Notice of Availability of Draft Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 15-Supporting Technical Information Document and Request for Comments, 44872-44873 [2020-15868]

Download as PDF 44872 Federal Register / Vol. 85, No. 143 / Friday, July 24, 2020 / Notices Due to security concerns, comments should be sent directly to www.reginfo.gov/public/do/PRAMain. Comments submitted to OMB should be sent within 60 days of publication of this notice in the Federal Register and refer to FERC–517 and OMB Control No. 1902–TBD. Please submit to the Commission copies of comments concerning the collection of information and the associated burden estimates (identified by Docket Nos. RM20–9–000 and AD20– 21–000) by any of the three methods listed above. For assistance with filing or any of the Commission’s online systems, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8258. Dated: July 16, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–15872 Filed 7–23–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD20–20–000] Notice of Availability of Draft Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 15—Supporting Technical Information Document and Request for Comments jbell on DSKJLSW7X2PROD with NOTICES The staff of the Office of Energy Projects (OEP) has drafted its initial version of Chapter 15—Supporting Technical Information Document of its Engineering Guidelines for the Evaluation of Hydropower Projects (Guidelines). This chapter will supersede the portions of Chapter 14— Dam Safety Performance Monitoring Program that pertain to the Supporting Technical Information Document, and is one of four draft chapters intended to provide additional guidance related to the notice of proposed rulemaking issued by the Commission in Docket No. RM20–9–000. Please note that any comments on the proposed rulemaking or on draft chapters of the Guidelines other than Chapter 15 should be filed in the corresponding docket number.1 1 The Commission is concurrently issuing for public comment four draft chapters of the Guidelines in Docket Nos. AD20–20–000 (Chapter 15—Supporting Technical Information Document), AD20–21–000 (Chapter 16—Part 12D Program), AD20–22–000 (Chapter 17—Potential Failure Mode Analysis), and AD20–23–000 (Chapter 18—Level 2 Risk Analysis). VerDate Sep<11>2014 20:45 Jul 23, 2020 Jkt 250001 Comments are now requested on the draft Chapter 15—Supporting Technical Information Document from federal and state agencies, licensees whose projects are subject to Part 12, Subpart D of the Commission’s regulations, independent consultants and inspectors, and other interested parties with special expertise with respect to dam safety. Comments are due 60 days from the date of this Notice. Interested parties can help us determine the appropriate updates and improvements by providing: Meaningful comments or suggestions that focus on the specific sections requiring clarification; updates to reflect current laws and regulations; or improved measures and best practices for compiling and storing project records in physical and electronic formats. The more specific your comments, the more useful they will be. A detailed explanation of your submissions and/or any references of scientific studies associated with your comments will greatly help us with this process. We will consider all timely comments on the revised Guidelines before issuing the final version. For your convenience, there are three methods which you can use to submit your comments to the Commission. In all instances please reference the docket number (AD20–20–000) on the first page of your submission. The Commission strongly encourages electronic filing. (1) You can file your comments electronically using the eComment feature on the Commission’s website (www.ferc.gov). Select the FERC Online option from the left-hand column and click on eComment. This is an easy method for interested persons to submit brief, text-only comments up to 6,000 characters. You must include your name and contact information at the end of your comments. (2) You can file your comments electronically using the eFiling feature on the Commission’s website (www.ferc.gov). Select the FERC Online option from the left-hand column and click on eFiling. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on eRegister. When selecting the filing type, select General, then choose Comment (on Filing, Environ. Report or Tech Conf). (3) In lieu of electronic filing, you can mail a paper copy of your comments to: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE, Washington, DC 20426. Hand-delivered comments, or those delivered by carriers/couriers other than PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 the US Postal Service, should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. All information related to Chapter 15—Supporting Technical Information Document, including the draft chapter and all submitted comments, can be found on the FERC website (www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on General Search and enter the docket number, excluding the last three digits in the Docket Number field (i.e., AD20– 20). Be sure you have selected an appropriate date range. The Commission also offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with electronic notification of these filings and direct links to the documents. Go to the Commission’s website (www.ferc.gov), select the FERC Online option from the left-hand column, and click on eSubscription. Users must be registered in order to use eSubscription. Information Collection Statement The proposed Guidelines include information collection activities for which the Paperwork Reduction Act 2 requires approval by the Office of Management and Budget (OMB). The Commission has included the burden and cost estimates for information collection activities in these Guidelines in the Notice of Proposed Rulemaking titled, Safety of Water Power Projects and Project Works (Docket No. RM20– 9–000). The Commission has designated the information collection activities in the proposed rule and in the Guidelines as FERC–517. Upon approval of FERC– 517, OMB will assign an OMB Control Number and expiration date. If you would like to submit comments on the information-collection aspects (such as burden, cost, need for the data, and frequency of reporting or recordkeeping) of the proposed Guidelines, please submit them to: Office of Information and Regulatory Affairs, Office of Management and Budget [Attention: Federal Energy Regulatory Commission Desk Officer]. Due to security concerns, comments should be sent directly to www.reginfo.gov/public/do/PRAMain. Comments submitted to OMB should be sent within 60 days of publication of this notice in the Federal Register and refer to FERC–517 and OMB Control No. 1902–TBD. 2 44 E:\FR\FM\24JYN1.SGM U.S.C. 3501–3521. 24JYN1 44873 Federal Register / Vol. 85, No. 143 / Friday, July 24, 2020 / Notices Please submit to the Commission copies of comments concerning the collection of information and the associated burden estimates (identified by Docket Nos. RM20–9–000 and AD20– 20–000) by any of the three methods listed above. For assistance with filing or any of the Commission’s online systems, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8258. Dated: July 16, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–15868 Filed 7–23–20; 8:45 am] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Effectiveness of Exempt Wholesale Generator and Foreign Utility Company Status BILLING CODE 6717–01–P Wind Wall 1 LLC ........................................................................................................................................................................ Cedar Creek II, LLC .................................................................................................................................................................... Midlands Solar LLC ................................................................................................................................................................... Midlands Lessee LLC ................................................................................................................................................................. Briar Creek Solar 1, LLC ............................................................................................................................................................ Elm Branch Solar 1, LLC ........................................................................................................................................................... Huntley Solar, LLC ..................................................................................................................................................................... Cubico Huntley Lessee, LLC ...................................................................................................................................................... Richmond Spider Solar LLC ...................................................................................................................................................... Pleinmont Solar 2, LLC .............................................................................................................................................................. Pleinmont Solar 1, LLC .............................................................................................................................................................. Highlander Solar Energy Station 1, LLC ................................................................................................................................... Highlander IA, LLC .................................................................................................................................................................... Lone Tree Wind, LLC ................................................................................................................................................................. Techren Solar III LLC ................................................................................................................................................................. Techren Solar IV LLC ................................................................................................................................................................. Mountain Breeze Wind, LLC ..................................................................................................................................................... Assembly Solar, LLC .................................................................................................................................................................. Bighorn Solar 1, LLC .................................................................................................................................................................. IP Aragorn, LLC .......................................................................................................................................................................... IP Juno, LLC ................................................................................................................................................................................ IP Titan, LLC ............................................................................................................................................................................... AES ES Alamitos, LLC ............................................................................................................................................................... Little Bear Master Tenant, LLC ................................................................................................................................................. Raymond Wind Farm, LLC ........................................................................................................................................................ West Raymond Wind Farm, LLC ............................................................................................................................................... Boiling Springs Wind Farm, LLC .............................................................................................................................................. Cimarron Bend Wind Project III, LLC ....................................................................................................................................... Aurora Wind Project, LLC ......................................................................................................................................................... Taygete Energy Project, LLC ...................................................................................................................................................... Biomasseheizkraftwerk Zolling GmbH ...................................................................................................................................... ENGIE Kraftwerke Farge GmbH & Co KGaA ............................................................................................................................. ENGIE Kraftwerke Zolling GmbH & Co KGaA .......................................................................................................................... ENGIE Kraftwerke Wilhemshaven GmbH & Co KG ................................................................................................................. Power Plant Rotterdam B.V ....................................................................................................................................................... Take notice that during the month of June 2020, the status of the abovecaptioned entities as Exempt Wholesale Generators or Foreign Utility Companies became effective by operation of the Commission’s regulations. 18 CFR 366.7(a) (2019). DEPARTMENT OF ENERGY Dated: July 10, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. ANR Pipeline Company; Great Lakes Transmission Limited Partnership; Notice of Intent to Prepare an Environment Assessment for the Proposed Alberta Xpress and Lease Capacity Abandonment Projects Request for Comments on Environmental Issues [FR Doc. 2020–16083 Filed 7–23–20; 8:45 am] jbell on DSKJLSW7X2PROD with NOTICES BILLING CODE 6717–01–P Federal Energy Regulatory Commission [Docket Nos. CP20–484–000 and CP20–485– 000] The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Alberta Xpress Project involving construction and operation of facilities by ANR Pipeline Company (ANR) in VerDate Sep<11>2014 20:45 Jul 23, 2020 Jkt 250001 PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 EG20–111–000 EG20–112–000 EG20–113–000 EG20–114–000 EG20–115–000 EG20–116–000 EG20–117–000 EG20–118–000 EG20–119–000 EG20–120–000 EG20–121–000 EG20–122–000 EG20–123–000 EG20–124–000 EG20–125–000 EG20–126–000 EG20–127–000 EG20–128–000 EG20–129–000 EG20–134–000 EG20–135–000 EG20–136–000 EG20–137–000 EG20–139–000 EG20–140–000 EG20–141–000 EG20–142–000 EG20–143–000 EG20–144–000 EG20–145–000 FC20–5–000 FC20–6–000 FC20–7–000 FC20–8–000 FC20–9–000 Evangeline Parish, Louisiana, and the Lease Capacity Abandonment Project proposed by Great Lakes Transmission Limited Partnership (GLTLP), which is associated with the Alberta Xpress Project. The Commission will use this EA in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies about issues regarding the project. The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from its action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. NEPA also requires the Commission to discover concerns the public may have about proposals. This process is referred to as ‘‘scoping.’’ The main goal of the E:\FR\FM\24JYN1.SGM 24JYN1

Agencies

[Federal Register Volume 85, Number 143 (Friday, July 24, 2020)]
[Notices]
[Pages 44872-44873]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-15868]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. AD20-20-000]


Notice of Availability of Draft Engineering Guidelines for the 
Evaluation of Hydropower Projects: Chapter 15--Supporting Technical 
Information Document and Request for Comments

    The staff of the Office of Energy Projects (OEP) has drafted its 
initial version of Chapter 15--Supporting Technical Information 
Document of its Engineering Guidelines for the Evaluation of Hydropower 
Projects (Guidelines). This chapter will supersede the portions of 
Chapter 14--Dam Safety Performance Monitoring Program that pertain to 
the Supporting Technical Information Document, and is one of four draft 
chapters intended to provide additional guidance related to the notice 
of proposed rulemaking issued by the Commission in Docket No. RM20-9-
000. Please note that any comments on the proposed rulemaking or on 
draft chapters of the Guidelines other than Chapter 15 should be filed 
in the corresponding docket number.\1\
---------------------------------------------------------------------------

    \1\ The Commission is concurrently issuing for public comment 
four draft chapters of the Guidelines in Docket Nos. AD20-20-000 
(Chapter 15--Supporting Technical Information Document), AD20-21-000 
(Chapter 16--Part 12D Program), AD20-22-000 (Chapter 17--Potential 
Failure Mode Analysis), and AD20-23-000 (Chapter 18--Level 2 Risk 
Analysis).
---------------------------------------------------------------------------

    Comments are now requested on the draft Chapter 15--Supporting 
Technical Information Document from federal and state agencies, 
licensees whose projects are subject to Part 12, Subpart D of the 
Commission's regulations, independent consultants and inspectors, and 
other interested parties with special expertise with respect to dam 
safety. Comments are due 60 days from the date of this Notice.
    Interested parties can help us determine the appropriate updates 
and improvements by providing: Meaningful comments or suggestions that 
focus on the specific sections requiring clarification; updates to 
reflect current laws and regulations; or improved measures and best 
practices for compiling and storing project records in physical and 
electronic formats. The more specific your comments, the more useful 
they will be. A detailed explanation of your submissions and/or any 
references of scientific studies associated with your comments will 
greatly help us with this process. We will consider all timely comments 
on the revised Guidelines before issuing the final version.
    For your convenience, there are three methods which you can use to 
submit your comments to the Commission. In all instances please 
reference the docket number (AD20-20-000) on the first page of your 
submission. The Commission strongly encourages electronic filing.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's website (www.ferc.gov). Select the FERC 
Online option from the left-hand column and click on eComment. This is 
an easy method for interested persons to submit brief, text-only 
comments up to 6,000 characters. You must include your name and contact 
information at the end of your comments.
    (2) You can file your comments electronically using the eFiling 
feature on the Commission's website (www.ferc.gov). Select the FERC 
Online option from the left-hand column and click on eFiling. With 
eFiling, you can provide comments in a variety of formats by attaching 
them as a file with your submission. New eFiling users must first 
create an account by clicking on eRegister. When selecting the filing 
type, select General, then choose Comment (on Filing, Environ. Report 
or Tech Conf).
    (3) In lieu of electronic filing, you can mail a paper copy of your 
comments to: Federal Energy Regulatory Commission, Secretary of the 
Commission, 888 First Street NE, Washington, DC 20426. Hand-delivered 
comments, or those delivered by carriers/couriers other than the US 
Postal Service, should be delivered to Health and Human Services, 12225 
Wilkins Avenue, Rockville, Maryland 20852.
    All information related to Chapter 15--Supporting Technical 
Information Document, including the draft chapter and all submitted 
comments, can be found on the FERC website (www.ferc.gov) using the 
eLibrary link. Click on the eLibrary link, click on General Search and 
enter the docket number, excluding the last three digits in the Docket 
Number field (i.e., AD20-20). Be sure you have selected an appropriate 
date range. The Commission also offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
electronic notification of these filings and direct links to the 
documents. Go to the Commission's website (www.ferc.gov), select the 
FERC Online option from the left-hand column, and click on 
eSubscription. Users must be registered in order to use eSubscription.

Information Collection Statement

    The proposed Guidelines include information collection activities 
for which the Paperwork Reduction Act \2\ requires approval by the 
Office of Management and Budget (OMB). The Commission has included the 
burden and cost estimates for information collection activities in 
these Guidelines in the Notice of Proposed Rulemaking titled, Safety of 
Water Power Projects and Project Works (Docket No. RM20-9-000). The 
Commission has designated the information collection activities in the 
proposed rule and in the Guidelines as FERC-517. Upon approval of FERC-
517, OMB will assign an OMB Control Number and expiration date.
---------------------------------------------------------------------------

    \2\ 44 U.S.C. 3501-3521.
---------------------------------------------------------------------------

    If you would like to submit comments on the information-collection 
aspects (such as burden, cost, need for the data, and frequency of 
reporting or recordkeeping) of the proposed Guidelines, please submit 
them to: Office of Information and Regulatory Affairs, Office of 
Management and Budget [Attention: Federal Energy Regulatory Commission 
Desk Officer]. Due to security concerns, comments should be sent 
directly to www.reginfo.gov/public/do/PRAMain. Comments submitted to 
OMB should be sent within 60 days of publication of this notice in the 
Federal Register and refer to FERC-517 and OMB Control No. 1902-TBD.

[[Page 44873]]

    Please submit to the Commission copies of comments concerning the 
collection of information and the associated burden estimates 
(identified by Docket Nos. RM20-9-000 and AD20-20-000) by any of the 
three methods listed above.
    For assistance with filing or any of the Commission's online 
systems, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8258.

    Dated: July 16, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-15868 Filed 7-23-20; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.