, 47005-47007 [2020-17045]

Download as PDF Federal Register / Vol. 85, No. 149 / Monday, August 3, 2020 / Presidential Documents 47005 Presidential Documents Presidential Permit of July 29, 2020 Authorizing TransCanada Keystone Pipeline, L.P., To Operate and Maintain Existing Pipeline Facilities at the International Boundary Between the United States and Canada By virtue of the authority vested in me as President of the United States of America (the ‘‘President’’), I hereby grant this Presidential permit, subject to the conditions herein set forth to TransCanada Keystone Pipeline, L.P. (the ‘‘permittee’’). The permittee is a limited partnership, organized under the laws of the State of Delaware and owned by affiliates of TC Energy Corporation, a Canadian public company organized under the laws of Canada. Permission is hereby granted to the permittee to operate and maintain existing pipeline Border facilities, as described herein, at the international border of the United States and Canada at Cavalier County, North Dakota, for the transport between the United States and Canada of all hydrocarbons and petroleum products of every description, refined or unrefined (inclusive of, but not limited to, crude oil, naphtha, liquefied petroleum gas, natural gas liquids, jet fuel, gasoline, kerosene, and diesel), but not including natural gas subject to section 3 of the Natural Gas Act, as amended (15 U.S.C. 717b). This permit supersedes and revokes the Presidential permit issued previously to the permittee, dated March 11, 2008. See 73 Fed. Reg. 11456 (Mar. 3, 2008) (notice of proposed permit determination). This permit does not affect the applicability of any otherwise-relevant laws and regulations. As confirmed in Article 2 of this permit, the Border facilities shall remain subject to all such laws and regulations. The term ‘‘Facilities,’’ as used in this permit, means the portion in the United States of the international pipeline project associated with the permittee’s July 12, 2019, application for an amendment to its existing permit, and any land, structures, installations, or equipment appurtenant thereto. khammond on DSKJM1Z7X2PROD with PRESDOC3 The term ‘‘Border facilities,’’ as used in this permit, means those parts of the Facilities consisting of a 30-inch diameter pipeline in existence at the time of this permit’s issuance extending from the international border between the United States and Canada at Cavalier County, North Dakota, to and including the first mainline shut-off valve or pumping station in the United States, and any land, structures, installations, or equipment appurtenant thereto. This permit is subject to the following conditions: Article 1. The Border facilities herein described, and all aspects of their operation, shall be subject to all the conditions, provisions, and requirements of this permit and any subsequent Presidential amendment to it. This permit may be terminated, revoked, or amended at any time at the sole discretion of the President, with or without advice provided by any executive department or agency (agency). The permittee shall make no substantial change in the Border facilities, in the location of the Border facilities, or in the operation authorized by this permit unless the President has approved the change in an amendment to this permit or in a new permit. Such substantial changes do not include, and the permittee may make, changes to the average daily throughput capacity of the Border facilities to any volume of products VerDate Sep<11>2014 23:02 Jul 31, 2020 Jkt 250001 PO 00000 Frm 00001 Fmt 4790 Sfmt 4790 E:\FR\FM\03AUO2.SGM 03AUO2 47006 Federal Register / Vol. 85, No. 149 / Monday, August 3, 2020 / Presidential Documents that is achievable through the Border facilities, and to the directional flow of any such products. Article 2. The standards for, and the manner of, operation and maintenance of the Border facilities shall be subject to inspection by the representatives of appropriate Federal, State, and local agencies. Officers and employees of such agencies who are duly authorized and performing their official duties shall be granted free and unrestricted access to the Border facilities by the permittee. The Border facilities, including the operation and maintenance of the Border facilities, shall be subject to all applicable laws and regulations, including pipeline safety laws and regulations issued or administered by the Pipeline and Hazardous Materials Safety Administration of the U.S. Department of Transportation. Article 3. Upon the termination, revocation, or surrender of this permit, unless otherwise decided by the President, the permittee, at its own expense, shall remove the Border facilities within such time as the President may specify. If the permittee fails to comply with an order to remove, or to take such other appropriate action with respect to, the Border facilities, the President may direct an appropriate official or agency to take possession of the Border facilities—or to remove the Border facilities or take other action—at the expense of the permittee. The permittee shall have no claim for damages caused by any such possession, removal, or other action. Article 4. When, in the judgment of the President, ensuring the national security of the United States requires entering upon and taking possession of any of the Border facilities or parts thereof, and retaining possession, management, or control thereof for such a length of time as the President may deem necessary, the United States shall have the right to do so, provided that the President or his designee has given due notice to the permittee. The United States shall also have the right thereafter to restore possession and control to the permittee. In the event that the United States exercises the rights described in this article, it shall pay to the permittee just and fair compensation for the use of such Border facilities, upon the basis of a reasonable profit in normal conditions, and shall bear the cost of restoring the Border facilities to their previous condition, less the reasonable value of any improvements that may have been made by the United States. Article 5. Any transfer of ownership or control of the Border facilities, or any part thereof, or any changes to the name of the permittee, shall be immediately communicated in writing to the President or his designee, and shall include information identifying any transferee. Notwithstanding any such transfers or changes, this permit shall remain in force subject to all of its conditions, permissions, and requirements, and any amendments thereto, unless subsequently terminated, revoked, or amended by the President. khammond on DSKJM1Z7X2PROD with PRESDOC3 Article 6. (1) The permittee is responsible for acquiring any right-ofway grants or easements, permits, and other authorizations as may become necessary or appropriate. (2) The permittee shall hold harmless and indemnify the United States from any claimed or adjudged liability arising out of construction, connection, operation, or maintenance of the Border facilities, including environmental contamination from the release, threatened release, or discharge of hazardous substances or hazardous waste. (3) To ensure the safe operation of the Border facilities, the permittee shall maintain them and every part of them in a condition of good repair and in compliance with applicable law. Article 7. The permittee shall file with the President or his designee, and with appropriate agencies, such sworn statements or reports with respect to the Border facilities, or the permittee’s activities and operations in connection therewith, as are now, or may hereafter, be required under any law or regulation of the United States Government or its agencies. These reporting VerDate Sep<11>2014 23:02 Jul 31, 2020 Jkt 250001 PO 00000 Frm 00002 Fmt 4790 Sfmt 4790 E:\FR\FM\03AUO2.SGM 03AUO2 Federal Register / Vol. 85, No. 149 / Monday, August 3, 2020 / Presidential Documents 47007 obligations do not alter the intent that this permit be operative as a directive issued by the President alone. Article 8. Upon request, the permittee shall provide appropriate information to the President or his designee with regard to the Border facilities. Such requests could include, for example, information concerning current conditions or anticipated changes in ownership or control, construction, connection, operation, or maintenance of the Border facilities. Article 9. This permit is not intended to, and does not, create any right or benefit, substantive or procedural, enforceable at law or in equity by any party against the United States, its departments, agencies, or entities, its officers, employees, or agents, or any other person. IN WITNESS WHEREOF, I, DONALD J. TRUMP, President of the United States of America, have hereunto set my hand this twenty-ninth day of July, in the year of our Lord two thousand twenty, and of the Independence of the United States of America the two hundred and forty-fifth. [FR Doc. 2020–17045 Filed 7–31–20; 11:15 am] VerDate Sep<11>2014 23:02 Jul 31, 2020 Jkt 250001 PO 00000 Frm 00003 Fmt 4790 Sfmt 4790 E:\FR\FM\03AUO2.SGM 03AUO2 Trump.EPS</GPH> khammond on DSKJM1Z7X2PROD with PRESDOC3 Billing code 3295–F0–P

Agencies

[Federal Register Volume 85, Number 149 (Monday, August 3, 2020)]
[Presidential Documents]
[Pages 47005-47007]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-17045]




                        Presidential Documents 



Federal Register / Vol. 85, No. 149 / Monday, August 3, 2020 / 
Presidential Documents

[[Page 47005]]


                Presidential Permit of July 29, 2020

                


                Authorizing TransCanada Keystone Pipeline, L.P., To 
                Operate and Maintain Existing Pipeline Facilities at 
                the International Boundary Between the United States 
                and Canada

                By virtue of the authority vested in me as President of 
                the United States of America (the ``President''), I 
                hereby grant this Presidential permit, subject to the 
                conditions herein set forth to TransCanada Keystone 
                Pipeline, L.P. (the ``permittee''). The permittee is a 
                limited partnership, organized under the laws of the 
                State of Delaware and owned by affiliates of TC Energy 
                Corporation, a Canadian public company organized under 
                the laws of Canada. Permission is hereby granted to the 
                permittee to operate and maintain existing pipeline 
                Border facilities, as described herein, at the 
                international border of the United States and Canada at 
                Cavalier County, North Dakota, for the transport 
                between the United States and Canada of all 
                hydrocarbons and petroleum products of every 
                description, refined or unrefined (inclusive of, but 
                not limited to, crude oil, naphtha, liquefied petroleum 
                gas, natural gas liquids, jet fuel, gasoline, kerosene, 
                and diesel), but not including natural gas subject to 
                section 3 of the Natural Gas Act, as amended (15 U.S.C. 
                717b).

                This permit supersedes and revokes the Presidential 
                permit issued previously to the permittee, dated March 
                11, 2008. See 73 Fed. Reg. 11456 (Mar. 3, 2008) (notice 
                of proposed permit determination).

                This permit does not affect the applicability of any 
                otherwise-relevant laws and regulations. As confirmed 
                in Article 2 of this permit, the Border facilities 
                shall remain subject to all such laws and regulations.

                The term ``Facilities,'' as used in this permit, means 
                the portion in the United States of the international 
                pipeline project associated with the permittee's July 
                12, 2019, application for an amendment to its existing 
                permit, and any land, structures, installations, or 
                equipment appurtenant thereto.

                The term ``Border facilities,'' as used in this permit, 
                means those parts of the Facilities consisting of a 30-
                inch diameter pipeline in existence at the time of this 
                permit's issuance extending from the international 
                border between the United States and Canada at Cavalier 
                County, North Dakota, to and including the first 
                mainline shut-off valve or pumping station in the 
                United States, and any land, structures, installations, 
                or equipment appurtenant thereto.

                This permit is subject to the following conditions:

                    Article 1. The Border facilities herein described, 
                and all aspects of their operation, shall be subject to 
                all the conditions, provisions, and requirements of 
                this permit and any subsequent Presidential amendment 
                to it. This permit may be terminated, revoked, or 
                amended at any time at the sole discretion of the 
                President, with or without advice provided by any 
                executive department or agency (agency). The permittee 
                shall make no substantial change in the Border 
                facilities, in the location of the Border facilities, 
                or in the operation authorized by this permit unless 
                the President has approved the change in an amendment 
                to this permit or in a new permit. Such substantial 
                changes do not include, and the permittee may make, 
                changes to the average daily throughput capacity of the 
                Border facilities to any volume of products

[[Page 47006]]

                that is achievable through the Border facilities, and 
                to the directional flow of any such products.
                    Article 2. The standards for, and the manner of, 
                operation and maintenance of the Border facilities 
                shall be subject to inspection by the representatives 
                of appropriate Federal, State, and local agencies. 
                Officers and employees of such agencies who are duly 
                authorized and performing their official duties shall 
                be granted free and unrestricted access to the Border 
                facilities by the permittee. The Border facilities, 
                including the operation and maintenance of the Border 
                facilities, shall be subject to all applicable laws and 
                regulations, including pipeline safety laws and 
                regulations issued or administered by the Pipeline and 
                Hazardous Materials Safety Administration of the U.S. 
                Department of Transportation.
                    Article 3. Upon the termination, revocation, or 
                surrender of this permit, unless otherwise decided by 
                the President, the permittee, at its own expense, shall 
                remove the Border facilities within such time as the 
                President may specify. If the permittee fails to comply 
                with an order to remove, or to take such other 
                appropriate action with respect to, the Border 
                facilities, the President may direct an appropriate 
                official or agency to take possession of the Border 
                facilities--or to remove the Border facilities or take 
                other action--at the expense of the permittee. The 
                permittee shall have no claim for damages caused by any 
                such possession, removal, or other action.
                    Article 4. When, in the judgment of the President, 
                ensuring the national security of the United States 
                requires entering upon and taking possession of any of 
                the Border facilities or parts thereof, and retaining 
                possession, management, or control thereof for such a 
                length of time as the President may deem necessary, the 
                United States shall have the right to do so, provided 
                that the President or his designee has given due notice 
                to the permittee. The United States shall also have the 
                right thereafter to restore possession and control to 
                the permittee. In the event that the United States 
                exercises the rights described in this article, it 
                shall pay to the permittee just and fair compensation 
                for the use of such Border facilities, upon the basis 
                of a reasonable profit in normal conditions, and shall 
                bear the cost of restoring the Border facilities to 
                their previous condition, less the reasonable value of 
                any improvements that may have been made by the United 
                States.
                    Article 5. Any transfer of ownership or control of 
                the Border facilities, or any part thereof, or any 
                changes to the name of the permittee, shall be 
                immediately communicated in writing to the President or 
                his designee, and shall include information identifying 
                any transferee. Notwithstanding any such transfers or 
                changes, this permit shall remain in force subject to 
                all of its conditions, permissions, and requirements, 
                and any amendments thereto, unless subsequently 
                terminated, revoked, or amended by the President.
                    Article 6. (1) The permittee is responsible for 
                acquiring any right-of-way grants or easements, 
                permits, and other authorizations as may become 
                necessary or appropriate.

(2) The permittee shall hold harmless and indemnify the United States from 
any claimed or adjudged liability arising out of construction, connection, 
operation, or maintenance of the Border facilities, including environmental 
contamination from the release, threatened release, or discharge of 
hazardous substances or hazardous waste.

(3) To ensure the safe operation of the Border facilities, the permittee 
shall maintain them and every part of them in a condition of good repair 
and in compliance with applicable law.

                    Article 7. The permittee shall file with the 
                President or his designee, and with appropriate 
                agencies, such sworn statements or reports with respect 
                to the Border facilities, or the permittee's activities 
                and operations in connection therewith, as are now, or 
                may hereafter, be required under any law or regulation 
                of the United States Government or its agencies. These 
                reporting

[[Page 47007]]

                obligations do not alter the intent that this permit be 
                operative as a directive issued by the President alone.
                    Article 8. Upon request, the permittee shall 
                provide appropriate information to the President or his 
                designee with regard to the Border facilities. Such 
                requests could include, for example, information 
                concerning current conditions or anticipated changes in 
                ownership or control, construction, connection, 
                operation, or maintenance of the Border facilities.
                    Article 9. This permit is not intended to, and does 
                not, create any right or benefit, substantive or 
                procedural, enforceable at law or in equity by any 
                party against the United States, its departments, 
                agencies, or entities, its officers, employees, or 
                agents, or any other person.

                IN WITNESS WHEREOF, I, DONALD J. TRUMP, President of 
                the United States of America, have hereunto set my hand 
                this twenty-ninth day of July, in the year of our Lord 
                two thousand twenty, and of the Independence of the 
                United States of America the two hundred and forty-
                fifth.
                
                
                    (Presidential Sig.)

[FR Doc. 2020-17045
Filed 7-31-20; 11:15 am]
Billing code 3295-F0-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.