Notice of Final Federal Agency Actions on Proposed Highway in Florida, 60868-60869 [2020-20932]
Download as PDF
60868
Federal Register / Vol. 85, No. 188 / Monday, September 28, 2020 / Notices
94) continues the Highway Safety
Improvement Program (HSIP) as a core
federal-aid program with the purpose to
achieve a significant reduction in traffic
fatalities and serious injuries on all
public roads, including non-Stateowned public roads and roads on tribal
lands. The HSIP requires a data-driven,
strategic approach to improving
highway safety on all public roads that
focuses on performance.
The existing provisions of Title 23
U.S.C. Sections 130, Railway-Highway
Crossings Program, as well as
implementing regulations in 23 CFR
924, remain in effect. Included in these
combined provisions are requirements
for State DOTs to annually produce and
submit to FHWA by August 31 reports
related to the implementation and
effectiveness of their HSIPs, that are to
include information on: (a) Progress
being made to implement HSIP projects
and the effectiveness of these projects in
reducing traffic fatalities and serious
injuries [Sections 148(h)]; and (b)
progress being made to implement the
Railway-Highway Crossings Program
and the effectiveness of the projects in
that program [Sections 130(g) and
148(h)], which will be used by FHWA
to produce and submit biennial reports
to Congress. To be able to produce these
reports, State DOTs must have safety
data and analysis systems capable of
identifying and determining the relative
severity of hazardous highway locations
on all public roads, based on both crash
experience and crash potential, as well
as determining the effectiveness of
highway safety improvement projects.
FHWA provides an online reporting tool
to support the annual HSIP reporting
process. Additional information is
available on the Office of Safety website
at https://safety.fhwa.dot.gov/hsip/
resources/onrpttool/. Reporting into the
online reporting tool meets all report
requirements and USDOT website
compatibility requirements. The
information contained in the annual
HSIP reports provides FHWA with a
means for monitoring the effectiveness
of these programs and may be used by
Congress for determining the future
HSIP program structure and funding
levels.
Respondents: 51 State Transportation
Departments, including the District of
Columbia.
Frequency: Annually.
Estimated Average Burden per
Response: 250 hours.
Estimated Total Annual Burden
Hours: 12,750 hours (51 states at an
average of 250 hours each).
Public Comments Invited: You are
asked to comment on any aspect of this
information collection, including: (1)
VerDate Sep<11>2014
18:25 Sep 25, 2020
Jkt 250001
Whether the proposed collection is
necessary for the FHWA’s performance;
(2) the accuracy of the estimated
burdens; (3) ways for the FHWA to
enhance the quality, usefulness, and
clarity of the collected information; and
(4) ways that the burden could be
minimized, including the use of
electronic technology, without reducing
the quality of the collected information.
The agency will summarize and/or
include your comments in the request
for OMB’s clearance of this information
collection.
Authority: The Paperwork Reduction Act
of 1995; 44 U.S.C. Chapter 35, as amended;
and 49 CFR 1.48.
Issued On: September 22, 2020.
Michael Howell,
Information Collection Officer.
[FR Doc. 2020–21259 Filed 9–25–20; 8:45 am]
BILLING CODE 4910–RY–P
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Notice of Final Federal Agency Actions
on Proposed Highway in Florida
Federal Highway
Administration (FHWA), DOT.
ACTION: Notice of Limitations on Claims
for Judicial Review of Actions by FHWA
and Other Federal Agencies.
AGENCY:
This notice announces action
taken by FHWA and other Federal
agencies that are final. This final agency
action relates to a proposed highway
project on I–275 from the Howard
Frankland Bridge to north of Martin
Luther King Jr. Blvd. and I–4 from I–275
to east of 50th Street. The project will
provide multilane improvements along
I–275 including the addition of 2 tolled
express lanes in each direction,
reconstruction of the I–275/SR60
(Westshore) interchange, and
operational improvements to the I–275/
I–4 (Downtown) interchange. The
Tampa Interstate System (TIS) project
corridor traverses the urban area of
Tampa in Hillsborough County, Florida.
The FHWA’s Supplemental
Environmental Impact Statement (SEIS)
provides details on the Selected
Alternative for the proposed
improvements.
DATES: A claim seeking judicial review
of the Federal agency actions on the
highway project will be barred unless
the claim is filed on or before February
25, 2021. If the Federal law that
authorizes judicial review of a claim
provides a time period of less than 150
days for filing such claim, then that
shorter time period still applies.
SUMMARY:
PO 00000
Frm 00117
Fmt 4703
Sfmt 4703
For
FHWA: Luis D. Lo´pez Rivera, P.E.,
Senior Environmental Specialist,
Federal Highway Administration,
Florida Division, 400 W Washington
Street, Suite 4200, Orlando, FL 32801;
(407) 867–6420; luis.d.lopez@dot.gov.
The FHWA Florida Division Office’s
normal business hours are 7:30 a.m. to
4 p.m. (Eastern Time). For FDOT: Jason
Watts, Director, Office of Environmental
Management, FDOT, 605 Suwannee
Street, MS 37, Tallahassee, Florida
32399; telephone (850) 414–4316; email:
Jason.Watts@dot.state.fl.us. The FDOT
Office of Environmental Management’s
normal business hours are 8:00 a.m. to
5:00 p.m. (Eastern Standard Time),
Monday through Friday, except State
holidays.
SUPPLEMENTARY INFORMATION: Notice is
hereby given that FHWA has taken a
final agency action by issuing a Record
of Decision (ROD) for the following
highway project in the State of Florida:
Tampa Interstate System (TIS) Multilane
Improvements along I–275 include the
addition of 2 tolled express lanes in
each direction, reconstruction of the I–
275/SR60 (Westshore) interchange, and
operational improvements to the I–275/
I–4 (Downtown) interchange. The length
of the project is approximately fifteen
miles. The full reconstruction of the I–
275/SR 60 (Westshore) interchange will
include new general purpose ‘‘flyover’’
ramps, the addition of tolled express
lanes and ramps, and will accommodate
future fixed-guideway transit in the
median. The proposed express lane
improvements will provide several
direct connections to and from I–275,
and Reo Street will be modified as a part
of this project. Southbound, a new twolane bridge will be constructed north of
the existing southbound I–275 lanes
over the Hillsborough River.
Northbound, a new one-lane bridge will
be constructed south of the existing
northbound I–275 lanes over the
Hillsborough River.
The I–275/SR 60 (Westshore)
interchange is fully funded through
construction in the current Cost Feasible
Plan (CFP) of the Hillsborough
Metropolitan Planning Organization’s
(MPO) Plan Hillsborough 2045 Update
Long Range Transportation Plan (LRTP).
The FDOT Fiscal Year (FY) 2019/20–
2022/23 State Transportation
Improvement Program (STIP) and the
Hillsborough MPO’s FY2019/2020
Transportation Improvement Program
(TIP) also contain funding for Right-ofWay acquisition for the I–275/SR 60
(Westshore) interchange.
The I–275/I–4 (Downtown)
interchange is fully funded through
FOR FURTHER INFORMATION CONTACT:
E:\FR\FM\28SEN1.SGM
28SEN1
Federal Register / Vol. 85, No. 188 / Monday, September 28, 2020 / Notices
construction in the Hillsborough MPO’s
LRTP CFP. There is no funding in the
current FDOT STIP or Hillsborough
MPO’s TIP for any of the phases for the
I–275/I–4 (Downtown) interchange. The
FHWA’s action, related actions by other
Federal agencies, and the laws under
which such actions were taken, are
described in the SEIS approved on
September 15, 2020, and the ROD also
approved on September 15, 2020, and
other documents in the project file. The
SEIS and ROD are available for review
by contacting FHWA or FDOT at the
addresses provided above. In addition,
these documents can be viewed and
downloaded from the project website at
https://tampainterstatestudy.com/. This
notice of limitation on claims pertains
to final permit, license, and approval
decisions made as part of the
Supplemental EIS. The limitations on
claims for final permit, license, and
approval decisions made under
previous RODs associated with the TIS
project remain unaltered by this
subsequent notice. The laws under
which actions were taken include, but
are not limited to:
1. General: National Environmental
Policy Act (NEPA) [42 U.S.C. 4321 et
seq.]; Federal–Aid Highway Act (FAHA)
[23 U.S.C. 109 and 23 U.S.C. 128]; 23
CFR part 771.
2. Air: Clean Air Act (CAA) [42 U.S.C.
7401–7671(q)], with the exception of
project level conformity determinations
[42 U.S.C. 7506].
3. Noise: Noise Control Act of 1972
[42 U.S.C. 4901–4918]; 23 CFR part 772.
4. Land: Section 4(f) of the
Department of Transportation Act of
1966 [23 U.S.C. 138 and 49 U.S.C. 303];
Landscaping and Scenic Enhancement
(Wildflowers) [23 U.S.C. 319]; Land and
Water Conservation Fund (LWCF) [54
U.S.C. 200302–200310]; 23 CFR part
774.
5. Wildlife: Endangered Species Act
(ESA) [16 U.S.C. 1531–1544 and 1536];
Marine Mammal Protection Act [16
U.S.C. 1361–1423h], Anadromous Fish
Conservation Act [16 U.S.C. 757(a)–
757(f)]; Fish and Wildlife Coordination
Act [16 U.S.C. 661–667(d)]; Migratory
Bird Treaty Act (MBTA) [16 U.S.C. 703–
712]; Magnuson-Stevenson Fishery
Conservation and Management Act of
1976, as amended [16 U.S.C. 1801–
1891d], with Essential Fish Habitat
requirements [16 U.S.C. 1855(b)(2)].
6. Historic and Cultural Resources:
Section 106 of the National Historic
Preservation Act of 1966, as amended
[54 U.S.C. 3006101 et seq.];
Archaeological Resources Protection Act
of 1979 (ARPA) [16 U.S.C. 470(aa)–
470(II)]; Preservation of Historical and
Archaeological Data [54 U.S.C. 312501–
VerDate Sep<11>2014
18:25 Sep 25, 2020
Jkt 250001
312508]; Native American Grave
Protection and Repatriation Act
(NAGPRA) [25 U.S.C. 3001–3013; 18
U.S.C. 1170];
7. Social and Economic: Civil Rights
Act of 1964 [42 U.S.C. 2000d–2000d–1];
American Indian Religious Freedom Act
[42 U.S.C. 1996]; Farmland Protection
Policy Act (FPPA) [7 U.S.C. 4201–4209].
8. Wetlands and Water Resources:
Clean Water Act (Section 319, Section
401; Coastal Barriers Resources Act
(CBRA) [16 U.S.C. 3501–3510]; Coastal
Zone Management Act (CZMA) [16
U.S.C. 1451–1466]; Safe Drinking Water
Act (SDWA) [42 U.S.C. 300f–300j–26];
Rivers and Harbors Act of 1899 [33
U.S.C. 401–406]; Wild and Scenic
Rivers Act [16 U.S.C. 1271–1287];
Emergency Wetlands Resources Act [16
U.S.C. 3921, 3931]; Wetlands
Mitigation, [23 U.S.C. 119(g) and
133(b)(3)]; Flood Disaster Protection Act
[42 U.S.C. 4001–4130].
9. Hazardous Materials:
Comprehensive Environmental
Response, Compensation, and Liability
Act (CERCLA) [42 U.S.C. 9601–9675];
Superfund Amendments and
Reauthorization Act of 1986 (SARA);
Resource Conservation and Recovery
Act (RCRA) [42 U.S.C. 6901–6992(k)].
10. Executive Orders: E.O. 11990
Protection of Wetlands; E.O. 11988
Floodplain Management; E.O. 12898,
Federal Actions to Address
Environmental Justice in Minority
Populations and Low Income
Populations; E.O. 11593 Protection and
Enhancement of Cultural Resources;
E.O. 13007 Indian Sacred Sites; E.O.
13287 Preserve America; E.O. 13175
Consultation and Coordination with
Indian Tribal Governments; E.O. 11514
Protection and Enhancement of
Environmental Quality; E.O. 13112
Invasive Species.
(Catalog of Federal Domestic Assistance
Program Number 20.205, Highway Planning
and Construction. The regulations
implementing Executive Order 12372
regarding intergovernmental consultation on
Federal programs and activities apply to this
program.)
Authority: 23 U.S.C. 139(l)(1).
Issued on: September 17, 2020,
Karen M. Brunelle,
Director of Project Development, Tallahassee,
Florida.
[FR Doc. 2020–20932 Filed 9–25–20; 8:45 am]
BILLING CODE 4910–RY–P
PO 00000
Frm 00118
Fmt 4703
Sfmt 4703
60869
DEPARTMENT OF TRANSPORTATION
Federal Motor Carrier Safety
Administration
[Docket No. FMCSA–2020–0116]
Hours of Service of Drivers: Pronto.ai,
Inc., Application for Exemption
Federal Motor Carrier Safety
Administration (FMCSA), DOT.
AGENCY:
Notice of final disposition;
denial of exemption.
ACTION:
FMCSA announces its
decision to deny Pronto.ai, Inc.’s
(‘‘Pronto’’) application for an exemption
from the 11-hour driving limit and the
prohibition against driving after the
14th hour after coming on duty. Under
the exemption, drivers of commercial
motor vehicles (CMVs) equipped with
the Copilot by Pronto advanced driver
assistance systems (ADAS), the
SmartDrive® Video Safety Program, and
operating under certain other
safeguards, would be allowed to drive
up to 13 hours during a work shift
within 15 consecutive hours after
coming on duty following 10
consecutive hours off duty. FMCSA has
analyzed the exemption application and
the public comments and determined
that the applicant has not demonstrated
that the requested exemption would
likely achieve a level of safety that is
equivalent to, or greater than, the level
that would be achieved absent the
exemption.
SUMMARY:
This decision is applicable
September 28, 2020.
DATES:
ADDRESSES:
Docket: For access to the docket to
read background documents or
comments, go to www.regulations.gov at
any time or visit Room W12–140 on the
ground level of the West Building, 1200
New Jersey Avenue SE, Washington,
DC, between 9 a.m. and 5 p.m., ET,
Monday through Friday, except Federal
holidays. The on-line Federal Docket
Management System (FDMS) is
available 24 hours each day, 365 days
each year.
Privacy Act: In accordance with 5
U.S.C. 553(c), DOT solicits comments
from the public to better inform its
rulemaking process. DOT posts these
comments, without edit, including any
personal information the commenter
provides, to www.regulations.gov, as
described in the system of records
notice (DOT/ALL–14 FDMS), which can
be reviewed at www.dot.gov/privacy.
E:\FR\FM\28SEN1.SGM
28SEN1
Agencies
[Federal Register Volume 85, Number 188 (Monday, September 28, 2020)]
[Notices]
[Pages 60868-60869]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-20932]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Notice of Final Federal Agency Actions on Proposed Highway in
Florida
AGENCY: Federal Highway Administration (FHWA), DOT.
ACTION: Notice of Limitations on Claims for Judicial Review of Actions
by FHWA and Other Federal Agencies.
-----------------------------------------------------------------------
SUMMARY: This notice announces action taken by FHWA and other Federal
agencies that are final. This final agency action relates to a proposed
highway project on I-275 from the Howard Frankland Bridge to north of
Martin Luther King Jr. Blvd. and I-4 from I-275 to east of 50th Street.
The project will provide multilane improvements along I-275 including
the addition of 2 tolled express lanes in each direction,
reconstruction of the I-275/SR60 (Westshore) interchange, and
operational improvements to the I-275/I-4 (Downtown) interchange. The
Tampa Interstate System (TIS) project corridor traverses the urban area
of Tampa in Hillsborough County, Florida. The FHWA's Supplemental
Environmental Impact Statement (SEIS) provides details on the Selected
Alternative for the proposed improvements.
DATES: A claim seeking judicial review of the Federal agency actions on
the highway project will be barred unless the claim is filed on or
before February 25, 2021. If the Federal law that authorizes judicial
review of a claim provides a time period of less than 150 days for
filing such claim, then that shorter time period still applies.
FOR FURTHER INFORMATION CONTACT: For FHWA: Luis D. L[oacute]pez Rivera,
P.E., Senior Environmental Specialist, Federal Highway Administration,
Florida Division, 400 W Washington Street, Suite 4200, Orlando, FL
32801; (407) 867-6420; [email protected]. The FHWA Florida Division
Office's normal business hours are 7:30 a.m. to 4 p.m. (Eastern Time).
For FDOT: Jason Watts, Director, Office of Environmental Management,
FDOT, 605 Suwannee Street, MS 37, Tallahassee, Florida 32399; telephone
(850) 414-4316; email: [email protected]. The FDOT Office of
Environmental Management's normal business hours are 8:00 a.m. to 5:00
p.m. (Eastern Standard Time), Monday through Friday, except State
holidays.
SUPPLEMENTARY INFORMATION: Notice is hereby given that FHWA has taken a
final agency action by issuing a Record of Decision (ROD) for the
following highway project in the State of Florida: Tampa Interstate
System (TIS) Multilane Improvements along I-275 include the addition of
2 tolled express lanes in each direction, reconstruction of the I-275/
SR60 (Westshore) interchange, and operational improvements to the I-
275/I-4 (Downtown) interchange. The length of the project is
approximately fifteen miles. The full reconstruction of the I-275/SR 60
(Westshore) interchange will include new general purpose ``flyover''
ramps, the addition of tolled express lanes and ramps, and will
accommodate future fixed-guideway transit in the median. The proposed
express lane improvements will provide several direct connections to
and from I-275, and Reo Street will be modified as a part of this
project. Southbound, a new two-lane bridge will be constructed north of
the existing southbound I-275 lanes over the Hillsborough River.
Northbound, a new one-lane bridge will be constructed south of the
existing northbound I-275 lanes over the Hillsborough River.
The I-275/SR 60 (Westshore) interchange is fully funded through
construction in the current Cost Feasible Plan (CFP) of the
Hillsborough Metropolitan Planning Organization's (MPO) Plan
Hillsborough 2045 Update Long Range Transportation Plan (LRTP). The
FDOT Fiscal Year (FY) 2019/20-2022/23 State Transportation Improvement
Program (STIP) and the Hillsborough MPO's FY2019/2020 Transportation
Improvement Program (TIP) also contain funding for Right-of-Way
acquisition for the I-275/SR 60 (Westshore) interchange.
The I-275/I-4 (Downtown) interchange is fully funded through
[[Page 60869]]
construction in the Hillsborough MPO's LRTP CFP. There is no funding in
the current FDOT STIP or Hillsborough MPO's TIP for any of the phases
for the I-275/I-4 (Downtown) interchange. The FHWA's action, related
actions by other Federal agencies, and the laws under which such
actions were taken, are described in the SEIS approved on September 15,
2020, and the ROD also approved on September 15, 2020, and other
documents in the project file. The SEIS and ROD are available for
review by contacting FHWA or FDOT at the addresses provided above. In
addition, these documents can be viewed and downloaded from the project
website at https://tampainterstatestudy.com/. This notice of limitation
on claims pertains to final permit, license, and approval decisions
made as part of the Supplemental EIS. The limitations on claims for
final permit, license, and approval decisions made under previous RODs
associated with the TIS project remain unaltered by this subsequent
notice. The laws under which actions were taken include, but are not
limited to:
1. General: National Environmental Policy Act (NEPA) [42 U.S.C.
4321 et seq.]; Federal-Aid Highway Act (FAHA) [23 U.S.C. 109 and 23
U.S.C. 128]; 23 CFR part 771.
2. Air: Clean Air Act (CAA) [42 U.S.C. 7401-7671(q)], with the
exception of project level conformity determinations [42 U.S.C. 7506].
3. Noise: Noise Control Act of 1972 [42 U.S.C. 4901-4918]; 23 CFR
part 772.
4. Land: Section 4(f) of the Department of Transportation Act of
1966 [23 U.S.C. 138 and 49 U.S.C. 303]; Landscaping and Scenic
Enhancement (Wildflowers) [23 U.S.C. 319]; Land and Water Conservation
Fund (LWCF) [54 U.S.C. 200302-200310]; 23 CFR part 774.
5. Wildlife: Endangered Species Act (ESA) [16 U.S.C. 1531-1544 and
1536]; Marine Mammal Protection Act [16 U.S.C. 1361-1423h], Anadromous
Fish Conservation Act [16 U.S.C. 757(a)-757(f)]; Fish and Wildlife
Coordination Act [16 U.S.C. 661-667(d)]; Migratory Bird Treaty Act
(MBTA) [16 U.S.C. 703-712]; Magnuson-Stevenson Fishery Conservation and
Management Act of 1976, as amended [16 U.S.C. 1801-1891d], with
Essential Fish Habitat requirements [16 U.S.C. 1855(b)(2)].
6. Historic and Cultural Resources: Section 106 of the National
Historic Preservation Act of 1966, as amended [54 U.S.C. 3006101 et
seq.]; Archaeological Resources Protection Act of 1979 (ARPA) [16
U.S.C. 470(aa)-470(II)]; Preservation of Historical and Archaeological
Data [54 U.S.C. 312501-312508]; Native American Grave Protection and
Repatriation Act (NAGPRA) [25 U.S.C. 3001-3013; 18 U.S.C. 1170];
7. Social and Economic: Civil Rights Act of 1964 [42 U.S.C. 2000d-
2000d-1]; American Indian Religious Freedom Act [42 U.S.C. 1996];
Farmland Protection Policy Act (FPPA) [7 U.S.C. 4201-4209].
8. Wetlands and Water Resources: Clean Water Act (Section 319,
Section 401; Coastal Barriers Resources Act (CBRA) [16 U.S.C. 3501-
3510]; Coastal Zone Management Act (CZMA) [16 U.S.C. 1451-1466]; Safe
Drinking Water Act (SDWA) [42 U.S.C. 300f-300j-26]; Rivers and Harbors
Act of 1899 [33 U.S.C. 401-406]; Wild and Scenic Rivers Act [16 U.S.C.
1271-1287]; Emergency Wetlands Resources Act [16 U.S.C. 3921, 3931];
Wetlands Mitigation, [23 U.S.C. 119(g) and 133(b)(3)]; Flood Disaster
Protection Act [42 U.S.C. 4001-4130].
9. Hazardous Materials: Comprehensive Environmental Response,
Compensation, and Liability Act (CERCLA) [42 U.S.C. 9601-9675];
Superfund Amendments and Reauthorization Act of 1986 (SARA); Resource
Conservation and Recovery Act (RCRA) [42 U.S.C. 6901-6992(k)].
10. Executive Orders: E.O. 11990 Protection of Wetlands; E.O. 11988
Floodplain Management; E.O. 12898, Federal Actions to Address
Environmental Justice in Minority Populations and Low Income
Populations; E.O. 11593 Protection and Enhancement of Cultural
Resources; E.O. 13007 Indian Sacred Sites; E.O. 13287 Preserve America;
E.O. 13175 Consultation and Coordination with Indian Tribal
Governments; E.O. 11514 Protection and Enhancement of Environmental
Quality; E.O. 13112 Invasive Species.
(Catalog of Federal Domestic Assistance Program Number 20.205,
Highway Planning and Construction. The regulations implementing
Executive Order 12372 regarding intergovernmental consultation on
Federal programs and activities apply to this program.)
Authority: 23 U.S.C. 139(l)(1).
Issued on: September 17, 2020,
Karen M. Brunelle,
Director of Project Development, Tallahassee, Florida.
[FR Doc. 2020-20932 Filed 9-25-20; 8:45 am]
BILLING CODE 4910-RY-P