Airworthiness Directives; Airbus SAS Airplanes, 59460-59463 [2020-20676]

Download as PDF 59460 Federal Register / Vol. 85, No. 184 / Tuesday, September 22, 2020 / Proposed Rules TIS or until all 48 elevator torque tube attach fasteners are replaced, whichever occurs first. (iii) For airplanes that have accumulated 4,000 or more hours TIS as of the effective date of this AD, complete a one-time visual inspection within 200 hours TIS after the effective date of the AD. No repetitive inspections are required after completion of the one-time visual inspection. (2) If there are any loose, fretting, or incorrectly installed fasteners, remove the elevator and replace all 48 elevator torque tube attach fasteners (24 per side, with 12 each on the inboard and outboard elevator torque tube attach point) before further flight. Maintain proper alignment by marking each part prior to removal and by replacing one fastener at a time. Replacing all 48 fasteners is terminating action for the repetitive inspections required by paragraphs (g)(1)(i) and (ii) of this AD. (3) If all 48 fasteners were replaced before the effective date of this AD by following the instructions in paragraph (g)(2) of this AD, then the initial and recurring inspections detailed in paragraph (g)(1) of this AD are not required provided you report the information required by paragraph (h) of this AD. (h) Reporting Requirement Within 30 days after doing the initial inspection (regardless if loose, fretting, or incorrectly installed fasteners were found) or within 30 days after the effective date of this AD, whichever occurs later, and then within 30 days after each inspection where loose, fretting, or incorrectly installed fasteners were found, report the following information to the FAA at Wichita-COS@faa.gov: (1) Name and address of owner. (2) Date of the inspection. (3) Name, address, telephone number, and email address of person submitting the report. (4) Airplane serial number, registration number, and total hours TIS on the airplane at the time of the inspection. (5) If an earlier inspection identified loose, fretting, or incorrectly installed fasteners, identify the hours TIS on the airplane and which fasteners were replaced, if known, or if all fasteners were replaced. (6) If loose, fretting, or incorrectly installed fasteners were found, detailed information including a sketch or picture showing the location of the loose, fretting, or incorrectly installed fasteners and identification of any installed supplemental type certificates (STCs), alterations, repairs, or field approvals affecting the area of concern. (i) Paperwork Reduction Act Burden Statement A federal agency may not conduct or sponsor, and a person is not required to respond to, nor shall a person be subject to a penalty for failure to comply with a collection of information subject to the requirements of the Paperwork Reduction Act unless that collection of information displays a currently valid OMB Control Number. The OMB Control Number for this information collection is 2120–0056. Public reporting for this collection of information is estimated to be approximately 1 hour per response, including the time for reviewing VerDate Sep<11>2014 17:17 Sep 21, 2020 Jkt 250001 instructions, searching existing data sources, gathering and maintaining the data needed, completing and reviewing the collection of information. All responses to this collection of information are mandatory. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to: Information Collection Clearance Officer, Federal Aviation Administration, 10101 Hillwood Parkway, Fort Worth, TX 76177–1524. (j) Alternative Methods of Compliance (AMOCs) (1) The Manager, Wichita ACO Branch, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request to your principal inspector or local Flight Standards District Office, as appropriate. If sending information directly to the manager of the certification office, send it to the attention of the person identified in the Related Information section of this AD. (2) Before using any approved AMOC, notify your appropriate principal inspector, or lacking a principal inspector, the manager of the local flight standards district office/ certificate holding district office. Notice of proposed rulemaking (NPRM). ACTION: The FAA proposes to adopt a new airworthiness directive (AD) for certain Airbus SAS Model A350–941 and –1041 airplanes. This proposed AD was prompted by reports of migration of the bushings of the horizontal tail plane (HTP) lateral load fittings (LLFs) on the left- and right-hand sides during flight test. This proposed AD would require repetitive inspections for migration of the bushings of the HTP LLFs on the left- and right-hand sides, and terminating repair or modification of any affected bushing, as specified in a European Union Aviation Safety Agency (EASA), which will be incorporated by reference. The FAA is proposing this AD to address the unsafe condition on these products. DATES: The FAA must receive comments on this proposed AD by November 6, 2020. SUMMARY: [Docket No. FAA–2020–0846; Project Identifier MCAI–2020–00806–T] You may send comments, using the procedures found in 14 CFR 11.43 and 11.45, by any of the following methods: • Federal eRulemaking Portal: Go to https://www.regulations.gov. Follow the instructions for submitting comments. • Fax: 202–493–2251. • Mail: U.S. Department of Transportation, Docket Operations, M– 30, West Building Ground Floor, Room W12–140, 1200 New Jersey Avenue SE, Washington, DC 20590. • Hand Delivery: Deliver to Mail address above between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. For the material incorporated by reference (IBR) in this AD, contact the EASA, Konrad-Adenauer-Ufer 3, 50668 Cologne, Germany; telephone +49 221 8999 000; email ADs@easa.europa.eu; internet www.easa.europa.eu. You may find this IBR material on the EASA website at https://ad.easa.europa.eu. You may view this IBR material at the FAA, Airworthiness Products Section, Operational Safety Branch, 2200 South 216th St., Des Moines, WA. For information on the availability of this material at the FAA, call 206–231–3195. It is also available in the AD docket on the internet at https:// www.regulations.gov by searching for and locating Docket No. FAA–2020– 0846. RIN 2120–AA64 Examining the AD Docket (k) Related Information (1) For more information about this AD, contact Bobbie Kroetch, Aerospace Engineer, Wichita ACO Branch, FAA, 1801 Airport Rd, Wichita, KS 67209; phone: 316–946–4155; fax: 316–946–4107; email: bobbie.kroetch@ faa.gov or Wichita-COS@faa.gov. (2) For service information identified in this AD, contact Textron Aviation Inc., One Cessna Boulevard, Wichita, KS 67215, telephone: 316–517–5800, email: teamturbopropsupport@txtav.com, internet: https://support.cessna.com. You may review this referenced service information at the FAA, Airworthiness Products Section, Operational Safety Branch, 901 Locust, Kansas City, Missouri 64106. For information on the availability of this material at the FAA, call (816) 329–4148. Issued on September 15, 2020. Lance T. Gant, Director, Compliance & Airworthiness Division, Aircraft Certification Service. [FR Doc. 2020–20681 Filed 9–21–20; 8:45 am] BILLING CODE 4910–13–P DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 39 Airworthiness Directives; Airbus SAS Airplanes Federal Aviation Administration (FAA), DOT. AGENCY: PO 00000 Frm 00014 Fmt 4702 Sfmt 4702 ADDRESSES: You may examine the AD docket on the internet at https:// www.regulations.gov by searching for and locating Docket No. FAA–2020– 0846; or in person at Docket Operations E:\FR\FM\22SEP1.SGM 22SEP1 Federal Register / Vol. 85, No. 184 / Tuesday, September 22, 2020 / Proposed Rules between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. The AD docket contains this NPRM, any comments received, and other information. The street address for Docket Operations is listed above. Comments will be available in the AD docket shortly after receipt. FOR FURTHER INFORMATION CONTACT: Kathleen Arrigotti, Aerospace Engineer, Large Aircraft Section, International Validation Branch, FAA, 2200 South 216th St., Des Moines, WA 98198; telephone and fax 206–231–3218; email kathleen.arrigotti@faa.gov. SUPPLEMENTARY INFORMATION: Comments Invited The FAA invites you to participate in this rulemaking by submitting written comments, data, or views about this proposal. The most helpful comments reference a specific portion of the proposal, explain the reason for any recommended change, and include supporting data. To ensure the docket does not contain duplicate comments, commenters should send only one copy of written comments, or if comments are filed electronically, commenters should submit only one time. Send your comments to an address listed under the ADDRESSES section. Include ‘‘Docket No. FAA–2020–0846; Project Identifier MCAI–2020–00806–T at the beginning of your comments. Except for Confidential Business Information (CBI) as described in the following paragraph, and other information as described in 14 CFR 11.35, the FAA will post all comments received, without change, as well as a report summarizing each substantive public contact with FAA personnel concerning this proposed rulemaking. Before acting on this proposal, the FAA will consider all comments received by the closing date for comments. The FAA will consider comments filed after the comment period has closed if it is possible to do so without incurring expense or delay. The FAA may change this NPRM because of those comments. Confidential Business Information CBI is commercial or financial information that is both customarily and actually treated as private by its owner. Under the Freedom of Information Act (FOIA) (5 U.S.C. 552), CBI is exempt from public disclosure. If your comments responsive to this NPRM contain commercial or financial information that is customarily treated as private, that you actually treat as VerDate Sep<11>2014 17:17 Sep 21, 2020 Jkt 250001 private, and that is relevant or responsive to this NPRM, it is important that you clearly designate the submitted comments as CBI. Please mark each page of your submission containing CBI as ‘‘PROPIN.’’ The FAA will treat such marked submissions as confidential under the FOIA, and they will not be placed in the public docket of this NPRM. Submissions containing CBI should be sent to the person identified in the FOR FURTHER INFORMATION CONTACT section. Any commentary that the FAA receives which is not specifically designated as CBI will be placed in the public docket for this rulemaking. Discussion The EASA, which is the Technical Agent for the Member States of the European Union, has issued EASA AD 2020–0139R1, dated July 3, 2020 (‘‘EASA AD 2020–0139R1’’) (also referred to as the Mandatory Continuing Airworthiness Information, or ‘‘the MCAI’’), to correct an unsafe condition for certain Airbus SAS Model A350–941 and –1041 airplanes. This proposed AD was prompted by reports of migration of the bushings of the HTP LLFs on the left- and righthand sides during flight test. The FAA is proposing this AD to address combined corrosion and fatigue damage of the primary structure, possibly resulting in failure of an HTP LLF and damage to adjacent structure, which could result in reduced controllability of the airplane. See the MCAI for additional background information. Related IBR Material Under 1 CFR Part 51 EASA AD 2020–0139R1 describes procedures for repetitive detailed inspections for migration of the bushings of the HTP LLF on the leftand right-hand sides; and repair or modification of any affected bushing, which eliminates the need for the repetitive inspections. This material is reasonably available because the interested parties have access to it through their normal course of business or by the means identified in the ADDRESSES section. FAA’s Determination and Requirements of This Proposed AD This product has been approved by the aviation authority of another country, and is approved for operation in the United States. Pursuant to the FAA’s bilateral agreement with the State of Design Authority, the FAA has been PO 00000 Frm 00015 Fmt 4702 Sfmt 4702 59461 notified of the unsafe condition described in the MCAI referenced above. The FAA is proposing this AD because the FAA evaluated all the relevant information and determined the unsafe condition described previously is likely to exist or develop in other products of the same type design. Proposed AD Requirements This proposed AD would require accomplishing the actions specified in EASA AD 2020–0139R1 described previously, as incorporated by reference, except for any differences identified as exceptions in the regulatory text of this AD. Explanation of Required Compliance Information In the FAA’s ongoing efforts to improve the efficiency of the AD process, the FAA initially worked with Airbus and EASA to develop a process to use certain EASA ADs as the primary source of information for compliance with requirements for corresponding FAA ADs. The FAA has since coordinated with other manufacturers and civil aviation authorities (CAAs) to use this process. As a result, EASA AD 2020–0139R1 will be incorporated by reference in the FAA final rule. This proposed AD would, therefore, require compliance with EASA AD 2020– 0139R1 in its entirety, through that incorporation, except for any differences identified as exceptions in the regulatory text of this proposed AD. Using common terms that are the same as the heading of a particular section in the EASA AD does not mean that operators need comply only with that section. For example, where the AD requirement refers to ‘‘all required actions and compliance times,’’ compliance with this AD requirement is not limited to the section titled ‘‘Required Action(s) and Compliance Time(s)’’ in the EASA AD. Service information specified in EASA AD 2020–0139R1 that is required for compliance with EASA AD 2020– 0139R1 will be available on the internet at https://www.regulations.gov by searching for and locating Docket No. FAA–2020–0846 after the FAA final rule is published. Costs of Compliance The FAA estimates that this proposed AD affects 13 airplanes of U.S. registry. The FAA estimates the following costs to comply with this proposed AD: E:\FR\FM\22SEP1.SGM 22SEP1 59462 Federal Register / Vol. 85, No. 184 / Tuesday, September 22, 2020 / Proposed Rules ESTIMATED COSTS FOR REQUIRED ACTIONS Labor cost Cost per product Parts cost 10 work-hours × $85 per hour = $850 ......................... The FAA estimates that it would take about 1 work-hour per product to comply with the proposed reporting $0 $850 Cost on U.S. operators $11,050 per inspection cycle. requirement in this proposed AD. The average labor rate is $85 per hour. Based on these figures, the FAA estimates the cost of reporting the inspection results on U.S. operators to be $1,105, or $85 per product. ESTIMATED COSTS FOR OPTIONAL ACTIONS Labor cost Parts cost Up to 38 work-hours × $85 per hour = Up to $3,230 ................ Paperwork Reduction Act A federal agency may not conduct or sponsor, and a person is not required to respond to, nor shall a person be subject to penalty for failure to comply with a collection of information subject to the requirements of the Paperwork Reduction Act unless that collection of information displays a current valid OMB control number. The control number for the collection of information required by this proposed AD is 2120– 0056. The paperwork cost associated with this proposed AD has been detailed in the Costs of Compliance section of this document and includes time for reviewing instructions, as well as completing and reviewing the collection of information. Therefore, all reporting associated with this proposed AD is mandatory. Comments concerning the accuracy of this burden and suggestions for reducing the burden should be directed to Information Collection Clearance Officer, Federal Aviation Administration, 10101 Hillwood Parkway, Fort Worth, TX 76177–1524. Authority for This Rulemaking Title 49 of the United States Code specifies the FAA’s authority to issue rules on aviation safety. Subtitle I, section 106, describes the authority of the FAA Administrator. Subtitle VII: Aviation Programs, describes in more detail the scope of the Agency’s authority. The FAA is issuing this rulemaking under the authority described in Subtitle VII, Part A, Subpart III, Section 44701: General requirements. Under that section, Congress charges the FAA with promoting safe flight of civil aircraft in air commerce by prescribing regulations for practices, methods, and procedures the Administrator finds necessary for safety in air commerce. This regulation is within the scope of that authority because it addresses an VerDate Sep<11>2014 17:17 Sep 21, 2020 Jkt 250001 Cost per product $0 Up to $3,230. unsafe condition that is likely to exist or develop on products identified in this rulemaking action. (a) Comments Due Date The FAA must receive comments by November 6, 2020. Regulatory Findings The FAA determined that this proposed AD would not have federalism implications under Executive Order 13132. This proposed AD would not have a substantial direct effect on the States, on the relationship between the national Government and the States, or on the distribution of power and responsibilities among the various levels of government. For the reasons discussed above, I certify this proposed regulation: (1) Is not a ‘‘significant regulatory action’’ under Executive Order 12866, (2) Will not affect intrastate aviation in Alaska, and (3) Will not have a significant economic impact, positive or negative, on a substantial number of small entities under the criteria of the Regulatory Flexibility Act. (b) Affected ADs None. List of Subjects in 14 CFR Part 39 Air transportation, Aircraft, Aviation safety, Incorporation by reference, Safety. The Proposed Amendment Accordingly, under the authority delegated to me by the Administrator, the FAA proposes to amend 14 CFR part 39 as follows: PART 39—AIRWORTHINESS DIRECTIVES 1. The authority citation for part 39 continues to read as follows: ■ Authority: 49 U.S.C. 106(g), 40113, 44701. § 39.13 [Amended] 2. The FAA amends § 39.13 by adding the following new airworthiness directive (AD): ■ Airbus SAS: Docket No. FAA–2020–0846; Project Identifier MCAI–2020–00806–T. PO 00000 Frm 00016 Fmt 4702 Sfmt 4702 (c) Applicability This AD applies to Airbus SAS Model A350–941 and –1041 airplanes, certificated in any category, as identified in European Union Aviation Safety Agency (EASA) AD 2020–0139R1, dated July 3, 2020 (‘‘EASA AD 2020–0139R1’’). (d) Subject Air Transport Association (ATA) of America Code 55, Stabilizers. (e) Reason This AD was prompted by reports of migration of the bushings of the horizontal tail plane (HTP) lateral load fittings (LLFs) on the left- and right-hand sides during flight test. The FAA is issuing this AD to address combined corrosion and fatigue damage of the primary structure, possibly resulting in failure of an HTP LLF and damage to adjacent structure, which could result in reduced controllability of the airplane. (f) Compliance Comply with this AD within the compliance times specified, unless already done. (g) Requirements Except as specified in paragraph (h) of this AD: Comply with all required actions and compliance times specified in, and in accordance with, EASA AD 2020–0139R1. (h) Exceptions to EASA AD 2020–0139R1 (1) The ‘‘Remarks’’ section of EASA AD 2020–0139R1 does not apply to this AD. (2) Paragraph (6) of EASA AD 2020– 0139R1 specifies to report inspection results to Airbus within a certain compliance time. For this AD, report inspection results at the applicable time specified in paragraph (h)(2)(i) or (ii) of this AD. (i) If the inspection was done on or after the effective date of this AD: Submit the report within 30 days after the inspection. (ii) If the inspection was done before the effective date of this AD: Submit the report E:\FR\FM\22SEP1.SGM 22SEP1 Federal Register / Vol. 85, No. 184 / Tuesday, September 22, 2020 / Proposed Rules within 30 days after the effective date of this AD. (i) Other FAA AD Provisions The following provisions also apply to this AD: (1) Alternative Methods of Compliance (AMOCs): The Manager, Large Aircraft Section, International Validation Branch, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request to your principal inspector or local Flight Standards District Office, as appropriate. If sending information directly to the Large Aircraft Section, International Validation Branch, send it to the attention of the person identified in paragraph (j)(2) of this AD. Information may be emailed to: 9-AVS-AIR730-AMOC@faa.gov. Before using any approved AMOC, notify your appropriate principal inspector, or lacking a principal inspector, the manager of the local flight standards district office/certificate holding district office. (2) Contacting the Manufacturer: For any requirement in this AD to obtain instructions from a manufacturer, the instructions must be accomplished using a method approved by the Manager, Large Aircraft Section, International Validation Branch, FAA; or EASA; or Airbus SAS’s EASA Design Organization Approval (DOA). If approved by the DOA, the approval must include the DOA-authorized signature. (3) Required for Compliance (RC): For any service information referenced in EASA AD 2020–0139R1 that contains RC procedures and tests: Except as required by paragraph (i)(2) of this AD, RC procedures and tests must be done to comply with this AD; any procedures or tests that are not identified as RC are recommended. Those procedures and tests that are not identified as RC may be deviated from using accepted methods in accordance with the operator’s maintenance or inspection program without obtaining approval of an AMOC, provided the procedures and tests identified as RC can be done and the airplane can be put back in an airworthy condition. Any substitutions or changes to procedures or tests identified as RC require approval of an AMOC. (4) Paperwork Reduction Act Burden Statement: A federal agency may not conduct or sponsor, and a person is not required to respond to, nor shall a person be subject to a penalty for failure to comply with a collection of information subject to the requirements of the Paperwork Reduction Act unless that collection of information displays a current valid OMB Control Number. The OMB Control Number for this information collection is 2120–0056. Public reporting for this collection of information is estimated to be approximately 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. All responses to this collection of information are mandatory as required by this AD. Send comments regarding this burden estimate or any other aspect of this collection of information, VerDate Sep<11>2014 17:17 Sep 21, 2020 Jkt 250001 including suggestions for reducing this burden to Information Collection Clearance Officer, Federal Aviation Administration, 10101 Hillwood Parkway, Fort Worth, TX 76177–1524. 59463 DEPARTMENT OF TRANSPORTATION Transportation, Docket Operations, 1200 New Jersey Avenue SE, West Building Ground Floor, Room W12–140, Washington, DC 20590–0001; Telephone: (800) 647–5527, or (202) 366–9826. You must identify the Docket No. FAA–2020–0822; Airspace Docket No. 20–ASO–23, at the beginning of your comments. You may also submit comments through the internet at https://www.regulations.gov. FAA Order 7400.11E, Airspace Designations and Reporting Points, and subsequent amendments can be viewed on-line at https://www.faa.gov/air_ traffic/publications/. For further information, you can contact the Airspace Policy Group, Federal Aviation Administration, 800 Independence Avenue SW, Washington, DC 20591; Telephone: (202) 267–8783. The Order is also available for inspection at the National Archives and Records Administration (NARA). For information on the availability of FAA Order 7400.11E at NARA, email fedreg.legal@nara.gov or go to https:// www.archives.gov/federal-register/cfr/ ibr-locations.html. FOR FURTHER INFORMATION CONTACT: John Fornito, Operations Support Group, Eastern Service Center, Federal Aviation Administration, 1701 Columbia Avenue, College Park, GA 30337; Telephone (404) 305–6364. SUPPLEMENTARY INFORMATION: Federal Aviation Administration Authority for This Rulemaking (j) Related Information (1) For information about EASA AD 2020– 0139R1, contact the EASA, KonradAdenauer-Ufer 3, 50668 Cologne, Germany; telephone +49 221 8999 000; email ADs@ easa.europa.eu; internet www.easa.europa.eu. You may find this EASA AD on the EASA website at https:// ad.easa.europa.eu. You may view this material at the FAA, Airworthiness Products Section, Operational Safety Branch, 2200 South 216th St., Des Moines, WA. For information on the availability of this material at the FAA, call 206–231–3195. This material may be found in the AD docket on the internet at https://www.regulations.gov by searching for and locating Docket No. FAA–2020–0846. (2) For more information about this AD, contact Kathleen Arrigotti, Aerospace Engineer, Large Aircraft Section, International Validation Branch, FAA, 2200 South 216th St., Des Moines, WA 98198; telephone and fax 206–231–3218; email kathleen.arrigotti@faa.gov. Issued on September 14, 2020. Lance T. Gant, Director, Compliance & Airworthiness Division, Aircraft Certification Service. [FR Doc. 2020–20676 Filed 9–21–20; 8:45 am] BILLING CODE 4910–13–P 14 CFR Part 71 [Docket No. FAA–2020–0822; Airspace Docket No. 20–ASO–23] RIN 2120–AA66 Proposed Amendment of Class D Airspace, and Proposed Removal of Class E Airspace; Homestead, FL Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed rulemaking (NPRM). AGENCY: This action proposes to amend Class D airspace, and remove Class E airspace designated as an extension to a Class D surface area for Homestead Air Reserve Base (ARB), Homestead, FL. This action would also update the geographic coordinates of the airport. Controlled airspace is necessary for the safety and management of instrument flight rules (IFR) operations in the area. DATES: Comments must be received on or before November 6, 2020. ADDRESSES: Send comments on this proposal to: the U.S. Department of SUMMARY: PO 00000 Frm 00017 Fmt 4702 Sfmt 4702 The FAA’s authority to issue rules regarding aviation safety is found in Title 49 of the United States Code. Subtitle I, Section 106 describes the authority of the FAA Administrator. Subtitle VII, Aviation Programs, describes in more detail the scope of the agency’s authority. This rulemaking is promulgated under the authority described in Subtitle VII, Part A, Subpart I, Section 40103. Under that section, the FAA is charged with prescribing regulations to assign the use of airspace necessary to ensure the safety of aircraft and the efficient use of airspace. This regulation is within the scope of that authority as it would amend Class D airspace and remove Class E airspace designated as an extension to a Class D surface area for Homestead ARB, Homestead, FL, to support IFR operations in the area. Comments Invited Interested persons are invited to comment on this proposed rulemaking by submitting such written data, views, or arguments, as they may desire. Comments that provide the factual basis supporting the views and suggestions E:\FR\FM\22SEP1.SGM 22SEP1

Agencies

[Federal Register Volume 85, Number 184 (Tuesday, September 22, 2020)]
[Proposed Rules]
[Pages 59460-59463]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-20676]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. FAA-2020-0846; Project Identifier MCAI-2020-00806-T]
RIN 2120-AA64


Airworthiness Directives; Airbus SAS Airplanes

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Notice of proposed rulemaking (NPRM).

-----------------------------------------------------------------------

SUMMARY: The FAA proposes to adopt a new airworthiness directive (AD) 
for certain Airbus SAS Model A350-941 and -1041 airplanes. This 
proposed AD was prompted by reports of migration of the bushings of the 
horizontal tail plane (HTP) lateral load fittings (LLFs) on the left- 
and right-hand sides during flight test. This proposed AD would require 
repetitive inspections for migration of the bushings of the HTP LLFs on 
the left- and right-hand sides, and terminating repair or modification 
of any affected bushing, as specified in a European Union Aviation 
Safety Agency (EASA), which will be incorporated by reference. The FAA 
is proposing this AD to address the unsafe condition on these products.

DATES: The FAA must receive comments on this proposed AD by November 6, 
2020.

ADDRESSES: You may send comments, using the procedures found in 14 CFR 
11.43 and 11.45, by any of the following methods:
     Federal eRulemaking Portal: Go to https://www.regulations.gov. Follow the instructions for submitting comments.
     Fax: 202-493-2251.
     Mail: U.S. Department of Transportation, Docket 
Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New 
Jersey Avenue SE, Washington, DC 20590.
     Hand Delivery: Deliver to Mail address above between 9 
a.m. and 5 p.m., Monday through Friday, except Federal holidays.
    For the material incorporated by reference (IBR) in this AD, 
contact the EASA, Konrad-Adenauer-Ufer 3, 50668 Cologne, Germany; 
telephone +49 221 8999 000; email [email protected]; internet 
www.easa.europa.eu. You may find this IBR material on the EASA website 
at https://ad.easa.europa.eu. You may view this IBR material at the 
FAA, Airworthiness Products Section, Operational Safety Branch, 2200 
South 216th St., Des Moines, WA. For information on the availability of 
this material at the FAA, call 206-231-3195. It is also available in 
the AD docket on the internet at https://www.regulations.gov by 
searching for and locating Docket No. FAA-2020-0846.

Examining the AD Docket

    You may examine the AD docket on the internet at https://www.regulations.gov by searching for and locating Docket No. FAA-2020-
0846; or in person at Docket Operations

[[Page 59461]]

between 9 a.m. and 5 p.m., Monday through Friday, except Federal 
holidays. The AD docket contains this NPRM, any comments received, and 
other information. The street address for Docket Operations is listed 
above. Comments will be available in the AD docket shortly after 
receipt.

FOR FURTHER INFORMATION CONTACT: Kathleen Arrigotti, Aerospace 
Engineer, Large Aircraft Section, International Validation Branch, FAA, 
2200 South 216th St., Des Moines, WA 98198; telephone and fax 206-231-
3218; email [email protected].

SUPPLEMENTARY INFORMATION:

Comments Invited

    The FAA invites you to participate in this rulemaking by submitting 
written comments, data, or views about this proposal. The most helpful 
comments reference a specific portion of the proposal, explain the 
reason for any recommended change, and include supporting data. To 
ensure the docket does not contain duplicate comments, commenters 
should send only one copy of written comments, or if comments are filed 
electronically, commenters should submit only one time. Send your 
comments to an address listed under the ADDRESSES section. Include 
``Docket No. FAA-2020-0846; Project Identifier MCAI-2020-00806-T at the 
beginning of your comments.
    Except for Confidential Business Information (CBI) as described in 
the following paragraph, and other information as described in 14 CFR 
11.35, the FAA will post all comments received, without change, as well 
as a report summarizing each substantive public contact with FAA 
personnel concerning this proposed rulemaking. Before acting on this 
proposal, the FAA will consider all comments received by the closing 
date for comments. The FAA will consider comments filed after the 
comment period has closed if it is possible to do so without incurring 
expense or delay. The FAA may change this NPRM because of those 
comments.

Confidential Business Information

    CBI is commercial or financial information that is both customarily 
and actually treated as private by its owner. Under the Freedom of 
Information Act (FOIA) (5 U.S.C. 552), CBI is exempt from public 
disclosure. If your comments responsive to this NPRM contain commercial 
or financial information that is customarily treated as private, that 
you actually treat as private, and that is relevant or responsive to 
this NPRM, it is important that you clearly designate the submitted 
comments as CBI. Please mark each page of your submission containing 
CBI as ``PROPIN.'' The FAA will treat such marked submissions as 
confidential under the FOIA, and they will not be placed in the public 
docket of this NPRM. Submissions containing CBI should be sent to the 
person identified in the FOR FURTHER INFORMATION CONTACT section. Any 
commentary that the FAA receives which is not specifically designated 
as CBI will be placed in the public docket for this rulemaking.

Discussion

    The EASA, which is the Technical Agent for the Member States of the 
European Union, has issued EASA AD 2020-0139R1, dated July 3, 2020 
(``EASA AD 2020-0139R1'') (also referred to as the Mandatory Continuing 
Airworthiness Information, or ``the MCAI''), to correct an unsafe 
condition for certain Airbus SAS Model A350-941 and -1041 airplanes.
    This proposed AD was prompted by reports of migration of the 
bushings of the HTP LLFs on the left- and right-hand sides during 
flight test. The FAA is proposing this AD to address combined corrosion 
and fatigue damage of the primary structure, possibly resulting in 
failure of an HTP LLF and damage to adjacent structure, which could 
result in reduced controllability of the airplane. See the MCAI for 
additional background information.

Related IBR Material Under 1 CFR Part 51

    EASA AD 2020-0139R1 describes procedures for repetitive detailed 
inspections for migration of the bushings of the HTP LLF on the left- 
and right-hand sides; and repair or modification of any affected 
bushing, which eliminates the need for the repetitive inspections. This 
material is reasonably available because the interested parties have 
access to it through their normal course of business or by the means 
identified in the ADDRESSES section.

FAA's Determination and Requirements of This Proposed AD

    This product has been approved by the aviation authority of another 
country, and is approved for operation in the United States. Pursuant 
to the FAA's bilateral agreement with the State of Design Authority, 
the FAA has been notified of the unsafe condition described in the MCAI 
referenced above. The FAA is proposing this AD because the FAA 
evaluated all the relevant information and determined the unsafe 
condition described previously is likely to exist or develop in other 
products of the same type design.

Proposed AD Requirements

    This proposed AD would require accomplishing the actions specified 
in EASA AD 2020-0139R1 described previously, as incorporated by 
reference, except for any differences identified as exceptions in the 
regulatory text of this AD.

Explanation of Required Compliance Information

    In the FAA's ongoing efforts to improve the efficiency of the AD 
process, the FAA initially worked with Airbus and EASA to develop a 
process to use certain EASA ADs as the primary source of information 
for compliance with requirements for corresponding FAA ADs. The FAA has 
since coordinated with other manufacturers and civil aviation 
authorities (CAAs) to use this process. As a result, EASA AD 2020-
0139R1 will be incorporated by reference in the FAA final rule. This 
proposed AD would, therefore, require compliance with EASA AD 2020-
0139R1 in its entirety, through that incorporation, except for any 
differences identified as exceptions in the regulatory text of this 
proposed AD. Using common terms that are the same as the heading of a 
particular section in the EASA AD does not mean that operators need 
comply only with that section. For example, where the AD requirement 
refers to ``all required actions and compliance times,'' compliance 
with this AD requirement is not limited to the section titled 
``Required Action(s) and Compliance Time(s)'' in the EASA AD. Service 
information specified in EASA AD 2020-0139R1 that is required for 
compliance with EASA AD 2020-0139R1 will be available on the internet 
at https://www.regulations.gov by searching for and locating Docket No. 
FAA-2020-0846 after the FAA final rule is published.

Costs of Compliance

    The FAA estimates that this proposed AD affects 13 airplanes of 
U.S. registry. The FAA estimates the following costs to comply with 
this proposed AD:

[[Page 59462]]



                                      Estimated Costs for Required Actions
----------------------------------------------------------------------------------------------------------------
                                                                   Cost per
                  Labor cost                      Parts cost        product          Cost on U.S. operators
----------------------------------------------------------------------------------------------------------------
10 work-hours x $85 per hour = $850...........              $0            $850  $11,050 per inspection cycle.
----------------------------------------------------------------------------------------------------------------

    The FAA estimates that it would take about 1 work-hour per product 
to comply with the proposed reporting requirement in this proposed AD. 
The average labor rate is $85 per hour. Based on these figures, the FAA 
estimates the cost of reporting the inspection results on U.S. 
operators to be $1,105, or $85 per product.

                  Estimated Costs for Optional Actions
------------------------------------------------------------------------
            Labor cost                Parts cost      Cost per product
------------------------------------------------------------------------
Up to 38 work-hours x $85 per hour              $0  Up to $3,230.
 = Up to $3,230.
------------------------------------------------------------------------

Paperwork Reduction Act

    A federal agency may not conduct or sponsor, and a person is not 
required to respond to, nor shall a person be subject to penalty for 
failure to comply with a collection of information subject to the 
requirements of the Paperwork Reduction Act unless that collection of 
information displays a current valid OMB control number. The control 
number for the collection of information required by this proposed AD 
is 2120-0056. The paperwork cost associated with this proposed AD has 
been detailed in the Costs of Compliance section of this document and 
includes time for reviewing instructions, as well as completing and 
reviewing the collection of information. Therefore, all reporting 
associated with this proposed AD is mandatory. Comments concerning the 
accuracy of this burden and suggestions for reducing the burden should 
be directed to Information Collection Clearance Officer, Federal 
Aviation Administration, 10101 Hillwood Parkway, Fort Worth, TX 76177-
1524.

Authority for This Rulemaking

    Title 49 of the United States Code specifies the FAA's authority to 
issue rules on aviation safety. Subtitle I, section 106, describes the 
authority of the FAA Administrator. Subtitle VII: Aviation Programs, 
describes in more detail the scope of the Agency's authority.
    The FAA is issuing this rulemaking under the authority described in 
Subtitle VII, Part A, Subpart III, Section 44701: General requirements. 
Under that section, Congress charges the FAA with promoting safe flight 
of civil aircraft in air commerce by prescribing regulations for 
practices, methods, and procedures the Administrator finds necessary 
for safety in air commerce. This regulation is within the scope of that 
authority because it addresses an unsafe condition that is likely to 
exist or develop on products identified in this rulemaking action.

Regulatory Findings

    The FAA determined that this proposed AD would not have federalism 
implications under Executive Order 13132. This proposed AD would not 
have a substantial direct effect on the States, on the relationship 
between the national Government and the States, or on the distribution 
of power and responsibilities among the various levels of government.
    For the reasons discussed above, I certify this proposed 
regulation:
    (1) Is not a ``significant regulatory action'' under Executive 
Order 12866,
    (2) Will not affect intrastate aviation in Alaska, and
    (3) Will not have a significant economic impact, positive or 
negative, on a substantial number of small entities under the criteria 
of the Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

The Proposed Amendment

    Accordingly, under the authority delegated to me by the 
Administrator, the FAA proposes to amend 14 CFR part 39 as follows:

PART 39--AIRWORTHINESS DIRECTIVES

0
1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40113, 44701.


Sec.  39.13   [Amended]

0
2. The FAA amends Sec.  39.13 by adding the following new airworthiness 
directive (AD):

Airbus SAS: Docket No. FAA-2020-0846; Project Identifier MCAI-2020-
00806-T.

(a) Comments Due Date

    The FAA must receive comments by November 6, 2020.

(b) Affected ADs

    None.

(c) Applicability

    This AD applies to Airbus SAS Model A350-941 and -1041 
airplanes, certificated in any category, as identified in European 
Union Aviation Safety Agency (EASA) AD 2020-0139R1, dated July 3, 
2020 (``EASA AD 2020-0139R1'').

(d) Subject

    Air Transport Association (ATA) of America Code 55, Stabilizers.

(e) Reason

    This AD was prompted by reports of migration of the bushings of 
the horizontal tail plane (HTP) lateral load fittings (LLFs) on the 
left- and right-hand sides during flight test. The FAA is issuing 
this AD to address combined corrosion and fatigue damage of the 
primary structure, possibly resulting in failure of an HTP LLF and 
damage to adjacent structure, which could result in reduced 
controllability of the airplane.

(f) Compliance

    Comply with this AD within the compliance times specified, 
unless already done.

(g) Requirements

    Except as specified in paragraph (h) of this AD: Comply with all 
required actions and compliance times specified in, and in 
accordance with, EASA AD 2020-0139R1.

(h) Exceptions to EASA AD 2020-0139R1

    (1) The ``Remarks'' section of EASA AD 2020-0139R1 does not 
apply to this AD.
    (2) Paragraph (6) of EASA AD 2020-0139R1 specifies to report 
inspection results to Airbus within a certain compliance time. For 
this AD, report inspection results at the applicable time specified 
in paragraph (h)(2)(i) or (ii) of this AD.
    (i) If the inspection was done on or after the effective date of 
this AD: Submit the report within 30 days after the inspection.
    (ii) If the inspection was done before the effective date of 
this AD: Submit the report

[[Page 59463]]

within 30 days after the effective date of this AD.

(i) Other FAA AD Provisions

    The following provisions also apply to this AD:
    (1) Alternative Methods of Compliance (AMOCs): The Manager, 
Large Aircraft Section, International Validation Branch, FAA, has 
the authority to approve AMOCs for this AD, if requested using the 
procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19, 
send your request to your principal inspector or local Flight 
Standards District Office, as appropriate. If sending information 
directly to the Large Aircraft Section, International Validation 
Branch, send it to the attention of the person identified in 
paragraph (j)(2) of this AD. Information may be emailed to: [email protected]. Before using any approved AMOC, notify your 
appropriate principal inspector, or lacking a principal inspector, 
the manager of the local flight standards district office/
certificate holding district office.
    (2) Contacting the Manufacturer: For any requirement in this AD 
to obtain instructions from a manufacturer, the instructions must be 
accomplished using a method approved by the Manager, Large Aircraft 
Section, International Validation Branch, FAA; or EASA; or Airbus 
SAS's EASA Design Organization Approval (DOA). If approved by the 
DOA, the approval must include the DOA-authorized signature.
    (3) Required for Compliance (RC): For any service information 
referenced in EASA AD 2020-0139R1 that contains RC procedures and 
tests: Except as required by paragraph (i)(2) of this AD, RC 
procedures and tests must be done to comply with this AD; any 
procedures or tests that are not identified as RC are recommended. 
Those procedures and tests that are not identified as RC may be 
deviated from using accepted methods in accordance with the 
operator's maintenance or inspection program without obtaining 
approval of an AMOC, provided the procedures and tests identified as 
RC can be done and the airplane can be put back in an airworthy 
condition. Any substitutions or changes to procedures or tests 
identified as RC require approval of an AMOC.
    (4) Paperwork Reduction Act Burden Statement: A federal agency 
may not conduct or sponsor, and a person is not required to respond 
to, nor shall a person be subject to a penalty for failure to comply 
with a collection of information subject to the requirements of the 
Paperwork Reduction Act unless that collection of information 
displays a current valid OMB Control Number. The OMB Control Number 
for this information collection is 2120-0056. Public reporting for 
this collection of information is estimated to be approximately 1 
hour per response, including the time for reviewing instructions, 
searching existing data sources, gathering and maintaining the data 
needed, and completing and reviewing the collection of information. 
All responses to this collection of information are mandatory as 
required by this AD. Send comments regarding this burden estimate or 
any other aspect of this collection of information, including 
suggestions for reducing this burden to Information Collection 
Clearance Officer, Federal Aviation Administration, 10101 Hillwood 
Parkway, Fort Worth, TX 76177-1524.

(j) Related Information

    (1) For information about EASA AD 2020-0139R1, contact the EASA, 
Konrad-Adenauer-Ufer 3, 50668 Cologne, Germany; telephone +49 221 
8999 000; email [email protected]; internet www.easa.europa.eu. You 
may find this EASA AD on the EASA website at https://ad.easa.europa.eu. You may view this material at the FAA, 
Airworthiness Products Section, Operational Safety Branch, 2200 
South 216th St., Des Moines, WA. For information on the availability 
of this material at the FAA, call 206-231-3195. This material may be 
found in the AD docket on the internet at https://www.regulations.gov by searching for and locating Docket No. FAA-
2020-0846.
    (2) For more information about this AD, contact Kathleen 
Arrigotti, Aerospace Engineer, Large Aircraft Section, International 
Validation Branch, FAA, 2200 South 216th St., Des Moines, WA 98198; 
telephone and fax 206-231-3218; email [email protected].

    Issued on September 14, 2020.
Lance T. Gant,
Director, Compliance & Airworthiness Division, Aircraft Certification 
Service.
[FR Doc. 2020-20676 Filed 9-21-20; 8:45 am]
BILLING CODE 4910-13-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.