Black Marlin Pipeline LLC; Notice of Request Under Blanket Authorization, 47781-47782 [2020-17189]
Download as PDF
Federal Register / Vol. 85, No. 152 / Thursday, August 6, 2020 / Notices
DEPARTMENT OF ENERGY
Environmental Management SiteSpecific Advisory Board, Idaho
Cleanup Project
Office of Environmental
Management, Department of Energy.
ACTION: Notice of open virtual meeting.
AGENCY:
This notice announces an
online virtual meeting of the
Environmental Management SiteSpecific Advisory Board (EM SSAB),
Idaho Cleanup Project (ICP). The
Federal Advisory Committee Act
requires that public notice of this online
virtual meeting be announced in the
Federal Register.
DATES: Thursday, August 27, 2020; 8:00
a.m.—12:30 p.m.
The opportunities for public comment
is at 11:00 a.m. MT.
This time is subject to change; please
contact the Federal Coordinator (below)
for confirmation of times prior to the
meeting.
SUMMARY:
This meeting will be held
virtually via Zoom. To attend, please
contact Jordan Davies, ICP Citizens
Advisory Board (CAB) support staff, by
email jdavies@northwindgrp.com or
phone (720) 452–7379, no later than
5:00 p.m. MT on Wednesday, August
26, 2020.
To Sign Up for Public Comment:
Please contact Jordan Davies by email,
jdavies@northwindgrp.com, no later
than 5:00 p.m. MT on Wednesday,
August 26, 2020.
FOR FURTHER INFORMATION CONTACT:
Danielle Miller, Federal Coordinator,
U.S. Department of Energy, Idaho
Operations Office, 1955 Fremont
Avenue, MS–1203, Idaho Falls, Idaho
83415. Phone (208) 526–5709; or email:
millerdc@id.doe.gov or visit the Board’s
internet home page at: https://
www.energy.gov/em/icpcab/.
SUPPLEMENTARY INFORMATION:
Purpose of the Board: The purpose of
the Board is to make recommendations
to DOE–EM and site management in the
areas of environmental restoration,
waste management, and related
activities.
Tentative Topics (agenda topics may
change up to the day of the meeting;
please contact Danielle Miller for the
most current agenda):
• Recent Public Outreach
• ICP Reconstitution Plan and
Employee Safety
• ICP Overview
• Update on Integrated Waste
Treatment Unit (IWTU)
Public Participation: The online
virtual meeting is open to the public.
jbell on DSKJLSW7X2PROD with NOTICES
ADDRESSES:
VerDate Sep<11>2014
17:13 Aug 05, 2020
Jkt 250001
Written statements may be filed with
the Board either before or after the
meeting by sending them to Jordan
Davies at the aforementioned email
address. The Deputy Designated Federal
Officer is empowered to conduct the
meeting in a fashion that will facilitate
the orderly conduct of business.
Individuals wishing to make public
comments will be provided a maximum
of five minutes to present their
comments.
Minutes: Minutes will be available by
writing or calling Danielle Miller,
Federal Coordinator, at the address and
telephone number listed above. Minutes
will also be available at the following
website: https://www.energy.gov/em/
icpcab/listings/cab-meetings.
Signed in Washington, DC on July 31,
2020.
LaTanya Butler,
Deputy Committee Management Officer.
[FR Doc. 2020–17148 Filed 8–5–20; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–500–000]
Black Marlin Pipeline LLC; Notice of
Request Under Blanket Authorization
Take notice that on July 24, 2020,
Black Marlin Pipeline LLC (Black
Marlin), 2800 Post Oak Boulevard,
Houston, Texas 77056, filed in the
above referenced docket, a prior notice
request pursuant to sections 157.205
and 157.216 of the Commission’s
regulations under the Natural Gas Act
(NGA) and Columbia’s blanket
certificate issued in Docket No. CP89–
2115–000, for authorization to abandon
in place approximately 23.86 miles of
16-inch-diameter pipeline located in the
federal waters of the Gulf of Mexico,
Offshore Texas. Black Marlin states that
the facilities proposed for abandonment
have not provided service to any
customers since November 2016 and are
not covered under any firm or
interruptible transportation contracts.
Thus, they state that the proposed
abandonment will have no impact on
the daily design capacity of, or the
operating conditions of, Black Marlin’s
pipeline system, all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
47781
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this prior
notice request should be directed to
Sheryl Johnson-Schumack, Regulatory
Analyst Lead, Black Marlin Pipeline
LLC, 2800 Post Oak Boulevard,
Houston, Texas 77056, or call (713)
215–3449.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene, or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
E:\FR\FM\06AUN1.SGM
06AUN1
47782
Federal Register / Vol. 85, No. 152 / Thursday, August 6, 2020 / Notices
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions using the ‘‘eFiling’’
link at https://www.ferc.gov. In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852.
Dated: July 31, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–17189 Filed 8–5–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD20–25–000]
jbell on DSKJLSW7X2PROD with NOTICES
Electronic Document Management
System (eLibrary) Enhancements;
Notice Announcing Release of
Modernized eLIBRARY System
The Federal Energy Regulatory
Commission (Commission), hereby gives
notice announcing upcoming
enhancements to its Electronic
Document Management System
(eLibrary), that will be available the
week of August 3. The Commission
plans to upgrade its existing system
with newer, more robust and userfriendly technology. Ultimately, the new
system will provide users with an
improved user interface, more reliable
search capabilities and greater system
stability.
This version includes, but is not
limited to the following enhancements:
• A modern look and feel to the
eLibrary site
• Improved navigation and
consolidated search screens
• Removal of redundant features
• Improved search accuracy and
relevance
• On-Demand PDF generation for files
in an accession
• Multiple file zip and download
from the search results
• Improved reliability
Please see https://www.ferc.gov/ for
additional details on FERC’s
modernized eLibrary system, including
additional information on file formats,
VerDate Sep<11>2014
17:13 Aug 05, 2020
Jkt 250001
text searchable versus image formats,
file names, security, et al.
LLC, Osborn Wind Energy, LLC, Palo
Duro Wind Energy, LLC, Palo Duro
Wind Interconnection Services, LLC,
Dated: July 31, 2020.
Pratt Wind, LLC, Roswell Solar, LLC,
Nathaniel J. Davis, Sr.,
Rush Springs Energy Storage, LLC, Rush
Deputy Secretary.
Springs Wind Energy, LLC, Seiling
[FR Doc. 2020–17193 Filed 8–5–20; 8:45 am]
Wind, LLC, Seiling Wind II, LLC,
BILLING CODE 6717–01–P
Seiling Wind Interconnection Services,
LLC, Sholes Wind Energy, LLC, Steele
Flats Wind Project, LLC, Wessington
DEPARTMENT OF ENERGY
Springs Wind, LLC, Wildcat Ranch
Wind Project, LLC, Wilton Wind Energy
Federal Energy Regulatory
II, LLC.
Commission
Description: Notification of Change in
Status of NextEra Resources Entities.
Combined Notice of Filings #1
Filed Date: 7/30/20.
Take notice that the Commission
Accession Number: 20200730–5260.
received the following electric rate
Comments Due: 5 p.m. ET 8/20/20.
filings:
Docket Numbers: ER19–1935–003.
Docket Numbers: ER18–2118–007;
Applicants: UNS Electric, Inc.
ER10–1846–015; ER10–1849–021;
Description: Compliance filing: Errata
ER10–1852–042; ER10–1887–021;
to Order No. 845 Compliance Filing to
ER10–1951–024; ER10–1952–020;
be effective 5/22/2019.
ER10–1961–020; ER10–2551–016;
Filed Date: 7/31/20.
ER10–2720–022; ER11–2642–016;
Accession Number: 20200731–5150.
ER11–4428–022; ER11–4462–045;
Comments Due: 5 p.m. ET 8/21/20.
ER12–1228–022; ER12–1880–021;
Docket Numbers: ER20–1703–000.
ER12–2227–021; ER12–569–022; ER12–
Applicants: Capital Energy PA LLC.
895–020; ER13–2474–016; ER13–712–
Description: Second Supplement
023; ER14–2707–017; ER14–2708–018;
(Ownership Details) to April 30, 2020
ER14–2709–017; ER14–2710–017;
Capital Energy PA LLC tariff filing. Also
ER15–1925–015; ER15–2676–014;
submitted Third Supplement (Asset
ER15–30–015; ER15–58–015; ER16–
Appendix).
1440–011; ER16–1672–012; ER16–2190–
Filed Date: 7/22/20; 7/31/20.
011; ER16–2191–011; ER16–2240–011;
Accession Number: 20200722–5176,
ER16–2241–010; ER16–2275–010;
20200731–5132.
Comments Due: 5 p.m. ET 8/10/20.
ER16–2276–010; ER16–2297–010;
ER16–2453–012; ER17–2152–008;
Docket Numbers: ER20–2559–000.
ER17–838–020; ER18–1981–006; ER18–
Applicants: Ameren Illinois
2003–006; ER18–2032–006; ER18–2066– Company, Midcontinent Independent
003; ER18–2067–004; ER18–2182–006;
System Operator, Inc.
ER18–2314–003; ER18–882–007;ER19–
Description: § 205(d) Rate Filing:
1128–001; ER19–2495–002; ER19–2513– 2020–07–30_SA 2880 Att A-Proj Spec
002.
No. 5 WVPA–CBEC-Kewanee Burne to
Applicants: Armadillo Flats Wind
be effective 9/29/2020.
Project, LLC, Blackwell Wind, LLC,
Filed Date: 7/30/20.
Brady Interconnection, LLC, Brady
Accession Number: 20200730–5161.
Wind, LLC, Breckinridge Wind Project,
Comments Due: 5 p.m. ET 8/20/20.
LLC, Cedar Bluff Wind, LLC, Chaves
Docket Numbers: ER20–2560–000.
County Solar, LLC, Cimarron Wind
Applicants: Sabine Cogen, LP.
Energy, LLC, Cottonwood Wind Project,
Description: Tariff Cancellation:
LLC, Day County Wind, LLC, Elk City
Cancellation Filing to be effective 7/31/
Wind, LLC, Elk City Renewables II, LLC, 2020.
Ensign Wind, LLC, Florida Power &
Filed Date: 7/30/20.
Light Company, FPL Energy Cowboy
Accession Number: 20200730–5165.
Wind, LLC, FPL Energy South Dakota
Comments Due: 5 p.m. ET 8/20/20.
Wind, LLC, Gray County Wind Energy,
Docket Numbers: ER20–2561–000.
LLC, High Majestic Wind Energy Center,
Applicants: PJM Interconnection,
LLC, High Majestic Wind II, LLC,
L.L.C.
Kingman Wind Energy I, LLC, Kingman
Description: § 205(d) Rate Filing: First
Wind Energy II, LLC, Lorenzo Wind,
Revised ISA, Service Agreement No.
LLC, Mammoth Plains Wind Project,
2637; Queue No. AF1–177 to be
LLC, Minco Wind, LLC, Minco Wind II, effective 6/30/2020.
LLC, Minco Wind III, LLC, Minco Wind
Filed Date: 7/30/20.
Accession Number: 20200730–5168.
IV, LLC, Minco IV & V Interconnection,
Comments Due: 5 p.m. ET 8/20/20.
LLC, Minco Wind V, LLC, Ninnescah
Wind Energy, LLC, NEPM II, LLC,
Docket Numbers: ER20–2562–000.
NextEra Energy Marketing, LLC,
Applicants: Entergy Arkansas, LLC,
NextEra Energy Services Massachusetts, Entergy Mississippi, LLC, Entergy New
PO 00000
Frm 00054
Fmt 4703
Sfmt 4703
E:\FR\FM\06AUN1.SGM
06AUN1
Agencies
[Federal Register Volume 85, Number 152 (Thursday, August 6, 2020)]
[Notices]
[Pages 47781-47782]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-17189]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP20-500-000]
Black Marlin Pipeline LLC; Notice of Request Under Blanket
Authorization
Take notice that on July 24, 2020, Black Marlin Pipeline LLC (Black
Marlin), 2800 Post Oak Boulevard, Houston, Texas 77056, filed in the
above referenced docket, a prior notice request pursuant to sections
157.205 and 157.216 of the Commission's regulations under the Natural
Gas Act (NGA) and Columbia's blanket certificate issued in Docket No.
CP89-2115-000, for authorization to abandon in place approximately
23.86 miles of 16-inch-diameter pipeline located in the federal waters
of the Gulf of Mexico, Offshore Texas. Black Marlin states that the
facilities proposed for abandonment have not provided service to any
customers since November 2016 and are not covered under any firm or
interruptible transportation contracts. Thus, they state that the
proposed abandonment will have no impact on the daily design capacity
of, or the operating conditions of, Black Marlin's pipeline system, all
as more fully set forth in the application which is on file with the
Commission and open to public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
Any questions regarding this prior notice request should be
directed to Sheryl Johnson-Schumack, Regulatory Analyst Lead, Black
Marlin Pipeline LLC, 2800 Post Oak Boulevard, Houston, Texas 77056, or
call (713) 215-3449.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the EA for this proposal. The filing of the EA in the Commission's
public record for this proceeding or the issuance of a Notice of
Schedule for Environmental Review will serve to notify federal and
state agencies of the timing for the completion of all necessary
reviews, and the subsequent need to complete all federal authorizations
within 90 days of the date of issuance of the Commission staff's EA.
Any person may, within 60 days after the issuance of the instant
notice by the Commission, file pursuant to Rule 214 of the Commission's
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of
intervention. Any person filing to intervene, or the Commission's staff
may, pursuant to section 157.205 of the Commission's Regulations under
the NGA (18 CFR 157.205) file a protest to the request. If no protest
is filed within the time allowed therefore, the proposed activity shall
be deemed to be authorized effective the day after the time allowed for
protest. If a protest is filed and not withdrawn within 30 days after
the time allowed for filing a protest, the instant request shall be
treated as an application for
[[Page 47782]]
authorization pursuant to section 7 of the NGA.
The Commission strongly encourages electronic filings of comments,
protests, and interventions using the ``eFiling'' link at https://www.ferc.gov. In lieu of electronic filing, you may submit a paper
copy. Submissions sent via the U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent
via any other carrier must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Dated: July 31, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-17189 Filed 8-5-20; 8:45 am]
BILLING CODE 6717-01-P