Environmental Impact Statements; Notice of Availability, 46094-46095 [2020-16626]
Download as PDF
46094
Federal Register / Vol. 85, No. 148 / Friday, July 31, 2020 / Notices
information collection request (ICR),
NSPS for Stationary Spark Ignition
Internal Combustion Engines (EPA ICR
Number 2227.06, OMB Control Number
2060–0610), to the Office of
Management and Budget (OMB) for
review and approval in accordance with
the Paperwork Reduction Act. This is a
proposed extension of the ICR, which is
currently approved through September
30, 2020. Public comments were
previously requested, via the Federal
Register, on May 6, 2019 during a 60day comment period. This notice allows
for an additional 30 days for public
comments. A fuller description of the
ICR is given below, including its
estimated burden and cost to the public.
An agency may neither conduct nor
sponsor, and a person is not required to
respond to, a collection of information
unless it displays a currently valid OMB
control number.
DATES: Additional comments may be
submitted on or before August 31, 2020.
ADDRESSES: Submit your comments,
referencing Docket ID Number EPA–
HQ–OECA–2013–0353, to EPA online
using www.regulations.gov (our
preferred method), or by email to
docket.oeca@epa.gov, or by mail to: EPA
Docket Center, Environmental
Protection Agency, Mail Code 28221T,
1200 Pennsylvania Ave. NW,
Washington, DC 20460.
EPA’s policy is that all comments
received will be included in the public
docket without change, including any
personal information provided, unless
the comment includes profanity, threats,
information claimed to be Confidential
Business Information (CBI), or other
information whose disclosure is
restricted by statute.
Submit written comments and
recommendations to OMB for the
proposed information collection within
30 days of publication of this notice to
www.reginfo.gov/public/do/PRAMain.
Find this particular information
collection by selecting ‘‘Currently under
30-day Review—Open for Public
Comments’’ or by using the search
function.
FOR FURTHER INFORMATION CONTACT:
Patrick Yellin, Monitoring, Assistance,
and Media Programs Division, Office of
Compliance, Mail Code 2227A,
Environmental Protection Agency, 1200
Pennsylvania Ave. NW, Washington, DC
20460; telephone number: (202) 564–
2970; fax number: (202) 564–0050;
email address: yellin.patrick@epa.gov.
SUPPLEMENTARY INFORMATION:
Supporting documents, which explain
in detail the information that the EPA
will be collecting, are available in the
public docket for this ICR. The docket
VerDate Sep<11>2014
18:33 Jul 30, 2020
Jkt 250001
can be viewed online at
www.regulations.gov or in person at the
EPA Docket Center, WJC West, Room
3334, 1301 Constitution Ave. NW,
Washington, DC. The telephone number
for the Docket Center is 202–566–1744.
For additional information about EPA’s
public docket, visit: https://
www.epa.gov/dockets.
Abstract: The New Source
Performance Standards (NSPS) for
Stationary Spark Ignition Internal
Combustion Engines (40 CFR part 60,
subpart JJJJ) were proposed on June 12,
2006; promulgated on January 18, 2008;
and most-recently amended on February
27, 2014. These regulations apply to
existing and new manufacturers,
owners, and operators of stationary
spark ignition (SI) internal combustion
engines (ICE) that commenced
construction, modification, or
reconstruction either on or after the
dates specified at 40 CFR 60.4230(a)(1)–
(6). New facilities include those that
commenced construction, modification
or reconstruction after the date of
proposal. This information is being
collected to assure compliance with 40
CFR part 60, subpart JJJJ.
In general, all NSPS standards require
initial notifications, performance tests,
and periodic reports by the owners/
operators of the affected facilities. They
are also required to maintain records of
the occurrence and duration of any
startup, shutdown, or malfunction in
the operation of an affected facility, or
any period during which the monitoring
system is inoperative. These
notifications, reports, and records are
essential in determining compliance,
and are required of all affected facilities
subject to NSPS.
Form Numbers: None.
Respondents/affected entities:
Manufacturers, owners, and operators of
stationary spark ignition internal
combustion engines (SI ICE).
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart JJJJ).
Estimated number of respondents:
19,329 (total).
Frequency of response: Annually.
Total estimated burden: 36,600 hours
(per year). Burden is defined at 5 CFR
1320.3(b).
Total estimated cost: $6,860,000 (per
year), which includes $2,570,000 in
annualized capital/startup and/or
operation & maintenance costs.
Changes in the Estimates: There is an
increase in the total estimated burden as
currently identified in the OMB
Inventory of Approved Burdens. This
increase is not due to any program
changes or changes in regulatory
requirements. The change in the burden
and cost estimates is due primarily to an
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
increase in the number of existing
sources subject to rule requirements.
This increase is based on the growth
rate from the prior ICR and assumes
continued growth in the manufacture
and use of SI ICE. This has led to an
increase in O&M costs, as well as for
recordkeeping and reporting costs.
Courtney Kerwin,
Director, Regulatory Support Division.
[FR Doc. 2020–16578 Filed 7–30–20; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9052–1]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information 202–
564–5632 or https://www.epa.gov/nepa.
Weekly receipt of Environmental Impact
Statements (EIS)
Filed July 20, 2020, 10 a.m. EST
Through July 27, 2020, 10 a.m. EST
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
cdxnodengn.epa.gov/cdx-enepa-public/
action/eis/search.
EIS No. 20200149, Final, BLM, WY,
Converse County Oil and Gas Project,
Review Period Ends: 08/31/2020,
Contact: Mike Robinson 307–261–
7520.
EIS No. 20200150, Draft, BR, ID, Boise
River Basin Feasibility Study,
Comment Period Ends: 09/14/2020,
Contact: Selena Morre 208–383–2207.
EIS No. 20200151, Final Supplement,
USACE, MO, ADOPTION—Little
Otter Creek Watershed Plan Final
Supplemental Environmental Impact
Statement, Contact: Matt Sailor 816–
389–3197.
The Army Corps of Engineers
(USACE) has adopted the Natural
Resource Conservation Service Final
Supplemental EIS No. 20200001, filed
12/23/2019 with EPA. USACE was a
cooperating agency on this project.
Therefore, recirculation of the document
is not necessary under Section 1506.3(c)
of the CEQ regulations.
EIS No. 20200152, Final, DOC, NAT,
Summer Flounder Commercial Issues
and Goals and Objectives
Amendment: Amendment 21 to the
Summer Flounder, Scup, and Black
E:\FR\FM\31JYN1.SGM
31JYN1
Federal Register / Vol. 85, No. 148 / Friday, July 31, 2020 / Notices
Sea Bass Fishery Management Plan,
Review Period Ends: 08/31/2020,
Contact: Emily Keiley 978–281–9116.
EIS No. 20200153, Final Supplement,
FHWA, MI, I–94 Modernization
Project in Detroit, MI from I–96 to
Conner Avenue Combined FSEIS and
Record of Decision and Final Section
4(f) Evaluation, Contact: Ruth Hepfer
517–702–1847.
Under 23 U.S.C. 139(n)(2), FHWA has
issued a single document that consists
of a final supplemental environmental
impact statement and record of
decision. Therefore, the 30-day wait/
review period under NEPA does not
apply to this action.
EIS No. 20200154, Draft Supplement,
USACE, CA, American River
Watershed Common Features, Water
Resources Development Act of 2016
Project—Sacramento Weir Widening,
Comment Period Ends: 09/14/2020,
Contact: Robert Chase 916–557–7630.
EIS No. 20200155, Draft, USACE, FL,
Collier County Coastal Storm Risk
Management Draft Integrated
Feasibility Study and Environmental
Impact Statement, Comment Period
Ends: 09/14/2020, Contact: Zachary
Martin 757–201–7320.
EIS No. 20200156, Draft, BLM, NV,
Thacker Pass Lithium Mine Project,
Comment Period Ends: 09/14/2020,
Contact: Ken Loda 775–623–1500.
EIS No. 20200157, Final, USFWS, CA,
Proposed Habitat Conservation Plan
and Incidental Take Permit Sierra
Pacific Industries, Review Period
Ends: 08/31/2020, Contact: Kim
Turner 916–414–6606.
EIS No. 20200158, Final, BPA, BR,
USACE, OR, Columbia River System
Operations, Review Period Ends: 08/
31/2020, Contact: Rebecca Weiss 800–
290–5033.
Dated: July 27, 2020.
Cindy S. Barger,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2020–16626 Filed 7–30–20; 8:45 am]
BILLING CODE 6560–50–P
FARM CREDIT ADMINISTRATION
Privacy Act of 1974; System of
Records
Farm Credit Administration.
ACTION: Notice of a modified system of
records.
AGENCY:
Pursuant to the provisions of
the Privacy Act of 1974, as amended,
notice is hereby given that the Farm
Credit Administration (FCA or Agency)
is amending an existing system of
SUMMARY:
VerDate Sep<11>2014
18:33 Jul 30, 2020
Jkt 250001
records, FCA–3—Property
Accountability Records—FCA.
DATES: You may send written comments
on or before August 31, 2020. FCA filed
an amended System Report with
Congress and the Office of Management
and Budget on June 16, 2020. This
notice will become effective without
further publication on September 9,
2020 unless modified by a subsequent
notice to incorporate comments
received from the public.
ADDRESSES: We offer a variety of
methods for you to submit your
comments. For accuracy and efficiency,
commenters are encouraged to submit
comments by email or through the
FCA’s website. As facsimiles (fax) are
difficult for us to process and achieve
compliance with section 508 of the
Rehabilitation Act, we are no longer
accepting comments submitted by fax.
Regardless of the method you use,
please do not submit your comment
multiple times via different methods.
You may submit comments by any of
the following methods:
• Email: Send us an email at regcomm@fca.gov.
• FCA Website: https://www.fca.gov.
Click inside the ‘‘I want to . . . ’’ field,
near the top of the page; select
‘‘comment on a pending regulation’’
from the dropdown menu; and click
‘‘Go.’’ This takes you to an electronic
public comment form.
• Mail: David Grahn, Director, Office
of Regulatory Policy, Farm Credit
Administration, 1501 Farm Credit Drive,
McLean, VA 22102–5090.
You may review copies of comments
we receive at our office in McLean,
Virginia, or from our website at https://
www.fca.gov. Once you are in the
website, click inside the ‘‘I want to
. . . ’’ field, near the top of the page;
select ‘‘find comments on a pending
regulation’’ from the dropdown menu;
and click ‘‘Go.’’ This will take you to the
Comment Letters page, where you can
select the SORN for which you would
like to read public comments. The
comments will be posted as submitted
but, for technical reasons, items such as
logos and special characters may be
omitted. Identifying information that
you provide, such as phone numbers
and addresses, will be publicly
available. However, we will attempt to
remove email addresses to help reduce
internet spam.
FOR FURTHER INFORMATION CONTACT:
Autumn R. Agans, Privacy Act Officer,
Farm Credit Administration, McLean,
Virginia 22102–5090, (703) 883–4020,
TTY (703) 883–4019.
SUPPLEMENTARY INFORMATION: This
publication satisfies the requirement of
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
46095
the Privacy Act of 1974 that agencies
publish a system of records notice in the
Federal Register when there is a
revision, change, or addition to the
system of records.
The Property Accountability
Records—FCA system is used to
maintain control over accountable
property. The Agency is updating the
notice to reflect changes to the
categories of individuals, and to make
administrative updates as well as nonsubstantive changes to conform to the
SORN template requirements prescribed
in the Office of Management and Budget
(OMB) Circular No. A–108. The
substantive changes and modifications
to the currently published version of
FCA–3—Property Accountability
Records—FCA include:
1. Identifying the records in the
system as unclassified.
2. Updating the system location to
reflect the system’s current location.
3. Updating the system managers to
reflect the system’s current owner.
4. Updating the authorities to align
with the latest statutory provisions
related to property management.
5. Expanding and clarifying how
records may be stored and retrieved.
6. Revising the retention and disposal
section to reflect updated guidance from
the National Archives and Records
Administration.
7. Revising the safeguards section to
reflect updated cybersecurity guidance
and practices.
Additionally, non-substantive
changes have been made to the notice to
align with the latest guidance from
OMB.
The amended system of records is:
FCA–3—Property Accountability
Records—FCA. As required by 5 U.S.C.
552a(r) of the Privacy Act, as amended,
FCA sent notice of this proposed system
of records to the Office of Management
and Budget, the Committee on Oversight
and Government Reform of the House of
Representatives, and the Committee on
Homeland Security and Governmental
Affairs of the Senate. The notice is
published in its entirety below.
SYSTEM NAME AND NUMBER:
FCA–3—Property Accountability
Records—FCA.
SECURITY CLASSIFICATION:
Unclassified.
SYSTEM LOCATION:
Office of Agency Services, Farm
Credit Administration, 1501 Farm
Credit Drive, McLean, VA 22102–5090.
SYSTEM MANAGER:
Property Management Officer, Office
of Agency Services, Farm Credit
E:\FR\FM\31JYN1.SGM
31JYN1
Agencies
[Federal Register Volume 85, Number 148 (Friday, July 31, 2020)]
[Notices]
[Pages 46094-46095]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-16626]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9052-1]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information 202-564-5632 or https://www.epa.gov/nepa.
Weekly receipt of Environmental Impact Statements (EIS)
Filed July 20, 2020, 10 a.m. EST Through July 27, 2020, 10 a.m. EST
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-enepa-public/action/eis/search.
EIS No. 20200149, Final, BLM, WY, Converse County Oil and Gas Project,
Review Period Ends: 08/31/2020, Contact: Mike Robinson 307-261-7520.
EIS No. 20200150, Draft, BR, ID, Boise River Basin Feasibility Study,
Comment Period Ends: 09/14/2020, Contact: Selena Morre 208-383-2207.
EIS No. 20200151, Final Supplement, USACE, MO, ADOPTION--Little Otter
Creek Watershed Plan Final Supplemental Environmental Impact Statement,
Contact: Matt Sailor 816-389-3197.
The Army Corps of Engineers (USACE) has adopted the Natural
Resource Conservation Service Final Supplemental EIS No. 20200001,
filed 12/23/2019 with EPA. USACE was a cooperating agency on this
project. Therefore, recirculation of the document is not necessary
under Section 1506.3(c) of the CEQ regulations.
EIS No. 20200152, Final, DOC, NAT, Summer Flounder Commercial Issues
and Goals and Objectives Amendment: Amendment 21 to the Summer
Flounder, Scup, and Black
[[Page 46095]]
Sea Bass Fishery Management Plan, Review Period Ends: 08/31/2020,
Contact: Emily Keiley 978-281-9116.
EIS No. 20200153, Final Supplement, FHWA, MI, I-94 Modernization
Project in Detroit, MI from I-96 to Conner Avenue Combined FSEIS and
Record of Decision and Final Section 4(f) Evaluation, Contact: Ruth
Hepfer 517-702-1847.
Under 23 U.S.C. 139(n)(2), FHWA has issued a single document that
consists of a final supplemental environmental impact statement and
record of decision. Therefore, the 30-day wait/review period under NEPA
does not apply to this action.
EIS No. 20200154, Draft Supplement, USACE, CA, American River Watershed
Common Features, Water Resources Development Act of 2016 Project--
Sacramento Weir Widening, Comment Period Ends: 09/14/2020, Contact:
Robert Chase 916-557-7630.
EIS No. 20200155, Draft, USACE, FL, Collier County Coastal Storm Risk
Management Draft Integrated Feasibility Study and Environmental Impact
Statement, Comment Period Ends: 09/14/2020, Contact: Zachary Martin
757-201-7320.
EIS No. 20200156, Draft, BLM, NV, Thacker Pass Lithium Mine Project,
Comment Period Ends: 09/14/2020, Contact: Ken Loda 775-623-1500.
EIS No. 20200157, Final, USFWS, CA, Proposed Habitat Conservation Plan
and Incidental Take Permit Sierra Pacific Industries, Review Period
Ends: 08/31/2020, Contact: Kim Turner 916-414-6606.
EIS No. 20200158, Final, BPA, BR, USACE, OR, Columbia River System
Operations, Review Period Ends: 08/31/2020, Contact: Rebecca Weiss 800-
290-5033.
Dated: July 27, 2020.
Cindy S. Barger,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2020-16626 Filed 7-30-20; 8:45 am]
BILLING CODE 6560-50-P