Download as PDF jbell on DSKJLSW7X2PROD with NOTICES 50820 Federal Register / Vol. 85, No. 160 / Tuesday, August 18, 2020 / Notices Comments Due: 5 p.m. ET 9/2/20. Docket Numbers: ER20–2651–000. Applicants: Midcontinent Independent System Operator, Inc., Otter Tail Power Company. Description: § 205(d) Rate Filing: 2020–08–12_SA 3542 NSP–OTP–OTP T–T Deuel (J526) to be effective 8/7/ 2020. Filed Date: 8/12/20. Accession Number: 20200812–5042. Comments Due: 5 p.m. ET 9/2/20. Docket Numbers: ER20–2652–000. Applicants: Midcontinent Independent System Operator, Inc., Otter Tail Power Company. Description: § 205(d) Rate Filing: 2020–08–12_SA 3543 NSP–OTP–OTP (Astoria) T–T (J493 J510) to be effective 8/7/2020. Filed Date: 8/12/20. Accession Number: 20200812–5043. Comments Due: 5 p.m. ET 9/2/20. Docket Numbers: ER20–2653–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to ISA, SA No. 568; Queue No. A28 (amend) to be effective 12/19/ 2000. Filed Date: 8/12/20. Accession Number: 20200812–5055. Comments Due: 5 p.m. ET 9/2/20. Docket Numbers: ER20–2654–000. Applicants: Clear Power LLC. Description: Baseline eTariff Filing: Clear Power Market Based Rate Baseline Filing to be effective 8/12/2020. Filed Date: 8/12/20. Accession Number: 20200812–5072. Comments Due: 5 p.m. ET 9/2/20. Docket Numbers: ER20–2655–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, SA No. 5725; Queue No. AE1–039 and Cancellation of SA No. 3265 to be effective 7/13/2020. Filed Date: 8/12/20. Accession Number: 20200812–5115. Comments Due: 5 p.m. ET 9/2/20. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing VerDate Sep<11>2014 17:50 Aug 17, 2020 Jkt 250001 requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 12, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–18025 Filed 8–17–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12611–014] Verdant Power, LLC; Notice Soliciting Scoping Comments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Subsequent Minor License. b. Project No.: 12611–014. c. Date Filed: December 30, 2019. d. Applicant: Verdant Power, LLC. e. Name of Project: Roosevelt Island Tidal Energy Project (or RITE Project). f. Location: On the East River in New York County, New York. The project does not occupy federal land. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)–825 (r). h. Applicant Contact: Mr. Ronald F. Smith, President and Chief Operating Officer, Verdant Power, LLC, P.O. Box 282, Roosevelt Island, New York, New York 10044. Phone: (703) 328–6842. Email: rsmith@verdantpower.com. i. FERC Contact: Andy Bernick at (202) 502–8660 or andrew.bernick@ ferc.gov. j. Deadline for filing scoping comments: 30 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file scoping comments using the Commission’s eFiling system at https://www.ferc.gov/ docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P–12611–014. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application is not ready for environmental analysis at this time. l. The existing pilot project license authorizes the following project facilities: (a) Thirty 35-kilowatt, 5meter-diameter axial flow turbinegenerator units; (b) ten triframe mounts, each supporting three turbine-generator units; (c) 480-volt underwater cables from each triframe mount to five shoreline switchgear vaults that interconnect to a control room and interconnection points; and (d) appurtenant facilities for navigation safety and operation. Under the current pilot project license, which expires on December 31, 2021, Verdant installed, tested, and then removed a total of five turbine-generator units. Verdant also proposes to install three turbine-generator units attached to one triframe mount in late 2020 (i.e., Install B–1), under the existing pilot project license. The proposed project would be constructed in three phases: Install B–1 (under the existing pilot license, as noted above), Install B–2 (three triframe mounts with a total of nine turbinegenerator units), and Install C (one triframe mount with three turbinegenerator units). The project would consist of a maximum of fifteen 35kilowatt, 5-meter-diameter axial flow turbine-generator units with a total installed capacity of 0.525 megawatt. Each of the five triframe mounts would be connected via underwater cables to an existing control room and a proposed shoreline switchgear vault, and via an overhead transmission line (for the first two triframe mounts) and an underground transmission line (for the remaining three triframe mounts) to a point of interconnection. E:\FR\FM\18AUN1.SGM 18AUN1 jbell on DSKJLSW7X2PROD with NOTICES Federal Register / Vol. 85, No. 160 / Tuesday, August 18, 2020 / Notices The project would operate using the natural tidal currents of the East River, during both ebb and flood tidal periods. As the direction of tidal flow changes, each turbine-generator unit would rotate (or yaw) to align the rotor to the direction of flow, through a passive system caused by hydrodynamic forces on the turbine-generator unit. The annual generation is expected to be from 840 to 1,200 megawatt-hours. m. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested individuals an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (www.ferc.gov) using the eLibrary link. At this time, the Commission has suspended access to the Commission’s Public Access Room due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TTY, (202) 502–8659. You may also register online at https://ferconline.ferc.gov/ FERCOnline.aspx to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. o. Scoping Process. The Commission, in cooperation with the U.S. Environmental Protection Agency, intends to prepare an environmental assessment (EA) for the RITE Project in accordance with the National Environmental Policy Act. The EA will consider both site-specific and cumulative environmental impacts and reasonable alternatives to the proposed action. Commission staff does not propose to conduct any on-site scoping meetings at this time. Instead, we are soliciting comments, recommendations, and information, on the Scoping Document 1 (SD1) issued August 12, 2020. Copies of SD1 outlining the subject areas to be addressed in the EA were distributed to the parties on the Commission’s mailing list. Copies of SD1 may be viewed on the web at https://www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call 1–866–208–3676 or for TTY, (202) 502–8659. VerDate Sep<11>2014 17:50 Aug 17, 2020 Jkt 250001 Dated: August 12, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–17997 Filed 8–17–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY 50821 eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Federal Energy Regulatory Commission Dated: August 12, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. Combined Notice of Filings [FR Doc. 2020–18024 Filed 8–17–20; 8:45 am] Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP20–1087–000. Applicants: Equitrans, L.P. Description: § 4(d) Rate Filing: Negotiated Rate Capacity Release Agreement—8/8/2020 to be effective 8/8/2020. Filed Date: 8/7/20. Accession Number: 20200807–5062. Comments Due: 5 p.m. ET 8/19/20. Docket Numbers: RP20–1090–000. Applicants: Iroquois Gas Transmission System, L.P. Description: § 4(d) Rate Filing: 081120 Negotiated Rates—Wells Fargo Commodities, LLC R–7810–19 to be effective 10/1/2020. Filed Date: 8/11/20. Accession Number: 20200811–5027. Comments Due: 5 p.m. ET 8/24/20. Docket Numbers: RP20–1091–000. Applicants: Rockies Express Pipeline LLC. Description: § 4(d) Rate Filing: REX 2020–08–11 Negotiated Rate Agreement to be effective 8/11/2020. Filed Date: 8/11/20. Accession Number: 20200811–5093. Comments Due: 5 p.m. ET 8/24/20. Docket Numbers: RP20–1092–000. Applicants: Texas Gas Transmission, LLC. Description: § 4(d) Rate Filing: Neg Rate Agmt (Westlake 38162) to be effective 8/1/2020. Filed Date: 8/11/20. Accession Number: 20200811–5094. Comments Due: 5 p.m. ET 8/24/20. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified date(s). Protests may be considered, but intervention is necessary to become a party to the proceeding. PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2607–015] Spencer Mountain Hydropower, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 2607–015. c. Date Filed: June 30, 2020. d. Submitted By: Spencer Mountain Hydropower, LLC. e. Name of Project: Spencer Mountain Hydropower Project. f. Location: On the South Fork of the Catawba River, in the Town of Spencer Mountain, in Gaston County, North Carolina. The project does not occupy federal lands. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s Regulations. h. Potential Applicant Contact: Kevin Edwards, 916 Comer Road, Stoneville, NC 27048; (336) 589–6138; email— smhydro@pht1.com. i. FERC Contact: Michael Spencer at (202) 502–6093, or email at michael.spencer@ferc.gov. j. Spencer Mountain Hydropower, LLC filed its request to use the Traditional Licensing Process, and provided public notice of its request, on June 30, 2020. In a letter dated August 12, 2020, the Director of the Division of Hydropower Licensing approved Spencer Mountain Hydropower, LLC’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, Part 402. We are also initiating consultation with the North Carolina E:\FR\FM\18AUN1.SGM 18AUN1

Agencies

[Federal Register Volume 85, Number 160 (Tuesday, August 18, 2020)]
[Notices]
[Pages 50820-50821]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-17997]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12611-014]


Verdant Power, LLC; Notice Soliciting Scoping Comments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Subsequent Minor License.
    b. Project No.: 12611-014.
    c. Date Filed: December 30, 2019.
    d. Applicant: Verdant Power, LLC.
    e. Name of Project: Roosevelt Island Tidal Energy Project (or RITE 
Project).
    f. Location: On the East River in New York County, New York. The 
project does not occupy federal land.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825 (r).
    h. Applicant Contact: Mr. Ronald F. Smith, President and Chief 
Operating Officer, Verdant Power, LLC, P.O. Box 282, Roosevelt Island, 
New York, New York 10044. Phone: (703) 328-6842. Email: 
[email protected].
    i. FERC Contact: Andy Bernick at (202) 502-8660 or 
[email protected].
    j. Deadline for filing scoping comments: 30 days from the issuance 
date of this notice.
    The Commission strongly encourages electronic filing. Please file 
scoping comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy. 
Submissions sent via the U.S. Postal Service must be addressed to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via 
any other carrier must be addressed to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, 
Maryland 20852. The first page of any filing should include docket 
number P-12611-014.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application is not ready for environmental analysis at this 
time.
    l. The existing pilot project license authorizes the following 
project facilities: (a) Thirty 35-kilowatt, 5-meter-diameter axial flow 
turbine-generator units; (b) ten triframe mounts, each supporting three 
turbine-generator units; (c) 480-volt underwater cables from each 
triframe mount to five shoreline switchgear vaults that interconnect to 
a control room and interconnection points; and (d) appurtenant 
facilities for navigation safety and operation.
    Under the current pilot project license, which expires on December 
31, 2021, Verdant installed, tested, and then removed a total of five 
turbine-generator units. Verdant also proposes to install three 
turbine-generator units attached to one triframe mount in late 2020 
(i.e., Install B-1), under the existing pilot project license.
    The proposed project would be constructed in three phases: Install 
B-1 (under the existing pilot license, as noted above), Install B-2 
(three triframe mounts with a total of nine turbine-generator units), 
and Install C (one triframe mount with three turbine-generator units). 
The project would consist of a maximum of fifteen 35-kilowatt, 5-meter-
diameter axial flow turbine-generator units with a total installed 
capacity of 0.525 megawatt. Each of the five triframe mounts would be 
connected via underwater cables to an existing control room and a 
proposed shoreline switchgear vault, and via an overhead transmission 
line (for the first two triframe mounts) and an underground 
transmission line (for the remaining three triframe mounts) to a point 
of interconnection.

[[Page 50821]]

    The project would operate using the natural tidal currents of the 
East River, during both ebb and flood tidal periods. As the direction 
of tidal flow changes, each turbine-generator unit would rotate (or 
yaw) to align the rotor to the direction of flow, through a passive 
system caused by hydrodynamic forces on the turbine-generator unit. The 
annual generation is expected to be from 840 to 1,200 megawatt-hours.
    m. In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested individuals an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (www.ferc.gov) using the 
eLibrary link. At this time, the Commission has suspended access to the 
Commission's Public Access Room due to the proclamation declaring a 
National Emergency concerning the Novel Coronavirus Disease (COVID-19), 
issued by the President on March 13, 2020. For assistance, contact FERC 
at [email protected] or call toll-free, (886) 208-3676 or TTY, 
(202) 502-8659.
    You may also register online at https://ferconline.ferc.gov/FERCOnline.aspx to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    o. Scoping Process.
    The Commission, in cooperation with the U.S. Environmental 
Protection Agency, intends to prepare an environmental assessment (EA) 
for the RITE Project in accordance with the National Environmental 
Policy Act. The EA will consider both site-specific and cumulative 
environmental impacts and reasonable alternatives to the proposed 
action.
    Commission staff does not propose to conduct any on-site scoping 
meetings at this time. Instead, we are soliciting comments, 
recommendations, and information, on the Scoping Document 1 (SD1) 
issued August 12, 2020.
    Copies of SD1 outlining the subject areas to be addressed in the EA 
were distributed to the parties on the Commission's mailing list. 
Copies of SD1 may be viewed on the web at https://www.ferc.gov using the 
eLibrary link. Enter the docket number excluding the last three digits 
in the docket number field to access the document. For assistance, call 
1-866-208-3676 or for TTY, (202) 502-8659.

    Dated: August 12, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-17997 Filed 8-17-20; 8:45 am]