Black Marlin Pipeline LLC; Notice of Request Under Blanket Authorization, 47781-47782 [2020-17189]

Download as PDF Federal Register / Vol. 85, No. 152 / Thursday, August 6, 2020 / Notices DEPARTMENT OF ENERGY Environmental Management SiteSpecific Advisory Board, Idaho Cleanup Project Office of Environmental Management, Department of Energy. ACTION: Notice of open virtual meeting. AGENCY: This notice announces an online virtual meeting of the Environmental Management SiteSpecific Advisory Board (EM SSAB), Idaho Cleanup Project (ICP). The Federal Advisory Committee Act requires that public notice of this online virtual meeting be announced in the Federal Register. DATES: Thursday, August 27, 2020; 8:00 a.m.—12:30 p.m. The opportunities for public comment is at 11:00 a.m. MT. This time is subject to change; please contact the Federal Coordinator (below) for confirmation of times prior to the meeting. SUMMARY: This meeting will be held virtually via Zoom. To attend, please contact Jordan Davies, ICP Citizens Advisory Board (CAB) support staff, by email jdavies@northwindgrp.com or phone (720) 452–7379, no later than 5:00 p.m. MT on Wednesday, August 26, 2020. To Sign Up for Public Comment: Please contact Jordan Davies by email, jdavies@northwindgrp.com, no later than 5:00 p.m. MT on Wednesday, August 26, 2020. FOR FURTHER INFORMATION CONTACT: Danielle Miller, Federal Coordinator, U.S. Department of Energy, Idaho Operations Office, 1955 Fremont Avenue, MS–1203, Idaho Falls, Idaho 83415. Phone (208) 526–5709; or email: millerdc@id.doe.gov or visit the Board’s internet home page at: https:// www.energy.gov/em/icpcab/. SUPPLEMENTARY INFORMATION: Purpose of the Board: The purpose of the Board is to make recommendations to DOE–EM and site management in the areas of environmental restoration, waste management, and related activities. Tentative Topics (agenda topics may change up to the day of the meeting; please contact Danielle Miller for the most current agenda): • Recent Public Outreach • ICP Reconstitution Plan and Employee Safety • ICP Overview • Update on Integrated Waste Treatment Unit (IWTU) Public Participation: The online virtual meeting is open to the public. jbell on DSKJLSW7X2PROD with NOTICES ADDRESSES: VerDate Sep<11>2014 17:13 Aug 05, 2020 Jkt 250001 Written statements may be filed with the Board either before or after the meeting by sending them to Jordan Davies at the aforementioned email address. The Deputy Designated Federal Officer is empowered to conduct the meeting in a fashion that will facilitate the orderly conduct of business. Individuals wishing to make public comments will be provided a maximum of five minutes to present their comments. Minutes: Minutes will be available by writing or calling Danielle Miller, Federal Coordinator, at the address and telephone number listed above. Minutes will also be available at the following website: https://www.energy.gov/em/ icpcab/listings/cab-meetings. Signed in Washington, DC on July 31, 2020. LaTanya Butler, Deputy Committee Management Officer. [FR Doc. 2020–17148 Filed 8–5–20; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP20–500–000] Black Marlin Pipeline LLC; Notice of Request Under Blanket Authorization Take notice that on July 24, 2020, Black Marlin Pipeline LLC (Black Marlin), 2800 Post Oak Boulevard, Houston, Texas 77056, filed in the above referenced docket, a prior notice request pursuant to sections 157.205 and 157.216 of the Commission’s regulations under the Natural Gas Act (NGA) and Columbia’s blanket certificate issued in Docket No. CP89– 2115–000, for authorization to abandon in place approximately 23.86 miles of 16-inch-diameter pipeline located in the federal waters of the Gulf of Mexico, Offshore Texas. Black Marlin states that the facilities proposed for abandonment have not provided service to any customers since November 2016 and are not covered under any firm or interruptible transportation contracts. Thus, they state that the proposed abandonment will have no impact on the daily design capacity of, or the operating conditions of, Black Marlin’s pipeline system, all as more fully set forth in the application which is on file with the Commission and open to public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to PO 00000 Frm 00053 Fmt 4703 Sfmt 4703 47781 view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding this prior notice request should be directed to Sheryl Johnson-Schumack, Regulatory Analyst Lead, Black Marlin Pipeline LLC, 2800 Post Oak Boulevard, Houston, Texas 77056, or call (713) 215–3449. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s EA. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene, or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the NGA (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for E:\FR\FM\06AUN1.SGM 06AUN1 47782 Federal Register / Vol. 85, No. 152 / Thursday, August 6, 2020 / Notices authorization pursuant to section 7 of the NGA. The Commission strongly encourages electronic filings of comments, protests, and interventions using the ‘‘eFiling’’ link at https://www.ferc.gov. In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Dated: July 31, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–17189 Filed 8–5–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD20–25–000] jbell on DSKJLSW7X2PROD with NOTICES Electronic Document Management System (eLibrary) Enhancements; Notice Announcing Release of Modernized eLIBRARY System The Federal Energy Regulatory Commission (Commission), hereby gives notice announcing upcoming enhancements to its Electronic Document Management System (eLibrary), that will be available the week of August 3. The Commission plans to upgrade its existing system with newer, more robust and userfriendly technology. Ultimately, the new system will provide users with an improved user interface, more reliable search capabilities and greater system stability. This version includes, but is not limited to the following enhancements: • A modern look and feel to the eLibrary site • Improved navigation and consolidated search screens • Removal of redundant features • Improved search accuracy and relevance • On-Demand PDF generation for files in an accession • Multiple file zip and download from the search results • Improved reliability Please see https://www.ferc.gov/ for additional details on FERC’s modernized eLibrary system, including additional information on file formats, VerDate Sep<11>2014 17:13 Aug 05, 2020 Jkt 250001 text searchable versus image formats, file names, security, et al. LLC, Osborn Wind Energy, LLC, Palo Duro Wind Energy, LLC, Palo Duro Wind Interconnection Services, LLC, Dated: July 31, 2020. Pratt Wind, LLC, Roswell Solar, LLC, Nathaniel J. Davis, Sr., Rush Springs Energy Storage, LLC, Rush Deputy Secretary. Springs Wind Energy, LLC, Seiling [FR Doc. 2020–17193 Filed 8–5–20; 8:45 am] Wind, LLC, Seiling Wind II, LLC, BILLING CODE 6717–01–P Seiling Wind Interconnection Services, LLC, Sholes Wind Energy, LLC, Steele Flats Wind Project, LLC, Wessington DEPARTMENT OF ENERGY Springs Wind, LLC, Wildcat Ranch Wind Project, LLC, Wilton Wind Energy Federal Energy Regulatory II, LLC. Commission Description: Notification of Change in Status of NextEra Resources Entities. Combined Notice of Filings #1 Filed Date: 7/30/20. Take notice that the Commission Accession Number: 20200730–5260. received the following electric rate Comments Due: 5 p.m. ET 8/20/20. filings: Docket Numbers: ER19–1935–003. Docket Numbers: ER18–2118–007; Applicants: UNS Electric, Inc. ER10–1846–015; ER10–1849–021; Description: Compliance filing: Errata ER10–1852–042; ER10–1887–021; to Order No. 845 Compliance Filing to ER10–1951–024; ER10–1952–020; be effective 5/22/2019. ER10–1961–020; ER10–2551–016; Filed Date: 7/31/20. ER10–2720–022; ER11–2642–016; Accession Number: 20200731–5150. ER11–4428–022; ER11–4462–045; Comments Due: 5 p.m. ET 8/21/20. ER12–1228–022; ER12–1880–021; Docket Numbers: ER20–1703–000. ER12–2227–021; ER12–569–022; ER12– Applicants: Capital Energy PA LLC. 895–020; ER13–2474–016; ER13–712– Description: Second Supplement 023; ER14–2707–017; ER14–2708–018; (Ownership Details) to April 30, 2020 ER14–2709–017; ER14–2710–017; Capital Energy PA LLC tariff filing. Also ER15–1925–015; ER15–2676–014; submitted Third Supplement (Asset ER15–30–015; ER15–58–015; ER16– Appendix). 1440–011; ER16–1672–012; ER16–2190– Filed Date: 7/22/20; 7/31/20. 011; ER16–2191–011; ER16–2240–011; Accession Number: 20200722–5176, ER16–2241–010; ER16–2275–010; 20200731–5132. Comments Due: 5 p.m. ET 8/10/20. ER16–2276–010; ER16–2297–010; ER16–2453–012; ER17–2152–008; Docket Numbers: ER20–2559–000. ER17–838–020; ER18–1981–006; ER18– Applicants: Ameren Illinois 2003–006; ER18–2032–006; ER18–2066– Company, Midcontinent Independent 003; ER18–2067–004; ER18–2182–006; System Operator, Inc. ER18–2314–003; ER18–882–007;ER19– Description: § 205(d) Rate Filing: 1128–001; ER19–2495–002; ER19–2513– 2020–07–30_SA 2880 Att A-Proj Spec 002. No. 5 WVPA–CBEC-Kewanee Burne to Applicants: Armadillo Flats Wind be effective 9/29/2020. Project, LLC, Blackwell Wind, LLC, Filed Date: 7/30/20. Brady Interconnection, LLC, Brady Accession Number: 20200730–5161. Wind, LLC, Breckinridge Wind Project, Comments Due: 5 p.m. ET 8/20/20. LLC, Cedar Bluff Wind, LLC, Chaves Docket Numbers: ER20–2560–000. County Solar, LLC, Cimarron Wind Applicants: Sabine Cogen, LP. Energy, LLC, Cottonwood Wind Project, Description: Tariff Cancellation: LLC, Day County Wind, LLC, Elk City Cancellation Filing to be effective 7/31/ Wind, LLC, Elk City Renewables II, LLC, 2020. Ensign Wind, LLC, Florida Power & Filed Date: 7/30/20. Light Company, FPL Energy Cowboy Accession Number: 20200730–5165. Wind, LLC, FPL Energy South Dakota Comments Due: 5 p.m. ET 8/20/20. Wind, LLC, Gray County Wind Energy, Docket Numbers: ER20–2561–000. LLC, High Majestic Wind Energy Center, Applicants: PJM Interconnection, LLC, High Majestic Wind II, LLC, L.L.C. Kingman Wind Energy I, LLC, Kingman Description: § 205(d) Rate Filing: First Wind Energy II, LLC, Lorenzo Wind, Revised ISA, Service Agreement No. LLC, Mammoth Plains Wind Project, 2637; Queue No. AF1–177 to be LLC, Minco Wind, LLC, Minco Wind II, effective 6/30/2020. LLC, Minco Wind III, LLC, Minco Wind Filed Date: 7/30/20. Accession Number: 20200730–5168. IV, LLC, Minco IV & V Interconnection, Comments Due: 5 p.m. ET 8/20/20. LLC, Minco Wind V, LLC, Ninnescah Wind Energy, LLC, NEPM II, LLC, Docket Numbers: ER20–2562–000. NextEra Energy Marketing, LLC, Applicants: Entergy Arkansas, LLC, NextEra Energy Services Massachusetts, Entergy Mississippi, LLC, Entergy New PO 00000 Frm 00054 Fmt 4703 Sfmt 4703 E:\FR\FM\06AUN1.SGM 06AUN1

Agencies

[Federal Register Volume 85, Number 152 (Thursday, August 6, 2020)]
[Notices]
[Pages 47781-47782]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-17189]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP20-500-000]


Black Marlin Pipeline LLC; Notice of Request Under Blanket 
Authorization

    Take notice that on July 24, 2020, Black Marlin Pipeline LLC (Black 
Marlin), 2800 Post Oak Boulevard, Houston, Texas 77056, filed in the 
above referenced docket, a prior notice request pursuant to sections 
157.205 and 157.216 of the Commission's regulations under the Natural 
Gas Act (NGA) and Columbia's blanket certificate issued in Docket No. 
CP89-2115-000, for authorization to abandon in place approximately 
23.86 miles of 16-inch-diameter pipeline located in the federal waters 
of the Gulf of Mexico, Offshore Texas. Black Marlin states that the 
facilities proposed for abandonment have not provided service to any 
customers since November 2016 and are not covered under any firm or 
interruptible transportation contracts. Thus, they state that the 
proposed abandonment will have no impact on the daily design capacity 
of, or the operating conditions of, Black Marlin's pipeline system, all 
as more fully set forth in the application which is on file with the 
Commission and open to public inspection.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact FERC at 
[email protected] or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    Any questions regarding this prior notice request should be 
directed to Sheryl Johnson-Schumack, Regulatory Analyst Lead, Black 
Marlin Pipeline LLC, 2800 Post Oak Boulevard, Houston, Texas 77056, or 
call (713) 215-3449.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the EA for this proposal. The filing of the EA in the Commission's 
public record for this proceeding or the issuance of a Notice of 
Schedule for Environmental Review will serve to notify federal and 
state agencies of the timing for the completion of all necessary 
reviews, and the subsequent need to complete all federal authorizations 
within 90 days of the date of issuance of the Commission staff's EA.
    Any person may, within 60 days after the issuance of the instant 
notice by the Commission, file pursuant to Rule 214 of the Commission's 
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of 
intervention. Any person filing to intervene, or the Commission's staff 
may, pursuant to section 157.205 of the Commission's Regulations under 
the NGA (18 CFR 157.205) file a protest to the request. If no protest 
is filed within the time allowed therefore, the proposed activity shall 
be deemed to be authorized effective the day after the time allowed for 
protest. If a protest is filed and not withdrawn within 30 days after 
the time allowed for filing a protest, the instant request shall be 
treated as an application for

[[Page 47782]]

authorization pursuant to section 7 of the NGA.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions using the ``eFiling'' link at https://www.ferc.gov. In lieu of electronic filing, you may submit a paper 
copy. Submissions sent via the U.S. Postal Service must be addressed 
to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 
888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent 
via any other carrier must be addressed to: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, 
Rockville, Maryland 20852.

    Dated: July 31, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-17189 Filed 8-5-20; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.