Equitrans, L.P.; Notice of Request
Under Blanket Authorization
Take notice that on August 19, 2020,
Equitrans, L.P. (Equitrans), 2200 Energy
Drive, Canonsburg, Pennsylvania 15317,
filed a prior notice application pursuant
to sections 157.205, 157.213(b), and
157.216(b) of the Federal Energy
Regulatory Commission’s (Commission)
regulations under the Natural Gas Act
(NGA), and Equitrans’ blanket certificate
issued in Docket No. CP96–532–000.
Equitrans proposes to convert the Tepe
3900 injection/withdrawal storage well
to an observation well, remove the
associated drip, and abandon-in-place
385 feet of six-inch-diameter natural gas
pipeline. Equitrans states that the cause
for converting the Tepe 3900 well is to
mitigate future safety concerns due to a
recent hill slip in the vicinity of the
well. Equitrans states that conversion of
the well will not impact the operational
capability of the Tepe Storage Field.
Equitrans states the total cost for the
abandonment is 27,000 dollars. The
Tepe 3900 storage well is part of
Equitrans’ Tepe Storage Field located in
Allegheny County, Pennsylvania, all as
more fully set forth in the application,
which is open to the public for
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the eLibrary link. Enter
the docket number excluding the last
three digits in the docket number field
to access the document. At this time, the
Commission has suspended access to
the Commission’s Public Reference
Room, due to the proclamation
declaring a National Emergency
concerning the Novel Coronavirus
Disease (COVID–19), issued by the
President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to
Matthew Eggerding, Assistant General
Counsel, Equitrans, L.P., 2200 Energy
Drive, Canonsburg, PA 15317, or phone
(412) 553–5786, or by email
MEggerding@equitransmidstream.com.
VerDate Sep<11>2014
17:33 Sep 01, 2020
Jkt 250001
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenter will
not receive copies of all documents filed
by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
54555
The Commission strongly encourages
electronic filings of comments in lieu of
paper using the eFile link at https://
www.ferc.gov. In lieu of electronic filing,
you may submit a paper copy.
Submissions sent via the U.S. Postal
Service must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Dated: August 27, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–19378 Filed 9–1–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12766–007]
Green Mountain Power Corporation;
Notice of Application Accepted for
Filing, Soliciting Motions To Intervene
and Protests, Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New License
for Transmission Line Project.
b. Project No.: 12766–007.
c. Date filed: November 22, 2019.
d. Applicant: Green Mountain Power
Corporation (Green Mountain Power).
e. Name of Project: Clay Hill Road
Line 66 Transmission Project (Clay Hill
Project).
f. Location: The Clay Hill Project is
located along Clay Hill Road in Windsor
County, Vermont. The Clay Hill Project
does not occupy any federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: John Greenan,
Green Mountain Power Corporation,
2152 Post Road, Rutland, VT 05701;
Phone at (802) 770–2195, or email at
John.Greenan@
greenmountainpower.com.
i. FERC Contact: Bill Connelly, (202)
502–8587 or william.connelly@ferc.gov.
Deadline for filing motions to intervene
and protests, comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
E:\FR\FM\02SEN1.SGM
02SEN1
Agencies
[Federal Register Volume 85, Number 171 (Wednesday, September 2, 2020)]
[Notices]
[Page 54555]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-19378]
[[Page 54555]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP20-510-000]
Equitrans, L.P.; Notice of Request Under Blanket Authorization
Take notice that on August 19, 2020, Equitrans, L.P. (Equitrans),
2200 Energy Drive, Canonsburg, Pennsylvania 15317, filed a prior notice
application pursuant to sections 157.205, 157.213(b), and 157.216(b) of
the Federal Energy Regulatory Commission's (Commission) regulations
under the Natural Gas Act (NGA), and Equitrans' blanket certificate
issued in Docket No. CP96-532-000. Equitrans proposes to convert the
Tepe 3900 injection/withdrawal storage well to an observation well,
remove the associated drip, and abandon-in-place 385 feet of six-inch-
diameter natural gas pipeline. Equitrans states that the cause for
converting the Tepe 3900 well is to mitigate future safety concerns due
to a recent hill slip in the vicinity of the well. Equitrans states
that conversion of the well will not impact the operational capability
of the Tepe Storage Field. Equitrans states the total cost for the
abandonment is 27,000 dollars. The Tepe 3900 storage well is part of
Equitrans' Tepe Storage Field located in Allegheny County,
Pennsylvania, all as more fully set forth in the application, which is
open to the public for inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
eLibrary link. Enter the docket number excluding the last three digits
in the docket number field to access the document. At this time, the
Commission has suspended access to the Commission's Public Reference
Room, due to the proclamation declaring a National Emergency concerning
the Novel Coronavirus Disease (COVID-19), issued by the President on
March 13, 2020. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
Any questions regarding this application should be directed to
Matthew Eggerding, Assistant General Counsel, Equitrans, L.P., 2200
Energy Drive, Canonsburg, PA 15317, or phone (412) 553-5786, or by
email [email protected].
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding, or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenters will not be required to serve copies of filed
documents on all other parties. However, the non-party commenter will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments
in lieu of paper using the eFile link at https://www.ferc.gov. In lieu
of electronic filing, you may submit a paper copy. Submissions sent via
the U.S. Postal Service must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Room 1A, Washington, DC 20426. Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852.
Dated: August 27, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-19378 Filed 9-1-20; 8:45 am]
BILLING CODE 6717-01-P