Catalyst Power REPCo LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 62297-62298 [2020-21828]
Download as PDF
Federal Register / Vol. 85, No. 192 / Friday, October 2, 2020 / Notices
Comments Due: 5 p.m. ET 10/19/20.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 28, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–21830 Filed 10–1–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–525–000]
jbell on DSKJLSW7X2PROD with NOTICES
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization
Take notice that on September 21,
2020, Columbia Gas Transmission, LLC,
700 Louisiana Street, Houston, Texas
77002–2700, filed in Docket No. CP20–
525–000 a prior notice request pursuant
to section 157.205 and 157.213 of the
Commission’s regulations under the
Natural Gas Act, for authorization to
construct and operate one new
injection/withdrawal storage well and
related pipelines and appurtenances in
Columbia’s Lucas Storage Field in
Richland County, Ohio (Lucas 12617
New Well Project). Columbia states that
the proposed well will have no impact
on how the Lucas Storage Field is
operated. There will be no change in the
certificated physical parameters of the
field, including existing boundary, total
inventory, reservoir pressure, reservoir
and buffer boundaries, or the
certificated storage capacity, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection.
The filing is available for review on
the Commission’s website web at https://
VerDate Sep<11>2014
19:38 Oct 01, 2020
Jkt 253001
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TYY, (202)
502–8659. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room,
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued by the President on March 13,
2020.
Any questions concerning this
application should be directed to Sorana
Linder, Director, Modernization &
Certificates, Columbia Gas
Transmission, LLC, 700 Louisiana
Street, Suite 700, Houston, Texas
77002–2700, at (832) 320–5209 or
sorana_linder@tcenergy.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
Persons who wish to comment only
on the environmental review of this
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
62297
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenter’s
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenters,
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFile’’ link at https://www.ferc.gov.
Persons unable to file electronically may
mail similar pleadings to the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Dated: September 28, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–21845 Filed 10–1–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER20–2978–000]
Catalyst Power REPCo LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Catalyst
Power REPCo LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
E:\FR\FM\02OCN1.SGM
02OCN1
62298
Federal Register / Vol. 85, No. 192 / Friday, October 2, 2020 / Notices
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is October 19,
2020.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: September 28, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–21828 Filed 10–1–20; 8:45 am]
jbell on DSKJLSW7X2PROD with NOTICES
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9053–2]
[CERCLA–10–2020–0142; FRL–10014–61–
Region 10]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information 202–
564–5632 or https://www.epa.gov/nepa.
Weekly receipt of Environmental Impact
Statements (EIS)
Filed September 21, 2020 10 a.m. EST
Through September 28, 2020 10 a.m.
EST
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
cdxnodengn.epa.gov/cdx-enepa-public/
action/eis/search.
EIS No. 20200195, Draft, USFS, NM,
Integrated Non-Native Invasive Plant
Management, Comment Period Ends:
12/01/2020, Contact: Peggy
Luensmann 575–434–7200.
EIS No. 20200196, Final, FTA, CA, Final
Environmental Impact Statement/
Final Environmental Impact Report
(Vol 1) for the East San Fernando
Valley Transit Corridor Project,
Review Period Ends: 11/02/2020,
Contact: Ms. Charlene Lee Lorenzo
213–202–3952.
Amended Notice:
EIS No. 20200165, Draft, USFS, ID,
Stibnite Gold Project, Comment
Period Ends: 10/28/2020, Contact:
Brian Harris 208–634–6945. Revision
to FR Notice Published 8/21/2020;
Extending the Comment Period from
10/13/2020 to 10/28/2020.
EIS No. 20200176, Final, USACE, FL,
Lake Okeechobee Watershed
Restoration Project, Review Period
Ends: 10/28/2020, Contact: Dr.
Gretchen Ehlinger 904–232–1682.
Revision to FR Notice Published 08/
28/2020; Extending the Comment
Period from 09/28/2020 to 10/28/
2020.
Dated: September 28, 2020.
Cindy S. Barger,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2020–21796 Filed 10–1–20; 8:45 am]
BILLING CODE 6560–50–P
VerDate Sep<11>2014
19:38 Oct 01, 2020
Jkt 253001
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
Proposed CERCLA Administrative
Settlement; Spokane Recycling
Company
Environmental Protection
Agency (EPA).
ACTION: Notice; request for public
comment.
AGENCY:
In accordance with the
Comprehensive Environmental
Response, Compensation, and Liability
Act, as amended (‘‘CERCLA’’), notice is
hereby given of a proposed
administrative settlement for recovery of
past and projected future response costs
concerning the Former Kaiser Smelter
Site, Mead, Washington, with the
following settling party: Spokane
Recycling Company. The settlement
requires the settling party to pay 50% of
the net sales proceeds of the sale of the
Property or $325,000, whichever is less
to EPA to be used to conduct or finance
response actions undertaken at the Site
or to be transferred by EPA to the
Hazardous Substance Superfund. The
settlement includes a covenant not to
sue the settling party. For thirty (30)
days following the date of publication of
this document, the Agency will receive
written comments relating to the
settlement. The Agency will consider all
comments and may modify or withdraw
its consent to the settlement if
comments received disclose facts or
considerations which indicate that the
settlement is inappropriate, improper,
or inadequate. The Agency’s response to
any comments received will be available
electronically for public inspection at
https://www.regulations.gov.
DATES: Comments must be submitted on
or before November 2, 2020.
ADDRESSES: The proposed settlement is
available electronically for public
inspection at https://semspub.epa.gov/
src/collections/10/AR/WAN001020091.
Submit your comments, identified by
EPA Docket No. CERCLA–10–2020–
0142, by one of the following methods:
• https://www.regulations.gov.
Follow on-line instructions for
submitting comments. Once submitted,
comments cannot be edited or removed
from Regulations.gov. EPA may publish
any comment received to its public
docket. Do not submit electronically any
information you consider to be
Confidential Business Information
(‘‘CBI’’) or other information whose
disclosure is restricted by statute.
Multimedia submissions (audio, video,
SUMMARY:
E:\FR\FM\02OCN1.SGM
02OCN1
Agencies
[Federal Register Volume 85, Number 192 (Friday, October 2, 2020)]
[Notices]
[Pages 62297-62298]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-21828]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER20-2978-000]
Catalyst Power REPCo LLC; Supplemental Notice That Initial
Market-Based Rate Filing Includes Request for Blanket Section 204
Authorization
This is a supplemental notice in the above-referenced proceeding of
Catalyst Power REPCo LLC's application for market-based rate authority,
with an accompanying rate tariff, noting that such application includes
a request for blanket authorization, under 18 CFR part 34, of future
issuances of securities and assumptions of liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
[[Page 62298]]
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is October 19, 2020.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically may mail similar pleadings to
the Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. Hand delivered submissions in docketed
proceedings should be delivered to Health and Human Services, 12225
Wilkins Avenue, Rockville, Maryland 20852.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] or call toll-free,
(886) 208-3676 or TYY, (202) 502-8659.
Dated: September 28, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-21828 Filed 10-1-20; 8:45 am]
BILLING CODE 6717-01-P