InPipe Energy; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 60990-60991 [2020-21459]
Download as PDF
60990
Federal Register / Vol. 85, No. 189 / Tuesday, September 29, 2020 / Notices
Filed Date: 9/21/20.
Accession Number: 20200921–5033.
Comments Due: 5 p.m. ET 10/5/20.
Docket Numbers: RP20–1205–000.
Applicants: Southeast Supply Header,
LLC.
Description: § 4(d) Rate Filing:
Cleanup Filing—Removal of Terminated
Contracts to be effective 10/22/2020.
Filed Date: 9/22/20.
Accession Number: 20200922–5041.
Comments Due: 5 p.m. ET 10/5/20.
Docket Numbers: RP20–608–001.
Applicants: ANR Pipeline Company.
Description: Compliance filing
Penalty Updates Compliance Filing to
be effective 9/1/2020.
Filed Date: 9/22/20.
Accession Number: 20200922–5025.
Comments Due: 5 p.m. ET 10/5/20.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 23, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–21457 Filed 9–28–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD20–8–000]
InPipe Energy; Notice of Preliminary
Determination of a Qualifying Conduit
Hydropower Facility and Soliciting
Comments and Motions To Intervene
On September 22, 2020, InPipe
Energy filed a notice of intent to
construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act (FPA). The
proposed Piedmont Temporary
Regulator Pressure Recovery Project
would have an installed capacity of 30
kilowatts (kW), and would be located
along an existing municipal water
pipeline in the city of Piedmont,
Alameda County, California.
Applicant Contact: Gregg Semler, 222
NW 8th Ave, Portland, Oregon 97209,
Phone No. (503) 341–0004, Email:
gregg@inpipeenergy.com.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, Email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) One 30-kW
turbine-generator within a 13-foot by 5foot by 5-foot fiberglass enclosure at the
Piedmont Temporary Regulator; and (2)
appurtenant facilities. The proposed
project would have an estimated annual
generation of approximately 125
megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all the criteria shown in
the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A) .........................
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric power and
uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 40 megawatts ...................................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
FPA 30(a)(3)(C)(i) ......................
jbell on DSKJLSW7X2PROD with NOTICES
FPA 30(a)(3)(C)(ii) .....................
FPA 30(a)(3)(C)(iii) ....................
Preliminary Determination: The
proposed Piedmont Temporary
Regulator Pressure Recovery Project will
not alter the primary purpose of the
conduit, which is used to distribute
potable water within the city of
Piedmont’s municipal water supply
system. Therefore, based upon the above
criteria, Commission staff preliminarily
determines that the proposal satisfies
the requirements for a qualifying
conduit hydropower facility, which is
not required to be licensed or exempted
from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 30 days from the issuance
date of this notice. Deadline for filing
motions to intervene is 30 days from the
issuance date of this notice. Anyone
VerDate Sep<11>2014
18:14 Sep 28, 2020
Jkt 250001
may submit comments or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210 and 385.214.
Any motions to intervene must be
received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY or
MOTION TO INTERVENE, as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
Y
Y
Y
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
1 18
E:\FR\FM\29SEN1.SGM
CFR 385.2001–2005 (2020).
29SEN1
Federal Register / Vol. 85, No. 189 / Tuesday, September 29, 2020 / Notices
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may send a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, MD 20852. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 385.2010.
Locations of Notice of Intent: The
Commission provides all interested
persons an opportunity to view and/or
print the contents of this document via
the internet through the Commission’s
website at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (i.e., CD20–8) in the docket
number field to access the document.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
Copies of the notice of intent can be
obtained directly from the applicant. At
this time, the Commission has
suspended access to the Commission’s
Public Reference Room due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, call toll-free 1–866–208–
3676 or email FERCOnlineSupport@
ferc.gov. For TTY, call (202) 502–8659.
Dated: September 23, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–21459 Filed 9–28–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–524–000]
jbell on DSKJLSW7X2PROD with NOTICES
Bradford County Real Estate Partners
LLC; Notice of Petition for Declaratory
Order
Take notice that on September 18,
2020, pursuant to Rule 207(a)(2) of the
Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, Bradford
County Real Estate Partners LLC (BCREP
VerDate Sep<11>2014
18:14 Sep 28, 2020
Jkt 250001
or Petitioner) filed a petition for
declaratory order. The petition seeks a
declaratory order from the Commission
stating that BCREP’s construction and
operation of a natural gas liquefaction
and truck and rail loading facility
(Wyalusing Facility) in Wyalusing
Township, Bradford County,
Pennsylvania, would not be subject to
the Commission’s jurisdiction under
section 3 or section 7 of the Natural Gas
Act, 15 U.S.C. 717b and 717f (2018), as
more fully explained in BCREP’s
petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically may
mail similar pleadings to the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the eLibrary link. Enter
the docket number excluding the last
three digits in the docket number field
to access the document. At this time, the
Commission has suspended access to
the Commission’s Public Reference
Room, due to the proclamation
declaring a National Emergency
concerning the Novel Coronavirus
Disease (COVID–19), issued by the
President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Comment Date: 5:00 p.m. Eastern time
on October 23, 2020.
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
60991
Dated: September 23, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–21458 Filed 9–28–20; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OLEM–2020–0259; FRL–10015–
37–OMS]
Information Collection Request
Submitted to OMB for Review and
Approval; Comment Request;
Anaerobic Digestion Facilities
Processing Wasted Food To Support
EPA’s Sustainable Materials
Management Program and Sustainable
Management of Food Efforts (Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA) has submitted an
information collection request (ICR),
Anaerobic Digestion Facilities
Processing Wasted Food to Support
EPA’s Sustainable Materials
Management Program and Sustainable
Management of Food Efforts (EPA ICR
Number 2533.04, OMB Control Number
2050–0217) to the Office of Management
and Budget (OMB) for review and
approval in accordance with the
Paperwork Reduction Act. This is a
proposed renewal of a previous ICR,
which is currently approved through
September 30, 2020. Public comments
were previously requested via the
Federal Register on June 5, 2020 during
a 60-day comment period. This notice
allows for an additional 30 days for
public comments. A fuller description
of the ICR is given below, including its
estimated burden and cost to the public.
An agency may not conduct or sponsor
and a person is not required to respond
to a collection of information unless it
displays a currently valid OMB control
number.
DATES: Additional comments may be
submitted on or before October 29,
2020.
ADDRESSES: Submit your comments to
EPA, referencing Docket ID No. EPA–
HQ–OLEM–2020–0259, online using
www.regulations.gov (our preferred
method) or by mail to: EPA Docket
Center, Environmental Protection
Agency, Mail Code 28221T, 1200
Pennsylvania Ave. NW, Washington, DC
20460. EPA’s policy is that all
comments received will be included in
the public docket without change
including any personal information
SUMMARY:
E:\FR\FM\29SEN1.SGM
29SEN1
Agencies
[Federal Register Volume 85, Number 189 (Tuesday, September 29, 2020)]
[Notices]
[Pages 60990-60991]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-21459]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD20-8-000]
InPipe Energy; Notice of Preliminary Determination of a
Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On September 22, 2020, InPipe Energy filed a notice of intent to
construct a qualifying conduit hydropower facility, pursuant to section
30 of the Federal Power Act (FPA). The proposed Piedmont Temporary
Regulator Pressure Recovery Project would have an installed capacity of
30 kilowatts (kW), and would be located along an existing municipal
water pipeline in the city of Piedmont, Alameda County, California.
Applicant Contact: Gregg Semler, 222 NW 8th Ave, Portland, Oregon
97209, Phone No. (503) 341-0004, Email: [email protected].
FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, Email:
[email protected].
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) One 30-kW turbine-generator within a 13-
foot by 5-foot by 5-foot fiberglass enclosure at the Piedmont Temporary
Regulator; and (2) appurtenant facilities. The proposed project would
have an estimated annual generation of approximately 125 megawatt-
hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
Satisfies (Y/
Statutory provision Description N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A)................................ The conduit the facility uses is a tunnel, canal, Y
pipeline, aqueduct, flume, ditch, or similar
manmade water conveyance that is operated for
the distribution of water for agricultural,
municipal, or industrial consumption and not
primarily for the generation of electricity.
FPA 30(a)(3)(C)(i)............................. The facility is constructed, operated, or Y
maintained for the generation of electric power
and uses for such generation only the
hydroelectric potential of a non-federally owned
conduit.
FPA 30(a)(3)(C)(ii)............................ The facility has an installed capacity that does Y
not exceed 40 megawatts.
FPA 30(a)(3)(C)(iii)........................... On or before August 9, 2013, the facility is not Y
licensed, or exempted from the licensing
requirements of Part I of the FPA.
----------------------------------------------------------------------------------------------------------------
Preliminary Determination: The proposed Piedmont Temporary
Regulator Pressure Recovery Project will not alter the primary purpose
of the conduit, which is used to distribute potable water within the
city of Piedmont's municipal water supply system. Therefore, based upon
the above criteria, Commission staff preliminarily determines that the
proposal satisfies the requirements for a qualifying conduit hydropower
facility, which is not required to be licensed or exempted from
licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 30
days from the issuance date of this notice. Deadline for filing motions
to intervene is 30 days from the issuance date of this notice. Anyone
may submit comments or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must be received on or before the
specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the COMMENTS CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY or MOTION TO INTERVENE, as applicable; (2)
state in the heading the name of the applicant and the project number
of the application to which the filing responds; (3) state the name,
address, and telephone number of the person filing; and (4) otherwise
comply with the requirements of sections 385.2001 through 385.2005 of
the Commission's regulations.\1\ All comments contesting Commission
staff's preliminary determination that the facility meets the
qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2020).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at [email protected], (866)
[[Page 60991]]
208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic
filing, you may send a paper copy. Submissions sent via the U.S. Postal
Service must be addressed to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
12225 Wilkins Avenue, Rockville, MD 20852. A copy of all other filings
in reference to this application must be accompanied by proof of
service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 385.2010.
Locations of Notice of Intent: The Commission provides all
interested persons an opportunity to view and/or print the contents of
this document via the internet through the Commission's website at
https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number
(i.e., CD20-8) in the docket number field to access the document. You
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. Copies of the notice of
intent can be obtained directly from the applicant. At this time, the
Commission has suspended access to the Commission's Public Reference
Room due to the proclamation declaring a National Emergency concerning
the Novel Coronavirus Disease (COVID-19), issued by the President on
March 13, 2020. For assistance, call toll-free 1-866-208-3676 or email
[email protected]. For TTY, call (202) 502-8659.
Dated: September 23, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-21459 Filed 9-28-20; 8:45 am]
BILLING CODE 6717-01-P