Texas Eastern Transmission LP; Notice of Intent To Prepare an Environmental Assessment for the Proposed Bailey East Mine Panel 12J Project and Request for Comments on Environmental Issues, 43825-43827 [2020-15575]
Download as PDF
Federal Register / Vol. 85, No. 139 / Monday, July 20, 2020 / Notices
The closing date for the
submission of FY 2020 Title X claims is
September 12, 2020. The claims will be
processed for payment together with
any eligible unpaid approved claim
balances from prior years, based on the
availability of funds from congressional
appropriations. If the total approved
claim amounts exceed the available
funding, the approved claim amounts
will be reimbursed on a prorated basis.
All reimbursements are subject to the
availability of funds from congressional
appropriations.
ADDRESSES: Claims should be forwarded
by certified or registered mail, return
receipt requested, to Jalena Dayvault,
U.S. DOE Department of Energy, Office
of Legacy Management, 2597 Legacy
Way, Grand Junction, Colorado 81503.
Two copies of the claim should be
included with each submission.
FOR FURTHER INFORMATION CONTACT: Julia
Donkin, Title X Program Lead at (202)
586–5000 or email: Julia.Donkin@
em.doe.gov.
SUPPLEMENTARY INFORMATION: DOE
published a final rule under 10 CFR part
765 in the Federal Register on May 23,
1994, (59 FR 26714) to carry out the
requirements of Title X of the Energy
Policy Act of 1992 (sections 1001–1004
of Pub. L. 102–486, 42 U.S.C. 2296a et
seq.) and to establish the procedures for
eligible licensees to submit claims for
reimbursement. DOE amended the final
rule on June 3, 2003, (68 FR 32955) to
adopt several technical and
administrative amendments (e.g.,
statutory increases in the
reimbursement ceilings). Title X
requires DOE to reimburse eligible
uranium and thorium licensees for
certain costs of decontamination,
decommissioning, reclamation, and
other remedial action incurred by
licensees at active uranium and thorium
processing sites. The eligible licensees
incurred these costs to remediate
byproduct material, generated as an
incident of sales to the United States
Government of uranium or thorium that
was extracted or concentrated from ores
processed primarily for their source
material contents. To be reimbursable,
costs of remedial action must be for
work that is necessary to comply with
applicable requirements of the Uranium
Mill Tailings Radiation Control Act of
1978 (42 U.S.C. 7901 et seq.) or, where
appropriate, with requirements
established by a State pursuant to a
discontinuance agreement under section
274 of the Atomic Energy Act of 1954
(42 U.S.C. 2021). Claims for
reimbursement must be supported by
reasonable documentation as
determined by DOE in accordance with
DATES:
VerDate Sep<11>2014
18:30 Jul 17, 2020
Jkt 250001
10 CFR part 765. Funds for
reimbursement will be provided from
the Uranium Enrichment
Decontamination and Decommissioning
Fund established at the Department of
Treasury pursuant to section 1801 of the
Atomic Energy Act of 1954 (42 U.S.C.
2297g). Payment or obligation of funds
shall be subject to the requirements of
the Anti-Deficiency Act (31 U.S.C.
1341).
Authority: Section 1001–1004 of Public
Law 102–486, 106 Stat. 2776 (42 U.S.C.
2296a et seq.).
Signing Authority
This document of the Department of
Energy was signed on July 15, 2020, by
Julia Donkin, Office of Waste Disposal,
Office of Environmental Management,
pursuant to delegated authority from the
Secretary of Energy. That document
with the original signature and date is
maintained by DOE. For administrative
purposes only, and in compliance with
requirements of the Office of the Federal
Register, the undersigned DOE Federal
Register Liaison Officer has been
authorized to sign and submit the
document in electronic format for
publication, as an official document of
the Department of Energy. This
administrative process in no way alters
the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC, on July 15,
2020.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
[FR Doc. 2020–15590 Filed 7–17–20; 8:45 am]
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP20–1017–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rates—EQT Amended NRA
911235 eff 7–8–2020 to be effective 7/
8/2020.
Filed Date: 7/8/20.
Accession Number: 20200708–5085.
Comments Due: 5 p.m. ET 7/20/20.
Docket Numbers: RP20–1018–000.
Applicants: Southern Star Central Gas
Pipeline, Inc.
Description: § 4(d) Rate Filing: Vol.
2—Amended Non-Conforming Discount
Frm 00020
Fmt 4703
Sfmt 4703
Agreement—Empire District Electric Co.
to be effective 7/8/2020.
Filed Date: 7/8/20.
Accession Number: 20200708–5086.
Comments Due: 5 p.m. ET 7/20/20.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 10, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–15612 Filed 7–17–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–471–000]
Texas Eastern Transmission LP;
Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Bailey East Mine Panel 12J
Project and Request for Comments on
Environmental Issues
BILLING CODE 6450–01–P
PO 00000
43825
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Bailey East Mine Panel 12J Project
involving construction and operation of
facilities by Texas Eastern Transmission
LP (Texas Eastern) in Marshall County,
West Virginia. The Commission will use
this EA in its decision-making process
to determine whether the project is in
the public convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies about issues
regarding the project. The National
Environmental Policy Act (NEPA)
requires the Commission to take into
E:\FR\FM\20JYN1.SGM
20JYN1
43826
Federal Register / Vol. 85, No. 139 / Monday, July 20, 2020 / Notices
account the environmental impacts that
could result from its action whenever it
considers the issuance of a Certificate of
Public Convenience and Necessity.
NEPA also requires the Commission to
discover concerns the public may have
about proposals. This process is referred
to as ‘‘scoping.’’ The main goal of the
scoping process is to focus the analysis
in the EA on the important
environmental issues. By this notice, the
Commission requests public comments
on the scope of issues to address in the
EA. To ensure that your comments are
timely and properly recorded, please
submit your comments so that the
Commission receives them in
Washington, DC on or before 5:00 p.m.
Eastern Time on August 12, 2020.
You can make a difference by
submitting your specific comments or
concerns about the project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EA. Commission staff
will consider all filed comments during
the preparation of the EA.
If you sent comments on this project
to the Commission before the opening of
this docket on June 1, 2020, you will
need to file those comments in Docket
No. CP20–471–000 to ensure they are
considered as part of this proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
easement agreement. You are not
required to enter into an agreement.
However, if the Commission approves
the project, that approval conveys with
it the right of eminent domain.
Therefore, if you and the company do
not reach an easement agreement, the
pipeline company could initiate
condemnation proceedings in court. In
such instances, compensation would be
determined by a judge in accordance
with state law.
Texas Eastern provided landowners
with a fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ This fact sheet addresses a
number of typically asked questions,
VerDate Sep<11>2014
18:30 Jul 17, 2020
Jkt 250001
including the use of eminent domain
and how to participate in the
Commission’s proceedings. It is also
available for viewing on the FERC
website (www.ferc.gov) under the
natural gas Landowner Topics link.
Public Participation
The Commission offers a free service
called eSubscription which makes it
easy to stay informed of all issuances
and submittals regarding the dockets/
projects to which you subscribe. These
instant email notifications are the fastest
way to receive notification and provide
a link to the document files which can
reduce the amount of time you spend
researching proceedings. Go to https://
www.ferc.gov/ferc-online/overview to
register for eSubscription.
For your convenience, there are three
methods you can use to submit your
comments to the Commission. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to FERC Online. Using
eComment is an easy method for
submitting brief, text-only comments on
a project;
(2) You can file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to FERC Online. With
eFiling, you can provide comments in a
variety of formats by attaching them as
a file with your submission. New
eFiling users must first create an
account by clicking on ‘‘eRegister.’’ You
will be asked to select the type of filing
you are making; a comment on a
particular project is considered a
‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address using the U.S. Postal
Service. Be sure to reference the project
docket number (CP20–471–000) with
your submission: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent through carriers other
than the U.S. Postal Service must be
sent to 12225 Wilkins Avenue,
Rockville, Maryland 20852 for
processing.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
Summary of the Proposed Project
Texas Eastern proposes to excavate
and elevate sections of four natural gas
transmission pipelines due to longwall
mining activities. According to Texas
Eastern, its project would allow for safe
and efficient operation of Texas
Eastern’s existing pipeline facilities for
the duration of the longwall mining
activities planned by CONSOL Energy
Inc. in the area beneath Texas Eastern’s
pipelines. The general location of the
project facilities is shown in appendix
1.1
Land Requirements for Construction
Construction of the proposed facilities
would disturb about 37.7 acres of land
for the excavation and elevation of the
pipeline segments. Following
construction, Texas Eastern would
maintain about 15.2 acres for permanent
operation of the project’s facilities; the
remaining acreage would be restored
and revert to former uses. The proposed
pipeline excavation and elevation
parallels existing pipeline rights-of-way
for 100 percent of the project.
The EA Process
The EA will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils;
• water resources and wetlands;
• vegetation and wildlife;
• threatened and endangered species;
• cultural resources;
• land use;
• air quality and noise;
• public safety; and
• cumulative impacts
Commission staff will also evaluate
reasonable alternatives to the proposed
project or portions of the project, and
make recommendations on how to
lessen or avoid impacts on the various
resource areas.
The EA will present Commission
staffs’ independent analysis of the
issues. The EA will be available in
electronic format in the public record
through eLibrary 2 and the
Commission’s natural gas
environmental documents web page
(https://www.ferc.gov/industries-data/
1 The appendices referenced in this notice will
not appear in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’ or from the
Commission’s Public Reference Room, 888 First
Street NE, Washington, DC 20426, or call (202) 502–
8371. For instructions on connecting to eLibrary,
refer to the last page of this notice.
2 For instructions on connecting to eLibrary, refer
to the last page of this notice.
E:\FR\FM\20JYN1.SGM
20JYN1
Federal Register / Vol. 85, No. 139 / Monday, July 20, 2020 / Notices
43827
natural-gas/environment/
environmental-documents). If
eSubscribed, you will receive instant
email notification when the EA is
issued. The EA may be issued for an
allotted public comment period.
Commission staff will consider all
comments on the EA before making
recommendations to the Commission.
To ensure Commission staff have the
opportunity to address your comments,
please carefully follow the instructions
in the Public Participation section,
beginning on page 2.
With this notice, the Commission is
asking agencies with jurisdiction by law
and/or special expertise with respect to
the environmental issues of this project
to formally cooperate in the preparation
of the EA.3 Agencies that would like to
request cooperating agency status
should follow the instructions for filing
comments provided under the Public
Participation section of this notice.
facilities, and anyone who submits
comments on the project. Commission
staff will update the environmental
mailing list as the analysis proceeds to
ensure that Commission notices related
to this environmental review are sent to
all individuals, organizations, and
government entities interested in and/or
potentially affected by the proposed
project.
If the Commission issues the EA for
an allotted public comment period, a
Notice of Availability of the EA will be
sent to the environmental mailing list
and will provide instructions to access
the electronic document on the FERC’s
website (www.ferc.gov). If you need to
make changes to your name/address, or
if you would like to remove your name
from the mailing list, please return the
attached ‘‘Mailing List Update Form’’
(appendix 2).
Consultation Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, the Commission is
using this notice to initiate consultation
with the applicable State Historic
Preservation Office, and to solicit their
views and those of other government
agencies, interested Indian tribes, and
the public on the project’s potential
effects on historic properties.4 The EA
for this project will document findings
on the impacts on historic properties
and summarize the status of
consultations under section 106.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number in the ‘‘Docket Number’’
field, excluding the last three digits (i.e.,
CP20–471). Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Public sessions or site visits will be
posted on the Commission’s calendar
located at https://www.ferc.gov/newsevents/events along with other related
information.
Description: Tariff filing per
284.123(b),(e)/: Amend Operating
Statement for The East Ohio Gas
Company 4/30/2020 to be effective.
Filed Date: 7/10/20.
Accession Number: 202007105074.
Comments Due: 5 p.m. ET 7/24/2020.
Docket Numbers: RP20–1019–000.
Applicants: Midwestern Gas
Transmission Company.
Description: § 4(d) Rate Filing:
Operational Flow Orders to be effective
8/8/2020.
Filed Date: 7/9/20.
Accession Number: 20200709–5110.
Comments Due: 5 p.m. ET 7/21/20.
Docket Numbers: RP20–1020–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) Rate Filing: REX—
2020–07–09 Administrative Change to
be effective 6/26/2020.
Filed Date: 7/9/20.
Accession Number: 20200709–5136.
Comments Due: 5 p.m. ET 7/21/20.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 13, 2020.
Kimberly D. Bose,
Secretary.
Dated: July 13, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–15575 Filed 7–17–20; 8:45 am]
[FR Doc. 2020–15609 Filed 7–17–20; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Combined Notice of Filings
[Docket No. CP20–489–000]
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Number: PR20–55–001.
Applicants: The East Ohio Gas
Company.
Southern Star Central Gas Pipeline,
Inc.; Notice of Application
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
3 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
4 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
VerDate Sep<11>2014
18:30 Jul 17, 2020
Jkt 250001
Additional Information
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
Take notice that on June 30, 2020,
Southern Star Central Gas Pipeline, Inc.
(Southern Star), 4700 State Route 56,
Owensboro, Kentucky 42301, filed an
E:\FR\FM\20JYN1.SGM
20JYN1
Agencies
[Federal Register Volume 85, Number 139 (Monday, July 20, 2020)]
[Notices]
[Pages 43825-43827]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-15575]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP20-471-000]
Texas Eastern Transmission LP; Notice of Intent To Prepare an
Environmental Assessment for the Proposed Bailey East Mine Panel 12J
Project and Request for Comments on Environmental Issues
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Bailey East Mine Panel 12J
Project involving construction and operation of facilities by Texas
Eastern Transmission LP (Texas Eastern) in Marshall County, West
Virginia. The Commission will use this EA in its decision-making
process to determine whether the project is in the public convenience
and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies about issues regarding the project. The National Environmental
Policy Act (NEPA) requires the Commission to take into
[[Page 43826]]
account the environmental impacts that could result from its action
whenever it considers the issuance of a Certificate of Public
Convenience and Necessity. NEPA also requires the Commission to
discover concerns the public may have about proposals. This process is
referred to as ``scoping.'' The main goal of the scoping process is to
focus the analysis in the EA on the important environmental issues. By
this notice, the Commission requests public comments on the scope of
issues to address in the EA. To ensure that your comments are timely
and properly recorded, please submit your comments so that the
Commission receives them in Washington, DC on or before 5:00 p.m.
Eastern Time on August 12, 2020.
You can make a difference by submitting your specific comments or
concerns about the project. Your comments should focus on the potential
environmental effects, reasonable alternatives, and measures to avoid
or lessen environmental impacts. Your input will help the Commission
staff determine what issues they need to evaluate in the EA. Commission
staff will consider all filed comments during the preparation of the
EA.
If you sent comments on this project to the Commission before the
opening of this docket on June 1, 2020, you will need to file those
comments in Docket No. CP20-471-000 to ensure they are considered as
part of this proceeding.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this proposed
project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the proposed facilities. The company
would seek to negotiate a mutually acceptable easement agreement. You
are not required to enter into an agreement. However, if the Commission
approves the project, that approval conveys with it the right of
eminent domain. Therefore, if you and the company do not reach an
easement agreement, the pipeline company could initiate condemnation
proceedings in court. In such instances, compensation would be
determined by a judge in accordance with state law.
Texas Eastern provided landowners with a fact sheet prepared by the
FERC entitled ``An Interstate Natural Gas Facility On My Land? What Do
I Need To Know?'' This fact sheet addresses a number of typically asked
questions, including the use of eminent domain and how to participate
in the Commission's proceedings. It is also available for viewing on
the FERC website (www.ferc.gov) under the natural gas Landowner Topics
link.
Public Participation
The Commission offers a free service called eSubscription which
makes it easy to stay informed of all issuances and submittals
regarding the dockets/projects to which you subscribe. These instant
email notifications are the fastest way to receive notification and
provide a link to the document files which can reduce the amount of
time you spend researching proceedings. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
For your convenience, there are three methods you can use to submit
your comments to the Commission. The Commission encourages electronic
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected]. Please carefully follow these
instructions so that your comments are properly recorded.
(1) You can file your comments electronically using the eComment
feature, which is located on the Commission's website (www.ferc.gov)
under the link to FERC Online. Using eComment is an easy method for
submitting brief, text-only comments on a project;
(2) You can file your comments electronically by using the eFiling
feature, which is located on the Commission's website (www.ferc.gov)
under the link to FERC Online. With eFiling, you can provide comments
in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You will be asked to select the type of filing you
are making; a comment on a particular project is considered a ``Comment
on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the following address using the U.S. Postal Service. Be sure to
reference the project docket number (CP20-471-000) with your
submission: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent through carriers other than the U.S. Postal Service
must be sent to 12225 Wilkins Avenue, Rockville, Maryland 20852 for
processing.
Summary of the Proposed Project
Texas Eastern proposes to excavate and elevate sections of four
natural gas transmission pipelines due to longwall mining activities.
According to Texas Eastern, its project would allow for safe and
efficient operation of Texas Eastern's existing pipeline facilities for
the duration of the longwall mining activities planned by CONSOL Energy
Inc. in the area beneath Texas Eastern's pipelines. The general
location of the project facilities is shown in appendix 1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of appendices were sent to all those
receiving this notice in the mail and are available at www.ferc.gov
using the link called ``eLibrary'' or from the Commission's Public
Reference Room, 888 First Street NE, Washington, DC 20426, or call
(202) 502-8371. For instructions on connecting to eLibrary, refer to
the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facilities would disturb about 37.7
acres of land for the excavation and elevation of the pipeline
segments. Following construction, Texas Eastern would maintain about
15.2 acres for permanent operation of the project's facilities; the
remaining acreage would be restored and revert to former uses. The
proposed pipeline excavation and elevation parallels existing pipeline
rights-of-way for 100 percent of the project.
The EA Process
The EA will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
Geology and soils;
water resources and wetlands;
vegetation and wildlife;
threatened and endangered species;
cultural resources;
land use;
air quality and noise;
public safety; and
cumulative impacts
Commission staff will also evaluate reasonable alternatives to the
proposed project or portions of the project, and make recommendations
on how to lessen or avoid impacts on the various resource areas.
The EA will present Commission staffs' independent analysis of the
issues. The EA will be available in electronic format in the public
record through eLibrary \2\ and the Commission's natural gas
environmental documents web page (https://www.ferc.gov/industries-data/
[[Page 43827]]
natural-gas/environment/environmental-documents). If eSubscribed, you
will receive instant email notification when the EA is issued. The EA
may be issued for an allotted public comment period. Commission staff
will consider all comments on the EA before making recommendations to
the Commission. To ensure Commission staff have the opportunity to
address your comments, please carefully follow the instructions in the
Public Participation section, beginning on page 2.
---------------------------------------------------------------------------
\2\ For instructions on connecting to eLibrary, refer to the
last page of this notice.
---------------------------------------------------------------------------
With this notice, the Commission is asking agencies with
jurisdiction by law and/or special expertise with respect to the
environmental issues of this project to formally cooperate in the
preparation of the EA.\3\ Agencies that would like to request
cooperating agency status should follow the instructions for filing
comments provided under the Public Participation section of this
notice.
---------------------------------------------------------------------------
\3\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
---------------------------------------------------------------------------
Consultation Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, the Commission is using this notice to initiate
consultation with the applicable State Historic Preservation Office,
and to solicit their views and those of other government agencies,
interested Indian tribes, and the public on the project's potential
effects on historic properties.\4\ The EA for this project will
document findings on the impacts on historic properties and summarize
the status of consultations under section 106.
---------------------------------------------------------------------------
\4\ The Advisory Council on Historic Preservation's regulations
are at Title 36, Code of Federal Regulations, Part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project. Commission staff will update the environmental
mailing list as the analysis proceeds to ensure that Commission notices
related to this environmental review are sent to all individuals,
organizations, and government entities interested in and/or potentially
affected by the proposed project.
If the Commission issues the EA for an allotted public comment
period, a Notice of Availability of the EA will be sent to the
environmental mailing list and will provide instructions to access the
electronic document on the FERC's website (www.ferc.gov). If you need
to make changes to your name/address, or if you would like to remove
your name from the mailing list, please return the attached ``Mailing
List Update Form'' (appendix 2).
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website at www.ferc.gov using the eLibrary link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number
in the ``Docket Number'' field, excluding the last three digits (i.e.,
CP20-471). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
[email protected] or (866) 208-3676, or for TTY, contact (202)
502-8659. The eLibrary link also provides access to the texts of all
formal documents issued by the Commission, such as orders, notices, and
rulemakings.
Public sessions or site visits will be posted on the Commission's
calendar located at https://www.ferc.gov/news-events/events along with
other related information.
Dated: July 13, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-15575 Filed 7-17-20; 8:45 am]