Environmental Impact Statements; Notice of Availability, 51693-51694 [2020-18367]

Download as PDF Federal Register / Vol. 85, No. 163 / Friday, August 21, 2020 / Notices Canada impair the United States electric power supply system or impede [OE Docket No. EA–281–C] coordinated use of regional facilities.’’ App. at 5–6. Application to Export Electric Energy; Manitoba Hydro agrees ‘‘it will abide Manitoba Hydro by the export limits contained in the AGENCY: Office of Electricity, relevant [proposed] export authorization Department of Energy. for such facilities.’’ App. at 6. Manitoba Hydro contends it will not impede or ACTION: Notice of application. tend to impede the coordinated use of SUMMARY: Manitoba Hydro (Applicant or transmission facilities under the FPA Manitoba Hydro) has applied for because it ‘‘has no ‘system’ of its own authorization to transmit electric energy in the United States on which its from the United States to Canada exports of power could have a pursuant to the Federal Power Act. reliability, fuel use or stability impact.’’ DATES: Comments, protests, or motions See App. at 4–5. to intervene must be submitted on or The existing international before September 21, 2020. transmission facilities to be utilized by the Applicant have previously been ADDRESSES: Comments, protests, authorized by Presidential permits motions to intervene, or requests for issued pursuant to Executive Order more information should be addressed 10485, as amended, and are appropriate by electronic mail to for open access transmission by third Electricity.Exports@hq.doe.gov, or by parties. facsimile to (202) 586–8008. Procedural Matters: Any person SUPPLEMENTARY INFORMATION: The desiring to be heard in this proceeding Department of Energy (DOE) regulates should file a comment or protest to the exports of electricity from the United Application at the address provided States to a foreign country, pursuant to above. Protests should be filed in sections 301(b) and 402(f) of the accordance with Rule 211 of the Federal Department of Energy Organization Act Energy Regulatory Commission’s (FERC) (42 U.S.C. 7151(b) and 42 U.S.C. Rules of Practice and Procedure (18 CFR 7172(f)). Such exports require 385.211). Any person desiring to authorization under section 202(e) of become a party to this proceeding the Federal Power Act (16 U.S.C. should file a motion to intervene at the 824a(e)). above address in accordance with FERC On November 17, 2010 DOE issues Rule 214 (18 CFR 385.214). Order EA–281–B, which authorized Comments and other filings Manitoba Hydro to transmit electric energy from the United States to Canada concerning Manitoba Hydro’s application to export electric energy to for a ten-year term using existing Canada should be clearly marked with international transmission facilities OE Docket No. EA–281–C. Additional appropriate for open access. This copies are to be provided directly to authorization expires on November 17, Michael Douglas, 360 Portage Avenue, 2020. On July 2, 2020, Manitoba Hydro Winnipeg, Manitoba, Canada R3C 0G8; filed an application with DOE (Application or App.) for renewal of the midouglas@hydro.mb.ca; Jesse Halpern, export authorization contained in Order 1909 K Street NW, Suite 600, Washington, DC 20006; jhalpern@ No. EA–281–B. thompsoncoburn.com; and Nicole S. Manitoba Hydro states that it ‘‘is a Allen, 1909 K Street NW, Suite 600, Canadian Crown Corporation created Washington, DC 20006; nallen@ pursuant to The Manitoba Hydro Act.’’ thompsoncoburn.com. App. at 1. Manitoba Hydro adds that it A final decision will be made on the ‘‘does not own, control or operate any Application after the environmental generation, transmission or other impacts have been evaluated pursuant facilities in the United States.’’ Id. to DOE’s National Environmental Policy Manitoba Hydro further states that it ‘‘will purchase the power to be exported Act Implementing Procedures (10 CFR from electric utilities and federal power part 1021) and after DOE determines that the proposed action will not have marketing agencies as those terms are an adverse impact on the sufficiency of defined in Sections 3(22) and 3(19) of supply or reliability of the U.S. electric the Federal Power Act [FPA].’’ App. at power supply system. 5. Manitoba Hydro contends that ‘‘such Copies of the Application will be power is surplus to the system of the made available, upon request, by generator and this will not impair the sufficiency of the electric power system accessing the program website at https:// energy.gov/node/11845, or by emailing within the United States.’’ Id. Further, ‘‘nor will moving the energy through the Matthew Aronoff at matthew.aronoff@ hq.doe.gov. border systems and across the border to jbell on DSKJLSW7X2PROD with NOTICES DEPARTMENT OF ENERGY VerDate Sep<11>2014 19:04 Aug 20, 2020 Jkt 250001 PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 51693 Signed in Washington, DC, on August 18, 2020. Christopher Lawrence, Management and Program Analyst, Transmission Permitting and Technical Assistance, Office of Electricity. [FR Doc. 2020–18381 Filed 8–20–20; 8:45 am] BILLING CODE 6450–01–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–9052–4] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information 202– 564–5632 or https://www.epa.gov/nepa. Weekly receipt of Environmental Impact Statements (EIS) Filed August 10, 2020, 10 a.m. EST Through August 17, 2020, 10 a.m. EST Pursuant to 40 CFR 1506.9. Notice Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// cdxnodengn.epa.gov/cdx-enepa-public/ action/eis/search. EIS No. 20200168, Draft, FAA, CA, Bob Hope Hollywood Burbank Airport Replacement Passenger Terminal Project, Comment Period Ends: 10/05/ 2020, Contact: Edvige B. Mbakoup 424–405–7283. EIS No. 20200169, Final, USAF, TX, F– 35A Operational Beddown—Air Force Reserve Command, Review Period Ends: 09/21/2020, Contact: Mr. Hamid Kamalpour 210–925–273. EIS No. 20200170, Draft, FAA, NY, LaGuardia Airport Access Improvement Project, Comment Period Ends: 10/05/2020, Contact: Andrew Brooks 718–553–2511. EIS No. 20200171, Final, USACE, CA, Malibu Creek Ecosystem Restoration Study, Review Period Ends: 09/21/ 2020, Contact: Larry Smith 213–452– 3846. Amended Notice EIS No. 20200165, Draft, USFS, ID, Stibnite Gold Project, Comment Period Ends: 10/13/2020, Contact: Brian Harris 208–634–6945. Revision to FR Notice Published 08/ 14/2020; Correction to Comment Period Due Date from September 28, 2020 to October 13, 2020; Correction to Lead Agency Contact Phone Number from 208–879–6945 to 208–634–6945. E:\FR\FM\21AUN1.SGM 21AUN1 51694 Federal Register / Vol. 85, No. 163 / Friday, August 21, 2020 / Notices Dated: August 17, 2020. Cindy S. Barger, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2020–18367 Filed 8–20–20; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OAR–2020–0037; FRL–10013–82– OAR] EPA Responses to Certain State Designation Recommendations for the 2010 Sulfur Dioxide Primary National Ambient Air Quality Standard: Notice of Availability and Public Comment Period Environmental Protection Agency (EPA). ACTION: Notice of availability and public comment period. AGENCY: Notice is hereby given that the Environmental Protection Agency (EPA) has posted our responses to certain state designation recommendations for the 2010 Sulfur Dioxide (SO2) Primary National Ambient Air Quality Standard (NAAQS) on the Agency’s website and electronic docket. These responses include our intended designations for the affected areas, specifically all remaining undesignated areas for the 2010 SO2 NAAQS in the United States. The EPA also invites the public to review and provide input on our intended designations during the comment period specified in the DATES section. The EPA sent its responses directly to the states on or about August 13, 2020. The EPA intends to make final designation determinations for the areas of the country addressed by these responses no later than December 31, 2020. jbell on DSKJLSW7X2PROD with NOTICES SUMMARY: Comments must be received on or before September 21, 2020. Please refer to SUPPLEMENTARY INFORMATION for additional information on the comment period. ADDRESSES: Submit your comments, identified by Docket ID No. EPA–HQ– OAR–2020–0037, at https:// www.regulations.gov.1 Follow the online instructions for submitting comments. Out of an abundance of caution for members of the public and our staff, the EPA Docket Center and Reading Room are closed to the public, with limited exceptions, to reduce the risk of transmitting COVID–19. Our Docket Center staff will continue to provide remote customer service via email, phone, and webform. We encourage the public to submit comments via https:// www.regulations.gov, as there may be a delay in processing mail and faxes. Hand deliveries and couriers may be received by scheduled appointment only. For further information on EPA Docket Center services and the current status, please visit us online at https:// www.epa.gov/dockets. Once submitted, comments cannot be edited or removed from regulations.gov. The EPA may publish any comment received to our public docket. Do not submit electronically any information you consider to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Multimedia submissions (audio, video, etc.) must be accompanied by a written comment. The written comment is considered the official comment and should include discussion of all points you wish to make. The EPA will generally not consider comments or comment contents located outside of the primary submission (i.e., comments hosted on the Web, Cloud, or other file sharing DATES: system). For additional submission methods, the full EPA public comment policy, information about CBI or multimedia submissions, and general guidance on making effective comments, please visit https:// www.epa.gov/dockets/commenting-epadockets. For general questions concerning this action, please contact Corey Mocka, U.S. Environmental Protection Agency, Office of Air Quality Planning and Standards, Air Quality Policy Division, 109 T.W. Alexander Drive, Mail Code C539–04, Research Triangle Park, NC 27711; telephone: (919) 541–5142; email address: mocka.corey@epa.gov. The following EPA contacts can answer questions regarding areas in a particular EPA Regional office: FOR FURTHER INFORMATION CONTACT: U.S. EPA Regional Office Contacts Region 2—Marina Castro, telephone (212) 637–3713, email at castro.marina@ epa.gov. Region 3—Megan Goold, telephone (215) 814–2027, email at goold.megan@ epa.gov. Region 4—Twunjala Bradley, telephone (404) 562–9352, email at bradley.twunjala@epa.gov. Region 5—Alisa Liu, telephone (312) 353–3193, email at liu.alisa@epa.gov. Region 6—Robert Imhoff, telephone (214) 665–7262, email at imhoff.robert@ epa.gov. Region 7—William Stone, telephone (913) 551–7714, email at stone.william@ epa.gov. Region 8—Rebecca Matichuk, telephone (303) 312–6867, email at matichuk.rebecca@epa.gov. Region 9—Ashley R. Graham, telephone (415) 972–3877, email at graham.ashleyr@epa.gov. Region 10—John Chi, telephone (206) 553–1185, email at chi.john@epa.gov. Regional offices Affected state(s) EPA Region 2—Air Programs Branch, 290 Broadway, 25th Floor, New York, NY 10007 ............ EPA Region 3—Planning & Implementation Branch, 1650 Arch Street, Philadelphia, PA 19103 New York. Maryland, Pennsylvania, Virginia, and West Virginia. Alabama, Georgia, Kentucky, and North Carolina. Illinois, Indiana, and Wisconsin. EPA Region 4—Air Planning & Implementation Branch, Sam Nunn Atlanta Federal Center, 61 Forsyth Street SW, 12th Floor, Atlanta, GA 30303. EPA Region 5—Air Programs Branch, Air & Radiation Division (AR–18J), 77 West Jackson Blvd., Chicago, IL 60604. EPA Region 6—State Planning & Implementation Branch, 1201 Elm Street, Dallas, TX 75270 .. EPA Region 7—Air Quality Planning Branch, 11201 Renner Blvd., Lenexa, KS 66219 ............... EPA Region 8—Air Quality Planning Branch, 1595 Wynkoop Street, Denver, CO 80202 ............ EPA Region 9—Air Planning Branch, 75 Hawthorne Street, San Francisco, CA 94105 ............... EPA Region 10—Air Planning & State/Tribal Coordinations Branch, 1200 Sixth Avenue, Mail Code OAQ–107, Seattle, WA 98101. 1 The https://www.regulations.gov platform is in the process of being upgraded. Users may be automatically redirected to https:// VerDate Sep<11>2014 19:04 Aug 20, 2020 Jkt 250001 beta.regulations.gov. Both website addresses contain the same information and both website PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 Louisiana, Oklahoma, and Texas. Missouri and Nebraska. North Dakota and Wyoming. Hawaii. Washington. addresses allow users to submit comments to the docket. E:\FR\FM\21AUN1.SGM 21AUN1

Agencies

[Federal Register Volume 85, Number 163 (Friday, August 21, 2020)]
[Notices]
[Pages 51693-51694]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-18367]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-9052-4]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information 202-564-5632 or https://www.epa.gov/nepa.

Weekly receipt of Environmental Impact Statements (EIS)
Filed August 10, 2020, 10 a.m. EST Through August 17, 2020, 10 a.m. EST
Pursuant to 40 CFR 1506.9.

Notice

    Section 309(a) of the Clean Air Act requires that EPA make public 
its comments on EISs issued by other Federal agencies. EPA's comment 
letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-enepa-public/action/eis/search.

EIS No. 20200168, Draft, FAA, CA, Bob Hope Hollywood Burbank Airport 
Replacement Passenger Terminal Project, Comment Period Ends: 10/05/
2020, Contact: Edvige B. Mbakoup 424-405-7283.
EIS No. 20200169, Final, USAF, TX, F-35A Operational Beddown--Air Force 
Reserve Command, Review Period Ends: 09/21/2020, Contact: Mr. Hamid 
Kamalpour 210-925-273.
EIS No. 20200170, Draft, FAA, NY, LaGuardia Airport Access Improvement 
Project, Comment Period Ends: 10/05/2020, Contact: Andrew Brooks 718-
553-2511.
EIS No. 20200171, Final, USACE, CA, Malibu Creek Ecosystem Restoration 
Study, Review Period Ends: 09/21/2020, Contact: Larry Smith 213-452-
3846.

Amended Notice

EIS No. 20200165, Draft, USFS, ID, Stibnite Gold Project, Comment 
Period Ends: 10/13/2020, Contact: Brian Harris 208-634-6945.

    Revision to FR Notice Published 08/14/2020; Correction to Comment 
Period Due Date from September 28, 2020 to October 13, 2020; Correction 
to Lead Agency Contact Phone Number from 208-879-6945 to 208-634-6945.


[[Page 51694]]


    Dated: August 17, 2020.
Cindy S. Barger,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2020-18367 Filed 8-20-20; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.