Northern Natural Gas Company; Notice of Application, 50822-50823 [2020-17998]

Download as PDF 50822 Federal Register / Vol. 85, No. 160 / Tuesday, August 18, 2020 / Notices jbell on DSKJLSW7X2PROD with NOTICES State Historic Preservation Officer, as required by section 106 of the National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating Spencer Mountain Hydropower, LLC as the Commission’s non-federal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act and consultation pursuant to section 106 of the National Historic Preservation Act. m. Spencer Mountain Hydropower, LLC filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD may be viewed on the Commission’s website (https:// www.ferc.gov), using the eLibrary link. Enter the docket number, excluding the last three digits in the docket number field, to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC Online Support at FERCONlineSupport@ ferc.gov, (866) 208 3676 (toll free), or (202) 502–8659 (TTY). o. The licensee states its unequivocal intent to submit an application for a new license for Project No. 2607–015. Pursuant to 18 CFR 16.8, 16.9, and 16.10 each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by June 30, 2023. p. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: August 12, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–17995 Filed 8–17–20; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 17:50 Aug 17, 2020 Jkt 250001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP20–503–000; PF20–1–000] Northern Natural Gas Company; Notice of Application Take notice that on July 31, 2020, Northern Natural Gas Company (Northern), 1111 South 103rd Street, Omaha, NE 68124, filed an application in Docket No. CP20–503–000, pursuant to section 7 of the Natural Gas Act and Part 157 of the Commission’s Regulations thereunder, requesting the issuance of a certificate of public convenience and necessity to construct, modify, replace and operate certain compression and pipeline facilities, with appurtenances, located in various counties in Minnesota. All relevant information is more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding this application should be directed to Michael T. Loeffler, Senior Director, Certificates and External Affairs for Northern, 1111 South 103rd Street, Omaha, Nebraska 68124, or by calling (402) 398–7103. Specifically, Northern proposes to: (1) Construct an 0.80-mile-long, 24-inchdiameter pipeline extension and an 0.63-mile-long, 24-inch-diameter pipeline loop; (2) replace an 0.08-milelong, 8-inch-diameter branch line with an equivalent length of 12-inchdiameter pipeline; (3) construct a new 11,153 hp gas-fired turbine greenfield compressor station; (4) install an additional 1,100 hp electric-driven reciprocating compressor unit at its Pierz Compressor Station; and (5) construct various appurtenances, all located within Minnesota. On December 6, 2019, the Commission staff granted Northern’s request to utilize the National Environmental Policy Act (NEPA) PreFiling Process and assigned Docket No. PF20–1–000 to staff activities involving the Project. Now, as of the filing of this application on July 31, 2020, the NEPA Pre-Filing Process for this project has ended. From this time forward, this proceeding will be conducted in Docket PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 No. CP20–503–000, as noted in the caption of this Notice. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 3 copies of filings made in the proceeding with the Commission and must provide a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to E:\FR\FM\18AUN1.SGM 18AUN1 jbell on DSKJLSW7X2PROD with NOTICES Federal Register / Vol. 85, No. 160 / Tuesday, August 18, 2020 / Notices the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list and will be notified of any meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission and will not have the right to seek court review of the Commission’s final order. As of the February 27, 2018 date of the Commission’s order in Docket No. CP16–4–001, the Commission will apply its revised practice concerning out-of-time motions to intervene in any new NGA section 3 or section 7 proceeding.1 Persons desiring to become a party to a certificate proceeding are to intervene in a timely manner. If seeking to intervene out-of-time, the movant is required to show good cause why the time limitation should be waived, and should provide justification by reference to factors set forth in Rule 214(d)(1) of the Commission’s Rules and Regulations.2 In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. The Commission strongly encourages electronic filings of comments in lieu of paper using the eFile link at https:// www.ferc.gov. In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal 1 Tennessee Gas Pipeline Company, L.L.C., 162 FERC 61,167 at 50 (2018). 2 18 CFR 385.214(d)(1). VerDate Sep<11>2014 17:50 Aug 17, 2020 Jkt 250001 Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Comment Date: 5:00 p.m. Eastern Time on September 2, 2020. Dated: August 12, 2020. Kimberly D. Bose, Secretary. BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC20–20–000] Commission Information Collection Activities (Ferc–523); Comment Request; Extension Federal Energy Regulatory Commission. ACTION: Notice of information collection and request for comments. AGENCY: In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on a renewal of currently approved information collection, FERC–523 (Application for Authorization for the Issuance of Securities or the Assumption of Liabilities). SUMMARY: Comments on the collection of information are due October 19, 2020. ADDRESSES: You may submit comments (identified by Docket No. IC20–20–000) by one of the following methods: • eFiling at Commission’s website: https://www.ferc.gov. • U.S. Postal Service Mail: Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. • Effective 7/1/2020, delivery of filings other than by eFiling or the U.S. Postal Service should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: https:// www.ferc.gov. For user assistance, contact FERC Online Support by email PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 at ferconlinesupport@ferc.gov, or by phone at (866) 208–3676 (toll-free). Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at https://www.ferc.gov. FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at DataClearance@FERC.gov, telephone at (202) 502–8663. SUPPLEMENTARY INFORMATION: [FR Doc. 2020–17998 Filed 8–17–20; 8:45 am] DATES: 50823 Title: FERC–523, Application for Authorization for the Issuance of Securities or the Assumption of Liabilities. OMB Control No.: 1902–0043. Type of Request: Three-year approval of the FERC–523 information collection requirements with no changes to the current reporting requirements. Abstract: The information collected by FERC–523 is required to implement the statutory provisions of section 204 of the Federal Power Act (FPA) (16 U.S.C. 824c). Under section 204 of the FPA, no public utility or licensee shall issue any security, or assume any obligation or liability as guarantor, endorser, surety, or otherwise in respect of any security of another person, until the public utility applies for and receives Commission approval by order authorizing the issuance or assumption of the liability. The Commission issues an order if it finds that such issuance or assumption (a) is for lawful object, within the corporate purposes of the applicant and compatible with the public interest, which is necessary or appropriate for or consistent with the proper performance by the applicant as a public utility, and which will not impair its ability to perform that service, and (b) is reasonably necessary or appropriate for such purposes. The Commission uses the information contained in filings to determine its acceptance and/or rejection of applications for authorization to either issue securities or to assume an obligation or liability by the public utilities and licensees who submit these applications. The specific application requirements and filing format are found at 18 CFR part 34, and 18 CFR 131.43 and 131.50. This information is filed electronically. Type of Respondents: Public utilities subject to the Federal Power Act. E:\FR\FM\18AUN1.SGM 18AUN1

Agencies

[Federal Register Volume 85, Number 160 (Tuesday, August 18, 2020)]
[Notices]
[Pages 50822-50823]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-17998]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP20-503-000; PF20-1-000]


Northern Natural Gas Company; Notice of Application

    Take notice that on July 31, 2020, Northern Natural Gas Company 
(Northern), 1111 South 103rd Street, Omaha, NE 68124, filed an 
application in Docket No. CP20-503-000, pursuant to section 7 of the 
Natural Gas Act and Part 157 of the Commission's Regulations 
thereunder, requesting the issuance of a certificate of public 
convenience and necessity to construct, modify, replace and operate 
certain compression and pipeline facilities, with appurtenances, 
located in various counties in Minnesota. All relevant information is 
more fully set forth in the application which is on file with the 
Commission and open to public inspection. The filing may also be viewed 
on the web at https://www.ferc.gov using the eLibrary link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document. For assistance, contact FERC at 
[email protected] or call toll-free, (866) 208-3676 or TTY, 
(202) 502-8659.
    Any questions regarding this application should be directed to 
Michael T. Loeffler, Senior Director, Certificates and External Affairs 
for Northern, 1111 South 103rd Street, Omaha, Nebraska 68124, or by 
calling (402) 398-7103.
    Specifically, Northern proposes to: (1) Construct an 0.80-mile-
long, 24-inch-diameter pipeline extension and an 0.63-mile-long, 24-
inch-diameter pipeline loop; (2) replace an 0.08-mile-long, 8-inch-
diameter branch line with an equivalent length of 12-inch-diameter 
pipeline; (3) construct a new 11,153 hp gas-fired turbine greenfield 
compressor station; (4) install an additional 1,100 hp electric-driven 
reciprocating compressor unit at its Pierz Compressor Station; and (5) 
construct various appurtenances, all located within Minnesota.
    On December 6, 2019, the Commission staff granted Northern's 
request to utilize the National Environmental Policy Act (NEPA) Pre-
Filing Process and assigned Docket No. PF20-1-000 to staff activities 
involving the Project. Now, as of the filing of this application on 
July 31, 2020, the NEPA Pre-Filing Process for this project has ended. 
From this time forward, this proceeding will be conducted in Docket No. 
CP20-503-000, as noted in the caption of this Notice.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below file with the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 3 copies of filings made in the proceeding with the Commission 
and must provide a copy to the applicant and to every other party. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to

[[Page 50823]]

the party or parties directly involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list and will be 
notified of any meetings associated with the Commission's environmental 
review process. Environmental commenters will not be required to serve 
copies of filed documents on all other parties. However, the non-party 
commenters will not receive copies of all documents filed by other 
parties or issued by the Commission and will not have the right to seek 
court review of the Commission's final order.
    As of the February 27, 2018 date of the Commission's order in 
Docket No. CP16-4-001, the Commission will apply its revised practice 
concerning out-of-time motions to intervene in any new NGA section 3 or 
section 7 proceeding.\1\ Persons desiring to become a party to a 
certificate proceeding are to intervene in a timely manner. If seeking 
to intervene out-of-time, the movant is required to show good cause why 
the time limitation should be waived, and should provide justification 
by reference to factors set forth in Rule 214(d)(1) of the Commission's 
Rules and Regulations.\2\
---------------------------------------------------------------------------

    \1\ Tennessee Gas Pipeline Company, L.L.C., 162 FERC 61,167 at 
50 (2018).
    \2\ 18 CFR 385.214(d)(1).
---------------------------------------------------------------------------

    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://www.ferc.gov) using 
the eLibrary link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact FERC at 
[email protected] or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    The Commission strongly encourages electronic filings of comments 
in lieu of paper using the eFile link at https://www.ferc.gov. In lieu 
of electronic filing, you may submit a paper copy. Submissions sent via 
the U.S. Postal Service must be addressed to: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Room 1A, Washington, DC 20426. Submissions sent via any other carrier 
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852.
    Comment Date: 5:00 p.m. Eastern Time on September 2, 2020.

    Dated: August 12, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-17998 Filed 8-17-20; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.