Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization, 61946-61947 [2020-21716]

Download as PDF 61946 Federal Register / Vol. 85, No. 191 / Thursday, October 1, 2020 / Notices jbell on DSKJLSW7X2PROD with NOTICES and the Regulations under the Natural Gas Act (18 CFR 157.10).6 As a matter of practice, the Commission itself generally acts on requests for extensions of time to complete construction for Natural Gas Act facilities when such requests are contested before order issuance. For those extension requests that are contested,7 the Commission will aim to issue an order acting on the request within 45 days.8 The Commission will address all arguments relating to whether the applicant has demonstrated there is good cause to grant the extension.9 The Commission will not consider arguments that re-litigate the issuance of the April 15th Certificate order, including whether the Commission properly found the project to be in the public convenience and necessity and whether the Commission’s environmental analysis for the certificate complied with the National Environmental Policy Act.10 At the time a pipeline requests an extension of time, orders on certificates of public convenience and necessity are final and the Commission will not relitigate their issuance.11 The OEP Director, or his or her designee, will act on those extension requests that are uncontested. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning COVID–19, issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call 6 Only motions to intervene from entities that were party to the underlying proceeding will be accepted. Algonquin Gas Transmission, LLC, 170 FERC ¶ 61,144, at P 39 (2020). 7 Contested proceedings are those where an intervenor disputes any material issue of the filing. 18 CFR 385.2201(c)(1) (2020). 8 Algonquin Gas Transmission, LLC, 170 FERC ¶ 61,144, at P 40 (2020). 9 Id. P 40. 10 Similarly, the Commission will not re-litigate the issuance of an NGA section 3 authorization, including whether a proposed project is not inconsistent with the public interest and whether the Commission’s environmental analysis for the permit order complied with NEPA. 11 Algonquin Gas Transmission, LLC, 170 FERC ¶ 61,144, at P 40 (2020). VerDate Sep<11>2014 22:13 Sep 30, 2020 Jkt 253001 toll-free, (886) 208–3676 or TYY, (202) 502–8659. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFile’’ link at https://www.ferc.gov. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. Comment Date: 5:00 p.m. Eastern Time on October 13, 2020. Dated: September 25, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–21719 Filed 9–30–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP20–523–000] Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization Take notice that on September 15, 2020, Columbia Gas Transmission, LLC (Columbia), 700 Louisiana Street, Suite 700, Houston, Texas 77002–2700, filed in the above referenced docket a prior notice request pursuant to sections 157.205 and 157.213(b) of the Commission’s regulations under the Natural Gas Act (NGA) and its blanket certificate issued in Docket No. CP83– 76–000. Columbia requests authorization to construct and operate one new injection/withdrawal storage well and related appurtenances at Columbia’s Weaver Storage Field in Richland County, Ohio (Weaver 12611 New Well Project). Columbia estimates the cost of the project to be approximately $6 million, all as more fully set forth in the request which is on file with the Commission and open to public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding this application should be directed to Sorana Linder, Director, Modernization & Certificates, Columbia Gas Transmission, LLC, 700 Louisiana Street, Suite 700, Houston, Texas 77002–2700, by telephone at (832) 320– 5209, or by email at sorana_linder@ tcenergy.com. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. E:\FR\FM\01OCN1.SGM 01OCN1 Federal Register / Vol. 85, No. 191 / Thursday, October 1, 2020 / Notices Environmental commenters will be placed on the Commission’s environmental mailing list and will be notified of any meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments in lieu of paper using the ‘‘eFile’’ link at https:// www.ferc.gov. In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Dated: September 25, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–21716 Filed 9–30–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2150–152] jbell on DSKJLSW7X2PROD with NOTICES Puget Sound Energy, Inc.; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Non-Capacity Amendment of License. b. Project No.: 2150–152. c. Date Filed: August 27, 2020, and supplemented on September 24, 2020. d. Applicant: Puget Sound Energy, Inc. e. Name of Project: Baker River Hydroelectric Project. f. Location: The project is located on the Baker River in Skagit and Whatcom counties, Washington. The project occupies federal lands administered by the U.S. Forest Service within the Mt. Baker-Snoqualmie National Forest. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a–825r. VerDate Sep<11>2014 22:13 Sep 30, 2020 Jkt 253001 h. Applicant Contact: Mr. Jory Oppenheimer, Consulting Engineer, Puget Sound Energy, P.O. Box 97034, Bellevue, WA 98009–9734; telephone (425) 462–3556 and email jory.oppenheimer@pse.com. i. FERC Contact: Linda Stewart, (202) 502–8184, linda.stewart@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests is 30 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P–2150–152. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, it must also serve a copy of the document on that resource agency. k. Description of Request: Puget Sound Energy, Inc. (licensee) proposes to upgrade the turbine generating unit known as Unit 2 at the Upper Baker Development, which has reached the end of its expected life. The proposed upgrade would include installing a new turbine runner, refurbishing the turbine, refurbishing the generator poles, replacing the generator stator coils, and replacing the original distributor PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 61947 bushings. The proposal would increase the installed capacity of Unit 2 from 38.3 to 51.0 megawatts and would increase the hydraulic capacity of the Upper Baker Development from 5,030 to 5,140 cubic feet per second. The licensee does not propose any operational changes to the project following the upgrade of Unit 2. The licensee also requests to amend the authorized installed capacities of Unit 3 and Unit 4 at the Lower Baker Development to reflect current as-built conditions. Additionally, the licensee proposes to add to the license as a primary transmission line the existing 0.188-mile-long, 115-kilovolt transmission line connecting the Upper Baker powerhouse to the Shannon substation. l. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified deadline date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or E:\FR\FM\01OCN1.SGM 01OCN1

Agencies

[Federal Register Volume 85, Number 191 (Thursday, October 1, 2020)]
[Notices]
[Pages 61946-61947]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-21716]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP20-523-000]


Columbia Gas Transmission, LLC; Notice of Request Under Blanket 
Authorization

    Take notice that on September 15, 2020, Columbia Gas Transmission, 
LLC (Columbia), 700 Louisiana Street, Suite 700, Houston, Texas 77002-
2700, filed in the above referenced docket a prior notice request 
pursuant to sections 157.205 and 157.213(b) of the Commission's 
regulations under the Natural Gas Act (NGA) and its blanket certificate 
issued in Docket No. CP83-76-000. Columbia requests authorization to 
construct and operate one new injection/withdrawal storage well and 
related appurtenances at Columbia's Weaver Storage Field in Richland 
County, Ohio (Weaver 12611 New Well Project). Columbia estimates the 
cost of the project to be approximately $6 million, all as more fully 
set forth in the request which is on file with the Commission and open 
to public inspection.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact the Federal Energy 
Regulatory Commission at [email protected] or call toll-free, 
(886) 208-3676 or TYY, (202) 502-8659.
    Any questions regarding this application should be directed to 
Sorana Linder, Director, Modernization & Certificates, Columbia Gas 
Transmission, LLC, 700 Louisiana Street, Suite 700, Houston, Texas 
77002-2700, by telephone at (832) 320-5209, or by email at 
[email protected].
    Any person or the Commission's staff may, within 60 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and pursuant to section 157.205 of 
the regulations under the NGA (18 CFR 157.205), a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for filing a protest. If a protest is filed and 
not withdrawn within 30 days after the allowed time for filing a 
protest, the instant request shall be treated as an application for 
authorization pursuant to section 7 of the NGA.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the EA for this proposal. The filing of the EA in the Commission's 
public record for this proceeding or the issuance of a Notice of 
Schedule for Environmental Review will serve to notify federal and 
state agencies of the timing for the completion of all necessary 
reviews, and the subsequent need to complete all federal authorizations 
within 90 days of the date of issuance of the Commission staff's EA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission.

[[Page 61947]]

Environmental commenters will be placed on the Commission's 
environmental mailing list and will be notified of any meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission and will not have the right to seek court review of the 
Commission's final order.
    The Commission strongly encourages electronic filings of comments 
in lieu of paper using the ``eFile'' link at https://www.ferc.gov. In 
lieu of electronic filing, you may submit a paper copy. Submissions 
sent via the U.S. Postal Service must be addressed to: Kimberly D. 
Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street 
NE, Room 1A, Washington, DC 20426. Submissions sent via any other 
carrier must be addressed to: Kimberly D. Bose, Secretary, Federal 
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 
20852.

    Dated: September 25, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-21716 Filed 9-30-20; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.