Combined Notice of Filings, 54372-54373 [2020-19249]
Download as PDF
jbell on DSKJLSW7X2PROD with NOTICES
54372
Federal Register / Vol. 85, No. 170 / Tuesday, September 1, 2020 / Notices
Comments Due: 5 p.m. ET 9/14/20
Docket Numbers: ER19–697–001.
Applicants: Cheyenne Light, Fuel and
Power Company.
Description: Report Filing: Refund
Report under EL19–41, ER19–697 to be
effective N/A.
Filed Date: 8/26/20.
Accession Number: 20200826–5037.
Comments Due: 5 p.m. ET 9/16/20.
Docket Numbers: ER20–1616–001.
Applicants: Western Spirit
Transmission LLC.
Description: Compliance filing:
Facilities Use Agreement—Compliance
Filing per 6/19/2020 Order to be
effective 6/19/2020.
Filed Date: 8/26/20.
Accession Number: 20200826–5081.
Comments Due: 5 p.m. ET 9/16/20.
Docket Numbers: ER20–2148–001.
Applicants: Lexington Chenoa Wind
Farm LLC.
Description: Tariff Amendment:
Deficiency Filing Lexington Chenoa
Reactive Rate Schedule to be effective
8/23/2020.
Filed Date: 8/26/20.
Accession Number: 20200826–5066.
Comments Due: 5 p.m. ET 9/16/20.
Docket Numbers: ER20–2249–000.
Applicants: Priogen Power LLC.
Description: Amendment to June 30,
2020 Priogen Power LLC tariff filing.
Filed Date: 8/24/20.
Accession Number: 20200824–5131.
Comments Due: 5 p.m. ET 9/3/20.
Docket Numbers: ER20–2741–000.
Applicants: Public Service Company
of New Mexico.
Description: § 205(d) Rate Filing: PIA
with Pattern and Tecolote to be effective
10/24/2020.
Filed Date: 8/25/20.
Accession Number: 20200825–5140.
Comments Due: 5 p.m. ET 9/15/20.
Docket Numbers: ER20–2742–000.
Applicants: Pennsylvania Electric
Company, Jersey Central Power & Light
Company, Metropolitan Edison
Company, PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
Penelec, JCPL, and MetEd submit
Revised WASPs, SA Nos. 4221, 4222,
and 4223 to be effective 10/25/2020.
Filed Date: 8/25/20.
Accession Number: 20200825–5141.
Comments Due: 5 p.m. ET 9/15/20.
Docket Numbers: ER20–2743–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3552R2 TEA and MEAN Meter Agent
Agreement to be effective
8/1/2020.
Filed Date: 8/26/20.
Accession Number: 20200826–5003.
VerDate Sep<11>2014
19:00 Aug 31, 2020
Jkt 250001
Comments Due: 5 p.m. ET 9/16/20.
Docket Numbers: ER20–2744–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 2626
KCP&L, KCP&L GMO & Transource MO
Novation Cancellation to be effective 8/
26/2020.
Filed Date: 8/26/20.
Accession Number: 20200826–5004.
Comments Due: 5 p.m. ET 9/16/20.
Docket Numbers: ER20–2745–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2020–08–26_SA 2807 Entergy ArkansasEntergy Arkansas 1st Rev GIA (J376) to
be effective 8/12/2020.
Filed Date: 8/26/20.
Accession Number: 20200826–5029.
Comments Due: 5 p.m. ET 9/16/20.
Docket Numbers: ER20–2746–000.
Applicants: Riverstart Solar Park LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 10/26/2020.
Filed Date: 8/26/20.
Accession Number: 20200826–5099.
Comments Due: 5 p.m. ET 9/16/20.
Docket Numbers: ER20–2747–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: DSA
Silverstrand Grid, LLC & Cancel Letter
Agreement to be effective 10/26/2020.
Filed Date: 8/26/20.
Accession Number: 20200826–5043.
Comments Due: 5 p.m. ET 9/16/20.
Docket Numbers: ER20–2748–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3720
Thunderhead Wind Energy/Evergy KS
CentralMeter Agent Ag to be effective
8/1/2020.
Filed Date: 8/26/20.
Accession Number: 20200826–5051.
Comments Due: 5 p.m. ET 9/16/20.
Docket Numbers: ER20–2749–000.
Applicants: New York Independent
System Operator, Inc., Niagara Mohawk
Power Corporation.
Description: § 205(d) Rate Filing:
NYISO jointly filed a SGIA among
NYISO, NMPC and Duke Energy, SA
No. 2549 to be effective 8/20/2020.
Filed Date: 8/26/20.
Accession Number: 20200826–5088.
Comments Due: 5 p.m. ET 9/16/20.
Docket Numbers: ER20–2750–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
UAMPS TSOA Rev 5 to be effective
10/25/2020.
Filed Date: 8/26/20.
Accession Number: 20200826–5091.
Comments Due: 5 p.m. ET 9/16/20.
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 26, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–19248 Filed 8–31–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP20–1118–000.
Applicants: Boardwalk Storage
Company, LLC.
Description: § 4(d) Rate Filing:
Intermediate GMS Filing to be effective
9/25/2020.
Filed Date: 8/25/20.
Accession Number: 20200825–5064.
Comments Due: 5 p.m. ET 9/8/20.
Docket Numbers: RP20–1119–000.
Applicants: Trailblazer Pipeline
Company LLC.
Description: § 4(d) Rate Filing: TPC
2020–08–25 GT&C Section 3 Revisions
to be effective 9/25/2020.
Filed Date: 8/25/20.
Accession Number: 20200825–5139.
Comments Due: 5 p.m. ET 9/8/20.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
E:\FR\FM\01SEN1.SGM
01SEN1
Federal Register / Vol. 85, No. 170 / Tuesday, September 1, 2020 / Notices
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 26, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–19249 Filed 8–31–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL20–67–000]
jbell on DSKJLSW7X2PROD with NOTICES
Vistra Corp., Dynegy Marketing and
Trade, LLC, NextEra Energy
Resources, LLC, NRG Power Marketing
LLC, LS Power Associates, L.P.,
FirstLight Power Inc., Cogentrix
Energy Power Management, LLC v.
Constellation Mystic Power, LLC,
Exelon Generation Company, LLC,
Exelon Corporation; Notice of
Complaint
Take notice that on August 25, 2020,
pursuant to sections 206 and 306 of the
Federal Power Act, 16 U.S.C. 824e and
825e (2018), and Rule 206 of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.206, Vistra Corp.
(formerly known as Vistra Energy
Corp.), Dynegy Marketing and Trade,
LLC, NextEra Energy Resources, LLC,
NRG Power Marketing LLC, LS Power
Associates, L.P., FirstLight Power Inc.,
and Cogentrix Energy Power
Management, LLC (collectively, the New
England Generators or Complainants)
filed a formal complaint (Complaint)
against Constellation Mystic Power,
LLC, Exelon Generation Company, LLC
and Exelon Corporation (collectively
Respondents), asserting that
Respondents are circumventing
Commission precedent and therefore
alleges that Respondents’ actions are
unjust and unreasonable, all as more
fully explained in the complaint.
The New England Generators certify
that copies of the complaint were served
on the contacts for Mystic, Exelon
Generation and Exelon Corp. as listed
on the Commission’s list of Corporate
Officials.
VerDate Sep<11>2014
19:00 Aug 31, 2020
Jkt 250001
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically may
mail similar pleadings to the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the eLibrary link. Enter
the docket number excluding the last
three digits in the docket number field
to access the document. At this time, the
Commission has suspended access to
the Commission’s Public Reference
Room, due to the proclamation
declaring a National Emergency
concerning the Novel Coronavirus
Disease (COVID–19), issued by the
President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov, or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Comment Date: 5:00 p.m. Eastern
Time on September 14, 2020.
Dated: August 26, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–19252 Filed 8–31–20; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
54373
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–507–000]
Transcontinental Gas Pipe Line
Company, LLC; Notice of Intent To
Prepare an Environmental Assessment
for the Proposed VR–22 to Shore
Abandonment Project and Request for
Comments on Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the VR–22 to Shore Abandonment
Project (Project) involving construction
and operation of facilities by
Transcontinental Gas Pipe Line
Company, LLC (Transco) in Vermilion
Parish, Louisiana. The Commission will
use this EA in its decision-making
process to determine whether the
project is in the public convenience and
necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies about issues
regarding the project. The National
Environmental Policy Act (NEPA)
requires the Commission to take into
account the environmental impacts that
could result from its action whenever it
considers the issuance of a Certificate of
Public Convenience and Necessity.
NEPA also requires the Commission to
discover concerns the public may have
about proposals. This process is referred
to as scoping. The main goal of the
scoping process is to focus the analysis
in the EA on the important
environmental issues. By this notice, the
Commission requests public comments
on the scope of issues to address in the
EA. To ensure that your comments are
timely and properly recorded, please
submit your comments so that the
Commission receives them in
Washington, DC on or before 5:00 p.m.
Eastern Time on September 25, 2020.
Comments may be submitted in written
form. Further details on how to submit
comments are provided in the Public
Participation section of this notice.
You can make a difference by
submitting your specific comments or
concerns about the project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EA. Commission staff
E:\FR\FM\01SEN1.SGM
01SEN1
Agencies
[Federal Register Volume 85, Number 170 (Tuesday, September 1, 2020)]
[Notices]
[Pages 54372-54373]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-19249]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Docket Numbers: RP20-1118-000.
Applicants: Boardwalk Storage Company, LLC.
Description: Sec. 4(d) Rate Filing: Intermediate GMS Filing to be
effective 9/25/2020.
Filed Date: 8/25/20.
Accession Number: 20200825-5064.
Comments Due: 5 p.m. ET 9/8/20.
Docket Numbers: RP20-1119-000.
Applicants: Trailblazer Pipeline Company LLC.
Description: Sec. 4(d) Rate Filing: TPC 2020-08-25 GT&C Section 3
Revisions to be effective 9/25/2020.
Filed Date: 8/25/20.
Accession Number: 20200825-5139.
Comments Due: 5 p.m. ET 9/8/20.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern
[[Page 54373]]
time on the specified date(s). Protests may be considered, but
intervention is necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: August 26, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-19249 Filed 8-31-20; 8:45 am]
BILLING CODE 6717-01-P