Tuscarora Gas Transmission Company; Notice of Intent To Prepare An Environmental Assessment for the Proposed Tuscarora Xpress Project and Request for Comments on Environmental Issues, 48517-48519 [2020-17512]

Download as PDF Federal Register / Vol. 85, No. 155 / Tuesday, August 11, 2020 / Notices toll-free, (886) 208–3676 or TYY, (202) 502–8659. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. Comment Date: 5:00 p.m. Eastern Time on August 25, 2020. Dated: August 5, 2020. Kimberly D. Bose, Secretary.1 [FR Doc. 2020–17500 Filed 8–10–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD20–14–000] Carbon Pricing in Organized Wholesale Electricity Markets; Supplemental Notice of Technical Conference As announced in the Notice of Technical Conference issued in this proceeding on June 17, 2020, the Federal Energy Regulatory Commission (Commission) will convene a Commissioner-led technical conference in the above-referenced proceeding on Wednesday, September 30, 2020, from approximately 9:00 a.m. to 5:00 p.m. Eastern time. The conference will be held either in-person—at the Commission’s headquarters at 888 First Street NE, Washington, DC 20426 in the Commission Meeting Room (with a webcast option available)—or electronically. The purpose of this conference is to discuss considerations related to stateadoption of mechanisms to price carbon dioxide emissions, commonly referred to as carbon pricing, in regions with Commission-jurisdictional organized wholesale electricity markets (i.e., regions with regional transmission organizations/independent system operators, or RTOs/ISOs). This conference will address carbon pricing approaches where a state (or group of states) sets an explicit carbon price, whether through a price-based or 1 18 quantity-based approach, and how that carbon price intersects with RTO/ISOadministered markets, addressing both legal and technical issues. A high-level agenda for this conference is attached. The Commission will issue a further supplemental notice with a full agenda that includes questions for each panel and the list of panelists, and further details regarding whether this conference will be held inperson or electronically. There is no fee for attendance, and the conference will be webcast as an option for the public to attend electronically. Information on this technical conference, including a link to the webcast, will also be posted on this conference’s event page on the Commission’s website, www.ferc.gov/ news-events/events/technicalconference-regarding-carbon-pricingorganized-wholesale-electricity, prior to the event. The conference will be transcribed. Transcripts will be available for a fee from Ace Reporting, (202) 347–3700. Commission conferences are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations, please send an email to accessibility@ferc.gov, call toll-free (866) 208–3372 (voice) or (202) 208–8659 (TTY), or send a fax to (202) 208–2106 with the required accommodations. This notice is issued and published in accordance with 18 CFR 2.1 (2019). For more information about this technical conference, please contact: John Miller (Technical Information), Office of Energy Market Regulation, (202) 502–6016, john.miller@ferc.gov Anne Marie Hirschberger (Legal Information), Office of the General Counsel, (202) 502–8387, annemarie.hirschberger@ferc.gov Sarah McKinley (Logistical Information), Office of External Affairs, (202) 502–8004, sarah.mckinley@ferc.gov Dated: August 5, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–17505 Filed 8–10–20; 8:45 am] BILLING CODE 6717–01–P CFR 2.1 (2019). VerDate Sep<11>2014 17:02 Aug 10, 2020 Jkt 250001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 48517 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP20–486–000] Tuscarora Gas Transmission Company; Notice of Intent To Prepare An Environmental Assessment for the Proposed Tuscarora Xpress Project and Request for Comments on Environmental Issues The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Tuscarora Xpress Project (Project) involving construction and operation of facilities by Tuscarora Gas Transmission Company (Tuscarora) in Washoe County, Nevada. The Commission will use this EA in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies about issues regarding the project. The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from its action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. NEPA also requires the Commission to discover concerns the public may have about proposals. This process is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this notice, the Commission requests public comments on the scope of issues to address in the EA. To ensure that your comments are timely and properly recorded, please submit your comments so that the Commission receives them in Washington, DC on or before 5:00pm Eastern Time on September 3, 2020. Comments may be submitted in written form. Further details on how to submit comments are provided in the Public Participation section of this notice. You can make a difference by submitting your specific comments or concerns about the project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. Your input will help the Commission staff determine what issues they need to evaluate in the EA. Commission staff will consider all written comments during the preparation of the EA. E:\FR\FM\11AUN1.SGM 11AUN1 48518 Federal Register / Vol. 85, No. 155 / Tuesday, August 11, 2020 / Notices If you sent comments on this project to the Commission before the opening of this docket on June 24, 2020, you will need to file those comments in Docket No. CP20–486–000 to ensure they are considered as part of this proceeding. This notice is being sent to the Commission’s current environmental mailing list for this project. State and local government representatives should notify their constituents of this proposed project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, a pipeline company representative may contact you about the acquisition of an easement to construct, operate, and maintain the proposed facilities. The company would seek to negotiate a mutually acceptable easement agreement. You are not required to enter into an agreement. However, if the Commission approves the project, the Natural Gas Act conveys the right of eminent domain to the company. Therefore, if you and the company do not reach an easement agreement, the pipeline company could initiate condemnation proceedings in court. In such instances, compensation would be determined by a judge in accordance with state law. Tuscarora provided landowners with a fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ This fact sheet addresses a number of typically asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. This fact sheet along with other landowner topics of interest are available for viewing on the FERC website (www.ferc.gov) under the Natural Gas Questions or Landowner Topics link. Public Participation The Commission offers a free service called eSubscription which makes it easy to stay informed of all issuances and submittals regarding the dockets/ projects to which you subscribe. These instant email notifications are the fastest way to receive notification and provide a link to the document files which can reduce the amount of time you spend researching proceedings. Go to https:// www.ferc.gov/ferc-online/overview to register for eSubscription. For your convenience, there are three methods you can use to submit your comments to the Commission. The Commission encourages electronic filing of comments and has staff available to assist you at (866) 208–3676 or FercOnlineSupport@ferc.gov. Please carefully follow these instructions so VerDate Sep<11>2014 17:02 Aug 10, 2020 Jkt 250001 that your comments are properly recorded. (1) You can file your comments electronically using the eComment feature, which is located on the Commission’s website (www.ferc.gov) under the link to FERC Online. Using eComment is an easy method for submitting brief, text-only comments on a project; (2) You can file your comments electronically by using the eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to FERC Online. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; a comment on a particular project is considered a ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments by mailing them to the Commission. Be sure to reference the project docket number (CP20–486–000) on your letter. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Summary of the Proposed Project Tuscarora proposes to upgrade and replace an existing reciprocating compressor unit (and building) and construct a new skid-mounted compressor unit at the same location within the existing Wadsworth Compressor Station in Washoe County, Nevada. Additionally, Tuscarora would upgrade an existing meter, replace the existing meter bypass line with a new meter piping run, and install a second new meter within the existing compressor station site. According to Tuscarora, the Tuscarora Xpress Project would provide 15,000 dekatherms per day (Dth/d) of incremental firm transportation capacity on Tuscarora’s interstate natural gas pipeline system from its interconnection with Gas Transmission Northwest LLC in Malin, Oregon to its Wadsworth Compressor Station in northern Nevada to meet the growing market demand for natural gas in this area. The Tuscarora Xpress Project would consist of the following activities: • Demolition and replacement of one compressor facility and foundation; PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 • upgrade and replacement of a reciprocating compressor unit and foundation; • replacement of metering facilities; and • installation of station piping. The general location of the project facilities is shown in appendix 1.1 Land Requirements for Construction Construction of the proposed facilities would disturb approximately 4.6 acres of land, 4.0 acres of which would be restored to pre-existing conditions after construction is complete. The EA Process The EA will discuss impacts that could occur as a result of the construction and operation of the proposed project under these general headings: • Geology and soils; • water resources and wetlands; • vegetation and wildlife; • threatened and endangered species; • cultural resources; • land use; • air quality and noise; • public safety; and • cumulative impacts Commission staff will also evaluate reasonable alternatives to the proposed project or portions of the project and make recommendations on how to lessen or avoid impacts on the various resource areas. The EA will present Commission staffs’ independent analysis of the issues. The EA will be available in electronic format in the public record through eLibrary 2 and the Commission’s natural gas environmental documents web page (https://www.ferc.gov/industries-data/ natural-gas/environment/ environmental-documents). If eSubscribed, you will receive instant email notification when the EA is issued. The EA may be issued for an allotted public comment period. Commission staff will consider all comments on the EA before making recommendations to the Commission. To ensure Commission staff have the opportunity to address your comments, please carefully follow the instructions 1 The appendices referenced in this notice will not appear in the Federal Register. Copies of appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov using the link called ‘‘eLibrary’’ or from the Commission’s Public Reference Room, 888 First Street NE, Washington, DC 20426, or call (202) 502– 8371. For instructions on connecting to eLibrary, refer to the last page of this notice. 2 For instructions on connecting to eLibrary, refer to the last page of this notice. E:\FR\FM\11AUN1.SGM 11AUN1 Federal Register / Vol. 85, No. 155 / Tuesday, August 11, 2020 / Notices in the Public Participation section, beginning on page 2. With this notice, the Commission is asking agencies with jurisdiction by law and/or special expertise with respect to the environmental issues of this project to formally cooperate in the preparation of the EA.3 Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. If the Commission issues the EA for an allotted public comment period, a Notice of Availability of the EA will be sent to the environmental mailing list and will provide instructions to access the electronic document on the FERC’s website (www.ferc.gov). If you need to make changes to your name/address, or if you would like to remove your name from the mailing list, please return the attached ‘‘Mailing List Update Form’’ (appendix 2). Consultation Under Section 106 of the National Historic Preservation Act In accordance with the Advisory Council on Historic Preservation’s implementing regulations for section 106 of the National Historic Preservation Act, the Commission is using this notice to initiate consultation with the applicable State Historic Preservation Office, and to solicit their views and those of other government agencies, interested Indian tribes, and the public on the project’s potential effects on historic properties.4 The EA for this project will document findings on the impacts on historic properties and summarize the status of consultations under section 106. Additional Information Environmental Mailing List The environmental mailing list includes federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project and includes a mailing address with their comments. Commission staff will update the environmental mailing list as the analysis proceeds to ensure that Commission notices related to this environmental review are sent to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed project. 3 The Council on Environmental Quality regulations addressing cooperating agency responsibilities are at Title 40, Code of Federal Regulations, Part 1501.6. 4 The Advisory Council on Historic Preservation’s regulations are at Title 36, Code of Federal Regulations, Part 800. Those regulations define historic properties as any prehistoric or historic district, site, building, structure, or object included in or eligible for inclusion in the National Register of Historic Places. VerDate Sep<11>2014 17:02 Aug 10, 2020 Jkt 250001 Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website at www.ferc.gov using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number in the ‘‘Docket Number’’ field, excluding the last three digits (i.e., CP20–486). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. Public sessions or site visits will be posted on the Commission’s calendar located at https://www.ferc.gov/newsevents/events along with other related information. Dated: August 4, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–17512 Filed 8–10–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP20–52–001; CP20–52–000] WBI Energy Transmission, Inc.; Notice of Application Take notice that on July 28, 2020, WBI Energy Transmission, Inc. (WBI Energy), 1250 West Century Avenue, Bismarck, North Dakota 58503, filed in the above referenced docket an amendment to its application filed on February 14, 2020, pursuant to section 7(c) of the Natural Gas Act and Part 157 of the Commission’s regulations, to construct, modify and maintain the North Bakken Expansion Project (Project). By this amendment, WBI Energy proposes (i) to reduce the Project’s incremental firm transportation design capacity from PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 48519 350,000 Mcf/d to 250,000 Mcf/d by reducing the number of additional compressor units at its existing Tioga Compressor Station from six units to three units; (ii) to update the Project’s cost, and (iii) to update certain appurtenant Project facilities. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding this application should be directed Lori Myerchin, Director, Regulatory Affairs and Transportation Services, WBI Energy Transmission, Inc., 1250 West Century Avenue, Bismarck, North Dakota 58503, by telephone at (701) 530–1563 or by email at lori.myerchin@ wbienergy.com. Pursuant to section 157.9 of the Commission’s rules (18 CFR 157.9), within 90 days of this Notice, the Commission staff will issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the environmental assessment (EA) for this proposal. The issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and E:\FR\FM\11AUN1.SGM 11AUN1

Agencies

[Federal Register Volume 85, Number 155 (Tuesday, August 11, 2020)]
[Notices]
[Pages 48517-48519]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-17512]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP20-486-000]


Tuscarora Gas Transmission Company; Notice of Intent To Prepare 
An Environmental Assessment for the Proposed Tuscarora Xpress Project 
and Request for Comments on Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Tuscarora Xpress Project 
(Project) involving construction and operation of facilities by 
Tuscarora Gas Transmission Company (Tuscarora) in Washoe County, 
Nevada. The Commission will use this EA in its decision-making process 
to determine whether the project is in the public convenience and 
necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies about issues regarding the project. The National Environmental 
Policy Act (NEPA) requires the Commission to take into account the 
environmental impacts that could result from its action whenever it 
considers the issuance of a Certificate of Public Convenience and 
Necessity. NEPA also requires the Commission to discover concerns the 
public may have about proposals. This process is referred to as 
``scoping.'' The main goal of the scoping process is to focus the 
analysis in the EA on the important environmental issues. By this 
notice, the Commission requests public comments on the scope of issues 
to address in the EA. To ensure that your comments are timely and 
properly recorded, please submit your comments so that the Commission 
receives them in Washington, DC on or before 5:00pm Eastern Time on 
September 3, 2020. Comments may be submitted in written form. Further 
details on how to submit comments are provided in the Public 
Participation section of this notice.
    You can make a difference by submitting your specific comments or 
concerns about the project. Your comments should focus on the potential 
environmental effects, reasonable alternatives, and measures to avoid 
or lessen environmental impacts. Your input will help the Commission 
staff determine what issues they need to evaluate in the EA. Commission 
staff will consider all written comments during the preparation of the 
EA.

[[Page 48518]]

    If you sent comments on this project to the Commission before the 
opening of this docket on June 24, 2020, you will need to file those 
comments in Docket No. CP20-486-000 to ensure they are considered as 
part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this proposed 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. The company 
would seek to negotiate a mutually acceptable easement agreement. You 
are not required to enter into an agreement. However, if the Commission 
approves the project, the Natural Gas Act conveys the right of eminent 
domain to the company. Therefore, if you and the company do not reach 
an easement agreement, the pipeline company could initiate condemnation 
proceedings in court. In such instances, compensation would be 
determined by a judge in accordance with state law.
    Tuscarora provided landowners with a fact sheet prepared by the 
FERC entitled ``An Interstate Natural Gas Facility On My Land? What Do 
I Need To Know?'' This fact sheet addresses a number of typically asked 
questions, including the use of eminent domain and how to participate 
in the Commission's proceedings. This fact sheet along with other 
landowner topics of interest are available for viewing on the FERC 
website (www.ferc.gov) under the Natural Gas Questions or Landowner 
Topics link.

Public Participation

    The Commission offers a free service called eSubscription which 
makes it easy to stay informed of all issuances and submittals 
regarding the dockets/projects to which you subscribe. These instant 
email notifications are the fastest way to receive notification and 
provide a link to the document files which can reduce the amount of 
time you spend researching proceedings. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
    For your convenience, there are three methods you can use to submit 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected]. Please carefully follow these 
instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to FERC Online. Using eComment is an easy method for 
submitting brief, text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to FERC Online. With eFiling, you can provide comments 
in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on ``eRegister.'' You will be asked to select the type of filing you 
are making; a comment on a particular project is considered a ``Comment 
on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the Commission. Be sure to reference the project docket number (CP20-
486-000) on your letter. Submissions sent via the U.S. Postal Service 
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 
20426. Submissions sent via any other carrier must be addressed to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 
12225 Wilkins Avenue, Rockville, Maryland 20852.

Summary of the Proposed Project

    Tuscarora proposes to upgrade and replace an existing reciprocating 
compressor unit (and building) and construct a new skid-mounted 
compressor unit at the same location within the existing Wadsworth 
Compressor Station in Washoe County, Nevada. Additionally, Tuscarora 
would upgrade an existing meter, replace the existing meter bypass line 
with a new meter piping run, and install a second new meter within the 
existing compressor station site. According to Tuscarora, the Tuscarora 
Xpress Project would provide 15,000 dekatherms per day (Dth/d) of 
incremental firm transportation capacity on Tuscarora's interstate 
natural gas pipeline system from its interconnection with Gas 
Transmission Northwest LLC in Malin, Oregon to its Wadsworth Compressor 
Station in northern Nevada to meet the growing market demand for 
natural gas in this area.
    The Tuscarora Xpress Project would consist of the following 
activities:
     Demolition and replacement of one compressor facility and 
foundation;
     upgrade and replacement of a reciprocating compressor unit 
and foundation;
     replacement of metering facilities; and
     installation of station piping.
    The general location of the project facilities is shown in appendix 
1.\1\
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of appendices were sent to all those 
receiving this notice in the mail and are available at www.ferc.gov 
using the link called ``eLibrary'' or from the Commission's Public 
Reference Room, 888 First Street NE, Washington, DC 20426, or call 
(202) 502-8371. For instructions on connecting to eLibrary, refer to 
the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the proposed facilities would disturb approximately 
4.6 acres of land, 4.0 acres of which would be restored to pre-existing 
conditions after construction is complete.

The EA Process

    The EA will discuss impacts that could occur as a result of the 
construction and operation of the proposed project under these general 
headings:
     Geology and soils;
     water resources and wetlands;
     vegetation and wildlife;
     threatened and endangered species;
     cultural resources;
     land use;
     air quality and noise;
     public safety; and
     cumulative impacts
    Commission staff will also evaluate reasonable alternatives to the 
proposed project or portions of the project and make recommendations on 
how to lessen or avoid impacts on the various resource areas.
    The EA will present Commission staffs' independent analysis of the 
issues. The EA will be available in electronic format in the public 
record through eLibrary \2\ and the Commission's natural gas 
environmental documents web page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). If eSubscribed, you 
will receive instant email notification when the EA is issued. The EA 
may be issued for an allotted public comment period. Commission staff 
will consider all comments on the EA before making recommendations to 
the Commission. To ensure Commission staff have the opportunity to 
address your comments, please carefully follow the instructions

[[Page 48519]]

in the Public Participation section, beginning on page 2.
---------------------------------------------------------------------------

    \2\ For instructions on connecting to eLibrary, refer to the 
last page of this notice.
---------------------------------------------------------------------------

    With this notice, the Commission is asking agencies with 
jurisdiction by law and/or special expertise with respect to the 
environmental issues of this project to formally cooperate in the 
preparation of the EA.\3\ Agencies that would like to request 
cooperating agency status should follow the instructions for filing 
comments provided under the Public Participation section of this 
notice.
---------------------------------------------------------------------------

    \3\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultation Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, the Commission is using this notice to initiate 
consultation with the applicable State Historic Preservation Office, 
and to solicit their views and those of other government agencies, 
interested Indian tribes, and the public on the project's potential 
effects on historic properties.\4\ The EA for this project will 
document findings on the impacts on historic properties and summarize 
the status of consultations under section 106.
---------------------------------------------------------------------------

    \4\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project and includes a mailing address with their 
comments. Commission staff will update the environmental mailing list 
as the analysis proceeds to ensure that Commission notices related to 
this environmental review are sent to all individuals, organizations, 
and government entities interested in and/or potentially affected by 
the proposed project.
    If the Commission issues the EA for an allotted public comment 
period, a Notice of Availability of the EA will be sent to the 
environmental mailing list and will provide instructions to access the 
electronic document on the FERC's website (www.ferc.gov). If you need 
to make changes to your name/address, or if you would like to remove 
your name from the mailing list, please return the attached ``Mailing 
List Update Form'' (appendix 2).

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website at www.ferc.gov using the eLibrary link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number 
in the ``Docket Number'' field, excluding the last three digits (i.e., 
CP20-486). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or (866) 208-3676, or for TTY, contact (202) 
502-8659. The eLibrary link also provides access to the texts of all 
formal documents issued by the Commission, such as orders, notices, and 
rulemakings.
    Public sessions or site visits will be posted on the Commission's 
calendar located at https://www.ferc.gov/news-events/events along with 
other related information.

    Dated: August 4, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-17512 Filed 8-10-20; 8:45 am]