extending across the Arizona-New
Mexico State border, consist of the
following new facilities: (1) A 1,333foot-long, 542-foot-high earthen rock fill
dam (Upper Reservoir) with a surface
area of 392 acres; and a total storage
capacity of 35,043 acre-feet at a normal
maximum operating elevation of 8,970
feet average mean sea level (msl); (2) a
1,134-foot-long, 166-foot-high earthen
rock fill dam (Lower Reservoir) with a
surface area of 534 acres, and a total
storage capacity of 36,209 acre-feet at a
normal maximum operating elevation of
5,656 feet average msl; (3) two 300-footlong, 23-foot-diameter penstocks shafts;
two 2,841-foot penstock vertical shafts;
six 250-foot draft tube; and one 15,880foot horizontal headrace tunnel with 16foot diameter; (4) a 300-foot-long, 75foot-wide, 160-foot-high reinforced
concrete powerhouse housing six 250megawatt fixed turbines generators; up
to two 150-megawatt turbines with
variable speed machines; (5) four
24,788-foot-long low pressure tailrace
tunnels; (6) a 59,664-foot-long water
source pipeline connecting the water
pumping station located at the San Juan
River to the Lower Reservoir for initial
fill and make-up water; (7) two new
double circuit 500-kilovolt (kV) electric
transmission lines that connect the
project switchyard to the propose
existing uprates 500-kV transmission
lines, and (8) appurtenant facilities. The
estimated annual power generation at
the Beclabito Energy Storage Center
Project would be 2,628 gigawatt-hours.
Applicant Contact: Mr. Thomas
Conroy, Co-Founder, Kinetic Power,
LLC. Post Office Box 32482, Santa Fe,
NM 87506, tconroy@
kineticpowerco.com.
FERC Contact: Ousmane Sidibe;
Phone: (202) 502–6245.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. The Commission strongly
encourages electronic filing. Please file
comments, motions to intervene, notices
of intent, and competing applications
using the Commission’s eFiling system
at https://ferconline.ferc.gov/
FERCOnline.aspx. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
VerDate Sep<11>2014
18:02 Sep 22, 2020
Jkt 250001
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
In addition to publishing the full text
of this document in the Federal
Register, more information about this
project, including a copy of the
application, can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
website at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–15034) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Dated: September 17, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–20982 Filed 9–22–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL20–56–000]
PJM Interconnection, L.L.C.; Notice of
Institution of Section 206 Proceeding
and Refund Effective Date
On September 17, 2020, the
Commission issued an order in Docket
No. EL20–56–000, pursuant to section
206 of the Federal Power Act (FPA), 16
U.S.C. 824e (2018), instituting an
investigation into whether PJM
Interconnection, L.L.C.’s Tariff may be
unjust, unreasonable, unduly
discriminatory, or preferential. PJM
Interconnection, L.L.C., 172 FERC
¶ 61,243 (2020).
The refund effective date in Docket
No. EL20–56–000, established pursuant
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Any interested person desiring to be
heard in Docket No. EL20–56–000 must
file a notice of intervention or motion to
intervene, as appropriate, with the
Federal Energy Regulatory Commission,
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.214 (2019),
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
59783
within 21 days of the date of issuance
of the order.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFile’’ link at https://www.ferc.gov.
In lieu of electronic filing, you may
submit a paper copy. Submissions sent
via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Dated: September 17, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–20977 Filed 9–22–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2444–036]
Northern States Power Company—
Wisconsin; Notice of Intent to File
License Application, Filing of PreApplication Document, Approving Use
of the Traditional Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 2444–036.
c. Date Filed: July 29, 2020.
d. Submitted By: Northern States
Power Company—Wisconsin (Northern
States)
e. Name of Project: White River
Hydroelectric Project.
E:\FR\FM\23SEN1.SGM
23SEN1
Agencies
[Federal Register Volume 85, Number 185 (Wednesday, September 23, 2020)]
[Notices]
[Page 59783]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-20977]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL20-56-000]
PJM Interconnection, L.L.C.; Notice of Institution of Section 206
Proceeding and Refund Effective Date
On September 17, 2020, the Commission issued an order in Docket No.
EL20-56-000, pursuant to section 206 of the Federal Power Act (FPA), 16
U.S.C. 824e (2018), instituting an investigation into whether PJM
Interconnection, L.L.C.'s Tariff may be unjust, unreasonable, unduly
discriminatory, or preferential. PJM Interconnection, L.L.C., 172 FERC
] 61,243 (2020).
The refund effective date in Docket No. EL20-56-000, established
pursuant to section 206(b) of the FPA, will be the date of publication
of this notice in the Federal Register.
Any interested person desiring to be heard in Docket No. EL20-56-
000 must file a notice of intervention or motion to intervene, as
appropriate, with the Federal Energy Regulatory Commission, in
accordance with Rule 214 of the Commission's Rules of Practice and
Procedure, 18 CFR 385.214 (2019), within 21 days of the date of
issuance of the order.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://www.ferc.gov) using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to Commission's Public Reference
Room, due to the proclamation declaring a National Emergency concerning
the Novel Coronavirus Disease (COVID-19), issued by the President on
March 13, 2020. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFile'' link at
https://www.ferc.gov. In lieu of electronic filing, you may submit a
paper copy. Submissions sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
Dated: September 17, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.