Topsham Hydro Partners Limited Partnership (L.P.); Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 57210-57211 [2020-20309]
Download as PDF
57210
Federal Register / Vol. 85, No. 179 / Tuesday, September 15, 2020 / Notices
jbell on DSKJLSW7X2PROD with NOTICES
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments in lieu of
paper using the ‘‘eFile’’ link at https://
www.ferc.gov. In lieu of electronic filing,
you may submit a paper copy.
Submissions sent via the U.S. Postal
Service must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Dated: September 3, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–20244 Filed 9–14–20; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:57 Sep 14, 2020
Jkt 250001
Dated: September 4, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2020–20245 Filed 9–14–20; 8:45 am]
BILLING CODE 6717–01–P
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Number: PR20–72–000.
Applicants: BBT Mid Louisiana Gas
Transmission, LLC.
Description: Tariff filing per
284.123(e)/.224: BBT Mid Louisiana Gas
Transmission Cancellation of SOC to be
effective 9/2/2020 under PR20–72.
Filed Date: 9/2/2020.
Accession Number: 202009025163.
Comments/Protests Due: 5 p.m. ET 9/
23/20.
Docket Numbers: RP20–1167–000.
Applicants: Applicant information is
not available at this time. Atms or FOLA
not available now.
Description: § 4(d) Rate Filing:
Volume No. 2—Table of Contents Clean
Up & Nat Fuel SP359400 to be effective
9/1/2020.
Filed Date: 9/3/20.
Accession Number: 20200903–5091.
Comments Due: 5 p.m. ET 9/15/20.
Docket Numbers: RP20–1168–000.
Applicants: Applicant information is
not available at this time. Atms or FOLA
not available now.
Description: § 4(d) Rate Filing:
Negotiated & Non-Conforming Rate
Amd—Eversource to be effective 10/1/
2020.
Filed Date: 9/3/20.
Accession Number: 20200903–5180.
Comments Due: 5 p.m. ET 9/15/20.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 4784–106]
Topsham Hydro Partners Limited
Partnership (L.P.); Notice of
Application Tendered for Filing With
the Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 4784–106.
c. Date Filed: August 31, 2020.
d. Applicant: Topsham Hydro
Partners Limited Partnership (L.P.).
e. Name of Project: Pejepscot
Hydroelectric Project.
f. Location: On the Androscoggin
River in Sagadahoc, Cumberland, and
Androscoggin Counties in the village of
Pejepscot and the town of Topsham,
Maine. The project does not affect
federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Mr. Tom
Uncher, Vice President, Topsham Hydro
Partners Limited Partnership, 339B Big
Bay Rd, Queensbury, NY 12804,
Telephone: 1–518–743–2018,
Thomas.Uncher@
brookfieldrenewable.com.
i. FERC Contact: Ryan Hansen at (202)
502–8074 or email at ryan.hansen@
ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. Project Description: The existing
Pejepscot Project consists of: (1) A 560foot-long, 47.5-foot-high rock and
gravel-filled, timber crib overflow
structure that is topped with a 5-footthick reinforced concrete slab; (2) a
spillway consisting of five, 96-foot-long
by 3-foot-high steel bascule gates; (3) a
225-acre, 3 mile-long reservoir at an
elevation of 67.5 feet mean sea level
(MSL); (4) a 97-foot-wide, 146-foot-long
brick masonry and concrete original
powerhouse integral with the dam
including an integral intake structure
and containing three horizontal Francis
turbine-generator units with a combined
E:\FR\FM\15SEN1.SGM
15SEN1
57211
Federal Register / Vol. 85, No. 179 / Tuesday, September 15, 2020 / Notices
rated capacity of approximately 1.58
megawatts (MW); (5) a 60-foot-wide by
115-foot-long concrete with steel frame
superstructure newer powerhouse
integral with the dam including an
integral intake structure and containing
a Kaplan turbine and a generator with
a rated capacity of approximately 12.3
MW; (6) a vertical lift upstream fish
passage facility consisting of a 20-footlong, 7-foot-wide steel hopper with a
sloping bottom and an 8-inch-wide, 8foot-high V-trap inlet, a 6-foot-wide, 8foot-high, 110-foot-long metal flume,
four attraction pumps with a combined
capacity of 160 cubic feet per second
(cfs) and a viewing window; (7) a
downstream fish passage facility
consisting of two 4-foot-wide steel entry
weirs with grizzly racks that pass fish
through 30-inch-diameter, 185-foot-long
and 24-inch-diameter, 60-foot-long
outlet pipes, respectively; (8) a tailrace
with a bulkhead-like gate that
discharges water into the Androscoggin
River approximately 25 feet downstream
of the powerhouses; (9) two 900-footlong, 15-kilovolt cable connections to
substations located north and south of
the powerhouses, respectively; and (10)
appurtenant facilities.
The project is operated in a run-ofriver mode with an average annual
generation of 68.5 megawatt-hours.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Target date
Notice of Acceptance/Notice of Ready for Environmental Analysis ............................................................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions .........................................................
Commission issues Draft EA or EIS ............................................................................................................................................
Comments on Draft EA or EIS ....................................................................................................................................................
Modified terms and conditions .....................................................................................................................................................
Commission issues Final EA or EIS ............................................................................................................................................
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: September 9, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–20309 Filed 9–14–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jbell on DSKJLSW7X2PROD with NOTICES
Combined Notice of Filings
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: RP20–1167–000.
Applicants: Applicant information is
not available at this time. Atms or FOLA
not available now.
Description: § 4(d) Rate Filing:
Volume No. 2—Table of Contents Clean
Up & Nat Fuel SP359400 to be effective
9/1/2020.
Filed Date: 9/3/20.
Accession Number: 20200903–5091.
Comments Due: 5 p.m. ET 9/15/20.
Docket Numbers: RP20–1168–000.
Applicants: Applicant information is
not available at this time. Atms or FOLA
not available now.
VerDate Sep<11>2014
16:57 Sep 14, 2020
Jkt 250001
Description: (doc-less) Motion to
Intervene of Eversource Gas Company of
Massachusetts under RP20–1168.
Filed Date: 9/4/20.
Accession Number: 20200904–5100.
Comments Due: 5 p.m. ET 9/16/20.
Docket Numbers: RP20–1169–000.
Applicants: Applicant information is
not available at this time. Atms or FOLA
not available now.
Description: Tariff Cancellation: NonConforming Amendment & Cancellation
of Rate Schedule X–54 to be effective
10/5/2020.
Filed Date: 9/4/20.
Accession Number: 20200904–5048.
Comments Due: 5 p.m. ET 9/16/20.
Docket Numbers: RP20–1170–000.
Applicants: Applicant information is
not available at this time. Atms or FOLA
not available now.
Description: § 4(d) Rate Filing:
Amendment to Negotiated Rate
Agreement—Shell Energy North
America (US), L.P. to be effective 9/4/
2020.
Filed Date: 9/4/20.
Accession Number: 20200904–5120.
Comments Due: 5 p.m. ET 9/16/20.
Docket Numbers: RP20–1171–000.
Applicants: Applicant information is
not available at this time. Atms or FOLA
not available now.
Description: Joint Petition of Southern
Company Services, Inc., et al. for
Limited Waivers of Capacity Release
PO 00000
Frm 00031
Fmt 4703
Sfmt 9990
October 2020.
December 2020.
June 2021.
July 2021.
September 2021.
December 2021.
Regulations and Tariff Provisions, et al.
under RP20–1171.
Filed Date: 9/4/20.
Accession Number: 20200904–5172.
Comments Due: 5 p.m. ET 9/11/20.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 8, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–20237 Filed 9–14–20; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\15SEN1.SGM
15SEN1
Agencies
[Federal Register Volume 85, Number 179 (Tuesday, September 15, 2020)]
[Notices]
[Pages 57210-57211]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-20309]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 4784-106]
Topsham Hydro Partners Limited Partnership (L.P.); Notice of
Application Tendered for Filing With the Commission and Establishing
Procedural Schedule for Licensing and Deadline for Submission of Final
Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 4784-106.
c. Date Filed: August 31, 2020.
d. Applicant: Topsham Hydro Partners Limited Partnership (L.P.).
e. Name of Project: Pejepscot Hydroelectric Project.
f. Location: On the Androscoggin River in Sagadahoc, Cumberland,
and Androscoggin Counties in the village of Pejepscot and the town of
Topsham, Maine. The project does not affect federal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Mr. Tom Uncher, Vice President, Topsham Hydro
Partners Limited Partnership, 339B Big Bay Rd, Queensbury, NY 12804,
Telephone: 1-518-743-2018, [email protected].
i. FERC Contact: Ryan Hansen at (202) 502-8074 or email at
[email protected].
j. This application is not ready for environmental analysis at this
time.
k. Project Description: The existing Pejepscot Project consists of:
(1) A 560-foot-long, 47.5-foot-high rock and gravel-filled, timber crib
overflow structure that is topped with a 5-foot-thick reinforced
concrete slab; (2) a spillway consisting of five, 96-foot-long by 3-
foot-high steel bascule gates; (3) a 225-acre, 3 mile-long reservoir at
an elevation of 67.5 feet mean sea level (MSL); (4) a 97-foot-wide,
146-foot-long brick masonry and concrete original powerhouse integral
with the dam including an integral intake structure and containing
three horizontal Francis turbine-generator units with a combined
[[Page 57211]]
rated capacity of approximately 1.58 megawatts (MW); (5) a 60-foot-wide
by 115-foot-long concrete with steel frame superstructure newer
powerhouse integral with the dam including an integral intake structure
and containing a Kaplan turbine and a generator with a rated capacity
of approximately 12.3 MW; (6) a vertical lift upstream fish passage
facility consisting of a 20-foot-long, 7-foot-wide steel hopper with a
sloping bottom and an 8-inch-wide, 8-foot-high V-trap inlet, a 6-foot-
wide, 8-foot-high, 110-foot-long metal flume, four attraction pumps
with a combined capacity of 160 cubic feet per second (cfs) and a
viewing window; (7) a downstream fish passage facility consisting of
two 4-foot-wide steel entry weirs with grizzly racks that pass fish
through 30-inch-diameter, 185-foot-long and 24-inch-diameter, 60-foot-
long outlet pipes, respectively; (8) a tailrace with a bulkhead-like
gate that discharges water into the Androscoggin River approximately 25
feet downstream of the powerhouses; (9) two 900-foot-long, 15-kilovolt
cable connections to substations located north and south of the
powerhouses, respectively; and (10) appurtenant facilities.
The project is operated in a run-of-river mode with an average
annual generation of 68.5 megawatt-hours.
l. Locations of the Application: A copy of the application is
available for review at the Commission in the Public Reference Room or
may be viewed on the Commission's website at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in item (h) above.
m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Procedural Schedule: The application will be processed according
to the following preliminary Hydro Licensing Schedule. Revisions to the
schedule may be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready for October 2020.
Environmental Analysis.
Filing of recommendations, preliminary terms December 2020.
and conditions, and fishway prescriptions.
Commission issues Draft EA or EIS........... June 2021.
Comments on Draft EA or EIS................. July 2021.
Modified terms and conditions............... September 2021.
Commission issues Final EA or EIS........... December 2021.
------------------------------------------------------------------------
o. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: September 9, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-20309 Filed 9-14-20; 8:45 am]
BILLING CODE 6717-01-P