Notice of Availability of Draft Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 18-Level 2 Risk Analysis and Request for Comments, 44880-44881 [2020-15874]
Download as PDF
44880
Federal Register / Vol. 85, No. 143 / Friday, July 24, 2020 / Notices
respond, including the use of automated
collection techniques or other forms of
information technology.
Dated: July 17, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–15977 Filed 7–23–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER20–2444–000]
jbell on DSKJLSW7X2PROD with NOTICES
Millican Solar Energy LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Millican
Solar Energy LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is August 10,
2020.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
VerDate Sep<11>2014
20:45 Jul 23, 2020
Jkt 250001
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: July 20, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–16080 Filed 7–23–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD20–23–000]
Notice of Availability of Draft
Engineering Guidelines for the
Evaluation of Hydropower Projects:
Chapter 18—Level 2 Risk Analysis and
Request for Comments
The staff of the Office of Energy
Projects (OEP) has drafted its initial
version of ‘‘Chapter 18—Level 2 Risk
Analysis’’ of its Engineering Guidelines
for the Evaluation of Hydropower
Projects (Guidelines). This chapter is
one of four draft chapters intended to
provide additional guidance related to
the notice of proposed rulemaking
issued by the Commission in Docket No.
RM20–9–000. Please note that any
comments on the proposed rulemaking
or on draft chapters of the Guidelines
other than Chapter 18 should be filed in
the corresponding docket number.1
Comments are now requested on the
draft ‘‘Chapter 18—Level 2 Risk
1 The Commission is concurrently issuing for
public comment four draft chapters of the
Guidelines in Docket Nos. AD20–20–000 (Chapter
15—Supporting Technical Information Document),
AD20–21–000 (Chapter 16—Part 12D Program),
AD20–22–000 (Chapter 17—Potential Failure Mode
Analysis), and AD20–23–000 (Chapter 18—Level 2
Risk Analysis).
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Analysis’’ from federal and state
agencies, licensees whose projects are
subject to Part 12, Subpart D of the
Commission’s regulations, independent
consultants and inspectors, and other
interested parties with special expertise
with respect to dam safety. Comments
are due 60 days from the date of this
Notice.
Interested parties can help us
determine the appropriate updates and
improvements by providing: Meaningful
comments or suggestions that focus on
the specific sections requiring
clarification; updates to reflect current
laws and regulations; or best practices
related to the identification and
evaluation of risk using a semiquantitative process. The more specific
your comments, the more useful they
will be. A detailed explanation of your
submissions and/or any references of
scientific studies associated with your
comments will greatly help us with this
process. We will consider all timely
comments on the revised Guidelines
before issuing the final version.
For your convenience, there are three
methods which you can use to submit
your comments to the Commission. In
all instances please reference the docket
number (AD20–23–000) on the first page
of your submission. The Commission
strongly encourages electronic filing.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s website
(www.ferc.gov). Select the FERC Online
option from the left-hand column and
click on eComment. This is an easy
method for interested persons to submit
brief, text-only comments up to 6,000
characters. You must include your name
and contact information at the end of
your comments.
(2) You can file your comments
electronically using the eFiling feature
on the Commission’s website
(www.ferc.gov). Select the FERC Online
option from the left-hand column and
click on eFiling. With eFiling, you can
provide comments in a variety of
formats by attaching them as a file with
your submission. New eFiling users
must first create an account by clicking
on ‘‘eRegister.’’ When selecting the
filing type, select ‘‘General’’, then
choose ‘‘Comment (on Filing, Environ.
Report or Tech Conf).’’
(3) In lieu of electronic filing, you can
mail a paper copy of your comments to:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE, Washington, DC 20426.
Hand-delivered comments, or those
delivered by carriers/couriers other than
the US Postal Service, should be
delivered to Health and Human
E:\FR\FM\24JYN1.SGM
24JYN1
Federal Register / Vol. 85, No. 143 / Friday, July 24, 2020 / Notices
jbell on DSKJLSW7X2PROD with NOTICES
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
All information related to ‘‘Chapter
18—Level 2 Risk Analysis,’’ including
the draft chapter and all submitted
comments, can be found on the FERC
website (www.ferc.gov) using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number, excluding the last three
digits in the Docket Number field (i.e.,
AD23–20). Be sure you have selected an
appropriate date range. The Commission
also offers a free service called
eSubscription which allows you to keep
track of all formal issuances and
submittals in specific dockets. This can
reduce the amount of time you spend
researching proceedings by
automatically providing you with
electronic notification of these filings
and direct links to the documents. Go to
the Commission’s website
(www.ferc.gov), select the FERC Online
option from the left-hand column, and
click on eSubscription. Users must be
registered in order to use eSubscription.
Information Collection Statement
The proposed Guidelines include
information collection activities for
which the Paperwork Reduction Act 2
requires approval by the Office of
Management and Budget (OMB). The
Commission has included the burden
and cost estimates for information
collection activities in these Guidelines
in the Notice of Proposed Rulemaking
titled, ‘‘Safety of Water Power Projects
and Project Works’’ (Docket No. RM20–
9–000). The Commission has designated
the information collection activities in
the proposed rule and in the Guidelines
as FERC–517. Upon approval of FERC–
517, OMB will assign an OMB Control
Number and expiration date.
If you would like to submit comments
on the information-collection aspects
(such as burden, cost, need for the data,
and frequency of reporting or
recordkeeping) of the proposed
Guidelines, please submit them to:
Office of Information and Regulatory
Affairs, Office of Management and
Budget [Attention: Federal Energy
Regulatory Commission Desk Officer].
Due to security concerns, comments
should be sent directly to
www.reginfo.gov/public/do/PRAMain.
Comments submitted to OMB should be
sent within 60 days of publication of
this notice in the Federal Register and
refer to FERC–517 and OMB Control No.
1902–TBD.
Please submit to the Commission
copies of comments concerning the
collection of information and the
2 44
U.S.C. 3501–3521.
VerDate Sep<11>2014
20:45 Jul 23, 2020
Jkt 250001
associated burden estimates (identified
by Docket Nos. RM20–9–000 and AD20–
23–000) by any of the three methods
listed above.
For assistance with filing or any of the
Commission’s online systems, please
contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8258.
Dated: July 16, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP20–1027–000.
Applicants: Kern River Gas
Transmission Company.
Description: § 4(d) Rate Filing: 2020
Rose Park Meter to be effective 8/17/
2020.
Filed Date: 7/17/20.
Accession Number: 20200717–5060.
Comments Due: 5 p.m. ET 7/29/20.
Docket Numbers: RP20–1028–000.
Applicants: Equitrans, L.P.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreement—Range 7/
17/2020 to be effective 7/17/2020.
Filed Date: 7/17/20.
Accession Number: 20200717–5178.
Comments Due: 5 p.m. ET 7/29/20.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Frm 00034
Fmt 4703
Dated: July 20, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–16077 Filed 7–23–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER20–2455–000]
[FR Doc. 2020–15874 Filed 7–23–20; 8:45 am]
PO 00000
44881
Sfmt 4703
SR Platte, LLC; Supplemental Notice
That Initial Market-Based Rate Filing
Includes Request for Blanket Section
204 Authorization
This is a supplemental notice in the
above-referenced SR Platte, LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is August 10,
2020.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
E:\FR\FM\24JYN1.SGM
24JYN1
Agencies
[Federal Register Volume 85, Number 143 (Friday, July 24, 2020)]
[Notices]
[Pages 44880-44881]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-15874]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. AD20-23-000]
Notice of Availability of Draft Engineering Guidelines for the
Evaluation of Hydropower Projects: Chapter 18--Level 2 Risk Analysis
and Request for Comments
The staff of the Office of Energy Projects (OEP) has drafted its
initial version of ``Chapter 18--Level 2 Risk Analysis'' of its
Engineering Guidelines for the Evaluation of Hydropower Projects
(Guidelines). This chapter is one of four draft chapters intended to
provide additional guidance related to the notice of proposed
rulemaking issued by the Commission in Docket No. RM20-9-000. Please
note that any comments on the proposed rulemaking or on draft chapters
of the Guidelines other than Chapter 18 should be filed in the
corresponding docket number.\1\
---------------------------------------------------------------------------
\1\ The Commission is concurrently issuing for public comment
four draft chapters of the Guidelines in Docket Nos. AD20-20-000
(Chapter 15--Supporting Technical Information Document), AD20-21-000
(Chapter 16--Part 12D Program), AD20-22-000 (Chapter 17--Potential
Failure Mode Analysis), and AD20-23-000 (Chapter 18--Level 2 Risk
Analysis).
---------------------------------------------------------------------------
Comments are now requested on the draft ``Chapter 18--Level 2 Risk
Analysis'' from federal and state agencies, licensees whose projects
are subject to Part 12, Subpart D of the Commission's regulations,
independent consultants and inspectors, and other interested parties
with special expertise with respect to dam safety. Comments are due 60
days from the date of this Notice.
Interested parties can help us determine the appropriate updates
and improvements by providing: Meaningful comments or suggestions that
focus on the specific sections requiring clarification; updates to
reflect current laws and regulations; or best practices related to the
identification and evaluation of risk using a semi-quantitative
process. The more specific your comments, the more useful they will be.
A detailed explanation of your submissions and/or any references of
scientific studies associated with your comments will greatly help us
with this process. We will consider all timely comments on the revised
Guidelines before issuing the final version.
For your convenience, there are three methods which you can use to
submit your comments to the Commission. In all instances please
reference the docket number (AD20-23-000) on the first page of your
submission. The Commission strongly encourages electronic filing.
(1) You can file your comments electronically using the eComment
feature on the Commission's website (www.ferc.gov). Select the FERC
Online option from the left-hand column and click on eComment. This is
an easy method for interested persons to submit brief, text-only
comments up to 6,000 characters. You must include your name and contact
information at the end of your comments.
(2) You can file your comments electronically using the eFiling
feature on the Commission's website (www.ferc.gov). Select the FERC
Online option from the left-hand column and click on eFiling. With
eFiling, you can provide comments in a variety of formats by attaching
them as a file with your submission. New eFiling users must first
create an account by clicking on ``eRegister.'' When selecting the
filing type, select ``General'', then choose ``Comment (on Filing,
Environ. Report or Tech Conf).''
(3) In lieu of electronic filing, you can mail a paper copy of your
comments to: Federal Energy Regulatory Commission, Secretary of the
Commission, 888 First Street NE, Washington, DC 20426. Hand-delivered
comments, or those delivered by carriers/couriers other than the US
Postal Service, should be delivered to Health and Human
[[Page 44881]]
Services, 12225 Wilkins Avenue, Rockville, Maryland 20852.
All information related to ``Chapter 18--Level 2 Risk Analysis,''
including the draft chapter and all submitted comments, can be found on
the FERC website (www.ferc.gov) using the eLibrary link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number,
excluding the last three digits in the Docket Number field (i.e., AD23-
20). Be sure you have selected an appropriate date range. The
Commission also offers a free service called eSubscription which allows
you to keep track of all formal issuances and submittals in specific
dockets. This can reduce the amount of time you spend researching
proceedings by automatically providing you with electronic notification
of these filings and direct links to the documents. Go to the
Commission's website (www.ferc.gov), select the FERC Online option from
the left-hand column, and click on eSubscription. Users must be
registered in order to use eSubscription.
Information Collection Statement
The proposed Guidelines include information collection activities
for which the Paperwork Reduction Act \2\ requires approval by the
Office of Management and Budget (OMB). The Commission has included the
burden and cost estimates for information collection activities in
these Guidelines in the Notice of Proposed Rulemaking titled, ``Safety
of Water Power Projects and Project Works'' (Docket No. RM20-9-000).
The Commission has designated the information collection activities in
the proposed rule and in the Guidelines as FERC-517. Upon approval of
FERC-517, OMB will assign an OMB Control Number and expiration date.
---------------------------------------------------------------------------
\2\ 44 U.S.C. 3501-3521.
---------------------------------------------------------------------------
If you would like to submit comments on the information-collection
aspects (such as burden, cost, need for the data, and frequency of
reporting or recordkeeping) of the proposed Guidelines, please submit
them to: Office of Information and Regulatory Affairs, Office of
Management and Budget [Attention: Federal Energy Regulatory Commission
Desk Officer]. Due to security concerns, comments should be sent
directly to www.reginfo.gov/public/do/PRAMain. Comments submitted to
OMB should be sent within 60 days of publication of this notice in the
Federal Register and refer to FERC-517 and OMB Control No. 1902-TBD.
Please submit to the Commission copies of comments concerning the
collection of information and the associated burden estimates
(identified by Docket Nos. RM20-9-000 and AD20-23-000) by any of the
three methods listed above.
For assistance with filing or any of the Commission's online
systems, please contact FERC Online Support at
[email protected] or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8258.
Dated: July 16, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-15874 Filed 7-23-20; 8:45 am]
BILLING CODE 6717-01-P