Catalyst Power REPCo LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 62297-62298 [2020-21828]

Download as PDF Federal Register / Vol. 85, No. 192 / Friday, October 2, 2020 / Notices Comments Due: 5 p.m. ET 10/19/20. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 28, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–21830 Filed 10–1–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP20–525–000] jbell on DSKJLSW7X2PROD with NOTICES Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization Take notice that on September 21, 2020, Columbia Gas Transmission, LLC, 700 Louisiana Street, Houston, Texas 77002–2700, filed in Docket No. CP20– 525–000 a prior notice request pursuant to section 157.205 and 157.213 of the Commission’s regulations under the Natural Gas Act, for authorization to construct and operate one new injection/withdrawal storage well and related pipelines and appurtenances in Columbia’s Lucas Storage Field in Richland County, Ohio (Lucas 12617 New Well Project). Columbia states that the proposed well will have no impact on how the Lucas Storage Field is operated. There will be no change in the certificated physical parameters of the field, including existing boundary, total inventory, reservoir pressure, reservoir and buffer boundaries, or the certificated storage capacity, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing is available for review on the Commission’s website web at https:// VerDate Sep<11>2014 19:38 Oct 01, 2020 Jkt 253001 www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TYY, (202) 502–8659. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. Any questions concerning this application should be directed to Sorana Linder, Director, Modernization & Certificates, Columbia Gas Transmission, LLC, 700 Louisiana Street, Suite 700, Houston, Texas 77002–2700, at (832) 320–5209 or sorana_linder@tcenergy.com. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s EA. Persons who wish to comment only on the environmental review of this PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 62297 project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenter’s will be placed on the Commission’s environmental mailing list and will be notified of any meetings associated with the Commission’s environmental review process. Environmental commenter’s will not be required to serve copies of filed documents on all other parties. However, the non-party commenters, will not receive copies of all documents filed by other parties or issued by the Commission and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFile’’ link at https://www.ferc.gov. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Dated: September 28, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–21845 Filed 10–1–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER20–2978–000] Catalyst Power REPCo LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Catalyst Power REPCo LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. E:\FR\FM\02OCN1.SGM 02OCN1 62298 Federal Register / Vol. 85, No. 192 / Friday, October 2, 2020 / Notices Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is October 19, 2020. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Dated: September 28, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–21828 Filed 10–1–20; 8:45 am] jbell on DSKJLSW7X2PROD with NOTICES BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–9053–2] [CERCLA–10–2020–0142; FRL–10014–61– Region 10] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information 202– 564–5632 or https://www.epa.gov/nepa. Weekly receipt of Environmental Impact Statements (EIS) Filed September 21, 2020 10 a.m. EST Through September 28, 2020 10 a.m. EST Pursuant to 40 CFR 1506.9. Notice Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// cdxnodengn.epa.gov/cdx-enepa-public/ action/eis/search. EIS No. 20200195, Draft, USFS, NM, Integrated Non-Native Invasive Plant Management, Comment Period Ends: 12/01/2020, Contact: Peggy Luensmann 575–434–7200. EIS No. 20200196, Final, FTA, CA, Final Environmental Impact Statement/ Final Environmental Impact Report (Vol 1) for the East San Fernando Valley Transit Corridor Project, Review Period Ends: 11/02/2020, Contact: Ms. Charlene Lee Lorenzo 213–202–3952. Amended Notice: EIS No. 20200165, Draft, USFS, ID, Stibnite Gold Project, Comment Period Ends: 10/28/2020, Contact: Brian Harris 208–634–6945. Revision to FR Notice Published 8/21/2020; Extending the Comment Period from 10/13/2020 to 10/28/2020. EIS No. 20200176, Final, USACE, FL, Lake Okeechobee Watershed Restoration Project, Review Period Ends: 10/28/2020, Contact: Dr. Gretchen Ehlinger 904–232–1682. Revision to FR Notice Published 08/ 28/2020; Extending the Comment Period from 09/28/2020 to 10/28/ 2020. Dated: September 28, 2020. Cindy S. Barger, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2020–21796 Filed 10–1–20; 8:45 am] BILLING CODE 6560–50–P VerDate Sep<11>2014 19:38 Oct 01, 2020 Jkt 253001 PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 Proposed CERCLA Administrative Settlement; Spokane Recycling Company Environmental Protection Agency (EPA). ACTION: Notice; request for public comment. AGENCY: In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (‘‘CERCLA’’), notice is hereby given of a proposed administrative settlement for recovery of past and projected future response costs concerning the Former Kaiser Smelter Site, Mead, Washington, with the following settling party: Spokane Recycling Company. The settlement requires the settling party to pay 50% of the net sales proceeds of the sale of the Property or $325,000, whichever is less to EPA to be used to conduct or finance response actions undertaken at the Site or to be transferred by EPA to the Hazardous Substance Superfund. The settlement includes a covenant not to sue the settling party. For thirty (30) days following the date of publication of this document, the Agency will receive written comments relating to the settlement. The Agency will consider all comments and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicate that the settlement is inappropriate, improper, or inadequate. The Agency’s response to any comments received will be available electronically for public inspection at https://www.regulations.gov. DATES: Comments must be submitted on or before November 2, 2020. ADDRESSES: The proposed settlement is available electronically for public inspection at https://semspub.epa.gov/ src/collections/10/AR/WAN001020091. Submit your comments, identified by EPA Docket No. CERCLA–10–2020– 0142, by one of the following methods: • https://www.regulations.gov. Follow on-line instructions for submitting comments. Once submitted, comments cannot be edited or removed from Regulations.gov. EPA may publish any comment received to its public docket. Do not submit electronically any information you consider to be Confidential Business Information (‘‘CBI’’) or other information whose disclosure is restricted by statute. Multimedia submissions (audio, video, SUMMARY: E:\FR\FM\02OCN1.SGM 02OCN1

Agencies

[Federal Register Volume 85, Number 192 (Friday, October 2, 2020)]
[Notices]
[Pages 62297-62298]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-21828]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER20-2978-000]


Catalyst Power REPCo LLC; Supplemental Notice That Initial 
Market-Based Rate Filing Includes Request for Blanket Section 204 
Authorization

    This is a supplemental notice in the above-referenced proceeding of 
Catalyst Power REPCo LLC's application for market-based rate authority, 
with an accompanying rate tariff, noting that such application includes 
a request for blanket authorization, under 18 CFR part 34, of future 
issuances of securities and assumptions of liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426, in accordance with Rules 211 and 214 of the Commission's 
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone 
filing a motion to intervene or protest must serve a copy of that 
document on the Applicant.

[[Page 62298]]

    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR part 34, of future issuances of securities and assumptions of 
liability, is October 19, 2020.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically may mail similar pleadings to 
the Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. Hand delivered submissions in docketed 
proceedings should be delivered to Health and Human Services, 12225 
Wilkins Avenue, Rockville, Maryland 20852.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact the Federal Energy 
Regulatory Commission at [email protected] or call toll-free, 
(886) 208-3676 or TYY, (202) 502-8659.

    Dated: September 28, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-21828 Filed 10-1-20; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.