Columbia Gulf Transmission, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Mainline 300 Replacement Project, and Request for Comments on Environmental Issues, 47786-47788 [2020-17190]

Download as PDF 47786 Federal Register / Vol. 85, No. 152 / Thursday, August 6, 2020 / Notices The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–17194 Filed 8–5–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP20–490–000] jbell on DSKJLSW7X2PROD with NOTICES Columbia Gulf Transmission, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Mainline 300 Replacement Project, and Request for Comments on Environmental Issues The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment that will discuss the environmental impacts of the Mainline 300 Replacement Project (Project) involving the replacement of segments of an existing natural gas transmission pipeline in Menifee and Montgomery Counties, Kentucky. The Commission will use this EA in its decision-making process to determine whether the Project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies about issues regarding the Project. The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from its action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. NEPA also requires the Commission to discover concerns the public may have VerDate Sep<11>2014 17:13 Aug 05, 2020 Jkt 250001 about proposals. This process is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this notice, the Commission requests public comments on the scope of issues to address in the EA. To ensure that your comments are timely and properly recorded, please submit your comments so that the Commission receives them in Washington, DC on or before 5:00 p.m. Eastern Time on August 31, 2020. Comments may be submitted in written form. Further details on how to submit comments are provided in the Public Participation section of this notice. You can make a difference by submitting your specific comments or concerns about the Project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. Your input will help the Commission staff determine what issues they need to evaluate in the EA. Commission staff will consider all written comments during the preparation of the EA. If you sent comments on this project to the Commission before the opening of this docket on June 30, 2020, you will need to file those comments in Docket No. CP20–490–000 to ensure they are considered as part of this proceeding. This notice is being sent to the Commission’s current environmental mailing list for this project. State and local government representatives should notify their constituents of this proposed project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, a pipeline company representative may contact you about the acquisition of an easement to construct, operate, and maintain the proposed facilities. The company would seek to negotiate a mutually acceptable easement agreement. You are not required to enter into an agreement. However, if the Commission approves the Project, the Natural Gas Act conveys the right of eminent domain to the company. Therefore, if you and the company do not reach an easement agreement, the pipeline company could initiate condemnation proceedings in court. In such instances, compensation would be determined by a judge in accordance with state law. Columbia Gulf Transmission, LLC (Columbia Gulf) provided landowners with a fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ This fact sheet addresses a number of typically asked questions, including the use of eminent domain PO 00000 Frm 00058 Fmt 4703 Sfmt 4703 and how to participate in the Commission’s proceedings. It is also available for viewing on the FERC website (www.ferc.gov) under the natural gas Landowner Topics link. Public Participation The Commission offers a free service called eSubscription which makes it easy to stay informed of all issuances and submittals regarding the dockets/ projects to which you subscribe. These instant email notifications are the fastest way to receive notification and provide a link to the document files which can reduce the amount of time you spend researching proceedings. Go to https:// www.ferc.gov/ferc-online/overview to register for eSubscription. For your convenience, there are three methods you can use to submit your comments to the Commission. The Commission encourages electronic filing of comments and has staff available to assist you at (866) 208–3676 or FercOnlineSupport@ferc.gov. Please carefully follow these instructions so that your comments are properly recorded. (1) You can file your comments electronically using the eComment feature, which is located on the Commission’s website (www.ferc.gov) under the link to FERC Online. Using eComment is an easy method for submitting brief, text-only comments on a project; (2) You can file your comments electronically by using the eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to FERC Online. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; a comment on a particular project is considered a ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments by mailing them to the Commission. Be sure to reference the Project docket number CP20–490–000) on your letter. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. E:\FR\FM\06AUN1.SGM 06AUN1 Federal Register / Vol. 85, No. 152 / Thursday, August 6, 2020 / Notices Summary of the Proposed Project Due to increased population density in the area along certain discrete sections of Mainline 300, Columbia Gulf is required, pursuant to Part 192 of the U.S. Department of Transportation (DOT) regulations to remediate the pipeline and replace certain segments of the pipeline. Columbia Gulf proposes to abandon and replace two segments of pipeline, totaling approximately 0.14 mile of pipeline in Montgomery and Menifee Counties, Kentucky. The new replacement pipeline would retain the maximum allowable operating pressure (MAOP) of 1,050 pounds per square inch gauge. The replacement pipeline segments would be abandoned by removal and the new pipeline would be installed in its place. The Project would involve the construction and operation of the following facilities: • Replacement of approximately 760 feet of existing 36-inch-diameter pipeline, with approximately 760 feet of new, 36-inch-diameter natural gas transmission pipeline from milepost 6.76 to milepost 6.90; and, • Replacement of approximately 15 feet of existing 36-inch-diameter pipeline, with approximately 15 feet of new, 36-inch-diameter natural gas transmission pipeline post 6.91 to milepost 6.91. The general location of the Project facilities is shown in appendix 1.1 Land Requirements for Construction Construction of the proposed facilities would require the use of approximately 9.9 acres of land, of which 3.5 acres would be permanently affected during operation of the Project. The land requirements of the Project include the existing permanent right-of-way, temporary construction right-of-way/ temporary workspace areas, and temporary access roads. Construction of the Project would result in both temporary and permanent land disturbance. Following construction, land affected during construction would be restored to preconstruction contours. jbell on DSKJLSW7X2PROD with NOTICES The EA Process The EA will discuss impacts that could occur as a result of the construction and operation of the proposed Project under these general headings: 1 The appendices referenced in this notice will not appear in the Federal Register. Copies of appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov using the link called ‘‘eLibrary’’ or from the Commission’s Public Reference Room, 888 First Street NE, Washington, DC 20426, or call (202) 502– 8371. For instructions on connecting to eLibrary, refer to the last page of this notice. VerDate Sep<11>2014 17:13 Aug 05, 2020 Jkt 250001 47787 • Geology and soils; • water resources and wetlands; • vegetation and wildlife; • threatened and endangered species; • cultural resources; • land use; • air quality and noise; • public safety; and • cumulative impacts Commission staff will also evaluate reasonable alternatives to the Project or portions of the Project, and make recommendations on how to lessen or avoid impacts on the various resource areas. The EA will present Commission staffs’ independent analysis of the issues. The EA will be available in electronic format in the public record through eLibrary 2 and the Commission’s natural gas environmental documents web page (https://www.ferc.gov/industries-data/ natural-gas/environment/ environmental-documents). If eSubscribed, you will receive instant email notification when the EA is issued. The EA may be issued for an allotted public comment period. Commission staff will consider all comments on the EA before making recommendations to the Commission. To ensure Commission staff have the opportunity to address your comments, please carefully follow the instructions in the Public Participation section, beginning on page 2. With this notice, the Commission is asking agencies with jurisdiction by law and/or special expertise with respect to the environmental issues of this project to formally cooperate in the preparation of the EA.3 Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. for this project will document findings on the impacts on historic properties and summarize the status of consultations under section 106. Consultation Under Section 106 of the National Historic Preservation Act In accordance with the Advisory Council on Historic Preservation’s implementing regulations for section 106 of the National Historic Preservation Act, the Commission is using this notice to initiate consultation with the applicable State Historic Preservation Office, and to solicit their views and those of other government agencies, interested Indian tribes, and the public on the project’s potential effects on historic properties.4 The EA Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website at www.ferc.gov using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number in the ‘‘Docket Number’’ field, excluding the last three digits (i.e., CP20–490). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, 2 For instructions on connecting to eLibrary, refer to the last page of this notice. 3 The Council on Environmental Quality regulations addressing cooperating agency responsibilities are at Title 40, Code of Federal Regulations, Part 1501.6. 4 The Advisory Council on Historic Preservation’s regulations are at Title 36, Code of Federal PO 00000 Frm 00059 Fmt 4703 Sfmt 4703 Environmental Mailing List The environmental mailing list includes federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for Project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project and includes a mailing address with their comments. Commission staff will update the environmental mailing list as the analysis proceeds to ensure that Commission notices related to this environmental review are sent to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed project. If the Commission issues the EA for an allotted public comment period, a Notice of Availability of the EA will be sent to the environmental mailing list and will provide instructions to access the electronic document on the FERC’s website (www.ferc.gov). If you need to make changes to your name/address, or if you would like to remove your name from the mailing list, please return the attached ‘‘Mailing List Update Form’’ appendix 2. Additional Information Regulations, Part 800. Those regulations define historic properties as any prehistoric or historic district, site, building, structure, or object included in or eligible for inclusion in the National Register of Historic Places. E:\FR\FM\06AUN1.SGM 06AUN1 47788 Federal Register / Vol. 85, No. 152 / Thursday, August 6, 2020 / Notices such as orders, notices, and rulemakings. Public sessions or site visits will be posted on the Commission’s calendar located at https://www.ferc.gov/newsevents/events along with other related information. Dated: July 31, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–17190 Filed 8–5–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP20–496–000] jbell on DSKJLSW7X2PROD with NOTICES Andalusian Energy, LLC; Notice of Petition for Declaratory Order Take notice that on July 20, 2020, pursuant to Rule 207(a)(2) of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, Andalusian Energy, LLC (Andalusian) filed a petition for declaratory order requesting the Commission issue an order stating that Andalusian’s: (1) Proposed compressed natural gas (CNG) production facility; (2) the docks from which Andalusian will export the CNG; and (3) Andalusian’s proposal to construct an on-site truck fueling station, a bunkering pipeline to transport end-use fuel to vessels, and provide an industrial fueling service to industrial customers in Texas are not subject to the Commission’s jurisdiction under section 3 or section 7 of the Natural Gas Act, 15 U.S.C. 717b and 717f (2018). Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 VerDate Sep<11>2014 17:13 Aug 05, 2020 Jkt 250001 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Comment Date: 5:00 p.m. Eastern time on August 20, 2020. Dated: July 31, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–17188 Filed 8–5–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Dated: July 31, 2020. Kimberly D. Bose, Secretary. [Docket No. EL18–6–004] FirstEnergy Service Company; Notice of Filing Take notice that on July 30, 2020, FirstEnergy Service Company submitted a Notice of Change in Circumstances in compliance with the Federal Energy Regulatory Commission (Commission), in the above captioned proceeding, on February 2, 2018.1 Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as 1 FirstEnergy Corp., 162 FERC ¶ 61,087 (2018) (2018 Waiver Order). PO 00000 Frm 00060 Fmt 4703 Sfmt 4703 appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. In addition to publishing the full text of this document in the Federal Register, The Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on August 20, 2020. [FR Doc. 2020–17183 Filed 8–5–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP20–471–000] Texas Eastern Transmission LP; Notice of Schedule for Environmental Review of the Bailey East Mine Panel 12j Project On June 1, 2020, Texas Eastern Transmission LP (Texas Eastern) filed an application in Docket No. CP20–471– 000 requesting a Certificate of Public Convenience and Necessity pursuant to Section 7(c) of the Natural Gas Act to construct and operate certain natural gas pipeline facilities. The proposed project, known as the Bailey East Mine Panel 12J Project (Project), would ensure safe and E:\FR\FM\06AUN1.SGM 06AUN1

Agencies

[Federal Register Volume 85, Number 152 (Thursday, August 6, 2020)]
[Notices]
[Pages 47786-47788]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-17190]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP20-490-000]


Columbia Gulf Transmission, LLC; Notice of Intent To Prepare an 
Environmental Assessment for the Proposed Mainline 300 Replacement 
Project, and Request for Comments on Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment that will discuss 
the environmental impacts of the Mainline 300 Replacement Project 
(Project) involving the replacement of segments of an existing natural 
gas transmission pipeline in Menifee and Montgomery Counties, Kentucky. 
The Commission will use this EA in its decision-making process to 
determine whether the Project is in the public convenience and 
necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies about issues regarding the Project. The National Environmental 
Policy Act (NEPA) requires the Commission to take into account the 
environmental impacts that could result from its action whenever it 
considers the issuance of a Certificate of Public Convenience and 
Necessity. NEPA also requires the Commission to discover concerns the 
public may have about proposals. This process is referred to as 
``scoping.'' The main goal of the scoping process is to focus the 
analysis in the EA on the important environmental issues. By this 
notice, the Commission requests public comments on the scope of issues 
to address in the EA. To ensure that your comments are timely and 
properly recorded, please submit your comments so that the Commission 
receives them in Washington, DC on or before 5:00 p.m. Eastern Time on 
August 31, 2020. Comments may be submitted in written form. Further 
details on how to submit comments are provided in the Public 
Participation section of this notice.
    You can make a difference by submitting your specific comments or 
concerns about the Project. Your comments should focus on the potential 
environmental effects, reasonable alternatives, and measures to avoid 
or lessen environmental impacts. Your input will help the Commission 
staff determine what issues they need to evaluate in the EA. Commission 
staff will consider all written comments during the preparation of the 
EA.
    If you sent comments on this project to the Commission before the 
opening of this docket on June 30, 2020, you will need to file those 
comments in Docket No. CP20-490-000 to ensure they are considered as 
part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this proposed 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. The company 
would seek to negotiate a mutually acceptable easement agreement. You 
are not required to enter into an agreement. However, if the Commission 
approves the Project, the Natural Gas Act conveys the right of eminent 
domain to the company. Therefore, if you and the company do not reach 
an easement agreement, the pipeline company could initiate condemnation 
proceedings in court. In such instances, compensation would be 
determined by a judge in accordance with state law.
    Columbia Gulf Transmission, LLC (Columbia Gulf) provided landowners 
with a fact sheet prepared by the FERC entitled ``An Interstate Natural 
Gas Facility On My Land? What Do I Need To Know?'' This fact sheet 
addresses a number of typically asked questions, including the use of 
eminent domain and how to participate in the Commission's proceedings. 
It is also available for viewing on the FERC website (www.ferc.gov) 
under the natural gas Landowner Topics link.

Public Participation

    The Commission offers a free service called eSubscription which 
makes it easy to stay informed of all issuances and submittals 
regarding the dockets/projects to which you subscribe. These instant 
email notifications are the fastest way to receive notification and 
provide a link to the document files which can reduce the amount of 
time you spend researching proceedings. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
    For your convenience, there are three methods you can use to submit 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected]. Please carefully follow these 
instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to FERC Online. Using eComment is an easy method for 
submitting brief, text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to FERC Online. With eFiling, you can provide comments 
in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on ``eRegister.'' You will be asked to select the type of filing you 
are making; a comment on a particular project is considered a ``Comment 
on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the Commission. Be sure to reference the Project docket number CP20-
490-000) on your letter. Submissions sent via the U.S. Postal Service 
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 
20426. Submissions sent via any other carrier must be addressed to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 
12225 Wilkins Avenue, Rockville, Maryland 20852.

[[Page 47787]]

Summary of the Proposed Project

    Due to increased population density in the area along certain 
discrete sections of Mainline 300, Columbia Gulf is required, pursuant 
to Part 192 of the U.S. Department of Transportation (DOT) regulations 
to remediate the pipeline and replace certain segments of the pipeline. 
Columbia Gulf proposes to abandon and replace two segments of pipeline, 
totaling approximately 0.14 mile of pipeline in Montgomery and Menifee 
Counties, Kentucky. The new replacement pipeline would retain the 
maximum allowable operating pressure (MAOP) of 1,050 pounds per square 
inch gauge. The replacement pipeline segments would be abandoned by 
removal and the new pipeline would be installed in its place.
    The Project would involve the construction and operation of the 
following facilities:
     Replacement of approximately 760 feet of existing 36-inch-
diameter pipeline, with approximately 760 feet of new, 36-inch-diameter 
natural gas transmission pipeline from milepost 6.76 to milepost 6.90; 
and,
     Replacement of approximately 15 feet of existing 36-inch-
diameter pipeline, with approximately 15 feet of new, 36-inch-diameter 
natural gas transmission pipeline post 6.91 to milepost 6.91.
    The general location of the Project facilities is shown in appendix 
1.\1\
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of appendices were sent to all those 
receiving this notice in the mail and are available at www.ferc.gov 
using the link called ``eLibrary'' or from the Commission's Public 
Reference Room, 888 First Street NE, Washington, DC 20426, or call 
(202) 502-8371. For instructions on connecting to eLibrary, refer to 
the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the proposed facilities would require the use of 
approximately 9.9 acres of land, of which 3.5 acres would be 
permanently affected during operation of the Project. The land 
requirements of the Project include the existing permanent right-of-
way, temporary construction right-of-way/temporary workspace areas, and 
temporary access roads. Construction of the Project would result in 
both temporary and permanent land disturbance. Following construction, 
land affected during construction would be restored to preconstruction 
contours.

The EA Process

    The EA will discuss impacts that could occur as a result of the 
construction and operation of the proposed Project under these general 
headings:
     Geology and soils;
     water resources and wetlands;
     vegetation and wildlife;
     threatened and endangered species;
     cultural resources;
     land use;
     air quality and noise;
     public safety; and
     cumulative impacts
    Commission staff will also evaluate reasonable alternatives to the 
Project or portions of the Project, and make recommendations on how to 
lessen or avoid impacts on the various resource areas.
    The EA will present Commission staffs' independent analysis of the 
issues. The EA will be available in electronic format in the public 
record through eLibrary \2\ and the Commission's natural gas 
environmental documents web page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). If eSubscribed, you 
will receive instant email notification when the EA is issued. The EA 
may be issued for an allotted public comment period. Commission staff 
will consider all comments on the EA before making recommendations to 
the Commission. To ensure Commission staff have the opportunity to 
address your comments, please carefully follow the instructions in the 
Public Participation section, beginning on page 2.
---------------------------------------------------------------------------

    \2\ For instructions on connecting to eLibrary, refer to the 
last page of this notice.
---------------------------------------------------------------------------

    With this notice, the Commission is asking agencies with 
jurisdiction by law and/or special expertise with respect to the 
environmental issues of this project to formally cooperate in the 
preparation of the EA.\3\ Agencies that would like to request 
cooperating agency status should follow the instructions for filing 
comments provided under the Public Participation section of this 
notice.
---------------------------------------------------------------------------

    \3\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultation Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, the Commission is using this notice to initiate 
consultation with the applicable State Historic Preservation Office, 
and to solicit their views and those of other government agencies, 
interested Indian tribes, and the public on the project's potential 
effects on historic properties.\4\ The EA for this project will 
document findings on the impacts on historic properties and summarize 
the status of consultations under section 106.
---------------------------------------------------------------------------

    \4\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for Project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project and includes a mailing address with their 
comments. Commission staff will update the environmental mailing list 
as the analysis proceeds to ensure that Commission notices related to 
this environmental review are sent to all individuals, organizations, 
and government entities interested in and/or potentially affected by 
the proposed project.
    If the Commission issues the EA for an allotted public comment 
period, a Notice of Availability of the EA will be sent to the 
environmental mailing list and will provide instructions to access the 
electronic document on the FERC's website (www.ferc.gov). If you need 
to make changes to your name/address, or if you would like to remove 
your name from the mailing list, please return the attached ``Mailing 
List Update Form'' appendix 2.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website at www.ferc.gov using the eLibrary link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number 
in the ``Docket Number'' field, excluding the last three digits (i.e., 
CP20-490). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or (866) 208-3676, or for TTY, contact (202) 
502-8659. The eLibrary link also provides access to the texts of all 
formal documents issued by the Commission,

[[Page 47788]]

such as orders, notices, and rulemakings.
    Public sessions or site visits will be posted on the Commission's 
calendar located at https://www.ferc.gov/news-events/events along with 
other related information.

    Dated: July 31, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-17190 Filed 8-5-20; 8:45 am]
BILLING CODE 6717-01-P