Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization, 62297 [2020-21845]
Download as PDF
Federal Register / Vol. 85, No. 192 / Friday, October 2, 2020 / Notices
Comments Due: 5 p.m. ET 10/19/20.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 28, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–21830 Filed 10–1–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–525–000]
jbell on DSKJLSW7X2PROD with NOTICES
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization
Take notice that on September 21,
2020, Columbia Gas Transmission, LLC,
700 Louisiana Street, Houston, Texas
77002–2700, filed in Docket No. CP20–
525–000 a prior notice request pursuant
to section 157.205 and 157.213 of the
Commission’s regulations under the
Natural Gas Act, for authorization to
construct and operate one new
injection/withdrawal storage well and
related pipelines and appurtenances in
Columbia’s Lucas Storage Field in
Richland County, Ohio (Lucas 12617
New Well Project). Columbia states that
the proposed well will have no impact
on how the Lucas Storage Field is
operated. There will be no change in the
certificated physical parameters of the
field, including existing boundary, total
inventory, reservoir pressure, reservoir
and buffer boundaries, or the
certificated storage capacity, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection.
The filing is available for review on
the Commission’s website web at https://
VerDate Sep<11>2014
19:38 Oct 01, 2020
Jkt 253001
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TYY, (202)
502–8659. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room,
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued by the President on March 13,
2020.
Any questions concerning this
application should be directed to Sorana
Linder, Director, Modernization &
Certificates, Columbia Gas
Transmission, LLC, 700 Louisiana
Street, Suite 700, Houston, Texas
77002–2700, at (832) 320–5209 or
sorana_linder@tcenergy.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
Persons who wish to comment only
on the environmental review of this
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
62297
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenter’s
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenters,
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFile’’ link at https://www.ferc.gov.
Persons unable to file electronically may
mail similar pleadings to the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Dated: September 28, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–21845 Filed 10–1–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER20–2978–000]
Catalyst Power REPCo LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Catalyst
Power REPCo LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
E:\FR\FM\02OCN1.SGM
02OCN1
Agencies
[Federal Register Volume 85, Number 192 (Friday, October 2, 2020)]
[Notices]
[Page 62297]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-21845]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP20-525-000]
Columbia Gas Transmission, LLC; Notice of Request Under Blanket
Authorization
Take notice that on September 21, 2020, Columbia Gas Transmission,
LLC, 700 Louisiana Street, Houston, Texas 77002-2700, filed in Docket
No. CP20-525-000 a prior notice request pursuant to section 157.205 and
157.213 of the Commission's regulations under the Natural Gas Act, for
authorization to construct and operate one new injection/withdrawal
storage well and related pipelines and appurtenances in Columbia's
Lucas Storage Field in Richland County, Ohio (Lucas 12617 New Well
Project). Columbia states that the proposed well will have no impact on
how the Lucas Storage Field is operated. There will be no change in the
certificated physical parameters of the field, including existing
boundary, total inventory, reservoir pressure, reservoir and buffer
boundaries, or the certificated storage capacity, all as more fully set
forth in the application which is on file with the Commission and open
to public inspection.
The filing is available for review on the Commission's website web
at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC at
[email protected] or call toll-free, (866) 208-3676 or TYY,
(202) 502-8659. At this time, the Commission has suspended access to
the Commission's Public Reference Room, due to the proclamation
declaring a National Emergency concerning the Novel Coronavirus Disease
(COVID-19), issued by the President on March 13, 2020.
Any questions concerning this application should be directed to
Sorana Linder, Director, Modernization & Certificates, Columbia Gas
Transmission, LLC, 700 Louisiana Street, Suite 700, Houston, Texas
77002-2700, at (832) 320-5209 or [email protected].
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the EA for this proposal. The filing of the EA in the Commission's
public record for this proceeding or the issuance of a Notice of
Schedule for Environmental Review will serve to notify federal and
state agencies of the timing for the completion of all necessary
reviews, and the subsequent need to complete all federal authorizations
within 90 days of the date of issuance of the Commission staff's EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenter's will be
placed on the Commission's environmental mailing list and will be
notified of any meetings associated with the Commission's environmental
review process. Environmental commenter's will not be required to serve
copies of filed documents on all other parties. However, the non-party
commenters, will not receive copies of all documents filed by other
parties or issued by the Commission and will not have the right to seek
court review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFile'' link at
https://www.ferc.gov. Persons unable to file electronically may mail
similar pleadings to the Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426. Submissions sent via any other
carrier must be addressed to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland
20852.
Dated: September 28, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-21845 Filed 10-1-20; 8:45 am]
BILLING CODE 6717-01-P