Nevada PSH Energy Storage LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 59780-59781 [2020-20981]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
59780
Federal Register / Vol. 85, No. 185 / Wednesday, September 23, 2020 / Notices
mitigating measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
The proposed Clifton to Palmyra ALine Abandonment Project includes the
following activities:
• Disconnect the existing 24-inchdiameter M600A and the existing 20inch-diameter M600J at Northern’s
existing Clifton Compressor Station;
• disconnect the existing 24-inchdiameter M590A and the existing 24inch-diameter M600A at Northern’s
existing Beatrice Compressor Station;
• disconnect the existing 24-inchdiameter M590A at Northern’s existing
Palmyra Compressor Station;
• abandon in-place 54.3 miles of
existing 24-inch-diameter M600A
mainline in Gage and Jefferson
Counties, Nebraska, and Washington
and Clay Counties, Kansas;
• abandon in-place 19.9 miles of
existing 20-inch-diameter M600J
mainline in Clay and Washington
Counties, Kansas;
• abandon in-place 41.7 miles of
existing 24-inch-diameter M590A in
Otoe, Lancaster, and Gage Counties,
Nebraska, between Palmyra and
Beatrice, Nebraska; and
• install a new 15,900-horsepower
turbine driven compressor unit at
Northern’s existing Beatrice Compressor
Station near Beatrice, Nebraska.
The Commission mailed a copy of the
Notice of Availability to federal, state,
and local government representatives
and agencies; elected officials;
environmental and public interest
groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
and newspapers and libraries in the
project area. The EA is only available in
electronic format. It may be viewed and
downloaded from the FERC’s website
(www.ferc.gov), on the natural gas
environmental documents page (https://
www.ferc.gov/industries-data/naturalgas/environment/environmentaldocuments). In addition, the EA may be
accessed by using the eLibrary link on
the FERC’s website. Click on the
eLibrary link (https://www.ferc.gov/ferconline/elibrary/overview), select
‘‘General Search’’ and enter the docket
number in the ‘‘Docket Number’’ field,
excluding the last three digits (i.e.
CP20–460). Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659.
The EA is not a decision document.
It presents Commission staff’s
independent analysis of the
VerDate Sep<11>2014
18:02 Sep 22, 2020
Jkt 250001
environmental issues for the
Commission to consider when
addressing the merits of all issues in
this proceeding. Any person wishing to
comment on the EA may do so. Your
comments should focus on the EA’s
disclosure and discussion of potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. The more
specific your comments, the more useful
they will be. To ensure that the
Commission has the opportunity to
consider your comments prior to
making its decision on this project, it is
important that we receive your
comments in Washington, DC on or
before 5:00 p.m. Eastern Time on
October 16, 2020.
For your convenience, there are three
methods you can use to file your
comments to the Commission. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s website
(www.ferc.gov) under the link to FERC
Online. This is an easy method for
submitting brief, text-only comments on
a project;
(2) You can also file your comments
electronically using the eFiling feature
on the Commission’s website
(www.ferc.gov) under the link to FERC
Online. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ You must select the type of
filing you are making. If you are filing
a comment on a particular project,
please select ‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
Commission. Be sure to reference the
project docket number (CP20–460–000)
on your letter. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
Filing environmental comments will
not give you intervenor status, but you
do not need intervenor status to have
your comments considered. Only
intervenors have the right to seek
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
rehearing or judicial review of the
Commission’s decision. At this point in
this proceeding, the timeframe for filing
timely intervention requests has
expired. Any person seeking to become
a party to the proceeding must file a
motion to intervene out-of-time
pursuant to Rule 214(b)(3) and (d) of the
Commission’s Rules of Practice and
Procedures (18 CFR 385.214(b)(3) and
(d)) and show good cause why the time
limitation should be waived. Motions to
intervene are more fully described at
https://www.ferc.gov/ferc-online/ferconline/how-guides.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
Dated: September 16, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–20986 Filed 9–22–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15031–000]
Nevada PSH Energy Storage LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On April 27, 2020, the Nevada PSH
Energy Storage LLC, filed an application
for a preliminary permit, and
resubmitted on June 18, 2020, pursuant
to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Ruby Hill Pumped Hydro Energy
Storage Project to be located in Eureka,
Nevada. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
E:\FR\FM\23SEN1.SGM
23SEN1
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 85, No. 185 / Wednesday, September 23, 2020 / Notices
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would be
located at the existing Ruby Hill Mine
an existing open pit mine with the
pump storage utilizing and existing
deep open pit mine for the lower
reservoir and an earthen dam for the
upper reservoir. The project consist of
the following new facilities: (1) A 3,474foot-long, 30-meter-high earthen dam
(Upper Reservoir) with a surface area of
20 acres; and a total storage capacity of
1,941 acre-feet at a normal maximum
surface elevation of 1,231 feet average
mean sea level (msl); (2) an existing
open pit mine (Lower Reservoir) that
will not require a dam with a maximum
surface elevation of 1,707 average msl,
and a storage capacity of 2,000 acre-feet;
(3) two 4,760-foot-long, 10-foot-diameter
steel penstocks; (4) an underground
powerhouse housing four 50-megawatt
pump turbine units at an approximate
elevation of 1,670 msl, the final
dimension is to be determined; (5) a
single 15-foot-diameter low pressure
draft tube that will extend
approximately 80 feet from the
powerhouse to the Lower Reservoir; (6)
the initial fill water would come from
water purchased from existing water
right holders, with an estimated 100gallons per minute (gpm) from Eureka
wastewater treatment plant to be used as
a make-up water source; (7) a 200-mega
volt amp substation for converting the
20-kilovolt (kV), generator/motor
voltage to 230- kV, a new 230- kV,
13,000-foot-long transmission lines that
connect the new substation to the
existing 230-kV transmission lines at
Machacek substation, and (8)
appurtenant facilities. The estimated
annual power generation at the Ruby
Hill Pumped Hydro Energy Storage
Project would be 730 gigawatt-hours.
Applicant Contact: Mr. Michael
Werner, Managing Director, Nevada
PSH Energy Storage LLC. 7425 East
Columbia Drive, Spokane, Washington
99212, michaelawerner@comcast.net.
FERC Contact: Ousmane Sidibe;
Phone: (202) 502–6245.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
VerDate Sep<11>2014
18:02 Sep 22, 2020
Jkt 250001
and competing applications using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
In addition to publishing the full text
of this document in the Federal
Register, more information about this
project, including a copy of the
application, can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
website at https://www.ferc.gov/ferconline/elibrary/overview. Enter the
docket number (P–15031) in the docket
number field to access the document.
For assistance, contact FERC Online
Support.
Dated: September 17, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–20981 Filed 9–22–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–1247–001.
Applicants: Entergy Arkansas, Inc.
Description: Report Filing: EAL
Refund Report (ER18–1247–001) to be
effective N/A.
Filed Date: 9/16/20.
Accession Number: 20200916–5056.
Comments Due: 5 p.m. ET 10/7/20.
Docket Numbers: ER20–2446–001.
Applicants: Bitter Ridge Wind Farm,
LLC.
Description: Tariff Amendment:
Deficiency Filing for Bitter Ridge
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
59781
Reactive Rate Schedule to be effective 9/
14/2020.
Filed Date: 9/17/20.
Accession Number: 20200917–5040.
Comments Due: 5 p.m. ET 9/28/20.
Docket Numbers: ER20–2878–003.
Applicants: Pacific Gas and Electric
Company.
Description: Tariff Amendment: Third
Amendment to Wholesale Distribution
Tariff Rate Case 2020 (WDT3), PWRPA
30 to be effective 11/15/2020.
Filed Date: 9/16/20.
Accession Number: 20200916–5071.
Comments Due: 5 p.m. ET 10/7/20.
Docket Numbers: ER20–2878–004.
Applicants: Pacific Gas and Electric
Company.
Description: Tariff Amendment:
Fourth Amendment to Wholesale
Distribution Tariff Rate Case 2020
(WDT3), PWRPA56 to be effective 11/
15/2020.
Filed Date: 9/16/20.
Accession Number: 20200916–5075.
Comments Due: 5 p.m. ET 10/7/20.
Docket Numbers: ER20–2878–005.
Applicants: Pacific Gas and Electric
Company.
Description: Tariff Amendment: Fifth
Amendment to Wholesale Distribution
Tariff Rate Case 2020 (WDT3), S Cove to
be effective 11/15/2020.
Filed Date: 9/16/20.
Accession Number: 20200916–5077.
Comments Due: 5 p.m. ET 10/7/20
Docket Numbers: ER20–2878–006.
Applicants: Pacific Gas and Electric
Company.
Description: Tariff Amendment: Sixth
Amendment to Wholesale Distribution
Tariff Rate Case 2020 (WDT3), Western
to be effective 11/15/2020.
Filed Date: 9/16/20.
Accession Number: 20200916–5079.
Comments Due: 5 p.m. ET 10/7/20.
Docket Numbers: ER20–2878–007.
Applicants: Pacific Gas and Electric
Company.
Description: Tariff Amendment:
Seventh Amendment to Wholesale
Distribution Tariff Rate Case 2020
(WDT3), WPA to be effective 11/15/
2020.
Filed Date: 9/16/20.
Accession Number: 20200916–5082.
Comments Due: 5 p.m. ET 10/7/20.
Docket Numbers: ER20–2878–008.
Applicants: Pacific Gas and Electric
Company.
Description: Tariff Amendment:
Eighth Amendment to Wholesale
Distribution Tariff Rate Case 2020
(WDT3), Western to be effective 11/15/
2020.
Filed Date: 9/16/20.
Accession Number: 20200916–5084.
E:\FR\FM\23SEN1.SGM
23SEN1
Agencies
[Federal Register Volume 85, Number 185 (Wednesday, September 23, 2020)]
[Notices]
[Pages 59780-59781]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-20981]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 15031-000]
Nevada PSH Energy Storage LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On April 27, 2020, the Nevada PSH Energy Storage LLC, filed an
application for a preliminary permit, and resubmitted on June 18, 2020,
pursuant to section 4(f) of the Federal Power Act (FPA), proposing to
study the feasibility of the Ruby Hill Pumped Hydro Energy Storage
Project to be located in Eureka, Nevada. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit
[[Page 59781]]
term. A preliminary permit does not authorize the permit holder to
perform any land-disturbing activities or otherwise enter upon lands or
waters owned by others without the owners' express permission.
The proposed project would be located at the existing Ruby Hill
Mine an existing open pit mine with the pump storage utilizing and
existing deep open pit mine for the lower reservoir and an earthen dam
for the upper reservoir. The project consist of the following new
facilities: (1) A 3,474-foot-long, 30-meter-high earthen dam (Upper
Reservoir) with a surface area of 20 acres; and a total storage
capacity of 1,941 acre-feet at a normal maximum surface elevation of
1,231 feet average mean sea level (msl); (2) an existing open pit mine
(Lower Reservoir) that will not require a dam with a maximum surface
elevation of 1,707 average msl, and a storage capacity of 2,000 acre-
feet; (3) two 4,760-foot-long, 10-foot-diameter steel penstocks; (4) an
underground powerhouse housing four 50-megawatt pump turbine units at
an approximate elevation of 1,670 msl, the final dimension is to be
determined; (5) a single 15-foot-diameter low pressure draft tube that
will extend approximately 80 feet from the powerhouse to the Lower
Reservoir; (6) the initial fill water would come from water purchased
from existing water right holders, with an estimated 100-gallons per
minute (gpm) from Eureka wastewater treatment plant to be used as a
make-up water source; (7) a 200-mega volt amp substation for converting
the 20-kilovolt (kV), generator/motor voltage to 230- kV, a new 230-
kV, 13,000-foot-long transmission lines that connect the new substation
to the existing 230-kV transmission lines at Machacek substation, and
(8) appurtenant facilities. The estimated annual power generation at
the Ruby Hill Pumped Hydro Energy Storage Project would be 730
gigawatt-hours.
Applicant Contact: Mr. Michael Werner, Managing Director, Nevada
PSH Energy Storage LLC. 7425 East Columbia Drive, Spokane, Washington
99212, [email protected].
FERC Contact: Ousmane Sidibe; Phone: (202) 502-6245.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://ferconline.ferc.gov/QuickComment.aspx. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
In addition to publishing the full text of this document in the
Federal Register, more information about this project, including a copy
of the application, can be viewed or printed on the ``eLibrary'' link
of Commission's website at https://www.ferc.gov/ferc-online/elibrary/overview. Enter the docket number (P-15031) in the docket number field
to access the document. For assistance, contact FERC Online Support.
Dated: September 17, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-20981 Filed 9-22-20; 8:45 am]
BILLING CODE 6717-01-P