Combined Notice of Filings #1, 66546-66547 [2020-23200]
Download as PDF
66546
Federal Register / Vol. 85, No. 203 / Tuesday, October 20, 2020 / Notices
Comments: Comments are invited on:
(1) Whether the collections of
information are necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s
estimates of the burden and cost of the
collections of information, including the
validity of the methodology and
assumptions used; (3) ways to enhance
the quality, utility and clarity of the
information collections; and (4) ways to
minimize the burden of the collections
of information on those who are to
respond, including the use of automated
collection techniques or other forms of
information technology.
in subsequent rows in this table. As stated in the
NERC Petition, ‘‘[t]he currently effective standard is
applicable to Planning Coordinators, ‘‘UFLS
entities’’ (which may include Transmission Owners
and Distribution Providers that own, operate, or
control UFLS equipment), and Transmission
Owners that own certain Elements. In proposed
Reliability Standard PRC–006–4, NERC proposes to
add the UFLS-Only Distribution Provider as an
applicable UFLS entity, consistent with the
language in Section III(b) of Appendix 5B of the
NERC Rules of Procedure (Statement of Compliance
Registry Criteria) that the Reliability Standards
applicable to UFLS-Only Distribution Providers
includes prior effective versions of the PRC–006
standard.’’ The changes are not due to Docket No.
RD20–4–000.
34 The increases are not due to Docket No. RD20–
4–000. They are a program increase of 64 PCs (and
the corresponding hrs.) in order to correct and
clarify the estimates.
35 The program increase is due to adding 63
UFLS-only DPs due to Docket No. RD20–4–000. In
addition, 415 TOs and DPs were originally
estimated in FERC–725A due to Order No. 693.
However, the estimates and descriptions were not
clearly spelled out, so we are clarifying them. As
a result, there are 315 hours (63 * 5 hours) and the
corresponding increase of 63 respondents of
program increase due to Docket No. RD20–4–000,
and 2,075 hours (415 * 5 hours) of increase due to
adjustment.
36 The estimates reflect a program decrease of 63
de-registered LSEs (and corresponding program
decrease of 504 hrs.) related to Docket No. RD20–
4–000, and an adjustment/clarification (decrease) of
498 DPs, TPs, and BAs (and corresponding decrease
of 3,984 hrs.), not related to Docket No. RD20–4–
000. The updated number of 381 DPs, TPs and BAs
is listed in a new row clarifying their applicability
with Requirements R2 and R4. Requirement R2
requires applicable entities to develop and provide
data pursuant with Requirement R1.
37 The 113 PCs and BAs were originally estimated
in FERC–725A due to Order No. 693. However, the
estimates and descriptions were not clearly spelled
out, so we are clarifying them. [Some of this burden
may still be in FERC–725A (and double counted
temporarily).]
38 The estimate is changing to 174 (from 188) due
to normal industry fluctuation.
39 The estimate is changing to 188 (from 194) due
to normal industry fluctuation.
40 The net total program changes due to Docket
No. RD20–4–000 result in a decrease of 1,260 hours
and decrease of 126 respondents.
VerDate Sep<11>2014
18:08 Oct 19, 2020
Jkt 253001
Dated: October 13, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–23059 Filed 10–19–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG21–6–000.
Applicants: Harts Mill TE Holdings
LLC.
Description: Notice of SelfCertification as an Exempt Wholesale
Generator of Harts Mill TE Holdings
LLC.
Filed Date: 10/14/20.
Accession Number: 20201014–5006.
Comments Due: 5 p.m. ET 11/4/20.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER20–17–003.
Applicants: Tenaska Pennsylvania
Partners, LLC.
Description: Report Filing: Refund
Report—Informational Filing to be
effective N/A.
Filed Date: 10/14/20.
Accession Number: 20201014–5055.
Comments Due: 5 p.m. ET 11/4/20.
Docket Numbers: ER20–2453–001.
Applicants: Hamilton Patriot LLC.
Description: Compliance filing:
Amendment to Notice of Succession to
be effective 7/18/2020.
Filed Date: 10/14/20.
Accession Number: 20201014–5064.
Comments Due: 5 p.m. ET 11/4/20.
Docket Numbers: ER21–98–000.
Applicants: Baltimore Gas and
Electric Company, PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: BGE
submits Revisions to PJM Tariff, H–2A
re: Depreciation filing re: ER20–1929 to
be effective 11/1/2020.
Filed Date: 10/13/20.
Accession Number: 20201013–5346.
Comments Due: 5 p.m. ET 11/3/20.
Docket Numbers: ER21–99–000.
Applicants: DesertLink, LLC.
Description: Compliance filing:
Annual TRBAA Filing to be effective
1/1/2021.
Filed Date: 10/14/20.
Accession Number: 20201014–5034.
Comments Due: 5 p.m. ET 11/4/20.
Docket Numbers: ER21–100–000.
Applicants: Gulf Power Company.
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
Description: § 205(d) Rate Filing:
Facility Construction Agreement for
Affected System Project to be effective
10/7/2020.
Filed Date: 10/14/20.
Accession Number: 20201014–5075.
Comments Due: 5 p.m. ET 11/4/20.
Docket Numbers: ER21–101–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2020–10–14 EIM Entity Agreement—Los
Angeles Dept of Water and Power—
LADWP to be effective 1/20/2021.
Filed Date: 10/14/20.
Accession Number: 20201014–5088.
Comments Due: 5 p.m. ET 11/4/20.
Docket Numbers: ER21–102–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Generator Retirement Process Tariff
Revisions to be effective 1/1/2021.
Filed Date: 10/14/20.
Accession Number: 20201014–5091.
Comments Due: 5 p.m. ET 11/4/20.
Docket Numbers: ER21–103–000.
Applicants: Horizon Power and Light
LLC.
Description: Baseline eTariff Filing:
Horizon Power and Light, LLC Updated
Market-Based Rate Tariff to be effective
12/13/2020.
Filed Date: 10/14/20.
Accession Number: 20201014–5093.
Comments Due: 5 p.m. ET 11/4/20.
Docket Numbers: ER21–104–000.
Applicants: Basin Electric Power
Cooperative, Southwest Power Pool, Inc.
Description: § 205(d) Rate Filing:
Basin Electric Power Cooperative
Formula Rate to be effective 1/1/2020.
Filed Date: 10/14/20.
Accession Number: 20201014–5109.
Comments Due: 5 p.m. ET 11/4/20.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
E:\FR\FM\20OCN1.SGM
20OCN1
66547
Federal Register / Vol. 85, No. 203 / Tuesday, October 20, 2020 / Notices
Dated: October 14, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
proceeding on June 17, 2020, the
Federal Energy Regulatory Commission
(Commission) will convene a staff-led
technical conference in the above
referenced proceeding on Tuesday,
October 27, 2020, from 9:00 a.m. to 4:30
p.m. (ET).1 The conference will be held
virtually and will be webcast.
Commissioners may attend and
participate. This conference will
consider whether and how existing
regional transmission organization
(RTO) and independent system operator
(ISO) interconnection, merchant
transmission and transmission planning
frameworks can accommodate
anticipated growth in offshore wind
generation in an efficient or cost-
[FR Doc. 2020–23200 Filed 10–19–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD20–18–000]
Offshore Wind Integration in RTOs/
ISOs; Supplemental Notice of
Technical Conference
As first announced in the Notice of
Technical Conference issued in this
effective manner that safeguards open
access transmission principles. The
conference also will provide an
opportunity for participants to discuss
possible changes or improvements to
the current regulatory frameworks that
may accommodate such growth.
Attached to this Supplemental Notice is
an agenda for the technical conference,
which includes the final conference
program and speakers.
We note that discussions at the
conference may involve issues raised in
proceedings that are currently pending
before the Commission. These
proceedings include, but are not limited
to:
Docket Nos.
Constellation Mystic Power, LLC v. ISO New England Inc ..................................................................................
Midcontinent Independent System Operator, Inc ..................................................................................................
Midcontinent Independent System Operator, Inc. and Southwest Power Pool, Inc .............................................
Midcontinent Independent System Operator, Inc ..................................................................................................
Midcontinent Independent System Operator, Inc ..................................................................................................
New York Independent System Operator Inc .......................................................................................................
PJM Interconnection, L.L.C ...................................................................................................................................
PJM Interconnection, L.L.C. and Midcontinent Independent System Operator, Inc .............................................
PJM Interconnection, L.L.C ...................................................................................................................................
Southwest Power Pool, Inc ...................................................................................................................................
Vineyard Wind LLC ................................................................................................................................................
There is no fee for attendance, and the
conference is open for the public to
attend via webcast. Information on this
technical conference, including a link to
the webcast, will be posted on the
conference’s event page on the
Commission’s website (https://
www.ferc.gov/news-events/events/
technical-conference-regarding-offshorewind-integration-rtosisos-docket-noad20) prior to the event. The conference
will be transcribed. Transcripts of the
conference will be available for a fee
from Ace-Federal Reporters, Inc. (202–
347–3700). For more information about
this technical conference, please
contact:
Sarah McKinley (Logistical
Information), Office of External
Affairs, (202) 502–8004,
sarah.mckinley@ferc.gov
David Rosner (Technical Information),
Office of Energy Policy and
Innovation, (202) 502–8479,
david.rosner@ferc.gov
Rishi Garg (Legal Information), Office of
the General Counsel, (202) 502–8667,
rishi.garg@ferc.gov
1 18
Dated: October 14, 2020.
Kimberly D. Bose,
Secretary.
Staff-Led Technical Conference on
Offshore Wind Integration in RTOs/
ISOs
Docket No. AD20–18–000
October 27, 2020
Agenda and Speakers
9:00 a.m.–9:15 a.m.: Welcome and
Opening Remarks
9:15 a.m.–10:45 a.m.: Panel 1:
Background on the U.S. Offshore
Wind Industry in RTO/ISO Markets
Judy Chang, Undersecretary of
Energy, State of Massachusetts,
Massachusetts Executive Office of
Energy and Environmental Affairs
Carrie Cullen Hitt, Executive Director,
National Offshore Wind Research
and Development Consortium
Johannes Pfeifenberger, Principal, The
Brattle Group
Casey Reeves, Project Coordinator,
U.S. Department of Interior, Bureau
of Ocean Energy Management
Gabe Tabak, Counsel, American Wind
Energy Association
This panel will provide an overview
of factors driving interest in the
development and integration of offshore
EL20–52–000, EL20–52–001.
ER20–940–002.
ER20–943–002.
ER20–942–002.
ER20–2788–000.
EL20–65–000.
ER20–939–001.
ER20–944–002.
ER20–2308–000.
ER20–945–001.
ER19–570–000.
wind generation in the RTO/ISO
regions, and will outline potential
models for grid integration to meet
anticipated growth in offshore wind
generation. The panel will include a
discussion of the following topics and
questions:
1. What factors are driving interest in
the development and integration of
offshore wind generation in the RTO/
ISO regions?
2. What is the status of state policy
targets regarding the procurement of
offshore wind generation? How do state
procurement processes for offshore
wind generation account for
Commission rules and RTO/ISO
processes for interconnection, merchant
transmission and transmission
planning? Are there any state-level
regulatory challenges surrounding
offshore wind generator
interconnection, merchant transmission
and transmission planning that
Commission staff should be aware of?
3. There are likely many challenges
and opportunities facing efficient or
cost-effective integration of offshore
wind generation. Where do
interconnection, merchant transmission
and transmission planning rank among
these?
CFR 2.1(a)(1)(xi) (2020).
VerDate Sep<11>2014
18:08 Oct 19, 2020
Jkt 253001
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
E:\FR\FM\20OCN1.SGM
20OCN1
Agencies
[Federal Register Volume 85, Number 203 (Tuesday, October 20, 2020)]
[Notices]
[Pages 66546-66547]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-23200]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG21-6-000.
Applicants: Harts Mill TE Holdings LLC.
Description: Notice of Self-Certification as an Exempt Wholesale
Generator of Harts Mill TE Holdings LLC.
Filed Date: 10/14/20.
Accession Number: 20201014-5006.
Comments Due: 5 p.m. ET 11/4/20.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER20-17-003.
Applicants: Tenaska Pennsylvania Partners, LLC.
Description: Report Filing: Refund Report--Informational Filing to
be effective N/A.
Filed Date: 10/14/20.
Accession Number: 20201014-5055.
Comments Due: 5 p.m. ET 11/4/20.
Docket Numbers: ER20-2453-001.
Applicants: Hamilton Patriot LLC.
Description: Compliance filing: Amendment to Notice of Succession
to be effective 7/18/2020.
Filed Date: 10/14/20.
Accession Number: 20201014-5064.
Comments Due: 5 p.m. ET 11/4/20.
Docket Numbers: ER21-98-000.
Applicants: Baltimore Gas and Electric Company, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: BGE submits Revisions to PJM
Tariff, H-2A re: Depreciation filing re: ER20-1929 to be effective 11/
1/2020.
Filed Date: 10/13/20.
Accession Number: 20201013-5346.
Comments Due: 5 p.m. ET 11/3/20.
Docket Numbers: ER21-99-000.
Applicants: DesertLink, LLC.
Description: Compliance filing: Annual TRBAA Filing to be effective
1/1/2021.
Filed Date: 10/14/20.
Accession Number: 20201014-5034.
Comments Due: 5 p.m. ET 11/4/20.
Docket Numbers: ER21-100-000.
Applicants: Gulf Power Company.
Description: Sec. 205(d) Rate Filing: Facility Construction
Agreement for Affected System Project to be effective 10/7/2020.
Filed Date: 10/14/20.
Accession Number: 20201014-5075.
Comments Due: 5 p.m. ET 11/4/20.
Docket Numbers: ER21-101-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2020-10-14 EIM Entity
Agreement--Los Angeles Dept of Water and Power--LADWP to be effective
1/20/2021.
Filed Date: 10/14/20.
Accession Number: 20201014-5088.
Comments Due: 5 p.m. ET 11/4/20.
Docket Numbers: ER21-102-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: Generator Retirement Process
Tariff Revisions to be effective 1/1/2021.
Filed Date: 10/14/20.
Accession Number: 20201014-5091.
Comments Due: 5 p.m. ET 11/4/20.
Docket Numbers: ER21-103-000.
Applicants: Horizon Power and Light LLC.
Description: Baseline eTariff Filing: Horizon Power and Light, LLC
Updated Market-Based Rate Tariff to be effective 12/13/2020.
Filed Date: 10/14/20.
Accession Number: 20201014-5093.
Comments Due: 5 p.m. ET 11/4/20.
Docket Numbers: ER21-104-000.
Applicants: Basin Electric Power Cooperative, Southwest Power Pool,
Inc.
Description: Sec. 205(d) Rate Filing: Basin Electric Power
Cooperative Formula Rate to be effective 1/1/2020.
Filed Date: 10/14/20.
Accession Number: 20201014-5109.
Comments Due: 5 p.m. ET 11/4/20.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
[[Page 66547]]
Dated: October 14, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-23200 Filed 10-19-20; 8:45 am]
BILLING CODE 6717-01-P