PJM Interconnection, LLC; Notice of Filing, 43577 [2020-15480]

Download as PDF khammond on DSKJM1Z7X2PROD with NOTICES Federal Register / Vol. 85, No. 138 / Friday, July 17, 2020 / Notices deadline date for the particular proceeding. Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the ‘‘COMMENTS CONTESTING QUALIFICATION FOR A CONDUIT HYDROPOWER FACILITY’’ or ‘‘MOTION TO INTERVENE,’’ as applicable; (2) state in the heading the name of the applicant and the project number of the application to which the filing responds; (3) state the name, address, and telephone number of the person filing; and (4) otherwise comply with the requirements of sections 385.2001 through 385.2005 of the Commission’s regulations.1 All comments contesting Commission staff’s preliminary determination that the facility meets the qualifying criteria must set forth their evidentiary basis. The Commission strongly encourages electronic filing. Please file motions to intervene and comments using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may send a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Locations of Notice of Intent: The Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s website at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number (i.e., CD20–7) in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances 1 18 18:12 Jul 16, 2020 Dated: July 13, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–15484 Filed 7–16–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL19–58–002] PJM Interconnection, LLC; Notice of Filing Take notice that on July 6, 2020, PJM Interconnection, LLC submitted a filing in compliance with the Federal Energy Regulatory Commission’s (Commission) Order on Proposed Tariff Revisions and Operating Agreement Revisions, in the above captioned proceeding, on May 21, 2020.1 Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. 1 PJM Interconnection, L.L.C., 171 FERC ¶ 61,153 (2020) (‘‘May 21 Order’’). CFR 385.2001–2005 (2019). VerDate Sep<11>2014 related to this or other pending projects. Copies of the notice of intent can be obtained directly from the applicant. At this time, the Commission has suspended access to the Commission’s Public Reference Room due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, call toll-free 1–866–208– 3676 or email FERCOnlineSupport@ ferc.gov. For TTY, call (202) 502–8659. Jkt 250001 PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 43577 In addition to publishing the full text of this document in the Federal Register, The Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on July 27, 2020. Dated: July 13, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–15480 Filed 7–16–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1894–000] Dominion Energy South Carolina, Inc.; Notice of Authorization for Continued Project Operation On June 28, 2018, South Carolina Electric & Gas Company (now identified as Dominion Energy South Carolina, Inc.),1 licensee for the Parr Hydroelectric Project, filed an Application for a New License pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Parr Hydroelectric Project is on the Broad River in Newberry and Fairfield Counties, South Carolina. The license for Project No. 1894 was issued for a period ending June 30, 2020. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or 1 Effective April 29, 2019, South Carolina Electric & Gas Company changed the company name to Dominion Energy South Carolina, Inc. On July 29, 2019, the Commission approved the name change. 168 FERC ¶ 62,053 (2019). E:\FR\FM\17JYN1.SGM 17JYN1

Agencies

[Federal Register Volume 85, Number 138 (Friday, July 17, 2020)]
[Notices]
[Page 43577]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-15480]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL19-58-002]


PJM Interconnection, LLC; Notice of Filing

    Take notice that on July 6, 2020, PJM Interconnection, LLC 
submitted a filing in compliance with the Federal Energy Regulatory 
Commission's (Commission) Order on Proposed Tariff Revisions and 
Operating Agreement Revisions, in the above captioned proceeding, on 
May 21, 2020.\1\
---------------------------------------------------------------------------

    \1\ PJM Interconnection, L.L.C., 171 FERC ] 61,153 (2020) (``May 
21 Order'').
---------------------------------------------------------------------------

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. On or 
before the comment date, it is not necessary to serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE, Washington, DC 
20426.
    In addition to publishing the full text of this document in the 
Federal Register, The Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://www.ferc.gov) using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to Commission's Public Reference 
Room, due to the proclamation declaring a National Emergency concerning 
the Novel Coronavirus Disease (COVID-19), issued by the President on 
March 13, 2020. For assistance, contact FERC at 
[email protected] or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on July 27, 2020.

    Dated: July 13, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-15480 Filed 7-16-20; 8:45 am]
BILLING CODE 6717-01-P