Combined Notice of Filings #1, 47201-47202 [2020-16942]

Download as PDF Federal Register / Vol. 85, No. 150 / Tuesday, August 4, 2020 / Notices FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Dated: July 29, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–16950 Filed 8–3–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission jbell on DSKJLSW7X2PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG20–220–000. Applicants: East Line Solar, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of East Line Solar, LLC. Filed Date: 7/28/20. Accession Number: 20200728–5121. Comments Due: 5 p.m. ET 8/18/20. VerDate Sep<11>2014 18:14 Aug 03, 2020 Jkt 250001 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER14–2666–004. Applicants: Avalon Solar Partners, LLC, Gulf Coast Solar Center III, LLC, Gulf Coast Solar Center II, LLC, Nicolis, LLC, Tropico, LLC. Description: Compliance filing: Notice of Non-Material Change in Status and Revised MBR Tariffs to be effective 7/ 30/2020. Filed Date: 7/29/20. Accession Number: 20200729–5077. Comments Due: 5 p.m. ET 8/19/20. Docket Numbers: ER16–2501–002. Applicants: Nicolis, LLC, Tropico, LLC, Avalon Solar Partners, LLC, Gulf Coast Solar Center III, LLC, Gulf Coast Solar Center II, LLC. Description: Compliance filing: Notice of Non-Material Change in Status and Revised MBR Tariffs to be effective 7/ 30/2020. Filed Date: 7/29/20. Accession Number: 20200729–5073. Comments Due: 5 p.m. ET 8/19/20. Docket Numbers: ER16–2502–002. Applicants: Avalon Solar Partners, LLC, Nicolis, LLC, Gulf Coast Solar Center II, LLC, Gulf Coast Solar Center III, LLC, Tropico, LLC. Description: Compliance filing: Notice of Non-Material Change in Status and Revised MBR Tariffs to be effective 7/ 30/2020. Filed Date: 7/29/20. Accession Number: 20200729–5066. Comments Due: 5 p.m. ET 8/19/20. Docket Numbers: ER17–1671–002; ER17–1672–002. Applicants: Gulf Coast Solar Center II, LLC, Gulf Coast Solar Center III, LLC. Description: Notice of Non-Material Change in Status of Gulf Coast Solar Center II, LLC. Filed Date: 7/29/20. Accession Number: 20200729–5126. Comments Due: 5 p.m. ET 8/19/20. Docket Numbers: ER19–1664–003; ER19–1665–003; ER20–76–003; ER19–1666–003; ER10–1992–022. Applicants: Refresh Wind, LLC, Refresh Wind 2, LLC, Tehachapi Plains Wind, LLC, Terra-Gen 251 Wind, LLC, Victory Garden Phase IV, LLC. Description: Notice of Non-Material Change in Status of Refresh Wind, LLC, et al. Filed Date: 7/29/20. Accession Number: 20200729–5156. Comments Due: 5 p.m. ET 8/19/20. Docket Numbers: ER19–1920–003. Applicants: Tampa Electric Company. Description: Compliance filing: Third Compliance Filing under Order Nos. 845 and 845A to be effective 5/22/2019. PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 47201 Filed Date: 7/29/20. Accession Number: 20200729–5041. Comments Due: 5 p.m. ET 8/19/20. Docket Numbers: ER20–2153–001. Applicants: Sanford Airport Solar, LLC. Description: Tariff Amendment: Amendment to the MBR Application of Sanford Airport Solar, LLC to be effective 8/24/2020. Filed Date: 7/28/20. Accession Number: 20200728–5136. Comments Due: 5 p.m. ET 8/7/20. Docket Numbers: ER20–2527–000. Applicants: Liberty Utilities (Granite State Electric) Corp. Description: § 205(d) Rate Filing: Borderline Sales Rate Sheet Update Revised per PUC Order July 2020 to be effective 7/1/2020. Filed Date: 7/28/20. Accession Number: 20200728–5132. Comments Due: 5 p.m. ET 8/18/20. Docket Numbers: ER20–2528–000. Applicants: Airport Solar LLC. Description: Baseline eTariff Filing: Reactive Power Compensation Filing to be effective 8/1/2020. Filed Date: 7/29/20. Accession Number: 20200729–5012. Comments Due: 5 p.m. ET 8/19/20. Docket Numbers: ER20–2529–000. Applicants: AEP Texas Inc. Description: § 205(d) Rate Filing: AEPTX-Taygete II 2nd Amended Generation Interconnection Agreement to be effective 7/17/2020. Filed Date: 7/29/20. Accession Number: 20200729–5037. Comments Due: 5 p.m. ET 8/19/20. Docket Numbers: ER20–2530–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, SA No. 5688; Queue No. AF1–192 to be effective 6/29/2020. Filed Date: 7/29/20. Accession Number: 20200729–5040. Comments Due: 5 p.m. ET 8/19/20. Docket Numbers: ER20–2531–000. Applicants: Midcontinent Independent System Operator, Inc, Michigan Electric Transmission Company, LLC, Consumers Energy Company. Description: § 205(d) Rate Filing: 2020–07–29_SA 1926 & SA 3536 METC–CE DTIA and TSA to be effective 12/31/9998. Filed Date: 7/29/20. Accession Number: 20200729–5043. Comments Due: 5 p.m. ET 8/19/20. Docket Numbers: ER20–2532–000. Applicants: AEP Texas Inc. Description: § 205(d) Rate Filing: AEPTX—Texas-New Mexico Power 4th Amended Interconnection Agreement to be effective 7/20/2020. E:\FR\FM\04AUN1.SGM 04AUN1 jbell on DSKJLSW7X2PROD with NOTICES 47202 Federal Register / Vol. 85, No. 150 / Tuesday, August 4, 2020 / Notices Filed Date: 7/29/20. Accession Number: 20200729–5046. Comments Due: 5 p.m. ET 8/19/20. Docket Numbers: ER20–2533–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, SA No. 5691; Queue No. AF1–194 to be effective 6/30/2020. Filed Date: 7/29/20. Accession Number: 20200729–5049. Comments Due: 5 p.m. ET 8/19/20. Docket Numbers: ER20–2534–000. Applicants: AEP Texas Inc. Description: § 205(d) Rate Filing: AEPTX-Concho Valley EC-Golden Spread EC 3rd Amended Interconnection Agreement to be effective 7/20/2020. Filed Date: 7/29/20. Accession Number: 20200729–5051. Comments Due: 5 p.m. ET 8/19/20. Docket Numbers: ER20–2535–000. Applicants: Duke Energy Ohio, Inc. Description: § 205(d) Rate Filing: DEO–AEP—RS 272—Agreement for Transmission Service Billing for Retail Load to be effective 9/28/2020. Filed Date: 7/29/20. Accession Number: 20200729–5065. Comments Due: 5 p.m. ET 8/19/20. Docket Numbers: ER20–2536–000. Applicants: Tri-State Generation and Transmission Association, Inc. Description: § 205(d) Rate Filing: Amendment to Tri-State Rate Schedule No. 129 to be effective 2/26/2020. Filed Date: 7/29/20. Accession Number: 20200729–5068. Comments Due: 5 p.m. ET 8/19/20. Docket Numbers: ER20–2537–000. Applicants: Crowned Ridge Wind, LLC. Description: Baseline eTariff Filing: Crowned Ridge Wind, LLC Filing of Assignment, Co-Tenancy and SFA to be effective 8/6/2020. Filed Date: 7/29/20. Accession Number: 20200729–5105. Comments Due: 5 p.m. ET 8/19/20. Docket Numbers: ER20–2538–000. Applicants: Midcontinent Independent System Operator, Inc, Michigan Electric Transmission Company, LLC. Description: § 205(d) Rate Filing: 2020–07–29_SA 2376 METC-Lowell Light & Power 2nd Rev IFA to be effective 9/28/2020. Filed Date: 7/29/20. Accession Number: 20200729–5106. Comments Due: 5 p.m. ET 8/19/20. Docket Numbers: ER20–2539–000. Applicants: Duke Energy Florida, LLC. Description: § 205(d) Rate Filing: Dynamic Transfer Agreement RS–270— VerDate Sep<11>2014 18:14 Aug 03, 2020 Jkt 250001 DEF, Winter Park, FPMA, FMPP to be effective 10/1/2020. Filed Date: 7/29/20. Accession Number: 20200729–5124. Comments Due: 5 p.m. ET 8/19/20. Docket Numbers: ER20–2540–000. Applicants: California Ridge Wind Energy LLC. Description: § 205(d) Rate Filing: Request for Cat. 1 Seller Status in the Central Region and Revised MBR Tariff to be effective 7/30/2020. Filed Date: 7/29/20. Accession Number: 20200729–5131. Comments Due: 5 p.m. ET 8/19/20. Docket Numbers: ER20–2541–000. Applicants: Entergy Louisiana, LLC. Description: § 205(d) Rate Filing: ELL JWLPS Reactive to be effective 10/1/ 2020. Filed Date: 7/29/20. Accession Number: 20200729–5133. Comments Due: 5 p.m. ET 8/19/20. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 29, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–16942 Filed 8–3–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 10821–005] Pacific Gas and Electric Company; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions Take notice that the following license application has been filed with the Commission and is available for public inspection. PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 a. Type of Application: Subsequent License—Transmission Line Only. b. Project No.: P–10821–005. c. Date filed: June 27, 2019. d. Applicant: Pacific Gas and Electric Company (PG&E). e. Name of Project: Camp Far West Transmission Line Project. f. Location: The existing transmission line project, with proposed modifications, would be located in Placer and Yuba Counties, California. The project would occupy a total of 52.3 acres and include tribal land managed by the U.S. Department of the Interior, Bureau of Indian Affairs (Auburn OffReservation Land Trust) and federal land managed by the U.S. Department of Defense (Beale Air Force Base). g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a–825r. h. Applicant Contact: Mr. Robert Donovan, Senior Transmission Planner, Pacific Gas and Electric Company, 245 Market Street, Room 1053B, Mail Code N10A, San Francisco, California 94105. i. FERC Contact: Quinn Emmering, (202) 502–6382, quinn.emmering@ ferc.gov. j. Deadline for filing comments, recommendations, terms and conditions, and prescriptions: 60 days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file comments, recommendations, terms and conditions, and prescriptions using the Commission’s eFiling system at https:// ferconline.ferc.gov/FERC.aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://ferconline.ferc.gov/ QuickComment.aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P– 10821–005. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of E:\FR\FM\04AUN1.SGM 04AUN1

Agencies

[Federal Register Volume 85, Number 150 (Tuesday, August 4, 2020)]
[Notices]
[Pages 47201-47202]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-16942]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG20-220-000.
    Applicants: East Line Solar, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status of East Line Solar, LLC.
    Filed Date: 7/28/20.
    Accession Number: 20200728-5121.
    Comments Due: 5 p.m. ET 8/18/20.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER14-2666-004.
    Applicants: Avalon Solar Partners, LLC, Gulf Coast Solar Center 
III, LLC, Gulf Coast Solar Center II, LLC, Nicolis, LLC, Tropico, LLC.
    Description: Compliance filing: Notice of Non-Material Change in 
Status and Revised MBR Tariffs to be effective 7/30/2020.
    Filed Date: 7/29/20.
    Accession Number: 20200729-5077.
    Comments Due: 5 p.m. ET 8/19/20.

    Docket Numbers: ER16-2501-002.
    Applicants: Nicolis, LLC, Tropico, LLC, Avalon Solar Partners, LLC, 
Gulf Coast Solar Center III, LLC, Gulf Coast Solar Center II, LLC.
    Description: Compliance filing: Notice of Non-Material Change in 
Status and Revised MBR Tariffs to be effective 7/30/2020.
    Filed Date: 7/29/20.
    Accession Number: 20200729-5073.
    Comments Due: 5 p.m. ET 8/19/20.

    Docket Numbers: ER16-2502-002.
    Applicants: Avalon Solar Partners, LLC, Nicolis, LLC, Gulf Coast 
Solar Center II, LLC, Gulf Coast Solar Center III, LLC, Tropico, LLC.
    Description: Compliance filing: Notice of Non-Material Change in 
Status and Revised MBR Tariffs to be effective 7/30/2020.
    Filed Date: 7/29/20.
    Accession Number: 20200729-5066.
    Comments Due: 5 p.m. ET 8/19/20.

    Docket Numbers: ER17-1671-002; ER17-1672-002.
    Applicants: Gulf Coast Solar Center II, LLC, Gulf Coast Solar 
Center III, LLC.
    Description: Notice of Non-Material Change in Status of Gulf Coast 
Solar Center II, LLC.
    Filed Date: 7/29/20.
    Accession Number: 20200729-5126.
    Comments Due: 5 p.m. ET 8/19/20.

    Docket Numbers: ER19-1664-003; ER19-1665-003; ER20-76-003;
    ER19-1666-003; ER10-1992-022.
    Applicants: Refresh Wind, LLC, Refresh Wind 2, LLC, Tehachapi 
Plains Wind, LLC, Terra-Gen 251 Wind, LLC, Victory Garden Phase IV, 
LLC.
    Description: Notice of Non-Material Change in Status of Refresh 
Wind, LLC, et al.
    Filed Date: 7/29/20.
    Accession Number: 20200729-5156.
    Comments Due: 5 p.m. ET 8/19/20.

    Docket Numbers: ER19-1920-003.
    Applicants: Tampa Electric Company.
    Description: Compliance filing: Third Compliance Filing under Order 
Nos. 845 and 845A to be effective 5/22/2019.
    Filed Date: 7/29/20.
    Accession Number: 20200729-5041.
    Comments Due: 5 p.m. ET 8/19/20.

    Docket Numbers: ER20-2153-001.
    Applicants: Sanford Airport Solar, LLC.
    Description: Tariff Amendment: Amendment to the MBR Application of 
Sanford Airport Solar, LLC to be effective 8/24/2020.
    Filed Date: 7/28/20.
    Accession Number: 20200728-5136.
    Comments Due: 5 p.m. ET 8/7/20.

    Docket Numbers: ER20-2527-000.
    Applicants: Liberty Utilities (Granite State Electric) Corp.
    Description: Sec.  205(d) Rate Filing: Borderline Sales Rate Sheet 
Update Revised per PUC Order July 2020 to be effective 7/1/2020.
    Filed Date: 7/28/20.
    Accession Number: 20200728-5132.
    Comments Due: 5 p.m. ET 8/18/20.

    Docket Numbers: ER20-2528-000.
    Applicants: Airport Solar LLC.
    Description: Baseline eTariff Filing: Reactive Power Compensation 
Filing to be effective 8/1/2020.
    Filed Date: 7/29/20.
    Accession Number: 20200729-5012.
    Comments Due: 5 p.m. ET 8/19/20.

    Docket Numbers: ER20-2529-000.
    Applicants: AEP Texas Inc.
    Description: Sec.  205(d) Rate Filing: AEPTX-Taygete II 2nd Amended 
Generation Interconnection Agreement to be effective 7/17/2020.
    Filed Date: 7/29/20.
    Accession Number: 20200729-5037.
    Comments Due: 5 p.m. ET 8/19/20.

    Docket Numbers: ER20-2530-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA, SA No. 5688; 
Queue No. AF1-192 to be effective 6/29/2020.
    Filed Date: 7/29/20.
    Accession Number: 20200729-5040.
    Comments Due: 5 p.m. ET 8/19/20.

    Docket Numbers: ER20-2531-000.
    Applicants: Midcontinent Independent System Operator, Inc, Michigan 
Electric Transmission Company, LLC, Consumers Energy Company.
    Description: Sec.  205(d) Rate Filing: 2020-07-29_SA 1926 & SA 3536 
METC-CE DTIA and TSA to be effective 12/31/9998.
    Filed Date: 7/29/20.
    Accession Number: 20200729-5043.
    Comments Due: 5 p.m. ET 8/19/20.

    Docket Numbers: ER20-2532-000.
    Applicants: AEP Texas Inc.
    Description: Sec.  205(d) Rate Filing: AEPTX--Texas-New Mexico 
Power 4th Amended Interconnection Agreement to be effective 7/20/2020.

[[Page 47202]]

    Filed Date: 7/29/20.
    Accession Number: 20200729-5046.
    Comments Due: 5 p.m. ET 8/19/20.

    Docket Numbers: ER20-2533-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA, SA No. 5691; 
Queue No. AF1-194 to be effective 6/30/2020.
    Filed Date: 7/29/20.
    Accession Number: 20200729-5049.
    Comments Due: 5 p.m. ET 8/19/20.

    Docket Numbers: ER20-2534-000.
    Applicants: AEP Texas Inc.
    Description: Sec.  205(d) Rate Filing: AEPTX-Concho Valley EC-
Golden Spread EC 3rd Amended Interconnection Agreement to be effective 
7/20/2020.
    Filed Date: 7/29/20.
    Accession Number: 20200729-5051.
    Comments Due: 5 p.m. ET 8/19/20.

    Docket Numbers: ER20-2535-000.
    Applicants: Duke Energy Ohio, Inc.
    Description: Sec.  205(d) Rate Filing: DEO-AEP--RS 272--Agreement 
for Transmission Service Billing for Retail Load to be effective 9/28/
2020.
    Filed Date: 7/29/20.
    Accession Number: 20200729-5065.
    Comments Due: 5 p.m. ET 8/19/20.
    Docket Numbers: ER20-2536-000.
    Applicants: Tri-State Generation and Transmission Association, Inc.
    Description: Sec.  205(d) Rate Filing: Amendment to Tri-State Rate 
Schedule No. 129 to be effective 2/26/2020.
    Filed Date: 7/29/20.
    Accession Number: 20200729-5068.
    Comments Due: 5 p.m. ET 8/19/20.

    Docket Numbers: ER20-2537-000.
    Applicants: Crowned Ridge Wind, LLC.
    Description: Baseline eTariff Filing: Crowned Ridge Wind, LLC 
Filing of Assignment, Co-Tenancy and SFA to be effective 8/6/2020.
    Filed Date: 7/29/20.
    Accession Number: 20200729-5105.
    Comments Due: 5 p.m. ET 8/19/20.

    Docket Numbers: ER20-2538-000.
    Applicants: Midcontinent Independent System Operator, Inc, Michigan 
Electric Transmission Company, LLC.
    Description: Sec.  205(d) Rate Filing: 2020-07-29_SA 2376 METC-
Lowell Light & Power 2nd Rev IFA to be effective 9/28/2020.
    Filed Date: 7/29/20.
    Accession Number: 20200729-5106.
    Comments Due: 5 p.m. ET 8/19/20.

    Docket Numbers: ER20-2539-000.
    Applicants: Duke Energy Florida, LLC.
    Description: Sec.  205(d) Rate Filing: Dynamic Transfer Agreement 
RS-270--DEF, Winter Park, FPMA, FMPP to be effective 10/1/2020.
    Filed Date: 7/29/20.
    Accession Number: 20200729-5124.
    Comments Due: 5 p.m. ET 8/19/20.

    Docket Numbers: ER20-2540-000.
    Applicants: California Ridge Wind Energy LLC.
    Description: Sec.  205(d) Rate Filing: Request for Cat. 1 Seller 
Status in the Central Region and Revised MBR Tariff to be effective 7/
30/2020.
    Filed Date: 7/29/20.
    Accession Number: 20200729-5131.
    Comments Due: 5 p.m. ET 8/19/20.

    Docket Numbers: ER20-2541-000.
    Applicants: Entergy Louisiana, LLC.
    Description: Sec.  205(d) Rate Filing: ELL JWLPS Reactive to be 
effective 10/1/2020.
    Filed Date: 7/29/20.
    Accession Number: 20200729-5133.
    Comments Due: 5 p.m. ET 8/19/20.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: July 29, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-16942 Filed 8-3-20; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.