Columbia Gas Transmission, LLC; Notice of Request for Extension of Time, 44066-44067 [2020-15732]
Download as PDF
44066
Federal Register / Vol. 85, No. 140 / Tuesday, July 21, 2020 / Notices
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the eLibrary link. Enter
the docket number excluding the last
three digits in the docket number field
to access the document. At this time, the
Commission has suspended access to
the Commission’s Public Reference
Room, due to the proclamation
declaring a National Emergency
concerning the Novel Coronavirus
Disease (COVID–19), issued by the
President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: July 15, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–15716 Filed 7–20–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AC20–150–000]
jbell on DSKJLSW7X2PROD with NOTICES
Pacific Gas and Electric Company;
Notice of Filing
Take notice that on July 10, 2020,
Pacific Gas and Electric Company
submitted a request for authorization to
modify the Allowance for Funds Used
During Construction (AFUDC) rate in a
manner that incorporates certain
adjustments related to financing
wildfire liability claims and
contributions to California’s Wildfire
Fund.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 or 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
VerDate Sep<11>2014
17:42 Jul 20, 2020
Jkt 250001
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFilinglink at https://www.ferc.gov.
Persons unable to file electronically may
mail similar pleadings to the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Comment Date: 5 p.m. Eastern Time
on August 5, 2020.
Dated: July 15, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–15734 Filed 7–20–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–80–000]
Columbia Gas Transmission, LLC;
Notice of Request for Extension of
Time
Take notice that on July 8, 2020,
Columbia Gas Transmission, LLC
(Columbia) requested that the Federal
Energy Regulatory Commission
(Commission) grant an extension of
time, until July 18, 2023, to complete
the construction of the Eastern
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
Panhandle Expansion Project, as
authorized in the July 19, 2018 Order
Issuing Certificate (July 19 Order).1 The
July 19 Order required Columbia to
complete construction and make the
facilities available for service within
two years of the Order date.
Columbia states that, due to
unforeseen delays in acquiring an
easement from the government of
Maryland across the Western Maryland
Rail Trail, additional time is now
required in order to complete the
construction of the authorized Project
facilities.
This notice establishes a 15-calendar
day intervention and comment period
deadline. Any person wishing to
comment on Columbia’s request for an
extension of time may do so. No reply
comments or answers will be
considered. If you wish to obtain legal
status by becoming a party to the
proceedings for this request, you
should, on or before the comment date
stated below, file a motion to intervene
in accordance with the requirements of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the Natural
Gas Act (18 CFR 157.10).2
As a matter of practice, the
Commission itself generally acts on
requests for extensions of time to
complete construction for Natural Gas
Act facilities when such requests are
contested before order issuance. For
those extension requests that are
contested,3 the Commission will aim to
issue an order acting on the request
within 45 days.4 The Commission will
address all arguments relating to
whether the applicant has demonstrated
there is good cause to grant the
extension.5 The Commission will not
consider arguments that re-litigate the
issuance of the certificate order,
including whether the Commission
properly found the project to be in the
public convenience and necessity and
whether the Commission’s
environmental analysis for the
certificate complied with the National
Environmental Policy Act.6 At the time
1 Columbia Gas Transmission, LLC, 164 FERC
61,036 (2018).
2 Only motions to intervene from entities that
were party to the underlying proceeding will be
accepted. Algonquin Gas Transmission, LLC, 170
FERC 61,144, at P 39 (2020).
3 Contested proceedings are those where an
intervenor disputes any material issue of the filing.
18 CFR 385.2201(c)(1) (2019).
4 Algonquin Gas Transmission, LLC, 170 FERC
61,144, at P 40 (2020).
5 Id. at P 40.
6 Similarly, the Commission will not re-litigate
the issuance of an NGA section 3 authorization,
including whether a proposed project is not
inconsistent with the public interest and whether
E:\FR\FM\21JYN1.SGM
21JYN1
Federal Register / Vol. 85, No. 140 / Tuesday, July 21, 2020 / Notices
a pipeline requests an extension of time,
orders on certificates of public
convenience and necessity are final and
the Commission will not re-litigate their
issuance.7 The OEP Director, or his or
her designee, will act on all of those
extension requests that are uncontested.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the e-File link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and three
copies of the protest or intervention to
the Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426.
In lieu of electronic filing, you may
submit a paper copy. Submissions sent
via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Comment Date: 5:00 p.m. Eastern
Time on July 30, 2020.
Dated: July 15, 2020.
Kimberly D. Bose,
Secretary.
jbell on DSKJLSW7X2PROD with NOTICES
[FR Doc. 2020–15732 Filed 7–20–20; 8:45 am]
BILLING CODE 6717–01–P
the Commission’s environmental analysis for the
permit order complied with NEPA.
7 Algonquin Gas Transmission, LLC, 170 FERC
61,144, at P 40 (2020).
VerDate Sep<11>2014
17:42 Jul 20, 2020
Jkt 250001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–493–000]
Tennessee Gas Pipeline Company,
L.L.C.; Notice of Application
Take notice that on June 30, 2020,
Tennessee Gas Pipeline Company,
L.L.C. (Tennessee), 1001 Louisiana
Street, Suite 1000, Houston, Texas
77002, filed in the above referenced
docket an application pursuant to
section 7(c) of the Natural Gas Act
(NGA) and Part 157 of the Commission’s
regulations requesting authorization to
(1) install one 11,107 horsepower (HP)
gas-turbine driven compressor unit at its
existing Compressor Station 321 in
Susquehanna County, Pennsylvania; (2)
install one 20,500 HP gas-turbine driven
compressor unit at its existing
Compressor Station 325 in Sussex
County, New Jersey; and (3) construct
the new 19,000 HP electric-driven
Compressor Station 327 in Passaic
County, New Jersey (East 300 Upgrade
Project). The East 300 Upgrade Project
would create 115,000 dekatherms per
day of firm transportation service.
Tennessee estimates the cost of the
project to be approximately $246.3
million, all as more fully described in
the application which is on file with the
Commission and open to public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the eLibrary link. Enter
the docket number excluding the last
three digits in the docket number field
to access the document. At this time, the
Commission has suspended access to
the Commission’s Public Reference
Room, due to the proclamation
declaring a National Emergency
concerning the Novel Coronavirus
Disease (COVID–19), issued by the
President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to Ben
Carranza, Director, Regulatory,
Tennessee Gas Pipeline Company,
L.L.C., 1001 Louisiana Street, Suite
1000, Houston, Texas 77002, by
telephone at (713) 420–5535, or by
emailing ben_carranza@
kindermorgan.com.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
44067
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule will serve to notify
federal and state agencies of the timing
for the completion of all necessary
reviews, and the subsequent need to
complete all federal authorizations
within 90 days of the date of issuance
of the Commission staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
five copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
E:\FR\FM\21JYN1.SGM
21JYN1
Agencies
[Federal Register Volume 85, Number 140 (Tuesday, July 21, 2020)]
[Notices]
[Pages 44066-44067]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-15732]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP17-80-000]
Columbia Gas Transmission, LLC; Notice of Request for Extension
of Time
Take notice that on July 8, 2020, Columbia Gas Transmission, LLC
(Columbia) requested that the Federal Energy Regulatory Commission
(Commission) grant an extension of time, until July 18, 2023, to
complete the construction of the Eastern Panhandle Expansion Project,
as authorized in the July 19, 2018 Order Issuing Certificate (July 19
Order).\1\ The July 19 Order required Columbia to complete construction
and make the facilities available for service within two years of the
Order date.
---------------------------------------------------------------------------
\1\ Columbia Gas Transmission, LLC, 164 FERC 61,036 (2018).
---------------------------------------------------------------------------
Columbia states that, due to unforeseen delays in acquiring an
easement from the government of Maryland across the Western Maryland
Rail Trail, additional time is now required in order to complete the
construction of the authorized Project facilities.
This notice establishes a 15-calendar day intervention and comment
period deadline. Any person wishing to comment on Columbia's request
for an extension of time may do so. No reply comments or answers will
be considered. If you wish to obtain legal status by becoming a party
to the proceedings for this request, you should, on or before the
comment date stated below, file a motion to intervene in accordance
with the requirements of the Commission's Rules of Practice and
Procedure (18 CFR 385.214 or 385.211) and the Regulations under the
Natural Gas Act (18 CFR 157.10).\2\
---------------------------------------------------------------------------
\2\ Only motions to intervene from entities that were party to
the underlying proceeding will be accepted. Algonquin Gas
Transmission, LLC, 170 FERC 61,144, at P 39 (2020).
---------------------------------------------------------------------------
As a matter of practice, the Commission itself generally acts on
requests for extensions of time to complete construction for Natural
Gas Act facilities when such requests are contested before order
issuance. For those extension requests that are contested,\3\ the
Commission will aim to issue an order acting on the request within 45
days.\4\ The Commission will address all arguments relating to whether
the applicant has demonstrated there is good cause to grant the
extension.\5\ The Commission will not consider arguments that re-
litigate the issuance of the certificate order, including whether the
Commission properly found the project to be in the public convenience
and necessity and whether the Commission's environmental analysis for
the certificate complied with the National Environmental Policy Act.\6\
At the time
[[Page 44067]]
a pipeline requests an extension of time, orders on certificates of
public convenience and necessity are final and the Commission will not
re-litigate their issuance.\7\ The OEP Director, or his or her
designee, will act on all of those extension requests that are
uncontested.
---------------------------------------------------------------------------
\3\ Contested proceedings are those where an intervenor disputes
any material issue of the filing. 18 CFR 385.2201(c)(1) (2019).
\4\ Algonquin Gas Transmission, LLC, 170 FERC 61,144, at P 40
(2020).
\5\ Id. at P 40.
\6\ Similarly, the Commission will not re-litigate the issuance
of an NGA section 3 authorization, including whether a proposed
project is not inconsistent with the public interest and whether the
Commission's environmental analysis for the permit order complied
with NEPA.
\7\ Algonquin Gas Transmission, LLC, 170 FERC 61,144, at P 40
(2020).
---------------------------------------------------------------------------
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://www.ferc.gov) using
the eLibrary link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to Commission's Public Reference
Room, due to the proclamation declaring a National Emergency concerning
the Novel Coronavirus Disease (COVID-19), issued by the President on
March 13, 2020. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the e-File link at
https://www.ferc.gov. Persons unable to file electronically should
submit an original and three copies of the protest or intervention to
the Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426.
In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
Comment Date: 5:00 p.m. Eastern Time on July 30, 2020.
Dated: July 15, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-15732 Filed 7-20-20; 8:45 am]
BILLING CODE 6717-01-P