Notice of Availability of Draft Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 15-Supporting Technical Information Document and Request for Comments, 44872-44873 [2020-15868]
Download as PDF
44872
Federal Register / Vol. 85, No. 143 / Friday, July 24, 2020 / Notices
Due to security concerns, comments
should be sent directly to
www.reginfo.gov/public/do/PRAMain.
Comments submitted to OMB should be
sent within 60 days of publication of
this notice in the Federal Register and
refer to FERC–517 and OMB Control No.
1902–TBD.
Please submit to the Commission
copies of comments concerning the
collection of information and the
associated burden estimates (identified
by Docket Nos. RM20–9–000 and AD20–
21–000) by any of the three methods
listed above.
For assistance with filing or any of the
Commission’s online systems, please
contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8258.
Dated: July 16, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–15872 Filed 7–23–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD20–20–000]
Notice of Availability of Draft
Engineering Guidelines for the
Evaluation of Hydropower Projects:
Chapter 15—Supporting Technical
Information Document and Request for
Comments
jbell on DSKJLSW7X2PROD with NOTICES
The staff of the Office of Energy
Projects (OEP) has drafted its initial
version of Chapter 15—Supporting
Technical Information Document of its
Engineering Guidelines for the
Evaluation of Hydropower Projects
(Guidelines). This chapter will
supersede the portions of Chapter 14—
Dam Safety Performance Monitoring
Program that pertain to the Supporting
Technical Information Document, and is
one of four draft chapters intended to
provide additional guidance related to
the notice of proposed rulemaking
issued by the Commission in Docket No.
RM20–9–000. Please note that any
comments on the proposed rulemaking
or on draft chapters of the Guidelines
other than Chapter 15 should be filed in
the corresponding docket number.1
1 The Commission is concurrently issuing for
public comment four draft chapters of the
Guidelines in Docket Nos. AD20–20–000 (Chapter
15—Supporting Technical Information Document),
AD20–21–000 (Chapter 16—Part 12D Program),
AD20–22–000 (Chapter 17—Potential Failure Mode
Analysis), and AD20–23–000 (Chapter 18—Level 2
Risk Analysis).
VerDate Sep<11>2014
20:45 Jul 23, 2020
Jkt 250001
Comments are now requested on the
draft Chapter 15—Supporting Technical
Information Document from federal and
state agencies, licensees whose projects
are subject to Part 12, Subpart D of the
Commission’s regulations, independent
consultants and inspectors, and other
interested parties with special expertise
with respect to dam safety. Comments
are due 60 days from the date of this
Notice.
Interested parties can help us
determine the appropriate updates and
improvements by providing: Meaningful
comments or suggestions that focus on
the specific sections requiring
clarification; updates to reflect current
laws and regulations; or improved
measures and best practices for
compiling and storing project records in
physical and electronic formats. The
more specific your comments, the more
useful they will be. A detailed
explanation of your submissions and/or
any references of scientific studies
associated with your comments will
greatly help us with this process. We
will consider all timely comments on
the revised Guidelines before issuing the
final version.
For your convenience, there are three
methods which you can use to submit
your comments to the Commission. In
all instances please reference the docket
number (AD20–20–000) on the first page
of your submission. The Commission
strongly encourages electronic filing.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s website
(www.ferc.gov). Select the FERC Online
option from the left-hand column and
click on eComment. This is an easy
method for interested persons to submit
brief, text-only comments up to 6,000
characters. You must include your name
and contact information at the end of
your comments.
(2) You can file your comments
electronically using the eFiling feature
on the Commission’s website
(www.ferc.gov). Select the FERC Online
option from the left-hand column and
click on eFiling. With eFiling, you can
provide comments in a variety of
formats by attaching them as a file with
your submission. New eFiling users
must first create an account by clicking
on eRegister. When selecting the filing
type, select General, then choose
Comment (on Filing, Environ. Report or
Tech Conf).
(3) In lieu of electronic filing, you can
mail a paper copy of your comments to:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE, Washington, DC 20426.
Hand-delivered comments, or those
delivered by carriers/couriers other than
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
the US Postal Service, should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
All information related to Chapter
15—Supporting Technical Information
Document, including the draft chapter
and all submitted comments, can be
found on the FERC website
(www.ferc.gov) using the eLibrary link.
Click on the eLibrary link, click on
General Search and enter the docket
number, excluding the last three digits
in the Docket Number field (i.e., AD20–
20). Be sure you have selected an
appropriate date range. The Commission
also offers a free service called
eSubscription which allows you to keep
track of all formal issuances and
submittals in specific dockets. This can
reduce the amount of time you spend
researching proceedings by
automatically providing you with
electronic notification of these filings
and direct links to the documents. Go to
the Commission’s website
(www.ferc.gov), select the FERC Online
option from the left-hand column, and
click on eSubscription. Users must be
registered in order to use eSubscription.
Information Collection Statement
The proposed Guidelines include
information collection activities for
which the Paperwork Reduction Act 2
requires approval by the Office of
Management and Budget (OMB). The
Commission has included the burden
and cost estimates for information
collection activities in these Guidelines
in the Notice of Proposed Rulemaking
titled, Safety of Water Power Projects
and Project Works (Docket No. RM20–
9–000). The Commission has designated
the information collection activities in
the proposed rule and in the Guidelines
as FERC–517. Upon approval of FERC–
517, OMB will assign an OMB Control
Number and expiration date.
If you would like to submit comments
on the information-collection aspects
(such as burden, cost, need for the data,
and frequency of reporting or
recordkeeping) of the proposed
Guidelines, please submit them to:
Office of Information and Regulatory
Affairs, Office of Management and
Budget [Attention: Federal Energy
Regulatory Commission Desk Officer].
Due to security concerns, comments
should be sent directly to
www.reginfo.gov/public/do/PRAMain.
Comments submitted to OMB should be
sent within 60 days of publication of
this notice in the Federal Register and
refer to FERC–517 and OMB Control No.
1902–TBD.
2 44
E:\FR\FM\24JYN1.SGM
U.S.C. 3501–3521.
24JYN1
44873
Federal Register / Vol. 85, No. 143 / Friday, July 24, 2020 / Notices
Please submit to the Commission
copies of comments concerning the
collection of information and the
associated burden estimates (identified
by Docket Nos. RM20–9–000 and AD20–
20–000) by any of the three methods
listed above.
For assistance with filing or any of the
Commission’s online systems, please
contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8258.
Dated: July 16, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–15868 Filed 7–23–20; 8:45 am]
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator and Foreign
Utility Company Status
BILLING CODE 6717–01–P
Wind Wall 1 LLC ........................................................................................................................................................................
Cedar Creek II, LLC ....................................................................................................................................................................
Midlands Solar LLC ...................................................................................................................................................................
Midlands Lessee LLC .................................................................................................................................................................
Briar Creek Solar 1, LLC ............................................................................................................................................................
Elm Branch Solar 1, LLC ...........................................................................................................................................................
Huntley Solar, LLC .....................................................................................................................................................................
Cubico Huntley Lessee, LLC ......................................................................................................................................................
Richmond Spider Solar LLC ......................................................................................................................................................
Pleinmont Solar 2, LLC ..............................................................................................................................................................
Pleinmont Solar 1, LLC ..............................................................................................................................................................
Highlander Solar Energy Station 1, LLC ...................................................................................................................................
Highlander IA, LLC ....................................................................................................................................................................
Lone Tree Wind, LLC .................................................................................................................................................................
Techren Solar III LLC .................................................................................................................................................................
Techren Solar IV LLC .................................................................................................................................................................
Mountain Breeze Wind, LLC .....................................................................................................................................................
Assembly Solar, LLC ..................................................................................................................................................................
Bighorn Solar 1, LLC ..................................................................................................................................................................
IP Aragorn, LLC ..........................................................................................................................................................................
IP Juno, LLC ................................................................................................................................................................................
IP Titan, LLC ...............................................................................................................................................................................
AES ES Alamitos, LLC ...............................................................................................................................................................
Little Bear Master Tenant, LLC .................................................................................................................................................
Raymond Wind Farm, LLC ........................................................................................................................................................
West Raymond Wind Farm, LLC ...............................................................................................................................................
Boiling Springs Wind Farm, LLC ..............................................................................................................................................
Cimarron Bend Wind Project III, LLC .......................................................................................................................................
Aurora Wind Project, LLC .........................................................................................................................................................
Taygete Energy Project, LLC ......................................................................................................................................................
Biomasseheizkraftwerk Zolling GmbH ......................................................................................................................................
ENGIE Kraftwerke Farge GmbH & Co KGaA .............................................................................................................................
ENGIE Kraftwerke Zolling GmbH & Co KGaA ..........................................................................................................................
ENGIE Kraftwerke Wilhemshaven GmbH & Co KG .................................................................................................................
Power Plant Rotterdam B.V .......................................................................................................................................................
Take notice that during the month of
June 2020, the status of the abovecaptioned entities as Exempt Wholesale
Generators or Foreign Utility Companies
became effective by operation of the
Commission’s regulations. 18 CFR
366.7(a) (2019).
DEPARTMENT OF ENERGY
Dated: July 10, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
ANR Pipeline Company; Great Lakes
Transmission Limited Partnership;
Notice of Intent to Prepare an
Environment Assessment for the
Proposed Alberta Xpress and Lease
Capacity Abandonment Projects
Request for Comments on
Environmental Issues
[FR Doc. 2020–16083 Filed 7–23–20; 8:45 am]
jbell on DSKJLSW7X2PROD with NOTICES
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
[Docket Nos. CP20–484–000 and CP20–485–
000]
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Alberta Xpress Project involving
construction and operation of facilities
by ANR Pipeline Company (ANR) in
VerDate Sep<11>2014
20:45 Jul 23, 2020
Jkt 250001
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
EG20–111–000
EG20–112–000
EG20–113–000
EG20–114–000
EG20–115–000
EG20–116–000
EG20–117–000
EG20–118–000
EG20–119–000
EG20–120–000
EG20–121–000
EG20–122–000
EG20–123–000
EG20–124–000
EG20–125–000
EG20–126–000
EG20–127–000
EG20–128–000
EG20–129–000
EG20–134–000
EG20–135–000
EG20–136–000
EG20–137–000
EG20–139–000
EG20–140–000
EG20–141–000
EG20–142–000
EG20–143–000
EG20–144–000
EG20–145–000
FC20–5–000
FC20–6–000
FC20–7–000
FC20–8–000
FC20–9–000
Evangeline Parish, Louisiana, and the
Lease Capacity Abandonment Project
proposed by Great Lakes Transmission
Limited Partnership (GLTLP), which is
associated with the Alberta Xpress
Project. The Commission will use this
EA in its decision-making process to
determine whether the project is in the
public convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies about issues
regarding the project. The National
Environmental Policy Act (NEPA)
requires the Commission to take into
account the environmental impacts that
could result from its action whenever it
considers the issuance of a Certificate of
Public Convenience and Necessity.
NEPA also requires the Commission to
discover concerns the public may have
about proposals. This process is referred
to as ‘‘scoping.’’ The main goal of the
E:\FR\FM\24JYN1.SGM
24JYN1
Agencies
[Federal Register Volume 85, Number 143 (Friday, July 24, 2020)]
[Notices]
[Pages 44872-44873]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-15868]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. AD20-20-000]
Notice of Availability of Draft Engineering Guidelines for the
Evaluation of Hydropower Projects: Chapter 15--Supporting Technical
Information Document and Request for Comments
The staff of the Office of Energy Projects (OEP) has drafted its
initial version of Chapter 15--Supporting Technical Information
Document of its Engineering Guidelines for the Evaluation of Hydropower
Projects (Guidelines). This chapter will supersede the portions of
Chapter 14--Dam Safety Performance Monitoring Program that pertain to
the Supporting Technical Information Document, and is one of four draft
chapters intended to provide additional guidance related to the notice
of proposed rulemaking issued by the Commission in Docket No. RM20-9-
000. Please note that any comments on the proposed rulemaking or on
draft chapters of the Guidelines other than Chapter 15 should be filed
in the corresponding docket number.\1\
---------------------------------------------------------------------------
\1\ The Commission is concurrently issuing for public comment
four draft chapters of the Guidelines in Docket Nos. AD20-20-000
(Chapter 15--Supporting Technical Information Document), AD20-21-000
(Chapter 16--Part 12D Program), AD20-22-000 (Chapter 17--Potential
Failure Mode Analysis), and AD20-23-000 (Chapter 18--Level 2 Risk
Analysis).
---------------------------------------------------------------------------
Comments are now requested on the draft Chapter 15--Supporting
Technical Information Document from federal and state agencies,
licensees whose projects are subject to Part 12, Subpart D of the
Commission's regulations, independent consultants and inspectors, and
other interested parties with special expertise with respect to dam
safety. Comments are due 60 days from the date of this Notice.
Interested parties can help us determine the appropriate updates
and improvements by providing: Meaningful comments or suggestions that
focus on the specific sections requiring clarification; updates to
reflect current laws and regulations; or improved measures and best
practices for compiling and storing project records in physical and
electronic formats. The more specific your comments, the more useful
they will be. A detailed explanation of your submissions and/or any
references of scientific studies associated with your comments will
greatly help us with this process. We will consider all timely comments
on the revised Guidelines before issuing the final version.
For your convenience, there are three methods which you can use to
submit your comments to the Commission. In all instances please
reference the docket number (AD20-20-000) on the first page of your
submission. The Commission strongly encourages electronic filing.
(1) You can file your comments electronically using the eComment
feature on the Commission's website (www.ferc.gov). Select the FERC
Online option from the left-hand column and click on eComment. This is
an easy method for interested persons to submit brief, text-only
comments up to 6,000 characters. You must include your name and contact
information at the end of your comments.
(2) You can file your comments electronically using the eFiling
feature on the Commission's website (www.ferc.gov). Select the FERC
Online option from the left-hand column and click on eFiling. With
eFiling, you can provide comments in a variety of formats by attaching
them as a file with your submission. New eFiling users must first
create an account by clicking on eRegister. When selecting the filing
type, select General, then choose Comment (on Filing, Environ. Report
or Tech Conf).
(3) In lieu of electronic filing, you can mail a paper copy of your
comments to: Federal Energy Regulatory Commission, Secretary of the
Commission, 888 First Street NE, Washington, DC 20426. Hand-delivered
comments, or those delivered by carriers/couriers other than the US
Postal Service, should be delivered to Health and Human Services, 12225
Wilkins Avenue, Rockville, Maryland 20852.
All information related to Chapter 15--Supporting Technical
Information Document, including the draft chapter and all submitted
comments, can be found on the FERC website (www.ferc.gov) using the
eLibrary link. Click on the eLibrary link, click on General Search and
enter the docket number, excluding the last three digits in the Docket
Number field (i.e., AD20-20). Be sure you have selected an appropriate
date range. The Commission also offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
electronic notification of these filings and direct links to the
documents. Go to the Commission's website (www.ferc.gov), select the
FERC Online option from the left-hand column, and click on
eSubscription. Users must be registered in order to use eSubscription.
Information Collection Statement
The proposed Guidelines include information collection activities
for which the Paperwork Reduction Act \2\ requires approval by the
Office of Management and Budget (OMB). The Commission has included the
burden and cost estimates for information collection activities in
these Guidelines in the Notice of Proposed Rulemaking titled, Safety of
Water Power Projects and Project Works (Docket No. RM20-9-000). The
Commission has designated the information collection activities in the
proposed rule and in the Guidelines as FERC-517. Upon approval of FERC-
517, OMB will assign an OMB Control Number and expiration date.
---------------------------------------------------------------------------
\2\ 44 U.S.C. 3501-3521.
---------------------------------------------------------------------------
If you would like to submit comments on the information-collection
aspects (such as burden, cost, need for the data, and frequency of
reporting or recordkeeping) of the proposed Guidelines, please submit
them to: Office of Information and Regulatory Affairs, Office of
Management and Budget [Attention: Federal Energy Regulatory Commission
Desk Officer]. Due to security concerns, comments should be sent
directly to www.reginfo.gov/public/do/PRAMain. Comments submitted to
OMB should be sent within 60 days of publication of this notice in the
Federal Register and refer to FERC-517 and OMB Control No. 1902-TBD.
[[Page 44873]]
Please submit to the Commission copies of comments concerning the
collection of information and the associated burden estimates
(identified by Docket Nos. RM20-9-000 and AD20-20-000) by any of the
three methods listed above.
For assistance with filing or any of the Commission's online
systems, please contact FERC Online Support at
[email protected] or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8258.
Dated: July 16, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-15868 Filed 7-23-20; 8:45 am]
BILLING CODE 6717-01-P