Columbia Gulf Transmission, LLC; Notice of Application and Establishing Intervention Deadline, 65394-65395 [2020-22779]
Download as PDF
65394
Federal Register / Vol. 85, No. 200 / Thursday, October 15, 2020 / Notices
Signed in Washington, DC, on October 9,
2020.
Amy Sweeney,
Director, Office of Regulation, Analysis, and
Engagement, Office of Fossil Energy.
[FR Doc. 2020–22873 Filed 10–14–20; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Environmental Management SiteSpecific Advisory Board, Idaho
Cleanup Project
Office of Environmental
Management, Department of Energy.
ACTION: Notice of cancellation of open
in-person/virtual hybrid meeting.
AGENCY:
On October 1, 2020, the
Department of Energy published a
notice of open meeting announcing an
in-person/virtual hybrid meeting on
October 22, 2020, of the Environmental
Management Site-Specific Advisory
Board, Idaho Cleanup Project. This
notice announces the cancellation of
this in-person/virtual hybrid meeting.
DATES: The in-person/virtual hybrid
meeting scheduled for October 22, 2020,
announced in the October 1, 2020, issue
of the Federal Register (FR Doc. 2020–
21743, 85 FR 61941), is cancelled.
FOR FURTHER INFORMATION CONTACT:
Danielle Miller, Federal Coordinator,
U.S. Department of Energy, Idaho
Operations Office, 1955 Fremont
Avenue, MS–1203, Idaho Falls, Idaho
83415. Phone (208) 526–5709; or email:
millerdc@id.doe.gov or visit the Board’s
internet home page at: https://
www.energy.gov/em/icpcab/.
SUMMARY:
Signed in Washington, DC, on October 9,
2020.
LaTanya Butler,
Deputy Committee Management Officer.
[FR Doc. 2020–22796 Filed 10–14–20; 8:45 am]
BILLING CODE 6405–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–527–000]
jbell on DSKJLSW7X2PROD with NOTICES
Columbia Gulf Transmission, LLC;
Notice of Application and Establishing
Intervention Deadline
Take notice that on September 24,
2020, Columbia Gulf Transmission, LLC
(Columbia Gulf), 700 Louisiana Street,
Suite 700, Houston, TX 77002–2700,
filed an application under section 7(c)
of the Natural Gas Act (NGA), and Part
157 of the Commission’s regulations
requesting authorization of its East
VerDate Sep<11>2014
17:41 Oct 14, 2020
Jkt 253001
Lateral XPress Project (Project). The
Project consists of the construction: (i)
Two new compressor stations, (ii) a new
point of delivery meter station, (iii)
approximately 8 miles of new 30-inchdiameter natural gas pipeline lateral,
(iv) two new mainline valves, a tie-in
facility, launcher and receiver facilities,
and other auxiliary appurtenant
facilities all located in St. Mary,
Lafourche, Jefferson, and Plaquemines
Parishes, Louisiana. The Project will
create 183,000 dekatherms per day
(Dth/d) of incremental capacity. The
incremental capacity created by the
Project, in conjunction with the
utilization of existing capacity, will
allow for open access firm
transportation service on approximately
725,000 Dth/d on Columbia Gulf’s East
Lateral. Columbia Gulf estimates the
total cost of the Project to be
$363,898,548 and proposes a new
incremental recourse rate to apply to the
Project capacity, all as more fully set
forth in the application which is on file
with the Commission and open for
public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding the proposed
project should be directed to Alexander
Kass, Legal Counsel, Columbia Gulf
Transmission, LLC, 700 Louisiana
Street, Suite 700, Houston, Texas, by
phone at (832) 320–5226, or by email at
alexander_kass@tcenergy.com.
Pursuant to Section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
Complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
1 18
PO 00000
CFR 157.9.
Frm 00056
Fmt 4703
Sfmt 4703
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify federal and state
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Public Participation
There are two ways to become
involved in the Commission’s review of
this project: You can file comments on
the project, and you can file a motion
to intervene in the proceeding. There is
no fee or cost for filing comments or
intervening. The deadline for filing a
motion to intervene is 5:00 p.m. Eastern
Time on October 29, 2020.
Comments
Any person wishing to comment on
the project may do so. Comments may
include statements of support or
objections to the project as a whole or
specific aspects of the project. The more
specific your comments, the more useful
they will be. To ensure that your
comments are timely and properly
recorded, please submit your comments
on or before October 29, 2020.
There are three methods you can use
to submit your comments to the
Commission. In all instances, please
reference the Project docket number
CP20–527–000 in your submission.
(1) You may file your comments
electronically by using the eComment
feature, which is located on the
Commission’s website at www.ferc.gov
under the link to Documents and
Filings. Using eComment is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You may file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
eRegister. You will be asked to select
the type of filing you are making; first
select General and then select Comment
on a Filing; or
(3) You can file a paper copy of your
comments by mailing them to the
E:\FR\FM\15OCN1.SGM
15OCN1
Federal Register / Vol. 85, No. 200 / Thursday, October 15, 2020 / Notices
following address below.2 Your written
comments must reference the Project
docket number (CP17–490–000).
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The Commission encourages
electronic filing of comments (options 1
and 2 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Persons who comment on the
environmental review of this project
will be placed on the Commission’s
environmental mailing list, and will
receive notification when the
environmental documents (EA or EIS)
are issued for this project and will be
notified of meetings associated with the
Commission’s environmental review
process.
The Commission considers all
comments received about the project in
determining the appropriate action to be
taken. However, the filing of a comment
alone will not serve to make the filer a
party to the proceeding. To become a
party, you must intervene in the
proceeding. For instructions on how to
intervene, see below.
jbell on DSKJLSW7X2PROD with NOTICES
Interventions
Any person, which includes
individuals, organizations, businesses,
municipalities, and other entities,3 has
the option to file a motion to intervene
in this proceeding. Only intervenors
have the right to request rehearing of
Commission orders issued in this
proceeding and to subsequently
challenge the Commission’s orders in
the U.S. Circuit Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is October 29,
2020. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as the
your interest in the proceeding. [For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene.] For more
information about motions to intervene,
refer to the FERC website at https://
2 Hand
delivered submissions in docketed
proceedings should be delivered to Health and
Human Services, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
3 18 CFR 385.102(d).
4 18 CFR 385.214.
5 18 CFR 157.10.
VerDate Sep<11>2014
17:41 Oct 14, 2020
Jkt 253001
www.ferc.gov/resources/guides/how-to/
intervene.asp.
There are two ways to submit your
motion to intervene. In both instances,
please reference the Project docket
number CP20–527–000 in your
submission.
(1) You may file your motion to
intervene by using the Commission’s
eFiling feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. New eFiling users must first
create an account by clicking on
eRegister. You will be asked to select
the type of filing you are making; first
select General and then select
Intervention. The eFiling feature
includes a document-less intervention
option; for more information, visit
https://www.ferc.gov/docs-filing/efiling/
document-less-intervention.pdf.; or
(2) You can file a paper copy of your
motion to intervene, along with three
copies, by mailing the documents to the
address below.6 Your motion to
intervene must reference the Project
docket number CP20–527–000.
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The Commission encourages
electronic filing of motions to intervene
(option 1 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Motions to intervene must be served
on the applicant either by mail or email
at: 700 Louisiana Street, Suite 700,
Houston, Texas or at alexander_kass@
tcenergy.com. Any subsequent
submissions by an intervenor must be
served on the applicant and all other
parties to the proceeding. Contact
information for parties can be
downloaded from the service list at the
eService link on FERC Online. Service
can be via email with a link to the
document.
All timely, unopposed 7 motions to
intervene are automatically granted by
operation of Rule 214(c)(1).8 Motions to
intervene that are filed after the
intervention deadline are untimely, and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
6 Hand delivered submissions in docketed
proceedings should be delivered to Health and
Human Services, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
7 The applicant has 15 days from the submittal of
a motion to intervene to file a written objection to
the intervention.
8 18 CFR 385.214(c)(1).
PO 00000
Frm 00057
Fmt 4703
Sfmt 4703
65395
Commission’s Rules and Regulations.9
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the eLibrary link as
described above. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on October 29, 2020.
Dated: October 8, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–22779 Filed 10–14–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF THE INTERIOR
Office of Natural Resources Revenue
[Docket No. ONRR–2011–0009; DS63644000
DRT000000.CH7000 212D1113RT; OMB
Control Number 1012–0008]
Agency Information Collection
Activities; Collection of Monies Due
the Federal Government; and
Processing Refund Requests Related
to Overpayments Made to ONRR
Office of Natural Resources
Revenue, Interior.
ACTION: Notice of information collection;
request for comment.
AGENCY:
In accordance with the
Paperwork Reduction Act of 1995, the
Office of Natural Resources Revenue
(ONRR) is proposing to renew an
information collection with revisions.
Through this Information Collection
Request (ICR), ONRR seeks authority to
collect information related to the
SUMMARY:
9 18
E:\FR\FM\15OCN1.SGM
CFR 385.214(b)(3) and (d).
15OCN1
Agencies
[Federal Register Volume 85, Number 200 (Thursday, October 15, 2020)]
[Notices]
[Pages 65394-65395]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-22779]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP20-527-000]
Columbia Gulf Transmission, LLC; Notice of Application and
Establishing Intervention Deadline
Take notice that on September 24, 2020, Columbia Gulf Transmission,
LLC (Columbia Gulf), 700 Louisiana Street, Suite 700, Houston, TX
77002-2700, filed an application under section 7(c) of the Natural Gas
Act (NGA), and Part 157 of the Commission's regulations requesting
authorization of its East Lateral XPress Project (Project). The Project
consists of the construction: (i) Two new compressor stations, (ii) a
new point of delivery meter station, (iii) approximately 8 miles of new
30-inch-diameter natural gas pipeline lateral, (iv) two new mainline
valves, a tie-in facility, launcher and receiver facilities, and other
auxiliary appurtenant facilities all located in St. Mary, Lafourche,
Jefferson, and Plaquemines Parishes, Louisiana. The Project will create
183,000 dekatherms per day (Dth/d) of incremental capacity. The
incremental capacity created by the Project, in conjunction with the
utilization of existing capacity, will allow for open access firm
transportation service on approximately 725,000 Dth/d on Columbia
Gulf's East Lateral. Columbia Gulf estimates the total cost of the
Project to be $363,898,548 and proposes a new incremental recourse rate
to apply to the Project capacity, all as more fully set forth in the
application which is on file with the Commission and open for public
inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] or call toll-free,
(886) 208-3676 or TYY, (202) 502-8659.
Any questions regarding the proposed project should be directed to
Alexander Kass, Legal Counsel, Columbia Gulf Transmission, LLC, 700
Louisiana Street, Suite 700, Houston, Texas, by phone at (832) 320-
5226, or by email at [email protected].
Pursuant to Section 157.9 of the Commission's Rules of Practice and
Procedure,\1\ within 90 days of this Notice the Commission staff will
either: Complete its environmental review and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or environmental
assessment (EA) for this proposal. The filing of an EA in the
Commission's public record for this proceeding or the issuance of a
Notice of Schedule for Environmental Review will serve to notify
federal and state agencies of the timing for the completion of all
necessary reviews, and the subsequent need to complete all federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
---------------------------------------------------------------------------
\1\ 18 CFR 157.9.
---------------------------------------------------------------------------
Public Participation
There are two ways to become involved in the Commission's review of
this project: You can file comments on the project, and you can file a
motion to intervene in the proceeding. There is no fee or cost for
filing comments or intervening. The deadline for filing a motion to
intervene is 5:00 p.m. Eastern Time on October 29, 2020.
Comments
Any person wishing to comment on the project may do so. Comments
may include statements of support or objections to the project as a
whole or specific aspects of the project. The more specific your
comments, the more useful they will be. To ensure that your comments
are timely and properly recorded, please submit your comments on or
before October 29, 2020.
There are three methods you can use to submit your comments to the
Commission. In all instances, please reference the Project docket
number CP20-527-000 in your submission.
(1) You may file your comments electronically by using the eComment
feature, which is located on the Commission's website at www.ferc.gov
under the link to Documents and Filings. Using eComment is an easy
method for interested persons to submit brief, text-only comments on a
project;
(2) You may file your comments electronically by using the eFiling
feature, which is located on the Commission's website (www.ferc.gov)
under the link to Documents and Filings. With eFiling, you can provide
comments in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on eRegister. You will be asked to select the type of filing you are
making; first select General and then select Comment on a Filing; or
(3) You can file a paper copy of your comments by mailing them to
the
[[Page 65395]]
following address below.\2\ Your written comments must reference the
Project docket number (CP17-490-000).
---------------------------------------------------------------------------
\2\ Hand delivered submissions in docketed proceedings should be
delivered to Health and Human Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
---------------------------------------------------------------------------
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC 20426.
The Commission encourages electronic filing of comments (options 1
and 2 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected]
Persons who comment on the environmental review of this project
will be placed on the Commission's environmental mailing list, and will
receive notification when the environmental documents (EA or EIS) are
issued for this project and will be notified of meetings associated
with the Commission's environmental review process.
The Commission considers all comments received about the project in
determining the appropriate action to be taken. However, the filing of
a comment alone will not serve to make the filer a party to the
proceeding. To become a party, you must intervene in the proceeding.
For instructions on how to intervene, see below.
Interventions
Any person, which includes individuals, organizations, businesses,
municipalities, and other entities,\3\ has the option to file a motion
to intervene in this proceeding. Only intervenors have the right to
request rehearing of Commission orders issued in this proceeding and to
subsequently challenge the Commission's orders in the U.S. Circuit
Courts of Appeal.
---------------------------------------------------------------------------
\3\ 18 CFR 385.102(d).
---------------------------------------------------------------------------
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \4\ and the regulations under the NGA \5\ by the
intervention deadline for the project, which is October 29, 2020. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
the your interest in the proceeding. [For an individual, this could
include your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene.] For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\4\ 18 CFR 385.214.
\5\ 18 CFR 157.10.
---------------------------------------------------------------------------
There are two ways to submit your motion to intervene. In both
instances, please reference the Project docket number CP20-527-000 in
your submission.
(1) You may file your motion to intervene by using the Commission's
eFiling feature, which is located on the Commission's website
(www.ferc.gov) under the link to Documents and Filings. New eFiling
users must first create an account by clicking on eRegister. You will
be asked to select the type of filing you are making; first select
General and then select Intervention. The eFiling feature includes a
document-less intervention option; for more information, visit https://www.ferc.gov/docs-filing/efiling/document-less-intervention.pdf.; or
(2) You can file a paper copy of your motion to intervene, along
with three copies, by mailing the documents to the address below.\6\
Your motion to intervene must reference the Project docket number CP20-
527-000.
---------------------------------------------------------------------------
\6\ Hand delivered submissions in docketed proceedings should be
delivered to Health and Human Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
---------------------------------------------------------------------------
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC 20426.
The Commission encourages electronic filing of motions to intervene
(option 1 above) and has eFiling staff available to assist you at (202)
502-8258 or [email protected]
Motions to intervene must be served on the applicant either by mail
or email at: 700 Louisiana Street, Suite 700, Houston, Texas or at
[email protected]. Any subsequent submissions by an
intervenor must be served on the applicant and all other parties to the
proceeding. Contact information for parties can be downloaded from the
service list at the eService link on FERC Online. Service can be via
email with a link to the document.
All timely, unopposed \7\ motions to intervene are automatically
granted by operation of Rule 214(c)(1).\8\ Motions to intervene that
are filed after the intervention deadline are untimely, and may be
denied. Any late-filed motion to intervene must show good cause for
being late and must explain why the time limitation should be waived
and provide justification by reference to factors set forth in Rule
214(d) of the Commission's Rules and Regulations.\9\ A person obtaining
party status will be placed on the service list maintained by the
Secretary of the Commission and will receive copies (paper or
electronic) of all documents filed by the applicant and by all other
parties.
---------------------------------------------------------------------------
\7\ The applicant has 15 days from the submittal of a motion to
intervene to file a written objection to the intervention.
\8\ 18 CFR 385.214(c)(1).
\9\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
eLibrary link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Intervention Deadline: 5:00 p.m. Eastern Time on October 29, 2020.
Dated: October 8, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-22779 Filed 10-14-20; 8:45 am]
BILLING CODE 6717-01-P