, the Federal Energy
Regulatory Commission proposes to amend the definition of useful
thermal energy output in its regulations implementing the Public
Utility Regulatory Policies Act of 1978 to recognize the technical
evolution of cogeneration.
DATES: Comments are due November 25, 2020.
ADDRESSES: Comments, identified by docket number, may be filed
electronically at https://www.ferc.gov in acceptable native applications
and print-to-PDF, but not in scanned or picture format. For those
unable to file electronically, comments may be filed by mail or hand-
delivery to: Federal Energy Regulatory Commission, Secretary of the
Commission, 888 First Street NE, Washington, DC 20426. The Comment
Procedures Section of this document contains more detailed filing
procedures.
FOR FURTHER INFORMATION CONTACT:
Lawrence R. Greenfield (Legal Information), Office of the General
Counsel, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426, (202) 502-6415, [email protected]
Helen Shepherd (Technical Information), Office of Energy Market
Regulation, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426, (202) 502-6176, [email protected]
Thomas Dautel (Technical Information), Office of Energy Policy and
Innovation, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426, (202) 502-6196, [email protected]
SUPPLEMENTARY INFORMATION:
I. Introduction
1. In this Notice of Proposed Rulemaking (NOPR), the Federal Energy
Regulatory Commission (Commission) proposes to revise its regulations
(PURPA Regulations) \1\ implementing sections 201 and 210 of the Public
Utility Regulatory Policies Act of 1978 (PURPA) \2\ in light of the
development of Solid Oxide Fuel Cell systems with integrated natural
gas reformation equipment as a technical evolution of cogeneration and
in response to a petition for rulemaking submitted by Bloom Energy
Corporation (Bloom Energy) asking the Commission to take such action
given such development.
---------------------------------------------------------------------------
\1\ 18 CFR part 292.
\2\ 16 U.S.C. 796, 824a-3.
---------------------------------------------------------------------------
2. PURPA was enacted in 1978 as part of a package of legislative
proposals intended to reduce the country's dependence on oil and
natural gas, which at the time were in short supply and subject to
dramatic price increases.\3\ PURPA sets forth a framework to encourage
the development of cogeneration facilities that make more efficient use
of the heat produced both from fossil fuels used in the production of
electricity by using that heat for, e.g., industrial purposes, and also
from fossil fuels used for, e.g., industrial purposes by using that
heat for the production of electricity. As relevant here, as required
by PURPA, a cogeneration facility is a qualifying facility (QF) if the
Commission determines that the QF meets certain requirements.\4\
---------------------------------------------------------------------------
\3\ Qualifying Facility Rates and Requirements Implementation
Issues Under the Public Utility Regulatory Policies Act of 1978,
Order No. 872, 85 FR 54,638 (Sept. 2, 2020), 172 FERC ] 61,041, at P
47 (2020).
\4\ 16 U.S.C. 796(18); 18 CFR 292.203(b), 292.205.
---------------------------------------------------------------------------
3. In enacting PURPA, Congress could not, and did not, predict
specific technological developments that would occur in future years,
but instead recognized the Commission's discretion by directing the
Commission to ``from time to time thereafter revise[ ] such rules as it
determines necessary to encourage cogeneration.'' \5\ Although in 1978
the predominant form of cogeneration was a more traditional combined
heat and power, Congress did not limit the definition of qualifying
cogeneration facilities to the particular technologies then in
existence. Instead, Congress defined a cogeneration facility in a more
open-ended manner, as a facility that produces: (1) Electric energy;
and (2) steam or forms of useful energy, such as heat, which are used
for industrial, commercial, heating or cooling purpose.\6\ Congress
thus left it for the Commission to determine the types of facilities
that would qualify as cogeneration facilities under the statute.
---------------------------------------------------------------------------
\5\ 16 U.S.C. 824a-3(a).
\6\ 16 U.S.C. 796(18)(A).
---------------------------------------------------------------------------
4. Due to innovation and development in the last decade, Solid
Oxide Fuel Cell
[[Page 67700]]
systems with integrated natural gas reformation equipment are now a
viable option for efficient electric energy cogeneration furthering
PURPA's goal of encouraging the innovation and development of
cogeneration facilities. Additionally, the industrial applications of
hydrogen continue to grow, with distributed production of hydrogen
becoming increasingly important.\7\ Solid Oxide Fuel Cell systems with
integrated natural gas reformation equipment represent ``continuing
progress in the development of efficient electricity generating
technology'' \8\ since the enactment of PURPA. We find that this
development constitutes a sufficient change in circumstance since the
Commission's PURPA regulations were first promulgated in 1980 \9\ to
warrant issuing this NOPR.
---------------------------------------------------------------------------
\7\ Today almost all the hydrogen produced in the United States
is used for refining petroleum, treating metals, producing
fertilizer, and processing foods, as the use of hydrogen as a fuel
source for energy generation is currently limited by lack of
infrastructure for hydrogen distribution and delivery. U.S.
Department of Energy, Alternative Fuels Data Center, Hydrogen
Production and Distribution (Oct 2020), https://afdc.energy.gov/
fuels/
hydrogen_production.html#:~:text=Natural%20Gas%20Reforming%2FGasifica
tion%3A%20Synthesis,water%20to%20produce%20additional%20hydrogen.
Thus, using the hydrogen, in this case for electricity generation,
where it is produced represents an efficient use of that hydrogen.
\8\ 16 U.S.C. 824a-3(n)(1)(A)(iii).
\9\ Small Power Production and Cogeneration Facilities--
Qualifying Status, Order No. 70, FERC Stats. & Regs. ] 30,134
(cross-referenced at 10 FERC ] 61,230), orders on reh'g, Order No.
70-A, FERC Stats. & Regs. ] 30,159 (cross-referenced at 11 FERC ]
61,119), order on reh'g, Order No. 70-B, FERC Stats. & Regs. ]
30,176 (cross-referenced at 12 FERC ] 61,128), order on reh'g, FERC
Stats. & Regs. ] 30,192 (1980) (cross-referenced at 12 FERC ]
61,306), amending regulations, Order No. 70-D, FERC Stats. & Regs. ]
30,234 (cross-referenced at 14 FERC ] 61,076), amending regulations,
Order No. 70-E, FERC Stats. & Regs. ] 30,274 (1981) (cross-
referenced at 15 FERC ] 61,281).
---------------------------------------------------------------------------
5. We thus propose to add a new paragraph (4) to Sec. 292.202(h)
of its PURPA Regulations to amend the definition of ``[u]seful thermal
energy output'' of a topping cycle cogeneration facility to include
thermal energy that is used by a Solid Oxide Fuel Cell system with an
integrated steam hydrocarbon reformation process for production of fuel
for electricity generation. This definition would clarify that the
thermal energy produced by a Solid Oxide Fuel Cell that then uses the
thermal energy it produces to reform methane and produce hydrogen for
electricity generation is useful thermal energy that would enable a
facility powered by such fuel cells to be certified as a cogeneration
QF.\10\ To be clear, this NOPR applies only to Solid Oxide Fuel Cell
systems with integrated natural gas reformation that take in natural
gas to produce hydrogen and to generate electricity by using steam from
the power generation process to reform the natural gas to produce the
hydrogen that the Solid Oxide Fuel Cell systems use to generate
electricity.
---------------------------------------------------------------------------
\10\ There are different types of fuel cells, classified
primarily by the kind of electrolyte used, with different kinds of
chemical reactions. The type of chemical reaction determines the
temperature range of operation, and other factors relating to the
suitability of applications. Bloom Energy Petition at 8.
---------------------------------------------------------------------------
6. We seek comments on these proposed reforms 30 days from the date
of publication of the NOPR in the Federal Register.
II. Background
7. PURPA was part of a legislative package Congress enacted in 1978
to address the energy crisis then facing the country.\11\ As the
Supreme Court explained in FERC v. Mississippi, in passing PURPA
Congress was aware that domestic oil production had lagged behind
demand, and the country had become increasingly dependent on foreign
oil--which could jeopardize the country's economy and undermine its
independence.\12\ Roughly a third of the nation's electricity was
generated using oil and natural gas,\13\ and Congress concluded that
increased reliance on cogeneration and small power production could
significantly contribute to conserving this energy.\14\ As recognized
by the Supreme Court, Congress passed PURPA to address the consequences
of shortages of oil and natural gas (and electric utilities' decreasing
efficiency in their generating capacities), which adversely impacted
rates to customers and the economy as a whole.\15\
---------------------------------------------------------------------------
\11\ See Public Law 95-617, 92 Stat. 3117. In addition to PURPA,
that legislative package included: The Energy Tax Act of 1978,
Public Law 95-618, 92 Stat. 3174; the National Energy Conservation
Policy Act, Public Law 95-619, 92 Stat. 3206; the Powerplant and
Industrial Fuel Use Act of 1978, Public Law 95-620, 92 Stat. 3289;
and the Natural Gas Policy Act of 1978, Public Law 95-621, 92 Stat.
3351.
\12\ FERC v. Miss., 456 U.S. 742, 756 (1982).
\13\ Id. at 745.
\14\ Id. at 757.
\15\ Id. at 745-46.
---------------------------------------------------------------------------
8. Congress enacted PURPA section 210 in 1978 to address the energy
crisis by encouraging the development of QFs and thereby reducing the
country's demand for traditional fossil fuels.\16\ To accomplish this,
section 210(a) directed that the Commission ``prescribe, and from time
to time thereafter revise, such rules as [the Commission] determines
necessary to encourage cogeneration and small power production.'' \17\
---------------------------------------------------------------------------
\16\ Id. at 750.
\17\ 16 U.S.C. 824a-3(a).
---------------------------------------------------------------------------
9. In 1980, the Commission issued Order No. 70, which promulgated
the required rules that, as relevant here, remain in effect today.\18\
Order No. 70 established the ``criteria and procedures by which small
power producers and cogeneration facilities can obtain qualifying
status to receive the rate benefits and exemptions'' contained in
section 210 of PURPA.\19\ As relevant here, the Commission established
criteria for a cogeneration QF, a facility that, as required by the
statute, ``produces electric energy as well as steam or forms of useful
energy (such as heat) which are used for industrial, commercial,
heating or cooling purposes.'' \20\
---------------------------------------------------------------------------
\18\ Order No. 70, FERC Stats. & Regs. ] 30,134.
\19\ Id. at 30,933.
\20\ 16 U.S.C. 796(18); accord 18 CFR 292.202(c).
---------------------------------------------------------------------------
10. In 2005, Congress passed the Energy Policy Act of 2005 (EPAct
2005).\21\ Pursuant to section 210 of PURPA, as modified by section
1253 of EPAct 2005, the Commission established regulations to ensure
that new cogeneration QFs are using their thermal output in a
productive and beneficial manner; that the electrical, thermal,
chemical and mechanical output of any new cogeneration QFs are used
fundamentally for industrial, commercial, residential or institutional
purposes; and that there is continuing progress in the development of
efficient electric energy generating technology.\22\ In determining
whether the thermal output is used in a ``productive and beneficial
manner,'' the Commission stated it would consider factors such as
whether the product produced by the thermal energy is needed and
whether there is a market for the product.\23\
---------------------------------------------------------------------------
\21\ Public Law 109-58, 119 Stat. 594, 969-70, as implemented in
Revised Regulations Governing Small Power Production and
Cogeneration Facilities, Order No. 671, FERC Stats. & Regs. ] 31,203
(cross-referenced at 114 FERC ] 61,102), order on reh'g, Order No.
671-A, FERC Stats. & Regs. ] 31,219 (2006) (cross-referenced at 115
FERC ] 61,225).
\22\ 16 U.S.C. 824-3(n)(1)(A)(iii).
\23\ Order No. 671, FERC Stats. & Regs. ] 31,203 at P 17. Here,
the relevant product would be hydrogen.
---------------------------------------------------------------------------
11. Unlike more traditional electric generation that relies on
combustion of fossil fuels to produce electric energy, fuel cells
convert the chemical energy in hydrogen to electric energy without
combustion. This conversion has been characterized as a significant
improvement in the efficiency of electric generation.\24\ More
specifically, hydrogen fuel enters the anode side of the fuel cell.
Simultaneously, ambient air enters the cathode side of the fuel cell.
The hydrogen fuel on the anode
[[Page 67701]]
attracts oxygen ions from the cathode. In a Solid Oxide Fuel Cell
system with integrated natural gas reformation equipment, the resulting
electrochemical reaction provides electricity, plus heat and steam that
is used to reform natural gas on-site to produce the hydrogen fuel to
fuel the cell.\25\
---------------------------------------------------------------------------
\24\ Bloom Energy Petition at 8.
\25\ Id.
---------------------------------------------------------------------------
12. If the natural gas reformation equipment were instead located
offsite, then waste heat (in the form of steam) from the electricity
production by the Solid Oxide Fuel Cell would not be available to aid
the reformation process to fuel the cell. In this offsite reformation
scenario, we would expect the external reformation process to require
additional natural gas to be burned to create steam so that the
remainder of the input natural gas could be reformed into hydrogen.\26\
This would be inefficient, and inconsistent with Congress's goal in
enacting PURPA, as discussed above.
---------------------------------------------------------------------------
\26\ Furthermore, as hydrogen is frequently compressed or
liquified for shipment to the point of consumption, yet more energy
would be needed for these activities. Id. at 8 & App. B.
---------------------------------------------------------------------------
13. Stated another way, integrating the natural gas reformation
process into a Solid Oxide Fuel Cell generating facility as described
in this NOPR \27\ results in significant ``progress in the development
of efficient electric energy generating technology.'' \28\
---------------------------------------------------------------------------
\27\ See supra P 5 (emphasizing the limited scope of the
proposed change in the regulations).
\28\ Bloom Energy Petition at 1, 3, 7, 16 (citing 16 U.S.C.
824a-3(n)(1)(A)(iii)).
---------------------------------------------------------------------------
III. Commission Proposal
14. As discussed above, the statutory definition of cogeneration
facilities requires that a cogeneration facility produce ``(i) electric
energy, and (ii) steam or forms of useful energy (such as heat) which
are used for industrial, commercial, heating or cooling purposes. . .
.'' \29\ This definition provides for steam or other forms of useful
energy to be used for, e.g., an industrial purpose. The creation by a
Solid Oxide Fuel Cell system with an integrated natural gas reformation
process of a commercially valuable fuel as described in this NOPR fits
within this definition. Consistent with the PURPA regulations, Solid
Oxide Fuel Cell systems with integrated natural gas reformation
equipment produce two forms of energy: Electricity; and the heat/steam
(thermal energy) used to create the hydrogen (a chemical energy).
---------------------------------------------------------------------------
\29\ 16 U.S.C. 796(18)(A).
---------------------------------------------------------------------------
15. Currently, the Commission's PURPA regulations provide that a
topping-cycle cogeneration facility is a cogeneration facility in which
the energy input to the facility is first used to produce useful power
output and at least some of the reject heat from the power production
process is then used to provide useful thermal energy.\30\
---------------------------------------------------------------------------
\30\ 18 CFR 292.202(d).
---------------------------------------------------------------------------
16. Solid Oxide Fuel Cell systems with integrated natural gas
reformation equipment convert the chemical energy within natural gas
into electricity using a steam-methane reformation process,\31\ which
converts the natural gas input to hydrogen, which then reacts with
oxygen in the fuel cell to produce electricity. The by-product of the
fuel cell's production of electricity is heat and steam, some of which
is used in the steam-methane reformation process to convert more
methane into hydrogen, which the fuel cells use, in combination with
oxygen from the air, to produce electricity.
---------------------------------------------------------------------------
\31\ Industrial gas manufacturers also produce hydrogen from
natural gas using a steam-methane reformation process, but must
produce their own steam, usually through combustion of some of the
input natural gas. Because the buyers of the resulting hydrogen are
usually remote from the industrial gas manufacturer, this hydrogen
is either compressed or liquified in order to transport the hydrogen
to the end user. Integrating the natural gas steam reformation
process into a Solid Oxide Fuel Cell system increases efficiency and
avoids the energy loss of external reformation, and compression or
liquefaction for surface transportation. Bloom Energy Petition at 8
& App. B.
---------------------------------------------------------------------------
17. A cogeneration QF is one that ``produces electric energy as
well as steam or forms of useful energy (such as heat) which are used
for industrial, commercial, heating or cooling purposes.'' \32\
Consistent with these regulations, Solid Oxide Fuel Cell systems with
integrated natural gas reformation equipment generate two forms of
useful energy--electricity, and heat/steam (thermal energy) that is
used to produce hydrogen (a chemical energy). Commission regulations
provide three categories of useful thermal output of a topping-cycle
cogenerator. They are thermal energy: (1) That is ``made available to
an industrial or commercial process . . .; (2) that is used in a
heating application . . .; or (3) that is used in a space cooling
application .'' \33\ We propose to amend our regulations to provide
that the production of heat/steam by a Solid Oxide Fuel Cell system for
use in an integrated natural gas reformation process to produce
hydrogen is an industrial process that, as described in this NOPR,
yields a ``useful thermal energy output'' that entitles such a system
to be considered a topping cycle cogeneration facility that qualifies,
subject to meeting the other relevant requirements,\34\ to be a QF. The
recent technological advances in utilizing the thermal energy from a
Solid Oxide Fuel Cell in an integrated steam hydrocarbon reformation
process were not known or anticipated when the Commission adopted its
original definitions for useful thermal energy, but that fact should
not stand in the way of the Commission now recognizing such advances
and responding accordingly.\35\
---------------------------------------------------------------------------
\32\ 16 U.S.C. 796(18).
\33\ 18 CFR 292.202(h).
\34\ See 18 CFR 292.203(b), 292.205.
\35\ We recognize that in EG&G, Inc., 16 FERC ] 61,060, at
61,104 (1981), the Commission stated that, for cogeneration, ``the
use of thermal energy must be completely independent of the power
production process.'' That order did not involve fuel cells and in
any event was issued under the regulations then effective, see id.
at 61,103-04, which we propose to revise in this NOPR, to now
allow--for a Solid Oxide Fuel Cell system with an integrated natural
gas reformation process--the production of hydrogen to be considered
an industrial process that yields a ``useful thermal energy output''
that entitles such a system to be considered a topping cycle
cogeneration facility that qualifies, subject to meeting the other
relevant requirements, as a QF.
---------------------------------------------------------------------------
18. In sum, recognizing technological advancements over the past 40
years and Congress's commitment to ``continuing progress in the
development of efficient electric energy generating technology,'' \36\
and in light of the development and commercialization of Solid Oxide
Fuel Cell systems with integrated natural gas reformation equipment
since the original adoption of the PURPA regulations, we propose to
amend Sec. 292.202(h) of the PURPA Regulations by adding a new
paragraph to provide that useful thermal energy output includes the
thermal energy ``that is used by a solid oxide fuel cell system with an
integrated steam hydrocarbon reformation process for production of fuel
for electricity generation.''
---------------------------------------------------------------------------
\36\ 16 U.S.C. 824a-3(n)(1)(A)(iii).
---------------------------------------------------------------------------
19. In proposing this change to its regulations, the Commission
does not propose to revise Sec. 292.205(d) of the PURPA Regulations,
which establishes additional criteria for new cogeneration facilities
seeking to sell electric energy pursuant to PURPA section 210.\37\ The
Commission proposes that any new cogeneration facility that is a solid
oxide fuel cell system with an integrated steam hydrocarbon reformation
process would be required to satisfy the existing
[[Page 67702]]
criteria of Sec. 292.205(d) of the PURPA Regulations if it seeks to
make sales of electric energy pursuant to PURPA section 210.
---------------------------------------------------------------------------
\37\ 18 CFR 292.205(d); see also 18 CFR 292.205(d)(4) (``For
purposes of paragraphs (d)(1) and (2) of this section, a new
cogeneration facility of 5 MW or smaller will be presumed to satisfy
the requirements of those paragraphs.''). That presumption, we note,
is a rebuttable presumption, though. Revised Regulations Governing
Small Power Production and Cogeneration Facilities, Order No. 671,
114 FERC ] 61,102, at PP 26, 60, order on reh'g, Order No. 671-A,
115 FERC ] 61,225 (2006).
---------------------------------------------------------------------------
IV. Information Collection Statement
20. The Paperwork Reduction Act \38\ requires each federal agency
to seek and obtain the Office of Management and Budget's (OMB) approval
before undertaking a collection of information (including reporting,
record keeping, and public disclosure requirements) directed to ten or
more persons or contained in a rule of general applicability. OMB
regulations require approval of certain information collection
requirements contemplated by proposed rules (including deletion,
revision, or implementation of new requirements).\39\ Upon approval of
a collection of information, OMB will assign an OMB control number and
an expiration date. Respondents subject to the filing requirements of a
rule will not be penalized for failing to respond to the collection of
information unless the collection of information displays a valid OMB
control number.
---------------------------------------------------------------------------
\38\ 44 U.S.C. 3501-21.
\39\ See 5 CFR 1320.11.
---------------------------------------------------------------------------
Public Reporting Burden: In this NOPR, the Commission proposes to
revise its regulations implementing PURPA. The proposed change is to
provide that useful thermal energy outputs will now include the thermal
energy ``that is used by a solid oxide fuel cell system with an
integrated steam hydrocarbon reformation process for production of fuel
for electricity generation.'' The estimated changes to the burden and
cost of the information collection affected by this NOPR, i.e., the
FERC Form No. 556, follow.\40\
---------------------------------------------------------------------------
\40\ The changes to the FERC Form No. 556, adopted in Order No.
872 are pending OMB review (under ICR #202006-1902-004). Those
changes are separate and are not addressed in this NOPR.
FERC-556, Certification of Qualifying Facility Status for a Small Power Production or Cogeneration Facility, Proposed Changes Due to NOPR in Docket Nos.
RM21-2-000 and RM20-20-000 \41\
--------------------------------------------------------------------------------------------------------------------------------------------------------
Annual number Average burden Total annual Annual cost
Facility type Filing tpe Number of of responses Total number hours & cost per burden hours & per
respondents per respondent of responses response total annual cost respondent ($)
(1) (2) (1) * (2) = (4).............. (3) * (4) = (5).. (5) / (1)
(3)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Cogeneration Facility <=1 MW Self- 5 \43\ 600 3,000 1.5 hrs.; $124.50 4,500 hrs.; $74,700
\42\. certification. $373,500.
Cogeneration Facility >1 MW.... Self- 5 20 100 1.5 hrs.; $124.50 1,500 hrs.; 2,490
certification. $12,450.
Cogeneration Facility >1 MW.... Application for 5 1 5 50 hrs.; $4,150.. 250 hrs.; $20,750 4,150
FERC
certification.
-----------------------------------------------------------------------------------------------------
FERC-556, Total additional ................. 15 .............. 3,105 ................. 6,250 hrs.; ..............
burden and cost due to $406,700.
NOPR in RM21-2 and RM20-20.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Title: FERC-556, Certification of Qualifying Facility (QF) Status
for a Small Power Production or Cogeneration Facility.
---------------------------------------------------------------------------
\41\ The figures in this table reflect estimated changes to the
current OMB-approved inventory for the FERC Form No. 556 (approved
by OMB on November 18, 2019). This table only reflects cogeneration
facilities because small power production facilities will not be
affected by the proposed changes in the NOPR. The Commission staff
believes that the industry is similarly situated to the Commission
in terms of wages and benefits. Therefore, cost estimates are based
on FERC's 2020 average hourly wage (and benefits) of $83.00/hour.
\42\ Such facilities are not required to file but have the
choice whether to do so.
\43\ Bloom Energy has stated they have 600 facilities, with an
average size of 0.6 MW, see Bloom Energy Petition at 14, which, if
they all were in fact to file, would result in as many as 600 self-
certifications of below 1 MW facilities. The Commission accordingly
will adopt a conservative approach and estimate 600 such responses
over the course of a year, which is especially conservative given
that the Commission's regulations do not require below-1 MW
facilities to submit self-certifications.
---------------------------------------------------------------------------
Action: Revisions to existing information collection FERC-556.\44\
---------------------------------------------------------------------------
\44\ The FERC Form No. 556 is not being revised, but respondents
with Solid Oxide Fuel Cell systems with integrated natural gas
reformation equipment who are self-certifying or requesting
Commission certification as a cogenerator will use the FERC Form No.
556. On page 8, item 6a of the FERC Form No. 556, those respondents
should indicate ``Fossil fuel, natural gas (not waste).''
---------------------------------------------------------------------------
OMB Control No.: 1902-0075.
Respondents: Facilities that are self-certifying their status as a
cogenerator or that are submitting an application for Commission
certification of their status as a cogenerator; and electric utilities,
state regulatory authorities, or other entities submitting comments on,
or protests to, the self-certification or application for Commission
certification.
Frequency of Information: Ongoing.
Necessity of Information: The Commission proposes the changes in
this NOPR in order to revise its implementation of PURPA in light of
technological advancements in electric generation since the enactment
of PURPA in 1978.
Internal Review: The Commission has reviewed the proposed changes
and has determined that such changes are necessary. These requirements
conform to the Commission's ongoing need for efficient information
collection, communication, and management within the energy industry,
in light of technological advancements in electric generation.
Interested persons may obtain information on the reporting
requirements by contacting the Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC 20426 [Attention: Ellen Brown,
Office of the Executive Director], by email to [email protected],
or by phone (202) 502-8663.
Please send comments concerning the collection of information and
the associated burden estimates to: Office of Information and
Regulatory Affairs, Office of Management and Budget [Attention: Federal
Energy Regulatory Commission Desk Officer]. Due to security concerns,
comments should be sent directly to www.reginfo.gov/public/do/PRAMain.
Comments submitted to OMB should be sent within 30 days of publication
of this proposed rule in the Federal Register and should refer to FERC-
556 (OMB Control No. 1902-0075).
V. Environmental Analysis
21. The Commission is required to prepare an Environmental
Assessment or an Environmental Impact Statement for any action that may
have a significant adverse effect on the human
[[Page 67703]]
environment.\45\ Whether and how the revisions proposed here, however,
would affect QF development and the environment is speculative.
---------------------------------------------------------------------------
\45\ Regulations Implementing National Environmental Policy Act
of 1969, Order No. 486, 52 FR 47,897 (Dec. 17, 1987), FERC Stats. &
Regs. Preambles 1986-1990 ] 30,783 (1987) (cross-referenced at 41
FERC ] 61,284).
---------------------------------------------------------------------------
22. The proposed changes to the PURPA Regulations do not authorize
or fund particular generation that may happen to qualify as QFs, nor do
they license or issue permits for operation of generation that may
happen to qualify as QFs; such generation can be built and operated
independent of, i.e., without, QF certification. They do not authorize
or prohibit a generator's use of any particular technologies or fuels,
nor do they mandate or limit where QFs should or should not be built.
They do not exempt QFs from any Federal, state or local environmental,
siting, or other similar laws or regulatory requirements. Given these
facts any environmental impact analysis of the revisions proposed here
would be speculative and not meaningfully inform the Commission or the
public of the revisions' impact on QF development or, correspondingly,
of any associated potential impacts on the environment; there are, in
short, no reasonably foreseeable environmental impacts for the
Commission to consider.\46\ Moreover, the revisions proposed here would
apply only to a limited number of QFs: Solid Oxide Fuel Cell systems
with integrated natural gas reformation equipment. Therefore, the
Commission will not prepare an environmental document.
---------------------------------------------------------------------------
\46\ While courts have held that NEPA requires ``reasonable
forecasting,'' an agency is not required ``to engage in speculative
analysis'' or ``to do the impractical, if not enough information is
available to permit meaningful consideration.'' N. Plains Res.
Council v. Surface Transp. Board, 668 F.3d 1067, 1078 (9th Cir.
2011).
---------------------------------------------------------------------------
VI. Regulatory Flexibility Act Analysis
23. The Regulatory Flexibility Act of 1980 (RFA) \47\ generally
requires a description and analysis of proposed rules that will have
significant economic impact on a substantial number of small entities.
In lieu of preparing a regulatory flexibility analysis, an agency may
certify that a proposed rule will not have a significant economic
impact on a substantial number of small entities.\48\
---------------------------------------------------------------------------
\47\ 5 U.S.C. 601-12.
\48\ 5 U.S.C. 605(b).
---------------------------------------------------------------------------
24. The Small Business Administration's (SBA) Office of Size
Standards develops the numerical definition of a small business.\49\
The SBA size standard for electric utilities is based on the number of
employees, including affiliates.\50\ Under SBA's current size
standards, the threshold for a small entity (including its affiliates)
is 250 employees for cogeneration in the NAICS \51\ category:
---------------------------------------------------------------------------
\49\ 13 CFR 121.101.
\50\ SBA Final Rule on ``Small Business Size Standards:
Utilities,'' 78 FR 77, 343 (Dec. 23, 2013).
\51\ The North American Industry Classification System (NAICS)
is an industry classification system that Federal statistical
agencies use to categorize businesses for the purpose of collecting,
analyzing, and publishing statistical data related to the U.S.
economy. United States Census Bureau, North American Industry
Classification System, https://www.census.gov/eos/www/naics/
(accessed October 4, 2020).
---------------------------------------------------------------------------
NAICS Code 221118 for Other Electric Power Generation
25. The Commission does not expect the proposed revision, if
adopted, to affect a substantial number of small entities. This
proposed rule directly affects only certain QFs, i.e., those that are
Solid Oxide Fuel Cell systems with integrated natural gas reformation
equipment; this proposed rule is voluntary. That is, this proposed rule
expands the types of cogenerators that would be eligible to qualify as
QFs to include Solid Oxide Fuel Cell systems with integrated natural
gas reformation equipment, but this proposed rule does not require
Solid Oxide Fuel Cell systems with integrated natural gas reformation
equipment to file for QF certification. The Commission does not
anticipate that the number of affected small entities would be
substantial, nor does the Commission expect that any additional
reporting burden or cost imposed on QFs, regardless of their status as
a small or large business, would be significant.\52\
---------------------------------------------------------------------------
\52\ The average cost per response is estimated to vary from
$124.50 to $4,150. The cost per respondent will vary based on the
respondent's number of facilities and related requests for self-
certification and applications for Commission certification (with an
estimated cost ranging from $2,490 to $74,700 per respondent).
---------------------------------------------------------------------------
VII. Comment Procedures
26. The Commission invites interested persons to submit comments on
the matters and issues proposed in this document to be adopted,
including any related matters or alternative proposals that commenters
may wish to discuss. Comments are due November 25, 2020. Comments must
refer to Docket Nos. RM21-2-000 and RM20-20-000, and must include the
commenter's name, the organization the commenter represents, if
applicable, and the commenter's address.
27. The Commission encourages comments to be filed electronically
via the eFiling link on the Commission's website at https://www.ferc.gov. The Commission accepts most standard word processing
formats. Documents created electronically using word processing
software should be filed in native applications or print-to-PDF format
and not in a scanned format. Commenters filing electronically do not
need to make a paper filing.
28. Commenters that are not able to file comments electronically
must send an original of their comments to: Federal Energy Regulatory
Commission, Secretary of the Commission, 888 First Street NE,
Washington, DC 20426.
29. All comments will be placed in the Commission's public files
and may be viewed, printed, or downloaded remotely as described in the
Document Availability section below. Commenters on this proposal are
not required to serve copies of their comments on other commenters.
VIII. Document Availability
30. In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://www.ferc.gov). At
this time, the Commission has suspended access to the Commission's
Public Reference Room due to the President's March 13, 2020
proclamation declaring a National Emergency concerning the Novel
Coronavirus Disease (COVID-19).
31. From the Commission's Home Page on the internet, this
information is available on eLibrary. The full text of this document is
available on eLibrary in PDF and Microsoft Word format for viewing,
printing, and/or downloading. To access this document in eLibrary, type
the docket number excluding the last three digits of this document in
the docket number field.
32. User assistance is available for eLibrary and the Commission's
website during normal business hours from the Commission's Online
Support at 202-502-6652 (toll free at 1-866-208-3676) or email at
[email protected], or the Public Reference Room at (202) 502-
8371. Email the Public Reference Room at [email protected].
List of Subjects in 18 CFR Part 292
Electric power plants, Electric utilities, Reporting and
recordkeeping requirements.
By direction of the Commission.
Issued: October 15, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
In consideration of the foregoing, the Commission proposes to amend
part
[[Page 67704]]
292, chapter I, title 18, Code of Federal Regulations, as follows.
PART 292--REGULATIONS UNDER SECTIONS 201 AND 210 OF THE PUBLIC
UTILITY REGULATORY POLICIES ACT OF 1978 WITH REGARD TO SMALL POWER
PRODUCTION AND COGENERATION
0
1. The authority citation for part 292 continues to read as follows:
Authority: 16 U.S.C. 791a-825r, 2601-2645; 31 U.S.C. 9701; 42
U.S.C. 7101-7352.
0
2. Amend Sec. 292.202 by:
0
a. revising paragraphs (h)(2) and (3); and
0
b. adding paragraph (h)(4).
The revisions and addition read as follows:
Sec. 292.202 Definitions.
* * * * *
(h) * * *
(2) That is used in a heating application (e.g., space heating,
domestic hot water heating);
(3) That is used in a space cooling application (i.e., thermal
energy used by an absorption chiller); or
(4) That is used by a solid oxide fuel cell system with an
integrated steam hydrocarbon reformation process for production of fuel
for electricity generation.
* * * * *
[FR Doc. 2020-23282 Filed 10-23-20; 8:45 am]