Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization, 61946-61947 [2020-21716]
Download as PDF
61946
Federal Register / Vol. 85, No. 191 / Thursday, October 1, 2020 / Notices
jbell on DSKJLSW7X2PROD with NOTICES
and the Regulations under the Natural
Gas Act (18 CFR 157.10).6
As a matter of practice, the
Commission itself generally acts on
requests for extensions of time to
complete construction for Natural Gas
Act facilities when such requests are
contested before order issuance. For
those extension requests that are
contested,7 the Commission will aim to
issue an order acting on the request
within 45 days.8 The Commission will
address all arguments relating to
whether the applicant has demonstrated
there is good cause to grant the
extension.9 The Commission will not
consider arguments that re-litigate the
issuance of the April 15th Certificate
order, including whether the
Commission properly found the project
to be in the public convenience and
necessity and whether the
Commission’s environmental analysis
for the certificate complied with the
National Environmental Policy Act.10 At
the time a pipeline requests an
extension of time, orders on certificates
of public convenience and necessity are
final and the Commission will not relitigate their issuance.11 The OEP
Director, or his or her designee, will act
on those extension requests that are
uncontested.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning COVID–19,
issued by the President on March 13,
2020. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
6 Only motions to intervene from entities that
were party to the underlying proceeding will be
accepted. Algonquin Gas Transmission, LLC, 170
FERC ¶ 61,144, at P 39 (2020).
7 Contested proceedings are those where an
intervenor disputes any material issue of the filing.
18 CFR 385.2201(c)(1) (2020).
8 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
9 Id. P 40.
10 Similarly, the Commission will not re-litigate
the issuance of an NGA section 3 authorization,
including whether a proposed project is not
inconsistent with the public interest and whether
the Commission’s environmental analysis for the
permit order complied with NEPA.
11 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
VerDate Sep<11>2014
22:13 Sep 30, 2020
Jkt 253001
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFile’’ link at https://www.ferc.gov.
Persons unable to file electronically may
mail similar pleadings to the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Comment Date: 5:00 p.m. Eastern
Time on October 13, 2020.
Dated: September 25, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–21719 Filed 9–30–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–523–000]
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization
Take notice that on September 15,
2020, Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street, Suite
700, Houston, Texas 77002–2700, filed
in the above referenced docket a prior
notice request pursuant to sections
157.205 and 157.213(b) of the
Commission’s regulations under the
Natural Gas Act (NGA) and its blanket
certificate issued in Docket No. CP83–
76–000. Columbia requests
authorization to construct and operate
one new injection/withdrawal storage
well and related appurtenances at
Columbia’s Weaver Storage Field in
Richland County, Ohio (Weaver 12611
New Well Project). Columbia estimates
the cost of the project to be
approximately $6 million, all as more
fully set forth in the request which is on
file with the Commission and open to
public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to Sorana
Linder, Director, Modernization &
Certificates, Columbia Gas
Transmission, LLC, 700 Louisiana
Street, Suite 700, Houston, Texas
77002–2700, by telephone at (832) 320–
5209, or by email at sorana_linder@
tcenergy.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
E:\FR\FM\01OCN1.SGM
01OCN1
Federal Register / Vol. 85, No. 191 / Thursday, October 1, 2020 / Notices
Environmental commenters will be
placed on the Commission’s
environmental mailing list and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments in lieu of
paper using the ‘‘eFile’’ link at https://
www.ferc.gov. In lieu of electronic filing,
you may submit a paper copy.
Submissions sent via the U.S. Postal
Service must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Dated: September 25, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–21716 Filed 9–30–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2150–152]
jbell on DSKJLSW7X2PROD with NOTICES
Puget Sound Energy, Inc.; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Non-Capacity
Amendment of License.
b. Project No.: 2150–152.
c. Date Filed: August 27, 2020, and
supplemented on September 24, 2020.
d. Applicant: Puget Sound Energy,
Inc.
e. Name of Project: Baker River
Hydroelectric Project.
f. Location: The project is located on
the Baker River in Skagit and Whatcom
counties, Washington. The project
occupies federal lands administered by
the U.S. Forest Service within the Mt.
Baker-Snoqualmie National Forest.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791a–825r.
VerDate Sep<11>2014
22:13 Sep 30, 2020
Jkt 253001
h. Applicant Contact: Mr. Jory
Oppenheimer, Consulting Engineer,
Puget Sound Energy, P.O. Box 97034,
Bellevue, WA 98009–9734; telephone
(425) 462–3556 and email
jory.oppenheimer@pse.com.
i. FERC Contact: Linda Stewart, (202)
502–8184, linda.stewart@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 30
days from the issuance date of this
notice by the Commission.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–2150–152. Comments
emailed to Commission staff are not
considered part of the Commission
record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, it must also
serve a copy of the document on that
resource agency.
k. Description of Request: Puget
Sound Energy, Inc. (licensee) proposes
to upgrade the turbine generating unit
known as Unit 2 at the Upper Baker
Development, which has reached the
end of its expected life. The proposed
upgrade would include installing a new
turbine runner, refurbishing the turbine,
refurbishing the generator poles,
replacing the generator stator coils, and
replacing the original distributor
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
61947
bushings. The proposal would increase
the installed capacity of Unit 2 from
38.3 to 51.0 megawatts and would
increase the hydraulic capacity of the
Upper Baker Development from 5,030 to
5,140 cubic feet per second. The
licensee does not propose any
operational changes to the project
following the upgrade of Unit 2. The
licensee also requests to amend the
authorized installed capacities of Unit 3
and Unit 4 at the Lower Baker
Development to reflect current as-built
conditions. Additionally, the licensee
proposes to add to the license as a
primary transmission line the existing
0.188-mile-long, 115-kilovolt
transmission line connecting the Upper
Baker powerhouse to the Shannon
substation.
l. In addition to publishing the full
text of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659. Agencies may obtain copies
of the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
deadline date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
E:\FR\FM\01OCN1.SGM
01OCN1
Agencies
[Federal Register Volume 85, Number 191 (Thursday, October 1, 2020)]
[Notices]
[Pages 61946-61947]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-21716]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP20-523-000]
Columbia Gas Transmission, LLC; Notice of Request Under Blanket
Authorization
Take notice that on September 15, 2020, Columbia Gas Transmission,
LLC (Columbia), 700 Louisiana Street, Suite 700, Houston, Texas 77002-
2700, filed in the above referenced docket a prior notice request
pursuant to sections 157.205 and 157.213(b) of the Commission's
regulations under the Natural Gas Act (NGA) and its blanket certificate
issued in Docket No. CP83-76-000. Columbia requests authorization to
construct and operate one new injection/withdrawal storage well and
related appurtenances at Columbia's Weaver Storage Field in Richland
County, Ohio (Weaver 12611 New Well Project). Columbia estimates the
cost of the project to be approximately $6 million, all as more fully
set forth in the request which is on file with the Commission and open
to public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] or call toll-free,
(886) 208-3676 or TYY, (202) 502-8659.
Any questions regarding this application should be directed to
Sorana Linder, Director, Modernization & Certificates, Columbia Gas
Transmission, LLC, 700 Louisiana Street, Suite 700, Houston, Texas
77002-2700, by telephone at (832) 320-5209, or by email at
[email protected].
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the EA for this proposal. The filing of the EA in the Commission's
public record for this proceeding or the issuance of a Notice of
Schedule for Environmental Review will serve to notify federal and
state agencies of the timing for the completion of all necessary
reviews, and the subsequent need to complete all federal authorizations
within 90 days of the date of issuance of the Commission staff's EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission.
[[Page 61947]]
Environmental commenters will be placed on the Commission's
environmental mailing list and will be notified of any meetings
associated with the Commission's environmental review process.
Environmental commenters will not be required to serve copies of filed
documents on all other parties. However, the non-party commenters will
not receive copies of all documents filed by other parties or issued by
the Commission and will not have the right to seek court review of the
Commission's final order.
The Commission strongly encourages electronic filings of comments
in lieu of paper using the ``eFile'' link at https://www.ferc.gov. In
lieu of electronic filing, you may submit a paper copy. Submissions
sent via the U.S. Postal Service must be addressed to: Kimberly D.
Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426. Submissions sent via any other
carrier must be addressed to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland
20852.
Dated: September 25, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-21716 Filed 9-30-20; 8:45 am]