Combined Notice Filings #1, 40638-40639 [2020-14549]
Download as PDF
40638
Federal Register / Vol. 85, No. 130 / Tuesday, July 7, 2020 / Notices
subject to Commission oversight, or the
Commission can independently enforce
Reliability Standards.2
On February 3, 2006, the Commission
issued Order No. 672, implementing
section 215 of the FPA.3 Pursuant to
Order No. 672, the Commission certified
one organization, North American
Electric Reliability Corporation (NERC),
as the ERO.4 The Reliability Standards
developed by the ERO and approved by
the Commission apply to users, owners
and operators of the Bulk-Power System
as set forth in each Reliability Standard.
On February 7, 2020, the North
American Electric Reliability
Corporation filed a petition seeking
approval of proposed Reliability
Standard TPL–007–4 (Transmission
System Planned Performance for
Geomagnetic Disturbance Events).
NERC’s filed petition was noticed on
February 11, 2020, with interventions,
comments and protests due on or before
March 9, 2020. No interventions or
comments were received.
The DLO was issued on March 19,
2020. The standard goes in effect at
NERC on October 1, 2020.
On April 16, 2020, the Commission
published a Notice in the Federal
Register in Docket No. RD20–3–000
requesting public comments. The
Commission received no public
comment(s) which is addressed here
and in the related submittal to OMB.
Type of Respondents: Generator
Owner, Planning Coordinator,
Distribution Provider and Transmission
Owners.
Estimate of Annual Burden: 5 Our
estimates are based on the NERC
Compliance Registry Summary of
Entities as of January 31, 2020.
The individual burden estimates
include the time needed to gather data,
run studies, and analyze study results.
These are consistent with estimates for
similar tasks in other Commissionapproved standards. Estimates for the
additional average annual burden and
cost 6 as proposed in Docket No. RD20–
3–000 follow:
FERC–725N IN DOCKET NO. RD20–3–000
Annual
number 1 of
respondents
Annual
number of
responses per
respondent
Total
number of
responses
Average
burden hrs. & Cost
($) per response
Total annual
burden hours & cost
($) (rounded)
Cost per
respondent
($)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1)
GO 7 ...................
PC 8 ....................
DP 9 ....................
TO 10 ..................
969
71
318
321
1
1
1
1
969
71
318
321
Total ............
............................
............................
1,679
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: June 30, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–14533 Filed 7–6–20; 8:45 am]
BILLING CODE 6717–01–P
2 16
U.S.C. 824o(e)(3).
Concerning Certification of the Electric
Reliability Organization; and Procedures for the
Establishment, Approval, and Enforcement of
Electric Reliability Standards, Order No. 672, FERC
Stats. & Regs. 31,204, order on reh’g, Order No.
672–A, FERC Stats. & Regs. 31,212 (2006).
4 North American Electric Reliability Corp., 116
FERC ¶ 61,062, order on reh’g and compliance, 117
FERC 61,126 (2006), order on compliance, 118
jbell on DSKJLSW7X2PROD with NOTICES
3 Rules
VerDate Sep<11>2014
16:59 Jul 06, 2020
Jkt 250001
40
40
40
40
hours; $3,200 ...
hours; $3,200 ...
hours & $3,200
hours & $3,200
38,760 hours; $3,100,800 ..
2,840 hours; $ 227,200 ......
12,720 hours; $1,017,600 ..
12,840 hours; $1,027,200 ..
$3,200
3,200
3,200
3,200
...............................
67,160 hours; $5,372,800 ..
....................
Generation, LLC, Bath County Energy,
LLC, Bolt Energy Marketing, LLC,
Federal Energy Regulatory
Buchanan Energy Services Company,
Commission
LLC, Buchanan Generation, LLC,
Chambersburg Energy, LLC, Columbia
Combined Notice Filings #1
Energy LLC, Doswell Limited
Partnership, Gans Energy, LLC, Helix
Take notice that the Commission
Ironwood, LLC, Helix Maine Wind
received the following electric rate
Development, LLC, Helix Ravenswood,
filings:
LLC, LifeEnergy, LLC, LSP University
Docket Numbers: ER10–2739–026;
Park, LLC, Ocean State Power LLC,
ER10–1631–015; ER10–1854–015;
Riverside Generating Company, L.L.C.,
ER10–1892–013; ER10–2678–016;
Rockford Power, LLC, Rockford Power
ER10–2729–010; ER10–2744–016;
II, LLC, Seneca Generation, LLC,
ER11–3320–015; ER11–3321–009;
Springdale Energy, LLC, Troy Energy,
ER13–2316–013; ER14–1219–010;
LLC, University Park Energy, LLC,
ER14–19–014; ER14–2548–007; ER16–
Wallingford Energy LLC, West Deptford
1652–014; ER16–1732–009; ER16–2405– Energy, LLC, Yards Creek Energy, LLC.
009; ER16–2406–010; ER17–1946–008;
Description: Updated Market Power
ER17–1947–003; ER17–1948–003;
Analysis for the Northeast Region of the
ER17–989–008; ER17–990–008; ER17–
LS Northeast MBR Sellers.
992–008; ER17–993–008; ER18–95–005;
Filed Date: 6/26/20.
ER20–1440–001; ER20–660–001.
Accession Number: 20200626–5422.
Applicants: LS Power Marketing, LLC,
Comments Due: 5 p.m. ET 8/25/20.
Armstrong Power, LLC, Aurora
DEPARTMENT OF ENERGY
FERC 61,190, order on reh’g, 119 FERC 61,046
(2007), aff’d sub nom. Alcoa Inc. v. FERC, 564 F.3d
1342 (D.C. Cir. 2009).
5 Burden is defined as the total time, effort, or
financial resources expended by persons to
generate, maintain, retain, or disclose or provide
information to or for a federal agency. See 5 CFR
1320 for additional information on the definition of
information collection burden.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
6 Commission staff estimates that the industry’s
skill set and cost (for wages and benefits) for FERC–
725N(1) are approximately the same as the
Commission’s average cost. The FERC 2019 average
salary plus benefits for one FERC full-time
equivalent (FTE) is $167,091/year (or $80.00/hour).
7 Generator Owner.
8 Planning Coordinator.
9 Distribution Provider.
10 Transmission Owner.
E:\FR\FM\07JYN1.SGM
07JYN1
jbell on DSKJLSW7X2PROD with NOTICES
Federal Register / Vol. 85, No. 130 / Tuesday, July 7, 2020 / Notices
Docket Numbers: ER10–2794–032;
ER12–1825–030; ER14–2672–017.
Applicants: EDF Trading North
America, LLC, EDF Energy Services,
LLC, EDF Industrial Power Services
(CA), LLC.
Description: Updated Market Power
Analysis for the Northeast Region of
EDF Trading North America, LLC, et al.
Filed Date: 6/29/20.
Accession Number: 20200629–5414.
Comments Due: 5 p.m. ET 8/28/20.
Docket Numbers: ER15–1456–009;
ER10–2934–015; ER10–2959–016;
ER11–2335–015; ER11–3859–020;
ER11–4634–009; ER14–1699–010;
ER15–1457–009; ER15–748–006; ER17–
436–008; ER18–920–005; ER19–464–
002; ER19–967–003; ER19–968–003.
Applicants: Beaver Falls, L.L.C.,
Chambers Cogeneration Limited
Partnership, Dighton Power, LLC,
Fairless Energy, L.L.C., Garrison Energy
Center LLC, Hazleton Generation LLC,
Logan Generating Company, LP,
Manchester Street, L.L.C., Marco DM
Holdings, L.L.C., Marcus Hook Energy,
L.P., Milford Power, LLC, Plum Point
Services Company, LLC, Syracuse,
L.L.C., Vermillion Power, L.L.C.
Description: Triennial Market Power
Update of Beaver Falls, L.L.C., et al.
Filed Date: 6/29/20.
Accession Number: 20200629–5472.
Comments Due: 5 p.m. ET 8/28/20.
Docket Numbers: ER15–1905–008.
Applicants: Amazon Energy, LLC.
Description: Triennial Market Power
Analysis for the Northeast Region of
Amazon Energy, LLC.
Filed Date: 6/26/20.
Accession Number: 20200626–5419.
Comments Due: 5 p.m. ET 8/25/20.
Docket Numbers: ER15–2013–011;
ER10–2435–018; ER10–2440–013;
ER10–2442–015; ER10–2444–017;
ER10–2446–013; ER10–2449–015;
ER10–3286–014; ER10–3299–013;
ER12–2510–010; ER12–2512–010;
ER15–2014–007; ER15–2018–006;
ER15–2022–006; ER15–2026–006;
ER18–2252–002; ER19–2250–003;
ER19–481–003.
Applicants: Talen Energy Marketing,
LLC, Brandon Shores LLC, Brunner
Island, LLC, Camden Plant Holding,
L.L.C., Dartmouth Power Associates
Limited Partnership, Elmwood Park
Power, LLC, H.A. Wagner LLC, LMBE
Project Company LLC, Martins Creek,
LLC, MC Project Company LLC,
Millennium Power Partners, LP,
Montour, LLC, New Athens Generating
Company, LLC, Newark Bay
Cogeneration Partnership, L.P,
Pedricktown Cogeneration Company LP,
Susquehanna Nuclear, LLC, York
Generation Company LLC, TrailStone
Energy Marketing, LLC.
VerDate Sep<11>2014
16:59 Jul 06, 2020
Jkt 250001
Description: Updated Market Power
Analysis for the Riverstone Northeast
MBR Sellers.
Filed Date: 6/29/20.
Accession Number: 20200629–5436.
Comments Due: 5 p.m. ET 8/28/20.
Docket Numbers: ER17–1314–003;
ER10–2398–009; ER10–2399–009;
ER10–2406–010; ER10–2408–006;
ER10–2409–009; ER10–2410–009;
ER10–2411–010; ER10–2412–010;
ER11–2935–011; ER13–1816–012;
ER14–1933–009; ER16–1152–004;
ER16–1724–006; ER17–1315–006;
ER18–1189–004; ER19–1281–001;
ER19–1282–002.
Applicants: Arkwright Summit Wind
Farm LLC, Blackstone Wind Farm, LLC,
Blackstone Wind Farm II LLC,
Headwaters Wind Farm LLC, High Trail
Wind Farm, LLC, Lexington Chenoa
Wind Farm LLC, Jericho Rise Wind
Farm LLC, Marble River, LLC, Meadow
Lake Wind Farm LLC, Meadow Lake
Wind Farm II LLC, Meadow Lake Wind
Farm III LLC, Meadow Lake Wind Farm
IV LLC, Meadow Lake Wind Farm V
LLC, Meadow Lake Wind Farm VI LLC,
Paulding Wind Farm II LLC, Paulding
Wind Farm III LLC, Paulding Wind
Farm IV LLC, Sustaining Power
Solutions LLC.
Description: Updated Market Power
Analysis for the Northeast Region of
Arkwright Summit Wind Farm LLC, et
al.
Filed Date: 6/26/20.
Accession Number: 20200626–5423.
Comments Due: 5 p.m. ET 8/25/20.
Docket Numbers: ER18–2399–003;
ER15–1147–003; ER18–1990–003;
ER19–1194–002.
Applicants: Canal Generating LLC,
Canal 3 Generating LLC, Stonepeak
Kestrel Energy Marketing LLC,
Bucksport Generation LLC.
Description: Updated Market Power
Analysis for the Northeast Region of
Canal Generating LLC, et al.
Filed Date: 6/29/20.
Accession Number: 20200629–5437.
Comments Due: 5 p.m. ET 8/28/20.
Docket Numbers: ER19–106–002.
Applicants: Birdsboro Power LLC.
Description: Triennial Compliance
Filing and Notice of Non-Material
Change in Status of Birdsboro Power
LLC.
Filed Date: 6/29/20.
Accession Number: 20200629–5399.
Comments Due: 5 p.m. ET 8/28/20.
Docket Numbers: ER19–1200–001;
ER10–2346–010; ER10–2353–010;
ER11–4351–010; ER19–842–001.
Applicants: Clearway Power
Marketing LLC, Energy Center Paxton
LLC, Forward WindPower LLC, Lookout
WindPower LLC, Pinnacle Wind, LLC.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
40639
Description: Updated Market Power
Analysis for the Northeast Region of the
Clearway Northeast MBR Sellers.
Filed Date: 6/25/20.
Accession Number: 20200625–5192.
Comments Due: 5 p.m. ET 8/25/20.
Docket Numbers: ER20–2014–000.
Applicants: Rattlesnake Flat, LLC.
Description: Supplement to June 8,
2020 Rattlesnake Flat, LLC tariff filing.
Filed Date: 6/25/20.
Accession Number: 20200625–5187.
Comments Due: 5 p.m. ET 7/6/20.
Docket Numbers: ER20–2239–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Kansas Power Pool Formula Rate to be
effective 9/1/2020.
Filed Date: 6/29/20.
Accession Number: 20200629–5433.
Comments Due: 5 p.m. ET 7/20/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 30, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–14549 Filed 7–6–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP20–865–001.
Applicants: Leaf River Energy Center
LLC.
Description: Compliance filing Leaf
River Energy Center LLC NAESB
Compliance Filing to be effective 6/25/
2020.
E:\FR\FM\07JYN1.SGM
07JYN1
Agencies
[Federal Register Volume 85, Number 130 (Tuesday, July 7, 2020)]
[Notices]
[Pages 40638-40639]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-14549]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2739-026; ER10-1631-015; ER10-1854-015; ER10-
1892-013; ER10-2678-016; ER10-2729-010; ER10-2744-016; ER11-3320-015;
ER11-3321-009; ER13-2316-013; ER14-1219-010; ER14-19-014; ER14-2548-
007; ER16-1652-014; ER16-1732-009; ER16-2405-009; ER16-2406-010; ER17-
1946-008; ER17-1947-003; ER17-1948-003; ER17-989-008; ER17-990-008;
ER17-992-008; ER17-993-008; ER18-95-005; ER20-1440-001; ER20-660-001.
Applicants: LS Power Marketing, LLC, Armstrong Power, LLC, Aurora
Generation, LLC, Bath County Energy, LLC, Bolt Energy Marketing, LLC,
Buchanan Energy Services Company, LLC, Buchanan Generation, LLC,
Chambersburg Energy, LLC, Columbia Energy LLC, Doswell Limited
Partnership, Gans Energy, LLC, Helix Ironwood, LLC, Helix Maine Wind
Development, LLC, Helix Ravenswood, LLC, LifeEnergy, LLC, LSP
University Park, LLC, Ocean State Power LLC, Riverside Generating
Company, L.L.C., Rockford Power, LLC, Rockford Power II, LLC, Seneca
Generation, LLC, Springdale Energy, LLC, Troy Energy, LLC, University
Park Energy, LLC, Wallingford Energy LLC, West Deptford Energy, LLC,
Yards Creek Energy, LLC.
Description: Updated Market Power Analysis for the Northeast Region
of the LS Northeast MBR Sellers.
Filed Date: 6/26/20.
Accession Number: 20200626-5422.
Comments Due: 5 p.m. ET 8/25/20.
[[Page 40639]]
Docket Numbers: ER10-2794-032; ER12-1825-030; ER14-2672-017.
Applicants: EDF Trading North America, LLC, EDF Energy Services,
LLC, EDF Industrial Power Services (CA), LLC.
Description: Updated Market Power Analysis for the Northeast Region
of EDF Trading North America, LLC, et al.
Filed Date: 6/29/20.
Accession Number: 20200629-5414.
Comments Due: 5 p.m. ET 8/28/20.
Docket Numbers: ER15-1456-009; ER10-2934-015; ER10-2959-016; ER11-
2335-015; ER11-3859-020; ER11-4634-009; ER14-1699-010; ER15-1457-009;
ER15-748-006; ER17-436-008; ER18-920-005; ER19-464-002; ER19-967-003;
ER19-968-003.
Applicants: Beaver Falls, L.L.C., Chambers Cogeneration Limited
Partnership, Dighton Power, LLC, Fairless Energy, L.L.C., Garrison
Energy Center LLC, Hazleton Generation LLC, Logan Generating Company,
LP, Manchester Street, L.L.C., Marco DM Holdings, L.L.C., Marcus Hook
Energy, L.P., Milford Power, LLC, Plum Point Services Company, LLC,
Syracuse, L.L.C., Vermillion Power, L.L.C.
Description: Triennial Market Power Update of Beaver Falls, L.L.C.,
et al.
Filed Date: 6/29/20.
Accession Number: 20200629-5472.
Comments Due: 5 p.m. ET 8/28/20.
Docket Numbers: ER15-1905-008.
Applicants: Amazon Energy, LLC.
Description: Triennial Market Power Analysis for the Northeast
Region of Amazon Energy, LLC.
Filed Date: 6/26/20.
Accession Number: 20200626-5419.
Comments Due: 5 p.m. ET 8/25/20.
Docket Numbers: ER15-2013-011; ER10-2435-018; ER10-2440-013; ER10-
2442-015; ER10-2444-017; ER10-2446-013; ER10-2449-015; ER10-3286-014;
ER10-3299-013; ER12-2510-010; ER12-2512-010; ER15-2014-007; ER15-2018-
006; ER15-2022-006; ER15-2026-006; ER18-2252-002; ER19-2250-003; ER19-
481-003.
Applicants: Talen Energy Marketing, LLC, Brandon Shores LLC,
Brunner Island, LLC, Camden Plant Holding, L.L.C., Dartmouth Power
Associates Limited Partnership, Elmwood Park Power, LLC, H.A. Wagner
LLC, LMBE Project Company LLC, Martins Creek, LLC, MC Project Company
LLC, Millennium Power Partners, LP, Montour, LLC, New Athens Generating
Company, LLC, Newark Bay Cogeneration Partnership, L.P, Pedricktown
Cogeneration Company LP, Susquehanna Nuclear, LLC, York Generation
Company LLC, TrailStone Energy Marketing, LLC.
Description: Updated Market Power Analysis for the Riverstone
Northeast MBR Sellers.
Filed Date: 6/29/20.
Accession Number: 20200629-5436.
Comments Due: 5 p.m. ET 8/28/20.
Docket Numbers: ER17-1314-003; ER10-2398-009; ER10-2399-009; ER10-
2406-010; ER10-2408-006; ER10-2409-009; ER10-2410-009; ER10-2411-010;
ER10-2412-010; ER11-2935-011; ER13-1816-012; ER14-1933-009; ER16-1152-
004; ER16-1724-006; ER17-1315-006; ER18-1189-004; ER19-1281-001; ER19-
1282-002.
Applicants: Arkwright Summit Wind Farm LLC, Blackstone Wind Farm,
LLC, Blackstone Wind Farm II LLC, Headwaters Wind Farm LLC, High Trail
Wind Farm, LLC, Lexington Chenoa Wind Farm LLC, Jericho Rise Wind Farm
LLC, Marble River, LLC, Meadow Lake Wind Farm LLC, Meadow Lake Wind
Farm II LLC, Meadow Lake Wind Farm III LLC, Meadow Lake Wind Farm IV
LLC, Meadow Lake Wind Farm V LLC, Meadow Lake Wind Farm VI LLC,
Paulding Wind Farm II LLC, Paulding Wind Farm III LLC, Paulding Wind
Farm IV LLC, Sustaining Power Solutions LLC.
Description: Updated Market Power Analysis for the Northeast Region
of Arkwright Summit Wind Farm LLC, et al.
Filed Date: 6/26/20.
Accession Number: 20200626-5423.
Comments Due: 5 p.m. ET 8/25/20.
Docket Numbers: ER18-2399-003; ER15-1147-003; ER18-1990-003; ER19-
1194-002.
Applicants: Canal Generating LLC, Canal 3 Generating LLC, Stonepeak
Kestrel Energy Marketing LLC, Bucksport Generation LLC.
Description: Updated Market Power Analysis for the Northeast Region
of Canal Generating LLC, et al.
Filed Date: 6/29/20.
Accession Number: 20200629-5437.
Comments Due: 5 p.m. ET 8/28/20.
Docket Numbers: ER19-106-002.
Applicants: Birdsboro Power LLC.
Description: Triennial Compliance Filing and Notice of Non-Material
Change in Status of Birdsboro Power LLC.
Filed Date: 6/29/20.
Accession Number: 20200629-5399.
Comments Due: 5 p.m. ET 8/28/20.
Docket Numbers: ER19-1200-001; ER10-2346-010; ER10-2353-010; ER11-
4351-010; ER19-842-001.
Applicants: Clearway Power Marketing LLC, Energy Center Paxton LLC,
Forward WindPower LLC, Lookout WindPower LLC, Pinnacle Wind, LLC.
Description: Updated Market Power Analysis for the Northeast Region
of the Clearway Northeast MBR Sellers.
Filed Date: 6/25/20.
Accession Number: 20200625-5192.
Comments Due: 5 p.m. ET 8/25/20.
Docket Numbers: ER20-2014-000.
Applicants: Rattlesnake Flat, LLC.
Description: Supplement to June 8, 2020 Rattlesnake Flat, LLC
tariff filing.
Filed Date: 6/25/20.
Accession Number: 20200625-5187.
Comments Due: 5 p.m. ET 7/6/20.
Docket Numbers: ER20-2239-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: Kansas Power Pool Formula
Rate to be effective 9/1/2020.
Filed Date: 6/29/20.
Accession Number: 20200629-5433.
Comments Due: 5 p.m. ET 7/20/20.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: June 30, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-14549 Filed 7-6-20; 8:45 am]
BILLING CODE 6717-01-P