Great Lakes Gas Transmission Limited Partnership; Notice of Application, 41030-41031 [2020-14664]
Download as PDF
41030
Federal Register / Vol. 85, No. 131 / Wednesday, July 8, 2020 / Notices
to the following revised Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Filing of recommendations, preliminary
terms and conditions,
and preliminary
fishway prescriptions.
Commission issues
Draft EA or EIS.
Comments on Draft EA
or EIS.
Modified Terms and
Conditions.
Commission Issues
Final EA or EIS.
Target date
August 2020.
April 2021.
May 2021.
July 2021.
October 2021.
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
q. A license applicant must file no
later than 60 days following the date of
issuance of the notice of acceptance and
ready for environmental analysis
provided for in 5.22: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Dated: July 1, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–14665 Filed 7–7–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–485–000]
jbell on DSKJLSW7X2PROD with NOTICES
Great Lakes Gas Transmission Limited
Partnership; Notice of Application
Take notice that on June 22, 2020,
Great Lakes Gas Transmission Limited
Partnership (GLGT), 700 Louisiana
Street, Suite 700, Houston, Texas 77002,
filed in Docket No. CP20–485–000 an
application pursuant to section 7(b) of
the Natural Gas Act (NGA) requesting
authorization to abandon firm capacity
by a lease agreement with ANR Pipeline
Company (ANR). This application is
related to application filed by ANR in
Docket No. CP20–484–000 to construct
and operate the Alberta Xpress Project
including the authorization to acquire
firm capacity from GLGT pursuant to
the capacity lease agreement between
GLGT and ANR dated June 19, 2020.
In addition to publishing the full text
of this document in the Federal
VerDate Sep<11>2014
17:17 Jul 07, 2020
Jkt 250001
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the eLibrary link. Enter
the docket number excluding the last
three digits in the docket number field
to access the document. At this time, the
Commission has suspended access to
the Commission’s Public Reference
Room, due to the proclamation
declaring a National Emergency
concerning the Novel Coronavirus
Disease (COVID–19), issued by the
President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application may be directed to Richard
Bralow, Sr. Legal Counsel, ANR
Pipeline Company, 700 Louisiana
Street, Suite 700, Houston, Texas 77002,
by phone (832) 320–5177, or by email
Richard_bralow@tcenergy.com.
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
within 90 days of this Notice, the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule will serve to notify
federal and state agencies of the timing
for the completion of all necessary
reviews, and the subsequent need to
complete all federal authorizations
within 90 days of the date of issuance
of the Commission staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
PO 00000
Frm 00069
Fmt 4703
Sfmt 4703
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
five copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list and will be
notified of meetings associated with the
Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
As of the February 27, 2018 date of
the Commission’s order in Docket No.
CP16–4–001, the Commission will
apply its revised practice concerning
out-of-time motions to intervene in any
new NGA section 3 or section 7
proceeding.1 Persons desiring to become
a party to a certificate proceeding are to
intervene in a timely manner. If seeking
to intervene out-of-time, the movant is
required to show good cause why the
time limitation should be waived, and
should provide justification by reference
to factors set forth in Rule 214(d)(1) of
the Commission’s Rules and
Regulations.2
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
1 Tennessee Gas Pipeline Company, L.L.C., 162
FERC 61,167 at 50 (2018).
2 18 CFR 385.214(d)(1).
E:\FR\FM\08JYN1.SGM
08JYN1
Federal Register / Vol. 85, No. 131 / Wednesday, July 8, 2020 / Notices
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically may
mail similar pleadings to the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Comment Date: 5:00 p.m. Eastern
Standard Time on July 22, 2020.
Dated: July 1, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–14664 Filed 7–7–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jbell on DSKJLSW7X2PROD with NOTICES
Combined Notice of Filings #
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP17–913–004.
Applicants: Natural Gas Pipeline
Company of America.
Description: Compliance filing NGPL
Fuel Transparency Report Informational
Filing.
Filed Date: 6/30/20.
Accession Number: 20200630–5153.
Comments Due: 5 p.m. ET 7/13/20.
Docket Numbers: RP20–972–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rates—Chevron 911109
Releases eff 07–01–20 to be effective 7/
1/2020.
Filed Date: 6/30/20.
Accession Number: 20200630–5045.
Comments Due: 5 p.m. ET 7/13/20.
Docket Numbers: RP20–973–000.
Applicants: NEXUS Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates—Columbia Gas 860005
7–1–2020 releases to be effective 7/1/
2020.
Filed Date: 6/30/20.
Accession Number: 20200630–5046.
Comments Due: 5 p.m. ET 7/13/20.
Docket Numbers: RP20–974–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates—Various Releases eff
7–1–20 to be effective 7/1/2020.
Filed Date: 6/30/20.
Accession Number: 20200630–5053.
Comments Due: 5 p.m. ET 7/13/20.
Docket Numbers: RP20–975–000.
VerDate Sep<11>2014
17:17 Jul 07, 2020
Jkt 250001
Applicants: Northern Natural Gas
Company.
Description: § 4(d) Rate Filing:
20200630 Negotiated Rate to be effective
7/1/2020.
Filed Date: 6/30/20.
Accession Number: 20200630–5061.
Comments Due: 5 p.m. ET 7/13/20.
Docket Numbers: RP20–976–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreement Filing—
Devon Gas Services to be effective 7/1/
2020.
Filed Date: 6/30/20.
Accession Number: 20200630–5095.
Comments Due: 5 p.m. ET 7/13/20.
Docket Numbers: RP20–977–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: § 4(d) Rate Filing:
Amendment to a Negotiated Rate
Agreement Filing-Lucid Energy to be
effective 7/1/2020.
Filed Date: 6/30/20.
Accession Number: 20200630–5103.
Comments Due: 5 p.m. ET 7/13/20.
Docket Numbers: RP20–978–000.
Applicants: Cheyenne Connector,
LLC.
Description: § 4(d) Rate Filing: CC
2020–06–30 Administrative Changes to
be effective 8/1/2020.
Filed Date: 6/30/20.
Accession Number: 20200630–5109.
Comments Due: 5 p.m. ET 7/13/20.
Docket Numbers: RP20–979–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) Rate Filing: REX
2020–06–30 Administrative Changes to
be effective 8/1/2020.
Filed Date: 6/30/20.
Accession Number: 20200630–5112.
Comments Due: 5 p.m. ET 7/13/20.
Docket Numbers: RP20–980–000.
Applicants: East Tennessee Natural
Gas, LLC.
Description: § 4(d) Rate Filing: ETNG
Section 4 Rate Case to be effective 8/1/
2020.
Filed Date: 6/30/20.
Accession Number: 20200630–5156.
Comments Due: 5 p.m. ET 7/13/20.
Docket Numbers: RP20–981–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: § 4(d) Rate Filing:
Limited Section 4 to Adjust Fuel Gas
and Lost and Unaccounted For
Retention Fact to be effective 8/1/2020.
Filed Date: 6/30/20.
Accession Number: 20200630–5158.
Comments Due: 5 p.m. ET 7/13/20.
Docket Numbers: RP20–982–000.
Applicants: Gulf South Pipeline
Company, LLC.
PO 00000
Frm 00070
Fmt 4703
Sfmt 4703
41031
Description: § 4(d) Rate Filing: Cap
Rel Neg Rate Agmts (Atlanta Gas 8438
releases eff 7–1–2020) to be effective 7/
1/2020.
Filed Date: 6/30/20.
Accession Number: 20200630–5164.
Comments Due: 5 p.m. ET 7/13/20.
Docket Numbers: RP20–983–000.
Applicants: Gulf South Pipeline
Company, LLC.
Description: § 4(d) Rate Filing:
Remove Expired Agreements eff 7/1/
2020 to be effective 7/1/2020.
Filed Date: 6/30/20.
Accession Number: 20200630–5162.
Comments Due: 5 p.m. ET 7/13/20.
Docket Numbers: RP20–984–000.
Applicants: Dominion Energy
Transmission, Inc.
Description: § 4(d) Rate Filing: DETI—
June 30, 2020 Negotiated Rate and
Nonconforming Service Agreements to
be effective 8/1/2020.
Filed Date: 6/30/20.
Accession Number: 20200630–5171.
Comments Due: 5 p.m. ET 7/13/20.
Docket Numbers: RP20–985–000.
Applicants: Columbia Gulf
Transmission, LLC.
Description: Compliance filing
Compliance to Settlement in RP20–177–
000 Implement Rates to be effective 8/
1/2020.
Filed Date: 6/30/20.
Accession Number: 20200630–5176.
Comments Due: 5 p.m. ET 7/13/20.
Docket Numbers: RP20–986–000.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates—Cherokee AGL—
Replacement Shippers—Jul 2020 to be
effective 7/1/2020.
Filed Date: 6/30/20.
Accession Number: 20200630–5245.
Comments Due: 5 p.m. ET 7/13/20.
Docket Numbers: RP20–987–000.
Applicants: Northern Natural Gas
Company.
Description: § 4(d) Rate Filing:
20200630 Non Conforming to be
effective 7/30/2020.
Filed Date: 6/30/20.
Accession Number: 20200630–5290.
Comments Due: 5 p.m. ET 7/13/20.
Docket Numbers: RP20–988–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing: TETLP
EPC AUG 2020 FILING to be effective 8/
1/2020.
Filed Date: 6/30/20.
Accession Number: 20200630–5293.
Comments Due: 5 p.m. ET 7/13/20.
Docket Numbers: RP20–989–000.
Applicants: Texas Eastern
Transmission, LP.
E:\FR\FM\08JYN1.SGM
08JYN1
Agencies
[Federal Register Volume 85, Number 131 (Wednesday, July 8, 2020)]
[Notices]
[Pages 41030-41031]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-14664]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP20-485-000]
Great Lakes Gas Transmission Limited Partnership; Notice of
Application
Take notice that on June 22, 2020, Great Lakes Gas Transmission
Limited Partnership (GLGT), 700 Louisiana Street, Suite 700, Houston,
Texas 77002, filed in Docket No. CP20-485-000 an application pursuant
to section 7(b) of the Natural Gas Act (NGA) requesting authorization
to abandon firm capacity by a lease agreement with ANR Pipeline Company
(ANR). This application is related to application filed by ANR in
Docket No. CP20-484-000 to construct and operate the Alberta Xpress
Project including the authorization to acquire firm capacity from GLGT
pursuant to the capacity lease agreement between GLGT and ANR dated
June 19, 2020.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
eLibrary link. Enter the docket number excluding the last three digits
in the docket number field to access the document. At this time, the
Commission has suspended access to the Commission's Public Reference
Room, due to the proclamation declaring a National Emergency concerning
the Novel Coronavirus Disease (COVID-19), issued by the President on
March 13, 2020. For assistance, contact the Federal Energy Regulatory
Commission at [email protected] or call toll-free, (886) 208-
3676 or TYY, (202) 502-8659.
Any questions concerning this application may be directed to
Richard Bralow, Sr. Legal Counsel, ANR Pipeline Company, 700 Louisiana
Street, Suite 700, Houston, Texas 77002, by phone (832) 320-5177, or by
email [email protected].
Pursuant to section 157.9 of the Commission's rules (18 CFR 157.9),
within 90 days of this Notice, the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule will serve to
notify federal and state agencies of the timing for the completion of
all necessary reviews, and the subsequent need to complete all federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit five copies of filings made with the Commission and must mail a
copy to the applicant and to every other party in the proceeding. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list and will be
notified of meetings associated with the Commission's environmental
review process. Environmental commenters will not be required to serve
copies of filed documents on all other parties. However, the non-party
commenters will not receive copies of all documents filed by other
parties or issued by the Commission and will not have the right to seek
court review of the Commission's final order.
As of the February 27, 2018 date of the Commission's order in
Docket No. CP16-4-001, the Commission will apply its revised practice
concerning out-of-time motions to intervene in any new NGA section 3 or
section 7 proceeding.\1\ Persons desiring to become a party to a
certificate proceeding are to intervene in a timely manner. If seeking
to intervene out-of-time, the movant is required to show good cause why
the time limitation should be waived, and should provide justification
by reference to factors set forth in Rule 214(d)(1) of the Commission's
Rules and Regulations.\2\
---------------------------------------------------------------------------
\1\ Tennessee Gas Pipeline Company, L.L.C., 162 FERC 61,167 at
50 (2018).
\2\ 18 CFR 385.214(d)(1).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using
[[Page 41031]]
the eFiling link at https://www.ferc.gov. Persons unable to file
electronically may mail similar pleadings to the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand
delivered submissions in docketed proceedings should be delivered to
Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland
20852.
Comment Date: 5:00 p.m. Eastern Standard Time on July 22, 2020.
Dated: July 1, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-14664 Filed 7-7-20; 8:45 am]
BILLING CODE 6717-01-P