Great Lakes Gas Transmission Limited Partnership; Notice of Application, 41030-41031 [2020-14664]

Download as PDF 41030 Federal Register / Vol. 85, No. 131 / Wednesday, July 8, 2020 / Notices to the following revised Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. Milestone Filing of recommendations, preliminary terms and conditions, and preliminary fishway prescriptions. Commission issues Draft EA or EIS. Comments on Draft EA or EIS. Modified Terms and Conditions. Commission Issues Final EA or EIS. Target date August 2020. April 2021. May 2021. July 2021. October 2021. p. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of this notice. q. A license applicant must file no later than 60 days following the date of issuance of the notice of acceptance and ready for environmental analysis provided for in 5.22: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. Dated: July 1, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–14665 Filed 7–7–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP20–485–000] jbell on DSKJLSW7X2PROD with NOTICES Great Lakes Gas Transmission Limited Partnership; Notice of Application Take notice that on June 22, 2020, Great Lakes Gas Transmission Limited Partnership (GLGT), 700 Louisiana Street, Suite 700, Houston, Texas 77002, filed in Docket No. CP20–485–000 an application pursuant to section 7(b) of the Natural Gas Act (NGA) requesting authorization to abandon firm capacity by a lease agreement with ANR Pipeline Company (ANR). This application is related to application filed by ANR in Docket No. CP20–484–000 to construct and operate the Alberta Xpress Project including the authorization to acquire firm capacity from GLGT pursuant to the capacity lease agreement between GLGT and ANR dated June 19, 2020. In addition to publishing the full text of this document in the Federal VerDate Sep<11>2014 17:17 Jul 07, 2020 Jkt 250001 Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this application may be directed to Richard Bralow, Sr. Legal Counsel, ANR Pipeline Company, 700 Louisiana Street, Suite 700, Houston, Texas 77002, by phone (832) 320–5177, or by email Richard_bralow@tcenergy.com. Pursuant to section 157.9 of the Commission’s rules (18 CFR 157.9), within 90 days of this Notice, the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the PO 00000 Frm 00069 Fmt 4703 Sfmt 4703 Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit five copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission and will not have the right to seek court review of the Commission’s final order. As of the February 27, 2018 date of the Commission’s order in Docket No. CP16–4–001, the Commission will apply its revised practice concerning out-of-time motions to intervene in any new NGA section 3 or section 7 proceeding.1 Persons desiring to become a party to a certificate proceeding are to intervene in a timely manner. If seeking to intervene out-of-time, the movant is required to show good cause why the time limitation should be waived, and should provide justification by reference to factors set forth in Rule 214(d)(1) of the Commission’s Rules and Regulations.2 The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using 1 Tennessee Gas Pipeline Company, L.L.C., 162 FERC 61,167 at 50 (2018). 2 18 CFR 385.214(d)(1). E:\FR\FM\08JYN1.SGM 08JYN1 Federal Register / Vol. 85, No. 131 / Wednesday, July 8, 2020 / Notices the eFiling link at https://www.ferc.gov. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. Comment Date: 5:00 p.m. Eastern Standard Time on July 22, 2020. Dated: July 1, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–14664 Filed 7–7–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission jbell on DSKJLSW7X2PROD with NOTICES Combined Notice of Filings # Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP17–913–004. Applicants: Natural Gas Pipeline Company of America. Description: Compliance filing NGPL Fuel Transparency Report Informational Filing. Filed Date: 6/30/20. Accession Number: 20200630–5153. Comments Due: 5 p.m. ET 7/13/20. Docket Numbers: RP20–972–000. Applicants: Texas Eastern Transmission, LP. Description: § 4(d) Rate Filing: Negotiated Rates—Chevron 911109 Releases eff 07–01–20 to be effective 7/ 1/2020. Filed Date: 6/30/20. Accession Number: 20200630–5045. Comments Due: 5 p.m. ET 7/13/20. Docket Numbers: RP20–973–000. Applicants: NEXUS Gas Transmission, LLC. Description: § 4(d) Rate Filing: Negotiated Rates—Columbia Gas 860005 7–1–2020 releases to be effective 7/1/ 2020. Filed Date: 6/30/20. Accession Number: 20200630–5046. Comments Due: 5 p.m. ET 7/13/20. Docket Numbers: RP20–974–000. Applicants: Algonquin Gas Transmission, LLC. Description: § 4(d) Rate Filing: Negotiated Rates—Various Releases eff 7–1–20 to be effective 7/1/2020. Filed Date: 6/30/20. Accession Number: 20200630–5053. Comments Due: 5 p.m. ET 7/13/20. Docket Numbers: RP20–975–000. VerDate Sep<11>2014 17:17 Jul 07, 2020 Jkt 250001 Applicants: Northern Natural Gas Company. Description: § 4(d) Rate Filing: 20200630 Negotiated Rate to be effective 7/1/2020. Filed Date: 6/30/20. Accession Number: 20200630–5061. Comments Due: 5 p.m. ET 7/13/20. Docket Numbers: RP20–976–000. Applicants: Natural Gas Pipeline Company of America. Description: § 4(d) Rate Filing: Negotiated Rate Agreement Filing— Devon Gas Services to be effective 7/1/ 2020. Filed Date: 6/30/20. Accession Number: 20200630–5095. Comments Due: 5 p.m. ET 7/13/20. Docket Numbers: RP20–977–000. Applicants: Natural Gas Pipeline Company of America. Description: § 4(d) Rate Filing: Amendment to a Negotiated Rate Agreement Filing-Lucid Energy to be effective 7/1/2020. Filed Date: 6/30/20. Accession Number: 20200630–5103. Comments Due: 5 p.m. ET 7/13/20. Docket Numbers: RP20–978–000. Applicants: Cheyenne Connector, LLC. Description: § 4(d) Rate Filing: CC 2020–06–30 Administrative Changes to be effective 8/1/2020. Filed Date: 6/30/20. Accession Number: 20200630–5109. Comments Due: 5 p.m. ET 7/13/20. Docket Numbers: RP20–979–000. Applicants: Rockies Express Pipeline LLC. Description: § 4(d) Rate Filing: REX 2020–06–30 Administrative Changes to be effective 8/1/2020. Filed Date: 6/30/20. Accession Number: 20200630–5112. Comments Due: 5 p.m. ET 7/13/20. Docket Numbers: RP20–980–000. Applicants: East Tennessee Natural Gas, LLC. Description: § 4(d) Rate Filing: ETNG Section 4 Rate Case to be effective 8/1/ 2020. Filed Date: 6/30/20. Accession Number: 20200630–5156. Comments Due: 5 p.m. ET 7/13/20. Docket Numbers: RP20–981–000. Applicants: Natural Gas Pipeline Company of America. Description: § 4(d) Rate Filing: Limited Section 4 to Adjust Fuel Gas and Lost and Unaccounted For Retention Fact to be effective 8/1/2020. Filed Date: 6/30/20. Accession Number: 20200630–5158. Comments Due: 5 p.m. ET 7/13/20. Docket Numbers: RP20–982–000. Applicants: Gulf South Pipeline Company, LLC. PO 00000 Frm 00070 Fmt 4703 Sfmt 4703 41031 Description: § 4(d) Rate Filing: Cap Rel Neg Rate Agmts (Atlanta Gas 8438 releases eff 7–1–2020) to be effective 7/ 1/2020. Filed Date: 6/30/20. Accession Number: 20200630–5164. Comments Due: 5 p.m. ET 7/13/20. Docket Numbers: RP20–983–000. Applicants: Gulf South Pipeline Company, LLC. Description: § 4(d) Rate Filing: Remove Expired Agreements eff 7/1/ 2020 to be effective 7/1/2020. Filed Date: 6/30/20. Accession Number: 20200630–5162. Comments Due: 5 p.m. ET 7/13/20. Docket Numbers: RP20–984–000. Applicants: Dominion Energy Transmission, Inc. Description: § 4(d) Rate Filing: DETI— June 30, 2020 Negotiated Rate and Nonconforming Service Agreements to be effective 8/1/2020. Filed Date: 6/30/20. Accession Number: 20200630–5171. Comments Due: 5 p.m. ET 7/13/20. Docket Numbers: RP20–985–000. Applicants: Columbia Gulf Transmission, LLC. Description: Compliance filing Compliance to Settlement in RP20–177– 000 Implement Rates to be effective 8/ 1/2020. Filed Date: 6/30/20. Accession Number: 20200630–5176. Comments Due: 5 p.m. ET 7/13/20. Docket Numbers: RP20–986–000. Applicants: Transcontinental Gas Pipe Line Company, LLC. Description: § 4(d) Rate Filing: Negotiated Rates—Cherokee AGL— Replacement Shippers—Jul 2020 to be effective 7/1/2020. Filed Date: 6/30/20. Accession Number: 20200630–5245. Comments Due: 5 p.m. ET 7/13/20. Docket Numbers: RP20–987–000. Applicants: Northern Natural Gas Company. Description: § 4(d) Rate Filing: 20200630 Non Conforming to be effective 7/30/2020. Filed Date: 6/30/20. Accession Number: 20200630–5290. Comments Due: 5 p.m. ET 7/13/20. Docket Numbers: RP20–988–000. Applicants: Texas Eastern Transmission, LP. Description: § 4(d) Rate Filing: TETLP EPC AUG 2020 FILING to be effective 8/ 1/2020. Filed Date: 6/30/20. Accession Number: 20200630–5293. Comments Due: 5 p.m. ET 7/13/20. Docket Numbers: RP20–989–000. Applicants: Texas Eastern Transmission, LP. E:\FR\FM\08JYN1.SGM 08JYN1

Agencies

[Federal Register Volume 85, Number 131 (Wednesday, July 8, 2020)]
[Notices]
[Pages 41030-41031]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-14664]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP20-485-000]


Great Lakes Gas Transmission Limited Partnership; Notice of 
Application

    Take notice that on June 22, 2020, Great Lakes Gas Transmission 
Limited Partnership (GLGT), 700 Louisiana Street, Suite 700, Houston, 
Texas 77002, filed in Docket No. CP20-485-000 an application pursuant 
to section 7(b) of the Natural Gas Act (NGA) requesting authorization 
to abandon firm capacity by a lease agreement with ANR Pipeline Company 
(ANR). This application is related to application filed by ANR in 
Docket No. CP20-484-000 to construct and operate the Alberta Xpress 
Project including the authorization to acquire firm capacity from GLGT 
pursuant to the capacity lease agreement between GLGT and ANR dated 
June 19, 2020.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://ferc.gov) using the 
eLibrary link. Enter the docket number excluding the last three digits 
in the docket number field to access the document. At this time, the 
Commission has suspended access to the Commission's Public Reference 
Room, due to the proclamation declaring a National Emergency concerning 
the Novel Coronavirus Disease (COVID-19), issued by the President on 
March 13, 2020. For assistance, contact the Federal Energy Regulatory 
Commission at [email protected] or call toll-free, (886) 208-
3676 or TYY, (202) 502-8659.
    Any questions concerning this application may be directed to 
Richard Bralow, Sr. Legal Counsel, ANR Pipeline Company, 700 Louisiana 
Street, Suite 700, Houston, Texas 77002, by phone (832) 320-5177, or by 
email [email protected].
    Pursuant to section 157.9 of the Commission's rules (18 CFR 157.9), 
within 90 days of this Notice, the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule will serve to 
notify federal and state agencies of the timing for the completion of 
all necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit five copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list and will be 
notified of meetings associated with the Commission's environmental 
review process. Environmental commenters will not be required to serve 
copies of filed documents on all other parties. However, the non-party 
commenters will not receive copies of all documents filed by other 
parties or issued by the Commission and will not have the right to seek 
court review of the Commission's final order.
    As of the February 27, 2018 date of the Commission's order in 
Docket No. CP16-4-001, the Commission will apply its revised practice 
concerning out-of-time motions to intervene in any new NGA section 3 or 
section 7 proceeding.\1\ Persons desiring to become a party to a 
certificate proceeding are to intervene in a timely manner. If seeking 
to intervene out-of-time, the movant is required to show good cause why 
the time limitation should be waived, and should provide justification 
by reference to factors set forth in Rule 214(d)(1) of the Commission's 
Rules and Regulations.\2\
---------------------------------------------------------------------------

    \1\ Tennessee Gas Pipeline Company, L.L.C., 162 FERC 61,167 at 
50 (2018).
    \2\ 18 CFR 385.214(d)(1).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using

[[Page 41031]]

the eFiling link at https://www.ferc.gov. Persons unable to file 
electronically may mail similar pleadings to the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand 
delivered submissions in docketed proceedings should be delivered to 
Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 
20852.
    Comment Date: 5:00 p.m. Eastern Standard Time on July 22, 2020.

    Dated: July 1, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-14664 Filed 7-7-20; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.